Home
USER MANUAL
Contents
1. 9 n 4 Ei Electric Latch If the gate is opened outward 1 If the gate is opened outward please change the spring inside and screw it in the different place See Figure 3 3 7 4 Figure 3 3 7 5 Figure 3 3 7 6 amp Figure 3 3 7 7 Figure3 3 7 6 Figure3 3 7 4 Unscrew the screws Figure3 3 7 5 Take the casing off The location of the spring Installation Figure3 3 7 7 Change the spring and screw it in the different place INSTRUCTIONS F330 400 820 3735 www fabetgroup com 2 VVeld the back plate of the electric latch to the surface on the master gate See Figure 3 3 7 8 Please avoid melting the vvires by the heat of the fixed plate Figure3 3 7 8 For the gate opened inward Figure3 3 7 9 For the gate opened Outward 77 77 TAF 5 FTIT EE C THA 3 The gap between the bottom of electric latch and the stopper should be less than 7mm See Figure 3 3 7 10 Figure3 3 7 10 For the gate opened inward Figure3 3 7 11 For the gate opened Outward 4 Connect the wires of the electric latch to the terminal LAT and LAT on the PCB 400 820 3735 INSTRUCTIONS F330 www fabetgroup com 3 3 8 PC200 Control Box 1 Decide the installation position of PC200 control box first it is suggested to be installed near the gate and should be protected from possible damage Be avvare of the motor cable length before decidin
2. F330 SVVING GATE OPENERS 24V DC GEAR MOTOR FOR RESIDENTIAL USER MANUAL 400 820 3735 www fabetgroup com 720 ki Index 1 Warnings 2 42 SW2 Dip Switch Setting 19 2 Product Description 3 4 2 1 Electric Latch Adiustment Dip 5 Latch 19 24 Applications 3 422 Slowdown Speed Adjustment of 2 Description of The Automation 3 HS Pipe 19 23 Description of Devices 3 423 Operation Speed Adjustment of 2 3 1 F330 Electromechanical TheGearMotorm Dip7TFas 0 019 Gear Motors 4 424 Single and Dual Gate Operation 232 200 Control Box 4 Adustment Dip 8 Ds Set 719 2 3 3 PH 1 Photocells 2 234 Radio Transmitter 4 44 Transmitter Memorizing and Erasing Process 20 235 Flashing Light 5 4 5 System Learning Process 21 236 PKS 1 Key Selector p 5 2 3 7 PPB 1 Push Button p 47 Gafe moving Logic 060 21 2 3 8 PEL 1 Eleciric Latch and PS 1 Stopper 5 4 8 Advanced Operation of the Transmitter 21 3 installation 5 5 Trouble Shooting 22 31 Notes of Motors in Operation 5 6 Technical Characteristics 23 3 1 1 Tools in Installing 6 61 F330 23 3 1 2 Motors Components and Its Installation 6 2 PC200 Control Box 23 in Illustration 6 63 PH 1 Photocells 23 3 2 Power Connection 6 64 PKS 1 Key Selector 23 3 2 1 Notes for Power Connection 6 65 PPB 1 Push Button 23 22 nstallation 7 66 PF 1 Flashing Light 23 3 3 1 Preparation for Motor Installation f 67 PR 1 Transmitter 24 3 3 2 Installation of The
3. Check the dip switch setting of the speed adjustment The Flashing light does not work The leaves shall be closed instead of opening Check if the wiring connection of the flashing light is correct Change the polarity connection of the positive with the negative of the gear motors The leaves suddenly stop during moving 1 Check if the RESET socket is activated 2 Make sure the wiring connection of the gear motors is firm 3 Make sure the hall sensor wiring connection is firm 4 The GND terminal of the photocells on the PCB must be short circuited if no photocells installed Make sure the fuse is workable The leaves does not move or only move toward one direction Check if the RESET socket is activated Make sure the wiring connection of the gear motors is firm Make sure the hall sensor wiring connection is firm The GND terminal of the photocells on the PCB must be short circuited if no photocells installed The master gate closes to the end first and the slave gate stops the flashing light blinks fast for five seconds Cut off the AC input power and the output of the batteries Release the master gate and slave gate manually then open the master to the end and close the slave gate to the end by hand then power the whole unit by connecting the AC and battery terminals The gear motors does not run and the relay is noisy when operating the gate opening and closing Check i
4. Front plate 2pcs Rear plate 2pcs Post bracket 4pcs M8 25L hex bolt 4pcs M8 self locking nut 4pcs M12 25L hex bolt 2pcs M12 self locking nut 2pcs Release key 2pcs 2 3 2 Control Box Control box consists of one control panel with incorporated receiver one transformer and two back up batteries Provides the complete automation of the gear motors and other accessories of F330 kit To connect separate terminals on the control panel and activate the gear motors and other accessories the installation manual has to be carefully read beforehand Table 2 List of small parts for Control Box Quantity 5 30 Screw 4 pcs Nylon screw anchor 4 pcs 2 3 3 PH 1 Photocells The pair of PH 1 photocells has to be installed on the wall and connected to the control panel The function of the photocells is to detect the obstacles found on the optical axis between the transmitter TX and the receiver RX 2 3 4 PR 1 Radio Transmitter PR 1 radio transmitter is used for the remote control of the gate movement To use the transmitter press and hold the button for 1 second There are two buttons on the transmitter and A button is open stop close mode and B button is pedestrian mode Figure 3 1 F330 2 Release Key c 89 Figure 4 Figure 5 Sal Figure 6 INSTRUCTIONS F330 400 820 3735 www fabetgroup com 2 3 5 PF 1 Flashing Light PF 1 flashing light is cont
5. operation when there is a power failure and the gear motors can be released by special keys to move the gate manually 2 2 Description of the Automation The following diagram of F330 typical installation describes some terms and accessories of a gate automation system Figure 1 2 3 Description of Devices F330 includes the accessories shown in Figure 2 Please check the accessories the same as the package provided Attention Some accessories of F330 are not included due to local regulations or customized order A 2 F330 electromechanical gear motors with mounting brackets B 2 release keys C 1 pair of PH 1photocells one TX and one RX D 2 PR 1 radio transmitters E F Figure 2 1 PKS 1 key selector with two keys 1 PPB 1 push button switch G 1 PF 1 flashing light H 1 Control box 1 1 PEL 1 electric latch J 1 PS 1 stopper K Various small parts bolts nuts etc See Tables 1 2 3 4 5 6 400 820 3735 INSTRUCTIONS F330 www fabetgroup com 2 3 1 F330 Electromechanical Gear Motors F330 consists of a vvorm screvv reduction gear and a 24V direct current motor The gear motor could be released manually by special release keys vvhen there is a power failure The gear motor is installed with two post brackets one rear plate and one front plate for the installation Table 1 List of small parts F330 Front bracket 2pcs
6. essential requirements art 3 2 of the R amp TTE Directive 1999 5 EC 2 The above product has been tested with the listed standards and in compliance with the European Directive LVD 2006 95 EC 3 The submitted sample of the above product has been tasted for CE marking according to the following European Directives 2006 42 EC Machinery Directive Comply with the following Standards EN 301489 1 V1 8 1 2008 EN 301489 3 V1 4 1 2002 EN 300220 1 V2 1 1 2006 EN 300220 2 V2 1 2 2007 EN 60335 1 2002 A11 2004 A1 2004 A12 2006 A2 2006 A13 2008 EN 60335 2 103 2003 EN 62233 2008 EN 12445 2001 EN 12453 2001 And also declare that the machinery may not be put into service until the machine which will be integrated or become one of the components and announced to comply with the provisions as the required Taiwan March 14 2013 David Lan Deputy Managing Director 400 820 3735 INSTRUCTIONS F330 www fabetgroup com 2154 IRAH 400 820 3735 PIE www fabetgroup com
7. the front plate of the motor to be installed 8 Place two post brackets on the surface to be installed and mark the drilling points then drill minimum diameter of 8mm holes by four on the mounting surface to be installed and fasten up the brackets with screws and washers 9 Please make sure the front plate is completely installed horizontally Figure 22 Figure 21 Refer to Figure 23 the distance between front plate of the motor and rear plate is 798mm F330 the difference in height is 2 5mm F330 Figure 23 Figure 24 Clamp and fix the motor front plate on the door temporarily 400 820 3735 INSTRUCTIONS F330 www fabetgroup com 12 Lift up the motor and insert the screvvs into the front plate 13 Open the gear motor cover and release the screvv then take out the bolt as belovv Figure25 Lift the motor overhead and push the gate to the end until the screvv holes of the motor end matches the holes on the rear plate as shown in Figure 25 1 and fasten the motor to the rear plate with bolt and screw as shown in Figure25 2 f Figure 25 Figure 25 1 Figure 25 2 14 Fasten the nut tightly and loosen it for half round for motor supporting in rotating 15 Fasten the motor front end to the front plate with the bolt A and nut B tightly Fully tighten the screw 21 Connect the motor power cable as shown in Figure27 22 Close the gear motor cover by tightening the two screws as shown in Figure28 Figure 27 Figu
8. www fabetgroup com 3 1 1 Tools in Installing Please make sure all tools and cables are ready and conform to the industrial safety standard before installation Please refer to Figure 11 Figure 11 3 1 2 Motors Components and Installation in Illustration The installation procedure of F330 may be changed due to various accessories and quantities installed The basic wiring diagram is shown in Figure 12 No wiring cables for accessories are supplied with KIT F330 Figure 12 r 3 2 Povver Connection F330 comes with two power cables of 2m and 7m long which requires very low voltage that no professionally trained personnel is required in installation however the users are advised to read the installation manual carefully before going for it After getting to know all accessories and their positions suggest starting from cable conduit arrangement to prevent the cables from being broken or damaged 3 2 1 Notes for Power Connection 1 The installation of power supply cable to the motor should be carried out by a qualified professional electrician 2 The power supply cable of the motor should be equipped with short circuit protection and leakage protection Please make sure to shut off the power before going installation or maintenance INSTRUCTIONS F330 400 820 3735 www fabetgroup com 3 3 Installation 3 3
9. 1 Preparation for Motor Installation F330 is not applicable to a gate which is inefficient or unsafe neither to solve the defects due to incorrect installation nor poor maintenance Check the following items before going for installation 1 Make sure the weight and dimensions of the gate conform to the operation range of F330 Don t use F330 if the gate specifications do not meet the requirements 2 3 4 5 Make sure the gate structure conform to the criteria of automatic operation and force regulations Make sure there is no serious friction existing in the opening or closing travel of the gate leaves Make sure the gate is at horizontal level that the gate will not move aside at any position Make sure the gate can bear the impact of the motor torque vvhen it is installed on any hole of the bracket vvhich the surface is sufficiently sturdy 6 Make sure the photo sensors are installed on flat surfaces to ensure the two ends of receiving and transmitting corresponded to each other T Check the dimensions of the motors as below Figure 13 8 Make sure to leave enough space when the gate is opening Figure 14 400 820 3735 INSTRUCTIONS F330 www fabetgroup com 9 If the gate is OPENED OUTVVARD please leave at least 70mm between the post brackets and the gate Figure 15 Aerial View Figure 16 Aerial View Min 10 Using the leaf opening angle as cri
10. Connect the motor wire Yellow to the terminals M2 and White to T M2 4 PH 1 Photocells See Figure 3 3 8 4 Figure 3 3 8 5 A In the installation of one set Connect the vvires referred to 7 and 9 And remove the electric jumper 1 B n the installation of tvvo sets connect the vvires referred to 7 8 9 and 10 And remove both the electric jumper JP2 and JP1 5 PKS 1 Key Selector For single gate installation Refer to Figure 3 3 8 6 and connect the two vviresfrom the key selector to the terminal SKEY and GND on the For dual gate installation Refer to Figure 3 3 8 5 and connect the two vvires from the key selector to the terminal DKEY and GND on the PCB Figure 3 3 8 4 6 PPB 1 Push Button For single gate installation Refer to Figure 3 3 8 6 and connect the two wires from the push button to the terminal SKEY and GND on the PCB For dual gate installation Refer to Figure 3 3 8 5 and connect the tvvo vvires from the push button to the terminal DKEY and on the PCB INSTRUCTIONS F330 400 820 3735 www fabetgroup com Figure 3 3 8 5 Transformer P T 1 9 EA Ee Es 400 820 3735 INSTRUCTIONS F330 www fabetgroup com 2 iim Before powering
11. Gear Motors 9 648 PEL 1 Electric Latch 24 3 3 3 PKS 1 Key Selector T1 Annexes 25 3 34 PPB 1 Push Button 12 71 CE Dedlaration of Conformityy 25 3 3 5 PF 1 Flashing Light 12 3 3 6 1 Photocells 13 3 3 7 PEL 1 Electric Latch and PS 1 Stopper 14 3 3 8 200 Control Box 16 4 Dip Svvitch Setting 18 4 1 2 Over current Adjustment Dip 2 Over2 amp Dip 3 Over1 18 4 1 3 Gate Auto close Adjustment Dip 4 Auto 3 Dip 5 Auto 2 amp Dip 6 Auto 1 19 414 Photocells Adjustment Dip 7 Photo 19 4 1 5 Flashing Light Adjustment Dip 8 Light 19 400 820 3735 INSTRUCTIONS F330 www fabetgroup com 1 VVarnings Please read this instruction manual carefully before the installation of gate automated system This manual is exclusively for qualified installation personnel Is not responsible for improper installation and failure to comply with local electrical and building regulations Keep all the components of F330 system and this manual for further consultation e n this manual please pay extra attention to the contents marked by the symbol e Be aware of the hazards that may exist in the procedures of installation and operation of the gate automated System Besides the installation must be carried out in conformity with local standards and regulations e If the system is correctly installed and used following all the standards and regulations it will ensure a high degree of safety e Make sure that the gates works
12. ON The speed is 10096 output of the full speed OFF The speed is 80 output of the full speed 4 2 4 Single and Dual Gate Operation Adjustment Dip 8 Ds Set ON Dual Gates operation in system learning and normal operation OFF Single Gate operation in system learning and normal operation 400 820 3735 INSTRUCTIONS F330 19 www fabetgroup com 4 3 LED Indication LED1 System Learning LED1 blinks once when single gate learning is completed LED1 blinks twice when dual gate learning is completed LED2 RF If the switch of the transmitter key selector or the push button is activated LED2 will be on LED3 Photocells 1 LED3 will be on when the first pair of the photocells are activated LED4 Photocells 2 LED4 will be on when the second pair of the photocells are activated LED5 RF Indicator LED5 will be on when RF signal is received lt LED1 LI SYSlearn LI LED2 R gri Ep LI LED3 pro LED4 E Pno2 LED5 1 0 5 B LI 4 4 Transmitter Memorizing and Erasing Process A Transmitter Memorizing Press and hold the S3 button on the PCB for 1 second and then the blue LED indicator on the RF board will be ON Press A button for dual gate installation press button for single gate installation on the transmitter
13. ally See Figure 3 3 5 1 2 Unscrew the four screws on the light base and separate the base with the bottom as shown in Figure 3 3 5 2 3 Connect the wires and penetrate the wires into the hole of the base See Figure 3 3 5 3 4 Drill the holes in the wall and fix the bottom to the wall by three screws See Figure 3 3 5 4 Figure 3 3 5 1 Figure 3 3 5 2 Figure 3 3 5 3 Figure 3 3 5 4 1 INSTRUCTIONS F330 02202 www fabetgroup com 5 Connect the four vvires of the light and the antenna to the PCB terminals and place the vvires into the if necessary See Figure 3 3 5 5 6 Tighten the four screvvs back on the light base Figure 3 3 5 6 7 Replacing the bulb set See Figure 3 3 5 7 7 1 Unscrevv the flashing light vvires from the PCB terminals and make sure the povver of the light is off 7 2 Release the three screws A C of the flashing light cover 7 3 Separate the flashing light cover and replace the bulb set vvith a nevv one 7 4 Tighten the three screws A C of the flashing light cover Figure 3 3 5 5 Figure 3 3 5 6 Figure 3 3 5 7 3 3 6 PH 1 Photocells 1 Decide the installation position of the photocells See Figure 3 3 6 1 2 Unscrevv the screvvs and secure the photocells on the post A B or C See Figure 3 3 6 2 and 3 Figure 3 3 6 1 Figure 3 3 6 2 Figure 3 3 6 3 3 VViring connection TX C
14. ature 20 C 50 C Dimension 6 5 PPB 1 Push Button 85mm 60 5mm 40 5mm Application For outdoor use Installation Wall mounted vertically Operating Temperature 20 C 50 C Dimension 85mm 60 5mm 40 0mm l www fabetgroup com 400 820 3735 INSTRUCTIONS F330 23 6 6 PF 1 Flashing Light Application For vvaming purpose during leaves movement Lamp 24Vdc Halogens bulb Operating Temperature 20 C 50 C Installation horizontally or vertically installed Dimension 205mm 80mm 75mm 6 7 PR 1 Radio Transmitter Application Radio transmitter for remote control Frequency 433 92Mhz Coding Rolling code Buttons 2 for single gate or dual gate operation Power Supply 3V with one CR2032 button type lithium battery Operating Temperature 20 C 50 C Dimension 71 5mm 33mm 14mm 6 8 PEL 1 Electric Latch Application For locking the gate Power Supply 24Vdc Operating Temperature 20 C 50 C Operating Current 5A Dimension 61mm 55mm 120mm INSTRUCTIONS F330 400 820 3735 www fabetgroup com C Declaration of Conformity Manufacturer Timotion Technology Co Ltd Address Shiyong Minying Industrial Zone Hengli Town DongGuan City GuangDong China Model F330 PC200 PR 1 1 Certificate of conformity of a product with the
15. c Dip switch 6 OFF Dip Switch 5 OFF Dip Switch 4 ON 40 sec Dip switch 6 ON Dip Switch 5 OFF Dip Switch 4 ON 60 sec Dip switch 6 OFF Dip Switch 5 ON Dip Switch 4 ON 120 sec Dip switch 6 ON Dip Switch 5 ON Dip Switch 4 ON 300 sec Note Auto close mode activates when the gates move to the end position or stopped manually If the transmitter push button or the key selector is activated before the auto close counting the gate will close immediately 4 1 4 Photocells Adjustment Dip 7 Photo ON When encountering any obstacles the gates will stop during opening phase stop and reverse during closing phase OFF The gate will keep moving when encountering any obstacles during closing and opening phases 4 1 5 Flashing Light Adjustment Dip 8 Light ON The flashing light blinks for 3 seconds before the gate moves and blinks simultaneously during the movement OFF The flashing light blinks and the gate moves simultaneously 4 2 SW2 Dip Switch Setting 4 2 1 Electric Latch Adjustment Dip 5 Latch ON The electric latch functions when dip switch is set to ON OFF The electric latch does not function when dip switch is set to OFF 4 2 2 Slowdown Speed Adjustment of The Gear Motors Dip 6 Slow ON The speed is 7096 output of the full speed OFF The speed is 5096 output of the full speed 4 2 3 Operation Speed Adjustment of The Gear Motors Dip 7 Fast
16. ell will be fixed to the bottom 9 Tighten the lock body with the two screws and insert the round cover by pressing it to attach to the whole unit Figure 3 3 3 5 Figure 3 3 3 6 0 LO f T Jie a 400 820 3735 INSTRUCTIONS F330 www fabetgroup com 3 3 4 PPB 1 Push Button 1 PPB 1 push button is installed indoors at the height of about 100cm so that it could be used by most people 2 Remove the round cover A by prizing it out vvith a screvvdriver See Figure 3 3 4 1 3 Unscrevv the tvvo screvvs beside the button 4 Separate the upper shell vvith the bottom See Figure 3 3 4 2 5 Breach the three holes at the bottom and mark the points by the holes as reference 6 Drill the holes in the vvall and fix the bottom to the vvall by three screvvs See Figure 3 3 4 3 T Connect the electric wires to the terminals as shown in Figure 3 3 4 4 and it s not required to distinguish any polarity The terminals can be removed for connecting the wires easily 8 Attach the upper shell to the bottom and screw them up by two screws and insert the round cover by pressing it to attach to the whole unit Figure 3 3 4 1 3 3 5 PF 1 Flashing Light 1 Decide the installation position of the flashing light The flashing light has to be installed near the gate and easy to be seen by users and passersby The flashing light can be installed horizontally or vertic
17. f the fuse is burned A INSTRUCTIONS F330 400 820 3735 www fabetgroup com 6 Technical Characteristics 6 1 F330 Motor 24Vdc motor vvith mechanical release Gear type VVorm gear Max Absorbed Povver 144VV Peak thrust 3500N Nominal thrust 3000N Stroke length 350mm Power supply 24Vdc Nominal input povver 2A Maximum operating current 5 5A for maximum 10 seconds Maximum gate vveight 350 kg per leaf Maximum gate length Duty cycle 4 meters 2096 Operating Temperature 20 C 50 C Dimension 844mm 115mm 106mm Weight 6 25kg 6 2 PC200 Control Box Application For F330 power supply Main power supply 230Vac 110Vac 50Hz 60Hz Back up battery 2pcs of batteries for emergency operation 1 2A each Transformer 6A 24V Receiver board 433 92MHz 200 transmitters memory Installation Wall mounted vertically Operating Temperature 20 C 50 C Dimension 275mm 195mm 102mm 6 3 PH 1 Photocells Detection type Through beam Operating distance 30 meters Response time 100ms Input voltage AC DC 12 24V Operating Temperature Protection class 20 C 60 C IP66 Dimension 59mm 87mm 38mm 6 4 PKS 1 Key Selector Application For outdoor use Installation Wall mounted vertically Operating Temper
18. g the installation position 2 Remove the cover by unscrevving the four screvvs on the cover See Figure 3 3 8 1 3 Use a screvvdriver to puncture the holes beneath the bottom of the control box See Figure 3 3 8 2 4 Secure it on the wall See Figure 3 3 8 3 Figure 3 3 8 1 Figure 3 3 8 2 Figure 3 3 8 3 5 VViring Connection Prepare all the vvires of the accessories beforehand and connect the vvires to the gear motors and accessories on the PCB as shown in Figure 3 3 8 5 All of the wiring connections of the accessories are not requested to distinguish the positive and the negative polarity 1 PF 1 Flashing light Connect the two wires from the flashing light to the terminal LIT and LIT on the PCB 2 PEL 1 Electric Latch Connect the two wires from the electric latch to the terminal LAT and LAT on the PCB 3 F330 Gear Motors Refer to Figure 3 3 8 5 and connect the wires separately to the terminals on the PCB M1 Connect the motor wire White to the terminals M1 and Yellow to the M1 Connect the hall sensor wires red green and black to the terminals 5 S1 GND M2 Connect the motor wire White to the terminals M2 and Yellow to the M2 Connect the hall sensor wires red green and black to the terminals 5V S2 GND Notes For gates opened outward M1 Connect the motor wire Yellow to the terminals M1 and White to the terminals M1 M2
19. group com For four channel transmitter there are four normal adjustments 5 OS Situation 2 BSk Transmitter button B for single leaf operation DkA Transmitter button A for double leaves operation Situation 3 CSk Transmitter button C for single leaf operation DkD Transmitter button D for double leaves operation See the following description 5 s Trouble Shooting Situation 1 ASk Transmitter button A for single leaf operation Transmitter button for double leaves operation Situation 4 DSk Transmitter button D for single leaf operation Transmitter button for double leaves operation Overheated Back up Batteries Check the vviring connection of the batteries The gate doesn t move when pressing the button of the transmitter 1 Check if LED3 or 4 is ON 2 Check if the voltage of the batteries is below 22V 3 Check if LED1 is ON 4 Make sure all the wiring connections are firmly connected to the terminals on the PCB 5 Make sure the fuse is workable The gate only moves a little distance when pressing the button of the transmitter Make sure the wiring connection of the hall sensor is firm The transmitting distance is too short Make sure the connecting terminals of the Antenna is firm The gear motors run very slowly
20. he learning process again when there isa power failure C The slave gate opens 3 seconds after the master gate opens and the master gate closes 3 seconds after the slave gate closes 4 6 Gate Operation Press the button A on the transmitter for dual gate operation Press the button B on the transmitter for single gate operation in either single gate or dual gate installation 4 7 Gate moving Logic A In gate opening phase The gates stop if the transmitter push button key selector is activated and close when the transmitter push button key selector is reactivated B In gate closing phase The gates stop if the transmitter push button key selector is activated and open when the transmitter push button key selector is reactivated C In gate opening or gate closing phase For safety purpose the gates stop if encountering obstacles 4 8 Advanced Operation of the Transmitter You could decide the buttons of the transmitter to operate single or double leave by adjusting the position of JP3 jumpers For two channel transmitter there are two adjustments LAT BJ Situation 1 ASk Transmitter button A for single leaf operation DkB Transmitter button B for double leaves operation PR 1 5 2 See the follovving description Situation 2 BSk Transmitter button B for single leaf operation D C Dx A DkA Transmitter button A for double leaves operation A 400 820 3735 INSTRUCTIONS F330 www fabet
21. on the control unit the following dip switch setting must be decided by gate weight and installation environment first See Figure 32 Ot 68 OS 1 lk LI T Errem 5 No Connection 123 4 56 78 123 4 56 78 h n BIB DH 1 NC 5 Latch 1 S F Set 5Auto2 2 NC 6 Slow 2 Over2 6 Auto1 3 NC 7 Fast 3 Over1 7 Photo 4 NC 8 Ds Set 4 Auto3 8 Light 4 1 SVV1 Dip Switch Setting 4 1 1 Slowdown Adjustment Dip 1 S F Set ON The gear motors do not slow down before the gates completely close or open OFF The gear motors slow down before the gates completely close or open 4 1 2 Over current Adjustment Dip 2 Over2 amp Dip 3 Over1 Current Amp Dip Switch 3 OFF Dip Switch 2 OFF Dip Switch 3 ON Dip Switch 2 OFF Dip Switch 3 OFF Dip Switch 2 ON Dip Switch 3 ON Dip Switch 2 ON INSTRUCTIONS F330 400 820 3735 www fabetgroup com 4 1 3 Gate Auto close Adiustment Dip 4 Auto 3 Dip 5 Auto 2 8 Dip 6 Auto 1 Auto close 1 Dip svvitch 6 OFF Auto close 2 Dip Svvitch 5 OFF Auto close 3 Dip Svvitch 4 OFF Effect No auto close Dip switch 6 ON Dip Switch 5 OFF Dip Switch 4 OFF 3 sec Dip switch 6 OFF Dip Switch 5 ON Dip Switch 4 OFF 10 sec Dip switch 6 ON Dip Switch 5 ON Dip Switch 4 OFF 20 se
22. onnect terminals 1 and 2 on the transmitter vvith the terminals GND and 24V on the PC200 PCB RX Connect terminals 1 2 and 4 on the receiver with the terminals GND 24V and phot1 on the PC200 PCB And use an extra wire to connect terminals 2 and 5 on the receiver as a bridge See Figure 3 3 6 4 Figure 3 3 6 5 and Figure 3 3 8 5 Figure 3 3 6 5 Transmitter Receiver Figure 3 3 6 4 CA CC Q NA NC C 12 S lll J NA Normal Open C Common NC Normal Close CA AC 12 24 DC Input Voltage DC 12 24 DC Input Voltage VERT Vertical ORIZ Horizontal Power LED Green Vertical Adjustment Horizontal Adjustment LED Red Beam Alignment 400 820 3735 INSTRUCTIONS F330 www fabetgroup com 3 3 7 PEL 1 Electric Latch and PS 1 Stopper 1 Stopper 1 Before installing the stopper please make sure the gates are in close positions and the surface to be installed is flat 2 Place the stopper on the ground using the bottom as reference and mark the 3 drilling points See Figure 3 3 7 1 For the gate opened inward See Figure 3 3 7 2 For the gate opened outward Note If the gate is opened outward place the stopper in opposite direction 3 Drill the 3 marked points and then securely attach the stopper to the ground with screws and washers See Figure 3 3 7 3 AY
23. properly before installing the gate automated system and confirm the gates are appropriate for the application eDo not let children gate automated system operate or play with the e Do not cross the path of the gate automated system when operating e Please keep all the control devices and any other pulse generator away from children to avoid the gate automated system being activated accidentally e Do not make any modifications to any components except that it is mentioned in this manual Do not try to manually open or close the gates before you release the gear motor e f there is a failure that cannot be solved and is not mentioned in this manual please contact qualified installation personnel e Do not use the gate automated system before all the procedures and instructions have been carried out and thoroughly read e Test the gate automated system weekly and have qualified installation personnel to check and maintain the system at least every 6 month e Install warning signs if necessary on the both sides of the gate to warn the people in the area of potential hazards INSTRUCTIONS F330 400 820 3735 www fabetgroup com 2 Product Description and Applications 2 1 Applications F330 is applied for residential automation of single or dual leaf gate F330 has to be operated with electricity and it s forbidden to be operated by back up batteries for normal use Back up batteries are only allowed for emergent
24. re 26 White Motor Yellow Hall sensor Red 5V Hall sensor Green Signal Hall sensor Black GND 23 Gear Motor Release 1 Turn the plate on the release part to OPEN position See Figure 29 2 Push out the release part to the end See Figure 30 3 Use the release key to turn the pin anti clockvvise to the end See Figure 31 Figure 29 Figure 30 Figure 31 INSTRUCTIONS F330 400 820 3735 www fabetgroup com 3 3 3 PKS 1 Key Selector 1 PKS 1 key selector is installed outside and close to the gate at the height of about 100cm so that it could be used by most people Decide the installation position of PKS 1 first See Figure 3 3 3 1 2 Remove the round cover A by prizing it out vvith a screvvdriver See Figure 3 3 3 2 3 Unscrew the two screws beside the lock body See Figure 3 3 3 3 4 Turn the key and separate the bottom of the shell with the lock body See Figure 3 3 3 4 Figure 3 3 3 1 Figure 3 3 3 2 5 Breach the three holes at the bottom and mark the points by the holes as reference 6 Drill the holes in the wall and fix the bottom to the wall by three screws See Figure 3 3 3 5 T Connect the electric wires to the terminals as shown in Figure 3 3 3 6 and it s not required to distinguish any polarity The terminals can be removed for connecting the wires easily 8 Turn the key and insert the shell on the bottom Turn the key back to the center position and the sh
25. rolled by control box and blinks when the gate is moving The flashing light stops blinking when the gates finish opening or closing Table 2 List of small parts for PF 1 Quantity 3 20 Screw 3 pcs Nylon screw anchor 3 pcs 2 3 6 PKS 1 Key selector The PKS 1 key selector is used for opening the gate outdoors without the radio transmitter PKS 1 key selector is supplied with two keys Figure 8 Table 3 List of small parts for PKS 1 Quantity 3 20 Screw 3 pcs Nylon screw anchor 3 pcs Keys 2 pcs 2 3 7 PPB 1 Push Button The PPB 1 push button is used for opening the gate indoors without the radio transmitter Table 4 List of small parts for PPB 1 Quantity 3 20 Screw 3 pcs Nylon screw anchor 3 pcs 2 3 8 PEL 1 Electric Latch and PS 1 Stopper PEL 1 electric latch is used to lock the gate and it has to be used with PS 1 stopper and installed on the master gate Table 6 List of small parts for PEL 1 and PS 1 Quantity M8 25L hex bolt 3 pcs 8 self locking nut 3 pcs Key 2 pcs 3 Installation 3 1 Notes of Motors in Operation The F330 gate openers are applicable to per leaf of 4 0 meters in width and 350 kg in weight which can be opened up to 120 degrees primarily for residential use where the performance shall be influenced by the factors such as gate dimension weight and climate that the driven torque is necessarily to be adjusted properly 400 820 3735 INSTRUCTIONS F330
26. teria to make sure all criteria in Figure 17 can be met Figure 17 Bimm 120 130 140 150 160 170 180 190 A mm 120 25 4 1 1110 120 41 2120 190110 C value is 139mm D can be measured from the gate easily A C D The value of B can be calculated from the value of A and the leaves opening angle Ex If A 160mm with the leaves opening angle of 100 degrees then the value of B is approximate 190mm Please make sure B and A are similar or the same in value that the leaves can be operated smoothly also to reduce the burden of the motor INSTRUCTIONS F330 400 820 3735 www fabetgroup com 3 3 2 Installation of The Gear Motors 1 Choose the correct dimensions of the motors and position to be installed 2 Check if the mounting surface the brackets to be installed is smooth vertical and rigid 3 Arrange the cable conduit for power supply cable of the motors 4 n order to obtain the optimal supporting from the rear plate please assemble two post brackets and one rear metal plate according to Figure 18 5 Loosen the two screws and remove the back cover of the motor as shown in Figure 19 6 Place the leaves in the closed position Figure 20 Figure 18 7 Refer to the distance of B in Figure 17 place the rear plate in the correct position on the mounting surface Inspect if the distance is proper as shown in Figure 23 i e the position
27. vvithin 5 seconds The transmitter learning is completed when the blue indicator is OFF B Transmitter Memory Erasing Press and hold the S3 button on the PCB for three seconds C One radio receiver can be memorized with 200pcs of transmitters 20 INSTRUCTIONS F330 400 820 3735 www fabetgroup com 4 5 System Learning Process Step1 Connect the master motor wires to M1 terminals and the slave motor wires to M2 terminals correctly If only one gate is installed the motor wires have to be connected to M1 terminals Step2 Press and hold the S2 button on the PCB for 5 seconds After LED1 blinks once per second press the button on the transmitter to choose dual gate A button or single gate B button system learning In system learning mode the gates will proceed with the following procedures A Dual Gate Mode Slave Gate closes Master Gate closes Master Gate opens Slave Gate opens Slave Gate closes Master Gate closes B Single Gate Mode Master Gate closes Master Gate opens Master Gate closes The completion of system learning A For Dual Gate installation The system learning is completed when LED1 quickly blinks twice per second B For Single Gate installation The system learning is completed when LED1 quickly blinks once per second Notes A System learning fails and needs to be learned again when an unpredictable interruption occurs B Once the system learning is completed there is no need to proceed with t
Download Pdf Manuals
Related Search
Related Contents
USER`S MANUAL Untitled DEFINITY ECS Release 9 Installation Sukhoi SU-26m 480 ARF - E Para entender la legionelosis Una hoja informativa para Service Manual Copyright © All rights reserved.
Failed to retrieve file