Home

1 - Webee

image

Contents

1. ZigBee network of your Smartee the status LED will stop blinking If the after following these steps the Switchee will not join the Smartee Zigbee network do as follows e Make sure the network on your Smartee is open for joining Keep in mind that once you clicked on Add Devices the network will be open for 60 seconds eCheck if the Switchee hasn t join another network the light will be static see the next step to learn how to remove it from a network in order to add itto anew one Once the Switchee is added to your Smartee you will be able to start controlling it trough your Webee App Removing from Zigbee Network If it becomes necessary to remove the Switchee from a Zigbee network then you must factory default the Switchee To factory default the Switchee A Press and hold the Switchee s CONFIG button for 5 8 seconds B When the Led blinks twice release the button LED will start blinking erratically C The Switchee will now be reset to factory defaults and begin scanning for a ZigBee network to join i i b d E CONFIG BUTTON STATUS LED Webee Switchee Getting started Page 06 2014 Webee LLC All rights reserved The Webee logo Boss and Bees are trademarks or registered trademarks of Webee LLC vvebee SWITCHEE s SPECS GETTING STARTED WITH SWITCHEE Electrical specifications of power supply Description Min Typ Max Unit Input voltage range 90 264
2. to do it carefully as it could represent an electrical hazard since these wires will allow AC current to flow through them b To use the Load 2 to connect another electrical system repeat the process by connecting the two wires from the second electrical system to Load2 A and Load2 B connectors on the Switchee Once again do it carefully to avoid electrical hazards 3 Last connect the L connector on your Switchee to the phase Live wire of your electrical wiring and N connector of the Switchee to the Neutral wire of your electrical wiring see Diagram 2 bellow Diagram 2 Mounting Switchee to a power outlet Load1 Load2 d A A B dl A load1 B load2 A load2 B CONFIG BUTTON STATUS LED E oO N Getting started Page 05 2014 Webee LLC All rights reserved The Webee logo Boss and Bees are trademarks or registered trademarks of Webee LLC GETTING STARTED WITH SWITCHEE vvebee GETTING STARTED WITH SWITCHEE CONNECTING TO SMARTEE Adding to Zigbee Network To join the Switchee to the Smartee click on the Add Device function of your App and the Smartee will automatically connect your Switchee to the network For more detailed instructions check our Smartee User Manual If the Switchee does not automatically join the network press and hold the Config button The Switchee will continuously blink erratically as it attempts to join the hub Upon a successful joining of the Switchee to the
3. GETTING STARTED WITH SWITCHEE This document is the property of Webee L L C The data contained here in whole or in part may not be duplicated used or disclosed outside the recipient for any purpose This restriction does not limit the recipient s right to use information contained in the data if it is obtained from another source without restriction vvebee GETTING STARTED WITH SWITCHEE INDEX Section 1 Mounting your Switchee Toamelectrical SWItO soiin 03 Diagrami Teeraa e EENE 04 Toa OWS Outlet so iee e E 05 Diagram 2era E E EEE 05 Section 2 Connecting to Smartee Adding Switchee to Zigbee Network 06 Removing Switchee from Zigbee Network 06 Section 3 Specs Electrical Specification S ssassn 07 Load control SHSCHICAIONS visminveseninocoainarmanarienscorbeduonmmanesd 07 RP eharacteniStiC Saesson en a aa 08 Dimension S eaianeteiee ne ra 08 Section 4 Security Instructions Security Guideline ese cesses ce cde cece secs se cecicecesemenes 09 Webee Switchee Getting started 2014 Webee LLC All rights reserved The Webee logo Boss and Bees are trademarks or registered trademarks of Webee LLC Page 02 vvebee GETTING STARTED WITH SWITCHEE MOUNTING YOUR SWITCHEE To an electrical switch In order to connect the Switchee to your existing electrical switch follow these steps 1 Make sure the electricity at home is off in order to safety handle the device As you will be connec
4. VAC Input frequency 47 63 Hz Operating temperature 40 70 G Storage temperature 40 85 C 95 RH Operating Humidity 85 RH Input current A5mA 115VAC mA VAC 23mMA 230VAC Load control specifications Description Min Typ Max Unit Output voltage range 90 264 VAC Input frequency 47 63 Hz Total power output 2500 W Power output per 2500 230VAC W channel using one channel 1600 115VAC Power output per 1250 230VAC W Channel using two channels 1250 115VAC Webee Switchee Getting started Page 07 2014 Webee LLC All rights reserved The Webee logo Boss and Bees are trademarks or registered trademarks of Webee LLC vvebee GETTING STARTED WITH SWITCHEE RF Characteristics Sensitivity Description Min Typ Max Unit Frequency 2405 2480 MHZ Power output 40 20 dBm dBm 0 1 2 0 a o Webee Switchee Getting started 2014 Webee LLC All rights reserved The Webee logo Boss and Bees are trademarks or registered trademarks of Webee LLC Page 08 vvebee GETTING STARTED WITH SWITCHEE SAFETY INSTRUCTIONS A Safety Guidelines To be installed and or used in accordance with appropriate electrical codes and regulations If you are unsure about any of these instructions consult a qualified electrician Follow all guidelines carefully if you hav
5. e any questions contact us at support webeelife com function Warning Make sure to veriffy that the devices you are connecting are within the electrical range of the Swicthee Check electrical specifications Otherwise it will be damage and will no longer Webee Switchee Getting started Page 09 2014 Webee LLC All rights reserved The Webee logo Boss and Bees are trademarks or registered trademarks of Webee LLC
6. o manually 5 Last connect the L connector on your Switchee to the phase Live wire of your electrical wiring and N connector of the Switchee to the Neutral wire of your electrical wiring see Diagram 1 on page 4 Webee Switchee Getting started Page 03 2014 Webee LLC All rights reserved The Webee logo Boss and Bees are trademarks or registered trademarks of Webee LLC vvebee GETTING STARTED WITH SWITCHEE Diagram 1 Mounting Switchee to an electrical switch Load Load2 NEUTRAL p LIVE PHASE E A AA d E dl A load1 B load2 A load2 B CONFIG BUTTON STATUS LED swl sw2 com webee D W K Webee Switchee Getting started Page 04 2014 Webee LLC All rights reserved The Webee logo Boss and Bees are trademarks or registered trademarks of Webee LLC vvebee To a power outlet In order to connect the Switchee to your existing power outlet follow these steps 1 Make sure the electricity at home is off in order to safety handle the device As you will be connecting the wires from your electrical current to the Swicthee is imperative that the electricity is disabled 2 Identify the Load 1 and Load 2 see Diagram 2 bellow Each Load works separately as two different power outputs a Connect the 2 wires from your outlet could be from any electrical system such as lamps lights etc to the Load1 A and Load1 B connectors on the Switchee When connecting make sure
7. ting the wires from your electrical current to the Swicthee is imperative that the electricity is disabled 2 Identify the Load 1 and Load 2 see Diagram 1 on page 4 Each Load works separately as two different power outputs e a Connect the 2 wires from your outlet could be from any electrical system such as lamps lights etc to the Load1 A and Load1 B connectors on the Switchee When connecting make sure to do it carefully as it could represent an electrical hazard since these wires will allow AC current to flow through them e b To use the Load 2 to connect another electrical system repeat the process by connecting the two wires from the second electrical system to Load2 A and Load2 B connectors on the Switchee Once again do it carefully to avoid electrical hazards 3 Connect the COM common connector to your switch or switches depending if you will be using both power outputs Load1 and Load2 as shown on the Diagram 1 on page 4 4 Connect the SW1 to the connector left on the switch that will be controlling Load1 And connect SW2 to the connector left on the switch that will be controlling Load2 as shown on Diagram1 The connectors SW1 SW2 and COM are signaling ports They do not represent an electrical hazard as they use only 5v for signaling purposes The switches will function as toggle button once they are properly connected Which means you will be able to turn the controlled devices on off not only with your Webee App but als

Download Pdf Manuals

image

Related Search

Related Contents

Capítulo 4 Ajuste avanzado de la HDTV  HPGA - Hochpräziser generischer arm  CoMo AV Instruction Manual  Moen TL2303CP User's Manual  E4208 - World Bank  適切なOn-line HDF/HF療法を目指して  Campbell Hausfeld NS349099AV Use and Care Manual  BLANCO ZEROX 8 S-IF  Symantec Endpoint Protection v.11.0  

Copyright © All rights reserved.
Failed to retrieve file