Home

NOP Public Portal - User Guide

image

Contents

1. Pil iab a diene m b kh mum Ertami Oeste ia ni eee 12 iacu D dis pa Cuire kc pasegg BEE AER pt Ku qum nog cupmchp Dey Lipa i peri Ferrel The gru nli Erhai Lacer oes n KTICH p Pbi da wa eid ori Merce 1 DONIS y roce x g peg larg Derer mer Mali Di Lat Erden 5508215 IE TL EDT T3171 1025 cS TEL ED Be ST 30530807113 LES E LCS REGLERI AF ETID CERETI iadi CHENI 1229 fie i AS CT PENTITI DE QU Operational Reference Information Airspace Scenarios ruwrg ngu E imper STE merry bi paper nm Ferries Hos rope irre mi Pen iHd igan Collaboration Area Emah Teni Bes SHIII ETT Thcer a insure Ther ac A cries FASII ETH MINCE duane iine TEMERE tI C rz sees Bee P ef
2. November 2015 Monday 30 November 2015 Mon Tue Wed Thu Fri Sat Sun Show only starting events 26 27 28 29 30 31 4 Select Types amp EDGG 7 8 EDGG Scenarios j 0710212010 00 00 31 12 2999 00 00 12 13 14 15 EDMM EDUU EDMM VoLMuK PROJECT i9 20 M 22 09 02 2012 00 00 31 12 2999 00 00 38 37 28 29 EU Scenarios 3 4 5 6 15 04 2009 00 00 31 12 2999 00 00 LFRR ERATO implementation 021 2015 00 00 01 07 2016 00 00 Search k List Search List It presents all Network Events Section 5 22 1 available for a given day or period as the single access point for information provided during the ATM operational phases e Strategic information when and where the event will occurs what are the expected benefits and the expected operational impact e Pre tactical information what mitigation measures are to be put in place e Post operations information performance analysis what performance was recorded in relation to the event was the operational impact as expected were the mitigation means effective What can we do better different in the future etc Overview When launched the current date is set on the current portal time The selected day highlighted day cell is set on the portal target date The calendar header shows the current calendar date and the navigation controls cil Curr
3. EDGGO030 EDWW0037 EDUUODS7 SELAGSEF RM KAGCS EQUIPPED TCAS EQUIPPED 003227238833 Click on the highlighted CLICK HERE TO ENTER DATA link to open the OTHER INFORMATION wizard Other Information INDICATOR STs REASON ALTRY FP HEAD NONRVSM ATFMX HOSP fF SAR FFR STATE MARSA P HAZMAT MEDEVAC OK CANCEL The Other Information wizard is structured as follows INDICATOR a drop down menu listing all available indicators STS PBN EUR COM Parameter s numerical of alphanumerical value text field s tables etc Action Buttons the standard OK and CANCEL buttons Add Indicator Example for the NAV indicator Fl Select the desired INDICATOR Other Information INDICATOR STS STS PBN EUR HEAD NONRV5SM REASON NAW HOSP SAR HUM E STATE MARSA SUR MEDEVAC DEP DEST OK CANCEDOF RAG 2 Specify the value s Other Information INDICATOR VALUE GBAS SBAS 6 OK CANCEL H Click on the OK button Dther Information INDICATOR WAY VALUE GBAS SBAS 4 The newly created NAV indicator now shows in the OTHER INFORMATION field page 88 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide OTHER INFORMATION CLICK HERE LO ENTER DATA PBN A1 B1 01 51 52 NAVIGBAS SBAS DOFA50929 REG OOSSC 006 EDGG0030
4. 1 AT TOT ROS b d Crib Monitoring Che equ tm don ee pes Authorised Access Applications Geers Eerie Levi Tinh Vee Ael is dar ber Drm lad Ty Mira fe ASS UIE Eni o EE uel P ET as ees Hh HT RE Fringe Brem UE Fir Paca Veaen Tam bii Peab 2 30 por dl Teg Herrig Deore PES Eee d HURSRSI 2 ed RETI ere EAD peeves ta me ud ARH forma for a roca RAD Fais Cal mi Lal pM acci Tu pisi merge Hima pst Bey mca ci map Harum For arra tru 2 asa cete Legii m DAE Hae Tools amp useful links PI PEPI RUNDE repara bese Loess P iL Lud Coe SSL Leer eco ee EAD Pro Limpirsim 1 1 euim M3
5. 12 BATTY 11 53 EBBRAI2 BATTY 11 53 RMZU12 12 38 EBHRAI2 BAIZY 12 00 KWURiCI2 LOHRE 12544 fan m c pg nu gt gt E 8 page 33 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 4 4 4 Color overlays and Error Messages When a query can not be performed the Detached View window freezes and is shaded with a light red transparent overlay indicating that an error was encountered A pale yellow Alert box also appears detailing the cause of the error and if possible providing information on how to solve the problem You need to click on the OK button to close the Alert box unfreeze the window and resume working Target Date 19 08 20158 Mandatory field Airspace must contain at least 1 alphabetic or numeric or special character D Tactical Lm emm 1 Traffic Type Traffic Load Compare With D iii ee ui In the above example the query was launched with no data in the Airspace search field while it is a mandatory field which must contain at least 1 alphabetic or numeric character Loading data Waiting time Some queries can put a significantly heavy load on the Portal server requiring some time to be processed and displayed back in your browser To provide a strong visual clue that you
6. NET one D LT E wii arre enim orum inl i Thr boyan Dope ee dor ete ol die Deeg UE eee ee relies o Note this is the default layout you may determine what you see and adapt the information displayed to your 05 88 2013 17 23ennc accu E prt ea deua 5 TETI d os Iram prem E ab Deby aC Caceres gu erm asig Tae IW Aurora Capa rp AT deprem Uam ur ng Ip camem Pam ATE E ih ce Gat Madore Ctra TH E Hn E Dy iain rM DE cxt ed recipi Samen ba ieri a Teira eyle piri i kl ar pn ap iria Furia Vera rich fand ene cud RI E 25 rd lE ees Heine Cami Der Gee reed ile ie ETENE glee eee in rase ci nt fem Ve ral
7. Compare O Time Threaholek D D Level Threshoki 0 D Threahold 0 Preweous Perice 12 05 2013 12 00 42 25 am Selected Flights Collapse All Plot Evita Selector ITOT TA STA ARCID ATYP Aner ADEs D T laar iost u ecToT 0 5 Opp MSG REGUL TTO Fix ATT 0 Impacted 12 00 AX LTFE EBR B4 120825 Okabe 08 35 2 BRITY 11 45 155 144 H 355 12 024 JAF51 8733 LEPA 350 T2 1ESD 12 12 024 12034 OLAY ERER EDOF 23 12 1 50 10st 12 034 12 DLHE amp HY BTXS Ef EBER 220 12 1110 1124 11 234 4Z D amp A ONYIBES AX 120845 DE 2DC 18 36 12 0 BELBSA HED LK EEGA 270 12 1010 120 10 28 12 084 BELTAT ESSA FEAR 3X 12 0650 1016 18 58 k 12104 T 3 0 42 445 1212 12 104 12 10 CSA X LEPA EEGA 3 12 10 1106C 11 01 12114 HELBHR AI LFMH T 370 12 12 00 12 12 115 12124 THYiPF 87 EBSA 35 12 08 50 08 42 12 144 CANS BT EBBR 3E 12 00 45 50 08 50 ATA RAMBIS HT GHMMN t 370 12 1145 orc 121178 1217A SELAI AT L EBBR 12 11 59 20C 11 01 12 184 AUG 12 1310 1221 12 182 EBBRAI2 IH 11 49 15 12 11 27 EBBRA I2 IH 11 32 EBBRA I2 12 04 M 12 41 2 BRITY 11 58
8. In a similar way the button will open a Contextual Help Section 4 2 3 window page 9 Version P 19 5 1 23 of 8 December 2015 25 NETWORK MANAGER Public User Guide Printing from the Portal A Printing from the Main View This may differ from each make and version but is basically obtained under the File and then Print function of your browser Consider having a look at the additional setting capabilities of your configuration to select more appropriate combination of settings where relevant e the Properties linked with your printer and printer s driver e the Page Setup linked with your browser B Printing from a Detached Section 4 4 View Since no toolbar is present in the detached view you will need to hit the Ctrl and the P keys of your keyboard to invoke the print dialog box You can beforehand specify the display mode of the detached view using the Display toggle button located in the header right after the right Set button This is the setting by default the Screen mode header is kept visible at all times and the vertical scrolling only affects the data tables Click on the icon to toggle in the Print mode i The Print mode is used when you want to keep the header and the data together in one piece typically for sending the whole content of a page to a printer Click on the icon to toggle in the Screen mode Consider having a look at the additional
9. arget Date 25 08 2013 0 1 Post Operations Go 20 08 2013 13 30 37 26 AMS Valid from Until Description Released on 25 08 2013 27910022013 TAXI TIME 2 05 2013 15 35 25 08 2013 30 08 2013 NETWORK NEWS FRIDAY 30 AUGUST 2013 25 05 2013 14 42 29 08 2013 23 08 2013 TAXI TIME LEPA 25 05 2013 08 35 29 08 2013 2910 2013 TAXI TIME LEPA 25 08 2013 08 33 25 08 2013 2389 08 2013 TAXI TIME 25 05 2013 08 27 23 08 2013 2108 2013 TAXI TIME LEPA 29 08 2013 08 16 z9003 2013 259038 2013 TAXI TIME LEPA 29 08 2013 07 45 208 2013 25 05 2013 TAXI TIME LROP 2910812013 06 49 2 08 2013 S 05 7013 TAXI TIME 2U0ID 842013 05 14 Z0 08 2013 08 2013 TAXI TIME 20 08 2013 04 50 29 08 2013 25 08 2013 TAXI TIME 20 08 2013 04 50 2g ar2013 2508 2013 TAXI TIME 20 08 2013 03 54 9708 2013 2508 2013 TAXI TIME EHAIM 20 08 2013 03 50 29 08 2013 AS 08 2013 TAXI TIME 20 08 2013 03 48 29 08 2013 2908 2013 TAXI TIME EHAM 20 00 2013 02 59 29 08 2013 29108 2013 TAXI TIME EHAM 20 08 2013 02 59 29 08 2013 2908 2013 TAXI TIME EHAM 28 08 2013 18 20 29 08 2013 2910872013 TAXI TIME LICC 28 08 2013 16 50 2008 2013 2910872013 NETWORK NEWS THURSDAY 29 AUGUST 2013 28 05872013 14 258 12 07 2013 01 02 2013 LFLB IFR ARRIVAL S FORBIDDEN UPDATE 12 07 2013 090 068 10 07 2013 30 05 2013 CONTINGENCY PROCEDURES IN HLLL FIR 10 07 2013 07 45 Clicking one of them in this example TAXI TIME LEMD will then open the corresponding
10. FLASH PLAYER Note administrator privileges may be required to carry out the installation In addition your browser should be configured to run JavaScript This is usually the case by default but some users or organisations disable it in which case we suggest to get in touch with your IT service Specific Settings 2 2 1 Internet Explorer 9 For the NOP to work properly on Internet Explorer 9 it is necessary to un tick the two check boxes Display all websites in Compatibility View and Display intranet sites in Compatibility View You can find these settings in the Compatibility View Settings dialogue available under Tools gt Compatibility View Settings Compatibility View Settings Toucan add and remave websites to be displayed File View Favorrbes Em Help Delete browsing history Ctrl Shift Del ieee InP rryste Browsing Ctrl 5hift P Tracki ng Protection Where bee you va added to t View Activex Filtering Fix connection problem Reopen last browsing session Add site ta Start menu downloads Ctrl l Pop up Blocker d SmartSereen Filter add ons oisniay all websites Compatb ty Vies Compatibility View Display intranet sites in Compatibility view V Denerd seed updated compatibiety fam Micrasolt Compatibility View settings gt Learn more reading the Interes Feed discovery k
11. ng jose a this process by providing Information about their capacity trafic forecast on going and planned actrwiles tub Benin Internabional 5 EDDB 1 iraffic mix infrastructure services and local contact details f ri Dresden DRS EDDC 5 assist you personally should you have amy questions whether on the Public Alrpart Commer teol or about the information tise FrankfuriMain FRA 1 5D maria christina meyergieurnocontrol Munster Csnabruck FMO pomum Hamburg HAM Pen POPOV Cee hoc etre int CEH Duszeldaif DUS EDDL Ed L Ok page 42 Version P 19 5 1 23 of 8 December 2015 5 5 NETWORK MANAGER Public User Guide Airspace Structure Typical Scope STR Structure The following links provide information on ERHIP Database The European Route Network Improvement Plan Database is a central interactive database accessible via a web interface integrating short medium and long term improvement projects already implemented planned for implementation or under development to improve the European ATS route network the airspace structure and its utilisation at local and network level ERNIP Database for externals The ERNIP database website is live under ERNIP Database website The Airspace Structure Portlet presents some elements formerly carried by the seasonal Network Operations Plan
12. page 43 Version P 19 5 1 23 of 8 December 2015 5 6 NETWORK MANAGER Public User Guide ANM Typical Scope Valid On 25 08 2013 Last Released The ANM ATFCM Notification Message is a message issued by the NM Operations to notify all concerned in the Aviation community of any ATFCM regulations The ANMs resulting from the ATFCM Daily Plan are sent the day before the day of operations upon finalisation and release of the plan around 16 00 17 00 UTC summer winter time When the data is not yet available this is what is shown on the NOP Each ANM has an associated released date time stamp When the Portlet is refreshed and if the ANM has a newer date time stamp than the former one the new item is displayed against a colored background to draw the attention of the user m Valid 25 09 2013 Ej Note Clicking on the link returns the Portlet to its normal status the color background is removed Clicking on the highlighted link opens the ANM List window depicted below listing all regulations matching the default query which means all regulations for the selected Day of Operation with no filter applied and sorted by FMP Identifier and Regulation Number Target Date 25 09 2013 D Tactical Type All FMP 25 08 2013 14 19 50 71 regulations Seq no 029 State CHANGE
13. Contingency The status of the Network Manager operations NORMAL Contingency Plan Summer 2014 Valid 30th March 2014 25th October 2014 This document addresses the contingency procedure to be carried out in the event of a long term failure of Network Operations systems The Contingency Portlet belongs to the ATFM Information Messages group as well as the AIM the ANM and the CRAM Portlets Its purpose is to display in a very compact way the status of the NM operations The possible status can be e NORMAL e CONTINGENCY This Portlet also provides a link to the NM Contingency Plan page 60 Version P 19 5 1 23 of 8 December 2015 5 13 NETWORK MANAGER Public User Guide Crisis Management Typical Scope TAC Crisis Management Closures and warnings The information provided is based on the latest NOTAMs and EASA Safety Information Bulletins SIBs published in relation to conflict zones MAP ILIST The referenced documents in above LIST can be found below Azerbaijan A0024M1 Egypt EASA 2014 30R1 EASA 2014 24 0054 14 02 Israel EA SA 2014 2261 Lybia General Information EASA 2014 23 0903 14 Syria EASA 2014 25 A003644A07 Ukraine General Information EASA 2014 10 EASA 2014 21 A001244 A005144A02 ICAO EURINAT 14 0243 631944 A194644 A21404 Teleconferences In the event of crisis teleconferences are accessed by phone nu
14. D 82 1150 gE 12 500 1202 55 E 12 3740 11 240 A320 LT 1208 15 DBZUL EF f2 10 10 1020C AMH 12 09 3 Poe 12108 1 42 11 45 1212 JCI F izini A319 R 12 1029 TiD 71 b 25 402 oe i EBBRAT 2 11 45 195 H Qn n gp ann c nns EBBRAI2 190 11 49 H iN 2 11 27 11 581 H EBRA LAO 11 32 1835 tise M EBBRAT2 12 04 1 597 M LOHRE 12 41 12229 M A ERRAI 11 58 195 11 05 M E m oG Gm oum Gt GE GE GE E os o oom Sa GC EUROCONTROL 2011 non affice rearacontroLint Legal Notice Disclaimer This setting is however ill suited for printing since it only prints what is visible in the window and in some cases only one of the frames the header OR the table Print Mode This mode is used when you want to keep the header and the data together in one piece typically for sending the whole content of a page to a printer See how the scroll bar on the left of the image now encompasses the whole window page 32 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Flight List Mozilla Firefox Target Date 12 08 2013 A D Tactical ARID Aerodrome Aerodrome Aerodrome Sei Aircratt tt perator Airspace Reguistion Trafic Volume Acrodreme ERBA Category Traffic Types Trartc Lowe WEF 1200 UAT 1300
15. new update 01 41 0800 UTC 4SEP 08 32 Civil aviation overflying Belarus update 19 08 18AUG 10 58 P Russia overflight permissions Subscribe k more This Portlet announces events that have a significant impact on the ATFCM Network the same way the headlines of a newspaper announce the main events of the day These events may be foreseen or not such as industrial action airspace closure sporting event bad weather with significant regional impact etc Portlet Structure 5 23 1 Latest News Ongoing News Tabs The Portlet opens by default the Latest News tab to display the list of Headline News as they are set to be announced with the newest item on top Click on the Ongoing News tab to get a list of the currently ongoing events effectively affecting the Network 5 23 2 News List Each line starts with the Date and Time of the item formatted as DDMMM hh mm two digits for the Day and three letters for the Month then two digits for the hour followed by two digits for the minutes Next comes the title of the Network Headline News displayed in two colors depending on the level of criticality e black INFO means there is no severity NORMAL is the lowest severity level WARNING indicates there could be a medium or high severity level e red ALARM is the highest severity level The news is critical Headline news must not be confused with AIMs ATFCM Information messages Events with minor or local impact on t
16. 28 Event s starting on the da s g y 34 _ Event s ongoing on the day 1 Event s starting while others are continuin vent s rting whi rs are continuing The Calendar also highlights AIRAC dates with a red dot 0 Click on date to jump to the corresponding selection displayed Day mode If you already were in mode disregard the above described step Next click on the title of an event to open the corresponding Event Detail Detached View Network Event Detail EDGG Scenarios E amp Prin Hide empty fields SPECI AL Event Print date 30 11 2015 08 57 EDGG Scenarios General Information Summary Type SPECIAL Sub Types CONTINGENCY CRITICAL Status IMPLEMENTED Estimated Period 07 02 2010 00 00 31 12 2999 00 00 Confirmed Pariad The NET Functions The Calendar Portlet features up to 4 NET functions this will vary according to your profile and the privileges attached to it page 94 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide Typically the Create and Subscribe functions will be reserved to specific NOP content contributors you may therefore not be able to see them Create b Subscribe Search List The two commands available to you are located at the bottom of the Portlet click on a link to get more information on each function e Search Section 5 22 2 e List Section 5 22 3 page 95 Version P 19 5 1 23 of 8 Decem
17. FL Flight Level Cap scenario the flow of traffic is level capped for a portion of its route to take it out of a congested area PR Preferred Routing scenario a suggested route which the concerned 5 on a particular axis would prefer the flow to follow This field can be empty RR Re Route scenario the flow of traffic is forced to refile geographically to avoid a congested area Refile Specific condition s to which the of traffic is required to comply e Suggested Alternative Routes Proposed profiles for the Aircraft Operators to consider when selecting a route in order to comply with the Condition s e Comments Used to provide additional information relating to the scenario For example RAD restrictions which will be ignored by IPFS to allow compliance with the Condition s or Refile fields Location Area The specific airspace s point s of congestion alleviated by the application of the scenario On load Areas The key airspaces which may expect to receive additional traffic as a result of the application of the scenario e Off load Areas The key airspaces which may expect to receive less traffic as a result of the application of the scenario page 55 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide Applicability If the availability of the scenario for the ATFCM use is limited to a specific period they are listed here For example weekend only during the ski season e
18. geographically and vertically The RAD is updated each AIRAC cycle following a structured standard process of 1 Requirement 2 Validation 3 Publication by the Network Manager in cooperation coordination with the States and the Aircraft Operators Scenario ATFCM measure applied as a result of an ATFCM Event either planned or unplanned Self Registered The Self Registration allows a non authenticated user to create an account with userID and static password to access certain services and data from Network Manager SESAR Single European Sky ATM Research Strategic One of the 4 ATFCM Phases as used in the Portal Covers the period from Day 12 months to Day 7 days inclusive page 126 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide TACTICAL One of the 4 ATFCM Phases as used in the Portal Covers the Day currently selected in the header from 00 00 to 24 00 UTC Target Date The date which has been set in the Portal Header and therefore for which the queries do apply The Target Date can also be modified from within the Header of some Detached Views typically for all views where you can submit a query TIL Stands for Until the end date and time of a period Token A software based one time password authentication method of protecting network resources typically used for remote access It is a small independent program that runs on the PC and that generates every minute a random numb
19. nios alid p cee pi id REMETE A The paired reia m cma CCR Ver pa cuna api pra Bboy 4 wra er pn Ceres ee enun poa cuni ee abh lan g em Fe y Cee cere d EM di LEPENE ei bean Peu p Cari Werl pr ray prepn andi ery bees lee de 1 Bcd Opec E Cetra ike EIP Pra bed oe ibunt uml ubiti Wr Hym eror m re eee eee hg ghee Mirs Mhe perrkar nprrr Be huuc Cana Hym miremur peer crei car Try ari bm bn T Sco Eni io UH T PE mre ter DD ote eet Ad gh reir ie Eri Bat Pre mau TARGET BATE SE CLR O F3 ears oe Navigation ATFCM Phases cH ETA wd Ta idi Ria Chiti JPETT941 teray JT Pulp Exc Lr auc J7ET 13 F piii now pad peers pr Lod Network Headline News gra ri 494 81 Tisi m Luna mop n pose
20. request for route proposals and then submit it You may either type in the data or paste it from an external Flight Plan editing application IFPUV Free Text i NOP IFPUV Structured Editor IFPUV Free Text Editor Contacts amp Support EURO Data Entry Validate FPL Data FPL EUROT IS 01B773 M SRYT7C EHAMOS10 NO430F240 GORLO ULSSD KAMAN 980 LOGAN 0040 k Validation Results It is divided in two sections 1 Data Entry 2 Validation Results Besides the Data Entry Section 5 20 1 1 area where you may enter the FPL in free form as opposed to the strucured method all the other features and tools are common with the Structured Editor Section 5 20 2 page 81 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 20 1 1 Data Entry Data Entry FPL Data The Editor section fatures a Validate button to be used in order to launch the validation process and see the results in the Validation Results section Data Entry Data Entry Validate FPL Data FPL BEL8L 02 15 RJ1H M SDES3FIRW IA EBBR1345 H0380F230 SOPOK 863 ETENO 863 EMGOD NO400F310 863 UBIDU UL607 ABUKA UNSSO0 0400 330 UNGSO ODINAJNO410F290 UM727 SRN UL153 PAR ULBSS RIPDU LIPEO134 LIPZ PBN B3BA4BS DOFA 51007 REG OODVH EET EDGGO018 LSAS0051 0106 RVRASO0 OPR BEL ORGN HDQOSSN HMK AGCS EQUIPPED TCAS EQUIPPED This is where
21. 012 AMRUFRA ARAC 1003 ED ET DELI GERMANY Country MPLEWENTED 181172015 R hr 2010031 EH HLO NETHERLANDS Country FRAnkfurt EDY MAASTRICHT ACC P SPECIAL Europa League Final 15 05 2013 EHAA AMSTERDAM ACC 245 IMPLEMENTED 11 03 2014 Amsterdam UC OU 156 05 2013 00 00 b SPECIAL MTV Awards 10 11 2013 IMPLEMENTED 1163 2014 00 00 11 11 2013 00 00 e Period the selected period e Free Text allows a free text search it will find any data matching even loosely in a fuzzy search approach suggesting likely matches the searched terms in the following fields e the Name field the Short Description field the Description field the Event itself Activity ies if any Impact s if any The and wildcards can be used here as well see the Name Pattern description aborve for details e Locations the locations s concerned by the event page 97 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide e Select Types opens a dialogue listing the proposed types you can select 1 AIRPORT 2 AIRSPACE IMPROVEMENT 3 MILITARY 4 SPECIAL 4 Note the Select Types component allows you to fine tune your query down to the sub type level PRE VALIDATION ATM SYSTEM NEW 5 ROOM AXIS MANAGEMENT CONTINGENCY CRITICAL OK Cancel e Select KPA opens a dialogue listing the proposed KPAs you can select 1 CAPACITY 2 FLIGHT_EFFICIE
22. 15807 IMPLEMENTED 14 11 2015 14058 e Status The current status of the event Responsible Data Source Identification of the originator of the event e Last Published Date The date of the most recent publication e Draft Owner Identification of the owner of the Draft version when relevant that is when a draft exists e unnamed provides a View Published link to the published version of the event page 99 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 22 2 1 Event Detail The Event Viewer generates a Network Event Detail detached view as depicted below Hetwork Event Detail EDGG Scenarios B wor Prin Hide empty fields SPECI AL Event Print date 30 11 2015 08 37 EDGG Scenarios General Information Summary Type SPECIAL Sub Types Status IMPLEMENTED Estimated Periad 07 02 2010 00 09 31 12 2999 00 00 Buttons Bar 5 22 2 1 1 Print This command launches the Print function of your browser looking like this this may however vary depending on your browser type and version Mame Dell MFP Ready Dell 2335dn USBOO E Print to file i AI Mumber of copies 2 Pages from 1 L Collate Selection E 2l 5 22 2 1 2 Hide empty fields Show empty fields Respectively hides or shows all fields for which no data has been provided by the event author Event Content The rest of the window displays the full content of the event in
23. 2013 19 00 13 06 2013 Occurrence 02 00 2 21 05 2013 00 00 31 05 2013 Event SKI Season 72012 2013 Event South West Axis 2013 IRP TRANSITION From 13 12 12 to Event 45102443 Event POKER 2013 04 EXERCISE CNL Event BELOTE 2043 04 Event EXERCISE executed page 40 Version P 19 5 1 23 of 8 December 2015 _ EDMM EDUU EDY Y EGTT LFBE ACCS Eun ED Y EGTT EISN GCCC LECB ACCs LECS ACCs LFEE LFFF LSAG ACCs LFBB LFEE LFFF LFMM LFRR ACCs LFBB LFFF LFMM LFRR ACCs LFBB LFEE LFFF LFMM LFRR 5 3 NETWORK MANAGER Public User Guide AIM Typical Released on 26 11 2014 09 35 26 11 2014 09 15 26 11 2014 07 15 26 11 2014 05 25 NM Operations send an AIM Air Traffic Flow and Capacity Management Information Message to inform the Aviation community whenever they consider it relevant These AIMs are also accessible through an AFTN address via the CHMI Applications A simple table lists the most recent valid AIMs for the selected Target Date giving as title a short Description of the message along with its Released on date and time Note the More link at the bottom of the Portlet which opens a Detached View AIM List in the on line documentation listing all AIMs valid for the selected Target Date Type your Note Box content here Highlights Newly released AIM messages are displayed against a colored background to draw the attention of the us
24. Changes Typical Scope STR Planning of Network Changes Summary Timetable of major Upgrades and Events These major upgrades end events are expected over the next four years Information is provided to facilitate the planning and coordination of these events at network level Updates and additions should be provided to the NOP Office via the nominated NOP focal points per ANSP Transition Plan for Major Projects in Europe Winter 2013 2014 The Transition Plan describes the processes the activities the plans and measures that will be applied by the Network and the nnaratinnal etabkahnldars ta minimize tha The Planning of ATM Network Changes Portlet presents the major ATM upgrades end events expected over the next four years to facilitate the planning and coordination of these events at network level Updates and additions should be provided to the NOP Office nop office eurocontrol int via the nominated NOP focal points per ANSP page 112 Version P 19 5 1 23 of 8 December 2015 9 54 NETWORK MANAGER NOP Public User Guide Portal Assistance Typical TRE STR Scope In case of problem or questions contact the NOP Office team via the NOP Assistance Portlet Portal Assistance If you have an urgent Operational request in relation to a flight please follow the procedure in place to reach the Network Manager Operations Center NMOC If you experience login problems
25. FMP EBBUFMP Published25 09 2013 07 06 Regulations Id EBBRA25 WEF 25 09 2013 05 20 Flight Level ALL UNT 25 09 2013 09 00 Reason Weather RMK Seq 040 State CANCEL FMP EBBUFMP Published 25 09 7013 07 00 Regulations ld WEF Flight Level ALL UNT CNL Reason Weather RMK FOG ELLX ARRIVALS Seq no 001 State CHANGE FMP EDGGFMPZ Fublished25 05 2013 12 40 Regulations ld EDDLA25 WEF 25 09 2013 11 20 Flight Level ALL UNT 25 09 2013 15 20 Reason Environmental Issues RMR REGULATION EXTENDED EDDL ARRIVAL Seq no 002 State CANCEL EMD EDEA Duhbliehad7 5 n n13 20557 ANM Query EBBR HMB ARRIVALS The Query area at the top of the window features 3 filtering and sorting options Type select e All page 44 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide e Active FMP text Enter the exact name of the searched FMP wildcards are not effective here Sort by select e FMP Identifier and Regulation Number e Regulation Number e Regulation Identifier e Released Time and Regulation Identifier page 45 Version P 19 5 1 23 of 8 December 2015 5 NETWORK MANAGER Public User Guide ATFCM Network Situation Typical Scope ATFCM Network Situation Static Map IE7 8 The ATFCM Network Situation displays a map of Europe where certain ACC areas are colour coded to indicate ATFCM delays for these areas Four types of delays are displayed ranging fro
26. Operations Report 2013 is now available See also All network performance reports The restricted operational reports are available through the EUROCONTROL extranet OneSky Online for registered users under NM Statistics New users can request access via the One Sky Online registration form If you have any questions about the network performance reports or for receiving archived reports 2 years send us an e mail The Network Operations Monitoring and Reporting Portlet gives access to a number of operational reports The restricted operational reports are available through the EUROCONTROL extranet OneSky Online for registered users under CFMU ATFCM Statistics New users can request access via the OneSky Online registration form For public reports visit the Network Operations and Monitoring website If you have any questions about the network performance reports send us an e mail page 105 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 25 Network Operations Weather Assessment Typical Scope PRE Network Operations Weather Assessment identifying monitoring and planning for potential severe weather events that may impact ATM capacity Daily Update The Network Operations Weather Assessment Portlet provides support to ANSPs and AOs in anticipating identifying monitoring and planning for potential severe weather events that may impact ATM capacit
27. Released EUUP 28 04 2014 07 00 28 04 2014 06 00 28 04 2014 07 03 EAUP 28 04 2014 06 00 28 04 2014 06 00 27 04 2014 14 17 Cancel In the example below the EAUP Details Detached View displays the cumulative updates having been applied to an original EAUP released on 27 07 2014 and updated twice once by the EUUP released on 28 04 2014 and once by the EUUP from which the Compare action has been launched 5 Route and CDR Type 1 Closure FL 8013 E 305 2900 13 15 ESHO ESH 2 c 00 12 55 EKR38 e 280 0900 1230 EKRI9 e 135 09 00 18 00 Ho change B Updated dala B Original data The background color indicates the following White no changes Green Update e Orange Original data before update page 77 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 18 EVITA Typical Scope TAC Note Access to EVITA is restricted to NOP Protected Portal Users To read the instructions for subscription please visit the NM Operational services and products page of our website For more information on the European Crisis Visualisation Interactive Tool for ATFCM EVITA please consult the EVITA web page page 78 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 19 FAQ nes STR Scope Token issues Technical support and l
28. Solaris 10 processors Intel or AMD for Solaris 11 1 Gb RAM HP Ux 11 11 e Mozilla 1 7 e Firefox 2 e Javascript and cookies enabled e Sun Java 5 e PA RISC processor e 1 Gb RAM e Only for Meeting Center no Training AIXL 5L 5 3 e Mozilla 1 6 e Firefox 2 e Javascript and cookies enabled e BM Java 5 e 1 Gb RAM e Only for Meeting Center no Training Smartphones Download the free WebEx app for your smartphone e Webex apps 5 33 4 Teleconferences with Anytime Telephone with keypad Training 1 Training on the use of WebEx can be provided via WebEx and or Arkadin websites e WebEx first click on Attend a meeting then on Connect to meeting audio Arkadin Academy register for Cisco WebEx Meeting Center 2 Specific D 1 demonstration D 1 demo for participants 3 Training on the use of the teleconference Arkadin Anytime can be provided via Arkadin Academy register for Arkadin Anytime or contact sales support arkadin com phone 32 25 54 06 50 page 116 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 34 Training Typical Scope RES Training Network Operations Courses and Training Network Operations Courses are given either 1 traditional classroom courses or as on line courses over the internet both with and without 4 an instructor HOP Classroom Courses Web based Training The Training Portlet provi
29. UIR Indicates the UIR that the available area lies within either wholly or partially 4 characters Compare A link used to list the Predecessors allowing you to pick one of them for comparison purposes details here Section 5 17 5 page 75 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 17 4 EAUP Details Level 2 RSA Allocations Rogie 12 Results Pa reark FOR TRAFFIC ORIGINATIRIS FROM EH DURING THE TIMES AHD TRIN THE VERTICAL LIMITS ALLOCATED AT EALIPYELILIP FOR TRAFFIC OGRIGINATIHG DOURG THE amp HD WITH THE VERTICAL LIMITS amp LLTXZATED AT EALIPTEJUFP Don 5 0600 0 BDRILZA ERTE SE ee EALPIEULP WITAM xv 123 zu 3 Doo 1000 TIU EHDAZZH EHAA Dea riptian NOT AVAILABLE PO TRAP IG QRIGISATING PROM ED AMD LP DURING THE TIMES WITHIN THE VERTAAL MTS ALLOCATED AT p LK Route ID The Route Identification RSA ID The Area Identification FIR Indicates the FIR that the available area lies within either wholly or partially 4 characters UIR Indicates the UIR that the available area lies within either wholly or partially 4 characters Expands or collapses the Description line with three additional fields FUA RS Id Description and Remark RSA ID The Area Identification FL T
30. Windows Update 2 2 2 Firefox By default and as a safety feature Firefox forbids scripts to raise windows and subsequently the Portal feature of bringing windows to the front cannot work To overwrite this safety measure open the options dialogue by selecting the menu entry Tools Options select the Content tab click on the Advanced button next to Enable JavaScript and ensure that the check box Raise or lower windows is selected page 4 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Options x oe m amp m M a General Tabs Content Applications Privacy Secunty Sync advanced Block pop up windows Load images automatically Iv Enable lavaScript Fonts amp Colors BLESS JavaScript Settings pefauk fork Times Hew Ram Allow scripts to e Move or resize popup windows Languages Disable replace contest menus OK carcel Specific Applications Some specific applications are supported on a smaller range or browsers due to their requirements on functionality CSST on Firefox e Helpdesk and Counts on HTML5 featured browsers Interactive and Static Map on HTML5 featured browsers WIND file upload on Internet Explorer page 5 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 2 3 Accessing the NOP ie The public version of the NOP contains informat
31. can come with or without a picture as shown on the two examples below Origin ESSA ESSB Destination EB EHAM LFP Types Conditions Hat alowed via ERDEK ACUU sector Refile Suggested Alternative Routez UN60 VES UNB 3 JUIST UPT74 EEL WOODY LFPG Comments Location EKDK On load Areas EKDK LVUV NS ESIAMAS ESSAJ SB ESMMBOISTY deps EFHK Off load Areas ERDE Status Published Applicability Agreed Periods Active Periods RRIAGUU Deps ESSA SB Dest EBBR LFP Not allowed via ACUAUC sector 1 285 999 Sliggested route a AAL UNGO VES UNS73 JUIST UP174 EEL for dest EHAM or EEL WOODY far dest EBBR LFP G b ATROS ULIBO DLE dest LFPG Offload ACUAUC D ESMM 2 Onload a EKOK West 0 ESMMA4 t EDULIOSE Routes zuggezad intended Tor guidance unbezz indicated ethaensiza Definitions of the field labels Identifier The Scenario name in the blue header Origin Where the flow of the traffic to which the scenario applies is coming from Destination Where the flow of the traffic to which the scenario applies is going to Types AR Alternative Route scenario A route usually non RAD compatible opened to alleviate congestion in an area Due to the non standard nature of the route this flow is usually regulated when available
32. components of an event in NET are described in more detail below Events Activities Impacts An Network Event typically occurs during a given period at a given location or set of locations and may have one of the effects described above which may in turn affect one or more key performance areas capacity flight efficiency cost effectiveness safety For example Geneva International Motorshow took place in Geneva between 06 16 March 2014 This was expected to result in increased traffic to Geneva airport causing parking congestion during this event This simple event consist in just one activity the motor show itself taking place at a specific location and over a specific period of time and expected to cause a specific impact on local operations This potential impact would be assessed prior to the start of the event and mitigation measures identified if necessary During the event performance analysis are collected and analysed at specific intervals according to current NM Processes Performance results are published monthly and annually Some Network Events can be more complex and consist in one or more parallel or sequential activities similar or different that occur over different periods and at different location sets Each of these activities may have cause different operational impacts which may in turn affect one or more key performance areas Some ATFCM measures may need to be prepared in advance and applied during the event to minim
33. due to aerodrome capacity btw 0540 0930 UTC Moderate delays Tactical mmclata 445E LT Simply click one the selected entry to open its corresponding item In this example clicking on the highlighted entry Applicable 05 08 2012 last update 04 08 2012 will open the correponding Daily Plan detached view depicted below E Daily Plan mare than 50 results please refine your search a Applicable 04 06 2043 last update 31 05 2013 Applicable 23 04 2013 last update 22 04 2043 Applicable 22 04 2013 last update 21 04 2013 a Applicable 17 03 2013 last update 16 03 2013 a Applicable 16 03 2013 last update 15 03 2013 Bg Applicable 12 08 2012 last update 11 08 2012 B Applicable 11 08 2012 last update 10 08 2012 B Applicable 10 08 2042 last update 09 08 2042 B Applicable 05 08 2012 last update 05 08 204 2 g Applicable 05 08 2012 last update 04 08 2041 2 B Applicable 03 08 2042 last update 02 08 2042 page 19 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Target Date 10 08 2012 D 367 Post Operations rue Headline EBBR runway closure Accs WIP started at EBBR a d on Wednesday 01 August 2012 and lasts for two weeks During this period runway 25R 07L will be permanently closed Depending on wind conditions each day single runway Ops using runway 02 20 will be required causing a reduction in capacities
34. first opened from the Portlet the ANM Detached View lists the ANMs for a given query by default for the currently set Target Date Target Date ii Tactical Type FMF Reguisticn Humber esulalsn kenther Released aud Ragulalnn 224 State HERY Publishedz10572173 1521 EBBRAZZ WEF 11220 ALL UNT 22 08 2013 13 00 WIF ERE 71 25 EBSR MB ARRIVALS 25 ERRUFRE Publiahedzi BRZ2013 1625 EBSRA ZZ TIEF ZHUB 2013 16 40 ALL UAT 19 WIP 011 25 FRESA HS ARRIVALS Gh State MEW EGGO MPZ Published 17565252123 Mr Overview e The EE Target Date query field enables you to search for AIMs for a specific day simply type in the new Target Date as dd mm yyyy or use the Date Picker to the left of the date field then click on the Set button e The filters Type FMP and Sort allow you to narrow down the query which you launch with the Go button e ZTimestampi is generated on each query as shown against the green background the example above It also indicates how many matches are found and listed This area may also contain a paging slider see here for more details in the Paging Section 4 4 2 section e The matching results are E in the bottom part of the screen page 30 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 4 4 2 Paging One of the feature
35. of ihis site is to assist the Aviation Community in understanding ihe RAD Coordination RAD Cut off and Publication dates Harmonization Rules The RAD iz created based ore RAD RAD Problem 1 COMWEESION REGULATION EU 255 2010 of 25 March 2010 laying Gowen common RAD Reuiews rules on air traffic fow management Article 4 General obligations of Member States RAD Team paragraph 4 and Special Events 2 COMMISSION REGULATION ELI 87772011 of 7 July 2011 laying down detailed rules far Increment File the implementation of air traffic management ATM network functions and amending Regulation Ma 69172010 Annex The European Route Network Design ERMD Function Part B Planning principle 514 The RAD iz part of ths European Route Meteork Improvement Plan The RAD is comman reference document containing ih pobcies procedures and description for route and traffic orientebion E also meldes route netvvork and free route arspece ulilisabon rules and The RAD if ao Air Traffic Flow Capacity Management tool That is designed as sole source tlinht elsmninnm which mec ates hath and The Increment File and Additional Documentation links provide shortcuts to the respective corresponding areas on the RAD website Lastly the RAD Portlet provides a number of links to the current and most recent s RAD U
36. of the map actually displayed in the window To scroll the visible part of the map 1 bring your mouse over the map area the pointer will turn into a hand 2 click and scroll up down to reveal the desired part of the map The Show Legend and Show navigator options are located in the toolbar is provided at the bottom of the map v Show legend Shaw Navigator Forecast Loop e While in Loop Mode when the Loop check box is ticked the display is refreshed every 30 seconds looping through an to H 4 cycle as selected with the Forecast menu H 1 2 H 3 H 4 FEN page 48 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide The toolbar also features a Help button bringing up instructions for moving around in the map a D n Help manipulation Move left right up down mouse down move mouse up mouse must stay on the map page 49 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide ATFCM Network Situation Data Typical Scope POS tac ATFCM Network Situation Data Last update 07 04 2014 09 45 Flights Total Landed Airborne Expected Delays in minutes Cumulated 14 306 0 Average F light 0 6 C CFT Feo Oke 7m En route Airport gt 30 min Delay Causes Weather ATC Equipment Airspace Management Others Special Event Capacity Aerodrome Capa
37. of time JJ contains various types of data texts images comments links to other sources It can in addition contain a number of Activities and or of Measures and Scenarios who are similarly associated with time limits and who can in turn contain references to Impacted elements In order to meet the requirements and support processes triggered in each operational phase the NET event data model has been developed to allow the necessary information to be collected gradually and stored in an structured manner aiming to progress towards a B2B service The complexity of effects that any events may have on the performance of the ATM Network needs a complex event data model de composition down to the level that would allow detailed analysis of their expected effect potential operational impact The long term goal of such detailed de composition is to enable automatic exchanges of data between specialised applications designed to increase experts awareness of the event progress through the ATM planning phases and to trigger impact assessments when necessary and most efficient This has resulted in a complex but comprehensive data model implemented in NET which allows decomposition of an event into specific activities occurring at specific periods in specific locations and producing specific effects on the network performance Hence a certain level of expertise and attention is required when creating updating Network Events in NET The main
38. search window is refreshed with the results A color coding tells you the quality of the found match e a partial match is indicated with an orange bullet e a full match is indicated with a green bullet 9 See below an example with the query EBBR EDDY Enter search word EBBR EDDY Search 12 08 2013 08 33 14 103 search results Daily Plan more than 50 results please refine your search Headline News more than 50 results please refine your search Prevalidation Exercise one result This tells you that 103 matches were found in 3 locations Daily Plan over 50 results Headline News over 50 results and Prevalidation Exercise one result Notice the two green expand boxes indicating that they contain one or more full match The fully expanded view looks like this Enter search word EBBR EDDY Search 12 08 2013 08 33 14 103 search results Daily Plan more than 50 results please refine your search Applicable 01 06 2013 last update 31 05 2043 Applicable 23 04 2013 last update 22 04 2043 8 Applicable Applicable Applicable B Applicable B Applicable B Applicable B Applicable B Applicable B Applicable B Applicable m Annmlicahle 22 04 2013 last update 17 03 2013 last update 16 03 2015 last update 12 08 2012 last update 11 08 2012 last update 10 08 2012 last update 06 08 2012 last update 05 08 2012 last
39. setting capabilities of your configuration to select more appropriate combination of settings where relevant e the Properties linked with your printer and printer s driver e the Page Setup linked with your browser more specifically the orientation of the paper Portrait or Landscape page 10 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 3 The NOP Header page 11 Version P 19 5 1 23 of 8 December 2015 3 1 NETWORK MANAGER Public User Guide Timeline Navigation Concept This is the Header of the NOP from which you can navigate across the different areas of the Portal The Timeline features 4 different Phases tabs based on the ATFCM cycle Post Operations Tactical PreTactical and Strategic oC NOP 27 03 2014 DATE 27 83 2814 SEARCH d Hetwork Operations Portal F SET 13 2 1 29UTC D TACTICAL Tactical PreTactical Strategic Each covers a specific time span as outlined below D being the current date Post Operations D 1 at 00 00 onwards Tactical D 00 00 to 24 00 UTC PreTactical D 6 to D 1 inclusive Strategic D 12 months to D 7 days inclusive These tabs allow you to navigate from one Phase to another In addition the selected tab rises to provide a visual indication of where you stand in the ATFCM cycle A fifth tab is featured as well opening the Resources page containing reference material not linked to time Navig
40. the NM OPS Room If you wish to submit a system improvement request please submit an Operational User Requirement OUR page 124 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 7 Glossary A AIM ATFCM Information Message AIS Aeronautical Information Services applications ARO Air Traffic Services Reporting Office ATFCM Air Traffic Flow and Capacity Management A service that is enhancing ATFM with the objective of managing the balance of demand and capacity by optimising the use of available resources and coordinating adequate responses in order to enhance the quality of service and the performance of the ATM system ATM Air traffic management The dynamic integrated management of air traffic and airspace including air traffic services airspace management and air traffic flow management safely economically and efficiently through the provision of facilities and seamless services in collaboration with all parties and involving airborne and ground based functions Axis Seasonal Flows of traffic across the European Network CCMS Web Web based Central Claim Management System The CCMS Web is an independent application where the NM is enabling authenticated clients to access and submit incident reports user requirements or requests for support in their field of activity CDM Collaborative Decision Making CFMU Central Flow Management Unit CHMI Collaborative Human Ma
41. 1 User Assistance page 130 Version P 19 5 1 23 of 8 December 2015 84 85 84 85 84 85 86 89 86 89 86 89 90 91 92 95 96 97 99 100 101 100 101 100 101 102 103 104 103 104 103 104 103 104 105 106 107 108 109 110 111 112 113 114 115 116 115 116 115 116 115 116 115 116 117 118 119 122 123 124 7 NETWORK MANAGER NOP Public User Guide Glossary Table of Contents page 131 Version P 19 5 1 23 of 8 December 2015 125 127 128 131
42. 14 update 04 05 2044 01 11 2014 Each entry comprises three components e The Title of the event serving as link to open the corresponding Network Events Detail Detached View illustrated below e The Estimated Period for which the event is valid e an update link opening the Axis Plan Detached View for the current week illustrated below ie Note the updates features is presently rarely used this explains the No update available at the moment and no updates mentions on the Axis Plan window Example of a Network Event Detail Network Event Detail South West Axis 2014 Print Network Event South West Axis 2014 General Information summary Name South West Axis 2014 Type SPECIAL Sub Types AXIS MANAGEMENT Status IMPLEMENTED Estimated Period na ns od Don no 10njond 4 n nn Example of an Axis Plan page 57 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Axis Plan South West Axis 2014 Week 19 05 0 NOP Axis Details Week 19 4 No update available at the moment t Monday 05 05 2014 k Tuesday 06 05 2014 t Wednesday 07 05 2014 k Thursday 08 05 2014 k Friday 09 05 2014 k Saturday 10 05 2014 k Sunday 11 05 2014 page 58 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 11 Axis Weekly Management
43. 18 EVITA 5 19 FAQ 5 20 Flight Plan Management 5 20 1 Free Text Editor 5 20 1 1 Data Entry 5 20 1 2 Validation Results 5 20 2 Structured Editor page 129 Version P 19 5 1 23 of 8 December 2015 43 44 45 46 47 48 49 50 51 52 53 54 53 54 53 54 55 56 57 58 59 60 61 62 63 64 66 64 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 5 20 2 3 5 2 05222 5 20 2 1 5 20 2 4 NETWORK MANAGER Public User Guide Validate Create Edit data Editing Tabs FPL Data 5 20 2 4 2 OTHER INFORMATION 5 20 2 4 1 EQUIPMENT 5 20 2 5 Validation Results 5 21 Network Axis Management 5 22 Network Events 5 22 1 5 22 2 Concept Search Events 5 22 2 1 Event Detail 5 22 2 1 2 Hide empty fields Show empty fields 5 22 2 1 1 Print 5 22 35 List 5 23 Network Headline News 952223 959327 5 23 1 Links News List Latest News Ongoing News Tabs 5 24 Network Operations Monitoring and Reporting 5 25 Network Operations Weather Assessment 5 26 NM News 5 27 NM Release Information 5 28 NOP Archive 5 29 NOP Updates 5 30 Planning of Network Changes 5 31 Portal Assistance 5 32 RAD 5 33 Tele WebEx conferences 5 33 4 9 99 91 5 93 2 59 99 Teleconferences with Anytime Online web conferences with WebEx Teleconferences Online web conferences 5 34 Training 5 35 Traffic Counts 5 36 Other Portlets Help 6
44. 2012 109 Version 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 28 Archive Typical 8 Scope Archive Axes Information Winter 2042 2043 Axes Information Summer 2017 London Olympics 2012 More information can be accessed via the calendar see 1st March 2012 page 110 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 29 NOP Updates Typical Scope STR NOP Updates European Network Operations Plan 2014 2018 19 27 03 2014 The European Network Operations Plan 2014 2018 19 has been released This version has been approved by the Network Management Board NMB on March 27th ou can find the complete document following the link here above ACC information for 2014 is available via the ACC Info portlet Airports information available via the Airports section in the Planning of Network Changes portlet Weekly and daily parts of the NOP are continuously updated and hosted on the PreTactical and Tactical areas of the Portal 1942 2013 The Transition Plan for Major Projects in Europe Winter 2015 2014 has been updated You can also find the document below in the portlet Planning of Network Changes NOP Updates Information on the dates and scope of the European Network Operations Plan last updates page 111 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 30 Planning of Network
45. 4 11 52 11 5 EAUP EUUP 20 04 2044 08 00 29 04 2014 06 00 25 04 2014 09 00 260412014 07 00 29 04 2014 06 00 20 04 2014 07 03 EAUP 20 04 2044 06 00 29 04 2014 06 00 217104 2014 14 17 EUUP 2704 2014 10 00 20 04 2014 06 00 27 04 2014 09 57 EAUP 2704 2014 06 00 20 04 2014 06 00 25 04 2014 14 01 page 72 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 17 1 EAUP Details ATS Route and CDR Type 1 Closure Route ID ATS Route and COR Type 1 Closure COR Type 2 Availability Acute ID 518 808 LaSi Mid Nt MESS MED M5S1 H513 H513 H513 Query Results am MD kp gm ing MLAS ALKS HLAS H5 245 27 00 15 00 BOMK DESEL 195 255 52 00 08 00 194 555 52 00 00 00 UKF W UKEY BONK SUGUL 155 555 02 00 00 00 UREW ROMOK 194 555 52 00 Q6 00 KUGOS 195 555 52 00 00 00 ROMOK BANH 155 555 06 00 DESEL 1275 595 05 00 06 00 URES DESEL Zum 555 C200 06 00 UREW BROR HECM 195 555 22 00 06 00 URES Route ID The Route Identification max 7 alphanumerics RSA ID The Area Identification FIR Indicates the FIR that the available area lies within either wholly or partially 4 characters UIR Indicates the UIR that the available area lies within either wholly or partially 4 characters Route ID The Rou
46. 4s pownloadas csv RTF 15 52 14 55 Events riad Locations tat Responsible Data Dradt Owner internal Source Published id ls Pare PP LD k amp pBSFPACE MPAOVENENT London ZI Airspace e0 00 20012 2015 Management Shoo Program LAMP EG GGA UE Counsy 15371 Phase 1 k ARSPACE MPAOVEWENT 62 072 mew 21 09 2015 EE EST ESTONIA Country PROPOSED 27H1 2015 15351 ACC sector e DD 20H2 2015 P ARSFACE USTIL 21082015 ER POL POLAMD Cauntryj UK UKA PRO POSED 2771172015 15246 0 00 20012 2015 UKRAINE Country k ARSPACE 65 0106 210002015 EP POL POLAND Csuniry PROPOSED PAMP ariii 14056 102 Version 19 5 1 23 of 8 December 2015 5 23 NETWORK MANAGER NOP Public User Guide Network Headline News Typical Scope PRE Network Headline News Latest News Ongoing News 1 17 28 b Tactical update 1100 UTC 19NOV 11 40 ATC stafing issue LPPC today 18NOV 14 21 b Prohibited area in Azerbaijan 17 09 03 EASA Safety Bulletin regarding Egypt Sinai update 17 41 2014 10NOV 21 20 8 33 kHz carriage checking by IFPS below FL185 in HUNGARY from 1341 2014 16 14 P FAA NOTAM concerning Egypt 0GNOV 16 01 b HLLL Libya FIR update 06 41 1605 UTC 01 09 48 P Ukraine situation
47. 5 221 NETWORK MANAGER NOP Public User Guide Purpose What is the purpose of the NOP The NOP Network Operations Portal aims at facilitating the NM Users access to all kinds of dynamic data and operational information in a consolidated way Information is displayed according to the ATFCM phases Strategic Pre tactical Tactical amp Post Operations The ultimate goal is to facilitate decision making for all ATFCM actors by sharing the most up to date view on the Network Operations situation along the ATFCM cycle plans events scenarios real time information on flights and measures etc Objectives The NOP achieves the following objectives as defined in the DMEAN Concept of Operations Reflect the ASM ATFCM decision status at the time they have been taken Enable a common understanding of the Network situation Present potential disturbances that could impact the Network and that could therefore require appropriate actions for risk mitigation Assist Airspace Users to take their operational decisions Assist Planners to build their local ATM plans and adjust them along the ATFCM phases in full mutual coordination SI abe oe All in all the NOP is the enabler of the operational CDM processes supporting ATM in Europe Content management The NOP is updated dynamically according to operational needs This means that the frequency of updates may be seasonal daily or ad hoc in real time depending on the nature of
48. AFA Countries NE IE Eum IDE n mum E ti FR Pu I LM i 12 Network Operations Strategi cm mm imm LIEGE s me Ts um m Ea H A E m 17 Network Operations Weather Sc Ea RENE ATFCM Reports Query Arche Airspace Airspace identification By default this field is empty Aircraft Operator optional By default this field is empty In case several II operators listed they will be separated by commat Table of Contents Traffic Type Type of traffic This field supports a drop down list containing a Traffic Load set by default Index b Traffic Demand c Reg Traffic Demand Search WEF Start time of the query penod By default this field is set to the current UTC time rounded down to the nearest hour UNT End time of the query period Iv page 27 Version P 19 5 1 23 of 8 December 2015 4 3 NETWORK MANAGER Public User Guide Detached Lists A Detached List is a NOP window which opens when you click on the more link from a list Portlet typically a short table presenting the first items of a series Ald Description Released on NETWORK NEWS FRIDAY 30 AUGUST 2013 29 08 2013 14 42 TAXI TIME LEMD 29 08 2013 15 35 TAXI TIME 29 08 2013 08 35 TAXI TIME 29 08 2013 08 33
49. ATFCM Network Situation Interactive Map in the on line documentation to get detailed help useful information and demo movies on the general Map features Opening a Detached View Five links are grouped on the top of the Portlet All Network FAB FMP and AMC ll Hetwork FAB FMP AMC Accessing the Map Two additional links do also appear at the bottom of the Portlet namely Network Static and Network Static Map IE7 8 Network Static Map Network Static Map The Network Interactive Map links to a Detached View Section 5 7 1 displaying a map connected to the operational system enabling you to extract operational information The Network Static Map links to a static version page 62 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 14 1 AII The shortcut opens a Daily Plan Detached View presenting a set of Tactical ATFCM measures e g activation of Routing Scenarios regulations etc prepared by the NM and agreed with all partners concerned Target Date 08 04 2014 2o D Tactical Published every day around 1600UTC the Daily Plan is a set of Tactical measures amp g activation of Rerouting Scenarios requlations etc prepared by and agreed with all partners concerned during the planning phase 08 04 2014 14 14 23 1 Unit CFMU Last Update Last Published 07 04 2014 07 27 State 07 04 2014 07 27 PUB
50. CE EQUIPMENT ROUTE CONTAINING AT LEAST CRUISING SPEED AND LEVEL FOLLOWED DCT EG N0485F330 DCT ADES TOTAL FET ALTN AERODROME 2ND ALTN AERODROME OTHER INFORMATION CLICK HERE TO ENTER DATA Validation Results It is divided in two sections 1 FPL Data itself composed of one subsection a FPL Data 2 Validation Results Note Flight Plan submission is only visible to the profiles with the Flight Plan Management role AO ARO and FMP 5 20 2 1 Editing Tabs When first opened the Editor panel features two tabs respectively labeled 1 and Next FPL 1 Next FPL FPL Data The first corresponds to the currently displayed data and is labeled 1 by default As soon as you enter data the label name changes to reflect the value of the AIRCRAFT ID field If need be you can create additional tabs and subsequently additional flight plans within the same Detached View and navigate between them To create a new tab simply click on the Next FPL tab in this example the result will be the creation of a new tab labeled 2 by default until you specify the relevant ARCID TOWS8a2A 3 o2 Next FPL FPL Data To delete a tab click on the corresponding Close red cross page 84 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide d 28 Next FPL Data Which results in 2 Next FPL FPL Data 5 20 2 2 Cr
51. Capacity will be increased tactically whenever possible Motam EB 4155612 refers For today Pre tactical regulation applied 0500 1300 with low delays expected Locations EBBR EBBRA10 EBBRARR Event kAccs k Nat page 20 Version 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 4 Portlets and Views page 21 Version P 19 5 1 23 of 8 December 2015 4 1 NETWORK MANAGER Public User Guide Portlet Availability It is of importance to understand that not all Portlets are available in every ATFCM Phase Whenever irrelevant they simply do not appear on the screen This is the case for the RAD portlet not showing in Post Operations In a similar way NMIR will not appear in Strategic It may also happen that a Portlet is present showing the border and title bar but displays no content In this case a message will tell the reason for the absence of data as for instance the exact wording may vary between Portlets but the overall meaning will be the same e The name of the Portlet for instance Network Daily Plan is currently not yet available this means that the data is not available yet for the context day and or time in which it is requested e You are not authorized to see name of the Portlet for instance Flights this means that your profile does not grant you access to some restricted information see table below e Data is no longer available this mean
52. Detached View TAXI TIME LEMD nop TAXI TIME LEMD Valid from 2013 08 25 Valid until 2013 08 29 Released Z013 08 28 15 35 25 IACI CASA INFORMATION MESSAGE l REF TART 2 VALID WEF 29 15 44 UNTIL 30 00 00 UTC TAXI TIME 20 3 REMARK CIOT FOR FLIGHIS DEPARTING ABOVE PERIOD WILL BE CALCULATED ACCORDING TO IHE NEW TAXI AND SLOT REVISION HESSAGES BE ISSUED 4 THE INDIVIDUAL TAXI IIMES PER FLIGHT THAT ARE PROVIDED BY OR UPDATED GLOBAL TAMI TIMES AS SPECIFIED ABOVE NETWORK OPERATIONS BRUSSELS amp EUROCONTROL 2011 nop afficegieurocantrol int Legal Notice amp Disclaimer page 28 Version P 19 5 1 23 of 8 December 2015 4 4 NETWORK MANAGER Public User Guide Detached Views Detached Views come in different sizes and layouts depending on their content but all having the same purpose e provide additional information to what was summarized on the parent Portlet e allow to further dig in the data by means of elaborate querying DR ID DO DH EL he LES D Ur LE AE UR Duris ot I 00 S mmm nm Dk nd Inte d n m z Bia am irra Zeer i ei Frm ell khe P f LE CHE BT UC DeC o APA remm plv Fea 4
53. E i DERI Bee BES THERE EDO Fai Cei Luma Fann ee T M Eja 4 5 x nmm el RRIHET EH EL 19 1 EL LEE HETTI pilosa via pori BATA er EA pp rat Ip utm Im abor Tar a unda hir k DO ni EI IT M TT iii M E Detached Views appear under the same NOP header reminding that they are issued from the Portal be it on your screen or when printed The header may also display the name of their portlet of origin when relevant A Target Date selector is sometimes also present in the header to modify the dates for which queries can be launched Navigation tabs and query areas typically reside at the top of the window whereas the body content can be of various nature e messages e lists e links e etc Whenever relevant one or more query areas allow further filtering or sorting operations on the current query result or the launch of new queries within the same context page 29 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 4 4 1 Querying from a Detached View A number of Detached Views allow you to launch queries without the need to close the window and or return to the Main View Some are very simple like ANM some more complex like Airspaces in the Airspace Data Portlet When
54. EDWWO0037 EDU OPR BEL RMK AGCS EQUIPPED TCAS EQUIPPED 003227238933 Edit Indicator Simply click on the desired indicator to open the corresponding wizard Delete Indicator Click on the trailing x link to remove the corresponding indicator from the OTHER INFORMATION field OTHER INFORMATION CLICK HERE TO ENTER DATA PBH A1 B1 D1 51 52 NAVIGBAS DOF 150929 HEG OOSSC x EET EHA AQ0006 EDGGOO30 EDVWVVOO37 EDU us OPR BEL HMK AGCS EQUIPPED TCAS EG PPED 003227230833 More information on how to work with the OTHER INFORMATION wizard can be found in the IFPUV Users Manual http www eurocontrol int sites default files content documents nm network operations HANDBOOKJ ifps users manual current pdf additional support can be obtained from the Contacts and Support tab Contacts amp Support IFPUV Structured Editor IFPUV Free Text Editor ight Plannin Assistance Contacts and Assistance Real Time Problems page 89 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 20 2 5 Validation Results The Validation Results panel is in effect a message area displaying the IFPUV response to the Validate action e If the submitted flight plan is correct the message is NO ERRORS The flight plan is therefore considered as being valid Validation Results HO ERRORS e If the submitted flight plan is not correct a message indicating the affected parameter and the nat
55. ENTED ERNIP 05 11 2015 15998 2072 04 05 Country k ARSPACE MPROVEMENT 71 012 AIRAC 1104 EK DNK DENMARK MPLEMENTED ERNIP S102015 15023 207104707 Country b amama me mirma Ta ar nmm Eri Fb be i NEIETU meram a mmm The Results Table features 10 columns all of them sortable with the exception of the first one Period Est AIRSPACE IMPROVEMENT 50 012 AMRUFRA AMsterdam ARAC 1003 ED ET DEU GERMANY Country EH HUD Ruhr FRAnkfurt 2010 03 11 EDY MAASTRICHT UAC ACC b AIRSPACE IMPROVEMENT 64 015 Aberdeen departures ARAC 0809 EG GBR UK Country 2008 08 28 b AIRSPACE IMPROVEMENT 65 042b EDDL NETEX departures ARAC 1313 EB BEL BELGIUM Country EDY Y MAASTRICHT UAC i 2013 12 12 DEU GERMANY Country EH NLD NETHERLANDS Cor FRANCE Country k AlpEBACF IMPROVEMENT APAC 12704 LF FRA FRANCE Canter e unnamed Expand Collapse arrows to display the content of the Summary field The Type of the event Name Name of the event e Period est The estimated period for the event e Locations The locations concerned by the event page 98 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Responsible Data Last Owner Published Date IMPLEMENTED ERNIP 14 11 2015 16616 IMPLEMENTED 31 10 2015
56. Ex by following this step by step procedure Step 1 Click on this link to test your PC and browser Only if Step 1 is unsuccessful please ask your IT department to check the minimum system requirements below and click here for Step 2 Further technical requirements Only if Step 2 is not sufficient go to Step 3 Download the installation packages from Internet Explorer in Windows msi file 15 8 MB Firefox or Chrome in Windows msi file 15 9 MB For MAC OS X dmg file 20 9 MB Minimum system requirements 5 33 3 Online web conferences with WebEx The minimum system requirements to be able to participate in a WebEx online conference Windows XP SP3 2000 Vista 7 Internet Explorer 6 7 8 and 9 with ActiveX enabled latest Firefox latest Chrome Javascript and cookies enabled Sun Java 5 1 GHz processor 512 Mb RAM for XP 2 GB RAM for Vista Mac OS X 10 5 10 6 10 7 e Safari 4 5 5 1 page 115 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide latest Firefox e latest Chrome e Javascript and cookies enabled e Apple Java 5 e Intel processor e 512 Mb RAM For Mac OS x 10 6 Snow Leopard 32 bit Ubuntu 10 x 11 x 32 bit Fedora 15 16 32 bit Red Hat 5 6 32 bit OpenSuSE 11 4 e latest 32 bit Firefox Javascript and cookies enabled e Sun Java 5 e 512 MB RAM Solaris 10 11 Mozilla 1 7 Firefox 3 x Javascript and cookies enabled Sun Java 5 processors SPARC Intel or AMD for
57. I ADEP CAAD 12c Click on the highlighted orange arrow to open the EQUIPMENT wizard note how the DESFGILORVWY H values of the text fields are presented in the editor Equipment and capabilities EQUIPMENT SURVEILLANCE GBAS Mode Ir Lev Made and C 77 LORANC F Mode 5 DME Aircraft Identification ACARS Pressure Alttude ADS B Enhanced Surveillance ADF P ADS B 1900MHz GNSS ADS B 1900MHz Qut In F ADS B UAT Out F Inertial Navigation ADS B UAT Out In CPDLC ADS B VDL Mode 4 Out ADS B VDL 4 Qut in VDL Mode 2 ADS C Fans 1A FANS 1 ADS C HFDL VOL Mode 4 F VDL Mode 2 SATCOM 5 5 iridium fF MLS ILS ATC RFT INMARSAT MT SA E Iridium STANDARD TACAN RTF VHF iv RVSM MNPS if 8 33 kHz F OTHER OK Cancel Select the desired parameters and click on the OK button to exit the wizard and apply the new values to the text fields or click on the Cancel button to discard unwanted changes 5 20 2 4 2 OTHER INFORMATION page 87 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide ADES TOTAL EET AERODROME 2ND EDDT 0127 EDDB OTHER INFORMATION CLICK HERE TO ENTER DATA PBN A1B1D1 51 52 00 150929 REG OOSSC
58. L666 Las BEXIIL WERU 285 660 07 20 06 00 EF Las BOMKI DE SEL 185 285 05 00 06 00 uUKFY 505 055 265 fem 06 00 MATA PLH DTR X 105 145 Dio 05 30 5656 Compare Query Route ID The Route Identification max 7 alphanumerics RSA ID The Area Identification e FIR Indicates the FIR that the available area lies within either wholly or partially 4 characters e UIR Indicates the UIR that the available area lies within either wholly or partially 4 characters Results e Route ID The Route Identification e Between The starting point of the route portion that is impacted by this route statement 2 to 5 characters e And The last ending point of the route portion that is impacted by this route statement 2 to 5 characters MNM FL The minimum flight level of the available area 3 digits or GND MAX FL The maximum flight level of the available area 3 digits or UNL WEF The start time of the available area hh mm UNT The end time de allocation of the available area hh mm e FIR Indicates the FIR that the available area lies within either wholly or partially 4 characters UIR Indicates the UIR that the available area lies within either wholly or partially 4 characters e Compare A link used to list the Predecessors allowing you to pick one of them for comparison purposes details here Section 5 17 5 page 74 Version P 19 5 1 23 of 8 December 2015 NETWORK
59. LISHED page 63 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 14 2 Network 5 14 2 1 Network The Network shortcut opens a Daily Plan Detached View presenting the different parts of the Network Daily Plan grouped in 6 collapsible sections Headline Event ACCs Nat Weather and Other These sections are detailed here Network Daily Plan the on line documentation Target Date 08 04 20148 et D Tactical CN Headline Event kACCS k Nat Weather k Other Regulation Plan Private Add comment ACCS UKRAINE EUROCONTROL FOLLOWS THE ICAO CONVENTION ON INTERNATIONAL CIVIL AVIATION AND WORKS WITH ICAO IN THE CONTEXT OF THE ICAO AIR NAVIGATION PLAN EUROPEAN REGION DOC 7754 HAS ISSUED LETTER TO STATES AND INTERNATIONAL ORGANISATIONS EURVNAT 14 024 TEC FOL CUP DRAWING ATTENTION TO POSSIBLE SAFETY RISKS IM THE SIMFEROPOL FLKSHT INFORMATION REGION THE ICAO LETTER SAYS DUE TO THE UNSAFE SITUATION WHERE MORE THAN ONE ATS PROVIDER MAY BE CONTROLLING FLIGHTS WITHIN THE SAME AIRSPACE FROM 3 APRIL 2014 UTC ONWARDS CONSIDERATION SHOULD BE GWEN TO MEASURES TO AVOID THE AIRSPACE AND CIRCUMNAVIGATE THE SIMFEROPOL FIR WITH ALTERNAITVE ROUTINGS THE EUROCONTROL NETWORK MANAGER STRONGLY ADVISES AIRSPACE U
60. M User Forum is the annual unmissable air traffic management event for the aviation community s operational people Read the complete feedback of the event 24 09 2012 ICAO 2012 Flight Planning Additional Test Session in October plus new Training application more k 06 02 2012 ICAO Flight Planning modifications for 2012 The amendments to the flight plan content announced by ICAO for worldwide implementation in November 2012 Read it Note the two tabs Online List and Archive List the latter giving access to more ancient material page 107 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 27 NM Release Information Typical Scope RES NM Release Information 08 40 2042 P Network Manager Release Notes and Deployment Information Edition 3 4 planned for implementation 2013 2014 18 09 2043 F Network Manager Release Notes and Deployment Information Edition 1 0 planned for implementation 2014 2015 17 07 2043 P Presentation of the NM17 5 to Externals slides and recording 12 08 2043 F Send your questions on NM Releases to nm releasesqmeurocontral int more The NM Release Information Portlet lists the last changes implemented in the Portal as well as some insight on future releases and evolution Click on the arrow to open the Summary of a given item T Release Information 05 10 2013 Network Manager Release Notes and Deployment Info
61. MANAGER Public 5 17 3 EAUP Details Level 1 RSA Allocations User Guide COR 2 Availability 100 07 00 16 k GCDZ B 280 07 00 06 00 acre Bpcc k GCHRAF1 855 07 00 06 00 Gccc GCHRAF12 oro 999 07 00 06 00 FUARSid Description Remark F LEDIOT 120 07 00 06 00 LECH i k 1 0119 245 B00 07 00 06 00 LECH k LED12 ooo 245 07 00 06 00 LECM k LED121 245 9700 06 00 LECH k LED123 020 245 07 00 06 00 LECH k LED125 es 245 0700 06 00 LECH 4 LED126 245 450 07 00 06 00 LECH E Compare Query e Route ID The Route Identification e RSA ID The Area Identification e FIR Indicates the FIR that the available area lies within either wholly or partially 4 characters e UIR Indicates the UIR that the available area lies within either wholly or partially 4 characters Results Expands or collapses the Description line with three additional fields FUA RS Id Description and Remark RSA ID The Area Identification FL The minimum flight level of the available area 3 digits or GND MAX FL The maximum flight level of the available area 3 digits or UNL WEF The start time of the available area hh mm UNT The end time de allocation of the available area hh mm FUA RS FUA Restriction Identification FIR Indicates the FIR that the available area lies within either wholly or partially 4 characters
62. NCY e Select Status opens a dialogue listing the proposed Statuses you can select 1 PROPOSED PLANNED CONFIRMED ON_HOLD IMPLEMENTED 6 CANCELLED Moe e Include Events with undefined Period Include Deleted amp Prefer Draft version check boxes to widen or narrow the scope of the query Lastly the Previous Period and Next Period navigation links will allow you to jump to the previous and next period respectively using the last date interval used The Result Area The Result Area presents a table listing all entries matching the query criteria see here an example with a Freetext search for EDLL 01 12 2015 19 33 16 22 Events Period Est Locations Responsible Last Internal Data Source Published i Date ARSBPACE MPROVEMENT 50 042 AMR UFRA 1003 ED ET DEU IMPLEMENTED ERNIP 14 11 2015 16616 AMsi erdam 2035 03011 GERMANY EH FRAnKfurt HLD NETHERLANDS Country EDY MAASTRICHT UAC 64 015 Aberdeen ARAC 0809 EG GBR UK Country MPLEMENTED ERNIP 311052015 18807 departure 20050823 k ARSPACE IMPROVEMENT 65 047b EDOL ARAC 1313 EB BEL BELGIUM MPLEMENTED ERNIP T2511 2015 14055 departures 2013 12012 Country ED MAASTRICHT UAC ACC ED ET DEU GERMANY Country HLD NETHERLANDS Country LF FRA FRANCE Country k ARSPACE MPROVEMENT 69 0688 AIRAC 1204 LF FRA FRANCE IMPLEM
63. Network Manager nominated the European Commission NOP Public User NETWORK MANAGER Edition Number P 19 5 1 23 Validity Date 8 December 2015 EUROCONTROL NETWORK MANAGER NOP Public User Guide Version NOP PUBLIC PORTAL Document Version P 19 5 1 23 Last Update 08 12 2015 NOP User Manual Feedback Please feel free to send us your feedback on the NOP User Manual NOT on the Portal itself to nop office eurocontrol int 1 Did the Online Help as a whole or for the specific topic you were looking for prove to be helpful enough In short do you find it useful 2 Was the information complete enough for your purpose 3 If you do not mind it would help us to know if you are one of the following AO FMP Other you may wish to specify 4 You can freely add some more comments information suggestion Thank you for your feedback The online HTML version of the NOP Help will be maintained and kept up to date on a regular basis The pdf manual on the contrary will only be generated on more important revisions As a result the pdf version and the material printed from it can be potentially outdated by the time you wish to use it Whenever in doubt please always refer to the online version for the most recent information page 1 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 2 The NOP Portal page 2 Version P 19 5 1 23 of 8 December 201
64. PC today 18NOV 14 21 Prohibited area in Azerbaijan 1 08 03 EASA Safety Bulletin regarding Egypt Sinai update 17 11 2014 21 20 8 33 kHz carriage checking by IFPS below FL195 in HUNGARY from 13 11 2014 O6NOV 16 14 FAA concerning Egypt OSNOV 16 01 HLLL Libya FIR update 06 11 1605 UTC MMOV 00 48 b Ilkraine citustion new undata 04 44 NANN e The Archive News view contains items on any state but Latest or Ongoing sorted by publication time latest on top e NOP Online Events List Archive Events List 19 08 39 Tactical update 0830 UTC 19 NOV 06 50 Tactical update 0700 UTC 19NOV 06 28 Tactical update 0630 UTC 19 05 15 Tactical update 0530 UTC 18NOV 13 08 amp Staffing shortage LPPC North sector 19 41 2014 a MUTA 4314 lh Ie Here again click on the expand button to view the News content page 104 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 24 Network Operations Monitoring and Reporting Typical 8 Scope Network Operations Monitoring and Reporting Visit the Network Operations Monitoring amp Reporting website for Network Operations Flight Efficiency and Compliance reporting Monthy Network Operations Report for the last two months can be accessed directly here Monthly Network Operations Report March 2014 Monthly Network Operations Report February 2014 The Yearly Network
65. Portlets Scope 4 2 3 Contextual Help 4 3 Detached Lists 4 4 Detached Views 4 4 1 Querying from a Detached View 4 4 2 Paging 4 4 3 Printing mode 4 4 4 Color overlays and Error Messages 4 5 Using Wildcards 5 Portlets from A to 2 5 1 Access Requests 5 2 ACC Info 5 3 AIM 5 4 Airport Info page 128 Version P 19 5 1 23 of 8 December 2015 4 5 4 5 4 5 7 9 10 11 12 13 14 15 16 17 17 17 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 NETWORK MANAGER NOP Public User Guide 5 5 Airspace Structure 5 6 ANM 5 7 ATFCM Network Situation 5 7 1 Static Map 5 7 2 Static Map IE7 8 5 8 ATFCM Network Situation Data 5 8 1 The ATFCM Situation Data Detached View 5 9 ATFCM Measures Scenarios 5 9 1 The ATFCM Scenarios Detached View 5 9 1 2 Content of the Result area 5 9 1 1 Content of the query area 5 9 2 Consulting a Scenario Details 5 10 Axis Management 5 11 Axis Weekly Management 5 12 Contingency 5 13 Crisis Management 5 14 Daily Plan 5 14 1 AII 5 14 2 Network 5 14 2 1 Network 5 14 3 FAB FMP AMC 5 14 4 Network Static Map 5 14 5 Network Static Map IE7 8 5 15 EAD 5 16 E Helpdesk 5 17 European AUP UUP 5 17 1 EAUP Details ATS Route and CDR Type 1 Closure 5 17 2 EAUP Details CDR Type 2 Availability 5 17 3 EAUP Details Level 1 RSA Allocations 5 17 4 EAUP Details Level 2 RSA Allocations 5 17 5 Compare with Predecessors 5
66. SERS TO AVOID THE SIMFEROPOL FIR DUE TO THESE SAFETY CONCERNS PLEASE REFER TO THE HEADLINE NEWS FOR LATEST INFORMATION REGARDING UNPLANNABLE ROUTES AND AIRPORT UNAMAILABILITY Locations UKFVCTA UKFB UKFF Irish amp UK FAB HIGH RISK OF EGLL ARRIVAL REGULATION DUE STRONG 3000FT WINDS FOR MILITARY ACTIVITY JOINT WARRIOR EGD0164 REFER TO EAUP Locations EGLL preTactical briefing MILEX JOINT WARRIOR until 11 04 2014 JOINT WARRIOR ACTIVITY WILL TAKE PLACE IN THREE FAST JET AREAS FJAS LIVE MISSILE FIRING AND MARITIME GUNNERY WILL TAKE PLACE IN J AREAS A NUMBER OF DANGER AREAS AND SPECIFIED LOCATIONS WILL ALSO BE USED 5 DESCRIBED AIPSUP 4 2014 AND ACN 2014 03 0143 4 BOLAGTO 8 0 64 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Mat Information Accs EASTBOUND PUBLISHED RESNO 56N TO OMOKO 49N WITH CORE EXPECTED VIA MALOT 53N WESTBOUND PREDICTION DOGAL 54N TO BEDRA 48N WITH CORE PREDICTED VIA SOMAX 50N Locations Eastbound Tracks Wi t3 an I rep pe sel page 65 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Other MILEX FRISIAN FLAG until 11 04 2014 Acces EDWW EDYY EHAA EKDK CEck here tor ei Fag 2H4 d
67. Status can be either Published Agreed or Active Published Used to indicate if the scenario is in draft mode or has been published for operational use Agreed The specific periods dates hours for which the concerned FMPs and Network Operations Division have agreed to apply the scenario Active The actual specific periods dates hours for which the scenario is was applied derived from the ETFMS Explanations of the map labels Map labels contain information from the scenario definition and are used to highlight on the map items of specific interest or which are worthy of particular care and attention page 56 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 10 Axis Management Typical Scope PRE Axis Management is a CDM process which optimises seasonal flows of traffic across the European Network The process starts in advance and has as an output ATFCM Measures e g re routings FL capping or alternative routings that would be further consolidated and applied on the day of operations This output is discussed and agreed through dedicated CDM conferences either via a meeting or an e conference and there is a monitoring process to fine tune the event management as well The Axis Management Portlet presents a short list of links to Network Events Section 5 22 1 dedicated to Axes Axis Management South West Axis 2014 update 01 05 2014 02 40 2014 south East Axis 20
68. Typical Scope PRE Axis Weekly Management Please refer to today s Daily Plan portlet below or the Pre Tactical tab for tomorrow s Plan published 76 00UTC South East Axis Stats Week 17 The Axis Weekly Management Portlet provides when available links to the current Axis s weekly debriefing documents in PDF format see the example of the SE Weekly Debriefing for week 2014 W17 EUROCOHTROL DIN MAM RAC REF LOC REASON risum ELM laicis e FLT EM ROUTE wes er roure m 27 1 WEEKLY SE DEBRIEFING FOR 2014 j CHE ERA TIONAL MESS UM EME NTZ iemwamRi Ameo RT Aerodrome wes ewroure acma gt 3 esi ew amesema 255 SUBTOTAL 20 LT T RAFFE IH 159 055 052 07 075 n gt z T 3 3 3 imm m ir Ee c E c PROPOR TRON OF ARES DELAYS PER E EG ULATION 5 ROUP 7266 ANE LAST TEAR 2908 AIRPORT ETC CAPACITY E i gt em m SEER AXE DELAYS 2381 AJRPO RTUVEATHER 8 _ SEAD AXE DELAYS 433 SED ELAYSYFLT j AIRPORT INFRASTRUCTURE ES SEER D ELAYSYELT 0 8 EX ROUTEWEATHER E SEAD ELAYSIFLT EW RoUTEEV ENTZ Se Hd IN Fi page 59 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 5 12 Contingency Typical Scope TAC
69. a structured way A General Information 1 Summary 2 Description and Expected Benefits page 100 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Originator Measures and Scenarios Reference Publications 6 Remarks and Comments B Activities and Impacts This section lists all activities declared for the event For each activity the following information is available 1 General Information a Period b Locations c Description d Comments 2 Impacts for each declared impact the following information is available a Period b Extended Network Impact Types Description Attachments Capacity Variation Sector Configuration Traffic Sample Description i Impacted Locations Possible Bottleneck Sectors Comments D On P N ou page 101 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 22 3 List The List link from the Calendar Portlet opens the Query Event View Detached View as does the Search Events Section 5 22 2 link This specific function will however perform an automatic query for the selected period Query Event View 4 e NOP 01 131 2014 01112 2214 Free Text Adie Internal id F inciuse Events Und ined Period Select Types 7 noud Deteted Select frotar varsan Select Status Previous Period West Period Create New Event Downbni
70. ab selected 5 9 1 1 Content of the query area Origin Where the flow of the traffic to which the scenario applies is coming from ATFCM Events Drop down list of events valid for the selected Target Date Area The specific airspace s point s of congestion alleviated by the application of the scenario Destination Where the flow of the traffic to which the scenario applies is going to Title the Scenario name Status allows you to filter the query by status Possible values can be a Only Active b Non Draft c Only Draft e Types Type s of scenarios select one or more Possible values can be a AR Alternative Route scenario b FL Flight Level scenario C PR Preferred Routing scenario d RR Re Route scenario Note that the Target Date can also be changed in the header of the detached view to any other date in the future or in the past Archived Scenarios Target Date 187101201288 Se D Tactical Online Scenarinx Archie Origuer Areas lineation Ge Events Ai Tithe Types EUROCONTROR 2041 nanpnfficeieureconiralmt Legaliictice amp Selecting the Archived Scenarios brings a new query area very similar to the one in use for the Online Scenarios except for the Status filter Result page 53 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Target D
71. ate 167101201788 D i Tactical Online Scenaring Archived Scenarios Origen Events Areas Types 1380 2013 05 51 15 1426 Status Title LAPYT283 LAPEDIT LAPETI LAPAS LAPI LAPW 8B AREE LAPAG LAPEH LAPU277 ARTSHI LAPS LAPEDES LAPWOTZ LAPEHS 120 LAPI LAPY6253 LAFL Ei Hed ni d On load Arens DTE Ioad Areas EFKT EFET EAD EDOD I EGKE EGHH ECHI ECHL ELE EGLE Cong EG EFA EGHH Eran EFA EGER rm Ei iTi io a dou d s m RM 5 9 1 2 Content of the Result area Status Title Origin On load Areas Off load Areas Destination Types EGHX EES EGIF EGE EGGP EET EGHX LFLL LFLS LFLU E ERD EGH PIAA EFRO EGEE EDON 3 2 Finally clicking one of the Scenarios identifier blue in the Title column opens Scenarios Detail Section 5 9 2 window page 54 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 9 2 Consulting a Scenario Details Scenario Details
72. ate in Time The Portal opens by default with the Tactical phase selected A first way to change from one phase to another and see the Portal content from a different time perspective is by means of the Date Picker to be found in the Target Date pane as shown in the red box below TARGET DATE 05 08 2013 SET D TACTICAL Clicking on the icon opens the Date Picker The Date Pickers behaves as you may expect from its layout 1 the left and right single arrows going one month back or forth the left and right double arrows going one year back or forth and the square recalling the current date 2 the number of the week the list to jump to a selected week the year August 2013 i a am gt pe 22 30 33 1 2 3 4 slel7lasal s 19 a 12 136 15 16 17 18 19 20 1 22 23 24 5 25 27 28 lal 31 1 3 7 2013 W31 90 13 32 2013 33 Week of yea 2013 34 Ta E M La am 2013 W35 J2 2013 36 user Once date is clicked E the Date Picker vanishes and the Date field with the pale green background is updated with the selected value in this example July 31st 2013 Note in some circumstances the choice in dates is limited and the Date Picker will only allow you to select the suitable ones in this example you could only opt for September 3rd or Septe
73. authenticated users ADMINISTRATION gives access to the Delegated Access Administration AO Administrators VERSION shows the current version of the Portal Developers WIND opens the content editor Contributors e VIEW shows the Publishing workflow Contributors SIMULATIONS opens the Simulations workspace Restricted by profile page 14 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 3 2 1 Help A global Help function is made available from the header f J i B 1 A TARGET DATE 27 03 2014 Portal 1 3 200 D TACTICAL Tactical Clicking on the HELP button opens a pop up window giving access to a comprehensive Help package A complete navigation system allows the user to search browse bookmark and print any page within the Help system The Help window opens by default on the Changes and Updates page Table of Contents Disclaimer Portal Help 7 Changes and Updates Changes and Updates The Portal Send Feedback E 7 Header D Portlets and Detached Views Document Version 3 0 duin 46 1 3 Download the Manual Date Section Detail Link 3 Glossary 31 01 2013 Paging Feature added go 28 01 2013 Setting Preferences Customisation editor added 23 01 2013 Traffic Count Section updated 23 01 2013 Header Setting Preferences updated 06 11 2012 Traffic Count Partlet go Table
74. ber 2015 NETWORK MANAGER NOP Public User Guide 5 22 1 Concept The Network Event is the root concept of the Network Events Tool NET application Definition A Network Event is an activity or set of activities which may e cause air traffic demand to increase for a period e g sports games etc e cause air traffic flows to be shifted for a period e g temporary traffic switch between airports security measures etc e lead to a temporary reduction of Network Performance e g capacity safety etc with various potential causes e implementation of new ATM system e move to new ACC Ops room e major airspace reorganisation e works on runways taxiways e runway closures e system or procedures changes e airport terminal reduced facilities e temporary reduction in ATC staff e opening of a new airport e significantly influence normal airport operations e g opening of a new runway airport runway closure new flight procedures e g CDO etc weather pattern etc These events are required to be communicated to the Network Manager in compliance with the EC Regulation 677 2011 Network Manager and EC Regulation 255 2010 ATFM Implementing Rule in order to facilitate the planning and coordination of these events at network and local level thus supporting a more efficient NM response to the evolution of traffic demand In short a Network Event is typically associated with given area spans over certain period
75. chine Interface CHMI provides a new graphical interface to the NM operational systems which enables users to display data and graphical information such as routes route attributes airspaces flight plan tracks etc via map displays As these maps are updated dynamically therefore CHMI provides a more user friendly display of real time information CRAM Conditional Route Availability Message Daedalus NM tool to dynamically calculate a route which is valid according to all airspace and flow management constraints known to the NM i e Conditional Route Availability Message CRAM RAD amp ATFCM Notification Message DMEAN Dynamic Management of European Airspace Network Docked Status of a Map window or component when it is attached to the Menu Bar on top of the Map detached view DWH Data Ware House The DWH system contains archived data from other NM systems together with derived performance and quality indicators It is used to provide an assessment of ATFCM performance and enable corrective action by facilitating comparison of the actual traffic situation with the ATFCM plan and to assist the CFMU and its users in the preparation of their Strategic Pre Tactical and Tactical activities by providing a forecast flight demand model based on historical data EFD ETFMS Flight Data significant flight data updates sent by ETFMS to ANSP s in the form of EFD messages ETFMS ETFMS provides the overall traffic situat
76. city 126 0 ATC Staffing 25 0 Accident Incident 0 0 more The ATFCM Situation Data Portlet is complementary to the Map displayed right above it in the ATFCM Network Situation Portlet It provides high level indicators at Network level on the real time status of e traffic e delays e delay causes The indicators are refreshed every 10 minutes by the ETFMS system Every hour a screenshot of the indicators is taken and archived This allows displaying the evolution of the ATFCM Situation over the day By clicking on the More button a detached view appears which provides e Customisable graphical representations of the indicators e A list of the delay causes with sorting functions page 50 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 8 1 The ATFCM Situation Data Detached View The ATFCM Situation Data Detached View comprises the 3 same sections as the Portlet only to provide more details on their respective Scope 1 Flights are rendered in a graphical way allowing you to switch between e pie chart and bar graph modes 2 The Delays in minutes and the Suspended Flights similar to the one provided in the Portlet 3 And finally the Delay Causes The Delay Causes table contains the regulations for the Target Day You can click anywhere in the column headers to sort the data as you need ascending or descending Target Date 07 04 201488 e NOP D Tactical Fli
77. d Flight Plan FPL data for use by the OPSD for ATFCM planning monitoring and slot allocation Nav Aid Any visual or electronic device airborne or on the surface that provides point to point guidance information or position data to aircraft in flight Network Manager Website Available to the general public without any registration It contains information relevant to the NM core business but information of an operational nature which are accessible from the NOP Portal NMIR NM Interactive Reporting Portlet Portal Element Configurable window providing a synthetic piece of static or dynamic content on a portal page Post Operations One of the 4 ATFCM Phases as used in the Portal Covers the period from Day 1 00 00 onwards Pre Tactical One of the 4 ATFCM Phases as used in the Portal Covers the period from Day 6 to Day 1 inclusive Protected Portal The NOP Protected Portal contains information for clients involved in ATM operations and is only available after acceptance of the NM Terms and Conditions It is accessed via RSA SecureID see Token Public Portal Available only after self registration The NOP Public Portal contains information to assist the NM clients involved in ATM operations however some elements which are subject to a service agreement are only accessible from the NOP Protected Portal RAD The RAD is a sole source flight planning document which integrates both structural and ATFCM requirements
78. des links to the NM Training website containing all the training dates and registration information page 117 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 35 Traffic Counts Typical Scope PRE Traffic Counts Traffic Counts The Traffic Counts Portlet gives the number of flights for a given Traffic Type Note that it may not be accessible to you depending on your role and or profile page 118 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 36 All Other Portlets The other Portlets are simple to use they are made of a summary text sometimes illustrated and most of the times propose organized shortcuts and links to the NM website or the EUROCONTROL website AIS Agora link to the Agora AIS Agora AIS Agora AIS AGORA is EUROCONTROL Aeronautical Information Forum aimed at improving communication among Aeronautical Information Stakeholders with the ultimate goal of improwin g the quality of aeronautical information The EUROCONTROL Cartography service produces pan European standard and tailored iis to the activities of Air Traffic Central Claim Management System CCHS Log in CCMS allows users to raise claims at the Hetwork Manager operational problem reports user requirements or general requests The preferred media is the CCMS Web secured application Alternatively a web form is available More inf
79. described in the section Portlets from A to Z a Typical Scope table summarises where you will most likely be able to see it Here is such a table indicating that the corresponding Portlet is present in all 5 phases e RES for Resources e POS for Post Operations e TAC for Tactical e PRE for Pre Tactical e STR for Strategic IP nes STA Scope Some are present in one phase only and most are present in 2 or 3 phases simultaneously This is however purely indicative page 25 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 4 2 3 Contextual Help Each portlet has its own contextual Help page which can be opened at any time by clicking on the Help button located in the title bar Network Operations Strategic Plan HOP Document The Document is the final result of the operations planning process which consolidates inputs from stakeholders involved in ATM operations ANSPs Airports Airspace Users Military and from EUROCONTROL Units in charge of Flow Capacity and amp irspace Management This document is published twice year with Summer and Winter Release and the electronic format document on the Web site is updated in advance of each AIRAC switch more Each Help page provides whenever relevant links to other concepts of interest in the form of See also links as shown below taken from the ATFCM Events page 9 Click ta Enlarge S
80. dgcra Bir iid Sa 59 Cni SCAM Princi Dip pesi wet eee eee fee peel nl hral erie mu ci METRE SCH miregi bam ce daala a ed anie rr ee FrbohdeiN LG AEM ATRL ogre Das Doiron 170 Due d 20013 Bart Dama Db 1 TEE dower borer PE Uram Ceres Errem Pihet eke EOE Facia bee Opa usa Eden 54 PHF ENTIA MEI ge men Bede Fr pa boj F hilea HIE r E Ee HAEE hrr Coke fel Hihun HEN Salake ase hirii Lege Fiir Capi specific needs by means of the Customisation HMI Customisation in the on line documentation feature Each Portal main page is made of Portlets individual content boxes each with its own title bar displaying text images links or data page 8 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide dynamically fed by the NM Operational back end Applications ETFMS IFPS DWH or by the Portal content editors Each portlet can be collapsed or expanded by means of Ll buttons in the Portlet title bar Your setup will be saved within your browser settings and restored if you use the same browser for another session even after reboot
81. eate Edit data Enter or edit the flight plan data please refer to the FPL Data Section 5 20 2 4 section for detailed information on the Structured Editor features 5 20 2 3 Validate FPL Data Validate FPL Data AIRCRAFT ID FLIGHT RULES TYPE OF FLIGHT The Editor section features a Validate button to be used in order to launch the validation process and see the results in the Validation Results Section 5 20 1 2 section page 85 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 20 2 4 FPL Data FPL Data DATE OF FLIGHT AIRCRAFT ID FLIGHT RULES TYPE OF FLIGHT 2015 Ld BELZTX HIFR S scheduled NUMBER AIRCRAFT TYPE WAKE TURBULEHCE CAT EQUIPMENT A319 I2medium DE3FGILORVAAPr H Ld ADEP EOBT EBBR 1850 ROUTE NO4SO0FS90 NIK 824 TOLEN UNS 73 EKROS _ 950 PAM ULS20 ARNEM UP147 RKN UL960 DLE T207 BATEL ADES TOTAL EET ALTH AERODROME ZND ALTN AERODROME EDDT 0127 EDDB OTHER INFORMATION CLICK HERE TO ENTER DATA PBN A1 B1 01 51 52 DOF A50823 HEG OO0SSC FETYEHAA0006 EDGGO030 EDWWO037 EDUUOOS CODE 44CE63 OPR BEL HMK AGCS EQUIPPED TCAS EQUIPPED 0032272393833 SWW Featuring plain text fields as well as dedicated editing components wizards the FPL Data area provides a structured and convenient way to enter or check the flight plan information DATE OF FLIGHT The date of the flight you may either type in the date or use the Da
82. ed by the major European airports in 23 E 2013 a amp R L the NM AE m The Local Airport Plans and Events document information provided by the major European airports in Q3 2013 EUROPEAN NETWORK OPERATIONS PLAN 2014 2019 Local plans for individual Airports E m TE c M J USE 2 24 2 2222 2 H H ig HHHH fmterbmSemphol 7 22 EB Mucenrsenamy summi DI l eee Et nnn seem S RRR eee eee eee E EERE E the Public Airport Corner website non confidential information reported by Airports via the NM Airport Corner amp EUROCONTROL Public Airport Comer Tha airporis are currenthy reviewing and updating their infermation in ihe Alnor Comer Most up to date information will ba availble im To accass man confidential information Trom a specific airport please select from the 151 below via airport mame or CAG codal Choose an airport task io help aimarts take advantage Of the newark approach solve operational issues and enhance pertomnantce as dell Belgium capture relevant airport information amd monitor airport operations and planni Brussals Brussels Hational BRU EBBR E
83. ee Also Portlet Scenarios In addition to the aforementioned features the whole navigation system Table of Content menu buttons and toolbar is a complementary means of finding relevant information page 26 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Table of Contents pig iii 1 NOP Portal Help E eo Airspace 5 n Send Feedback 2 Paint cc EE 2 Regulation Portlets from A to Z gt Flights gt 2 Traffic Volume Airspace zi S Flight Details Plotting flights the M 7 HMI Customisation for Flig grim Ec c Eta Flight Planning ights fram the Detached View gt Flight List gt e cma LL im omn gt 12 Main Reports r T M R7 E d E Measures r _ wm LI i 7 Network Axis Management Rand Ms s ILL iia E s r PM ie a mm a i PET Network Headline News ZI cp 2 E b imm oa EE c i Network Operations Meniterine aa ed 1 am A S
84. ent Click on the square to set display date to portal simulated time gt Previous Next Click on the left right arrow to go to the previous next day month depending on the View Mode tH b Major Previous Next Click on the left right double arrow to go to the previous next month or year depending on the View Mode Change the View Mode Change the View Mode by clicking on the tabs right under the header Month Day Mon Tue Wed Thu Fri Sat Sun Month Selected by default in all ATFCM phases besides Tactical Click on this tab to display the calendar view showing all the events starting or occurring in the selected month page 92 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Month Day Mon Tue Wed Thu Fri Sat Sun Day Selected by default when in Tactical phase Click on this tab to display the events scheduled for the selected day including those having started earlier but which are not ended yet Month Show only starting events Select Types EDGG EDGG Scenarios O7 D2 2D10 00 00 31 12 2999 00 00 EDMM EDUU EDMM PROJECT 09 02 2012 00 00 31 12 2999 00 00 EKDK Scenarios 15 04 2009 00 00 31 12 2999 00 00 LFRR ERATO implementation 021 2015 00 00 01 07 2076 00 00 te Note Starting events are displayed on top of the list and typed in italic to make them stand out from the Ongoing events Checking the Show starting e
85. eporting NMIR is a Web interface allowing users access to a wide f range of reports and statistical data on European ATFCM archived data User Manua NM Operations overview Link to NM web pages providing a high level view of the NM s main operational processes NM Operations Overview lis is an overview of the Network Operations describing the performed activities and the teams interactions with partners and Airspace Users Network Operations Overview ATFCM Management Flight Planning Airspace Data Main Areas of Operations European AlS Database OneSky Online Link to EUROCONTROL s extranet OneSky Online OneSky Online OneSky Online OneSky Online is EUROCONTROL s Extranet the website secured area which is only 4 accessible to authorised external users and EUROCONTROL staff A migration of all OneSky Online Teams to a new tool is currently on going Some groups have been migrated already and can be accessed through the following link OneSky Online new platform SKYbrary Electronic repository of safety data related to ATM and aviation safety in general SKY brary and aviation safety in general It is built of a hyperlinked network of articles and documents Read more Access the SKYbrary website SkyView is a viewer of spatial aeronautical information based on the OpenGis specifications and 15019100 standardisation framework The aim is to improve information s
86. er Released on 26 11 2014 09 35 25 11 2014 08 15 26 11 2014 07 15 This highlight disappears when one of the actions below are performed e You manually refresh the Portal and as a result reset the 15 min timer e You open the highlighted message or any other message displayed in the Portlet Opening an AIM The light blue color of the AIM titles indicate a hyperlink opening a Detached View with the full AIM content as shown in the example below FLIPNC SCENARIO IMPLEMENTED Released 12 08 2013 10 04 IHE FOLLOWING SCENARIO HAS BEEN IMPLEMENTED BETWEEN 1240 1600 UIC FLIPNC REG ID FLIPNC12 DEPS LPPT DEST ALL NOT VIA SECTOR LEPC CENTRAL UPPER NORIH UPPEE REFILE BELOW FL345 UNTIL CLEAR OF LPPC AIRSPACE PINER TOSDI BARDI UREDI NMOC BRUSSELS EUROCONTROL 2011 nop officemeurocontrol int Legal Notice amp Disclaimer page 41 Version P 19 5 1 23 of 8 December 2015 5 4 NETWORK MANAGER Public User Guide Airport Info Typical Scope POS STR gu Please find in the Portlet Planning of Network Changes under the Strategic phase tab up to date information for individual Airports The Airport Info Portlet currently prompts you to open a couple of links presented in the Planning of Network Changes Portlet AT Ine Same mt The Transition Plan Roadmap can be accessed here Airport Plans and Events 2014 2019 Information provid
87. er called the token code UserID Your UserName or UserID is a login name which has been assigned to your User account by NM For example pOxxx1 The UserName is not case sensitive Way Point A pre determined geographical position used for route or approach definition or progress reporting purpose Two Way Points define a route segment WEF With Effect From the start date and time of a period WIND Web Interface for NOP Data This content and workflow management software is used to maintain the content of the Portal for the static content and manage the presentation of the content from back end systems WYSIWYG What You See Is What You Get A descriptive designation for a form of visual display or graphical user interface gui that shows on the screen the actual appearance of a document being processed page 127 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 8 Table of Contents 1 Version 2 The NOP Portal 2 1 Purpose 2 2 Technical Prerequisites 2 2 2 Firefox 2 2 1 Internet Explorer 9 2 3 Accessing the NOP 2 4 Global Layout Main View 2 5 Printing from the Portal 3 The NOP Header 3 1 Timeline Navigation Concept 3 2 Header Buttons 3 2 1 HELP 3 3 Searching the Portal 3 3 1 Search Text 3 3 1 3 Term 3 3 1 2 Item 3 3 1 1 Text 3 3 2 Search Results 4 Portlets and Views 4 1 Portlet Availability 4 2 Portlets General Features 4 2 1 Portlet Definition 4 2 2
88. etails MILITARY EXERCISE FRISIAN FLAG 2014 WILL TAKE PLACE FROM MAR 31 TO APR 11 WE EXCL AMSTERDAM EHAA COPENHAGEN ERDK AND BREMEN EDVWW FIRJUIR CONCERNED ACTIVITY WILL TAKE PLACE DAILY 0730 1000 AND 1130 1400 MORNING SLOT ONLY ON FRIDAY 11TH APRIL THESE TIME SLOTS CAN BE ADAPTED CAPACITY REDUCTIONS IN EDYY JEVER DELTA SECTORS TO BE EXPECTED PRE TACTICAL MEASURES AND EDIT DAWL REGULATED DURING THE CORE PERIOD OF THE DAY GENERALLY LOW DELAYS PREDICTED Locations ED DAWL ED YYD4JL ANATOLIAN EAGLE Accs MILITARY EXERCISE ANATOLIAN EAGLE 2014 1 WILL TAKE PLACE IN TURKEY FROM 07 TILL 174PR 2014 WE EXCL ANKARA FIRIUIR AFFECTED NOTAMS LT 1706 14 AND 17084 BEEN PUBLISHED A kILIEHEXETI SO Oe Toe Tae Rc BA C0 LI aL PC OOK CRC RC Regulation Plan Private Add comment page 66 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 5 14 3 FAB FMP AMC The FAB FMP and AMC tabs are not currently in use page 67 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 14 4 Network Static Map Target Date 28 04 2014 D Tactical 1 m L 2 2 wal mur T a The Static version of the Daily Plan provides enlarged view of the annotated map proposed the Main view with
89. formance at network level Vetwork Operations HANDBOOK Network Operations Procedure Updates ASM Booklet ATFCM Users Manual Edition 17 0 Date 12 03 2013 Users Manual Edition 17 2 Date 22 10 2013 IFPS Users Manual Edition 17 0 Date 19 03 2013 IFPS Users Manual Edition 17 1 Date 29 10 2013 Annex to the IFPS Users Manual Generated Errors Edition 17 0 Date 19 03 2013 Annex to the IFPS Users Manual Generated Errors Edition 17 1 Date 29 10 2013 Flexible Use of Airspace AMC CADF Operations Manual Edition 5 1 Date 15 04 2013 EVITA Users Guide Operational Problem Reporting Edition 16 0 Date 10 08 2042 HANDBOOK amp User Guides Release Information NM Catalogue of Activities and Services E NM Developments links to several pages of the NM website describing the Network Operations systems and evolutions including reference documents in the NM Library NM Developments Network Operations Systems Overview Release Information The NM Release Notes and Deployment Information documents describe the next release of Services available functions land planning ETFMS NM Interactive Reporting Link to the NMIR application page 120 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide HM Interactive Reporting Interactive R
90. ghts Dalays in minutes Total 27689 Cumulated Average Flight 0 6 12000 En rout 527 0 B0 amp Airport 0 zz 30 mn 122 p EN Landed Aiborme Expected Delay Causes Reason 3 Weather 5127 26 n ATC Equipment 4973 35 Airspace Management 1678 12 Others 1145 special Event DOR Capacity 534 4 page 51 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide ATFCM Measures Scenarios Typical Scope RETERERSTH es Scenarios Scenarios aim at the optimisation of capacity across the European Network of ACCs Network Operations NMC works actively to minimise the number of regulations consistent with the protection of ATC sectors Scenario List The ATFCM Measures Scenarios Portlet provides the Scenario List link which opens the ATFCM Scenarios List Section 5 9 1 Detached View page 52 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 9 1 ATFCM Scenarios Detached View Online Scenarios Target Date 168 1020130 Tactical Scenarios Archived Scenarios Origen Areas Destinations Status AND Events Title Trees iC EURDCDONTR OL 2011 naop ofticsgreuracanmirelint Legal Mn ice E Disclaimer This is the header of the Scenarios List Detached View as it opens by default with the Online Scenarios t
91. gle word or first word second word 3 3 1 3 Term A Term is a single word or a collection of words within opening and closing double quotes The quotes are telling the system that the space between the words is not to be interpreted as a separator ore more simply that the text string between the quotes is the entity for which you are searching a match Example first word second word third word Searching for Text If an unsigned term matches a keyword with a Damerau Levenstein distance of at the most 2 the application considers this term as a match effectively the search algorithm allows the user up to 2 spelling mistakes and depending on the result of the matching process of signed terms the document will be added to the search result Refining the Search Additional features allow you refine your search e the sign right in front of the term the related term must match a keyword in exactly the same spelling except letter casing e the sign if a keyword exists that matches the related term then the whole document is removed from the set of matching documents page 17 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 3 3 2 Search Results The Portal Search Detached View lists all the entries matching the searched term s Ej If the search was initiated from the NOP header the results are displayed in a new search window If the search was initiated from the search window the
92. haring interchange and system to system integration Statfor Link to the EUROCONTROL Statfor web site page 121 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Air Traffic Statistics and Forecasts In the EUROCONTROL Agency the statistics essential ta its members and its stakeholders are produced by the Statistics and Forecast Service SLATFOR page 122 Version P 19 5 1 23 of 8 December 2015 6 NETWORK MANAGER Public User Guide page 123 Version P 19 5 1 23 of 8 December 2015 6 1 NETWORK MANAGER Public User Guide User Assistance In case of problem or questions contact the NOP Office team via the NOP Assistance Portlet To report a problem with the Portal usage or to provide feedback your user experience please send an email to the HOP Office The Portal Support Team will come back to you If you have an urgent Operational request in relation to a flight please follow the procedure in place to reach the OPS Room If you with to submit a system improvement request please submit an Operational User Requirement OUR This portlet provides ways to report a problem with the Portal usage or to provide feedback on your user experience If you have an urgent Operational request in relation to a flight please follow the procedure in place to reach
93. he ATFCM Network may be announced via an AIM while significant events will be announced via both media It will be let to the NM operations to determine the events that come within the Headline News category A summary of the News is revealed when clicking on expand button as shown below with the third item page 103 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Network Headline Hews Latest News Ongoing News 1 17 28 Tactical update 1100 UTC 1 11 40 ATC stafing issue in LPPC today 18NOV 14 21 Prohibited area in Azerbaijan Operators are reminded of the existing prohibited area UPB3 in Azerbaijan More details can be found in the Notam A002411 Brussels 5 23 3 Links Subscribe k more k Two Links are featured at the bottom of the Portlet Subscribe and more Subscribe The Subscribe link opens the Subscription Editor Subscriptions in the on line documentation when you can specify to which stream of information you wish to subscribe More The more button opens a Detached View listing all Network Headline News be they Online News or Archive News by means of their respective tabs e The Online News view contains all items which are in Latest or Ongoing state sorted by publication time latest on top e NOP Online Events List Archive Events List 19NOV 17 28 Tactical update 1100 UTC 19 11 40 ATC stafing issue in LP
94. he minimum flight level of the available area 3 digits or GND MAX FL The maximum flight level of the available area 3 digits or UNL WEF The start time of the available area hh mm UNT The end time de allocation of the available area hh mm FUA RS FUA Restriction Identification FIR Indicates the FIR that the available area lies within either wholly or partially 4 characters UIR Indicates the UIR that the available area lies within either wholly or partially 4 characters Compare A link used to list the Predecessors allowing you to pick one of them for comparison purposes details here Section 5 17 5 page 76 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 17 5 Compare with Predecessors 12 00 17 05 ENOR 22 25 23 00 ENOR 12 00 17 05 EKDK 22 25 23 00 int Legal Hotice amp Disclaimer A Compare link is available at the bottom of each EAUP Detached View It will however only be meaningful in case of a EUUP Clicking on Compare will in effect open an overlay listing the Predecessors allowing you to pick one of them for comparison purposes in order to check the changes having occurred between the original EAUP and its updated EUUP version Please note that an EUUP can in turn be updated by another EUUP in which case both will be listed in the Compare overlay The number of cumulative updates is presently limited to two TYPE Valid From Unt
95. hical information transactions provided by back end applications NOP Portlets are configurable within the portal and give access to more detailed information tools and applications news reference material web pages In the Portal the Portlets are grouped by nature and usage as explained in the Global Layout Section 2 4 section All m 0 11 ZR ror More There are two buttons in the Title bar one collapsing or expanding the portlet to respectively reveal or hide its content and the other to call a Contextual help Section 4 2 3 window A portlet will typically show a very synthetic rendering of the data and whenever relevant present some basic navigation filtering or querying mechanism to facilitate the retrieval of more detailed information This information is presented through pop up windows Detached Lists Section 4 3 or Detached Views Section 4 4 depending on the content o Several detached views can be left open at a time for comparison purposes or for later reference page 24 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 4 2 2 Portlets Scope Every Portlet does not show on all pages Depending on its scope it will be displayed according to the ATFCM Phase in which the Header is set However this is a configurable setting and the presence or absence of a given Portlet in a given ATFCM Phase may evolve over time For every Portlet individually
96. id equipment b Surveillance equipment By default both the fields are empty my A comprehensive wizard facilitates the specification of the equipment and capabilities parameters see description below page 86 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide ADEP ICAO code of the aerodrome of departure By default the field is empty EOBT Estimated Off Block time By default the field is empty ROUTE Brings together the values of the following parameters by default the field is empty 1 CRUISING SPEED The true airspeed for the first or the whole cruising portion of the flight 2 LEVEL Requested cruising level 3 ROUTE Flight Plan route ADES ICAO code of the aerodrome of destination By default the field is empty e TOTAL EET Total Estimated Elapsed Time hhmm By default the field is empty ALTN AERODROME ICAO code of the first alternate aerodrome of destination By default the field is empty 2ND ALTN AERODROME ICAO code of the second alternate aerodrome of destination By default the field is empty OTHER INFORMATION List of additional indicators when relevant as specified by ICAO for Field 18 of the FPL Wizards 5 20 2 4 1 EQUIPMENT FPL Data DATE FLIGHT AIRCRAFT ID FLIGHT RULES TYPE OF FLIGHT 30 Ld BELZTX HIFR S scheduled NUMBER AIRCRAFT WAKE TURBULENCE CAT EQUIPMENT A318 DESFGILORVVVr H
97. ide 5 20 Flight Plan Management Typical Scope PRE Flight Plan Management Network Manager Flight Planning area provides a flight plan validation service as well as a route finding service for secure access users Flight Planning Tools Free Text Editor structured Editor Contacts and Support Flight Planning Documentation k Note Flight Plan submission is only visible to the profiles with the Flight Plan Management role AO ARO and FMP The Flight Plan Management Portlet gives access to the IFPS Validation system IFPUV It is aimed to allow Airspace Users and Aerodrome Reporting Offices to submit their flight plans to a dedicated test system for validation prior to their submission to the operational system It may also be used to find an IFPS compliant route The tool delivers the shortest possible IFPS compliant routes taking into consideration some user defined constraints e g via a point or airspace avoiding a point or airspace The IFPUV contains the current IFPS software and receives copies of updates to the operational environment database fed by live updates It is therefore an accurate reflection of the operational system The Flight Plan Management Portlet also allows you to submit your flight plans and flight plan updates to the operational IFPS system Flight Planning Tools The Portlet lists the available tools e The Free Text Editor Structured Editor and Contact and Support l
98. inks provide shortcuts to respectively directly access the IFPUV Free Text Editor IFPUV Structured Editor and Contact amp Support tabs of the IFPUV Detached View e The Flight Planning Documentation link provides a shortcut to additional online documentation The main difference between the two editor modes resides in the way to enter the flight plan one single text field for the Free Text Editor against a set of form elements ensuring data quality in the Structured Editor Lastly the Contacts amp Support link opens a tab compiling all the means to get in touch with the NM access to useful information and documents and options to report problems P Caution Flight plans submitted to IFPUV for pre validation are not stored Manual correction is not possible The IFPUV response is automatic e Flight plan originators are reminded that flight plan messages must be submitted to the IFPS to ensure acceptance in the operational system e The routes that are proposed by IFPUV are not to be considered as NM recommended routes IFPUV is NOT a flight planning system The responsibility to ensure operational acceptance of the IFPUV proposed routes before filing to IFPS is with the flight plan originator page 80 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 20 1 Free Text Editor The Free Text Editor tab allows you to enter a flight plan directly in ADEXP or ICAO format validate it against IFPUV
99. ion for the NM area both current and future based upon flight plan data updated with current traffic position data allowing a precise anticipation of the traffic demand ETFMS brings benefits in the management of both routine traffic situations as well as unusual or exceptional conditions FAAS Flight Assessment and Alert System 3 letter acronym FAS The NM system hosting the SAFA application FCR File Content Repository The root folder where all the Portal content are stored page 125 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide FCU File Configurable Unit The smallest content package that can be updated independently In most cases it will be a single FCU item but some items do share common or crossed links and will therefore be grouped within an FCU folder Floating Status of Map window or coponent when it is freely movable and draggable in the main display area FMP Flow Management Position FUM Flight Update Messages aimed at making NM partners aware of the situation of a given flight in particular regarding the Estimated Landing Time IFPS Integrated Initial Flight Plan Processing System IFPS fulfils two primary functions 1 provides a centralised flight planning system for the States within the NM area with the object of rationalising reception initial processing and distribution of flight plan data to ATC Units 2 provides Repetitive Flight Plan RPL and File
100. ion to assist parties involved in ATM operations However some elements which are subject to a service agreement are only accessible from the Protected NOP Login to the Protected Portal in the on line documentation Access to the Portal The NOP is accessible from the Network Manager website http www eurocontrol int network manager Use the highlighted button to access the Protected NOP NM Protected Applications CCMS NOP dre To access the Public NOP use this other link Network Manager quicklinks Network Manager contacts Measuring performance Training NM Calendar J A large number of URLs have been updated since NM 18 0 replacing cfmu eurocontrol int with nm eurocontrol int In case you have bookmarked some links to the NOP please make sure they properly reflect the new addresses page 6 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 2 4 Global Layout Main View The NOP layout consists in a Header that manages the navigation and 5 main areas which correspond to the ATFCM phases e Strategic e Pre tactical e Tactical e Post Operations e Resources general reference information not specifically related to any ATFCM phase More information of the ATFCM phases in the Timeline Navigation Concept Section 3 1 HMI Customisation When opened for the first time the NOP presents by default all the currently available Portlets in their respec
101. ise the operational impact Performance data collection and analysis will take place as described above For example an ACC re organisation is planned in FRANCE in May 2015 which implies some training activities prior to the re organisation some technical tests of the ATC systems etc In addition a related pre validation exercise is foreseen to take place in Brussels in January 2015 involving a number of controllers from that French ACC All these activities are consolidated in a single event which may lead to a temporary reduction of that ACC s capacity page 96 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 22 2 Search Events The Search Events link from the Network Events Portlet opens the Query Event View Detached View Query Event View I 7 Period Ld Search Pattern Locations Free Text Advanced Internal id include Events With Select Undefined Period Types include Deleted Select Prefer Draft version Select Status Previous Period Next Period Create New Event Dewnbadss pownloadas CSV RTF The Query Area The Query Area features three command buttons namely Download as CSV and RTF used to download a generated file with the results of the query and save it on your computer in addition to the Search button used to launch the query Note Recognized NOP Editors Contributors get an additional Create New Event butto
102. ld e lower the waiting time for the clients in receiving a reply on their requests e free up telephones for other operational issues You will have to fill in the NM service request form to get access to the E Helpdek page 71 Version P 19 5 1 23 of 8 December 2015 5 17 European AUP UUP Typical Scope NETWORK MANAGER NOP Public User Guide European AUP ULP EUUP 28 04 2014 09 00 29 04 2014 06 00 EUUP 28 04 2044 07 00 29 04 2014 06 00 AUP 28 04 2014 06 00 29 04 2014 06 00 IEUUP 27 04 2044 10 00 28 04 2014 06 00 EAUP 27 04 2014 06 00 28 04 2014 06 00 more k The European AUP UUP Portlet lists the EAUPs and their updates e EAUP The European Airspace Use Plan e EUUP The European Updated Airspace Use Plan o Move your mouse over the Valid WEF link to get a tooltip message with the date and time of release Note that some entries may appear against a blue background This simply means that they are active with their validity period compatible with the Portal time setting Section 3 1 Opening a European AUP UUP Click on the Valid WEF link of your choice and the EAUP Details Detached view will open with the CDR Type 2 Availability tab selected by default You can alternatively click on the More link to get a EAUP List Detached View with the list of currently valid EAUPs and open the desired EAUP from there Target Date 28 04 20148 D Tactical 20 04 201
103. m over 45 minutes to less than 15 minutes lt 15 a lt 30 min E 45 min H gt 45 min Two links appear at the bottom of the Portlet namely Static Map and Static Map IE7 8 The Static Map Section 5 7 1 link opens a screenshot of the Network Situation refreshed on a regular basis It does however not allow you to launch queries plot various entities and get realtime details on various elements such as regulation delays flights etc wich come with the Interactive Map application presented on the Protected NOP The Static Map IE7 8 Section 5 7 2 link does the same as the Static Map to be preferred if you are using Internet Explorer 7 or Internet Explorer 8 to overcome possible compatibility issues Ej When in Tactical phase the ATFCM Network Situation displays a map of Europe where certain elements are colour coded to indicate the foreseen ATFCM delays for these elements at the time of consultation In the Post Operations phase the ATFCM Network Situation map for the selected target date displays the cumulated ATFM delay recorded per ACC over that day 00 00 am to 11 59 pm displayed with the same color code as in the Tactical phase page 46 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 7 1 Static Map The Static Map displays a snapshot of the actual Interactive Map visible to registered users of the Protected Portal The More button on the ATFCM Netw
104. mber 32 2 401 54 26 Relevant PIN CODE wil be available via Headline News or below PINCODE Special AIREPs for Volcanic Ash Should the crisis relate to volcanic ash a list of special AIREPs forwarded to NM can be found below The Crisis Management Portlet provides links to a collection of documents in relation to the following areas e Closures and warnings e Teleconferences e Special AIREPS for Volcanic Ash page 61 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 14 Daily Plan Typical Scope Daily Plan Network FAB gt FMP _ AMC Network Static Hetwork Static Map IE7 8 b The Daily Plan is a set of Tactical ATFCM measures e g activation of Routing Scenarios regulations etc prepared by the NM and other partners FAB FMP and AMC concerned during the planning phase Published every day around 16000 it is accessible via the NOP and also promulgated via AFTN by means of the ANM and Network News messages The ATFCM Daily Plan may be updated at any time according to the needs The map in this portlet displays with color codes the areas which are affected by an ATFCM Event or by a Network Headline News meaning a significant ATFCM event at the moment of publication Note The Daily Plan uses the same Map component as the ATFCM Network Situation Please refer to that specific section
105. mber 4th page 12 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide September 2013 A 8 H LEBBSEZSBSEJESESEN 33 36 ae 58 59 49 Week of year 201 3 35 Please be aware that the Target Date has been changed yet You need to first click on the blinking Set button to change it to the selected value TARGET DATE 85 08 2813 SET D TACTICAL Doing so updates the Target Date and resets the Date field TARGET DATE 31 07 2013 SET D 5 Post OPERATIONS page 13 Version P 19 5 1 23 of 8 December 2015 Note that you can also type the next target date directly in the Date field following the DD MM YYYY format and confirm with the Set button NETWORK MANAGER NOP Public User Guide 3 2 Header Buttons Depending on the user role and profile a number of buttons are available to provide additional functionalities to the Header SIMULATIONS VIEW WIND f an These buttons are reserved to specific roles You may therefore not see them when you login to the Portal this is simply because you will probably not need them However if you think that your profile is misconfigured and that you that you should be able to acccess please contact the NM Customer Support CSO Tel 32 2 745 1997 From right to left e HELP opens the Global Help pages All users CUSTOMISATION opens the Customisation Editor All
106. n allowing to create a Network Event without having to return to the Main page Query Event View Name Patten _ i include Events With Select undefined Period Types 1 include Deleted Select KPA Prefer Draft version Select Status Previous Period Next Penod A number of search parameters are used to define the query e Name Pattern allow you to define patterns using explicitly declared characters in combination with the following wildcards e the wildcard can be used in front at the end or on both sides of a search string and will stand for any number of characters e the wildcard can likewise be used in any position and will stand for a single character Example ca a will return any event that contains in the Name field the word Casablanca Canarias CANAC where can be any character on the third place in the word and all the characters that follow on the second a on the search fieldType your Note Box content here Search Rules A single word results in an exact match Words separated by spaces return entries matching any one of the listed terms north east axis will return any event that contains the wor north OR east OR axis in the Name field Note the search word string selected criteria is highlighted in yellow in the search results table see example for the Name Pattern Amsterdam Responsa Last Data Source Published Date k ARSPACE IMPROVEMENT 50
107. no other feature than basic panning and zooming commands described in the Static Map Section 5 7 1 section of the ATFCM Network Situation Portlet page 68 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 14 5 Network Static Map IE7 8 Target Date 2 Tactical The Static version of the Daily Plan provides an enlarged view of the annotated map proposed on the Main view with no other feature than a basic Navigator as described in the Static Map IE7 8 Section 5 7 2 section of the ATFCM Network Situation Portlet page 69 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 15 EAD BUS PRE STR Scope EAD Er EAD EAD is the world s largest Aeronautical Information System centralised reference database of quality assured aeronautical information EAD pravides access to worldwide and related static date as well as access AIP information in both PDF and AIXAM format for the ECAC region EAD Basic EAD Basicis the EAD general access for private pilotes general aviation training schools and any member of the public seraching for aeronautical information Register to EAD Basic new users Login EAD Basic existing users EAD Pro EAD Fro is the databases service for professional high volume users such ass sir operators airlines aviation service companies and Aeronautical Informa
108. o on CCMS CODA Link to the EUROCONTROL CODA website The objective of the Central Office for Delay Analysis CODA service is to publish regular and ad hoc reports and analyses on delays to air transport due to all causes Contacts Depending on the nature of your enquiry you can get direct contact with the or make a search on the Agency Contacts Network Operations amp HM All Contacts EUROCONTROL Contacts DDR Link to the DDR interface page 119 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide The Demand Data Repository DDR website provides past and future European air traffic demand data for efficient operations planning and monitoring needs The Phase 2 release now incorporates seasonal flight intentions from airport slots to airline schedule data and supports amongst other features the preparation of special events The options currently available for the generation of new routeings are the shortest and cheapest paths Direct access to DDR interface user id and login required See instructions to request an access INEST single simulation tool for network capacity 4 planning and airspace design resulting from the merge of SA AM and NEVAC NEST is a scenario based modelling tool used 5 by the Network Manager and ANSPs to optimise the available resources and improve per
109. of Contents 82 11 2012 Netword Axis Management Section updated 30 10 2012 CSST Section updated Index 10 09 2012 E helpdesk Tele WebEx Sections updated 222382 10 09 2012 E helpdesk Section updated 4 Favorites EUROCONTROL 2008 2013 All rights reserved Contextual Help Section 4 2 3 is also available from each Portlet which directly opens the relevant Help page page 15 Version P 19 5 1 23 of 8 December 2015 3 3 NETWORK MANAGER Public User Guide Searching the Portal The Search function is located in the top right corner of the Header in the Main View SEARCH F Type in your query in the light green text field and click on the SEARCH button to open a Search Detached View listing all the found matches The query is case insensitive and you can type in one or several words each separated by a space You can also directly click on the SEARCH button to open the Detached View and launch your query from there page 16 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 3 3 1 Search Text Definitions In order to make the best use of the Search function here are a few definitions as how the Portal considers your queries 3 3 1 1 Text A Text is a sequence of one or more Items separated by a space Example a collection of words single word another single word one last word 3 3 1 2 Item An Item is a group consisting of an optional sign in front of a Term Example sin
110. og in issues Learning on the NOP functionalities Access to Operational Services or data Flight Planning Browsers issues and display problems See all Network operations FAQs more The FAQ Portlet lists a number of Topic Categories Click any of them to open the corresponding Detached View te The more link here opens by default the Faq page of the first listed item Token issues in this case Structure of a FAQ page Technical support and log in issues oken issues H ho do I contact if have problems accessing the NOP Portal or other Operational lechnical support and log in services HOP Portal CCMS HMIR etc Where can find information on support which is available for the IFPUV earning on the HOP unctionalities Access to Operational Services or data light Planning Browsers issues and display problems see all Network operations As Where can find information on support which is available for the IFPUM From the Portal main window or the Free or Structured Text windows users can access Contact and Support information EUROCONTROL 2044 nop office eurocontrol int Legal Notice amp Disclaimer Fel The list of Topic Categories EH For the selected Category the list of FAQs For the selected FAQ the title of the Question and the proposed Answer page 79 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Gu
111. ork Situation Portlet has opened the detached view with a full screen view of the map Navigation Aid Navigation aid is provided with a set of pan and zoom buttons e The arrows reveal the map in the direction indicated e The and sign zoom respectively and out The grid icon resets the zoom factor and map position to their default values o Tip You can also use the mouse wheel to zoom in and out or click and hold the left mouse button to pan the map Display Refresh While in Loop Mode when the Loop check box is ticked the display is refreshed every 30 seconds looping through an to H 4 cycle as selected with the Forecast menu page 47 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 7 2 Static Map IE7 8 The More button on the ATFCM Network Situation Portlet has opened the detached view with a full screen view of the map Last update 25 04 2014 6 45 Hum 8 v Show legend Show J Forecast E legend explaining the colour codes can be displayed or hidden by means of the Show Legend check box 15 30 MIN 45 MIN gt 45 MIN A navigator can also be displayed or hidden by means of the Show Navigator check box It consists of a miniature version of the complete area which can be shown on the window The highlighted area in the navigator indicates the part of the
112. oyment Flexible rastering Improvement of profiles for arrivals from ihe south west IBBP IBP 2013 TRUK IR 2013 transfer sectors 21 UCESO Additional Information Propects LFFF PARIS ACC Target Delay per Flight min Forecast Delay per Flight min Actual Average En Route Delay per Flight min 2012 Summer 20413 Summer 2013 Annual LFFF PARIS ALL ACC FEB APR MAY JUH JUL AUG NOV DEC Average Average STD YTD Daily Average traffic 2725 2922 2998 3172 3264 3343 3449 0 0 0 0 0 2853 3126 Observed traffic increase 72 868 87 1 696 2 39 amp 5 5 3 65 0 0 0 0 00 0 0 00 47 Observed average ATFIM delay in min 034 05 021 20 08 0 05 030 043 000 000 0 00 000 O00 022 0 24 Observed average ATFM delay in min 000 000 000 0 0 00 0 00 0 00 0 00 0 00 000 000 000 000 0 00 excluding weather amp industrial action ATFCM Events k Axis Management k Special Events Military Events Contingency amp Critical Events page 39 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 05 12 2012 19 30 04 04 2013 Occurrence 23 58 Scenarios View 16 05 2013 00 01 05 09 2013 Occurrence 23 59 Scenarios View 13 12 2012 00 00 19 02 2013 Occurrence 00 00 05 02 2013 00 01 07 02 2013 Occurrence 23 58 23 04 2013 19 00 24 04 2013 Occurrence 02 00 11 06
113. pdates like 1310 19 September 2013 in the example shown above page 114 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 5 33 Tele WebEx conferences Typical Scope TAC PRE Tele WebEx conferences Tele WebEx conferences Customers will be invited via or Headline Mews to join Tactical Briefing targeted towards adhoc situations as they occur These conferences be in the form af a web conference via WebEx or a teleconference via Anytime Far the WebEx conference click here Far the teleconference dial 32 24 01 54 25 The required PIN willbe published via andor Headline Mews The Network Manager Operations Centre is making use of Centra since they started the daily online web conferences in 2003 From 15 May 2012 WebEx became the new tool for the online web conferences held by Network Operations On the same date there is also the change for the teleconferences SITA has been replaced with Arkadin Anytime 5 33 1 Online web conferences The online web conferences are used for Daily D 1 conference at 16 00 CET South West axis South East axis North East axis Ski conferences Special events Olympic Games Football tournaments and finals etc Training on CHMI and NOP 5 33 2 Teleconferences Teleconferences are used for ad hoc events like e Strikes e Crisis Test your PC and browser Please make sure that your PC and browser are compatible to use Web
114. please contact our Technical helpdesk CSO provide feedback on your user experience please send an email to the Portal Support This portlet provides ways to report a problem with the Portal usage or to provide feedback on your user experience If you have an urgent Operational request in relation to a flight please follow the procedure in place to reach the NM OPS Room If you wish to submit a system improvement request please submit an Operational User Requirement OUR page 113 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 32 RAD GE Scope The objective of the RAD Portlet is to facilitate flight planning IRAD z The RAD is designed part of the Network Manager operation The objective of the RAD is to facilitate flight planning in order to improve while allowing aircraft loperators flight planning flexibility RAD Homepage Increment File 1341 17 October 2043 1310 19 September 2013 Additional Documentation The RAD Homepage link opens the RAD website homepage where you can find all data and information related with the RAD updates Home Route Availability Document RAD Additional Documentation AIRAC 1310 19 September 2043 ARAC 1311 17 October 2013 ARAC 1312 14 November 2013 Airspace Data Management Welcome to the RAD website Hational RAD Coordinators The purpose
115. r computer is indeed waiting for a response from the server and not simply frozen the classical hourglass pointer has been replaced with a light indigo transparent overlay telling you that your query is being processed Processing airspaces page 34 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide Using Wildcards A wildcard is a special character or symbol in the case of the NOP that stands for one or more characters and is used in text string matching This enables you to select multiple files with a single specification A few examples for ICAO codes EBB returns EBBC EBBE EBBH EBBR Aerodrome List Aerodrome Details Aerodrome EBB Query by 7 Aerodrome Set 13 05 2014 11 49 47 7 Aerodromes Compute Impacted Aerodromes Plot Evita EBBC EBBE EBBH EBBL EBBR EBBT EBBX BX returns CYBX EBBX EDBX LFBX LTBX Aerodrome List Aerodrome Details Aerodrome BX Query by 7 Aerodrome Set 13 05 2014 11 51 25 5 Aerodromes Compute Impacted Aerodromes Plot Evita CYBX EBBX EDBX LFBX LTBX BB returns EBBC EBBE EBBH EBBL EBBR and also DABB DBBB and many more other combinations with a trailing or potentially starting if such a combination would exist in the ICAO context BB letter group page 35 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide Aerodrome List Aerod
116. rmation Edition 3 4 planned for implementation 2013 2014 A new version of the Network Manager Release Notes and Deployment Information is available in the Library edition 3 4 dated 08 10 2015 Planned for implementation in 2013 2014 It contains in particular additional information an browsers compatibility 18 09 2043 F Network Manager Release Notes and Deployment Information Edition 1 0 planned for implementation 2014 2015 17 07 2043 Presentation of the 17 5 Externals slides recording 12 08 2043 Send your questions on NM Relea nm releasesqmeurocontrol int more k Click on the more link to open another detached view with all issued items under the Online or Archived tab depending on their date of issue IN M Release Information 08 10 2013 P Network Manager Release Notes Deployment Information Edition 3 4 planned for implementation 2013 2014 18 09 2043 F Network Manager Release Notes and Deployment Information Edition 1 0 planned for implementation 2014 2015 17 07 2043 F Presentation of the NM17 5 to Externals slides and recording 12 06 2043 Send your questions Relea nm releasesqnmeurocontrol int page 108 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 08 10 2013 18 08 2013 17 07 2013 12 06 2013 12 03 2013 19 03
117. rome Details Aerodrome BB Query by 7 Aerodrome Set 13 05 2014 11 52 30 55 Aerodromes Compute Impacted Aerodromes Plot Evita DABB DBBB DBBK DBBN DBBP DEBS EBBC EBBE EBBH EBBL EBBR te Note the symbol can stand for zero one or several characters page 36 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER NOP Public User Guide 5 Portlets from A to Z This section lists all NOP Portlets in alphabetical order i When opened for the first time the NOP presents by default all the currently available Portlets in their respective expanded mode This results in a very large amount of information likely to make the Portal somewhat confusing to use The Portal Customisation enables you to store your preferences on how some sections of the portal will behave or look like to best fit your working habits or areas of interest and significantly reduce the size of the pages The Portlets can be defined to be visible or invisible on the Portal Main View resulting in a user defined layout only displaying the selected items and presenting them in a compact and practical way Please refer to the Customise the NOP on line documentation section to learn how to optimise the NOP layout page 37 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 1 Access Requests Typical Scope RES Access Request
118. s Links below give more information on how to obtain an initial or additional access es to the Operational Applications including NOP Protected Portal Service Request step by step quide for accessing Services This Portlet has been designed for requesting the subscription to a Network Manager Service It covers in particular the subscription to a NM Operational Application such as NOP NMIR CCMS Web the portfolio of CHMI applications etc page 38 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide ACC Info Typical Scope STR This Portlet allows you to view all the details for the queried ACC An autosuggest mechanism will propose you in a range gradually narrowing as you type in all matching ACCs identified in the ACC plan whose display period include the current portal UTC date ACC Go Airport ulnas Update LFEE nation per Airport can be expected the coming weeks LFFF LFMM LFRER Detached View The ACC Detached View displays the ACC info for the selected ACC Contacts 1 Focal Point Andre Vignoles andre vignoles aviation civile gouw tr 2 FMP Dominique dominique meyzeiaviation civile gouv fr 3 CFMU contact OPS Support at cimu ops support eurocontrokint Planned Capacity Capacity increase Improved Arspace Management and Procedures Stafi redepl
119. s present on a number of Detached Views is the Slide Bar part of the NOP Paging system In effect a page slider appears under the Query area in a light green box when the query returns a list of matches too long to fit on a single screen This is how it looks like for a query having returned 611 matches spread across 25 pages 19 03 2010 12 45 27 611 Matched Flights Simply move the pointer along the scale to display the relevant page To help you select the right page tooltip appears as you mouse over the diffferent markers indicating the range first and last item displayed page 31 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 4 4 3 Printing mode Target Date 19 08 2013 A Display toggle switch is present in the header of a Detached View displaying large tables like i e in Flights Airspace Data This button switches between the LJ Screen mode set by default to the Print mode simply click on it to change mode Screen Mode The vertical scrolling only affects the data tables This allows the query area and the table headers to be visible at all times for an easier on screen usage and reading Flight List Mazila Firefox ELM hipte eurecenkrelint PUBLISH gatesmrspec PORTAL 22 50 pp partal conbtesz gateway spec PORTALT7 00 56 AJI LTF 635 06406
120. s that the requested data is no longer accessible from the Portal This list is not exhaustive but as a general rule the displayed message will be such as to make clear the cause of the data unavailability Availability table This table lists the Portlets or specific functions whose access is reserved to authenticated users in other words reserved to the Protected Portal Portlet Restricted Access Comment ACC3 AIM Subscribe function Profile based Airspace Data ATFCM Network Situation nteractive Map ATFCM Network Situation Data Slot Window Compliance and Suspended Flights ATFCM Network Situation Data ASD Detached View Show Regulations CASTAR Profile based Crisis Management CSST Profile based Daily Plan Network Interactive Map EC SAFA ALARMING E Helpdesk EVITA Flights Flight Planning Route Catalogue MCDM Tool Profile based Measures Network Events Create and Subscribe functions Network Headline News Subscribe function NOP Showcase Traffic Counts page 22 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 4 2 Portlets General Features page 23 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 4 2 1 Portlet Definition A portlet is a window portion providing a synthetic piece of content on a portal page This content may be static or dynamic with interfaces for dialogue with the user and with data grap
121. te Identification Between The starting point of the route portion that is impacted by this route statement 2 to 5 characters And The last ending point of the route portion that is impacted by this route statement 2 to 5 characters FL The minimum flight level of the available area 3 digits or GND MAX FL The maximum flight level of the available area 3 digits or UNL WEF The start time of the available area hh mm UNT The end time de allocation of the available area hh mm FIR Indicates the FIR that the available area lies within either wholly or partially 4 characters UIR Indicates the UIR that the available area lies within either wholly or partially 4 characters Compare Compare A link used to list the Predecessors allowing you to pick one of them for comparison purposes details here Section 5 17 5 page 73 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 17 2 EAUP Details CDR Type 2 Availability Acute R84 ID TIL Go m ATS Route and COR Type 1 Closure m mE Level 1 REA Allocations d E 015 000 UNORA 015 08 00 FAX 5 TEV KA UNDRA 015 055 OF 08 00 KOLAM BALO 015 055 or 08 00 EGTT EHSA Lan PROS SOAK 205 245 05 00 LGG 1842 TRL HT 205 245 oo 05 00 Lead THH 115 245 05 00
122. te Picker F e Note you can achieve the same result by editing the value of the DOF indicator in the OTHER INFORMATION field ADES TOTAL EET AL Other Information HODROME EDDT 0127 EDL OTHER INFORMATION CLICK HERE TO ENTE DOF 150929 DVWOO3 EDUUDUS VALUE 150928 CODE 44CE63 RVRITS QUIPPED 003227238833 INDICATOR DOF B1 01 51 52 aE LASSEF AIRCRAFT ID Aircraft identification By default the field is empty e FLIGHT RULES Flight rules In the Flight Assistant mode a drop down list allows to select a possible value from a I for IFR b V for VFR c Y for IFR changing to VFR d Z for VFR changing to IFR Empty the default value e TYPE OF FLIGHT Flight type A drop down list allows selecting a possible value from a S for scheduled b N for non scheduled C G for general d M for military e X for training f Empty the default value e NUMBER Number of aircraft if more than one in case of formation flights By default the field is empty AIRCRAFT TYPE the type of Aircraft By default the field is empty e WAKE TURBULENCE CAT Wake turbulence category indicating maximum certified take off mass of the aircraft A drop down list allows selecting a possible value from a L for light b M for medium C H for heavy d J for super e Empty the default value EQUIPMENT Comprises of the following two fields a Radio communication navigation and approach a
123. the information The publication cycle of the operational information follows the principles described in the Network Operations Handbook ATFCM User Manual The NOP content is managed by a NOP office team for general and strategic information during office hours and by the NM operations teams on duty for the pre tactical and tactical information page 3 Version P 19 5 1 23 of 8 December 2015 2 2 NETWORK MANAGER Public User Guide Technical Prerequisites Operating System Windows versions other than Windows 7 are no longer supported Browser The Portal will work best with Firefox version 20 21 and 31 ESR Extended Support Release on a high resolution screen The ideal display size would be 1600x1200 Microsoft Internet Explorer 9 10 and 11 can be used as well they offer the full READING functionality but may lead to slight degradations or differences in the display Some applications including Headline News require Firefox to get the full AUTHORING functionality Internet Explorer not supported Other types versions of browsers might encounter functionality and or performance issues Some components the Calendar the Interactive Map ATFCM Situation Data also need a recent Flash plugin installed minimum 10 check your current configuration on http helpx adobe com flash player kb find version flash player html Get ADOBE You can also get the most recent version from http get adobe com fr flashplayer
124. tion Services A15 data providers EAD Pro is available on a dedicated terminal ECIT or through secure internet connection using SSL technology Learn more about EAD Pro Login EAD Pro SSL existing users EAD is the world s largest Aeronautical Information System a centralised reference database of quality assured aeronautical information EAD provides access to worldwide NOTAM and related static data as well as access to AIP information in both PDF and AIXM format for the ECAC region The EAD Portlet provides direct links to EAD Basic and EAD Pro EAD Basic is the EAD general access for private pilotes general aviation training schools and any member of the public searching for aeronautical information EAD Pro is the database s service for professional high volume users such as air operators airlines aviation service companies and Aeronautical Information Services AIS data providers EAD Pro is available on a dedicated terminal ECIT or through a secure internet connection using SSL technology page 70 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 16 E Helpdesk Typical Scope PRE E Helpdesk To request access to the E Helpdesk please fill in the service request form The purpose of the E Helpdesk is to reduce the amount of telephone calls to the Network Manager Operations Centre Helpdesk for slot improvements extensions and information This shou
125. tive expanded mode This results a very large amount of information likely to make the Portal somewhat confusing to use The Portal Customisation enables you to store your preferences on how some sections of the portal will behave or look like to best fit your working habits or areas of interest and significantly reduce the size of the pages The Portlets can be defined to be visible or invisible on the Portal Main View resulting in a user defined layout only displaying the selected items and presenting them in a compact and practical way Please refer to the Customise the NOP on line documentation section to learn how to optimise the NOP layout The NOP layout is globally consistent across all the pages to facilitate users navigation For instance News and Calendar are always displayed at the top right ATFCM Messages at the top left the main information of the period at the top centre the ATM functions at the middle right and the collaboration functions at the bottom centre on the other hand ACC Info and Airport Info are located differently in Strategic and Post Operations The overall layout is summarised below as it appears when all Portlet are expanded and visible page 7 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide en Pon Lad T Pals xi d arbi dem HAL 54 21 BLESS EPO orbi dora WAL E a t STS _ AEETI
126. update 03 08 2012 last update 02 08 2012 last update DT MVZ 2047 ilast unrlate Drilling down information Move your mouse over a result bullet to reveal the matching keyword s and scoring 21 04 2013 16 03 2013 15 03 2013 11 08 2012 10 08 2012 03 08 2012 05 08 2012 04 08 2012 02 08 2012 04 08 2012 IMA AA TI Daihy Plan more than 50 results please refine your search J Matchin g keywords eddf score full word matches 0 a TU THE Applicable 04 06 2015 last update 34 05 2013 LE partial word matc m Annlicahle 47 03 2043 last undate 1503 20431 page 1 8 Version P 19 5 1 23 of 8 December 2015 h score 5000 NETWORK MANAGER Public User Guide In a similar fashion move your mouse over a title light blue link to get its summary providing there is something to show As a matter of fact the tooltip is not available in all FCUs Daily Plan more than 50 results please refine your search E Headline News more than 50 results please refine your search Tactical update 0410 UTC ala Airports ela EBBR Arrivals Td are regulated due to aerodrome capacity wip on rwy btw 0520 0740 UTC aT Low to moderate delays ela LCLK Arrivals B regulated due to aerodrome capacity btw 0800 1000 UTC Moderate delays ela P _ 7 Arrivals 8 regulated
127. ure of the error is displayed Validation Results Errors SHS INVALID LONGITUDE DESIGNATOR EET LONG You can then make the necessary corrections and resubmit the query until the NO ERRORS message is returned page 90 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 21 Network Axis Management Typical Scope STR Network Axis Management Involvement of ACCs in the axes processes The following links provide information on the various axes for the Summer Season 2014 Horth East Axis south East Axis south West Axis The Network Axis Management Portlet presents some elements formerly carried by the seasonal Network Operations Plan It provides information about the AXIS s according to the actual season Outline e Focus on the traffic flows in a specified area e Indication of the participating ANSP s and ACC s e When applicable information on e applied Cherry picking Level capping e Re routing options e Scenarios Possibility for Tactical Supervisors to publish an AXIS update in cases where there is a significant change in the pretactical plan or anything important for the concerned traffic flows page 91 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 22 Network Events B PRE STR Scope This is the Network Events Portlet respectively with the Month and the Day tab selected Network Events Network Events
128. vents only button filters down the displayed list of events to the ones starting on the selected day Month Day Show only starting events select LECM LECB TLP 2015 4 30 Nov 3U 4 1 2015 12 30 3011 2015 17 00 LFMN LEMN Rumwvay closure 30 11 2015 00 00 15 12 2015 00 00 LFPB Climate Change Conference 21 30 11 2015 00 00 11 12 2015 00 00 The Select Type component provides an additional method to filter the displayed events Month 5how only starting events Clear Selection AIRPORT AIRSPACE IMPROVEMENT MILITARY SPECIAL OK Cancel Select the desired Events Types from the proposed options AIRPORT AIRPACE_IMPROVEMENT MILITARY and or SPECIAL and click page 93 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide on the OK button The active filters if any are indicated at the top of the display area and the list filtered as requested Month Day Show only starting events TLP 2015 4 30 Nov 30 11 2015 12 30 30 11 2015 17 00 LOCC Russian Navy exercise 291 2015 00 01 02 12 2015 23 59 Viewing Events By default the Calendar displays the events associated to the selected Target Date When you are in the Month mode a green symbol Event Mark indicates that there is an event scheduled for a given day either starting or ongoing Each symbol stands for one given event the color telling the type of event
129. y From the Tactical tab the Daily Update link opens a copy of the current Daily Eurocontrol Network Weather Assessment PDF document From the PreTactical tab the Daily Update link opens a copy of the previous Daily Eurocontrol Network Weather Assessment PDF document page 106 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 26 NM News Typical RES Scope EWS 26 02 2014 NM Release 18 from 11th to 18th March 2014 Read the complete Release Information in the upper portlet Release Information 25 02 2014 User Forum 2014 Feedback The User Forum is the annual unmissable air traffic management event for the aviation community s operational people Read the complete feedback of the event more The NM News Portlet displays the last 3 of a selection of the most relevant for the actors involved in Network Operations news items published on the Network Manager website Below a short summary and aligned to the left two distinct links perform the following actions At the very bottom of the Portlet itself and aligned to the right a 7 button opens the full list of the selection Online List Archive List 2610212014 NM Release 18 from 11th to 18th March 2014 Read the complete Release Information in the upper portlet Release Information 25 02 2014 User Forum 2014 Feedback The N
130. you will enter the content of the following field e FPL Data Free text area to enter a flight plan in ADEXP or ICAO format By default this field is empty page 82 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 20 1 2 Validation Results The Validation Results panel is in effect a message area displaying the IFPUV response to the Validate action e If the submitted flight plan is correct the message is NO ERRORS The flight plan is therefore considered as being valid Validation Results HO ERRORS e If the submitted flight plan is not correct a message indicating the affected parameter and the nature of the error is displayed Validation Results Errors SHS INVALID LONGITUDE DESIGNATOR EET LONG You can then make the necessary corrections and resubmit the query until the NO ERRORS message is returned page 83 Version P 19 5 1 23 of 8 December 2015 NETWORK MANAGER Public User Guide 5 20 2 Structured Editor The Structured Editor tab allows you to fill in various fields of a flight plan and then validate it against IFPUV request for route proposals and then submit it IFPUV Structured Editor IFPUV Structured Editor IFPUV Free Text Editor Contacts amp Support ul Next FPL FPL Data Validate FPL Data DATE OF FLIGHT AIRCRAFT ID FLIGHT RULES TYPE OF FLIGHT 28 08 2015 d NUMBER AIRCRAFT WAKE TURBULEN

Download Pdf Manuals

image

Related Search

Related Contents

が誇る充実のラインアップ この機会にごゆっくりとご覧ください。  Benutzerhandbuch ECOMiniDual - Jenaer Antriebstechnik GmbH  432R 3G Wireless Gateway User Guide  User Manual  ELMO Manuale Tecnico CF210  User Manual  精米機のある生活  Samsung T240 Uživatelská přiručka  Philips DesignLine Edge Smart LED TV 42PDL6907T  télécharger la circulaire (48 ko)  

Copyright © All rights reserved.
Failed to retrieve file