Home

Invisia™ Toilet Roll Holder

image

Contents

1. patch the wall cutout if backside access to bathroom consider making an access panel for future servicing to match the surrounding wall as shown in Figure 4 Specifications subject to change without notice PATENT PENDING Figure 1a Figure 1b BATHROOM WALL i e DRYWALL BACKSIDE ACCESS TO BATHROOM Figure 2b FIGURE 3 ALTERNATIVE TO SUPPORT FRAME MULTI LAYER PLYWOOD INSIDE WALL WITH WALLBOARD PATCH TOP VIEW Bathroom Tile Wall Generous amounts of CAUTION Do not puncture wood screws amp glue when fastening plywood Multi layers of 3 4 plywood approx 24 high L y 2 X 2 nom Stud approx 36 high d t Backside access to bathroom insert structure from this side Wall Stud Wallboard patch Figure 4 DC156C 754919 100 Page 3 of 4 INVISIA WALL TOILET ROLL HOLDER SD302 Assembly Inner Stem with PSA and Oring SD N HW222 Set Screw Hex Socket 10 32 x 25 L S S DIMENSIONAL DRAWINGS WTRH200SS BS CP Weldment Handle WTRH2 HW204 x4 Grommet Rubber WTRH302 Assembly Axle WTRH2 HARDWARE HW175 for top mount point Screw PPH WS 10 24 x 3 S S HW197 198 Tap Cap CD x3 x1 x1 HW177 for top mount point Washer Lock Split 10 18 8 S S HW300 Hex Key 3 32 in Short Arm HW225 SnapToggle Toggle Bolts Specifications subject to change without notice PATENT PENDING yi 7 6 62 1 6cm i
2. accessing the bathroom wall from the backside transfer the measurements for the support rail location to the backside wall as shown in Figure 1b 2 Find wall support studs amp cut hole in wall board to expose wall studs as shown in Figure 1 Suggested hole size is height A of 18 24 48 61cm and width B corresponding to wall stud spacing Expose half width of each stud to facilitate re installation of wall board patch IMPORTANT Avoid any utilities located in wall 3 Fabricate a support frame structure from suitable wood pieces as shown in Figure 2a Support frame width D should fit snugly within wall studs Support frame height E should be from 24 32 61 81cm high or more depending on material and stiffness of wall studs Locate top cross member F to position in line with top rail stem when rail is located at the height H Lower cross member G should be spaced at C 8 25 21cm center to center from top cross member Hold the support rail against the support frame to confirm the cross members are in the correct location Use a generous quantity of wood screws and glue to hold the support frame structure together as shown See alternative to support frame as shown in Figure 3 4 Insert support frame structure through hole in wall and secure uprights to wall studs using a generous amount of wood screws as shown in Figure 2b 5 Complete the Invisia Wall Toilet Roll Holder installation instructions on Page 2 Then
3. as possible as to not pull the wall stems off from the wall as shown in Figure 3b NOTE The peel and stick is not meant to be a permanent adhesive A6 Use the wall stem as a locating guide and mark with supplied center punch Drill a pilot hole using the appropriate drill bit for the fastener Fasten the wall stem to the wall with the appropriate fastener and lock washer A7 Place the rail back onto the wall stem and secure rail by tightening the set screw with supplied hex key as shown in Figure 4 The rail will pull into the stem as the set screw is tightened A8 Use a level to ensure the rail is straight and mark off the hole locations Drill pilot holes using the appropriate drill bit for the fasteners If SnapToggle toggle bolts are to be used please see the separate installation instructions Continue with step A9 AQ Fasten the rail with the appropriate fasteners as shown in Figure 5 NOTE Perform a final tighten and inspection of all fasteners Test the installation by vigorously pulling on the support handle of the Invisia Toilet Roll Holder A10 Install the plastic tap caps to cover the screws Your Invisia Toilet Roll Holder is now installed Specifications subject to change without notice PATENT PENDING Figure 2a Wall Stem Rail Socket Figure 3a Figure 4 Figure 5 Top View FASTENER TAP CAP DC156C 754919 100 Page 2 of 4 TIPS FOR LOCATING A WOOD STUD e For
4. 7 25 1 5 ey 3 8cm HW199 Screw PPH WS 10 12 x 2 S S HW136 for Snap Toggle Screw PPHMS 10 24 x 2 S S SD107 is E A DC156C 754919 100 Page 4 of 4
5. 8714 100 002 8714 100 295 FASTENERS INSTALLATION amp MAINTENANCE The Invisia Wall Toilet Roll Holder must be secured to the wall with fasteners appropriate to the structural material Included are 2 sets of mounting hardware for different wall applications Inspect or have inspected and tighten if necessary the screws on a monthly basis See Page 3 for structural reinforcement suggestions Supplied SnapToggles can be used as an alternative to structural reinforcement ONLY if the walls have not been compromised and are judged to be suitably structural 1 2 drywall or tile walls on 1 2 min cement board FULL MOUNTING STRUCTURE STRUCTURE RECOMMENDED AVAILABLE All mount points fasten Minimum two center into structural wood mount points top wall wood studs stem and center point reinforced wood on plate fasten into framing etc structural wood no PARTIAL MOUNTING NO MOUNTING STRUCTURE AVAILABLE None of the mount points align with the available structure structure available for 10 x 2 S S Screw outer mount points see WE DO NOT ae e Washer into Page 2 Figure 5 RECOMMEND THIS 10 x 3 S S Screw and PRODUCT BE Lock Washer amp 10 x 2 INSTALLED USING S S Screw for wood ONLY SNAP SnapToggles with 10 x 2 S S Bolts TOGGLES for areas w o structure 500lbs load capacity 350lbs load capacity N A TIPS FOR DRILLING INTO TILE e Use carbide tipped masonry dri
6. INVISIA LIVE BEAUTIFULLY THANK YOU Thank you for purchasing the Invisia Wall Toilet Roll Holder We are confident that you will find the unique design and durable construction of this product to be of great assistance in your daily routine To fully enjoy your Invisia Wall Toilet Roll Holder please take a few moments to read these instructions You should store these instructions in a safe place for future reference A SAFETY CONSIDERATIONS CAUTION It is your responsibility to see that your Invisia Wall Toilet Roll Holder is properly assembled installed and cared for Failure to follow instructions in this manual could result in serious injury Support rails can be slippery when wet use this product with caution INVISIA WALL TOILET ROLL HOLDER INSTALLATION The Invisia Wall Toilet Roll Holder should only be installed in areas where the mounting surface is structurally sound Strengthening modifications may be required see page 3 for details Should not be installed in fiberglass acrylic shower enclosures with insufficient stiffness and strength Should not be installed into metal studs If you are not equipped to undertake the outlined work we recommend that you have your Invisia Wall Toilet Roll Holder installed by a qualified contractor Suggested maximum user weight of support rail is 500Ilbs 227kg however this rating is conditional upon suitable fasteners and supporting surface WARRANTY All I
7. drywall surfaces use a stud sensor to locate a stud e For tile surfaces try a stud sensor to locate a stud If no stud is found measure 16 from a perpendicular wall Drill a small hole in the grout to ensure the stud has been found If there is no stud at this location bend a piece of wire in a L shape and insert it through the hole Spin the wire to determine exactly where the stud is located and mark its location Patch all holes with silicone to keep moisture out of the wall e If there is access to the backside of the bathroom wall i e through a closet measure the stud location and transfer the measurements into the bath area STRUCTURAL REINFORCEMENT SUGGESTIONS NOTE Due to variances in local construction methods and materials used details given below are suggestions only Consult the appropriate local contractor for specific advice For concrete walls you may be able to install fasteners such as a wedge anchor directly into the concrete wall without modification If there is access to the backside of the bathroom wall i e through a closet and structural reinforcement is required consider cutting a hole in this backside wall to allow access to the bathroom wall from behind without having to remove replace ceramic tiles 1 Choose optimal mounting location of rail including height H and side to side location L as shown in Figure 1 Mark the height and location on the wall for future reference NOTE If
8. ll on ceramic or consider a diamond tip drill for porcelain tile e If possible drill a smaller pilot hole first e Be careful to prevent the drill from moving when you first start it rotating use duct tape or a wood guide on the surface of the tile to hold the drill from walking sideways e A variable speed drill on slow is best to start the hole Do not apply too much pressure when drilling Do not use a hammer drill WATERPROOFING We recommend that sealant be applied around the wall contact points for any products mounted in the bathroom If not properly sealed there is the potential for water to seep into the wall This may cause the wood to rot thus compromising the structure the support rail is attached to TOILET PAPER AXLE REMOVAL 1 PUSH axle into rail 2 PULL cap from opposite side DC156C 754919 100 Page 1 of 4 MOUNTING LOCATION We strongly recommend that you give some thought as to the optimal location of your Invisia Wall Toilet Roll Holder before installation The following suggestions are offered for your consideration however it is recommended to consider advice from the appropriate healthcare professional for locating any support rail To determine the optimal location we recommend holding the rail in place and walking through the motions of a transfer sitting standing reaching etc Consider the following when determining the optimal mounting location 1 If possible move mounting
9. location to match structure behind the wall 2 Avoid electrical plumbing behind the wall 3 Where possible drill through tile not through grout RECOMMENDED INSTALLATION LOCATIONS Side Wall Figure 1a approximately 30 36 from back wall depending on toilet size amp location Opposite Wall Figure 1b recommended only if opposite wall is close enough to safely reach Rail Height Figure 1 Install rail between 24 36 depending on height of user INVISIA TOILET ROLL HOLDER INSTALLATION Place a blanket down in the area that you will be installing the Invisia Toilet Roll Holder to protect the area from parts that may fall during installation The proposed mounting location must be cleaned prior to installation Refer to the fastener chart on page 1 to determine the appropriate size of hole required for the wall construction present A1 Mark the horizontal and vertical location of the Invisia Toilet Roll Holder the wall stem and center hole of the wall plate MUST install into structural wood as shown in Figure 5 Top View A2 Using supplied hex key back off set screw in the rail sockets so the wall stems can move in and out freely as shown in Figure 2a and 2b A3 On back of wall stems peel off backing to expose adhesive side of rubber gasket washer A4 With the wall stems inside the rail sockets push rail firmly against wall in marked location as shown in Figure 3a A5 Remove the rail as straight
10. nvisia Collection products are covered by a one year limited warranty with the exception of hand grips which are subject to normal wear Buyer hereby indemnifies agrees to hold harmless and defend the manufacturer distributor of the Invisia Collection from and against any and all liabilities claims founded and unfounded losses damages costs and expenses including without limitation consequential damages and reasonable professional fees resulting from buyers specification application or improper use of goods described hereon buyers omission or neglect The manufacturer distributor of the Invisia Collection does not assume any liability for damage resulting from services performed by others or faulty installation misuse or misapplication of goods The manufacturer distributor of the Invisia Collection shall not be liable for prospective profits or special indirect or consequential damages or for the cost of any corrective work done without prior approval Manufacturer distributor of the Invisia Collection total liability hereunder shall in no event exceed the purchase price of the goods specified hereon TOOLS REQUIRED e Level e Personal Protective Eyewear Hammer e Carbide tip drill suitable for tile e Stud Finder e Protective blanket e Center Punch Specifications subject to change without notice PATENT PENDING Invisia Toilet Roll Holder Installation Instructions INV WTRH BS INV WTRH CP

Download Pdf Manuals

image

Related Search

Related Contents

64_Manual do Usuario - BeneHeart D6    USER`S MANUAL Stand-alone Keyboard Display Unit KP  Manual de instrucciones (página 1 de 2) E  Honda SH125D SH150D  Crate Amplifiers BFX100 Stereo Amplifier User Manual  Steba VK 5  Empire Comfort Systems DVP42FP7(0,1,2,3)(N,P)    Bericht - Fachbereich 4: HTW Berlin  

Copyright © All rights reserved.
Failed to retrieve file