1. experience and devices needed No one shall attempt to climb the tower and operate or maintain wind turbines without the necessary skills experience tools and safety equipment 4 2 It is essential for the reader to be familiar with the manual before preparing the site installing equipment operating the system or servicing any equipment 4 3 The site shall be prepared maintained operated and managed to allow work to be performed safely and efficiently Special care shall be given to installing operating and maintaining the generator system under unusual conditions such as lightning high winds or icing where applicable If you have any operation or service related questions please contact us 4 4 Prepare batteries inject acid and charge if the attached instruction specified 4 5 Open the crates and check the packing list to confirm that all items have been received The items shall be inspected for damage 4 6 Choosing a good place with good conditions To reduce wire loss reduce the distance from the wind generator to the batteries or electrical cabinet The wire shall be bigger for long distance while the distance is within 100 meters 5 INSTALLATION Please install wind generator system when wind scale is less than Force 2 ie 4 7 mph 5 1 Tower Assembly Place lower mast and middle mast on level ground clean the flanges make the masts in one line put silicon glue on contact surfaces for better sealing Insert bolt
2. and repair increase proper load shutdown to check detect and solve check and solve check and replace align gap and tighten check and repair tighten replace tighten shutdown and solve then start CON gt 1 shutdown and check 2 align load and output relation 3 keep good tightness Proper bearing gap is 0 2mm 4 align verticality lt 100mm on top 5 align to let tail turn 80 6 check and repair replace 1 check and solve 2 increase bleeder capacity 3 check and repair brake torque shall be more than 350Nm 13 APPENDIX A w CT ioe 14 APPENDIX B Batteries 1 Wind Generator Bleeder Inverter Wind Generator System Off grid Wind Generator System Grid tie 220 3 phase 380
3. gap or replace 2 tail vane not back position 2 check and solve orientation 1 blade angle too big 1 align as per requirement Slow wind rotor 2 generator bearing worn 2 check and replace 12 revolution 4 Serious Oscillation 5 Serious Noise 6 Wind rotor over speed even exceed rated speed 7 not shutdown output cable short circuit load brake device not release blade mounting bolts loose blades coated with ice blades missing output circuit phase loss nacelle bearing worn or damaged tail vane bearing worn or damaged stiff brake system too light load in yawing over speed running in gale without load fasteners loosing nose cone hub blades mounting bolts etc unbalance output from generator generator bearing loose or damaged nacelle bearing loose or damaged brake system to tight parts in nacelle loose tail vane bearing loose tail grid mounting bolts loose wind rotor over speed run in free load condition too light load nacelle bearing too tight mast not upright yaw angle not enough Stiff tail vane bearing 1 controlling system faults bleeder can not start in time 2 weak bleeder 3 yawing device and brake system out of work 3 check and solve 4 align voltage and loading point 5 check and solve 1 replace and tighten with proper torque 2 remove ice and align balance repair blades check and solve tighten or replace check
4. joints of mast segments bolts in the joint of nacelle shaft and upper mast hub mounting bolts blades mounting bolts nose cone bolts bolts to mounting generator on nacelle round nuts on nacelle bolts and upper lower nuts amp bolts on tail vane pin 8 1 2 Undergone initial strong wind Inspection work mentioned in 7 1 shall be done if the generator system has undergone strong wind 25m s for the fist time 8 1 3Annual Inspection Annual inspection is necessary If following parts are detected to be loose they shall be replaced with new parts and be tightened with proper torque nuts on anchor bolts bolts in the joints of mast segments bolts in the joint of nacelle shaft and upper mast hub mounting bolts blades mounting bolts nose cone bolts bolts to mounting generator on nacelle round nuts on nacelle bolts and upper lower nuts amp bolts on tail vane pin 8 2 Welding Seams inspection 8 2 1 After 1000 hours running inspect seams in mast assembly pay extra attention to mast root coupling flange and mast top flange hub and tail beams to detect if any cracks or defects 8 2 2 After 5000 hours running inspect all welding seams to detect if any cracks or defects 8 2 3 Inspection work mentioned in 7 2 1 shall be done if the generator system undergone strong wind 8 3 Yawing Device Inspection 8 3 1 Frequently check if the wind generator yawing device runs smoothly or not Use manual handle or electrical winch to turn t
5. 10KW Grid tie Wind Generator USER S MANUAL Contents 1 Main Parts 1 1 3 2 Safety Guideline 2 3 3 Foundation 4 4 Preparation 4 5 Installation 5 6 Electrical 9 7 Specifications 9 8 Maintenance 11 9 Trouble Shooting 12 Appendix A 14 Appendix 15 1 Main Parts 1 Tail vane 2 Nacelle 3 Wind R
6. aged in flange coupling Each bolt shall with a spring washer the bolts shall be tightened with proper torque Then set the nacelle stable 5 3 Tail Vane Installation 5 3 1 Assembly straight tail beam bent tail beam rain cover pulley pulley shroud tail rod tail grid and tail plate together Put the tubular pin 50X190 through pulley and pulley shroud install them on the tail rod Note for pulley shroud the side with plate shall be on top side e Put the straight beam upside and the bent beam downside align proper position and insert bolt M27X410 with washer Put nut but do not tighten Use 4 M10X25 bolts to fix rain cover on straight beam through 4 M10 screw holes e Use stainless steel bolts M10X70 plate washers spring washer and self lock nuts to fix tail skid grid on tail plate Fix the vane plate with stainless steel bolts M10X35 The big plate washers and spring washers shall be used on right side of tail rod plate and tail grid Use self tight nut and tighten them with proper torque Put the tail vane right side up lift the vane assembly and move it approaching the nacelle Let the 6 tail beams astride on nacelle with 2 50holes near two spherical bearings on nacelle tail Insert tail from tail beam side tighten the M16X30 bolts with holes Fix these two bolts with stainless steel wire and then tighten 4 M8 Allen bolts on upper and lower spherical bearings inner ring Lock the tail pin up
7. amps and with good conduction To avoid corrosion please coat protective grease on leads and joints Connecting generator output cables 3 phases to AC terminals on electrical cabinet For different users the electrical cabinet is equipped with AC and DC output terminals Choose correct terminals to avoid hazards Please take wind conditions load and batteries capacity into account do not over discharge or charge batteries for this may short the service life 6 2 If a grid connected converter is used please connect wire as appendix B The wind generator output DC voltage shall be in inverter input voltage range The controllers shall be equipped with bleeder load that is three times larger than generator rated output power Over speed and over load stop control system or devices shall be installed 7 SPECIFICATIONS Rotor Diameter m Blades Material Quantity Rated Power Max Power KW Rated Wind Speed m s Start Wind Speed m s Normal Working Speed m s Voltage V DC500V AC380V Generator Type Permanent Magnetic 3 phases AC Charging Method 3 Phase full wave rectify constant voltage charging Tower Height m Weighi kg Machine Above Tower Weight 10 8 MAINTENANCE 8 1 Fasteners inspection 8 1 1After one month s running After one month s running all fasteners shall be checked if any fasteners are loose tighten with proper torque Pay extra attention to nuts on anchor bolts bolts in the
8. ast assembly vertical and tighten the nuts It is critical that bolts be equally tightened in a sequential pattern diametrically opposed to each other The proper torque is 380 400Nm 5 7 4 crane is not available the user can set up two scaffolds which are 2 3m higher than the mast assembly and let them 4m aside Fix one H steel bar with two end on top of two scaffolds Install working platform and prepare hoist chain pulley and chain blocks First assemble erect and fix mast assembly on foundation then install the nacelle tail vane and rotor 5 8 Brake and Yawing Device Installation 5 8 1 Install winch and connect wire 5 8 2 Commission hydraulic brake device 5 8 3 Add brake oil and press driving cylinder then loose drain screw Repeat this process to drain out air in driving and driven cylinders then tighten the drain screw It should be like this when you push the brake handle the handle travel little distance you can feel the hydraulic resistance Turn the wind rotor and check the brake torque It shall be more than 350Nm But when the brake is released the rotor shall run when wind speed exceed 4m s 6 ELECTRICAL CONNECTION 6 1 If batteries are used please Join batteries in series The lead wire and connecting wire shall be with rubber covered cooper wire The conducting section shall be more than 16 m Put red mark on positive pole while put black mark 9 on negative pole All joints shall be connected with cl
9. eck if any overheated indications Every 3000 hours the contact surface shall be cleaned and grinded Over worn brushes shall be replaced with new ones New carbon brushes need run in before use The effective ratio of contact surface between the brushes and slide ring shall exceed 90 8 6 Brake System Inspection 8 6 1 Check oil system from driving cylinder to driven cylinder if any oil leakage 8 6 2 After initial 1000 hours running the oil level shall be checked After this every 3000 hours this check shall be performed 8 6 3 After every 3000 hours check the conditions of brake disc and brake shoes Check the brake torque the brake torque shall be more than 350 Nm 8 7 Lubrication 8 1 Use grease gun to inject grease into nacelle upper lower oil holes tail vane spherical oil holes two 8 2 Add lubricating oil to pulleys and winch after every 3000 hours running 8 3 Clean maintain and lubricate generator after every 20000 hours running Use high class lithium base grease 9 TROUBLE SHOOTING bad blade angle 1 align as per requirement uneven wind rotor even 2 do static balance blades dropped down detection wind rotor not start torque too big detect generator torque start in 4m s generator output short find short circuit place wind circuit too early load find stiff place stiff brake system check nacelle shaft align wind rotor not facing wind tightness 2 Seen 1 nacelle bearing stiff 1 align bearing
10. he tail vane 45 60 to check if the system is stiff Release the winch and the tail vane shall back to position 8 3 2 After 1000 hours running the user shall check the pulley system to check if the pulley run freely or not add lubricating oil if necessary to check if the steel wire joints are firm or not to check if the steel wire is damaged or seriously worn If the steel wire is damaged please replace if any pulley is stiff please dismantle is and repair 8 4 Oscillation Detection The wind generator shall not oscillate seriously in operation otherwise please shutdown and check 8 4 1 Check the rotor if any blades mounting bolts are loose or missing if any visible defects and cracks in blades Pay extra attention to blade roots and tips Static balancing shall be G2 5 G6 3 while unbalance shall be 25gm 63gm face run out shall not exceed 30mm tip angle difference in 3 blades shall not exceed 0 5 11 8 4 2 Check the generator Oscillation can be caused of phase loss Please check 3 phases output voltage 8 4 3 Check brake system ifthere are any distortion displacement unequal worn out missing parts or stiff moving 8 5 Generator Output Circuit Inspection 8 5 1 Check 3 output cables if they are firmly fixed in nacelle and cable cover damaged or not 8 5 2 Check 3 cable leads if they are firmly fixed with carbon brushes and well contacted 8 5 3 Check 6 carbon brushes are well contacted with slide ring or not Ch
11. ments For each segment the standard length is 3m The sequence shall be from mast assembly top to bottom If the mast assembly is in 15m the ladder includes 3 segments in 3m and 1 segment in 2 12m The segment in standard length shall be fixed with M16X40 bolts If the mast assembly height is not in 15m the remainder length will be the bottom section length Use 2 4 16 40 bolts to fix it 5 6 2 Mount 5 brackets on upper mast Each bracket shall be fixed by 4 M16X40 bolts To install platform smoothly it s better not to tighten the 4 M16X40 bolts before all bolts are inserted in position 5 7 Wind Generator System Erection All lifting devices should be inspected for integrity suitability for purpose and correct attachment before lifting A designated person should be clearly identified as the lift coordinator The lift coordinator should direct all equipment and personnel during the lift Supplementary radio contact is strongly recommended 5 7 1 Fasten the position pins in anchor bolts 5 7 2 Tie the lifting belt on mast assembly top flange lift the wind generator system slowly The nacelle and the tail vane shall not be used for lifting Avoid cables at mast bottom end being 8 damaged 5 7 3 Use Allen key to take position pins out and put nuts on Adjust 48 nuts up and beneath the anchor bolts template let the mast assembly upright against level The verticality tolerance shall be 0 002Xmast assembly height Keep the m
12. otor 4 Mast assembly Tower 1 Nacelle Arm 2 Hydraulic Brake Device 3 Nacelle Shaft 4 Winch 5 Wicket 2 SAFETY GUIDLINE This chapter indicates some rules you should follow while using The generator shall be stopped when the wind speed is more than 25m s The tower should not be installed near unprotected power lines All electric wires and cables should be considered dangerous Do not let the generator run free of load when wind speed exceeds 8m s Do not approach wind generator when the air vane is rotating If any abnormal noises or serious oscillation are detected please stop the generator and check The AC output cables shall be laid separately do not lay out with other cables In the process of assembling wind power system with batteries you must connect the batteries then connect the generator output cables in disassembly you must disconnect the generator output cables 3 then disconnect the batteries The ON OFF switch on electrical cabinet or separate Shorting switch shall be in ON position The function of this switch is to pause the generator to defend damaging gale or typhoon If the wind speed is under 5m s and the wind vane is turning slowly you can switch ON but do not switch when wind speed is high The batteries shall be installed in some place away from heat or fire Keep good venting so the gas created in charging can be dispersed The tail vane is equipped with gale protec
13. per end with 2 45 1 5 round nuts and lock washer Finally tighten 2 M27X410 bolts with proper torque 5 3 2 Mount brake arm on tail pin tighten 2 M12X35 bolts 5 3 3 Turn the nacelle let the rotor shaft up Fix the nacelle with frame and put the tail vane on wood plate 5 4 Nacelle Arm Installation 5 4 1 Mount the nacelle arm assembly on nacelle and fix 6 M16X30 bolts with spring washers 5 4 2 Open the nacelle upper cover untie the steel wire Let the steel wire end passing through pulley 1 pulley 2 and pulley 3 fasten the end to the flexible ring on nacelle arm The steel wire bush shall be tightened with 2 wire clamps 5 4 3 Close the upper cover tighten 2 M10X25 bolts 5 5 Blades Installation 5 5 1 Mount rotor hub on rotor shaft put washer and lock washer and then tighten the nuts with proper torque For the convenience of inspection in future mark the nuts with colored paint 5 5 2 Mount the blades and nose cone frame on rotor hub with 130 150Nm torque The blots to fix 7 blade shall be with special plate washer and special spring washer Paste waterproof glue on blade root gaps and bolts amp washers in inner side of hub flange 5 5 3 Mount nose cone Use 6 M10X25 bolts with spring washers and big size plate washers To avoid rotor rotating during assembly process please short circuit 3 phases output cables 5 6 Working Ladder amp Platform Installation 5 6 1 The working ladder consists of several seg
14. s and tighten nuts to couple the upper mast flange and middle mast flange Note Please tighten all nuts and bolts with socket wrenches and with proper torque do not damage their coating to avoid corrosion It is critical that bolts be equally tightened a sequential pattern diametrically opposed to each other 5 2 Nacelle Hub Assembly 5 2 1 Make the mast assembly on ground level keep the side with holes for access ladder up Put the button end near the foundation and then lift the top end 0 3m above the ground 5 2 2 Place the generator and nacelle close to mast assembly top flange keep the nacelle shaft near mast assembly top end flange 5 2 3 Pull the steel wire end from the nacelle shaft connect and extend steel wire as long as to access the winch Let the steel wire through the mast assembly and out from mast bottom wicket tie the wire end on wicket temporarily 5 2 4 Open mast assembly top cover connect three AC output cables and let them through the mast assembly fix them on terminal bolts inside mast assembly bottom 5 2 5 Connect cables from the foundation trench let them through the wicket to the terminals Connect 5 the cable ends on terminals fix the cables on inner side of mast to avoid the terminals endure too much weight 5 2 6 Let the nacelle right cover side up lift the generator with the nacelle to couple the nacelle shaft flange and the mast assembly top flange Avoid the steel wire and cables being dam
15. ting lock If the gale is gone reset it manually First switch the ON OFF switch to OFF then climb to the tower top and unlock the tail vane Pay attention to the tail vane after unlock to avoid injury 3 FOUNDATION 3 1 Dig rectangular pit on site Please note the foundation types and installation approaches are site specific and the foundations must be designed for the load conditions expected at the site in question For detailed dimension length width and depth of the pit please follow civil engineer s suggestions Take silty clay soil bearing capacity not lower than 120kpa for example for mast assembly height is 15m the pit dimension shall be 3mX3mX2m while for mast assembly height is 30m and the pit dimension shall be 4mX4mX3m 3 2 Place steel bars amp anchor bolts into the pit as per appendix A remember to remain a cable trench Adjust the anchor bolts template in level Prepare concrete as per Appendix A specified place concrete inside meanwhile oscillate to make it firm 3 3 After concrete is placed keep the concrete surface moist for curing for 200 hours The visible parts of anchor bolts shall be coated with grease or fastened with plastic film to avoid corrosion 4 PREPARATION 4 1 To install a wind generator requires specialized skills devices and experience Information supplied by us and our suppliers for the purposes of installing operating and maintaining all equipment assumes that personnel have the skills
Download Pdf Manuals
Related Search
Related Contents
User Manual NetTalk Phone Adaptor Installation Guide Lightning DSPC-8681E Quad-TMS320C6678 DSP PCI Benutzerhandbuch 2段式カンスタン ド取扱説明書 Information et formation des utilisateurs à l`interrogation de GS-4047_datasheet_fr USB PC – RX Interface Copy of Cover - Home Security Systems Copyright © All rights reserved.