Home
        Equipment User Manual Definition Document
         Contents
1.     11 1  FAILURE DETECTION AND MONITORING    This section shall describe the failure detection and monitoring mechanisms applied for the  lt EARTHCARE  Equipment   covering use of internal monitoring  external onboard monitoring and ground based monitoring     11 2 1 Internal Monitoring    List and describe the monitoring functions active within the equipment itself  Mode dependencies  monitoring  frequencies  trigger thresholds and filtering values should be included  The identifier of the internal corrective  action applied in the event of triggering should be identified  the detailed description of the corrective actions  will be in the next section   In addition the justification for the monitoring should be given     11 2 2 External Monitoring    List and describe the monitoring functions to be performed external to the equipment  e g  by the onboard  software or Ground    Mode dependencies  monitoring frequencies  trigger thresholds and filtering values  should be included  The identifier of the external corrective action applied in the event of triggering should be  identified  the detailed description of the corrective actions will be in the next section   In addition the  justification for the monitoring should be given     11 2 FAILURE ISOLATION AND RECOVERY    The objective of this section is to define a logical flow of activities to allow the onboard failure to be isolated  and corrected down to the level of available redundancy or equipment   unit re boot  The a
2.     zb Doc  No  EC IRD ASD SY 00019  EADS   ue EarthCare Issue  1    z3 Ss Gori rm Date  23 02 2009                   Page  1 of 30   Title  Equipment User Manual Definition Document  CI   No  0000  DRL Refs   TBD   LONE Name C D ES  Prepared by  Schwab  Armin 23 02 2009 PR as IE i  Checked by  Gotsmann  Michael 10 05 0 a  Product Assurance  Gessler  Leo Zo O5 8  Configuration Mgmt  Mrohs  Waldemar 20 03 08  9 Pres  Project Management  Slansky  Uwe Ze  J  v4 Orr           Astrium GmbH All rights reserved        Doc No  EC IRD ASD SY 00019  EADS   EarthCare Issue  1        Date  23 02 2009  E EE E IL Page  2 of 30    Change Record       Issue Date Sheet Description of Change       1 23 02 2009   all first issue                                                                               Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019  EADS 7 EarthCare Issue  1    ees Date  23 02 2009  Se Es E rILInm Page  3 of 30    Table of Contents    TS INTRODUGTION MERE 5  1 1 Scope of the Document  5  1 2 References    ice He A eal ed ag del evens 5   1 2 1 Applicable Doecutments      uicit chr rente RE eR es Een e eda e ae tc ERRAT 5  1 2 2 Normative  Ree E 5  1 2 3 Beference Documentsz   ener eia een 5  13 Requirments RL EE 5   2  EARTHCARE USER MANUAL VOLUME CONTENT DEFINITION                     eene nnns 7  HN EE DION c rc EE 9  EC 9  1 2 DOCUMENTS  oe Oeo ae Cr a be Re etie 9  1 3 TERMS AND DEFINITIO NS    die a Pe Eo abe ed ea etd eas 9  2   lt EARTHCARE EQUIPMENT
3.    FUNCTIONAL CHARACTERISTICS                  serene 10  2 1 FUNCTIONAL  OBJECTIVE Si ergeet ege tx itd rt Ra ete Ee t ba jan 10  2 2  PHINGIPEE OF OPERATO N tide t dal the ibd la e e Eon 10  3   lt EARTHCARE EQUIPMENT   CONFIGURATION esses enne nn nennen 10  3 1 PHYSICAL CONFIGURATION ka 10  3 3 FUNCTIONAL CONFIGURATION sense cage nan cnn rca ren rra nn 12  AREDUNDAN CA a a  12  4   lt EARTHCARE EQUIPMENT gt  MODERN 13  4 1 MODE  DESCRIPTIONS  ua caia adria 13  4 2  lt EARTHCARE EQUIPMENT gt  MODE TRANSITIONS                  sse nennen nennen 14  5    OPERATIONAL INTEREAGES      3  2 5  22 RR roter ete ente era D eade Fo e ER oa RR aA DU eredi bote 15  53  CONTROL  SIGNALS    ede et ata iene ead A a a Wh aas 15  5 2 COMMAND MECHANISMS nto eee ate det eludet  15  5 3  TELEMETRY MECHANISM     5 2  lapas 15  6  OPERATIONS AND GONSTHRAINTS    3 2  teet c Eee hte m eei tetas ce ra ee gota 16  6 1 ROUTINE OPERATIONS entree inneren ittis sn aiea aaa aaa aaae piia sinis enter nnns 16  6 2 LAUNCH  INITIAL SWITCH ON AND IN ORBIT CHECK OUT    16  6 3 OPERATIONS AND CONSTRAINTS FOR GROUND INITIATED RECONFIGURATIONS                 16  6 4 GENERAL CONSTRAINTS AND LIMITATIONS nennen nentes nnns trenes 16  7 GOMMAND AND CONTEBQObL      iiit t ente tii 19  9 OBSEBRVABIBIINES  n ettet o A e abs ENEE 20  9 SOETWARE waist tenes eee iii ee eee ie ex c dev ee a t die aie ete 21  9 1 SOFTWARE FUNCTIONAL BREAKDOWN ener nennen senten cnn narrar sinet ns 21  9 2 IMPLEMENTATION OF THE PACKET UTILIS
4.  Issue  1  EADS eriin Estos Date  23 02 2009  Page  27 of 30    15  BUDGETS    This chapter should contain all operationally meaningful budgets that are relevant at equipment level   Budgets to be considered are    Mass   Moment of inertia  Mechanical Disturbance  Telecommand  Telemetry  Measurement data rate  Power   Thermal dissipation  Microprocessor Loads  Microprocessor Memory  Data Bus load     16  LIST OF ABBREVIATIONS    This chapter should contain all abbreviations as used in the main body of the User Manual        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019  EA DS m EarthCare Issue  1    Date  23 02 2009  zeiebrium Page  29 of 30    ANNEXES     ANNEX 1 Detailed Configuration Drawings   All drawings as required by section 3 2 2     ANNEX 2 Internal Event Tables   This Annex should contain the internal command event tables  if relevant  These should detail all  actions as a result of commands or autonomous actions on an event by event basis  even if they are  not directly visible in the telemetry data  Relevant timing information should be included     ANNEX 3 Command and Control Diagrams   Command and control diagrams provide a diagrammatic representation of the relationship between  bus level commands  acquisitions  control signals and controllable entities such as relays  They should  contain representation of all controllable and observable switchable elements and give visibility of  command and acquisition data interfaces  The diagrams shall 
5.  be fully described including provision of the SW labels  offsets  and associated word values     9 2 IMPLEMENTATION OF THE PACKET UTILISATION STANDARD  EC   PUS     This section shall describe the application and implementation of the EC PUS into the  lt EARTHCARE  Equipment   software including specific services  tables and other data structures as needed  Reference to  SW User Maunal may be provided     10 MICROPROCESSORS AND MEMORIES    This section shall describe all microprocessors  their hardware software interfaces and memories contained  in  lt EARTHCARE Equipments  The following information should be provided     e Anoverview of the processor memory map   e The method and constraints for dumping the memory to the ground  this should include allowed SW  modes  limitations due to page boundaries  etc    e The method and constraints for obtaining the checksum of specified areas of memory    e The method and consiraints for patching the memory  this should include allowed SW modes   limitations due to page boundaries  etc    e Information about memory protection mechanisms  e g  scrubbing routines  EDAC etc         Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019    Issue  1  EADS E r iLim Esse Date  23 02 2009  Page  22 of 30    11  FAILURE DETECTION  ISOLATION AND RECOVERY  FDIR     This chapter shall allow the ground to isolate the cause of onboard anomalies to the extent that recovery can  be made using available onboard resources as e g  redundancy 
6.  of the processing performed on the sensor data  the algorithms used  selection or  rejection criteria  if under the responsibility of the contractor        Definition of the required ground SW processing of the science data    ANNEX x Other Information  Additional annexes should be provided for any other information that needs to be in the User Manual  but whose bulk is such that it is not appropriate to include it within the main body of the User Manual        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019    Issue  1  EADS     EarthCare Date  23 02 2009    etbrium Page      29 of 30    In some cases it may also be appropriate to include a complete document within the User Manual  In  this case the whole document can be attached as an annex to the User Manual         Astrium GmbH All rights reserved     EADS    Doc No  EC IRD ASD SY 00019  1    EarthCare Issue     Se ES Er Lim Date  23 02 2009    Page  30 of 30    3  USER MANUAL DELIVERY SCHEDULE    For the User Manual  the following delivery schedule is proposed  TBO                           UM Required Content Due Date  Issue  1 Initial Information   Functional description including   PDR  TM TC definition  2 Complete document including all nominal and   CDR  contingency procedures   3 Complete document  reflecting the latest state of  DRB  Note  knowledge of the Equipment   Note 1  1              Note 1  Dedicated User manuals required for each delivered model  e g  EM  FM           Astrium GmbH All ri
7.  unit should be provided  This table should be in the following format        Name Cl Description Reference R                            Cl   Configuration Item Number  R   Redundant assembly unit           lt EARTHCARE Equipment gt  Hardware List  Table 3 2 1 1   lt EARTHCARE Equipment gt  Hardware List       3 2 2  lt EARTHCARE Equipment gt  Assemblies  amp  Units and their Accommodation on EARTHCARE    This section should provide a physical description of the equipment assemblies and units and the  accommodation of them on the EARTHCARE spacecraft  In particular the following should be covered    e description of structure and physical layout   e description of thermal control hardware and its locations   e description of fields of view and zones of impingement   e description of mechanisms including those for deployments and releases     This description should be supported by detailed drawings contained in Annex 1 of the USER MANUAL        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019  1    EADS   EarthCare Issue         Date  23 02 2009  zeiebrium Page  120f30    3 3 FUNCTIONAL CONFIGURATION    3 3 1 Functional Block Diagram   Provide a functional block diagram identifying all assemblies and units  all internal interfaces and all external  interfaces    Provide supporting descriptive text describing how the assemblies and units function together at equipment  level and how they are interfaced to other external equipments     3 3 2 Functional Descripti
8. 1 2 References    1 2 1 Applicable Documents     AD 3  SRDB Population Requirements EC IRD ASD SY 00003     AD 5  Equipment Property Workbook Population EC IRD ASD SY 00020    Requirements     AD 110  EarthCARE Packet Utilization Standard EC STD ASD SY 00001    1 2 2 Normative Documents    1 2 3 Reference Documents    1 3 Requirments Definitions   Requirements in this specification are identified as follows   EUM nnn   lt source gt   V    lt Summary gt    where    e  EUM  is the prefix for requirements     e  nnn  is a running number  assigned by the DOORS tool  not editable     e   source   reads either  created  when the requirement is generated by the prime  or it gives the  reference requirement number from an upper level applicable document    e  V is the proposed verification method  which is either       Astrium GmbH All rights reserved     EADS    Doc No  EC IRD ASD SY 00019    eserim    O    Oo    j E r h r Issue  1      arthCare Date  23 02 2009  Page  6 of 30     R  for Review of Design  in this document  R  means that the requirements is already  covered by the proposed SIS Astrobus tool and the according documentation  In the next  phase a compliance matrix will be provided which requirement is covered where in which  document    T  for Test    I     for Inspection     A  for Analysis    e   Summary   is a short heading for the requirement text    The character style of the requirements text is in italic        Astrium GmbH All rights reserved     Doc No  EC IRD 
9. ASD SY 00019  Issue  1  EADS e EarthCare Date  23 02 2009    Sserium Page  7 of 30    2  EARTHCARE USER MANUAL VOLUME CONTENT  DEFINITION    EUM 001   lt CREATED gt   V    lt Equipment User Manual Contnt gt     The equipment user manual shall provide all technical information necessary to permit the  customer to       Prepare and validate the EarthCARE space segment segment  including the satellite  software simulator       Establish the operational databases  including TM TC and Flight Dynamics       Operate and control the EarthCARE spacecraft in nominal and contingency cases for all  phases of the mission      EUM 002   lt CREATED gt   V     Equipment User Manual Consistency gt   The contents of the equipment user manual shall be internally consistent and consistent with the      the equipment ICD and the related electronically readable equipment physical property  work book acc   AD 05       the equipment TM TC ICD and the related electronically readable equipment TMTC  database acc   AD 03     EUM 003   lt CREATED gt   V     ICD  amp  TMTC DB version gt     The content of the equipment user manual shall uniquely indicate to which version of the  equipment ICD and the TMTC data base it relates     EUM 004   lt CREATED gt   V     Equipment User Manual Content  gt     The content of the ESUM shall be consistent with the latest release of the on board software and  indicate to which versions  for equipment with software  it relates     EUM 005   lt CREATED gt   V     Equipme
10. ATION STANDARD  EC PUS  sss 21  10 MICROPROCESSORS AND MEMORIES sse ener ennt innen inris 21  11  FAILURE DETECTION  ISOLATION AND RECOVERY  FDIR                   seseseeenenenennn nn 22  11 1  FAILURE DETECTION AND MONITORING                 essent nnn ran canaria anar entrent 22  11 271 Nema Monno esisi ai eaa r te eet rete EE ENEE EE 22  11 2 2 External MOMONG ee eani aii i a i eene entem naar nean a ai a a eiddi 22  11 2 FAILURE ISOLATION AND RECOVERY cnocccccoccccconcnonnonanoccnnncnnnnnnnnnn nn non reiner sn nr n entere anna anar nn sinn en 22  12 NOMINAL PROGEDURES       5  nti hee i id 23       Astrium GmbH All rights reserved     Doc  No  EC IRD ASD SY 00019    Issue  1  EADS   EarthCare Date  23 02 2009    SSEri  m Page      40f30    13  CONTINGENCY RECOVERY PROCEDURES stt ttt nnne 25  14    EARTHCARE EQUIPMENT   ON GROUND OPERATION             ssett tenen 26  EIERE 27    6 EIS TOF ABBREVIATIONS dosis E AA AE 27  ANSES T EE E E E E E 28  3  USER MANUAL DELIVERY SCHEDULE        ccsssssssssssssscscssssssssnessesccssssssneseesecesssssunmesseeesssssssueseeeeeessnen 30    O Astrium GmbH All rights reserved     Doc  No   EAD E EarthCare Issue     S rm RE    1  INTRODUCTION    1 1 Scope of the Document    EC IRD ASD SY 00019  1   23 02 2009   5 of 30    The scope of this document is to provide the requirements for the generation of the equipment user manual  of the EarthCARE Space Segment  The equipment user manual will serve AIT as well as Flight Operation    purposes   
11. HCARE EQUIPMENT   FUNCTIONAL CHARACTERISTICS    2 1 FUNCTIONAL OBJECTIVES    Give a brief overview of the purpose of the equipment     2 2 PRINCIPLE OF OPERATION    Describe how the functionality described in the previous section is achieved and give a summary of the  expected equipment performance  including relevant spec values      3   lt EARTHCARE EQUIPMENT   CONFIGURATION    The objective of this chapter is to give a complete and accurate design description of the physical and  functional implementation of the equipment  This should consist of 3 sections as follows      Physical configuration     Functional configuration    Redundancy    These sections are expanded below     3 1 PHYSICAL CONFIGURATION    This section should identify all physical assemblies and units in the subsystem and their physical location on  the spacecraft     3 1 1 Units and Assemblies    A configuration block diagram of the equipment showing all its assemblies and units should be given in the  format of        Astrium GmbH All rights reserved     T Doc No  EC IRD ASD SY 00019  EADS um  EarthCare Issue  1    Date  23 02 2009  e  sbrium Page      11 of 30                                                                                                                            Unit 11 Unit 21 Unit 31  Unit 12 Unit 22 Unit 32  Unit 13 Unit 23 Unit 33                               A table listing the Configuration Item Number of each assembly   unit and whether it is the prime or  redundant assembly  
12. Lyn   X    O  ae       2    DH    Moore  Colin    z zizir rir  gompoji  o als   gt  ai ar  D HINID   o  o  c    93   a z ge      jaala  3 SI jo  m ben   2    D    M  nzenmayer  Ralf    Purvinskis  Robert  Reinert  Thido       aia  N  AEN  nia  o2  M  jO  git  als  O   amp   un  3        Richter  J  rgen Sprague  Mike Pees  Ruf   Daniel Tucker  Liz  R  he  Wolfgang Willis  Steve    Sander  J  rgen  Schuler  Thomas  Schwab  Armin  Sommer  Anette  Viehmann  D    Weih  Erich  Wiedmann  G  nther  Wiehe  Birgit          Bursch  Stefan   Sontag  Heinz   Stelter  Christian   Welsch  Mario   Gessner  Roland x                                                          
13. ained within each TM  packet    e the generation rate and trigger  cyclic or on specified event  for each packet   e datation information  e g  the relative age of the data contained within the packet with respect to the  time in the TM packet header     For each parameter a detailed description of its meaning and its behaviour should be given     Note   Science data produced by the equipment may be subject to the dedicated Annex 7     O Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019    EADS   EarthCare Issue  1        Date  23 02 2009  SP rm Page  210f30    9  SOFTWARE    This section shall describe SW functions specific to the  lt EARTHCARE Equipment gt   This should consist of  sections as follows      Software Functional Breakdown     Implementation of the Packet Utilisation Standard     These sections are expanded below     9 1 SOFTWARE FUNCTIONAL BREAKDOWN    This section shall give a high level overview of the   EARTHCARE Equipment   software and shall also  provide a functional breakdown of the   EARTHCARE Equipment   software into its individual elements  including interfaces to hardware  In particular  the following information shall be provided     e A task description giving a mapping of SW tasks onto software modules and giving an overview of  the SW implementation and scheduling  including the use of interrupts    e In the case that any patches are identified to be up linked from ground for either nominal or  contingency operations  these shall
14. ctivities shall be  described for onboard as well for on ground FDIR needs     The start point for this must always be the anomaly message contained in the TM  e g  event message   The  logic should be presented in the form of a flow diagram or a table with references to procedures in chapters  12 and 13 as appropriate    These failure localisations must be based on the FMECA and must either replicate information contained in  the FMECA or make reference to the FMECA which must then be included as an Annex to the User Manual        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019    Issue  1  EADS E riLim SR Date  23 02 2009  Page  23 of 30    12  NOMINAL PROCEDURES    All  lt EARTHCARE Equipment gt  nominal procedures shall be detailed in this chapter   Each procedure shall include a text header and a tabular body     The text header shall consist of the following   e Procedure Name consisting of a short meaningful description of the procedure and a unique  identifier  The unique identifier shall be of the form FCP xx nnn  where     FCP denotes that the name is a nominal flight control procedure    xx is the equipment code    nnn is a counter to distinguish between different nominal flight control procedures in the  equipment   e Procedure Objective consisting of a description of the principal aims of the procedure   e User Manual Reference referring to the relevant part of Chapter 6   e Initial Conditions specifying the context in which the procedure can be 
15. efinition  gt     The equipment user manual shall be provided as defined by the content definition for the User  Manuals for EarthCARE equipments        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019  1    EADS   EarthCare Issue     ae Date  23 02 2009  Sselrium Page  9 of 30    1  INTRODUCTION  1 1 SCOPE    Include the following text       This User Manual contains all information necessary for proper operation of the integrated  lt EARTHCARE  equipment gt   to be flown on EARTHCARE  In particular  this manual describes in detail any procedure to  follow and any constraint or limitation to be considered     This manual covers not only all relevant mission phases but also the on ground operation   The current issue of this document deals with the  lt EARTHCARE equipment gt   lt EM FM gt        1 2 DOCUMENTS    1 2 1 Applicable Documents    List all applicable documents for this USER MANUAL      AD 1    AD 2     1 3 2 Reference Documents    List all the source documents and the used issue for the information contained in this USER MANUAL      The operational information in this document is derived form the following reference documents       RD 1    RD 2     1 3 TERMS AND DEFINITIONS    Any terms and conditions should be included here  Definition of reference frames and reference models  should be included here        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019    Issue  1  EADS Er iLim Esse Datei 23 02 2009  Page  10 of 30    2   lt EART
16. es  CRPs  shall be detailed in this chapter     Each procedure should use the same layout as used in Chapter 12  The contingency recovery procedure    unique identifier shall be of the form CRP xx nnn where    CRP denotes that the name is a contingency recovery procedure     xx is the equipment code     nnn is a counter to distinguish between different contingency recovery procedures in the  equipment     The structure of the procedures shall be identical to those in section 12        Astrium GmbH All rights reserved     Doc  No  EC IRD ASD SY 00019    EADS   EarthCare Issue  1        Date  23 02 2009  etbrium Page      26 of 30    14   lt EARTHCARE EQUIPMENT gt  ON GROUND OPERATION    This chapter should describe all aspects of the subsystem operation specific to on ground operations  The  following items shall be included at minimum       Reference to Installation procedures     Specific preparations for any operation of the equipment in specific test environment     GSE to be used to operate the equipment     Operations of the GSE     On ground operations constraints  thermal           On ground handling constraints     Special  protections provisions required for on ground operation including all  safety hazardous aspects     Life limitation for on ground operations    Specifics for individual models shall be considered  i e  if an EM provides other characteristics or specific  constraints as an FM        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019   
17. ge      19 of 30    7  COMMAND AND CONTROL    This chapter describes the means of controlling the EARTHCARE Equipment  Operational interfaces can be  found in Chapter 5  Operations and Constraints in Chapter 6 and procedures are described in Chapters 12  and 13     A table listing all  lt EARTHCARE Equipment gt  commands available to the ground should be provided  For  each command this table should include the command name  the command ID  a brief description of the  command function  any mode dependency for the command  how to verify execution of the command ana  if  relevant  the execution time of the command     In addition to this table a description should be defined for each command giving     e a pictorial representation of the command layout and structure showing each parameter as a  separate field   e a detailed description for each parameter giving its meaning  its format and a definition of how to  compute it   e a detailed description of the command function  including the sequence of actions performed on the  subsystem    e any constraints associated with the command        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019    Jj Earth r Issue  1  EADS Sis arthCare Date  23 02 2009  Page  20 of 30    8  OBSERVABILITY    This chapter should give a comprehensive description of all the HK data  TM or TM packets produced by the  EARTHCARE Equipment  This should include    e the layout of each HK data  TM packet and identification of the parameters cont
18. ghts reserved     EarthCARE Doc  No   EC IRD ASD SY 00019          Issue  1  Distribution Sheet Date  23 02 2009               Transfer to Doc office via   from  ftp server      File server   A  Schwab creeren e mail     O  E  O  Name paper  O  O  O          nee S SE See  eerst TR o  SPRINT            Notes to Document Status   ASD project limited                                    ASD  coy   ASF   Gony Ext  Companies   Copy    Toulemont  Yves        Allgaier  Andreas       Galzin  Josette      SEA   Barilaro  Sandro     Bonnes  Evelyne      SSTL Ooo    Breitling  Walter       Antoine  Pierre Oliver    ees RE   Brendle  Klaus      Amoux J  O O   Berlioz P  f       Cusson   Bruno     Besse  P                 Duske  Norbert          Camus  Fabrice        Faust  Thomas       Corselle  Bertrand        Frank  J  rgen     Delettrez  Christophe       Gessler  Leo     Le Hors  L  naic        Levillain  Yves        Grillmayer   Georg     Marchal  Bruno        Mazuray  Laurent        Nonnet  Jean Christoph            Hashagen  Volker  Hilberath  Wolfgang  Hoffmann  Thomas  Huber  Peter    Pibrac  Dominque  Thibault  Dominique       DH           gt   9  S  D   H  bd  3  o    AAA  3 o 9   NES  odpe   moo     52  Oo  zig  710 ia  OI  3  oO  d     77 a  E        Ecclestone  Tim   Fernando  Priya  Gannon  John  Gray  Russel  Harrison  Les  Hopkins  Peter  Karlsson  Sara  Kemble  Steve  Mikelson  Brian  Robson  Phil  Rodier  Caroline            Kraft Ewin       Kruse  Klaus Werner     Mason 
19. include telemetry points  e g  relay  statuses  and SRDB IRDB TM and TC names     ANNEX 4 Logic Diagrams and Truth Tables   All logic blocks involved in the command and control of equipments  if any  shall be represented in this  annex as functional logic diagrams and supporting truth tables  This should include functions  implemented in ASICs FPGA   s     ANNEX 5 Source Code   This annex should include the source code for equipment processors that is delivered with Software     ANNEX 6 TM TC ICD    This annex shall include the complete TM TC ICD for the equipment  This shall include       A list of all unit HK telemetry parameters  For each parameter it shall include a function description  with validity conditions  telecommand relationship and all technical information necessary for using  it       A list of all unit commands  For each command it shall include a functional description with  utilization conditions and execution verification in telemetry  For each command the execution run   time shall be outlined       This data may be included in the electronic TM TC delivery towards the satellite reference data  base    ANNEX 7 Equipment Science Data Format and Processing Description  This annex shall include the complete description of the science data stream of the equipment if    provided  This shall include       Definition of the unit science output data  circumstance of generation  format  content and data  rate  for each operational mode of the unit       Definition
20. ipment gt  appendages  covers  locks  etc     if any   are commanded  i e   the used signal lines  schedule  by which unit the process is initiated and controlled  etc  If deployment of  appendages can be reversed  both processes together with their circumstances should be described     5 2 COMMAND MECHANISMS    Describe the used Command and Control interfaces logically  e g  number of signal lines  signal  characteristics  e g  analog  digital   used protocol  interdiction times  etc  and physically  e g  1553B bus   discrete signal lines  in the subchapters of this chapter  Each C amp C interface shall be described together with  its function     5 3 TELEMETRY MECHANISM    Describe the used telemetry interfaces logically  e g  number of signal lines  signal characteristics  e g   analog  digital   used protocol  interdiction times  etc  and physically  e g  1553B bus  discrete signal lines  in  the subchapters of this chapter  Note that detailed information about the down linked packets formats should  be contained in Chapter 8        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019    EADS   EarthCare Issue  1        Date  23 02 2009  Sserium Page  16 of 30    6  OPERATIONS AND CONSTRAINTS    This chapter should describe the nominal  lt EARTHCARE Equipment gt  operation and list all operational  constraints or limitations which apply  separated in the following sections  Any mode dependencies should  be indicated unambiguously in each of the following secti
21. is  should be clearly described  Likewise the effect of any other means to control the transition  Such as control  parameters in an initiating telecommand  should be described     Transition  from             to    X sec y sec Z Sec       Table 4 2 1  Mode Transition Times         Transition not possible       Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019  1    EADS   EarthCare Issue         Date  23 02 2009  SP rm Page  15 of 30    5  OPERATIONAL INTERFACES  5 1 CONTROL SIGNALS    List all the control signal lines used by the EARTHCARE Equipment  Describe all actions and timings  both  hardware and software  that take place after the activation of a control signal  Where appropriate  give  references to nominal and   or contingency recovery procedures     Describe  lt EARTHCARE Equipment gt  on board time synchronisation  Describe how the  lt EARTHCARE  Equipment gt will be synchronised  e g  describe the procedure   the resolution for maintaining the   lt EARTHCARE Equipment gt  on board time  when it shall take place  e g  after  lt EARTHCARE Equipment gt   initialisation   the synchronisation accuracy  the recovery actions in the case of time discrepancies  setting  and phase adjustments of counters   clocks  etc     State if specific synchronisation lines between the  lt EARTHCARE Equipment gt  and other EARTHCARE  equipments are used  If such lines are used then describe their logical and physical characteristics    Describe how any  lt EARTHCARE Equ
22. nt Procedures      The equipment user manual shall contain all nominal and contingency operations procedures  necessary for space segment operations  this also includes an initial version of any necessary  Operations Timelines  The list of procedures and timelines to be generated shall be agreed  between the Contractor and the customer and recorded in the User Manual     EUM 006   lt CREATED gt   V     Procedure Validation      The procedures presented in the equipment user manual shall be validated at equipment level  testing during AIV to the maximum extent  Another system  for example the SVF or EFM  can be  used for specific procedures  after agreement with customer     EUM 007   lt CREATED gt   V     Equipment User Manual Content gt     The equipment user manual shall be used by the contractor as a reference document during the       Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019  EADS a EarthCare Issue  1    ze Date  23 02 2009  aserium Page  8 of 30    AIV programme   EUM 008   lt CREATED gt   V    lt Operation Characteristics and Algorithms gt     The equipment user manual shall provide the definition of all operational characteristics associated  with the control of the equipment in flight and on ground  including any constraints or special  operations  It shall also contain any algorithms or ground processing required to support operations  during all phases of the mission     EUM 009   lt CREATED gt   V     Equipment User Manual Detailed Content D
23. on of  lt EARTHCARE Equipment   Units  Assemblies and Functions    Provide a detailed functional description of each   EarthCARE Equipment   assembly  unit and functions     3 4 REDUNDANCY    Provide a detailed description of the equipment redundancy and cross strapping        Astrium GmbH All rights reserved     Doc  No  EAD _ EarthCare Issue     S Er tum E    4   lt EARTHCARE EQUIPMENT   MODES    4 1 MODE DESCRIPTIONS  List all the  lt EARTHCARE Equipment   modes     EC IRD ASD SY 00019  1   23 02 2009   13 of 30    Provide a table mapping each assembly   unit status to each equipment mode using the format of Table 4 1     1 below     Provide a table summarising the mode characteristics using a format similar to Table 4 1 2 below    Provide a table summarising which equipment functions are active in each mode using a format similar to  Table 4 1 3 below  note that HW functions description is given in section 3 3 whereas SW functions  description is given in section 9 3      Modes YYY  Equipment Status    Assembly 1  Unit 11  Unit 12    Assembly 2    Unit 21    Assembly m    Unit m1       Table 4 1 1     EARTHCARE Equipment gt  equipment status versus  lt EARTHCARE Equipment gt     modes    Modes YYY  Functions    e g  1553B protocol YES II J       eg  15598 protocol  a do    gt  gt  pp     E dvo j  oo        Table 4 1 2  Active Functions versus  lt  EARTHCARE Equipment gt  Modes    O Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019    Issue  1  EADS EriOm Ea
24. ons  In each case the reason for the constraint or  limitation and the consequence of violation should be described     Within the context of this chapter a constraint is anything which  if violated  can risk a permanent degradation  of the  lt EARTHCARE Equipment gt  performance  function or reliability whereas a limitation is anything which   if violated  only risks a temporary loss or degradation of the planned operations or measurement data quality  or availability     6 1 ROUTINE OPERATIONS    Describe the nominal operation of the  lt EARTHCARE Equipment gt   routine commanding  routine  maintenance  routine calibration   Give the operational timeline for the  lt EARTHCARE Subsystem gt    if  relevant     Describe the in flight calibration process  e g  how often  when  how and where it shall take place  the  command and control procedure  the data flow  etc     If the  lt EARTHCARE Equipment gt  needs to change its modes and or states during nominal operations then  describe the foreseen activities  e g  when and why to initiate the mode changes      If the  lt EARTHCARE Equipment gt  within one mode changes automatically between submodes then describe  these processes  Provide timelines for all such automatic submode changes in the form of horizontal bar  charts     6 2 LAUNCH  INITIAL SWITCH ON AND IN ORBIT CHECK OUT    List all operational constraints and limitations regarding the  lt EARTHCARE Equipment   launch  initial switch   on and in orbit check out  e g  depl
25. oyments  releases  switch on  in orbit calibration  amp  verification  etc   In  case deployments are foreseen  describe the deployment sequence here     6 3 OPERATIONS AND CONSTRAINTS FOR GROUND INITIATED  RECONFIGURATIONS    Describe all operations and related operational constraints and limitations for ground initiated  reconfigurations  i e  main to redundant  redundant to main  use of cross strapping      6 4 GENERAL CONSTRAINTS AND LIMITATIONS    Identify and quantify all operational constraints and limitations regarding the  lt EARTHCARE Equipment    operation  For example  if a specific operation or mode depends on the deployment of an appendage  this  should be stated here  Another aspect may be that specific operations are only allowed in specific modes   The constraints and limitations should be given for the following aspects  If no constraint or limitation exists  for a particular aspect then this should be explicitly stated  Any other aspects that are not covered in section  6 3 should be included here        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019  EA DS A EarthCare Issue  1        Date  23 02 2009  Sserium Page  17 of 30    6 4 1 Satellite attitude and altitude    List all EARTHCARE Equipment operational constraints and limitations regarding the spacecraft attitude and  altitude  e g  equipment atomic oxygen exposure  if relevant   Additionally  if the EARTHCARE Equipment  performance is a function of spacecraft attitude or altitude   
26. rthCare Date  23 02 2009  Page  14 of 30    4 1 x Detailed Mode Descriptions    Provide a detailed description of each mode to a more detailed level of information than that contained in the  tables in the previous section  If the equipment has different statuses or sub modes within a mode then these  should be described here  The circumstances that lead to these different sub modes or statuses should also  be documented here     A description of the purpose of each mode or sub mode  why to enter and exit it and the duration spent in it  should be given     4 2  lt EARTHCARE EQUIPMENT gt  MODE TRANSITIONS    Provide a mode transition diagram showing all the equipment modes and allowed transitions between them   The trigger for each transition path should be identified  e g  ground command  automatic nominal  internal  corrective action  external corrective action  etc      Provide a table identifying the mode transition times using the format of Table 4 below  A mode transition is  defined to start when the equipment leaves a defined mode and is terminated when the equipment has  reached a new defined mode  In particular  for a mode transition triggered by a command  the mode  transition starts when the command execution is started     4 2 x Transition to mode x    Provide a detailed description of the mode transition including the sequence of events executed  as a  timeline if relevant   Where the sequence of events in the transition is dependent on the initiating trigger th
27. t gt  out gassing  For  example  if a unit shall not be operated until its out gassing is completed to a certain extent  because this  could cause performance losses or is harmful in some way then this should be stated here  The out gassing  times shall be given     6 4 7 Contamination    List all operational constraints and limitations regarding the  lt EARTHCARE Equipment gt  contamination  If  performance losses are expected under specific circumstances  this should be stated here     6 4 8 Life Limited Items  Using the following table list all the operational constraints and limitations regarding life limited items  All life  limited items associated with their limits should be given  For each listed item a short and precise description    of the limitations including the relevant unit  e g  no  of cycles  and the mode s   when the item will be used   shall be given     Life Limit Qual Limit TM parameter  detail  to  be monitored  Unit x   36540 cycles 1000 cycles TMxx for main  Switching relays TMyy for redundant       Unit y  chain selection relays    Table 6 4 8 1  Life Limited Items of  lt EarthCARE Equipment gt     6 4 x Other  lt EARTHCARE Equipment gt  Specific Constraints    Any other constraints and limitations not already covered in section 6 3 or in this section should be detailed  in additional subsections to section 6 4        Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019    Earth r Issue  1  EADS pa arthCare Date  23 02 2009    zeebrium Pa
28. the impact should be described here     6 4 2 Shocks    Using the following table list all the operational constraints and limitations regarding the  lt EARTHCARE  Equipment gt  unit shock limits  g load and duration   All units  as identified in section 3 1 should be listed  If no  limit applies then this should be stated      Unit Constraint      Ry ooo oo  uz oo    Table 6 4 2 1  Shock limits       6 4 3 In Orbit Acceleration    List all   EARTHCARE Equipment   operational constraints and limitations regarding the spacecraft  accelerations and vibrations using the following table     Frequency range Nominal Operational Modes Non Nominal Operational Modes       Table 6 4 3 1  In Orbit acceleration constraints    6 4 4 Thermal   In tabular form  for each unit  provide the thermal limits which apply for an operational constraint or limitation   As a minimum this should include definition of the operational temperature range  the non operational  temperature range and the switch on temperature range    6 4 5 Sun Illumination   List all operational constraints and limitations regarding sun illumination  For example if a unit shall not be    illuminated by direct sunlight  quantify the extent and geometry  the impact should be described here     6 4 6 Outgassing       Astrium GmbH All rights reserved     Doc No  EC IRD ASD SY 00019    Issue  1  EADS Eriom SBS Date  23 02 2009  Page  18 of 30    List all operational constraints and limitations regarding the  lt EARTHCARE Equipmen
29. used  in particular the initial  configuration of the equipment   e Final Configuration specifying the configuration of the equipment after the procedure has been run   e Constraints referring to any relevant constraints in chapter 6 and any constraints concerning the  need for other procedures to be run either before or after this procedure                          Example   Procedure Name FCP xx nnn  Switch GPS to Operational Mode  Procedure Objective This procedure switches the GPS into Operational Mode  User Manual Reference User Manual Volume 9  section x x  Other Reference  Initial Configuration GPS in Standby  Final Configuration GOS in Operational Mode  Constraints This procedure requires nominal platform operation                   Astrium GmbH All rights reserved     Doc  No  EC IRD ASD SY 00019  Issue  1  EADS     EarthCare 23 02 2009        Date   aserium Page  24 of 30    The tabular body shall include  e Anincrementing step number  e A description of the action to be performed  e Identification of the TC to be sent and definition of the parameter values to be sent  e Identification of the TM verification to be performed       START OF PROCEDURE       Step Activities TC TM                         END OF PROCEDURE       O Astrium GmbH All rights reserved        Doc No  EC IRD ASD SY 00019    Issue  1  EADS     EarthCare Date  23 02 2009    zeiebrium Page      250f30    13  CONTINGENCY RECOVERY PROCEDURES  All  lt EARTHCARE Equipment   contingency recovery procedur
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Bedienungsanleitung  C 565BEE - Hi-Fi Di Prinzio  取扱説明書  取扱説明書 - PlayStation  Sony SEL20F28 Operating Instructions      Wireーess LAN PCCL  M80 User Guide_4 - Studio Technologies, Inc.      Copyright © All rights reserved. 
   Failed to retrieve file