Home
        User Manual - Aluminium Towers & Site Sheds
         Contents
1.  a slippery  platform     8 2 DO NOT work on a scaffold in high winds     9 Dismantling    9 1 Once finished with the scaffold make sure any unused material   debris and rubble are cleaned or removed from the scaffold prior to  dismantling     9 2 When dismantling the scaffold work from top to bottom starting at  one end and working towards the other end one piece at atime  All  pieces must be passed or lowered down one at a time     9 3  Do not drop or throw scaffolding as it could result in the injury  of others or damage to the equipment     9 4 Safety glasses are recommended to avoid loose debris getting  into your eyes    Disclaimer   This guide provides general information about the obligations of   employers and users of Global Scaffold   s Baby Scaffold Tower to    maintain safe work practices  However  this guide is not intended to  represent a comprehensive statement of the law or substitute for legal    8    advice  Should legal advice be required you should contact WorkCover  in your state     
2.  the deck of a scaffold  to gain additional height     neither step nor extension ladder       Hoisting machines may not be attached or used on the scaffold   unless this is explicitly indicated      Always ensure the Scaffold is guyed to building or structure if the  height exceeds 3 times its minimum base dimension or if any other  circumstance is required for stability  or others stipulated by the  producer       Never use the Scaffold unless the original guardrails are fitted       During activities on the Scaffold always wear correct personal  protective equipment       Take good care of the scaffold  amp  keep it clean  Always inspect  the Scaffold and all applications before use for any damages  If  damaged do not use the Scaffold  do not take any risks  If in doubt  always contact the responsible parties concerned       Ensure that there is no building refuse falling or collecting on the  scaffold  Immediately clean the refuse       When climbing onto or descending the Scaffold only the delivered  material for this activity must be used  Never improvise or deviate  using other materials or methods      Do not use the Scaffold in unsafe conditions such as extreme  weather conditions  Unattended scaffolds must be secured so they  are resistant against wind strength greater than 6 beaufort      Never modify the Scaffold or its components in any way      Never exceed a maximum weight of 225kg on the scaffold       Never exceed safe maximum top working height       Before 
3. Global Scaffold Sales Pty  Lid     USER MANUAL    SPEEDY QUICK PRO  ALUMINIUM TOWER    Global Scaffold Sales Pty  Ltd   Gnangara Road  Landsdale  WA 6065  PO Box 107  Westminster  WA 6061       Table of Contents    Page  1  Design Information and Duty Ratings               cceeeeeeeeeeeeeeeeeeeeeeeeeeeneeees 3  2  Storage  amp  Maintenance ene  sseccodasess fads acc tadacy ctedecnes Cadateci eda dtudececivelias 3  Oo   Safety INSMUCHONS ces ten asveri ect eaa aeaa 4  Ws   ACCESS haastte Se deck ee tetas Rede Lat Atal ane MG i 7  Dv    JEPANS DORE  aoee e   pec a e Aa Er gash eres dese AEE E owes neds 7  6  Safe Working  P races coxa sieves cetcuet aateueoegtites tate vet ap taat tetas 7  7  Additional Safety Accessories                cece eee e eee ee eee eee ee teen ee eees 8  8     ACV6ISG W GalNer ica vata ee Aral aa ai nore onesies 8  97 Ess pat  pg 0 Bmreeee rere tea eee Mee terete ete eee areca eae ae reece ere seme tee ee eter ee 8  Disclaimer ierann a E E E sel T aclate tia tac ats 8    Appendix A   Component List and Unit Weights  Appendix B   Assembly Instructions    Global Scaffold Sales Pty  Ltd  Baby Tower    Information  amp  User Manual    1  Design Information and Duty Ratings     1 1      Scaffold Rating Light Duty 725mm wide frames     Maximum Height     1 937mm     Maximum FREE Standing Height     ONE frame     Maximum number of work platforms     one     Maximum live load per working platform     225 kgs    Note  the live load duty ratings are as specifie
4. d by  AS NZS 1576 3   1995 Appendix A C D and E  AS NZS 1576 1   2010 Scaffolding  Part 1  General Requirements    Identification   All Speedy Quick Pro Scaffold Towers will have Safety Instructions  and Assembly stickers with the company name and logo  attached  to the frames of the scaffold tower     2  Storage  amp  Maintenance     2 1    2 2    2 3    2 4    2 5    2 6    2 7    2 8    2 9    The Speedy Quick Pro Scaffold Tower must be stored off the  ground and in an area away from corrosive substances     While in storage the Speedy Quick Pro Scaffold Tower must be  provided with suitable protection from mechanical damage     When scaffold is not being used  it should be stacked in a neat and  safe manner in a way that is not dangerous to others     Scaffolding left in the weather  should be stacked in such a way so  as not to collect rain water     Report any damaged scaffolding to your employer or the owner of  the scaffold for repairs or replacement  Stack damaged items  separately     Vertical tubes  standards  on scaffold frames should be cleaned  regularly as they can become blocked with cement or other debris   which may obstruct the pins from going into the frames     Any build up of mortar and other materials must be cleaned off  and toggle pins and hinges kept clean     Carry out regular maintenance and inspection of hinges to  ensure they are free of damage and operate freely     All frames  braces and platform are to be inspected before use and  any damaged 
5. han 4 metres to low voltage power lines or where there is doubt  of the voltage  do not proceed without written authority from the local  power supply authority  Note  Victorian regulations require clearances  of 4 6 metres horizontally and 5 metres vertically from the overhead  wires     4 Access    4 1    4 2    4 3    4 4    4 5    4 6    Never climb onto the scaffold platform from a ladder     Face the side frame when climbing up or down  keeping the  body centred in the frame     Maintain a firm grip with both hands when climbing   Do not overreach  move the scaffold when needed   Do not    walk    or    jog    the scaffold when standing on it     Do not stand  sit or climb on guardrails or outriggers    5 Transport     5 1    5 2    5 3    The Speey Quick Pro Scaffold can be easily damaged during  transport so care must be taken when arranging their loading and  placement on the vehicle  The scaffold may be transported in either  the vertical or horizontal position taking care to avoid any damage     Note  Where suitable mechanical protection cannot be provided   top loading should be considered     The Scaffold Tower should be properly secured to the  vehicle during transport     6 Safe Working Practice    6 1    6 2    6 3    6 4    Once the scaffold has been erected and accepted as a work  platform  the users are responsible for using the scaffold in a  manner that minimises risk to themselves and others  Your  employer must ensure you have sufficient knowledge or ex
6. items should be tagged    out of service        3  SAFETY INSTRUCTIONS    These Safety Instructions must  be present in the area of the  Scaffold at all times       Hang and store the Safety Instructions in the area of the Scaffold  at a visible place for the user       Always read these Safety Instructions of the Scaffold accurately  before assembling the Scaffold and follow these Safety  Instructions      In case of questions on the safe functioning of the Scaffold   immediately contact the responsible parties or company  concerned    It is restricted for unauthorized personnel to be in the area of the  Scaffold  It is restricted for unauthorized personnel to make use of  the Scaffold      Always assemble the Scaffold as indicated by the manufacturer       Never deviate or improvise while assembling the scaffold  Only  use original delivered components to construct the Scaffold       Always take preventive precautions so unauthorized persons or  children cannot climb onto the Scaffold when used or not used       Always take preventive measures so falling objects such as  building refuse  materials  tools cannot damage or cause danger to  persons      Always ensure there is safe working area for the Scaffold      Never use the Scaffold for purposes for which it is not meant for     Never use the Scaffold if it is unstable      Never use scaffold on soft ground       Workers must not ride on scaffold when the scaffold is being    4    moved  At no time can a ladder be used on
7. perience  to do so     Any materials placed on scaffold should always be as close to the  frames as possible  Make sure that such material cannot fall off  the platform     Any building debris and waste material should be progressively  removed  Debris generated during use should be confined within  the working platform  Working debris must not be allowed to  fall from the working platform  Use chutes for debris or lower  materials debris by hoist     Electrical leads or equipment used on scaffolding must be tagged  with a recent date inspection tag confirming they are in good  working order     6 5 Where scaffold stands in close proximity to power lines  the  handling of reinforcing steel rods and other long metal items should  be carried in a manner that preserves the safe minimum distance  of 4 metres from the power lines     6 6 Scaffolding is made from Aluminium and is electrically  conductive  Any faulty electrical equipment on the scaffolding  could result in a fatal injury     7 Additional Safety Accessories    Provision has been made for the easy attachment of Handrails  It is  always recommended for personal safety that Handrails be used at  all times    Provision has been made for the fitting of outriggers    Both accessory safety items are readily available     8 Adverse Weather    8 1 In adverse weather conditions such as wind  rain or snow  special  precautions should be taken to ensure that work can be done  safely  You may need a safety harness when working on
8. starting the activities the users of the Scaffold must  possess all the knowledge on the safe functioning of the Scaffold       Before usage of the Scaffold check all the applications function   In case of doubt never take risks and always contact an expert       Always check the Scaffold for obstacles prior to use  Do not take  any risks when removing obstacles       Make sure  that there is always proper overview and that there  are no visual obstructions during the use of the Scaffold       Make sure there is proper lighting when activities are conducted  with the Scaffold       The use of the Scaffold  must always occur with complete  consciousness      In case of abnormal symptoms occurring during use of the  Scaffold  for example unstable situation  leave the Scaffold  cautiously and contact an expert       An authorized expert must always conduct repair activities on the  Scaffold       With the replacement of components of the Scaffold only original  components may be used       For cleaning of the Scaffold always use the prescribed cleaning  liquid and material       Report any unsafe conditions of the Scaffold to the responsible  persons or the supplier       Where scaffold is to be erected on canter levered support base it will  be necessary to obtain an engineer   s acceptance of the loading that is  intended       A scaffold must not be erected within 4 metres of low voltage power  lines  such as to a residence  Where it is necessary to erect a scaffold  closer t
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
SBC Version 3.80 - Revision History and Errata  Mode d`emploi    voir la fiche technique  Manual - Parrot  LET OP  取扱説明書(1552KB)  Vinotemp VINO1500CD User's Manual      Copyright © All rights reserved. 
   Failed to retrieve file