image

Contents

1. Measuring Transmitting Unit 15 20 or 30A Circuit Breaker Figure 3 b Installation of MTU communication via Ethernet ROCK OK Ck k OK k k k OK kK kK ck Rev 1 0 13 actoolsupply com actoolsupply com Page 10 OK OK k OK CR k k k GB OK OK OK GB Installation Detail STEP 1 Determine communication method to be used between MTU and ECC For Communication Options see Page 15 The system can be configured to use either PLC Power Line Carrier No wiring required between MTU and ECC See Fig 3 a on Page 8 or ETHERNET Requires a Cat V cable from the MTU to the Router or network See Fig 3 b on Page 9 Ethernet communication is required on 3 wire Delta connection See Page 16 for instal lation instructions for Ethernet communication PLC communication can only be used if all of the following conditions are met The panel where the MTU is being installed has a neutral IE it is a 208Y 120V Wye system or 240 120V Hi Leg Delta System The outlet that the ECC will be plugged into is fed from this panel There is not a great deal of noise on the powerline usually caused by electronic equipment dim mers inverters variable speed drives fluorescent lighting with noisy ballasts etc NOTE It is HIGHLY recommended that all M
2. 2 Appendix AH NLIN O00ENLIN V1130d Me Hd INVYOVIO DNISIM CV XIONIddV NOILVH3dO H3dOHd dN14S MO NI V1140 ME SV 135 38 LSNIN NOLLVTIVISNI 17201 Ad CIHINDIY SV SNV3IA H3HLO 4dV1 NOLLVOIHIELN3UI 3sVHd Asn qd3sn 38 SY0109 38IM 1N398324IQ 1WH1 AHINDIY AVIN 5 3INOS LHNH3H13 VIA AYMAILVO OL ID3NNOO TVHYLNIN ON 51 3H3H1 3504938 LINDY NO 3Sf1 dd LONNVO NOISSIINSNVHI 214 SILON iiia sng ennon o JHAA NYA AL 4 2 k OK CR k k k OK actoolsupply com actoolsupply com Page 21 OK OK k OK k k k k k k 3 Appendix A AH NLIN O00ENLIN V1130 93H 1H M Y Hd INVdOVICG DNIHIM EY XIGNd4ddV d 113S NOLLVTIVISNI 135 14901 YNOA CIHINDIY SV SNVIIN H3HLO YO ddVL NOILVOIHILNIOI 35 351 0950 38 590102 LN38324ICO AVIA SIIMINNOI 3IWOS 35VHd 3IAVS JHL NO LON MD CONV NLA NO 30V 18 AT3H3A3S 38 THM NOISSIASNW4l Jld LINDH V 3svHd OL MD 124NNO2 V 35WHd NO SI AD JHL OL NOISSINSNVUL Jld 941 JHL OL 3123NNOO 38 ISNIN 3018 NOLLVH3dO 1534409 SILON 01 318 LIINNOO k OK OK k k
3. This manual provides the steps necessary to safely install the MTU and Current Transformers CTs For detailed installation and operation of other components and software please find it on the TED website www theenergydetective com Every effort has been made in providing for the safe secure installation of TED The installation of TED requires the cover of the main electrical circuit breaker panel to be removed After the circuit breaker panel cover has been removed the potential hazard of shock burn or even electrocution now exists Do not attempt to complete this installation unless you are a licensed electrician familiar with the electrical components and operation of the circuit breaker panel Even when the main circuit breaker has been turned to the OFF position certain areas within the circuit breaker panel may still be electrified Do not attempt installation unless you know where these electrified areas are This symbol will be found throughout the instructions where there is a po i tential for electric shock burn or even ELECTRICAL electrocution Do not attempt to com HAZARD plete the noted section if you are not u an electrician or qualified installer WARNING These servicing instructions are for use by qualified personnel only To reduce the risk of electric shock DO NOT perform any servicing other than that contained in these operational instruc tions unless you are qualified to do so WARNING The
4. DISPLAY AND NETWORK IT IS EXTREMELY IMPORTANT THAT THE INSTALLING ELECTRICIAN VERIFY CORRECT OPERATION AND MEASUREMENT PRIOR TO LEAVING THE SITE ECC CONNECTION Select an electrical outlet free of other connections and connect ECC power cord Must be on same phase as MTU black power wire Connect provided Ethernet cable from ECC to available port in network router TESTING PLC COMMUNICATION nsure that the left LED on the MTU is blinking orange or green regularly every one or two sec onds This verifies PLC connection If orange verify MTU ID in ECC via EDIT System Settings Insure that the LED on the right side of the ECC is blinking Red Green This confirms that the ECC is sending receiving data from the MTU Gk k Gk k k k Rev 1 0 13 actoolsupply com actoolsupply com Page 14 OK OK k OK k OK TESTING MTU INSTALLATION The bestway to test the system is with all components MTU ECC Display Computer connected and operational fthis is not possible the installer can use a laptop or PC to test the system by connecting the MTU to the laptop PC with a CAT V Ethernet patch cable Seethe next section for system connection options which include viewing the real time information on the MTU stats page Step 7
5. Page 23 actoolsupply com actoolsupply com Page 3 Kook ok ock ok ok ale ok ok ok ok ok ok ok ok ok OK ok OK ok ok ck PART I INTRODUCTION SAFE OPERATING RANGE AND CONDITIONS amp EN SI Use x Indoor x Indoor Outdoor Condition Dry u Dry Damp Temperature x 10 40 C u 40 C to 50C Relative Humidity 80 x lt 95 Altitude 3 300 3 300M Voltage 95 265VAC 200 500 VAC Maximum Power oW u 4 5W Limitations Please note the following limitations If you have a Single Phase service TED Pro Commercial will work Use TED Pro Residential in most cases for a less costly solution f your main circuit breaker or fuse panel is larger than 1200 Amps TED WILL NOT work e If you have more than one main circuit breaker or switch you will need to use multiple MTUs f your main service circuit conductors wires are larger than 1 25 inch diameter TED WILL NOT work Other TED models and accessories may be available for these applications Please see our website for details TED MTU 3 PHASE OPERATION 3 Phase Services TED is designed to work on most 3 phase 50 60HZ electrical services worldwide TED will work on 3PH 4W Wye 3 PH 3W Delta 1 or 3PH 4W Hi Leg Delta services anywhere where the line line nominal voltage is between 200VAC and 600VAC For specific connection drawings for each type of service see Appendix Common 3 Phase Electr
6. Refer to Installation Detail on Page 16 for detailed instructions on installing the ECC NOTE For an Ethernet connected MTU Connect the ECC per above refer to TED Installation Utility on Page 18 item 1 Once the utility has located the TED Pro Commercial on the network highlight appropriate TED Pro and select Launch in Browser When the TED Pro Commercial user interface opens select Post to HTTP check box Then carefully type in the IP that the Installation Utility has returned for the TED Pro ECC into the ECC IP field select Save This setting will DISABLE the Power Line Carrier of this MTU Refer to Footprints manual or Quick Start Guide to complete ECC setup and test functionality OK OK OK CR k k k k actoolsupply com C TOOL actoolsupply com PLYG OM Page 15 207 1244 P aikencol Kook ck ck ck ok ck ck ck ck ck ck ck ck ok ck ck ck ck ck ck ck ck ck OK ck ck ck ck PART IV Communication Options MTU HV mounted INSIDE Panel ECC PLC Power Line Carrier A gt MTU HV mounted OUTSIDE Panel ECC Ethernet directly to ECC MTU HV mounted OUTSIDE Panel to Hub to MTU HV mounted OUTSIDE Panel ECC ECC Ethernet to LAN to ECC ROCK OK k ck ck k k k k k k k k Gk ck kK ck
7. communication method must be used The MTU and ECC will need to be connected to the Local Area Network or connected to each other via Ethernet Services with 400A parallel feeds will require the use of a CT harness Model ADP and additional sets of CTs CT301B for each additional parallel conductor Normally TED Pro Commercial MTU is provided with 400A current transformers For small services 200A or less where space is limited it is highly recommended that customer use 200A current transformers Model CT601B Please specify with order N AR Single Phase Services TED Pro Commercial is designed to work on 3 Phase services however it is possible to configure it for single phase services TED Pro Residential MTU LV is recommended for single phase services and provides a much smaller more accurate and less costly solution for single phase services up to 400A TED Pro Commercial MTU HV can be configured to work on any single phase service where the line line nominal voltage or line to neutral nominal voltage is between 200VAC and 250VAC For specific connection drawings for each type of service see the Appendix Gk Gk Gk k k k actoolsupply com actoolsupply com Page 5 OK k OK OK k k Common 1 Phase Electrical Services aro
8. ever if this is not possible such as in the case of a combination breaker panel then install on the primary side of the main breaker D Make sure the thumb squeeze split core CTs clamp tightly The CTs should be loose fitting around the wires E The CT inputs on the MTU HV are left to right Phase A Phase B Phase C and must be matched to the corresponding conductors for proper readings Important if phasing is not correct the device will not measure current power and energy correctly NOTE The connectors are polarized and can only be inserted one way do not force NOTE If installed on a 208Y 120V 1 PH 3 W system only install two of the CTs and connect to the two applicable ports on the MTU The third CT is not used NOTE While the TED Pro Commercial MTU is designed to work on services of 400A it is possible to use it on services with up to three 400A parallel conductors per phase up to 1200A by follow ing these steps Precision Measurement of Parallel Conductors 1 Purchase and install 1 CT Harness Kit Model ADP and 3 additional CTs Model CT301B for each additional parallel conductor IE If you have a 1200A service with 3 parallel conductors per phase you will need to purchase 1 Model ADP harness kits and 6 additional Model CT301B CTs 2 Refer to installation instructions provided with the CT Harness for correct installation F Determine the best location to mount the MTU i Choose location where it will not
9. for specific wiring diagrams for your system E If there is no spare circuit breaker the black red blue wires can be attached to any 15 20 or 30 Amp 3 pole circuit breaker in the panel provided that the circuit breaker is approved for 2 conduc tors and this is acceptable to the authority having jurisdiction in the installation location it is generally acceptable If a 3 pole circuit breaker is not available then use an approved handle tie to create one NOTE 1 The black red and blue wires will normally connect to the corresponding 3 phases on the cir cuit breaker IE Black wire to Phase A Red wire to Phase B and Blue wire to phase C The CT inputs on the MTU are left to right Phase A Phase B Phase C see image on front cover of this booklet and must be matched to the corresponding wires for proper readings Some Canadian Standards may have phases marked differently in the panel this doesn t matter as long as the MTU power cable wires and CT inputs correspond NOTE 2 For optimal PLC Communication the ECC should be plugged into a circuit on the same phase as the black wire on the MTU power cable If the ECC cannot be connected to phase A the black MTU wire may be swapped with the Phase B or Phase C wires but the corresponding CTs must also be swapped for proper readings NOTE 3 For Ethernet Communication HTTP post the circuit to which the ECC is connected does not matter F If the system has a neutral connect the whi
10. interfere with existing equipment or wiring ii If installed in the panel the MTU may be attached using double sided tape if allowed in your jurisdiction or with sheet metal or machine screws If installed outside the panel it may be mounted directly to the wall using the mounting lugs on the MTU or it may be mounted in a suitably sized junction box G Arrange and tie wrap all wiring in a neat and tidy manner H Turn the power back on The MTU will blink approximately 10 times when power is first applied After this it will blink when transmitting or receiving data Do not close the electrical panel until you have completed the installation of the ECC and verified that OK OK OK k k ck actoolsupply com actoolsupply com Page 13 k k OK ok ock ck k ok OK ok ok ok ok ok ok ok ok Ok ok OK Ok OK Ok ck ok Ok correct data is being received from the MTU Close the Electrical Panel only after you have confirmed the correct operation of TED Step 5 ETHERNET WIRING Neatly run a CAT V cable from the MTU to the customer s router or network location Be sure to use plenum rated cables where required Neatly route protect and secure the cable Make the connections and plug into MTU and Router Step 6 TESTING THE SYSTEM EVEN IF THE CUSTOMER CHOOSES TO CONFIGURE THE ECC
11. k k Rev 1 0 13 actoolsupply com actoolsupply com Pace 22 OK OK k OK k k OK OK GB Appendix 4 AH NLIN OOOENLW IN31SAS HdE WOdd Y AA I 4 13 MO NI 3dAL NOLLVTIVISNI 135 O3AId30 ME Hal W201 A8 AIYINDIY SV SNV3IA YIHLO NTYSVIO ONISIAA NOLLVIHILNI0I 3svHd 3sn 45 38 590100 3WIAA IN31134dIG 1VH1 IYINOIY AVIA SIIMINNOI V V XIGN4ddV 3SVHd 3IAVS JHL NO LON 34Y N NO 3HIA dl ATIYIAIS 38 NOLLYIINNININOI 21d 3SVHd M9 OL SHIM 32v 18 JAOW HO LINIUII V 3SVHd OL M9 123NNOO Y 3SVHd NO SI MO JHL OL NOISSIIWSNVHI e SALON LON n DNHHI 545 l dJ0AdS 3018 340 dv OK OK k k k k actoolsupply com actoolsupply com Page 23 OK Gk OK OK k OK k k K Appendix A 5 AH NLW QOOOENLIN ca ni dN13S 3dAL NOLLVTIVISNI 135 ASVHd 5 14907 CIYINDIY SV SNVIIN HdH1O Y YO 3dVI NOLLVOHILN3GI 3SVHd ISN 45 38 590100 JHI AA LN33334IQ 1VH1 3HI 1O38 AVIA S3IHINDOO INOS SY XIONHddW
12. 3svHd JINVS JHL NO LON 3UV NLIN NO FUIM MOVIE 41 AT383A3S Bm 38 THM NOISSIINSNVHI S3HIM A9W19 038 ION 5 12 JHL 3SH3A3H HO LINDUID v ASWHd OL M9 1DANNOI V 3SVHd NO SI JHL OL NOISSIINSNVHI 21 SILON IINYIHLI 5 15 u 430AdS 034 01 30148 1J3INNOJ rIY NO e Bis 21d Gk k OK k CR k k Rev 1 0 13 actoolsupply com C TOOL actoolsupply com PLY COM 207 1244 ill Bikoncoloncom actoolsupply com
13. Circuit Breaker MAX 1200A MAX 1200A CT s Phase A Phase C Phase B Neutral 2 a a CX 5 Gi ELECTRICAL ow HAZARD A Neutral Cam 20 e f Nin o MTU A White neutral Measuring Transmitting Unit Blue phase C Black phase A Red phase B 15 20 or 30A Circuit Breaker Figure 3 a Installation of MTU communication via Power Line Carrier CR Ck OK Gk ck k k k k kK kK K ck R actoolsupply com actoolsupply com Page 9 OK k OK OK k k k Incoming Power Lines MAX 600V MAX 1200A Main Circuit Breaker CT s MAX 1200A Phase A Phase C Phase B xxm Neutral Ethernet cable s A to Router e n x CN M n Dei AN NEED E N SOS SM y a UD MSS X SE NS DANGER AE _ x Ethernet 322 SE dod ER ELECTRICAL M HAZARD da Bus M CT Connectors ur Ethernet Port Z 2 amp T nd S S ch 3 Approved Cable S un Connector or Bushing White neutral Ee A Blue phase C Black phase A Red phase B Connector
14. Installation Manual 3 for TED Pro Commercial actoolsupply com actoolsupply com Pas 2 OK Gk k OK CR k k OK OK GB IMPORTANT The installation of your TED Pro system is a several step pro cess The Ist step is the installation of the MTU HV After the MTU HV is installed Step 2 is the installation of the ECC and the last Step Footprints software If the equipment is used in a manner not specified by the manufacturer the protection provided by the equipment may be impaired TABLE OF CONTENTS PARTI Introduction Page 3 Operating Conditions Page 3 Three phase services Page 3 Single phase from 3 phase Page 4 Components Page 5 PART II Safely Page 6 PART III Installation Page 7 PART IV Communication Options Page 15 MTU to ECC Communication via Ethernet Page 16 ECC Communication via Local Area Network Page 17 Footprints Software Installation Page 18 Appendix AppendixA1 Page 19 Appendix A2 Page 20 Appendix Page 21 Appendix A4 Page 22 Appendix 5
15. MTU must be connected to a switch or circuit breaker in close proximity to the equip ment and within easy reach of the operator lt must be marked as the disconnecting device for the MTU WARNING If the equipment is used in a manner not specified in these instructions the protection provided by the equipment may be impaired ENERGY Inc MODEL TED3000 TED Pro This device complies with part 15 of the FCC Rules Operation is subject to the following two conditions TESTED TO COMPLY WITH HC FCC STANDARDS 1 This device may not cause harmful interference FCC Part 15 SubPart B EU EN 61326 1 and 2 This device must accept any interference received FOR HOME AND OFFICE USE including interference that may cause undesired operations k OK OK k k k k ck actoolsupply com C TOOL actoolsupply com Y COM age Darco ai aikencolon com k k k k k OK k k OK CR cR GB PART Ill INSTALLATION BEFORE YOU START Do not begin installation until you have read the Safety section of this manual Readall instructions before beginning installation Estimated Installation Time Professional Installer 30 minutes Equipment Needed Flathead screwdriver small and large Phillips screwdriver small and large Flashlight QUALIFIED ELECTRICIANS OR PROFES
16. Rev 1 0 13 actoolsupply com actoolsupply com Page 16 OK OK k OK k k OK OK GB MTU to ECC Communication via Ethernet Following are steps for setting up MTU ECC Communication through the Ethernet port via HTTP post not using PLC Power Line Carrier and NOT connecting the ECC to the Local Area Network Instructions for MTU Ethernet setup when accessing the ECC on the Local Area Network are located in separate Instructions The ECC and MTU can communicate by connecting the two devices together with an Ethernet cable or connecting both devices to an Ethernet switch hub not router See the following steps for the proper configuration and setup 1 Set the computer s IP to 192 168 7 1 See the steps starting on page 35 of the TED 5000 User s Manual for instructions on setting your computer s IP to a specific IP The manual can be found at http www theenergydetective com downloads ted5000 usermanual pdf Note depending on the computer you may need an Ethernet Crossover cable when directly con necting the ECC and or MTU to the computer 2 Once the computer is set to 7 1 connect the MTU to an Ethernet switch or directly to the computer you will also have the ECC and the computer connected to this switch via Ethernet as well if a switch is available if not you can connect the MTU to the computer set it up and then c
17. SIONAL INSTALLERS FAMILIAR WITH ALL ASPECTS OF ELECTRICAL WIRING AND THEORY MAY USE THE FOLLOWING INSTRUCTIONS FOR INSTALLATION OF TED PRO COMMERCIAL MTU TED will work on single phase services however TED Pro Residential will prove to be a smaller and more cost effective solution For services where there are two or more main circuit breaker panels you will need one additional MTU for each main circuit breaker or panel For services with Wind Solar or Standby Generator an additional MTU will be required to measure GENERATION and NET All wiring in the United States must be installed in accordance with the latest adopted edition of the Na tional Electrical Code ANSI NFPA 70 NEC and state or local requirements All wiring in Canada must be installed in accordance with the latest adopted edition of the Canadian Electrical Code CSA C22 2 CEC Part and any provincial or local requirements Wiring in other countries and jurisdictions should be done in accordance with the rules and regulations in effect for the installing location Contact your local power authority or local regulator for more information k OK k k k k Rev 1 0 13 actoolsupply com actoolsupply com Page 8 OK OK k OK k k OK OK OK GB Incoming Power Lines MAX 600V Main
18. System Settings Wizard and go to your network settings tab Then un check the box next to use settings provided by router to set the current IP address of the ECC to a static address Be sure to update your system settings on the write to device tab of the wizard after un checking the box for the static IP setting to take effect OK OK OK k k k k k ck Rev 1 0 13 actoolsupply com actoolsupply com Page 18 OK OK k OK k k k k OK OK GB Footprints Software Setup After you have installed your MTU HV and ECC follow these instructions to complete your setup Installing Footprints Software 1 Gotothe following link and download the TED Pro Installation Utility appropriate for your com puter Windows Mac or Linux http www theenergydetective com downloads documents 2 Run the Installation Utility After the Utility locates your ECC IP address highlight the ECC line it may say TED6000 select launch in browser NOTE After you have selected Launch in Browser you will see a grey screen and Loading should appear followed by the Footprints dashboard If your computer screen appears to freeze on the grey colored screen please clear your cache and relaunch in browser Connecting TED to your Computer Router To connect TED to your
19. TU shown on the utility as TED 3000 Once it does select the TED 3000 IP address and then click Launch in Browser from the bottom of the utility This will launch the MTU setup page in the browser Once you have the MTU Setup page loaded select the correct 3 phase service type from the drop down list at the top of the page Then check the HTTP box and enter in the ECC IP that is listed on the utility Shown on the utility as TED 6000 This completes the setup for the MTU 3000 To view the real time readings per phase directly from the MTU type http 192 168 7 3 stats htm into the browser address bar Next you will go back to the utility and select the TED 6000 IP and Launch in Browser from the bottom of the utility This will load the live dashboard interface A few things to check on this page to verify that your TED Pro is working properly 1 Select Edit and then System Settings Wizard Go to the Product Identification tab Verify that the MTU ID is correctly entered as it should match the six digit ID listed on the MTU 2 Once verified select Help and then Statistics page Once this page loads simply verify that you are seeing correct voltage and kW readings You can do load tests to make sure that the system is registering the correct values as loads change 3 Additionally you can set the ECC to a static IP through the system settings This is highly recom mended To do this select Edit gt
20. TU installations be made outside of the panel for ease of performing future firmware updates ease of ac cess without the need for an electrician or access to directly connect an MTU to a computer should raw data be desired STEP 2 DETERMINE WHETHER THE MTU WILL BE MOUNTED IN OR ADJACENT TO THE PANEL See NOTE above See also Figs 3 a and 3 b on Page 8 9 e If using PLC communication the MTU can be mounted either inside or adjacent to the panel e If using Ethernet communication the MTU must be mounted adjacent the panel STEP 3 INSTALLING THE POWER CABLE AND MEASURING TRANSMITTING UNIT MTU DANGER ELECTRICAL HAZARD TURN OFF ALL POWER TO THE CIRCUIT BREAKER PANEL BY TURNING OFF THE MAIN BREAKER OR MAIN SWITCH A Turn off power B Remove circuit breaker panel cover C Note the Serial Number of the MTU as shown on the label It consists of six digits in the form 12 34 56 You will need to know this number to connect the MTU to the ECC Network k OK k k k actoolsupply com C TOOL actoolsupply com PLY COM Page 11 207 1244 iti encolon com EEE TEE k k k k k k Ok OK Ok D black red and blue wires from the MTU power cord to a spare 15 20 or 30 Amp three pole circuit breaker in the panel See Appendix
21. ical Services around the world include o 200V 3PH 3W Delta Japan o 208Y 120V 3PH 4W Wye North America o 240V 3PH 3W Delta North America k OK k k k k Rev 1 0 13 actoolsupply com C TOOL PLY COM 207 1244 OK OK k k OK EEES gt ail actoolsupply com Page 4 o 240 120 3PH 4W Hi Leg Delta North America o 380Y 220V 3PH 4W Wye or 380V 3PH 3W Delta Asia o 400Y 230V3PH 4W Wye or 380V 3PH 3W Delta Europe o 415Y 240V 3PH 4W Wye or 380V 3PH 3W Delta UK Australia NZ India 480Y 277V 3PH 4W Wye or 480V 3 PH 3W Delta North America o 600 347V 3PH 4W Wye 600V 3PH 3W Delta Canada Service voltages shown above are common systems There are other configurations If yours is not listed and you are not sure please contact Energy Inc Tech Support for assistance TED is only suitable for services of 400 Amps or less or up to 1200 Amps with parallel 400A feeds May require optional CT Harness TED is only suitable for services with cables that have a maximum outside diameter of 32mm 1 25 or 700 Conductors Delta Services and Wye services where voltage between line and neutral exceeds 250V cannot use PLC communication between the MTU and ECC In these cases the MTU must be mounted outside the electrical panel and Ethernet
22. onnect it to the ECC after setup 3 With the MTU connected directly to the computer or to a switch with the computer also connected to the switch open your web browser and type in http 192 168 7 3 to access the MTU setup page Note If you connect the ECC or MTU directly to the computer with the computer set to 192 168 7 1 and you are unable to bring up the software setup and unable to ping the IP address of 192 168 7 3 or 192 168 7 4 you will instead need to use an Ethernet Crossover Cable This will be more com mon with computers that were manufactured prior to 2011 For more information on the Crossover Cable please see http en wikipedia org wiki Ethernet_crossover_cable Crossover Cables are readily available at RadioShack WalMart BestBuy etc 4 Once the MTU setup page loads select your correct phase type from the drop down list at the top of the page 5 Check the box for HTTP With this box checked you can then enter in your ECC default IP which is 192 168 7 4 Once this is entered select SAVE at the bottom of the setup At this point the portion of setting up the MTU to ECC direct communication is complete To view the real time readings per phase directly from the MTU type http 192 168 7 3 stats htm into the browser address bar Next will be the ECC 6 You can connect the ECC either directly to your computer via Ethernet or you can run it through an Eth ernet switch or hub
23. router please visit http www theenergydetective com router To connect TED directly to your computer please visit http www theenergydetective com computer Once you launch TED Footprints go to the HELP tab click the User Manual download OK OK OK CR k k k k actoolsupply com Page 19 OK OK k k k k k k OK OK GB E O O o 2 O 1 Appendix JAM M Y Hd INVYDVIO DNIYIM XIGN4ddV OO0ENLIN HIMOd NLA m TYNDIS 31d 135 MD 3dAL NOILVIIVISNI 135 ALIYJOHLAV 201 YNOA Ag OJHINDIY SV SNVIIN H3HLO JdYL NOILVIHILNAOI 3S VW Hd 350 035N dd 590100 1N3834410 1WH1 IHINOIH AVIA SIIHLNNOI AWOS 4SVHd NO LON OLIN NO 38IM MIVTA A1383A3S 38 TIIM NOISSIINSNVHL 21d 30 18 Q38 NMOG 3NNILNOI 3SVHd MO OL 3UIM AJW18 HO V ASVHd OL MS LOANNOD V ASWHd NO SI MO JHL 01 NOISSIINSNVYL 214 OK OK k k k Rev 1 0 13 actoolsupply com actoolsupply com Page 20 OK OK k OK k k OK GB
24. te wire from the MTU to the neutral bus on the panel NOTE 4 If there is no neutral tape or place a wire nut over the conductor and coil neatly G Do not connect the Power Cable to the MTU until you have the CTs connected STEP 4 INSTALLING AND CONNECTING THE CURRENT TRANSFORMERS CTs CAUTION IF THIS IS A COMBINATION PANEL THE LUGS ON THE PRIMARY SIDE OF THE MAIN BREAKER ARE PROBABLY STILL HOT A The CTs must be installed with the red polarity dots facing towards the source of power the utility meter If all three CTs are not installed in this manner the readings will be wrong Note If you have solar wind or generator you will need an additional MTU if you want to measure Gen eration Load and Net Utility Please see solar wind section of our website for details Note Do not install the CT over the neutral N grounded conductor k k k k k Rev 1 0 13 actoolsupply com actoolsupply com Page 12 OK OK k k k OK OK OK GB B Install CT over each incoming power line or by pressing on the handle to open the split core then clipping it over the power line as shown below Press Here C The CTs should be installed on the secondary side of the main switch or main circuit breaker how
25. und the world include e 208Y 120V 1PH 3W Single Phase service derived from 3 Phase system North America e 240 120V 1PH 3W North America 230V 1PH 2W Europe and most other countries in the world TED Pro Commercial MTU HV will not work on 120V 1PH 2W services SYSTEM COMPONENTS TED Pro Commercial Energy Monitoring System includes e One 1 MTU3000 Measuring Transmitting Unit MTU HV One 1 ECC with Footprints firmware embedded One 1 wired or wireless Display if purchase included Display Associated cables power supplies installation brochure Three 3 400A Current Transformers CTs Unpacking Unpack TED and ensure that all parts are included in the package A One 1 Measuring Transmitting Unit MTU HV B One 1 ECC Energy Control Center C Power Cables for MTU HV and ECC Ethernet Cable Low gt voltage power adapter if optional wireless Display included D Three 3 Model QX400CT Current Transformers CT s E Installation Manual Please Read Carefully OK OK OK k k Rev 1 0 13 actoolsupply com actoolsupply com Page 6 OK k OK k k k OK GB PART Il SAFETY THE MTU AND CTs OF THE TED PRO COMMERCIAL SYSTEM MUST BE INSTALLED BY A LICENSED ELECTRICIAN
26. with the computer connected to the same switch hub via Ethernet Once connect ed open your web browser and type in http 192 168 7 4 to bring up the Footprints live dashboard Select EDIT gt SYSTEM SETTINGS WIZARD gt go to the Product ID tab Verify that the MTU ID entered k OK k k k k actoolsupply com actoolsupply com Page 17 OK OK k OK OK k k k k k matches the ID as listed on the MTU itself If they match you close the setup If they do not correct the ID to match the ID listed on the MTU and update your settings on the Write to Device tab 7 Once the ID is verified select HELP and then TED Statistics Page Verify that you are getting the correct voltage and power readings in the grid If you are receiving correct data on this page do a few load tests to make sure that the readings are changing according to load changes ECC Communication Over Local Area Network Connect the TED Pro ECC to the wireless router using the Ethernet cable provided and run the Instal lation Utility Instructions for the Installation Utility can be found on Page 18 Step 1 Let the program run for 5 10 minutes and it should bring back two different IP addresses one for the ECC shown on the Utility as TED 6000 and one for the M

Download Pdf Manuals

image

Related Search

Related Contents

Reconocimiento de la flora arvense asociada al cultivo de tabaco  ANNEXE 2 : Démarches à effectuer pour signer un contrat de  Manuale dell`utente TruVision DVR 41  製品安全データシート  L`ergonomie au bureau :  Notice VOLUPTO Elec 04-06-2014    laser e accessori geodesia misurazioni ambientali punzoni  TF 831/861 - Hochschule Trier  

Copyright © All rights reserved.
Failed to retrieve file