Home
duo boilers manual
Contents
1. HEATING JASPI DUO 1 2 amp Solar Multifuel boilers Ila e fe GG OF les d Gegen f em rn y F d 1 ue Pe Z n s i 1 KA 4 rr tq INSTALLATION AND USER MANUAL NOR THMAN WWW JASPI UK Table of Contents BS ox EE BOER INSTALLATION oase oe es Se ee EE Ee GE se Oo De Es dr General Gg Lee E Open Expansion Container SYyStemMS see ee ee ee ee ee ee ee Ee ee ee Coated Expansion Container Systems see ee EE ee ee ee ee ee ee ee DIVING Mater Oy S EM ESE DEE RO i BEGUIE ESSA ROVERE EAT create eta cr MATT Electricity CONNECTIONS BOILER INTRODUCTION ira UN CON CC re cease EE RE EE EN HA EE N DUNE INS AN Os eee Burner ao EE dE EE Wood side equipment Installation Ee ER ER ER Ee Ee Ee ee ee ee BOLERU SACE se ER Oe GE ee Ge ee N ee ee Ge Olii DUNNING WODO RE EE EE N N re General guidellies ies EERS daria UK IRELAND TECHNICAL HELPLINE 01392 247 343 IRL 44 1392 247 343 Figure 1 JASPI DUO 1 and JASPI DUO 2 boiler standard equipment Domestic hot water coil flange chimney extension liner combined mano thermometer grate cleaning equipment set adjustment plate Termomix mixing valve R 1 electric immersion heater draft control R 3 4 PARTS Domestic hot water out 22 mm Cold water in 922 mm Boiling aggregate output to accum R1 Expansion aggregate return fro
2. immersion temperature limiter to go off Once the boiler has somewhat cooled off temperature approx 80 C the released temperature limiter can be retuned by pressing the temperature limiter nr 21 24 figure 1 button strongly pressing with a narrow tipped stick on the control panel
3. the front position with the cleansing stick When burning wood the fire control plate should be pushed back To ensure good burning it is important to burn with sufficient draft Draft in the boiler is adjusted with the draft adjuster thus that draft in the charging space is sufficient to ensure clean burning It should also be made sure that secondary air is provided from the air valve nr 6 figure 4 The valve should be approx 5 mm open Figure 4 Wood side Cleaning hatch Funnel Fire control plate Coal grating Filling hatch Air valve secondary air Cheek plate on the right side 1 piece only DUO 2 Grate Fire management hatch 0 Draft valve primary air id a eS re ZZY AVIL AV LAIZ Cleansing the wood side is done from the front of the boiler Most important is to keep surfaces behind the cleansing hatch nr 1 figure 4 clean The fire surfaces can be cleansed by brushing and scraping off the accumulated smut through the cleansing and filling hatches Remove combustion residue through fire management hatch Notice The cleanness of the boiler s fire surfaces is important to keep the high efficiency GENERAL GUIDELINES The water level indicator manometer should be checked regularly to ensure the sufficiency of water in the system Simultaneously it should be visually checked whether there are any leaks in the piping The boiler can easily overheat in firewood use This can cause the burner or
4. Pro LJ 10 LF 1 and Bentone B 10 FUV Burner installation The burner can only be installed by a person qualified and entitled to the job An installation and usage manual is delivered with the boiler and it should be followed at all times Burner adjustment The exit gas values required for burner adjustment are measured from the analysis hole in the duct connection piece The analysis is taken on the first time of usage and the burner is adjusted accordingly Thus unnecessary smutting is avoided if ventilation is not sufficient The final adjustment is performed when boiler water reaches 75 In oil usage the adjusted values are appropriate when the smut value is 0 1 in the bachrah scale O2 3 5 4 5 CO2 gt 12 and CO lt 30 ppm Once the burner is correctly adjusted the boiler needs sweeping approx once a year NOTICE Incorrect burner adjustment can damage the burner hatch and exit gas controls In normal boilers the exit gas temperature is approx 140 If this temperature is too low for the chimney material the temperature can be raised by removing some of the hindermost plates of the exit gas controls nr 4 figure 3 in the convection part Removing one plate is equivalent to approx a 10 rise in exit gas temp erature Wood part gear The traction control is installed in the traction control aggregate nr 5 figure 1 and the damper nr 7 figure 1 according to instructions The cheek plate only in Duo 2
5. boiler nr 7 figure 4 reduces the grate surface and it is installed in a 45 angle to the boiler s side on to p of the grate to the right side when looking from the front BOILER USAGE OIL USAGE The burner control thermostat is set in the proximity of 75 C or higher thus producing more hot driving water Too low temperature in the boiler water below 70 C will produce condensation water on the fire surfaces and damage the boiler When heated with oil the control thermostat of the electric immersion heater is set to 60 C in Duo 1 S and Duo 2 S models If the boiler has not been equipped with an electric immersion upon delivery it can also be installed later contact manufacturer Figure 3 Oil side 1 Oil side cleaning hatch 2 Wood oil side cleaning hatch 3 Burner hatch with flame observation glass 4 Exit gas control 1 piece UU w BR UI Maintenance When the burner is correctly adjusted the boiler needs sweeping approx once a year see adjustment values page 4 Before the oil chamber can be cleansed power must be switched off from the burner s main switch Then the oil burner hatch nr 3 figure 3 and cleansing hatch nr 1 figure 3 are opened and the exit gas control found behind the latter hatch is removed nr 4 figure 3 The chambers are cleansed by re
6. ial safety requirements of the EC directive 97 23 EC article 3 subsection 2 3 The fulfilment of the essential safety requirements found in the directive appendix 1 articles 2 10 2 11 3 4 and section 5 subsection a and d is clarified in the aggregata s usage and installation instructions The manufacturing of the aggregata is done in accordance with good engineering practices In Raisio Finland 5 6 2002 Raimo Aaltonen General Manager GENERAL INSTALLATION INSTRUCTIONS Install the boiler in an upright position on an incombustible surface in a dry boiler room Observe sufficient installation and maintenance space around the boiler Boiler connections to the network are done so that the piping is not strained Install necessary lock valves in the network for maintenance purposes During the network pressure test the boiler pressure must not exceed 1 5 bar After filling the pipe connections and sealing are carefully checked to avoid damage to the boiler and electric appliances from a possible leak The free combustion air opening that is lead to the boiler room should be at least the size of the chimney aperture 150 mm x 150 mm The boiler is connected to the chimney with the chimney extension liner standard equipment Joints must be carefully compressed with mineral wool fibre glass braid or equivalent to avoid the weakening of traction The distance between the boiler and the duct can be up to seve
7. m acc R 1 Draft regulator aggregate R 3 4 Fire management hatch Air valve primary air Filling hatch Air valve secondary air 10 Cleaning hatch 11 12 Drain 13 Burner hatch 14 Flame observation glass 15 Cleaning hatch 16 Analysis hole 17 Mixing valve R 3 4 18 Heating output 19 Heating return 20 Adjustment panel 21 Burner thermostat 22 Immersion heater thermostat 23 Thermometer 24 Manometer 25 Wood loading hatch 255 x 100 mm 26 Leg 27 Sensor connection for TSK valve R 1 2 Water Wght RA 8 o wan Depi Hegh of wood ea kg Q O 8 0 49 D OO SN O O ei Lo DUO 1 1420 720 610 955 250 380 700 20 20 160 300 DUO 1 S 1420 720 610 955 250 380 700 20 20 160 300 DUO 2 1420 720 760 955 250 930 700 20 25 235 365 DUO2S 1420 720 760 955 250 930 700 20 25 235 365 Technical data Recommend accumulator 0 5 2 5 m e g JASPI GTV 500 Recommend chimney brick 250 cm steel 9150 mm Recomm chimney height min 5 metres Hot water coll 200 1 40 C 10 min Duo 1 200 1 45 C 10 min Duo 2 Structural pressure 1 5 bar Max temperature in usage 100 C ASSURANCE OF CONFORMITY WITH EC STANDARDS This assurance applies to our manually operated boilers functioning on solid fuel JASPI Tupla Triplex ECOPUU YPV 40 We assure that the abovementioned aggregata are in conformance with the essent
8. moving and extracting the smut from the surfaces After cleansing the exit gas control is replaced the hatches are closed and power is switched back on BURNING WOOD Lighting JASPI Duo operates with the top burning principle and burning is enhanced with a patented burning technique Therefore the exit gases are cleaner and efficiency is higher The boiler can be most efficiently exploited by burning wood when connected to a 500 1500 litre accumulator Ideally the firewood should be approx 30 cm Tupla 1 or 50 cm Tupla 2 long with a diameter of 10 12 cm cleaved First ensure that the damper is in a horizontal position Then the plate s adjustment lever nr 11 figure 1 has been pushed back The fire is lit in the boiler with chips on the bottom and then firewood is added Then the fire control plate nr 3 figure 4 should be pulled in the front position and before closing the filling hatch nr 5 figure 4 it is pushed to the rear position with the cleansing stick Fire can also be lit by filling the chamber with firewood and placing the chips underneath the topmost wood Then the fire control plate nr 3 figure 4 can already be pushed back Adding firewood Burning air Cleansing ve Avoid unnecessarily opening of the filling hatch Add firewood when the previous filling has finished burning The damper nr 10 figure 4 is closed before opening the filling hatch and the fire control plate is pulled to
9. oading valve e g Termovar 25 should be used in the coupling which ensures that the returning water temperature does not fall below 60 Electricity connection The boiler s electricity connections must only be performed by a qualified electrician The connections are made according to the following scheme FEED 230 240V 1 FROM MAINSWITCH OF HEATING ELEMENT X 6kW 30A 3x10mm AkW 20A 3x6mm 2kW 10A Sx1 5mm FEED FROM BURNER SWITC MAX 240V 10A TT BEN BURNER X 2 PPT SIS gt gt 3 10mm elle II eer fi kr 4 eS a 6mm 31 T CUT OFF X1 LT THERMOSTAT O 4mm s3 Signal lamp THERMOSTAT 32 W S2 ad C BURNER Sul THERMOSTAT BURNER la CUT OFF HEATING ELEMENT THERMOSTAT SPL 3x2kW 230V BOILER INTRODUCTION When introducing the boiler it should be ensured that the system is filled with water and air is removed The tightness of the piping should also be checked to avoid leaking damage to the system The manometer must be observed in conjunction with the usage of the apparata In coated expansion container systems the pressure should be above 0 5 bar but below 1 5 bar when hot Furthermore check that the opening pressure of the safety valve is 1 5 bar Burner choice All modern oil burners that are equipped with pre heating and designed for 1 4 2 3 kg of oil h are Suitable These values are reached at 0 5 US gall h with a 60 nozzle when oil pressure is 6 14 bar Suitable burners include e g Oilon Junior
10. r system The cold water pipe connected to the hot water coil is equipped with a valve group including a closing valve a backlash valve and a 10 bar safety valve The hot water thermostatic mixing valve is mounted between the cold and hot water aggregates A boiling prevention valve must be connected to the hot water coil to block overheating when wood is being burnt Valve connection guidelines are shown in figure 2 Figure 2 Connecting the boiling prevention valve e g Jaspi TSK to the driving water coil a b 1 Valve group ON 2 Boiling prevention valve df i 3 Sensor Pal df EES o ESE l Kylm vesi 1 Lammin vesi Heating system Mixing valve The boiler s standard equipment includes a 4 way mixing valve which is connected to the flange on top of the boiler The pipe entering the radiator network is connected to the left seen from the front and the return pipe to the right side of the valve The temperature of the outflow water that is needed in the network varies considerably Thus we recommend automating the functioning of the mixing valve Circulating water pump The best location for the circulating water pump is the radiator network return pipe To ensure the pump s good functioning removing the accumulating air from the network should be taken care of Energy accumulator The boiler should be connected to an energy accumulator with volume 500 2 500 litres if firewood burning is frequent A reliable l
11. ral metres In that case the connecting pipe should be in a horizontal or rather ascending position and the cross section must conform to chimney recommendations The pipe should be isolated and the joints sealed Possibility to sweep the chimney should also be ensured INSTALLATION Expansion system Coated expansion container system On top of the boiler in the boiling aggregate there should be a reliable without a clamping device 1 5 bar safety valve whose blasting output should correspond to the amount of water vapor that is produced at maximum output 20 kW Duo 1 25 kW Duo 2 Use of two safety valves is recommended The safety valve is installed unclamped to the boiler s boiling aggregate The valve s exhaust pipe should not be reduced from it s nominal size and it should be directed thus that the discharged vapor does not damage people or property The active volume of the coated expansion boiler should be at least 5 of the facility s total water quantity In practice it should be dimensioned according to at least 7 Open expansion container system On top of the boiler an unlocked sleeve pipe should be led to the expansion container The container s minimum volume must be 5 of the facility s total water quantity The container s overflow pipe should be mounted descending The vapor discharge pipe should be continuously ascending and it s pate directed thus that it does not damage people or property Driving wate
Download Pdf Manuals
Related Search
Related Contents
Broan 154 User's Manual Analyse du jeu des acteurs - UVT e-doc Tacens Anima ACR3 Husqvarna 326C, 326L, 326LX-Series, 326LDX Enquête de satisfaction du public, synthèse des entretiens ICC ICMPP024T2 patch panel Step Stool Ladder with Trolley - LF356 0120 343 550 www.componentsource.co.jp THE WILLIAMSWARN PERSONAL BREWERY USER MANUAL TAFCO WINDOWS NU2-359S-I Instructions / Assembly Copyright © All rights reserved.
Failed to retrieve file