Home

SEER-SEM 8.0 Release Notes

image

Contents

1. Server Client Installations The default configuration during first time initialization for a Client user or a user that runs SEER directly from the server is for SEER not to copy Document and Application Data files to the SEER local user profile Instead SEER only copies the SEER SEM Settings INI file to the SEER user profile The SEER SEM Settings INI file for client server users is copied to the Roaming application data location This insures that clients with roaming profiles will retain their SEER SEM Settings INI file as they log onto different servers or computers to run SEER The SEER SEM Settings INI file will be stored in the following location depending on the operating system Windows 7 Vista Users USER NAME AppData Roaming SEER SEER SEM 8 0 Windows XP Documents and Settings USER NAME Application Data SEER SEER SEM 8 0 See Finding Your User Path above for more information on user file locations 0100 Page 56 SEER SEM 8 0 User Manual Supplement Shared Application Data and Document Files Also by default all Client users share the set of Application Data and Document files installed on the server Since some of the document files require write privileges the person responsible for installing SEER on the server is advised to either Provide Clients with write access to the Documents and or AppData folder or
2. Project Monitor amp Control Nie LE Project Assistant 0 Recalculation ss ssssessseenseeeene Reports and Charts SCONALIOS iconas eed ee Schedule SEER SEM Data INI file SEER Metrics 000seceeeeees Server Mode User Interface cccseeeeeees Miscellaneous sssssnensseennneene Maintenance Release SO 20 ee KK KER KEREN RK KE EEN EE RRE KE EEN KE NNN Project Assistant D Project WBS oo deseeuegedtefe deeg dd aee eT Sean EEEN Deh eRN EES ENE EGE 0100 Page 4 SEER SEM 8 0 User Manual Supplement SCONANOS fas c cscs E A scocbasaancavustsued Rollup Risk Analysis Change Parameters in Multiple WBS Elements File AULOSAVG deed ege ENEE ed ebe Read Only Option for Open Files Miscellaneous sn snesnennnennenennnne Upgrade Information eessen INStallatiOn eisini File Upconvert sssssssesssseeseneen Estimate Compatibility ei zc 8 0 Release Notes Page 5 Quick Launch Options Quick Launch Options Guide me in creating an estimate Create a new project Load an existing project Create project from scenario Quick Launch Options Dialog Box SEER SEM 8 0 includes a new Quick Launch Options dialog box which appears when you first open the program unless it has been disabled using Don t show again as described below It includes the following options Option Description Guide me in creating an Brings up the SEER for
3. 0100 SEER SEM 8 0 Release Notes Page 49 Software Integration Level This command is used to enter the Software Integration Level parameter Format Software Integration Level LEAST LIKELY MOST Example Software Integration Level Low Nom Nom Show View Displays the view indicated by the Name argument Format Show View Name Example Show View Basic Size Inputs Close View Closes the view indicated by the Name argument Format Close view Name Example Close View Basic Size Inputs New Flexible Export Options Flexible Export includes the following new export options New Available Inputs SYSTEM INTEGRATION See also Program Enhancements Includes the following new input Software Integration Level SOFTWARE MAINTENANCE See also Maintenance Model Update Includes the following new inputs Maintenance Size Determines the size of the maintenance estimate 0100 Page 50 SEER SEM 8 0 User Manual Supplement Corrective Include Corrective effort in maintenance estimate Adaptive Include Adaptive effort in maintenance estimate Perfective Include Perfective effort in maintenance estimate Enhancements Include Enhancements effort in maintenance effort ADJUSTMENT FACTORS See also Program Enhancements Includes the following new input Calibration Defects Adjustment Includes the new Calibration Effort Adjustment subcategory with the following inputs Requirements Before Design Effort Adjustment Requirements After
4. Maintenance Allocation Data Analyzer E Corrective 13 51 E Adaptive 21 75 E Perfective 38 30 Enhancements 26 44 Maintenance Allocation Chart E sersem 8 0 Release Notes Page 35 Labor Categories and Allocation Default Labor Categories The default set of SEER SEM labor categories have been revamped to better reflect roles and disciplines used for a wide range of software development projects Parameters Function Based Sizing 8 Project Monitor amp Control Snapshots E Labor Category Allocation PROGRAM Data Analyzer Least Likely Most Note N ECONOMIC FACTORS Cost Input Base Year 2010 p Purchased Items 0 I AVERAGE MONTHLY LABOR RATE 22 000 Project Manager Monthly Labor Rate 22 000 Software Business Analyst Monthly Labor Rate 22 000 Software Architect Designer Monthly Labor Rate 22 000 Programmer Monthly Labor Rate 22 000 Data Analyst Architect Monthly Labor Rate 22 000 Quality Assurance Tester Monthly Labor Rate 22 000 Configuration Release Manager Monthly Labor Rate 22 000 Quality Control Lead Monthly Labor Rate 22 000 Default Labor Categories If you prefer to use the legacy labor designations you can do so by selecting them in the project parameters Select Labor Category Naming Scheme men Labor Category Naming Scheme SEER SEM Standard k Enw Current Project Cancel Hep Select Labor Category Naming Scheme Dialog Box Inp
5. The SEER SEM Server Mode Details xls has been updated to reflect the new server mode commands Please see Server Mode Commands Updates for more details Page 58 SEER SEM 8 0 User Manual Supplement 22 Two sample project files have been added Illinois Outreach and TaxSystemAccountReporting User Interface Using the Windows Start Menu key when the SEER SEM window is active no longer brings up the To change parameters message Miscellaneous Fixed an issue where when Link to MS Project was not working properly with MS Project 2007 SEER SEM no longer tries to re establish links from a project which had been linked but not saved SEER SEM is now able to handle 64 bit time Updated the Cost Escalation Factor to 1 13 the current BLS factor for the industry Maintenance Release 8 0 14 Find In the Parameters window the Find feature will now continue to find the next match instead of stopping at the first match Help Window Update HTML help is now opened in an internal help window instead of in Internet Explorer You no longer have to click the Allow ActiveX content security setting to open the help page If a new help topic is called it re uses the same help window and the help window will appear in the foreground Knowledge Bases The Commercial Low CMRCL LO std knowledge base has been updated with the correct parameter settings for the Specification Reliability Test Level and Quality Assurance Level
6. 3 058 37 2 766 60 2 482 13 2 183 01 1 823 06 1 181 04 Risk Adjusted Metrics Report In addition to the new Risk Adjusted Metrics report Risk Adjusted Effective Size and Technology are available in Flexible Export as Available Outputs Please see Flexible Export for more details System Integration Parameters A new parameter called Software Integration Level has been added In addition the Programs Concurrently Integrating parameter will now have a least likely and most entry available as opposed to a single entry PROGRAM Data Analyzer Least Likely Most SYSTEM INTEGRATION Programs Concurrently Integrating Software Integration Level Nom Nom Nom Concurrency of I amp T Schedule Hi i Hardware Integration Level Low Nom Nom Parameter Tab System Integration 0100 SEER SEM 8 0 Release Notes Page 45 SEER SEM Help The SEER SEM online help system has been converted to HTML format When you select a Help option in SEER SEM it will now appear in Internet Explorer the Help system includes a navigation pane Table of Contents Index and Search to the left of the main Help display pane Help content in parameter dialog boxes will now use the HTML format as well Calibration Factors Calibration Effort Adjustment and Calibration Schedule Adjustment have been expanded and there is a new Calibration Defects Adjustment PROGRAM Braintree Encryption Least Likely Most ADJUSTMENT FACTORS FBS Applica
7. For numeric inputs you can press the key to use the Parameter Calculator Example of Labor Category Allocation Input Dialog Box SEER SEM 8 0 Release Notes Page 37 Labor Category Allocation Report A new Labor Category Allocation report has been added This report is available only at the rollup project level and can be activated from the reports menu F Reports B x x LG Labor Category Allocation Activity Proj Mgr Analyst Design Program Data Test QA CM RM OC Lead System Requirements Design 12 00 52 00 14 00 0 00 6 00 12 00 2 00 2 00 SAN Requirements Analysis 12 00 46 00 14 00 6 00 6 00 12 00 2 00 2 00 reliminary Design 11 00 10 00 41 00 12 00 8 00 14 00 2 00 2 00 Detailed Design 11 00 10 00 41 00 12 00 8 00 14 00 2 00 2 00 ode amp Unit Test 7 00 3 00 6 00 55 00 6 00 15 00 4 00 4 00 omponent Integrate amp Test 8 00 2 00 4 00 39 00 8 00 29 00 5 00 5 00 8 00 2 00 4 00 39 00 8 00 29 00 5 00 5 00 8 00 2 00 4 00 19 00 1 00 59 00 5 00 2 00 8 00 2 00 4 00 38 00 1 00 40 00 5 00 2 00 of Total Effort 8 99 6 72 18 20 30 90 6 39 22 07 3 58 3 11 of Total Cost 9 13 7 39 20 19 29 90 7 14 19 55 3 38 3 27 Labor Category Allocation Report The report includes the Percent of Total Effort and Percent of Total Cost These values also appear in the Labor Category Allocation pie chart shown below which can display hours or cost Labor Ca
8. Save copies of the SEER Document and AppData files to a shared network location and configure the PATHS section of the SEER SEM Settings INI file before clients run SEER Customizing Server Installations Users running a Server installed version only receive a copy of the SEER SEM Settings INI file No other files are copied to the local user profile Administrators can change this default option by updating the FIRST TIME INIT AND UPGRADES table in the SEER SEM Settings ini file before a client runs the Server installed version The above paths are default locations for Document and Application Data Files Users may choose to set paths and point to other locations from the Options Set Paths dialog box in SEER SEM Maintenance Updates amp Useful Information Calendar Widget Fixed a problem in Quick Planner where a shift in the end date in would shift the start date Regional date formats are now accepted and function correctly in calendar widgets Calendar widgets can be found throughout SEER SEM where dates are accepted Parameters ESTABLISH GOALS The ESTABLISH GOALS parameter category list is now expanded by default Maintain Total System The Maintenance Total System Parameter has been replaced with the new Maintenance Size parameter SEER SEM will convert the value based on the following rule If Maintain Total System YES Maintenance Size Total Size If Maintain Total System NO Maintenance Size Effect
9. 20 will no longer be compatible with previous 8 0 releases 8 0 6 or 8 0 14 Itis recommended that backups of your project files are made before you use them in 8 0 20 Other Enhancements Projects can now be opened in SEER SEM by dragging and dropping the prj file into the SEER SEM window e g from Windows Explorer Email etc The View menu Show WBS Element Outline and Show WBS Element Icons settings are now saved when doing a Save Configuration The number of languages available for the Function Implementation Mechanism parameter has been increased to support 1000 items In the parameter entry dialog added a keyboard shortcut gt key for the gt button Gr SEER SEM 8 0 Release Notes Page 71 The Flexible Export dialog now includes an option to Suppress elements excluded from rollup If this option is selected then WBS elements excluded from rollups will not be exported In the Flexible Export dialog the first group of Available Outputs BASIC ESTIMATE is now expanded when the dialog is opened When initially saving a project the default for the file name will now be the project element description Fixes Fixed an issue with the Inputs with Notes report when using the Publish Reports or Export Report feature The Inputs with Notes report can now be printed exported for all applicable elements when the Entire Project or Include Current WBS Element Plus Subordinates option is
10. Design Effort Adjustment Design Thru Program Test Effort Adjustment System Integrate Thru OT amp E Adjustment Includes the new Calibration Schedule Adjustment subcategory with the following inputs Requirements Schedule Adjustment Design Thru Program Test Schedule Adjustment System Integrate Thru OT amp E Schedule Adjustment Includes the new Calibration Maintenance Adjustment subcategory See also Maintenance Model Update with the following calibration factor inputs for each individual maintenance phase Corrective Effort Adjustment Adaptive Effort Adjustment Perfective Effort Adjustment Enhancements Effort Adjustment SOFTWARE CODE METRICS Optional See also Program Enhancements Includes the new Existing Code Maturity Level subcategory with the following inputs used in calculation of latent defects for maintenance estimates Maturity Level Lines not designed for reuse Maturity Level Lines designed for reuse Maturity Level Functions not designed for reuse Maturity Level Functions designed for reuse Maturity Level Proxy not designed for reuse Maturity Level Proxy designed for reuse LABOR ALLOCATION BY ACTIVITY See also Labor Category Allocation The new LABOR ALLOCATION BY ACTIVITY input category includes the following inputs System Requirements Labor Allocation S W Requirements Analysis Labor Allocation Preliminary Design Labor Allocation Detailed Design Labor Allocation SEER SEM 8 0 Release Notes Page 51 C
11. Function Implementation Mechanism Programs Included In Size FUNCTIONS Classic PROXY SIZING PERSONNEL CAPABILITIES amp EXPERIENCE DEVELOPMENT SUPPORT ENVIRONMENT PRODUCT DEVELOPMENT REQUIREMENTS PRODUCT REUSABILITY REQUIREMENTS DEVELOPMENT ENVIRONMENT COMPLEXITY TARGET ENVIRONMENT SCHEDULE amp STAFFING CONSIDERATIONS Required Schedule Calendar Mos Start Date Complexity Staffing a Staff Loading Min Time vs Opt Effort Optimal Effort 1 th STAFFING CONSTRAINTS CONFIDENCE LEVEL Parameter s below Effort Probability 80 00 Schedule Probability 1 1 Defect Probability i l REQUIREMENTS 7 m r m l Clear Selected Parameter s Clear Al Parameters lt Back Cancel Help SEER SEM 8 0 Release Notes Page 69 When you are done making the parameter changes click the next button and you can choose which WBS elements to change You have the option annotate the block change Core Portal Services 1 1 1 Core Portal Services Release 4 1 1 1 1 SAP Release A 1 1 1 2 Portal Development Portalets 1 1 1 3 Portal Development Remote Function Calls to SBW 1 1 1 4 Portal Development Java Service Enhancements 1 1 1 5 RICE Components 1 1 1 6 RICE SAP Enhancements 1 1 2 Core Portal Services Release B 1 1 2 1 SAP Release B 1 1 2 2 Portal Development Portalets 1 1 2 3 Portal Development Remote F
12. Methods Lines Functions none Volume Inputs eo Project only Select one or Start Date 7714 2010 EB more sizing metrics SE FBS Method Project only For Function Create and Insert Next Element OK Cancel Created 7 14 2010 6 26 08 PM Modified 7 14 2010 8 26 08 PM Create Modify WBS Element Dialog Box The create Modify WBS Element dialog box has been redesigned and updated It includes a link to the Project Assistant a guidance pane with context sensitive HTML help enhanced icon based selection for element type and indentation level start date selection and improved sizing method selection Toolbar The toolbar has been resized and enhanced making it easier to navigate to commonly used features and functions The updated toolbar includes icons for the Project Assistant described above the Exclude Element from Rollup Totals feature described under Program Enhancements OM Si oC eanpbeb Kb kt A BERBSALH OS New Toolbar Page 30 Maintenance Model Update 0100 SEER SEM 8 0 User Manual Supplement The Maintenance Model for SEER SEM 8 0 includes the following updates and enhancements Partial Years You can now estimate software maintenance in partial years 3 SOFTWARE MAINTENANCE i Years of Maintenance 1 50 Years of Maintenance Parameter with partial year Individual Maintenance Phases It is now possible to choose which maintenance phase to include in a maintenance estimate Under the S
13. Software Project Assistant which gives you one estimate step at a time help in creating a new SEER SEM estimate Create a new project Brings up the Create Modify WBS Element dialog box allowing you to create a new project without the help of the Project Assistant Load an existing project Opens a popup menu listing recently opened project files The More projects entry on the popup menu brings up the Open dialog box listing the projects in the default SEER SEM Project directory Create project from Create a new SEER SEM project based on a scenario The scenario will scenario guide you through a series of dialog boxes in which you can select work elements or parameter settings Don t show again Click on this checkbox so that it is marked if you do not want the Quick Launch Options dialog box to appear when you open SEER SEM You can always re display the Quick Launch dialog box by pressing the Q key while in the start up screen Page 6 SEER SEM 8 0 User Manual Supplement Project Assistant The Project Assistant is a tool for creating all or part of a SEER SEM project It leads you through the process of creating each component of either a project or program The Project Assistant is an aid for new or casual SEER SEM users to guide them through the process of creating an estimate Once information is entered the Project Assistant loads the estimate information into SEER SEM creating a new project or adding to an existing project Get
14. Year Base Year Monthly Defects Data Details of Labor Categories and Activities SEER ENTERPRISE TOOL OUTPUTS Estimate to Complete Basic Only FBS Inputs All with Notes Function Point Count New Functions Only Function Point Count New and Pre Existing GOALS results Inputs With Notes Technology amp Env Parms Inputs All With Notes Cost By Labor Category Hours By Labor Category Maintenance Effort by Year Detailed Maintenance Outputs Maintenance Cost Maintenance Hours MS Project basic paste into Task Usage View SEER SEM Client for MS Project Data Template v Current Template Basic Estimate Report All Available Values l Export JI Save Template I Close Help Load Save Template Tab ei zc 8 0 Release Notes Page 25 Options Tab The functionality of the options tab is identical to the previous versions Template Tab Available Outputs and Inputs are now organized by category in a collapsible tree structure Items can be selected for export by double clicking them or by clicking and dragging the desired item to the Selected Choices list box When you double click or click and drag a category its subordinate items are also moved Item Move Up Move Down Remove Remove All Export Save Template Description Reorders the Selected Choice parameters Removes the selected parameter from the Selected Choice list Removes all parameters from the Selected Choice list
15. can be used in this 8 0 version However project files saved in 8 0 will no longer be compatible with 7 3 or earlier versions It is recommended that backups of your project files are made before you use them in 8 0 Estimate Compatibility Your SEER SEM 8 0 estimates will be compatible with earlier versions of SEER SEM Old projects will be loaded with the legacy settings To take advantage of new estimate options go to Options Set Project Parameters Specific areas of estimate compatibility are described here Calibration Factors If you load a legacy project from an older version of SEER SEM calibration adjustments at the lower level will be set to the general factor in old projects thus maintaining backwards compatibility Minimum Staff Option This option will be enabled by default for new estimates Estimates from old projects will have this option disabled If you want to take advantage of this new estimate option go to Options Set Project Parameters and check Assume Minimum Staff under the Schedule Options Staff Constrained Estimates Because of changes to the SEER SEM mathematical structure to accommodate detailed calibration factors the calculations that apply penalties or rewards for staff constrained scenarios has been changed Overall you should get answers that are consistent with previous versions of SEER SEM but they won t necessarily be exactly the same In most cases estimate differences are within 2 of SEER SEM
16. click on it the program will bring up the subject s main help page in the help browser Brings up this help system Return to the previous tab Go to the next tab Each tab is a step in the process of creating a project and the specific effects of using the Back and Next buttons will depend on the options which you have already selected Create an estimate in SEER SEM and exit the Project Assistant Exit the SEER for Software Project Assistant without creating a project Select A Sizing Approach COTS If you select Commercial Off the Shelf COTS in the Description tab you will see a somewhat different version of the Scope Tab PE SEER for Software Project Assistant Invoice project 089 program x Item Begin A E o 3 S a lt P t Z D S D HI 2 D E D Vi D 5 D E w Vi gt Size gt gt Select A Sizing Approach Off The Shelf Component Type Procedural Library v Sizing Method Features Object Sizing lt Back FINISH Cancel Select A Sizing Approach Tab COTS Description Off the Shelf Select a SEER SEM COTS Component Type knowledge base for the COTS ege 8 0 Release Notes Page 11 Component Type Sizing Method Specify Size Current Estimate Guidance Help Back Next FINISH Cancel WBS element Select a SEER SEM COTS sizing method Features Sizing based on typical COTS functionality Object Sizing For components implemented as
17. display and close a view SEER SEM now stores the Views Views Active setting in SEER SEM Settings ini Knowledge Base Updates New and Updated Platform Knowledge Bases Cost Input Base Year All Platform knowledge bases have been updated with the Cost Input Base Year set to 2010 Cost Input Base Year Labor Rates have been updated to base year 2010 Current default rates per effort month are Monthly Labor Rate Platforms 22 000 Ground Mobile or Sea Based Mission Critical Systems 17 600 Business Systems Enterprise Client Server Systems 25 100 Avionics Missiles amp Unmanned Air 29 100 Space Systems Web Based Development INTERNET ot Renamed from Internet Development Software that is accessed through a web browser over the internet or an intranet using web service transport mechanisms and protocols This knowledge base is appropriate for the development of web based or browser based applications New Application Knowledge Bases Business Intelligence ExecutivelnformationSystem app Specialized information system for top executives to provide information and decision support related to executive level performance monitoring and strategic decision making Examples include dashboards showing key metrics with drilldown capability Catalog Inventory Management CataloguelnventoryManagment app Software used to track sales and available inventory as well as interface with suppliers all with the objective of mainta
18. has been added For the XY Chart it will export the data points plotted and the points of the two variables used to plot the current XY chart 0100 SEER SEM 8 0 Release Notes Page 53 Miscellaneous Chart Options With the use of Chart FX the following chart options are available X Axis Gridlines Interlaced Vertical Labels Staggered Labels Y Axis Gridlines Interlaced Staggered Labels 2D 3D In Histogram mode you can switch the view between 2D and 3D Pop ups New pop ups have been added and existing pop ups now include more details Upgrade Information This release of SEER Metrics uses a different file format The new file format is sp3 there is backwards compatibility to support previous file formats sp2 New files and older files opened and saved from the current version will have the sp3 extension Updated Installation Options SEER SEM 8 0 has been updated to run more effectively on Windows XP Windows Vista and Windows 7 operating systems and within Terminal Server environments During installation a set of Document and Application Data files are installed in the chosen installation directory When a user first runs SEER SEER begins a first time initialization process and creates a User specific SEER profile As a minimum the SEER profile will contain the SEER SEM Settings INI file This file allows each user to customize SEER with specific preferences i e font colors font sizes defa
19. objects Click on the Specify Size button to bring up the Sizing dialog box The Current Estimate Panel displays the project s estimated effort duration and cost based on your selections so far After you make or change a selection Project Assistant will update the estimate you can also update it by clicking on Update To view charts showing the current effort duration and cost risks for the project click on Chart The Guidance panel provides background information on the items in the current tab The appropriate Guidance text will be displayed when you hover the mouse pointer over an item or when you select that item Depending on the subject there may be a More Guidance link If you click on it the program will bring up the subject s main help page in the help browser Brings up this help system Return to the previous tab Go to the next tab Each tab is a step in the process of creating a project and the specific effects of using the Back and Next buttons will depend on the options which you have already selected Create an estimate in SEER SEM and exit the Project Assistant Exit the SEER for Software Project Assistant without creating a project Page 12 SEER SEM 8 0 User Manual Supplement Classify This Software Tab In the Classify tab you select the knowledge bases which most accurately describe the operating environment purpose and development standards of the software under development xi Begin
20. report now includes a toggle allowing you to switch the display between development cost and development hours The toggle is also available in the Maintenance Risk report for switching the display between maintenance cost and maintenance hours Project has been removed from the Rollup Risk report names If an excluded rollup element has subordinate elements the subordinate elements are no longer included in the Rollup Risk calculations Page 66 SEER SEM 8 0 User Manual Supplement Rollup Development Risk IS Confidence Level Dev Hours independent Dev Hours Dependent H 108 400 50 218 123 070 69 651 toggle 135 249 99 737 between 144 395 113 168 50 hours and 152 539 132 470 60 cost 161 256 153 365 70 172 807 184 130 80 186 689 218 761 90 202 599 278 683 Mean 156 312 156 968 StdDev 39 694 115 790 D b Charts The Effort Risk and Maintenance Risk charts are now enabled at the Rollup level Flexible Export The existing items in the MONTE CARLO ANALYSIS section of the available outputs have been renamed to include Development to distinguish the outputs from the Maintenance outputs The MONTE CARLO ANALYSIS section of the available outputs now includes the new items that were added to the Rollup Risk reports Development Hours Risk Independent Maintenance Cost Risk Mean Independent Development Hours Risk Dependent Maintenance Cost Risk StdDev Independent Maintenance Cost Risk Independent Mai
21. that item Depending on the subject there may be a More Guidance link If you click on it the program will bring up the subject s main help page in the help browser Brings up this help system Return to the previous tab Go to the next tab Each tab is a step in the process of creating a project and the specific effects of using the Back and Next buttons will depend on the options which you have already selected Create an estimate in SEER SEM and exit the Project Assistant Exit the SEER for Software Project Assistant without creating a project 8 0 Release Notes Page 17 Summary Tab The Summary tab displays the name of the Program WBS element along with a list of all of the Component WBS elements currently included in the project P SEER for Software Project Assistant program EI Begin g E o S S 3 lt P t 2 D 2 A v 2 o E D Vi a D E D E m Vi Item Program Level Description Project Level Description Component List Start Another Component Current Estimate Guidance Summary gt Size gt Classify gt Development gt Program Level Description Disabled until two or more components have been created Components Sizing Method Jump back to a previous component by double clicking on it invoked with a blank project items in this screen will each be laid out as Program elements in a If the Project Assistant was invoked after a project was Ne
22. z c S S 3 F lt 5 2 D 2 D o 2 o z Le Ka a D D a B Vi Item Operating Environment Type of Application Standard or Quality Target Current Estimate Guidance Help Back gt Size gt Classify K Classify This Software Operating Environment Business and Non Critical MIS hd Type Of Application Network Management E Standard Or Quality Target mis HI lt Back FINISH Cancel Classify This Software Tab Description This sets the type of environment in which the program will operate Select a SEER SEM Platform knowledge base for the current element Select a SEER SEM Application knowledge base for the current element Select a SEER SEM Development Standard knowledge base for the current element The Current Estimate Panel displays the project s estimated effort duration and cost based on your selections so far After you make or change a selection Project Assistant will update the estimate you can also update it by clicking on Update To view charts showing the current effort duration and cost risks for the project click on Chart The Guidance panel provides background information on the items in the current tab The appropriate Guidance text will be displayed when you hover the mouse pointer over an item or when you select that item Depending on the subject there may be a More Guidance link If you click on it the program will bring up the subject s
23. 7 3 results You will see no changes in your estimates if you do not have any explicit staffing constraints and you have not applied any of the new SEER SEM 8 0 math options Maintenance Estimates New estimates will take advantage of the new maintenance model changes However legacy projects will be loaded with the SEER SEM 7 3 backwards compatibility option enabled This backwards compatibility mode will mean that new maintenance parameters will not be enabled and effort calculated will be based on legacy math To take advantage of the new maintenance estimate options go to Options Set Project and make sure SEM 7 3 or earlier Compatibility is unchecked
24. Characterize the Risk Tab Description Set the anticipated frequency and scope of change in the requirements after preliminary design starts See the Requirements Volatility parameter for a detailed description of the choices Set the probability that the project will be completed on schedule See Risk for a detailed description of the choices The Current Estimate Panel displays the project s estimated effort duration and cost based on your selections so far After you make or change a selection Project Assistant will update the ei zc 8 0 Release Notes Page 15 estimate you can also update it by clicking on Update To view charts showing the current effort duration and cost risks for the project click on Chart Guidance The Guidance panel provides background information on the items in the current tab The appropriate Guidance text will be displayed when you hover the mouse pointer over an item or when you select that item Depending on the subject there may be a More Guidance link If you click on it the program will bring up the subject s main help page in the help browser Help Brings up this help system Back Return to the previous tab Next Go to the next tab Each tab is a step in the process of creating a project and the specific effects of using the Back and Next buttons will depend on the options which you have already selected FINISH Create an estimate in SEER SEM and exit the Project Assistant Cance
25. ES SEER SEM 8 0 Release Notes Page 1 SEER SEM 8 0 Release Notes SEER for Software Welcome to the SEER for Software SEER SEM 8 0 August 2011 maintenance release These release notes are a Supplement to your existing user manual and a guide to new SEER SEM features and enhancements Table of Contents Quick Launch Options ccc cccceeeeee cece ence eeee ee eeeene ee eeeeaaseseeeenseaeaeseeeneaaeeeeneeseeaeaneeeeeneneeee 5 Brolect Assistant wcceseeiicsssecssessnvederverwunstsnessusvuvaassunsundsaseuensdseusaedsssuubeessuuuenvasceuurrinsuserdeuus 6 Getting Started with the Project Assistant ccceceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeaeeeeeeeeeeeee 6 Begin our Estimate TaD veces cccceetecs sdgavi ccc ehacecaxncuivenducuwvesancdpecasstus yess ncowseateanstescucdnsdeetencuecdsdens 7 Select A Sizing Approach Tab 9 Select A Sizing Approach COTS ccccccccecssseeeeeeeseecseereeeseseeaseceuecessueuaesereeessnesserereres 10 Classify This Software TAD wicccsces tree ccceswes ccosreendepeunagt es AS ENER EE ee ACEN EE EE ene eh 12 Describe the Development Method Tab ccccceeeeeeeeeeeeeeeeeeeeeeeeeeaeeeeeeaaeeeeeaeeeesaaeeeesaaeeeees 13 Characterize the Risk Tab ugefeiert de 14 Designate Staffing Approach Tab AEN 15 Summary TAD esseere deve cps des regu dev apes dee dat EE 17 Current Estimate Panel All Tabs ccccccccssseseeeeeeeeeeeeeeeeeeeeeeeeaaeeeeeeeeseeeaseeeeeeeesaaesseeeeeses 18 Estimate gee
26. Exports data using the current settings Saves the current settings as a template The user is asked to confirm the name of the template to be saved Flexible Export Load Save Template Options Template Available Outputs and Inputs Selected Choices new line spacer WBS Element Description Available Outputs Unit Type E RRRRRRR 6 EA GR E H Available Inputs WEBS Element Information Current Template Basic Estimate Report All Available Values Export Jl Save Template J Close JI Help BASIC ESTIMATE WBS Element Index COST BY FISCAL YEAR REPORT MAINTENANCE EFFORT BY YEAR DEVELOPMENT HOURS BY MONT Moves DETAILED STAFFING PROFILE RE Move Down PERSON HOURS BY LABOR CATE COST BY LABOR CATEGORY REP SOFTWARE METRICS REPORT Ri ACTIVITY REPORT Renove ESTIMATE TO COMPLETE REPO Remove All RISK ANALYSIS REPORT L eeea TIME PHASED DEFECTS REPO PPMC REPORT GOALS CONFIDENCE LEVEL OUTI CALIBRATION SUMMARY SEER ENTERPRISE TOOL OUTPL Template Tab Note The Copy Special option is a shortcut to the Flexible Export Template tab For a list of new items available for flexible export see New Export Options Page 26 SEER SEM 8 0 User Manual Supplement Parameter Linked Calculator A new parameter linked calculator has been added To bring up the calculator select a numerical parameter and then press the key on your key board Use the keyboard or the mouse t
27. OFTWARE MAINTENANCE parameters the four maintenance phases are listed with corresponding YES NO entries To omit a phase from the estimate change the YES to NO E Inputs L Parameters Function Based Sizing Project Monitor amp Control Snapshots Labor Category Allocation saa PROGRAM Data Analyzer of eee MAINTENANCE Years of Maintenance SG Kee Sites Maintenance Growth Over Life Personnel Differences Development Environment Differences Annual Change Rate Maintenance Level Rigor Min Maintenance Staff Optional Max Maintenance Staff Optional Maintenance Monthly Labor Rate Additional Annual Maintenance Cost Maintenance Start Date Percent To Be Maintained Maintenance Size Corrective Adaptive Perfective Likely 5 00 1 15 00 Nom Nom 11 00 Nom 0 00 0 00 22 000 0 3 19 2013 100 00 Total Size d Parameter View New Maintenance Parameters BS 8 0 Release Notes Page 31 Steady State Maintenance In previous versions of SEER SEM Steady State Maintenance Only was calculated by using a steady staff level SEER SEM now uses a steady effort level as well as a steady staff level to truly reflect a steady state after bug fixes and environment changes Maintenance Size The Maintenance parameter Maintain Total System has been changed to Maintenance Size The maintenance size parameter has 3 options Rating Description New Size All new size from lines functions or other size metrics use
28. Project Assistant The Project Assistant s overall design has been completely updated to make it more intuitive for the user This includes estimates that are dynamically displayed within the interface based on current information enhanced onscreen guidance updated labels and better navigation cues In addition Sizing options have been recast in a categorized tree control Both new and pre existing sizing entries may now be simultaneously made Arisk oriented screen has been introduced with more intuitive controls for specifying requirements volatility and risk tolerance Anew staffing approach screen permits you to determine the type of estimate minimum time versus optimal effort or constrained staffing in addition to staffing ramp up Project WBS Drag and Drop WBS elements can now be dragged and dropped in the Project WBS Rollup elements that are dragged and dropped will also move their subordinate elements to the new location When you move a lower level WBS element COTS Component or Unit to a new parent WBS element SEER SEM will ask to create a new sub element to keep size inputs already entered in the parent WBS element This is done to help you preserve any size inputs that you have already entered Size Conflict SS Create a new sub element to retain the parent element s size entries If you choose to create a new sub element it will be created containing the size inputs of the original parent eleme
29. R SEM 8 0 Release Notes Page 61 In Automation Interface mode exporting a flexible export template containing Category Header Items will now export a blank value for the Category Header instead of concatenating the element name In Automation Interface mode GetLastCommandStatus now checks the status of commands which involve making Project WBS selections such as SelectWBSElement This feature had been accidentally disabled with the introduction version 8 0 User Interface In the Window menu the Expand and Collapse options have been enabled The column widths in the input tabs are now preserved by WBS element type for the instance of SEER SEM The Options menu now includes a Select Historical Database option for setting the SEER Historical Database SEER HD DSN Used by the Analogy Based Estimating and Analogy Based Sizing features In the Collaboration menu the Default Database and Connect to Default Database selections have been renamed to Default Enterprise Database and Connect to Default Enterprise Database Miscellaneous SEER IT Labor Category names are now displayed in the Resource Assignment tab In Change Parameters in Multiple WBS Elements and Load Individual Knowledge Base elements within collapsed branches are no longer ignored Fixed several issues with the maintenance calculations when there is a constrained maintenance staff applied 0100 Page 62 SEER SEM 8 0 User Manual Supplement Maintenance Release 8 0 20
30. Thru Program Test Schedule Adjustment System Integrate Thru OT amp E Schedule Adjustment Page 46 SEER SEM 8 0 User Manual Supplement Calibration Defects Adjustment The Calibration Defects Adjustment is calibration adjustment for actual Defects This adjustment is a multiplier for total defects and can be set by creating a custom calibrated knowledge base Exclude WBS Element from Rollups Totals A new feature has been added to allow you to select WBS element to be included or excluded from the rollup project calculations This can be found under Estimate menu right clicking on the WBS element or by accessing it from the SEER SEM toolbar lt Collaboration Window Help ma HOH EEEES w Exclude WBS Element from Rollups Totals Toolbar Icon Object Sizing Input Names The names of the Input Services Output Services and Inquiry Services inputs have been changed to Input Methods Output Methods and Inquiry Methods respectively This change affects both the COTS Object Sizing parameters and the inputs for the Detailed Object Sizing proxy Proxy Names The names of several proxy sets have been updated Previous Name New Name Mark II Function Points Mark II Function Point Analysis Metric Fast Function Points Fast Function Points Metric Function Based Sizing Function Based Sizing Metric Source Lines of Code Source Lines of Code Metric Unadj Function Points Unadjusted Function Points OO Metric Use Cases Use Cases Trigger a
31. ab Next Go to the next tab Each tab is a step in the process of creating a project and the specific effects of using the Back and Next buttons will depend on the options which you have already selected FINISH Create an estimate in SEER SEM and exit the Project Assistant Cancel Exit the SEER for Software Project Assistant without creating a project Note If you have at least one un sized item in the Summary Tab the Size by Comparison dialog box will come up when you click on the click on the ESTIMATE Next or FINISH buttons Current Estimate Panel All Tabs m Current Estimate Effort 9 284 hours Duration 13 74 months Cost 1 074 941 chart Update Current Estimate Panel The Current Estimate panel lets you evaluate critical details of the project estimate before sending it to SEER SEM It appears in the upper right of all Project Assistant tabs and displays the project s estimated effort duration and cost based on your selections so far After you make or change a selection Project Assistant will update the estimate you can also update it by clicking on Update To view charts showing the current effort duration and cost risks for the project click on Chart Item Description Effort Estimated effort for the project determined from your settings Effort is given in 152 hour person months Effort includes direct labor expended from System Requirements Design through System Integration activities Estimat
32. ate ETE Estimate Development Schedule Months Development Effort Months Development Effort Hours Development Base Year Cost 7 329 618 Maintenance Effort Months 151 45 Defect Prediction 65 Constraints MIN TIME lt Reports Window with Multi color Tabs 0100 Page 28 SEER SEM 8 0 User Manual Supplement Open in New Window You can also open a copy of a report or chart in a freestanding fully resizable window by selecting Open in New Window from the right click menu of the tab for that report or chart You may open a maximum of ten reports and ten charts in separate windows at once The pull out report or chart windows can be placed anywhere on your display and do not need to stay within the boundaries of the SEER SEM program window Charts A 4 Labor Category Allocation Effort Risk Staffing Plan Annual Maintenai gt X KO K Data Anal Labor Category Allocation 160 120 80 40 DIE Qo6 10 20 30 40 50 Maintenance Included Copy to Window Labor Category Allocation chart Edit Find Find what Retest i C Match whole word only Direction C Match case OuUp Down Edit Find Dialog Box Edit Find brings up a standard Windows Find dialog box Enter all or part of a word or phrase You can search up or down and optionally look for matching text by whole word or case only Edit Find will look for matching text in the Project WBS or Input windows depending on which on
33. chedule based on the selected projects click on the checkbox so that it is marked Apply To Apply analogy based calibration to the current work element or the entire project 0100 8 0 Release Notes Page 21 Currently selected element All elements in project Computation Method Median Average Help Apply Cancel Project List Apply calibration only to the work element currently selected in the WBS window Apply calibration to the entire project Use the median or 50 percentile of the calibration factors from the selected data set Use the average or mean calibration factor from the selected data set The average can be influenced by outliers in the data set Brings up this help page Exit the dialog box applying calibration based on your selections Exit the dialog box without making any changes The project list includes all of the projects in your current SEER Historical Database You can use the checkboxes to select projects to be used in calculating calibration factors Item checkboxes Element Name Project Name Description Language SLOC UFP Effort Schedule Description To select a project click on the checkbox to the left of its name To select all projects click on the checkbox in the column header row SEER SEM will use all selected projects in calculating calibration factors The name of the work element The name of the project which includes the work element The description of t
34. d Total Size All size from both new and existing lines functions or other size metrics used Effective Size Only effective size based on new size plus rework of existing size Maintenance Calibration It is now possible to apply maintenance calibration factors to the individual phases Entries can be made at the top level parent parameter Calibration Maintenance Adjustments under Adjustment Factors or the lower level parameters Calibration Maintenance Adjustment Corrective Effort Adjustment 1 00 Adaptive Effort Adjustment 1 00 Perfective Effort Adjustment 1 00 i Enhancements Effort Adjustment 1 00 Calibration Maintenance Adjustment parameter Each calibration adjustment is a multiplier to its respected maintenance activity These adjustment factors can also be used to set custom calibrated knowledge bases Project Parameters To access an old project file created in an earlier version of SEER SEM 7 3 or earlier without applying the maintenance model changes click on SEM 7 3 or earlier Compatibility under the Maintenance heading in the Project Parameters dialog box 0100 Page 32 SEER SEM 8 0 User Manual Supplement Project Parameters Software Development Activity Naming Scheme Project Outline Start Number i SEER SEM Standard Fiscal Year Starting Month i SE fandard Cost Escalation Factor 1 50 Project Rollup Risk Iterations 100 Productive Hours Per Month Labor Category Naming Sche
35. e In Enter Into SLOC New Computation Method 95 673 S UFPs O Pre existing Average v Analogy Based Sizing Dialog Box The following items appear on the Analogy Based Sizing dialog box Item Description Retrieve Records Again Brings up the Retrieve Items From Repository dialog again so that you can change your search criteria project list Select projects from SEER HD to use for sizing See Project List below Show Size In Choose the metric in which the size of the selected project will be displayed SLOC Filter on projects that have use source lines of code as a size measure UFPs Filter on projects that have use unadjusted function points as a size measure size display Displays the size of the selected project in the metric which you chose Enter Into Choose where the size will be entered New Enters the analogy based size as new code Pre existing Enters the analogy based size as pre existing code El sch 8 0 Release Notes Page 23 Computation Method Median Average Sum Help Apply Cancel Project List Describes how size or calibration factors from the selected data set are aggregated and used Use the median or 50th percentile of the sizes from the selected data set for the Likely value the 1Oth percentile for Least and the 90th Percentile for Most Use the average or mean size from the selected data set for Likely 1 standard deviation for Least and 1 standard deviation for Most T
36. e WBS elements parameters or make estimate adjustments This makes it easy to export data for different WBS elements or allows you to make estimate changes between data exports Load Save Template Tab Item Select Directory Load New Delete Export Save Template Description Lets you select the Flex Ex template directory The default is the Export Templates subdirectory of the SEER SEM documents directory Selected template is loaded and appears under Current Template Creates a new template prompts the user for a name and description Deletes currently selected template Exports data using the current settings Saves the current settings as a template The user is asked to confirm the name of the template to be saved Flexible Export Load Save Template Options Template Select Directory C SEER SEM 4 8 Export Templates Filename actvhour fl actysch fl BASICEST FLX COPYFORSEERIT FLX COPYFORSEERITWITHINSERT FLX COSTBYFY FLX Defects FLX details fl ENTERPRI FLX ETC FLX FBSINPUT FLX fpentnew flx fpcount flx Goals FLX inp tech flx INPUTS FLX laborcst flx laborhrs flx Maintenance Effort By Year FLX Maintenance FLX MANT CST FLX MANT HRS FLX MSProj Basic FL mesproj flx Description Hours By Development Activity Schedule Detail By Development Activity Basic Estimate Report All Available Values Copy ForSeerIT Export to Create New Element in SEER IT Cost By Fiscal
37. e is selected In the Project WBS window it will look for work element and rollup names In the Input window it will search input and category names in the currently selected tab Note Find will not look for matches in user input text it will only look for matches in parameter and work element names For example if you search for Implementation in the Parameter tab it ei zc 8 0 Release Notes Page 29 will find the Function Implementation Mechanism parameter but if you look for Generation it will not find the 3rd Generation Languages selection Updated Create Modify WBS Element Dialog Box Create Modify WBS Element Guide me using Project Assistant f Description Investment Notes SE ER F or Analyst Command File Software E Indenture CEB ep beba Elle Rollup Program Component COTS Unit Level 3 Create Modify WBS This dialog box lets you Knowledge Base Selections describe a new project or WBS element Platform Business Mission Critical Guide me using Project Assistant Use the SEER Project SRST emm Assistant to create a new Acquisition Method General new and pre existing project or work element Description Development Method Incremental Enter text to uniquely a identify the item Development Standard 15 Formal Application Financial Transactions Notes k Enter work element notes Class Custom Analyst The analyst who is estimating this project Sizing
38. e the introduction of Small Schedule Staffing before version 8 0 set this value to NO Format MinimumStaff lt YES NO gt Example MinimumStaff YES Page 48 SEER SEM 8 0 User Manual Supplement 22 Maint7_3Compatible Maintain backwards compatibility for the Maintenance Model update If the project used the Maintenance Model updates introduced with after version 7 3 then set this value to Yes For projects created with version 7 3 or earlier set this value to NO Format Maint7_3Compatible lt YES NO gt Example Maint7_3Compatible NO Elementincluded This command can be used to exclude a work element from rollup totals In the WBS window such elements are crossed out in red The ElementIncluded command is placed after the WBSCreate command which makes it relevant to that work element If the Elementincluded command is not used SEER SEM assumes Elementincluded YES When using export commands the ElementIncluded command is automatically exported indicating the state of each element within the project Format ElementiIncluded lt YES NO gt Example wBSCreate Data Analyzer Program 1 ElementiIncluded YES wBSCreate Mission Simulator Program 1 ElementiIncluded NO Maturity Level Lines Functions Proxy NDR or DR This command can be used to enter a specific maturity level parameter Format Maturity Level CLines Functions Proxy NDR DR LEAST LIKELY MOST Example Maturity Level Lines not designed for reuse Nom Nom Nom
39. ed duration for the project determined from your settings This estimate combines all estimated activities from software requirements through final integration and test Duration is given as a standardized 21 67 working days per month given 152 working hours per month Estimated cost for the project determined from your settings Cost is given at an average monthly labor rate of 17400 with 152 working hours per month Duration Cost ei zc 8 0 Release Notes Estimate Chart Page 19 The Estimate Chart appears when you press the chart button in the Current Estimate area on any tab It displays a risk profile chart for effort duration or cost Item Effort Duration Cost Hours K xi Chart displays Effort Risk z Effort Risk 14 12 10 8 6 4 2 o 10 20 30 40 50 60 70 80 90 Effort Probability Help Close Estimate Chart Description Estimated effort for the project determined from your settings Effort is given in 152 hour person months Estimated duration for the project determined from your settings Duration is given as a standardized 21 67 working days per month given 152 working hours per month Estimated cost for the project determined from your settings Page 20 0100 SEER SEM 8 0 User Manual Supplement Analogy Based Estimating Analogy Based Estimating available from the Estimate menu allows you to automatically calibrate your estimate based on projects s
40. eeeceeeceecaeeeecaeceeceuscessaeeesaeeeseueeeessaseeesaneesses Elementi NC WAS EE Maturity Level Lines Functions Proxy NDR or DR SoOftWare Integration Leve l ca cceccceesedseeecceweedenecdesksgeascpinen EEN RRE coe encnnigueseveven SEENEN sity ee EE Close VIEW Nee ENEE ENEE dE Ee CN tise New Flexible Export Options ees kREEEERRESEEERRREEEEERER EE RREE EE ER KEE ER EEEEREE EE ER KEREN New Available Inputs eg New Available Outputs iniii nnana an ana aae aa aa aaa aa raaa aaa aa aa aa ennaa WBS Element Information SEER Metrics Benchmarking amp Analysis 2 ccsessceeeeeeeeeeneneeeeeeeneeeeeeeeeesenneeeeeeenees ele ET EE Copy as Text data only Miscellaneous Chart Options cccccccccsssseeeeeeeceeesseeeeeeeeeuausueceeeeeeeuaucseeeeeeeesuaeeereneseneaes Upgrade Informatio seiun iieiaeie a EENEG reat ven eee ea Updated Installation Options c ccccssccsessseesseesseeeseeneeseesesessseeeseoessenseseesseessenenees Beleg le In Server Client INStallatiONns seduetiedrdeertieegdue de N ASNENN NEEN EENS EE ENEE GEN EEN de Maintenance Updates amp Useful Information Sek EEEEEEKENRERER KEEN ERERER KEEN C lendar VIE EE ees agesgegageeg ode Ee d se ged Agen barameters niseiieireeiisisesira Recalculation ss ssssessseesseeeene Reports and Charts SCON ALS iiceoe sedeat Schedule Shipping Files cceeeeees User Interface cccseeeeeees le Help Window Update Knowledge Bases
41. elected from the SEER Historical Database SEER HD SEER SEM will compute calibration factors based on the selected projects estimated and actual development schedule and effort then apply those factors to your estimate Analogy Based Estimating Check to include exclude projects in the calibration Retrieve Records Again Element Project Name Name Jbidwatcher 1 0 Allows youto Java H 12 6 7 Zip 7 Zip is a file a j 71 Be Sweet Be Sweet is a 16 0 Description Language UFP Effort Schedule Calculator A scientific cal 22 9 Calendar Alarm The Calendar 17 8 Code Project The Code Proj 9 0 7 F S 2 IR vv owe Note Only projects containing actual and estimated effort schedule are shown Calibration Apply To Effort 0 93 Currently selected element Computation Method Schedule 2 79 O All elements in this project Average v Analogy Based Estimating Dialog Box The following items appear on the Analogy Based Estimating dialog box Item Description Retrieve Records Again Brings up the Retrieve Items From Repository dialog again so that you can change your search criteria project list Select projects from SEER HD to use for calibration See Project List below Calibration Chose the factors to be calibrated You can choose effort schedule or both Effort To calibrate effort based on the selected projects click on the checkbox so that it is marked Schedule To calibrate s
42. element Reports and Charts Report and Chart Menu Selections and Dialog Boxes The Choose Available Charts and Choose Available Reports menu selections and dialog boxes have been renamed to Choose Active Charts and Choose Active Reports Effort Schedule Trade Off Chart Fixed an issue in the chart when a program element has small size while the Minimum Staff Schedule Option is selected and the Productive Hours Per Month setting is greater than 152 Quick Estimate Report Maintenance Effort Months and Maintenance Schedule Months are now included in the Quick Estimate by default Restored tab delimited format when copying the Quick Estimate report to the clipboard 0100 Page 60 SEER SEM 8 0 User Manual Supplement Scenarios In the Scenario Parameter Query Query Choices dialog box If a Choose Query has been applied to a parameter with a percentage entry type selecting a choice will no longer multiply the selection by 100 The Linear Adjustment Option entry will now be applied to the selected choices while the dialog box is still open allowing you to see the final values that will be entered in the parameter entry dialog box While a scenario is being loaded the Prev Next and KBase buttons have been removed from the parameter entry dialog box Schedule Fixed some calculation anomalies when both a required schedule and schedule calibration factor were entered Fixed a calculation anomaly that caused estimates to errone
43. fault SEER SEM scenario directory Tools The SEER SEM manual supplement which includes a detailed description of changes to the program since the last upgrade in PDF format SEER SEM Server Mode Details SEMacros for creating Excel macros which run SEER SEM worksheets and support documents The document file directories are stored in the following locations Windows 7 Users USER NAME My Documents SEER SEER SEM 8 0 0100 SEER SEM 8 0 Release Notes Page 55 Windows Vista Users USER NAME Documents SEER SEER SEM 8 0 Windows XP Documents and Settings USER NAME My Documents SEER SEER SEM 8 0 Finding Your User Path On your system the section of the path represented by USER NAME will consist of your user name If for example you log in using the name SEM_user_1 the application data files path in Vista or Windows 7 would look like this Users SEM user _1 AppData SEER SEER SEM 8 0 In Windows XP it would look like this Documents and Settings SEM user 1 Local Settings Application Data SEER SEER SEM 8 0 Note The actual SEER SEM directory name will depend on the version of the program being installed SEER SEM version 8 0 will be installed in the SEER SEM 8 0 directory and the default installation directories for later versions will be numbered accordingly SEER SEM 8 1 SEER SEM 8 2 etc
44. feature In the past the cdx dbf and fpt files were generated for notes and to exclude notes from a saved project you could delete those files To exclude saving notes with the compressed project file you may uncheck the option Include notes in SEER file when you save your project Page 40 Save in SEER SEM 8 0 User Manual Supplement PROJECTS ig COTS Samples PRI B ig ERP Example PRI My Recent B OUTSIDE PRI Documents ial TACTICAL PRJ g trading prj Le E WATCHER PRI Desktop D My Documents 93 My Computer File name My Network Views Enhancements When you select a View for display by default it will now occupy the space usually taken up by the Save as type WATCHER PRJ SEER SEM project files Include notes in SEER file Save as Dialog box Inputs Reports and Charts windows You can still resize a View E ERP Example prj SEER SEM File Edit Estimate Ven Reports Charts Tools Options Project Monitor amp Control Collaboration Window Help Oo A BE FA Basic Size Inputs Program a Portal Development ortal Development ICE Components RICE SAP Enhancem t 1 2 Console st 1 2 1 Console Release 1 st 1 2 1 1 Rules Repository ERR ules Execution gy Ge D Seeeee D FAVORITES SPECIFY SIZING ASSUMPTIONS IF Basic Size Inputs i Source Lines of Code Inputs 1 Unadjusted Function Points Inpu
45. he average can be influenced by outliers in the data set Total the sizes from the selected data set and uses that value for Least Likely and Most Brings up this help page Exit the dialog box applying size based on your selections Exit the dialog box without making any changes The project list includes all of the projects in your system s current SEER Historical Database You can use the checkboxes to select projects to be used in sizing Item checkboxes Element Name Project Name Description Language SLOC UFP Effort Schedule Description To select a project click on the checkbox to the left of the project s name To select all projects click on the checkbox in the column header row SEER SEM will use all selected projects in sizing The name of the work element The name of the project which includes the work element The description of the work element The work element s programming language Function Implementation Mechanism The size of the work element in source lines of code or unadjusted function points The effort associated with the work element in months The work element s schedule duration in months Page 24 Flexible Export The flexible Export dialog box has been resized and enhanced to make it easier to create the templates and export data SEER SEM 8 0 User Manual Supplement One key change to flexible export is that you do not need to close the flexible export dialog to chang
46. he work element The work element s programming language Function Implementation Mechanism The size of the work element in source lines of code The size of the work element in unadjusted function points The effort associated with the work element in months The work element s schedule duration in months Page 22 SEER SEM 8 0 User Manual Supplement Analogy Based Sizing You can automatically estimate the size of a work element based on projects selected from the SEER Historical Database SEER HD SEER SEM will compute size based on the selected projects size then enter that size in the work element Analogy Based Sizing Check to include exclude projects in the calibration Retrieve Records Again Element Name Project Name Description Language SLOC Effort Schedule GNU Compiler Colle The GNU Compiler 3rd Generation Languages 984 076 1 0 0 Emacs 20 7 text edi Emacs is an extensi 3rd Generation Languages 627 626 1 0 0 Gimp 1 2 1 GNU Im Gimp is freely softw 3rd Generation Languages 455 980 0 0 mySQL 3 23 36 mySQL is the world 3rd Generation Languages 402 799 1 0 0 LAPACK Linear lg LAPACK provides r FORTRAN 474 829 y 0 0 Mesa 3 4 OpenGL Mesa is an open so 3rd Generation Languages 323 730 i 0 0 S HOO OO 8 O 0 0 Ghostscript Postscri Ghostscript contain 3rd Generation Languages 264 528 0 0 Is Note Only projects sized in lines or functions are shown Show Siz
47. ho will be assigned to the project at the same time and the Maximum Staff the maximum number of developers who can be assigned to the project Estimated staffing may be below the maximum but never above it The rate at which staff can be added to a project Staffing Ramp Up corresponds to the Complexity Staffing input in the following way The Very Rapid Ramp Up selection equals the Very Low Complexity setting while the Extremely Slow Ramp Up selection is the equivalent of Extra High Complexity with the other settings mapped accordingly so that faster ramp Up equals lower Complexity and slower Ramp Up equals higher Complexity This is because in a complex project interdependencies between parts of the project limit the amount of work that can be done in parallel while in a relatively simple project a large number of people may be able to work on various parts of the project independently The Current Estimate Panel displays the project s estimated effort duration and cost based on your selections so far After you make or change a selection Project Assistant will update the estimate you can also update it by clicking on Update To view charts showing the current effort duration and cost risks for the project click on Chart The Guidance panel provides background information on the items in the current tab The appropriate Guidance text will be displayed when you hover the mouse pointer over an item or when you select
48. hor Me Spacecraft Sample PRJ Space System Tactical Simulation Template PRIJ Trading Regions PRJ Trading Suppor Web Server PRI Retail USA eco Anne 4 w Help Load Cancel ei zc 8 0 Release Notes Page 65 A new Preview Scenario dialog has been added allowing you to make all WBS Element query selections at once instead of having to do them one at atime Review Load Scenario x To include an element select the check box next to the element name When a choose query is applied radio buttons appear Make your choice by selecting the radio button next to the element name Description and query attributes for the selected element are displayed below Cancel Scenario Work Elements Seege Help aM SH ing 1 1 System Manager i 1 2 Event Database O 8 1 3 Traffic Routing M 1 3 1 Route Optimizer 1 3 2 Option 2 i 1 3 3 Option 3 1 8 1 4 one more for good measure Rollup Risk Analysis Reports The three Rollup Risk reports are now included in the available list of reports that can printed and exported using the Publish Reports and Export Reports functionality The new Maintenance Risk report shows a statistically defensible estimate of the relative contribution of various WBS element uncertainties towards overall uncertainty in maintenance effort cost Similar to the other Rollup Risk reports it is available only when Enable Rollup Risk Analysis mode is enabled The Development Risk
49. ining optimal inventory levels Customer Relationship Management CustomerRelationshipManagement app Software used to support the tracking and interaction with customers and prospective customers The software maybe used to aid in organizing automating and synchronizing business processes Typically in sales but can also be used for marketing customer service and technical support related activities 0100 Page 42 SEER SEM 8 0 User Manual Supplement Decision Support System DecisionSupportSystem app A specialized information system used to support business decision making usually at the tactical or mid management level These systems feature the ability to access to data such as sales and inventory figures combined with business rules or a model to evaluate such data as well as a presentation layer or user interface to present information Document Management DocumentManagement app An application used to track and store electronic documents Electronic Data Interchange ElectronicDatalnterchange app An application specializing in the structured transmission of business data or documents between companies or organizations by electronic means without human intervention Voice Provisioning VoiceProvisioning app An application specializing in providing clients with access to voice communications by providing accounts and appropriate access unifying the common elements of end user operations and management of call sy
50. ive Size 0100 SEER SEM 8 0 Release Notes Page 57 Modern Development Practices Use The Modern Development Practices Use parameter under category Development Support Environment has been renamed to Development Practices Use Recalculation Automatic recalculation is now permanently turned on for Program Component Unit and COTS work elements At the Project Rollup level it may still be necessary at times to use the F9 key to force a recalculation Reports and Charts Labor Category Reports The Person Months by Labor Category and Person Hours by Labor Category reports layouts have been updated to be in a continuous report The Activities are no longer split up and can be viewed using the horizontal scroll Maintenance Effort by Year Report The Maintenance Effort by Year report now displays the Total for the Corrective Adaptive Perfective and Enhancements Efforts Project Rollup Risk Reports Project Rollup Schedule Risk and Cost Risk reports now include the standard deviation Publish Reports Export Report Print Preview for Export Publish reports is now initialized correctly Scenarios Fixed a problem where a parameter query for a numeric input with choices that have a range would only load the likely value Schedule When a user entered required schedule is longer than the optimal effort schedule the effort and complexity outputs for Minimum Time and Optimal Effort are now consistent with each other Shipping Files
51. l Exit the SEER for Software Project Assistant without creating a project Designate Staffing Approach Tab The Staffing tab is where you set the main factors which affect staffing x Begin gt Size gt Classify gt Development gt Risk gt Staffing gt p Current Estimate Effort Designate Staffing Approach Key Staffing Constraint Or Objective Duration Minimum Time Cost Optimal Effort det Constrained Staff f Guidance Staffing Ramp Up Staffing Constraint How quickly can staff be added Minimum Staff Maximum Staff Sie 1 3 4 The more complex the software the SLOWER staff can be added The more divisible or simpler the FASTER staff can be added SEER forSoftware Project Assistant Rapid Software of low logical lt Back Next gt FINISH Cancel Designate Staffing Approach Tab Item Description Key Staffing Constraint or Objective Select the basic approach that the project will take with regard to staffing You can select between two types of staffing objective minimum time or optimal effort or set specific staffing constraints Page 16 Staffing Constraint Staffing Ramp Up Current Estimate Guidance Help Back Next FINISH Cancel SEER SEM 8 0 User Manual Supplement If you select Constrained staff under Key Staffing Constraint or Objective the Staffing Constraint inputs will become available You can set the Minimum Staff the least number of developers w
52. lect a SEER SEM Acquisition Method knowledge base for the project or for the current WBS element If you select Commercial Off the Shelf COTS the Project Assistant will skip the Development tab and the Size tab will display special COTS only sizing options For all other Origin selections the Project Assistant will display the Development tab along with standard sizing options in the Size tab The Current Estimate Panel displays the project s estimated effort duration and cost based on your selections so far After you make or change a selection Project Assistant will update the estimate you can also update it by clicking on Update To view charts showing the current effort duration and cost risks for the project click on Chart The Guidance panel provides background information on the items in the current tab The appropriate Guidance text will be displayed when you hover the mouse pointer over an item or when you select that item Depending on the subject there may be a More Guidance link If you click on it the program will bring up the subject s main help page in the help browser Brings up this help system Return to the previous tab Go to the next tab Each tab is a step in the process of creating a project and the specific effects of using the Back and Next buttons will depend on the options which you have already selected Exit the SEER for Software Project Assistant without creating a project SS 8 0 Relea
53. location 11 00 Code amp Unit Test Labor Allocation 7 00 Component Integrate amp Test Labor Allocation 8 00 Program Test Labor Allocation 8 00 System Integrate Thru OT amp E Labor Allocation 8 00 Maintenance Labor Allocation 8 00 Inputs Window Labor Category Allocation The allocation for all labor categories must add up to a total of 100 representing 100 of the activity being allocated If they do not add up to 100 the program will warn you and ask you to either adjust the values or to click on the Normalize button in the input dialog box in order to adjust them automatically so that they total 100 System Requirements Design Labor Allocation Proj Mar 12 00 Data Em Analyst 52 00 Test 12 00 Design 14 00 CM AM 200 Program 0 DC Leed 2 00 Normalize Values 100 00 as More Help Labor Category Allocation The allocation for all labor categories must add up to a total of 100 representing 100 of the activity being allocated If they do not add up to 100 the program will warn you and ask you to either adjust the values or to click on the Normalize button in order to adjust them automatically so that they total 100 The labor categories are Proj Mgr Project Manager Data Data Analyst Architect Analyst Software Business Analyst Test QA Quality Assurance Tester Design Software Architect Designer CM RM Configuration Release Manager Program Programmer QC Lead Quality Control Lead Note
54. main help page in the help browser Brings up this help system Return to the previous tab ei zc 8 0 Release Notes Page 13 Next FINISH Cancel Go to the next tab Each tab is a step in the process of creating a project and the specific effects of using the Back and Next buttons will depend on the options which you have already selected Create an estimate in SEER SEM and exit the Project Assistant Exit the SEER for Software Project Assistant without creating a project Describe the Development Method Tab Select the component s development method and programming language xl Begin m 4 S o H E D 2 o 2 a D g H 3 d Ei 2 5 2 oc D ty o Item Development Process Language or Toolset Current Estimate Guidance gt Size gt Classify gt Development gt Describe the Development Method Development Process Agile Full bd Language Or Toolset 3rd Generation Languages hd lt Back FINISH Cancel Describe the Development Method Tab Description Select a SEER SEM Development Method knowledge base for the project or for the current WBS element Select a programming language for the project or for the current WBS element The Language selection will be used for the Component WBS element s Function Implementation Method parameter selection when the project is output to SEER SEM The Current Estimate Panel displays the project s estimated effort du
55. me Hours Per Month 152 00 SEER SEM Standard Apply Productive Hours To Effort Hours Effort Months Change Schedule Options V Use Extended Schedule Adjustment C Assume Minimum Staff Program Defaults Function Based Sizing Estimation Volume Inputs C SEM 6 0 or earlier Compatibility V Comp s Units Developed Independently FBS Method aintenance SEM 7 3 or earlier Compatibility Project Parameters dialog box Note If the box is checked Partial years will not be enabled Individual maintenance phases will not be enabled Maturity line factors will not be enabled Steady State maintenance will be calculated like previous versions New Size under the Maintenance Size parameter will take default value of Total Size Maturity Levels A new set of complementary parameters have been added to enhance the maintenance model The Maturity Levels which can be found under the Software Code Metrics section in the parameter window are used to estimate Latent Defects These defects can be considered dormant defects unknown upon arrival The factors are used to gauge the maturity of the software code ranging from newly delivered developed to defect free Existing Code Maturity Level Lines not designed for reuse Nom Nom Nom Lines designed for reuse Nom Nom Nom Functions not designed for reuse Nom Nom Nom unctions designed for reuse Nom Nom Nom Proxy not desig
56. mponents i A Work Element Tree Control The tree controls can also be found in other areas of SEER SEM such as the Inputs window They automatically display the parameter notes Resizable column headers are included Bee 8 0 Release Notes Page 27 Tabbed Windows The updated SEER SEM interface combines Parameters Function Based Sizing PMC Snapshots Project Manager and Studio edition only and Labor Category Allocation See below in a single tabbed window called Inputs The Reports and Charts windows now have tabs as well L Parameters Function Based Sizing Project Monitor amp Control Snapshots Labor Category Allocation E PROGRAM Mission Simulator Least Likely Most z LINES Classic New Lines of Code 12 000 24 000 48 000 Pre exists not designed for reuse 920 3 850 12 840 Pre existing lines of code 16 000 20 000 24 000 Lines to be deleted in pre exstg it 0 a Redesign required 5 00 10 00 40 00 Reimplermentation required 1 00 5 00 10 00 H Retest required 10 00 40 00 100 00 a Pre exists designed for reuse 0 0 0 Function Implementation Mechanism C Programs Included In Size 1 1 1 5 FUNCTIONS Classic i at NEW i New Functions Software phase at estimate di Dreo osiste nnt decinned for rence Inputs Window Multi Color Tabs You can use the new View Multi color Tabs option to display tabs in both the Reports and Charts windows in distinctive colors Reports 3 Blix a Patel D
57. n eege GENEE SEENEN EE 19 Analogy Based Estimating ccccsssscecceeeeeeceneeeeeeeneeeeeneneeaeanseeeeeanseeeeeseeeseaneeeeeeaaees 20 Analogy Based SiZimg c cccccseseeceeeeseeeeneeeeeeenneeeeeeaeesenneneeaeenseseeeaseeeoneeeeseaneeeeeeaaees 22 Project sscnss acacteneeve levies sancti a aa aaa a aa a a a aaa eaa aa 23 0100 Page 2 SEER SEM 8 0 User Manual Supplement a TIR TN aiurria naaasar aaa aaa Naaa aK aaa sensi seesdeuetseeny 24 Load Save Template Taboe ugetegeteanseettenb eeg ne aiana eaha eia aa iaa aaa iaaa 24 Options Tab nied Template TaD EE 25 Parameter Linked Calculator ccsssscsssccessecessensseeeeseeeeesenseeeeseeneesensssessenenseonsesnans 26 Graphical User Interface Updates sscccssssececessseeecesseeseeeseeesenseeeseeneeeeoesneeseaes 26 Tree Control Tabbed Windows M lti Color KC EE Open in New Window S Geld FInd ccscccesssessesssesesesssssssesesseseseessseeseceeeeeeeeeseeeeeeeeeeeeeseseeeseeeeeseesseeeeeeeeeeseeeeeeeeees Updated Create Modify WBS Element Dialog BOX AEN 29 Be Le TEE 29 Maintenance Model Update cs sccsssccesseeessenseeeensseesssensseoessenssseensesessenenseonssanaes 30 Partial years 30 Individual Maintenance Phases w 30 Steady State Maintenance we B31 Maintenance Size a se 31 Maintenance Calibration eH Project Parameters we 31 Maturity Levels AA we 32 Maintenance Chart U
58. nd Procedures Triggers and Procedures 0100 SEER SEM 8 0 Release Notes Page 47 Launching SEER Metrics From Choose Available Charts You can now launch SEER Metrics from the Choose Available Charts dialog box Choose Active Charts Allocation Assessment Comparison Risk C Activity M Estimate C Effort J Effort C Benchmark vs KBase C Labor Category C Technology C Schedule C Schedule C Defects C Size O Cost C Maintenance Cost Sensitivity Other C Effort C Estimate vs KBase C Goals Confidence Level J Staffing Plan CO Schedule C Top 10 Effort Impacts C Defect Profile C Project Gantt C Defects C Staff Level vs Reference C Effort Schedule Trade Off C Annual Expenditure PMC Estimates Maintenance C Schedule Accomplishments C Health amp Status Indicator C Maintenance by Fiscal Year C Performance Indices C Benchmark C Maintenance Allocation C Defects Tracking C Estimate at Complete SelectAll Deselect Al Help Choose Available Charts Dialog Box with SEER Metrics Selected Select the SEER Metrics checkbox then click on the OK button SEER Metrics will open Server Mode Command Updates The following Server Mode commands are new with SEER SEM 8 0 MinimumStaff Maintain backwards compatibility for the Small Schedule feature If the project used Small Schedule Staffing for small projects with 1 000 to 2 000 lines of code or less then set this value to Yes For projects created befor
59. ned for reuse Nom Nom Nom Proxy designed for reuse Nom Nom Nom Maturity Factor Parameters ES SEER SEM 8 0 Release Notes Maintenance Chart Updates Maintenance by Fiscal Year Page 33 The Maintenance by Fiscal Year Chart is a bar chart with a toggle that allows you to switch between Maintenance Effort by Fiscal Year and Maintenance Staff Level by Fiscal Year Maintenance Effort by Fiscal Year breaks down maintenance activities on a per year basis The chart is a representation of the Maintenance Effort by Year report Charts M aintenance by Fiscal Year Effort Month 2012 2013 2014 2015 2016 2017 m Corrective Adaptive m Perfective o Enhancements Maintenance by Fiscal Year Effort Chart Maintenance Staff Level by Fiscal Year breaks down staff levels on a per year basis Charts Maintenance by Fiscal Year 2012 2013 2014 2015 2016 2017 Maintenance by Fiscal Year Staff Level Chart 0100 Page 34 SEER SEM 8 0 User Manual Supplement Annual Expenditure The Annual Expenditure chart is a bar chart which breaks down the annual cost of development and maintenance on a per year basis Charts Kessen Expenditure Data Analyzer 1595200 797600 2010 2011 2012 2013 2014 2015 2016 2017 B Development Maintenance Annual Expenditure Chart Maintenance Allocation The Maintenance Allocation chart is a pie chart which breaks out the total maintenance effort by maintenance activity
60. nt and give the name of the parent in curly braces 28 1 2 1 3 Analysis Server SD 1 2 1 3 1 Analysis Server lt new element to maintain size 1 2 1 3 2 Portal Development lt moved WBS element CD 8 0 Release Notes Page 63 Delete Multiple WBS Elements The Delete WBS Element functionality has been enhanced Multiple elements including elements with subordinate elements can now be deleted After selecting the element s to be deleted a new Delete WBS Elements dialog will display all the elements to be deleted to confirm the selections Delete WBS Elements pes re OK stone Scheduler Cancel 1 2 2 Process Simulation W 92 1 2 3 Braintree Encryption Help V 1 2 4 User Management Module f 1 2 5 Report Management Module LE MB 1 2 6 Hobbit Data Services Page 64 SEER SEM 8 0 User Manual Supplement Scenarios The Scenario Search dialog has been updated to make it easier to find a scenario When the dialog is opened it will now automatically populate the list with all scenarios saved in the Scenario path location enario Search Define More Criteria And Or Property Condition Value AND v Keywords X contains sl CH Add to List Find files that match these criteria _Add to uist And Or Property Condition Value Keywords contains C Remove New Search Look In C Usersikaren mcritchie Documents SEER SEER SEM 8 0 Scer File Name Title Subject Aut
61. ntenance Hours Risk Mean Independent Maintenance Cost Risk Dependent Maintenance Hours Risk StdDev Independent Maintenance Hours Risk Independent Maintenance Cost Risk Mean Dependent Maintenance Hours Risk Dependent Maintenance Cost Risk StdDev Dependent Schedule Risk Mean Independent Maintenance Hours Risk Mean Dependent Schedule Risk StdDev Independent Maintenance Hours Risk StdDev Dependent Schedule Risk Mean Dependent Schedule Risk StdDev Dependent Gr SEER SEM 8 0 Release Notes Page 67 Server Mode Two new server mode commands are now available The MonteCarloEnabled command can be used to turn on off the Enable Rollup Risk Calculation option Format MonteCarloEnabled lt YES NO gt Example MonteCarloEnabled YES The MonteCarloRecalc command can be used to force a recalculation of the Monte Carlo results so that they can be exported If you are running SEER SEM through server mode or the Automation Interface and you want to export Monte Carlo results this command must be issued before exporting the data Example MontecCar loRecalc Page 68 SEER SEM 8 0 User Manual Supplement Change Parameters in Multiple WBS Elements The Change Parameters in Multiple Elements dialog has been redesigned and updated to make it more intuitive for the user e Change Parameters in Multiple Elements Select Parameters and Specify Values to Change gt Parameter mg PARAMETERS Parameter s below have val LINES Classic
62. o operate the calculator When you ve finished your calculation press the Enter key or key to close the calculator and have the value directly entered into the currently selected parameter Lines to be deleted in pre exstg Notes Likely ok Fem 5 Cancel Prev Next KBase More Help Lines to be Del This is the number of lines of code which will be deleted outright from the pre existing lines of code before any work begins There is no effort associated with the deleted lines of code they are simply discarded from the project before any work begins Included in this definition is any software that will no longer be supported or otherwise will no longer be used or needed Note For numeric inputs you can press the key to use the Parameter Calculator See Source Lines of Code General Definition Parameter Linked Calculator Graphical User Interface Updates SEER for Software or SEER SEM 8 0 release has many new interface updates including new tree controls for WBS elements parameters and flexible export A few of the major highlights include Tree Control The WBS structure now has an improved tree control This lets you collapse and expand work elements by clicking the boxes next to the rollup elements Project WBS X 1 Watcher pew MB 1 1 Data Analyzer j BR 1 2 Mission Simulator i MB 1 3 GUI ES 1 4 COTS Software Integration 0 1 4 1 COTS Co
63. ode amp Unit Test Labor Allocation Component Integrate amp Test Labor Allocation Program Test Labor Allocation System Integrate Thru OT amp E Labor Allocation Maintenance Labor Allocation New Available Outputs BASIC ESTIMATE REPORT The Basic Estimate Report includes the following new outputs Effort Risk Adj Effective Size Effort Risk Adj Risk Effective Technology RISK ANALYSIS REPORT The Risk Analysis Report includes the following new outputs See also Risk Adjusted Metrics Report Risk Effective Size Effective Size based on current confidence level Risk Effective Technology Effective Technology based on current confidence level MONTE CARLO ANALYSIS The new MONTE CARLO ANALYSIS output category includes the following outputs Risk Confidence Level Risk Independent Cost Risk Dependent Cost Risk Independent Schedule Risk Dependent Schedule The new MONTE CARLO MEANS AND STDDEVS output subcategory under MONTE CARLO ANALYSIS includes the following outputs Risk Independent Mean Cost Risk Independent StdDev Risk Dependent Mean Cost Risk Dependent StdDev Risk Independent Mean Schedule Risk Independent StdDev Schedule Risk Dependent Mean Schedule Risk Dependent StdDev Schedule Page 52 SEER SEM 8 0 User Manual Supplement WBS Element Information In SEER SEM 7 3 WBS element information was listed at the beginning of the Available Inputs without a category heading These items are now listed under their o
64. ously have schedules adjusted for the minimum staff constraint This fix should not impact your estimates unless you had a combination of key settings Productive Hours Per Person Month is large usually 180 hours or more Size is relatively small usually fewer than 20 UFP or 3000 lines Productive Hours Per Person Month is applied to hours the non default setting In the maintenance release you will see a slightly longer schedule since it is no longer applying the erroneous adjustment for the minimum staff constraint If you also had a Required Schedule input you will see the estimated effort change as well as the schedule benefit or penalty is now based on the correct schedule SEER SEM Data INI file SEER SEM factors and data previously stored in the SEER SEM Properties INI have been moved to a new configuration settings file The SEER SEM Data INI file is a customizable text file that is part of the AppData files It is used to store data such as languages COTS component types COTS application types PMC terminology etc SEER Metrics Proxy size as it translates to lines or functions is now sent to SEER Metrics Server Mode The FlexportOutput command can now be used to export individual flexible export items that have a period or double quote in the item s description Using the FlexportOutput command now automatically recalculates the entire project after running a server mode script MSP Integration issue Gr SEE
65. parameters Project Monitor amp Control The PMC menu and PMC Snapshots tab have been renamed to Project Monitor amp Control New Flexible Export outputs are available Under the PMC Report section the MONTHLY ACCOMPLISHMENTS branch includes monthly progress outputs for the Baseline Plan and Current Estimate and it includes the Time Now snapshot that is currently applied SEER SEM 8 0 Release Notes Page 59 New Chart The Estimate at Complete chart shows how the Estimate at Complete for the Baseline Plan and Current Estimate changes across the entered snapshots as of the Time Now selection Similar to deleting a snapshot in the SEER SEM user interface a snapshot can be deleted via server mode by entering O for the date Inthe Schedule Accomplishments chart the chart pop up value for the Current Estimate s Actual Spent now correctly displays the percentage against the Current Estimate and not the Baseline Plan Printing In the Print Options dialog box when a Project Rollup is selected checking the option to Include Lower Level WBS Elements will now print the selected reports and charts for subordinate elements in the Project WBS Project Assistant When using the Project Assistant knowledge base selections are now inherited from the project rollup element correctly Recalculation Estimates at the program level are now automatically recalculated after a knowledge base has been changed for a lower level
66. pdates 33 Labor Categories and Allocation i 35 Default Labor Cate TE ia 3D Inputs Window Labor Category Allocation Tab wD Labor Category Allocation Report AAA 37 Minimum Staff Scheduling Option scccceesseceeessceceenseeeseesseseeessseseanseeeseneseees 38 Project Parameters Dialog Box Quick Eetimate ssssssnnnneeeenennn Program Enhancements cccccssssssssncscceeseseesseenceeesesnseenseenceeeseseseeeseeneeeeseseseesseeneeenees Single Project DEE Saving Notes with Project Files ch Vi we EnbanGemettb g essgeugeutaeuggug Zeie an vesdelgdenits EENEG E EAR ARENS AE EES Knowledge Base Updates ougsgtgre regedagegeegksCgeEEN AEN ENEE AEN EEN ENEE EENEG Quick Estimate Report en Software Metrics REPO Mtn a ccs 2 seucacchccntdecesewcaecadesvedeavaedodaavesteceaeeaedeivass vEER ENEE ENEE Nee Risk Adjusted Metrics REPOrt nicc ccc ccacccsescccnsveecoossutneaeesstiascnonebeenetouvisacsvenensesetbourtsaties ction System Integration Parameters wee SEER SEM HEID eenen eeaeee aea eE EA e ea Ea a eaea sve wee deanet edeavacd ceavtenvaew Calibration ege Exclude WBS Element from Rollups Totals g s Object Sizing Input Na MeS ssassn cisnienie SEENEN Macedon cbauvbaetecdices OENE Geaa ES Droe N MES ae e aaa eege EE ENEE Launching SEER Metrics From Choose Available Charts Server Mode Command Updates Minimums taf EE Gr SEER SEM 8 0 Release Notes Maint7_3Compatible ccccccccccccssscceceeseeceee
67. ration and cost based on your selections so far After you make or change a selection Project Assistant will update the estimate you can also update it by clicking on Update To view charts showing the current effort duration and cost risks for the project click on Chart The Guidance panel provides background information on the items in the current tab The appropriate Guidance text will be displayed when you hover the mouse pointer over an item or when you select that item Page 14 Help Back Next FINISH Cancel SEER SEM 8 0 User Manual Supplement Depending on the subject there may be a More Guidance link If you click on it the program will bring up the subject s main help page in the help browser Brings up this help system Return to the previous tab Go to the next tab Each tab is a step in the process of creating a project and the specific effects of using the Back and Next buttons will depend on the options which you have already selected Create an estimate in SEER SEM and exit the Project Assistant Exit the SEER for Software Project Assistant without creating a project Characterize the Risk Tab The Risk tab is where you set the main risk factors for the project x Begin gt Size gt Classify gt Development gt Risk gt SEER for Software Project Assistant Item Requirements Volatility Risk Tolerance Current Estimate Characterize the Risk lt Back FINISH Cancel
68. re existing functions All maintenance activities are included corrective adaptive perfective and enhancements however the corrective maintenance level will reflect the maturity of the system This knowledge base replaces Maintenance Complete Maintenance Sustaining Mature System maintmin end This knowledge base can be used for maintenance only estimates for software that is newly deployed or operational for fewer than 3 years Size should be entered as pre existing source lines of code or as pre existing functions All maintenance activities are included corrective adaptive perfective and enhancements and the corrective maintenance level will reflect the maturity of the system This knowledge base replaces Maintenance Sustaining MainMin end Maintenance Full Effort for New System maintfulNewSys end This knowledge base can be used for maintenance only estimates for software that is newly deployed or operational for fewer than 3 years Size should be entered as pre existing source lines of code or as pre existing functions All maintenance activities are included corrective adaptive perfective and enhancements and the corrective maintenance level will reflect the maturity of the system Maintenance Sustaining New System maintminNewSys end This knowledge base can be used for estimating essential corrective and adaptive maintenance modifications and additions or software that is newly deployed or operational for fe
69. s in tree structure format with related types of sizing methods grouped under headings double click on a heading to expand or close its list of sizing methods Double click on a sizing method in the New tab to size new code Double click on a sizing method in the Pre existing tab to size pre existing code Reuse details Click on the Reuse details button to bring up the Reuse details dialog box and set the percentages of redesign reimplementation and retest required for pre existing code You can enter Least Likely and Most percentages for all three categories Click on the Redesign required Reimplementation required and Retest required labels to bring up help pages describing each reuse requirement category The Current Estimate Panel displays the project s estimated effort duration and cost based on your selections so far Page 10 Guidance Help Back Next FINISH Cancel SEER SEM 8 0 User Manual Supplement After you make or change a selection Project Assistant will update the estimate you can also update it by clicking on Update To view charts showing the current effort duration and cost risks for the project click on Chart The Guidance panel provides background information on the items in the current tab The appropriate Guidance text will be displayed when you hover the mouse pointer over an item or when you select that item Depending on the subject there may be a More Guidance link If you
70. se Notes Page 9 Select A Sizing Approach Tab Select the sizing method for the current component The contents of this tab will vary depending on whether COTS has been selected in the Origin input on the Description tab This shows what would be expected if COTS has not been selected as the origin Among the sizing options is Analogy Based Sizing See a description of this feature also available in the main SEER SEM interface P SEER for Software Project Assistant Invoice project 089 program x Begin A E S KH S a Ka e t 2 D 2 A w 2 o S D Vd a D D E B Vi Item Select a Sizing Approach New Pre existing Current Estimate gt Size gt gt gt Current Estimate e Effort Select A Sizing Approach New Pre existing Select a sizing method from a category below Source Lines of Code D By Analogy chart Analogy Based Sizing Gates z Size By Comparison E Functional E Function Based Sizing Analogy Based Sizing lets you size Cosmic Function Points based on one or more past projects Function Points stored in the SEER Historical Use Case Points oie E Lines Source Lines of Code E By Reference Data Centric Desktop App Functional SLOC References UFP References Duration Cost Select A Sizing Approach Tab Description Select and specify the sizing method by double clicking on it Sizing methods are listed in both the New and Pre existing tab
71. selected Fixed an issue that sometimes appeared when saving a project to the SEER Enterprise Database In certain scenarios an erroneous Estimate to Complete parameter value would result in a misleading error during the save Projects with the character in the file name can now be opened in SEER SEM by double clicking on the file name When a lower level element is selected in the Project WBS using the Load Individual Knowledge Base feature will now load the correct parameter values for parent level parameters for the selected element When inserting a lower level element 1 parameter notes in the Function Based Sizing view are now transferred to the lower level element and 2 proxy sizing inputs are now transferred to the lower level element When using server mode to apply staffing constraints if the Min Staff value is greater than the Max Staff value the values are now applied correctly Restored the right click context menu behavior in the Top 10 Effort Impacts chart Upgrade Information The following are special considerations for the users of earlier SEER SEM versions Installation You do not have to uninstall SEER SEM 7 3 to install SEER SEM 8 0 In fact it is recommended that you maintain your SEER SEM 7 3 installations We do recommend however that you uninstall any beta release versions you have installed 0100 Page 72 SEER SEM 8 0 User Manual Supplement File Upconvert Your SEER SEM files from 7 3 or earlier
72. stems Workflow Workflow app An application that aids in the automation of and adherence to a process Some steps in the workflow process may require human intervention such as approvals but leaving as much of the automated process to be handled by the application New Acquisition Method Knowledge Bases Acquisition Method Kbases that begin with an underscore _ are used to model parts of the overall software development lifecycle Size should be entered in the category used for Partial Life Cycle or Existing code These knowledge bases will determine the appropriate equivalent size as well as special calibration factors needed to estimate the desired portion of the life cycle _ High Level Design thru Test Only _Des thru Tst Only end This knowledge base will estimate the effort and schedule for preliminary design though program test _ Requirements Only _Req Only end This knowledge base can be used to estimate only the requirements effort and corresponding schedule _ System Test Only _System Test Only end This knowledge base can be used to estimate only the System Integration and Test effort and corresponding schedule SEER SEM 8 0 Release Notes Page 43 Maintenance Full Effort for Mature System maintful end This knowledge base can be used for maintenance only estimates for software that is considered mature or operational for 5 years or more Size should be entered as pre existing source lines of code or as p
73. te elements programs or components that are created as you iterate back to this tab Item Description Start Date PE SEER for Software Project Assistant Invoice project 089 program xi Begin gt SEER for Software Project Assistant gt Begin Your Estimate Description voice poet 089 Start Date Thursday August 11 2011 x Origin Acquisition Method General new and pre existing E Begin Your Estimate Tab Description The name of the Project Program or Component WBS element The text that you initially enter in the Description field will become the default Program Level Description in the Summary tab The Project Assistant applies the Description according to the following rules 1 When it creates a project the Description text becomes the name of the project the Program WBS element and the first Component WBS element 2 When it creates a Program WBS element the Description text becomes the name of the Program and the first Component WBS element 3 Each time that it creates a subsequent Component WBS element the new Description text becomes the name of that Component The start date of the project or WBS element To enter a start date click on the down arrow to the right of the field and select the date from the pop up calendar Page 8 Origin Acquisition Method Current Estimate Guidance Help Back Next Cancel SEER SEM 8 0 User Manual Supplement Se
74. tegory Allocation Customer Reporting Cost E Proj Mgr 11 4 Programmer E Analyst 24 8 Person Months Person Hours Cost of Total Cost E Program 9 1 Design 30 3 E Data 7 2 Test QA amp 13 2 E cuipu 2 0 E OC Lead 2 0 Labor Category Allocation Chart cost 0100 Page 38 SEER SEM 8 0 User Manual Supplement Minimum Staff Scheduling Option The Minimum Staff or MIN STAFF is a new scheduling option available in SEER SEM 8 0 Prior to this release with a project of small size 1000 2000 lines of code or less 50 function points or less the estimated schedule would be often overstated causing an average staff of less than one FTE With the minimum staff feature also known as small schedule SEER SEM computes the schedule based on the assumption that there will be a minimum average staff of at least one person on the project For very small size projects you will see shorter schedules when Minimum Staff is enabled Project Parameters Dialog Box To turn the minimum staff feature on or off check the Assume Minimum Staff box under Schedule Options in the Project Parameters dialog box To maintain backwards compatibility this option will be turned off by default for projects created in SEER SEM 7 3 or earlier Project Parameters Software Development Activity Naming Scheme Project Outline Start Number 1 SEER SEM Standard Fiscal Year Starting Month 1 I J Cost Escalation Fac
75. ting Started with the Project Assistant The Project Assistant can be accessed from within the Create Modify WBS Element dialog box or the SEER SEM toolbar If you do not currently have a project open in SEER SEM the Project Assistant will create a new one along with as many subordinate programs as you specify If a project is currently open the Project Assistant will create a program element plus subordinate components The Project Assistant can be used to create just one element in SEER SEM or several at a time Create Modify WBS Element x A cuide me using Project ing Project Assistant ea bie SEER For Analyst crane SSS d Element Type Indenture Software PUES ciles pa Ele c te M dify was Rollup Program Component COTS Unit Level 2 reate odi This dialog box lets you Knowledge Base Selections geed Platform Business and Non Critical MIS DI Create Modify WBS Element Guide Me Using Project Assistant a Eres a els ET Project Assistant Project Assistant Button on Toolbar Quick Launch Options x goeeeesesosceseeosoecesosseoescesesoeossesoeosscocsosssooeoesesosossesosssoesesseseeseseseeossesesossssessesssessesg Guide me in creating an estimate Project Assistant Button on Quick Launch Options BE 8 0 Release Notes Page 7 Begin Your Estimate Tab The Begin Your Estimate tab is where you initially specify the Project or Program being created and also subordina
76. tion Adjustment Factor 1 00 pe FBS Platform Adjustment Factor 0 92 zt Calibration Effort Adjustment 1 00 Requirements Before Design Effort Adjustment 1 00 Requirements After Design Effort Adjustment 1 00 Design Thru Program Test Effort Adjustment 1 00 System Integrate Thru OT amp E Effort Adjustm 1 00 5 Calibration Schedule Adjustment 1 00 Requirements Schedule Adjustment 1 00 Design Thru Program Test Schedule Adjust 1 00 om System Integrate Thru OT amp E Schedule Adju 1 00 Calibration Defects Adjustment 1 00 Calibration Technology Adjustment 1 00 Calibration Complexity Adjustment 1 00 4 Calibration Maintenance Adjustment 1 00 Calibration Adjustment Factors Calibration Effort Adjustment and Calibration Schedule Adjustment In SEER SEM there are three main phases that are accounted for in software development Requirements Design and System Integration In the previous versions of SEER SEM when users applied calibration factors all three phases were calibrated at the same time Now users will be able to apply a calibration factor on each individual phase of the software development process Calibration Effort Adjustment parameters Requirements Before Design Effort Adjustment Requirements After Design Effort Adjustment Design Thru Program Test Effort Adjustment System Integrate Thru OT amp E Effort Adjustment Calibration Schedule Adjustment parameters Requirements Schedule Adjustment Design
77. tor E 50 Project Rollup Risk Iterations NO Productive Hours Per Month Labor Category Naming Scheme Hours Per Month 152 00 SEER SEM Standard Apply Productive Hours To l Effort Hours O Effort Months Change Schedule Options V Use Extended Schedule Adjustment V Assume Minimum Staff Function Based Sizing Estimation Program Defaults e g Volume Inputs SEM 6 0 or earlier Compatibility V Comp s Units Developed Independently FBS Method jaintenance SEM 7 3 or earlier Compatibility OK Cancel Project Parameters Dialog box Note Use Extended Schedule Adjustment must be checked in order to activate Minimum Staff 0100 SEER SEM 8 0 Release Notes Page 39 Quick Estimate If your estimate falls into the small schedule range this will be indicated in your Quick Estimate report with a MIN STAFF constraint Sch Reports Wa Quick Estimate Program Data Analyzer Development Schedule Months Development Effort Months Development Effort Hours Development Base Year Cost Quick Estimate Report Program Enhancements Single Project Files Saved project and scenarios files are now stored in a single project file There are no more cdx dbf and fpt files A prl file is still generated for linking Saving Notes with Project Files A new option in the Save As Dialog box has been added to include or exclude saving notes This is to support the new compressed project file
78. ts Detailed Function Based Sizing Inputs 1 COTS Sizing SPECIFY PROJECT ASSUMPTIONS 2 SPECIFY PRODUCTIVITY ASSUMPTIONS ANALYSIS amp TRADE OFFS SEER SEM CLASSICS D Pme PROJECTMINER PROGRAM Core Portal Services Release C m New Lines of Code f Pre exists not designed for re Pre existing lines of code Redesign required Reimplementation required on Retast required th Pre exists designed for reuse Function Implementation Mechanism Programs Included In Size FUNCTIONS Classic New Functions s Pre exists not designed for re Pre existing functions Redesign required PPE RM Ee A ore Portal Services Release C BS 0 00 0 00 0 00 o Defined at lower level E 995 30 233 Quick Estimate Program Core Portal Services Release C Estimate 31 05 709 86 107 898 12 493 454 Development Schedule Months Development Effort Months Development Effort Hours Development Base Year Cost Maintenance Schedule Months 120 00 Maintenance Effort Months 525 24 Defect Prediction 66 Constraints MIN TIME Size Allocation Core Portal Services Release C E new 65 519 B EritsNOR 2 4696 8 xineDR 32 039 WBS Elements 51 New Default Views Display 8 0 Release Notes Page 41 The Views menu now includes a Delete View command it will delete the view that is currently selected in the Views selector Server Mode now includes commands to
79. ult reports etc The SEER User profile may also contain other SEER related documents and files however this typically depends on the type of install chosen Page 54 SEER SEM 8 0 User Manual Supplement Local Installations In a typical SEER SEM local installation where all of the files are installed on the user s system and not on a network server files are installed in the following locations Application Files Application files include the main SEER SEM program along with associated DLL Help and other supporting files Windows 7 Vista XP C Program Files SEER SEER SEM 8 0 Application Data Application data files include INI files which control basic program settings Typically you would not open or edit these files directly since they are maintained and updated by SEER SEM when you make changes within the program Application data files are stored in the following locations Windows 7 Vista Users USER NAME AppData SEER SEER SEM 8 0 Windows XP Documents and Settings USER NAME Local Settings Application Data SEER SEER SEM 8 0 Document Files Document files include these directories Directory Description Export Templates Default location for flexible export templates KBases The SEER SEM knowledge base and proxy files Projects Default location for your project files along with sample project files Scenarios De
80. unction Calls to SBW 1 1 2 4 Portal Development Java Service Enhancements 1 1 2 5 RICE Components 1 1 2 6 RICE SAP Enhancements 1 1 3 Core Portal Services Release C m 1 1 3 1 SAP Release C 1 1 3 2 SAP Pre existing Configuration Modifications 1 1 3 3 Portal Development Portalets i 1 1 2 4 Portal Navalanmont Paranta E metian Calle ta CAW m r 1 Hm m EEE E RERE Options F Record change in parameter note Include date time stamp aD Goa Ga 0100 Page 70 SEER SEM 8 0 User Manual Supplement File Autosave Autosave automatically saves a copy of the open project at the interval indicated in the Set Autosave Minutes dialog This optional feature is enabled from the options menu When you enable autosave you can set the autosave interval Autosave applies to project files and not projects opened from the database Set Autosave Minutes es Set the number of minutes for each Autosave to occur 10 2K Cancel Read Only Option for Open Files A Read Only copy of a project can now be opened if a project is locked for editing i e already open File In Use zl Illinois Outreach PRJ is locked for editing by Karen McRitchie Click OK to open a Read Only copy of the file Miscellaneous Your SEER SEM files from previous 8 0 releases 8 0 6 or 8 0 14 can be used in this 8 0 version However project files saved in 8 0
81. uts Window Labor Category Allocation Tab In previous versions of SEER SEM changing labor category allocations required editing a table in the SEER SEM SETTINGS INI file to adjust the necessary factors Modifications made to this table applied to all projects and programs In SEER SEM 8 0 it is now possible to set labor category allocations at the program level in the same way that you would enter parameter inputs This eliminates the inconvenience of having to 0100 Page 36 SEER SEM 8 0 User Manual Supplement alter the INI file and also allows for greater flexibility in allocating labor categories to activities In addition the values will be stored as parameters allowing them to be saved in Knowledge Bases The redesigned Inputs window includes a Labor Category Allocation tab with a full set of labor category allocation inputs This makes it possible to customize effort and cost allocation of the labor categories Double clicking an activity row brings up a dialog box with percentage value inputs for each labor category E Inputs 3 fe x L TE S p z TINTA Function Based Sizing Project Monitor amp Control Snapshots Labor Category Allocation n PROGRAM Customer Reporting Hg LABOR ALLOCATION BY ACTIVITY Proj Mar Analyst Design Program Data Test QA CM RM QC Lead ystem Requirements Design Labor Allocation 12 00 SAN Requirements Analysis Labor Allocation 12 00 Preliminary Design Labor Allocation 11 00 Detailed Design Labor Al
82. wer than 3 years Size should be entered as pre existing source lines of code or as pre existing functions Model Based Development mbd end This knowledge base should be used for code that is developed using the model based development tools and if you are using source lines of code as a sizing metric New size should be entered under pre exists designed for reuse parameter The rework parameters will calculate an equivalent effective size that is calibrated to this type of development Quick Estimate Report The Quick Estimate report has been updated to include proxy size The following outputs are affected Total Lines Only Total Functions Only Effective Lines Only Effective Functions Only Productivity Lines Person Month and Productivity Functions Person Month 0100 Page 44 SEER SEM 8 0 User Manual Supplement Software Metrics Report Software Metrics report has been updated to include proxy size The Software Metrics report now displays Latent Defects and Delivered Defects if SEM 7 3 compatibility is not checked in the Project Parameters dialog box Risk Adjusted Metrics Report A new Risk Adjusted Metrics report has been added The report displays Risk Adjusted Effective Size Risk Adjusted Effective Technology and Risk Adjusted Productivity by confidence level The Risk Adjusted Metrics report can be activated in the Reports menu or by right clicking on any open report 5 874 83 4 402 03 3 891 27 3 556 77 3 291 18
83. wn category heading WBS Element Information following the Available Inputs WBS Element Information includes the following new items Output Level outputs the currently WBS level in tree Elementincluded Indicates whether a work element is included in Rollups Totals SEER Metrics Benchmarking amp Analysis Previous versions of SEER Metrics used Graphic Server but since the last release SEER Metrics has been rewritten to use Chart FX Along with the use of Chart FX the following enhancements to SEER Metrics are Color Selection The drop down list for color selection has been replaced by buttons users now have a 24 bit palette for selecting colors X amp Y Properties Inputs and Controls innate D ou Show Hide Points X amp Y Metrics ik Display Options Display target da Basic colors bo M Display Total Ob WI E PI W P Display Observa DI P i m Displayed Historical BEZ PS DW a EN Iw Log transfd E ES Si DW EE transform X axis EEE EEE Ee EEE ES E IV Display target da L Display target da plus minus one BR J Custom colors i BR Iw Display target da Vv Display target da Define Custom Colors gt gt Deselect All squared value ES Help Save Configuration Filter Apply to Chart Close X amp Y Properties Display Target Data Copy as Text data only The Edit menu has been revamped to be clearer A Copy as Text data only option
84. xt FINISH Cancel Summary Tab Description Shows the name of the project or the program WBS element depending on whether the Project Assistant was started with a project having been created or without a project having been created Lists each of the components in the project along with its sizing method You can edit a component by double clicking on it this will return you to the Description tab with that component s information displayed To create a new component click on the Start Another Component button this will return you to the Description tab where you may enter information for the new component The Current Estimate Panel displays the project s estimated effort duration and cost based on your selections so far After you make or change a selection Project Assistant will update the estimate you can also update it by clicking on Update To view charts showing the current effort duration and cost risks for the project click on Chart The Guidance panel provides background information on the items in the current tab The appropriate Guidance text will be displayed when you hover the mouse pointer over an item or when you select that item Depending on the subject there may be a More Guidance link If you Page 18 SEER SEM 8 0 User Manual Supplement click on it the program will bring up the subject s main help page in the help browser Help Brings up this help system Back Return to the previous t

Download Pdf Manuals

image

Related Search

Related Contents

Servidores de impresión externos HP JetDirect  SERVICE MANUAL  événement - Marcel Bauer  Oki X400 User's Manual  AN-R007_catalogオモテのコピー  CANblue II - VirtualSCADA  Lirio by Philips Spot light 57113/48/LI  INSTRUCTION MANUAL  SPEEDLINK SL-6492-BK  Bedienungsanleitung Sony-Ericsson C902  

Copyright © All rights reserved.
Failed to retrieve file