Home
installation manual - Bosch Security Systems
Contents
1. Lernia 15 Overview of menu structure and operating functions 16 Notes on maintenance and service 17 Documents eroine asa 17 Replacement and disposal eee ees 17 Technical data rar rr RR RR RA 18 Standards and regulations rr rens rerna 18 Dimensions Weight Colour 18 Environmental conditions 0 0000 ccc eee eee 18 Serial interfaces sus doa a Sade den E eee 18 Display time uri alessandra 18 Power supply S555 0 ttn 2 eden ede Ea 19 230 VS Malns ing cathe ae usa Rae ates Be ae en AE 19 Power supply from the BZ 500 LSN eee 19 Maximum cable length between BZ 500 LSN and BE 500 19 For power supply from the BZ 500 LSN OV 12V 19 For power supply by the internal power supply unit 230 V 19 Abbreviallons sissi siii 0 nn 20 Nollces eher 21 BDL 4998100589 BOSCH A1 en 06 12 2000 page 2 ST FIR PRM1 deh Installation manual Operating unit BE 500 1 1 1 1 2 Installation Installation notes e Only install the equipment in dry attended interior rooms Ambient conditions should be taken into account see page 18 e Operating control and display elements must be positioned at eye level e Only use the installation material recommended by UC ST otherwise it will not be possible to guarantee against interference e Do not operate devices which have condensation on them e Push
2. 8 Notices BDL 4998100589 BOS A1 en 06 12 2000 page 21 ST FIR PRM1 deh Installation manual Operating unit BE 500 BDL 4998100589 BOS A1 en 06 12 2000 page 22 ST FIR PRM1 deh Installation manual Operating unit BE 500 BDL 4998100589 BOSCH At en 06 12 2000 page 23 ST FIR PRM1 deh BOSCH Bosch Security Systems Robert Koch Str 100 D 85521 Ottobrunn Info Service Telephone 49 89 6290 1039 Fax 49 89 6290 1039 www boschsecurity com info service de bosch com
3. GMA ISO LED LSN OVS PI SM UE uP VDE VdS ZALE BOSCH Connection handbook Anschaltehandbuch Connection PSU unit Anschaltung Netzger t Einheit Operating panel connection Bedienfeld Anschaltung BZ Operating and display panel Bedien und Anzeigeteil Tableau Operating unit Bedieneinheit Operating panel electronic Bedienfeld Elektronik BZ Central fire detection panel Brandmeldezentrale German institute for standardization Deutsches Institut f r Normung e V Electromagnetic compatability Elektromagnetische Vertr glichkeit European Standard Europa Norm Interface expansion unit Erweiterung Schnittstellen Einheit Fire department control panel Feuerwehrbedienfeld Security system panel Gefahrenmeldeanlage International Organisation for Standardization Light emitting diode Leuchtdiode Local security network Lokales Sicherheits Netzwerk V 24 interface Optokoppler V 24 Schnittstelle Product information Produktinformation Interface modules Schnittstellenmodul Transmission unit bertragungseinrichtung Flush mounting unter Putz Association of German Electrical Engineers Verband Deutscher Elektrotechniker e V German Association of Property Insurers Verband der Schadenversicherer Schadenverh tung GmbH Control unit display LSN unit Zentrale Anzeige LSN Einheit BDL 4998100589 A1 en 06 12 2000 page 20 ST FIR PRM1 deh Installation manual Operating unit BE 500
4. e Jumper assignment Set OVS jumpers BR1 and BR2 to 1 2 e The numbers correspond to SUB D 9 pin connector pin assignment Configuration notes The BE 500 is configured from a PC or laptop using the configuration program Win PARA A PC or laptop with at least 4 MB RAM and Windows version 3 1 or later is required for this Configuration steps 1 Call up the configuration data for the BZ 500 LSN from the gt WinPARA gt program Call up the CONTROL PANEL menu Enter BE 500 Enter any key switches and set their configuration data a fF WO N Assign interfaces to the BE 500 as follows Interfaces Central interface Interface 1 ERSE interface expansion Interface 2 Interface 3 Call up Interfaces 1 to 3 and enter the BE 500 control panel under device connected 6 Load the configuration data to the system BZ 500 LSN or to the individual BE 500 7 It is essential to backup the data after successful configuration from the BZ 500 LSN disk BDL 4998100589 BOSCH A1 en 06 12 2000 page 14 ST FIR PRM1 deh Installation manual Operating unit BE 500 4 Commissioning The cables have been disconnected A connection is established between the BZ 500 LSN and the BE 500 see chapter 2 Connections Switch on the voltage supply to the BE 500 Analyse and The green Operation remedy LED lights up malfunctions Configure the BE 500 via the he e BZ
5. BAB 10 Power supply from the BZ 500 LSN input voltage 10 2 14 8 V Isolating jumper for system voltage and current measurement 20mA serial interface for BZ 500 LSN connection For optocoupler V 24 interface OVS configuration Ribbon cable connections to the BEB 10 o od 000000 o 0 0 0 00000 OE10 OE4 oE11 0E5 Va OE12 OE6 o0V200V1 OX2 0X1 Fire department Key switch input Mains fuse control panel FBF connection Jumper on ON ifa new program 230 V is being loaded from the power BZ 500 LSN supply not during configuration Caution Caution high voltage The capacitor bonding on the BAB 10 connections board must not be removed BDL 4998100589 BOSCH A1 en 06 12 2000 page 10 ST FIR PRM1 deh Installation manual Operating unit BE 500 2 2 Description of terminals on the BAB 10 Terminal In I Out O Fire department Function control panel FBF FB 23 FB 19 for FBF switch off the UE button for FBF trigger check the UE button FB 14 Voltage supply 12V FB 12 for FBF UE triggered display FB 9 for FBF Alarm generator display switched off FB 8 for FBF reset control unit display FB 7 for FBF UE display switched off FB 6 l l l O O O O for FBF Buzzer off button FB 4 FB 2
6. LSN BE 500 user manual BOSCH page 16 BDL 4998100589 A1 en 06 12 2000 ST FIR PRM1 deh Installation manual Operating unit BE 500 5 5 1 5 2 Notes on maintenance and service Maintenance and inspection procedures must be carried out by appropriately qualified staff at the intervals specified VDE 0833 specifications are additionally valid for all work of this kind System power measuring points The system current can be measured on the BAB 10 connections board Remove the jumper POWER fitted in the factory and connect a current measuring device to the two Stoko pins Isolating jumper for system voltage and current measurement o o o 0 ooo oo 10V 15V OO 34 E gt ee T nn fa TOREN UTIN OE10 OE4 sz DOWNLOAD DEN OE 123 OE12 OE6 0 OV2 OOV1 OX2 ou Documents Item number LE Designation 3 002 219 470 1 BZ 500 LSN BE 500 operating instructions 3 002 218 156 1 AHBEMZ fire detection system control unit connection manual LE Delivery item For those with access authorization on the Bosch ST ExtraNet at www boschsecurity com emea fire the current information for each product as well as the installation instructions supplied with the device are available for download as a PDF file Replacement and disposal Printed boards and batteries which are faulty and can no longer be repaired m
7. a ferrite sleeve on the NYM 3x1 5 power cable 230 V e Clip a flap ferrite onto the data cable e Observe the usual precautionary measures for CMOS technology when handling printed circuit boards e Caution ESD electrostatic discharge Ensure that the usual measures and instructions with regard to electrostatic discharge are observed e Observe any electrical connection conditions currently enforced by local authorities fire service e If a BAT 100 LSN remote display panel is mounted in addition to the BE 500 as an LED individual display detector group it should be fitted casing to casing with the BE 500 Dimensions 270 75 Fire i x st BOSCH Safety Technology Malfunction O Verification Code eset Day Night m time ster on off Siren Operation O dd Switch off Zone 1 2 3 Code operation O Ihtetnal Buzzer Detector ABC DEF GHI O 1 Reset So 4 5 6 5 Strobe JkL mno PaR ontrol Transmission 7 8 9 unit stu wx bz g laintenance Extinguishing C 0 SH syster it itching no stop yes BoseH Linien ee 2 270 BDL 4998100589 BOSCH A1 en 06 12 2000 page 3 ST FIR PRM1 deh Installation manual Operating unit BE 500 1 3 Installation instructions The upper edge of the drilling Mark the position of the boreholes 3 template should be using the drilling template provided approximately 170 cm above the ground V
8. for FBF Alarm generator off button for FBF Control unit reset button FB 1 OV voltage supply Key switches E4 E5 E6 OV2 X1 Key switch 2 E10 E11 E12 OV1 X2 Key switch 1 Mains L1 Phase N Neutral conductor Protected earth BOSCH BDL 4998100589 A1 en 06 12 2000 page 11 ST FIR PRM1 deh Installation manual Operating unit BE 500 2 3 Connection of BE 500 to the BZ 500 LSN BZ 500 LSN BE 500 EE rici ii ANNE 10 BAB 10 ll 20mA interface n i EE 20 3 b In SDI green SDO O grey SDO 2 1x0 Do yellow DEE r SDI Q DIR Sl ee SDO SP L Aen Connect the shielding wire on both sides L SR Installation cable J Y St Y SS Only connect U EXT if the BE 500 is being supplied with power from the BZ 500 LSN BDL 4998100589 BOSCH A1 en 06 12 2000 page 12 ST FIR PRM1 deh Installation manual Operating unit BE 500 3 3 1 Configuration Configuration via BZ 500 LSN BE 500 configuration must take place via OVS if the BE 500 is connected to the BZ 500 LSN COM 1 interface see overleaf Configuration can be carried out directly via the BZ 500 LSN or via OVS if the BE 500 is connected to COM 2 and COM 3 The interface expansion unit ERSE 10 must be installed in the BZ 500 LSN for the COM 2 and COM 3 interface
9. from the BAB 10 internal power supply unit Continued overleaf BOSCH Di Operating unit BE 500 Isolating jumper INS ctso des 0V30 n se vO Z gt D 12FB120 14FB140 19FB190 23FB23 0 BDL 4998100589 A1 en 06 12 2000 ST FIR PRM1 deh Installation manual Operating unit BE 500 Fix the ferrite sleeve Power supply from the internal to the mounting using 230V power supply unit a cable tie Check that the 230V mains cable is off circuit before carrying out further work Mains voltage should be protected as a separate power circuit using an M 10A fuse Push a ferrite sleeve onto the mains cable and fix it to the BE 500 casing mounting using a cable tie Cable passage for the NYM 3x1 5 mains cable Unlocking lever Connect the mains cable to the 230V terminal on the BAB 10 connections board Do this by pressing the unlocking lever back with a screwdriver and inserting the conductor from the front Also connect the protected earth Class of protection I Power supply from the BZ 500 Observe the maximum cable length between the BZ 500 LSN and the BE 500 See table page 19 E o I 10V 15V a In the case of power supply from the BZ 500 LSN OV 12V the cables should be connected to the input Ka POWER e DOWN LOAD LU m zZ oO 0 m L lt Continued overleaf BDL 49981
10. 00589 BOSCH A1 en 06 12 2000 page 7 ST FIR PRM1 deh Installation manual Operating unit BE 500 Strip the data cable and fix it to the Data cable passage mountings using cable ties for strain relief Clip a flap ferrite onto the data cable Solder on the connector and plug it in Connect the shielding the wire see also chapter 2 Connections Shielding wire Cable tie terminal mountings With a 230V power supply Screw in the mains fuse SINE T500 Isolating jumper With a 230V power supply Screw in the SINE T 500 mains fuse Fit the system voltage and current measurement isolating jumper POWER 12FB120 14FB140 23FB23 0 Continued overleaf BDL 4998100589 BOSCH A1 en 06 12 2000 page 8 ST FIR PRM1 deh Installation manual Operating unit BE 500 Configure the BE 500 see chapter 3 page 13 Check all the BE 500 functions see chapter 4 page 15 First slide the cover onto the upper edge of the casing and then swing it down into the casing Tighten the screw A and seal it using a lead seal Two additional securing screws must be screwed into the base of the cover on VdS systems gd We BDL 4998100589 BOSCH A1 en 06 12 2000 page 9 ST FIR PRM1 deh Installation manual Operating unit BE 500 2 2 1 Connections Connection PCB
11. 30 V mains Mains voltage 230 V 15 10 Mains connection cable NYM 3 x 1 5 mm Mains frequency 50 Hz Mains voltage fuse protection M 10 A Mains fuse SINE T 500 Primary transformer 230 V 14 V 0 5 A Power consumption 5 W 230 V full system Protection class I 6 6 2 Power supply from the BZ 500 LSN Input voltage Uextern 10 2 V 14 8 V Power consumption with an input voltage of Uextern 14 8 V Off load current without FBF Off load current with FBF Alarm power including display lighting 120 MA Alarm power including display lighting and FBF 6 7 Maximum cable length between BZ 500 LSN and BE 500 6 7 1 For power supply from the BZ 500 LSN 0V 12V BZ 500 output voltage Upz 10 8 V min permissible voltage drop BE 500 input voltage Upe 10 2 V min lt 0 6 V Conductor diameter Maximum cable Maximum cable conductor length without FBF length with FBF cross section approximately 20 m approximately 15 m approximately 30 m approximately 25 m approximately 50 m approximately 35 m approximately 100 m approximately 70 m Cable resistance 2 x Ry lt 1 5 Q 6 7 2 For power supply from the internal power supply unit 230 V Maximum cable length 1 000 m BDL 4998100589 BOSCH A1 en 06 12 2000 page 19 ST FIR PRM1 deh Installation manual Operating unit BE 500 7 Abbreviations AHB ANNE BAB 10 BAT 100 BE 500 BEB 10 BMZ DIN EMV EN ERSE FBF
12. 500 LSN see chapter 3 Configuration Reset confirm messages on the BZ 500 LSN Carry out the test Check the operating functions Fit the casing cover screw on the casing and seal the screws The BE 500 is operational BDL 4998100589 BOSCH A1 en 06 12 2000 page 15 ST FIR PRM1 deh Installation manual 4 1 User code input Maintenance Operating unit BE 500 Overview of menu structure and operating functions Next Functions E Detectors detector groups groups Control Control zones zones UE Switching transmission points equipment Extinguishing Switching zones points Alarm Alarm generator generator UE Extinguishing transmission zones equipment Central unit functions malfunction Control Detectors Display alarm zones detector counter status groups Alarm Change operator generator Control code zones sal UE Backup memory DER transmission equipment Jump to a date an event Earth fault Select search for Alarm events generator Print events out Test the displays Enter the date time detectors detect Block or groups Display software status CG See also the BZ 500
13. INSTALLATION MANUAL Operating Unit BE 500 BOSCH Safety Technology Malfunction O System O Transmission unit O Sounder Strobe O Verification Reset Day Night Power supply O ti me System on off en Operation O Di Zone 1 2 3 Code operation O Internal Buzzer Detector ABC DEF GHI Day operation O 0 1 Sounder 4 5 6 Maintenance O Strob m ars ne Control O eier 7 8 9 au STU Vis YZ Transmission unit O 0 Maintenance Extinguishing CE 0 Switch off O system p Transmission unit O Addit Switching SC stop var Sounder Strobe O BOSCH function point gt BDL 4998100589 BOS k A1 en 06 12 2000 ST FIR PRM1 deh Installation manual Operating unit BE 500 1 1 1 2 1 3 2 1 2 2 2 3 3 1 3 2 3 3 4 1 5 1 5 2 6 1 6 2 6 3 6 4 6 5 6 6 6 6 1 6 6 2 6 7 6 7 1 6 7 2 7 8 Summary installations aa 3 Installation notes 222 eens 3 DIMENSIONS Aurea een 3 Installation instructions ers rss errors aa sa 4 Gonnectlons nn ea 10 Connections on PCB BAB IO 10 Description of terminals on the BAB 10 22 222 11 Connection of BE 500 to the BZ 500 LSN 12 Configuration u a a 13 Configuration via BZ 500 LSN nenn 13 Configuration via OVS puis setta ey ieee ea Bad 14 Gonfigurationmmnoles ra sarto tati tenticA tenta EES 14 Commissioning
14. s Before the PC laptop is connected to the PC terminal any SM 20 interface module which may be connected to the BZ 500 LSNs COM 1 interface must be removed Deenergize the BZ 500 LSN before any action BZ 500 LSN ANNE 10 BES 0060000 SM20 slot N 00 DOO BOO OOO with ERSE 006000 SM20 slot Sol SO BE CJI GoOgI O0 oo O Ol OQ Ol OO O Cj 0 Ol O Ol IE 79 OO 000 000 Ocg with ERSE OOOE0OOO SM20 slot BDL 4998100589 BOSCH A1 en 06 12 2000 page 13 ST FIR PRM1 deh Installation manual Operating unit BE 500 3 2 3 3 Configuration via OVS If there is no ERSE fitted the BE 500 must be configured via OVS optocoupler V 24 interface independently of the BZ 500 gt PC used for configuration QOOO Notes
15. ust be disposed of correctly BDL 4998100589 CH BOSCH A1 en 06 12 2000 page 17 ST FIR PRM1 deh Installation manual Operating unit BE 500 6 6 1 6 2 6 3 6 4 6 5 Technical data Standards and regulations The BE 500 complies with the relevant European regulations and codes of practice for alarm receiving stations GMA VdS certification number G 298054 EN 54 ISO DIN 14675 VDE 0833 EMC Directive 89 336 EEC Austrian standard Dimensions Weight Colour Dimensions h x w x d 270 x 270 x 75 mm Weight approx 2 3 kg Colour of casing light grey Colour of cover light grey Colour of control panel white grey Environmental conditions Environmental protection class Il EN 54 2 Degree of protection IP 30 EN 60529 DIN VDE 0470 part 1 Class of protection EN 60950 DIN VDE 0106 part 1 EMC noise emission EN 50081 1 EMC noise immunity EN 50130 4 Ambient temperature 268 K 318 K 5 C 45 C Storage temperature 253 K 333 K 20 C 60 C Serial interfaces Interface 20 mA optocoupler interface Transmission speed with ZALE 10 BZ 500 LSN 9600 bit s with ERSE 10 BZ 500 LSN 19200 bit s Installation cable J Y ST Y 2 x 2 x 0 6 Display time Malfunction signal display time 1 hour buzzer BDL 4998100589 BOSCH A1 en 06 12 2000 page 18 ST FIR PRM1 deh Installation manual Operating unit BE 500 6 6 Power supply 6 6 1 2
16. y Le An Drill 3 dowel holes 2 6 mm at least EMA 50 mm deep and insert the 9 o DZ Screw in the upper screw yf fp Amm 5x50 half round until approximately 4 St R 4 mm of the screw are left visible Uy 5x50 half round Undo the screw A on the BE 500 and remove the casing cover The cover is suspended from the top and must be raised from the bottom by approximately 10 mm before it can be removed Continued overleaf BDL 4998100589 BOSCH A1 en 06 12 2000 page 4 ST FIR PRM1 deh Installation manual Operating unit BE 500 Cable entries Data cable Mains cable Introduce the cable into the back of the BE 500 and fix the casing to the upper screw Line up the casing and screw in the two lower screws Recommended screws 5 x 50 half round Pull the operating panel forwards and push into the parking position Tighten the upper screw Continued overleaf BDL 4998100589 BOS del A1 en 06 12 2000 page 5 ST FIR PRM1 deh Installation manual Pull the operating panel out of the parking position and push it back into the casing Caution ESD electrostatic discharge Ensure that the usual measures and instructions with regard to electrostatic discharge are observed Remove system voltage isolating jumper from the connections board Power supply The power is supplied either from the BZ 500 LSN 0V 12V or
Download Pdf Manuals
Related Search
Related Contents
USeR MaNUal - La Nordica NDC-B052 Access Control Panel Fischer Panda Bedienungsanleitung Panda 45i PMS Super Kaltura MediaSpace 4.6 User Manual Porter-Cable 7800 Sander User Manual 无EPG-DP9501 English Usermanual (ZORAN36966P) Utility Payments in this user manual TE100-P21 - TRENDnet Haier HNSE032BB combi-fridge INDOOR UNIT/OUTDOOR UNIT Copyright © All rights reserved.
Failed to retrieve file