Home
        Standard Procedures to Use the Tissue Dryer
         Contents
1.    Electron Microscopy Centre    Title  STANDARD PROCEDURES TO USE THE TISSUE  DRYER    Equipment  Edwards Tissue Dryer Model ETD4  Revision  1 0  Effective Date  12 21 2005    Author  X  Yang    Warning     Before you attempt to operate this equipment for the first time  please make sure you  are aware of the precautions that you must take to ensure your own safety     Working Environment    Do not use electrical equipment in   e Rain or excessive moisture environment  e The presence of flammable or explosive gases    The equipment is not designed to be water or splash proof  or to be used in area  where there are flammable or explosive gases or fumes     Standard Procedures to Use the Tissue Dryer    The purpose of freeze dryer is to remove water from a frozen material by sublimation so to  preserve biological materials  Sensitive media such as tissues can be dried and preserved with  very low moisture contents  Reconstruction of freeze dried products can be achieved by adding  distilled or sterile water     Checkouts before a Drying run     1  Thermo electric module cooling check   1 1  Having connected the unit to the electrical and water supplies  switch on mains supply   Mains electricity indicators on the front panel should light    1 2  Ensure all valves are closed and the variable element controller is set at the zero position    1 3  Turn on water supply   1 4  Fill the desiccant tray with fresh molecular sieve and place in position on the base plate   1 5  Place th
2. e chamber in position on the base plate   1 6  Depress the buttons marked    RP        element    and    cold    on the temperature selector  switch and turn the variable element controller in a clockwise direction to position 7  The    temperature should start falling to  50   C     2  Vacuum check  2 1  Switch on the rotary pump by depressing the switch button on the front panel marked       Rp     2 2  Switch the chamber isolation valve from isolation to pump position on the front panel   2 3  The pressure should fall to 10 2 mbar within 6 minutes   Note  The pump down time can only be expected with a clean empty chamber containing  molecular sieve  The first pump down after a long exposure to atmosphere will be  prolonged due to the degassing of vapour from the surface of the system  Subsequently  pump down times should be shorter    2 4  If the above pumping performance cannot be obtained  switch off the element and turn the  variable element controller knob to zero position  Depress the    OFF    button on the front  panel and contact EMC staff immediately    The following steps only apply to advanced users only    2 5  Switch the chamber isolation valve from pump to isolation position and open the air    admittance valve to vent the chamber     2 6  Open the gas ballast valve on the front panel and allow the pump to operate on full gas  ballast for about 1 hour  This operation will clean the pump oil if contaminated and  improve the subsequent performance    2 7  Repea
3. n fresh desiccant is used it is advisable to allow the surface to absorb a small    quantity of atmospheric moisture  this will prevent its subsequent migration in the vacuum  system and possible contamination of the specimen     10     11     12     13     14     Turn on cooling water valve mounted on the wall  turn the valve anticlockwise and check that  sufficient water flows  The minimum flow required is 1 0 L min at a maximum pressure of 4 2  kgf cm        Check both cylinder valve  fully clockwise  and regulator valve  anticlockwise  are closed     Turn on argon  slowly turn the cylinder valve clockwise until there is a reading at the first  meter  Slowly turn the regulator clockwise until the second meter is reading about 5 psi     Note  Please refer to a separate document for detailed operation procedures for handling high  pressure gas cylinder     Switch on the power by depressing both green buttons marked    mains    and           Switch the chamber isolation valve to    pump        Switch on the rotary pump by depressing the button marked    RP     The rotary pump will start  immediately and the needle of the vacuum gauge will register falls  If the needle is falling  below 0 1 mbar  it indicates that there are no major leaks in the system  If the needle could not  fall under 0 1 mbar for a quite while  contact the EMC staff for support or refer to the vacuum  check section     Depress the buttons marked    element    and    cold    on the temperature selector swi
4. on the log book     Drying times for mammalian tissues as a function of thickness and module temperature                                                                                                                   Thickness of tissue   Temperature maintained Spleen Kidney Liver  1 0 mm  10   C 55 min lh 45 min  2 0 mm  10   C 1h 2h 1h  3 0 mm  10   C 3h 30 min   3h30min_   3h 30 min  4 0 mm  10   C  1 0mm  20   C lh 1h10min   45 min  2 0 mm  20   C 2h 30min   3h 1 h 30 min  3 0 mm  20   C 4h 4h 4h  4 0 mm  20   C 5h 5h30 min  5h  1 0mm  30   C 1h 20min   1h 20min   1h 20min  2 0 mm  30   C 3h 3h 3h  3 0 mm  30   C 3h45 min   4h 3h 45 min  4 0 mm  30   C  1 0 mm  40   C 2h 2h 2h  2 0 mm  40   C 3h45 min   3h45 min  3 h45 min  3 0 mm  40   C 4h 30 min   4h30 min   4h 30 min  4 0 mm  40   C 6h 30min   6h45 min   6h 30 min  1 0mm  50   C 3h 3h 3h  2 0 mm  50   C 4h45 min   4h45 min   4h 45 min  3 0 mm  50   C 6h15 min  6h15 min   6h 15 min  4 0 mm  50   C  1 0mm  60   C 5h30 min   5h30 min   5h 30 min  2 0 mm  60   C 8h 8h 8h  3 0 mm  60   C overnight   overnight   overnight  4 0 mm  60   C overnight   overnight   overnight   Reference     1  Edwards Tissue Dryer User Manual  Edwards 1983    
5. t the original vacuum test after gas ballasting has been completed  Close the  chamber air admittance valve  Depress the    element    and    cold    temperature selector  switches and turn the variable controller to maximum    2 8  When the temperature reaches  40  C open the chamber isolation valve and repeat test as  ZT     2 9  If the correct pump down times still cannot be obtained  check the system for leaks     Thermoelectric Module heating check   3 1  With the chamber under vacuum and the thermoelectric element cooled to about  58   C   turn the variable element controller to zero position    3 2  Depress the    element    and the    heat    button on the temperature selector switch    3 3  Turn the variable element controller in a clockwise direction  Heating will now take place  and with the controllers in a fully clockwise position  the temperature will rise to  approximately  60   C in about 12 minutes    Note  If the variable element controller has been preset to certain value for cooling down  purpose  the heat function will not start  You will have to turn it counterclockwise to zero    position then reset it to the desired value     Operation of Freeze Dryer     1     Check the waterline is proper connected    Check both air admit and gas ballast valves are closed  If not  close the valves   Check the variable element controller is set at zero position  If not  set to zero    Ensure the tray within the chamber is filled with fresh molecular sieve    Note  Whe
6. tch and turn  the variable element controller to the desired value  If not sure  a value of    7    is always a good  start point  The temperature on the base plate should start falling down to a certain value  depending on the setting     Prepare and freeze the specimen by quenching it in R12 refrigerant or iso pentane cooled by  liquid nitrogen     Switch the chamber isolation valve to    isolation    and open the air admittance valve by turning  it counter clockwise slowly to vent the chamber with dry Argon gas     When the chamber is vented  open the metal cover and transfer the frozen specimen onto the  base plate     Note  During the transferring  please remember to wear power free gloves provided to avoid  potential contamination to the specimen and vacuum chamber     Caution  A cold burn could result is the cold plate or the liquid nitrogen is in contact with bare  skin when transferring the frozen specimen     15     16     17     18     19     20     21     22     23     Replace the chamber cover in position  Close the air admittance valve and switch the chamber  isolation valve to    Pump        Caution  the air admittance valve and gas ballast valve and needle valves  which is very  sensitive to the force  When operating with such valve  please be gentle  The treads on air  admittance valve have been found to be worn out     The tissue should start to dry    Note  The drying times for individual specimen are different depending on the tissue type   frozen temperat
7. ure and thickness of the tissue  Please refer to available references   Practical tests might also have to be contacted in order to obtain more relevant  information     Examples of drying time are given at the end of the manual     When the specimen is dry  depress the    cold    button and set the variable element controller  back to zero position  The specimen should start to warm up to room temperature     Close the cylinder valve while the regulator valve remains on   Switch the isolation valve to    isolation    and slowly open the air admittance valve to vent the  chamber with residue dry argon gas  By doing this  user not only vents the work chamber but    also release the residue high pressure argon gas remained in the regulator and tubing     Caution  if the valve is opened too quickly  the specimen may be blown from the plate by the  inrush of air to the chamber     Remove the work chamber and top plate  with powder free gloves   Transfer the specimen to  vapour fixative to embedding medium as desired     Replace work chamber and top plate  Close the air admittance valve  fully clockwise  and  switch the chamber isolation valve to    pump    so the chamber could maintain at vacuum     Switch the isolation valve to    isolation    after evacuation  Switch off rotary pump and power  by depressing    RP    and two green buttons     Close the regulator valve by turning the knob counter clockwise when regulator meters read  Zero     24  Record the usage of freeze dryer 
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
USER'S MANUAL  discriminateur de sens de rotation  2551.090 Rev N Spanish Blind Magmeter.indd  HSR-240L  HK7-505 DVD-2683W13  Betriebsanleitung  End User Manual - Micron Communications  Slant/Fin Sentry S-120 User's Manual  取扱説明書 - トーヨーキッチン  Manual de Instalación N Classic Controla    Copyright © All rights reserved. 
   Failed to retrieve file