Home

The Energy Detective TED Pro Wireless Display w/ ZigBee USNAP

image

Contents

1. A8 G3YINDIY SV SNY3I H3H1O v113d SST M p Hd 3SVHd asn 38 SWOTOD INVHOVIQ ONIMIM 39M 1N3933310 LVHL 3310038 AVIA S3INLNNOD 3WOS gd IWYS JHL NO LON M9 ONY XIdN3ddV nio au yovie 41 A1383A3S NOISSINSNVUL LIn2MID V 3SVHd OL M9 123NNOO V ASWHd NO SI 3H1 OL NOISSINSNYYL 21d 931 HOIH OL 03193NNOO 38 1SQIA 38IM 3018 NOLLWY3d0 1238900 HOS a S310N information itm com INH a gy vw jp z z ij uf 01 3118 LDINNOD 1 800 561 8187 k k k ck ck ck OOK ck www theenergydetective com Copyright 2013 Energy Inc All rights reserved en N ck k k Gk k k k ck Appendix A 4 NLN OOOENLW IN31SAS HdE INO 40135 M9 NI NOLLVTIVISNI 135 2 A8 GI INOIY SV SNV3IA o3avi NOLLVDISILN3GI 3SVHd asn 5 38 590102 JMIAA 1N3933JIO LVHL JYINDIY AVIA S3IHINDOO 3IAOS 3SVHd 3INVS JHL LON 33V NLN NO X2V18 dI GIGVYOIG A1383A3S
2. k OK GB to er ge the LI and for deere Brit fp ed oe UL freon E ia zas phe a WT 1 m HE MTU 130551 AC oos H Complete setup and check that system is operating properly See TESTING step 3 VER IFY DASHBOARD READINGS in previous section 2 MTU UI User Interface on Local Network The MTU UI is accessed by running the TED Installation Utility as instructed in the previous section then highlighting the MTU and clicking LAUNCH IN BROWSER For accessing the MTU UI by connecting directly from a laptop see section Ill MTU Configuration Options A Phase configuration Set appropriate configuration and SAVE B Network options It is suggested local IT administrator be consulted before adjusting network settings C MTU Firmware updates D Rogowski coil configuration E 3rd Party Post Activation BETA Enter URL and Activation code to post MTU data to a server using TED 3rd Party Post API http www theenergydetective com downloads tedproapi pdf 3 MTU STATS PAGE From the MTU UI Page the Stats button opens a diagnostic page dis playing Voltage Current KW and KVA per phase in real time Verify Real Power KW is a positive number for each phase Unless
3. OK ck k k ck Rev 3 3 Page 12 OK k k CR k k GB OK GB NOTE 3 PLC signal is transmitted on the black wire of the MTU power cable normally connected to phase A Communication is optimized when the ECC is plugged into an outlet on Phase A If not practical to plug the ECC into a phase A outlet the Phase A voltage and CT connections of the MTU may need to be swapped to match the phase powering the ECC STEP 3 INSTALLING THE POWER CABLE AND MEASURING TRANSMITTING UNIT MTU DANGER ELECTRICAL HAZARD TURN OFF ALL POWER TO THE CIRCUIT BREAKER PANEL BY TURNING OFF THE MAIN BREAKER OR MAIN SWITCH A Turn off power B Remove circuit breaker panel cover C Note the Serial Number of the MTU as shown on the label It consists of six digits in the form 12 34 56 You will need to know this number to connect the MTU to the ECC Network D Connect the black red and blue wires from the MTU power cord to a spare 15 20 or 30 Amp three pole circuit breaker in the panel See Appendix for specific wiring diagrams for your system i If there is no spare circuit breaker the black red blue wires can be attached to any 15 20 or 30 Amp 3 pole circuit breaker in the panel provided that the circuit breaker is approved for 2 conduc tors and this is acceptable to the authority having juris
4. INSTALLATION MANUAL FOR TED Pro 1 800 561 8187 ww i com information itm com The Energy Detective Page 2 OK k CR k OK GB IMPORTANT The installation of your TED Pro system is a several step process The 1st step is the installation of the MTU Pro After the MTU Pro is installed Step 2 is the installation of the ECC and access to the Footprints Software If the equipment is used a manner not specified by the manufacturer the protection provided by the equipment may be impaired 1 800 561 8187 www GEER com information itm com Gk k OK k k ck OK Copyright 2013 Energy Inc All rights reserved www theenergydetective com TED OK k OK OK OK k k TABLE OF CONTENTS PARTI Page 4 Operating Conditions Page 4 Three phase 5 Page 5 Single phase from 3 phase Page 5 5 Page PART II Safely Page 7 PART III Page 8 PART IV Communication Options Page 11 Power Cable Co
5. Service voltages shown above are common systems There are other configurations If yours is O O O O O O O O O not listed and you are not sure please contact Energy Inc Tech Support for assistance TED is suitable for services of up to 5000 Amps For services over 1200 Amps see Appendix B Rogowski Coil options Standard CTs and models are suitable for services with up to 3 parallel cables per phase that each have a maximum outside diameter up to 23mm or 500 MCM Optional CTs are available for conductors up to 30mm or 750 MCM For larger conductors bus bars or more than 3 parallel conductors per phase see Appendix B Rogowski Coil Options Delta Services and Wye services where voltage between line and neutral exceeds 277V cannot use PLC communication between the MTU and ECC In these cases the MTU must be mounted outside the electrical panel and Ethernet communication method must be used The MTU and ECC will need to be connected to the Local Area Network or connected to each other via Ethernet 277V ECC power cord kit is available http www theenergydetective com tedprostore html N 800A and 1200A models include a CT harness and additional sets of CTs for each additional paral lel conductor Standard TED Pro MTU is provided with 400A current transformers For small services 200A or less where space is limited it is highly recommended that customer use 200A current transformers Model CT601B Please speci
6. 38 NOLLVDINNIWWO 21d 3SVHd M9 OL IYIM y2v18 NO LINDYID V 3SVHd OL 193NNOO V 3SVHd NO SI JHL OL NOISSINSNVUYL Jld S3LON a3sn LON V V XIGN4ddV information itm com M com 5 IL m www I KOK OK ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok ok JIM 3118 330 dV J18v2 HIMOd MLN 1 800 561 8187 Rev 3 3 Appendix A 5 Od NII d ALN 000 111 4 135 3dAL NOILVTIVISNI 13 ASVHd 11145 M E Hd T ALIHOHLQ V 1201 YNOA A8 G3YINDIY SV SNY3IA YIH IAI M S 3dV1 NOILV2IJILN3GI 3SVHd ISN 035 38 S4010 SNISIM 3WIAA 1N393433IQ LVHL AVIA SIINLNNOD IWC G V XIGN4ddV 3SVHd 3INVS JHL NO LON NLA NO 38IM 92v 18 dI A1383A3 39 THM NOISSIINSNVL 2714 S34IM 92 V18 ONY Q3 JHL 3583A39 YO LINDYID 8 3SVHd OL 193NNO 8 3SVHd NO SI M9 JHL OL NOISSIWSNYYL 21 information itm com LON 2 12 5 www GEER com 01 3018 193NNOO F PAYJVIMOJ NIN www theenergydetective com Page 24 kK CK CK k k k k Ck k OK ck k ck TR 1 800 561 8187 k k ck ck kK ck OOK
7. 648 Marina Drive Charleston South Carolina 29492 843 766 9800 800 959 5833 www theenergydetective com 1 800 561 8187 www GEER com information itm com OK OK k OK GB Copyright 2013 Energy Inc All rights reserved www theenergydetective com
8. monitoring Generation a negative reading would indicate A CTs are connected with Wrong polarity OR CTs and MTU Power Cable connections are not matched to the same phase Ill DIRECT ETHERNET CONNECTION Accessing TED devices by connecting Ethernet cable di rectly to a Laptop Computer NOT connecting through a Router or the Local Area Network Typically the ECC will be connected via Ethernet to a router or the Local Area Network The MTU would typically not be connected to a router or Network unless TCP Ethernet communication is se lected However either device can be connected directly to the Ethernet port of a laptop for setup or diagnostics Note depending on the computer you may need an Ethernet Crossover cable typically a crossover cable is not needed when using a laptop computer Crossover cables can be l 110 llle 111 1 800 561 8187 www GEER com information itm com k OK k k k ck Copyright 2013 Energy Inc All rights reserved www theenergydetective com TED pase 1 OK GR OK OK k k ck 1 COMPUTER SETTINGS The computer s Local Area Network settings must be set as follows for Ethernet Communication directly to the computer No Router IP 192 168 7 1 Subnet Mask 255 255
9. the corresponding 3 phases on the cir cuit breaker IE Black wire to Phase A Red wire to Phase B and Blue wire to phase C The CT inputs on the MTU are left to right Phase A Phase B Phase C see image on front cover of this booklet and must be matched to the corresponding wires for proper readings 4 wire Delta is an exception see Appendix A 3 Some Canadian Standards may have phases marked differently in the panel this doesn t matter as long as the MTU power cable wires and CT inputs correspond NOTE 2 For antimal PI C CC ommiinicatian the FCC should into a circuit an the same 1 800 561 8187 www GEER information itm com k OK OK k k ck Copyright 2013 Energy Inc All rights reserved www theenergydetective com TED OK k OK OK k k GB black MTU wire be swapped with the Phase or Phase wires but the corresponding CTs must also be swapped for proper readings NOTE 3 For Ethernet Communication TCP the circuit to which the ECC is connected does not matter STEP 4 INSTALLING AND CONNECTING THE CURRENT TRANSFORMERS CTs The connectors on your CTs can easily be INCORRECTLY installed resulting in incorrect data being recorded We suggest stopping at this point a
10. 255 0 Gateway IP 192 168 7 1 The ECC User s manual Appendix A gives an example of where to find these settings http www theenergydetective com downloads ECCUsermanual pdf 2 MTU UI PAGE A NOTE Computer Network Settings must be set as shown above B Connect Ethernet Cable directly from MTU to Laptop to OR Connect MTU and Laptop via Ethernet cable to a switch that is NOT connected to the Local Network or Router C Open a Web Browser Internet Explorer Chrome Safari etc D Type 192 168 7 3 into the address bar and press ENTER 3 FOOTPRINTS DASHBOARD ECC Connection A NOTE Computer Network Settings must be set as listed above B Connect Ethernet Cable directly from ECC to Laptop to OR Connect ECC and Laptop via Ethernet cable to a switch that is NOT connected to the Local Network or Router C Open a Web Browser Internet Explorer Chrome Safari etc D Type 192 168 7 4 into the address bar and press ENTER 4 ETHERNET TCP COMMUNICATION WHEN NOT CONNECTED TO A ROUTER OR NET WORK A Connect MTU ECC and Laptop into a network switch or hub that is NOT connected to the local Network NOTE If NOT using a switch or hub Connecting the MTU directly to ECC set up each device by connecting directly to laptop as instructed below Then connect Ethernet between MTU and ECC After several minutes of operation connect to ECC to verify data has been logged Access the Footprints dashboard by typing 192 168 7 4 in B
11. For 1200A systems you will have 9 CTs Remove the black loop jumper from the CT harnesses and connect 3 CTs to each harness Be sure the tab goes under the locking ridge as shown in the Cor rect image above After connecting your CTs to the Harness plug the end of the harness into the correct Phase slot in your MTU either A or CAUTION IF THIS IS A COMBINATION PANEL THE LUGS ON THE PRIMARY SIDE OF THE MAIN BREAKER ARE PROBABLY STILL HOT A The CTs must be installed with the red polarity dots facing towards the source of power the utility meter If all three CTs are not installed in this manner the readings will be wrong Note If you have solar wind or generator you will need an additional MTU if you want to measure Gen eration Load and Net Utility Please see solar wind section of our website for details Note Do not install the CT over the neutral N grounded conductor B Install one CT over each incoming power line A B or C by pressing on the handle to open the split core then clipping it over the power line as shown below Press Here The CTs should be installed the secondary side of the main switch or main circuit breaker however if this is not possible such as in the case of a combination breaker panel then install on the primary side of the main breaker D Make sure the thumb squeeze split core CTs clamp tightly The CTs should be loose fitting arou
12. SSIINSNVML 2 1c 311 information Gitm com In com ROCK k kK CK Gk OK Ck k k Gk ck Gk kK ck x www I 1 800 561 8187 www theenergydetective com Copyright 2013 Energy Inc All rights reserved CY O A ROCK OK k OK Gk ck CK k k kK k Ck ck kK kK ck Appendix A 2 OOOENLA VL13d M E WVeSVIC SNIdIA CN XIGN4ddV NOILVdsdO Y3dOYd YOd dN LS ALIMOHLNV1V301 A8 GI INDIY SV SNV3IA 3dV1 NOLLVOISILN3GI 3SVHd ISN 0350 38 590100 1 3 34310 LVHL AVIN S3IH LNDOO 3INOS 13NH3H13 VIA 199 OL LD3NNOO IVMLFI3N ON SI 383H1 5 8 LINDY NO Q3sf 38 LONNVO NOISSIINSNVHI 21 S310N Hey JUM 31IHAA sng 017 SYM ML 7 4 w 318V2 H3AAQOd NLN NI VLI3O SV 135 38 NOLLVTIVISNI information Gitm com In os ROCK OK OK Gk ck k k k k k ck ck ck k k ck E www I L 1 800 561 8187 Rev 3 3 Page 22 ROCK OK CK OK k k k k k OK ck k k k ck Appendix A 3 Old 000 LIN 4 13 MO NI NOLLVTIVISNI 135 i
13. ck Copyright 2013 Energy Inc All rights reserved pase 2s OK k OK OK k k k GB K ck cB Appendix ROGOWSKI COIL OPTION Rogowski coils are flexible CT ropes that allow for connecting around multiple conductors or even around bus bars 1 The Rogowski MTU options available from TED have specially modified in puts to accommodate the output from the Rogowski Coils Care should be taken that standard CTs are not connected to Rogowski MTUS this could cause irreversible damage to the MTU 2 The MTUs are calibrated to the coils with which they are shipped Each coil is marked by phase and must be connected in the proper CT input A Black B RED C BLUE 3 Position arrow so it correctly shows flow of current 4 Verify the Rogowski checkbox on the MTU UI has been selected for proper readings 2000 coil is 24 5000 coil is 36 See the Energy Inc website for availability http www theenergydetective com 1 800 561 8187 www GEER com information itm com KK KKK KK KKK GB GB Gk GB GR Gk KK Gk KK GB GB GR Gk KK GB KK GB Rev 3 3 Page 26 OK k k OK GB Appendix MTU Firmware Update Instructions Only perform updates when required or a particular new feature i
14. d Three 3 CT Harnesses Unpacking Unpack TED and ensure that all parts are included in the package A One 1 Measuring Transmitting Unit MTU Pro B One 1 ECC Energy Control Center C Power Cables for MTU Pro and ECC Ethernet Cable Low voltage power adapter if optional wireless Display included D Three 3 Model QX400CT Current Transformers CT s E Three 3 CT Black loop Adapter Harnesses in A 1 800 561 8187 www GEER com information itm com F Installation Manual Please Read Carefully ook KOK k k OK k OK ck bk ok ck ck k ck OK ok ck k ok ck ck ok OK ck ok OK ck ok OK ck ck OK ck Ok OK ch ck ck Copyright 2013 Energy Inc All rights reserved www theenergydetective com TED OK k OK OK k k k GB ck PART II SAFETY THE MTU AND CTs OF THE TED Pro SYSTEM MUST BE INSTALLED BY A LICENSED ELECTRICIAN This manual provides the steps necessary to safely install the MTU and Current Transformers CTs For detailed installation and operation of other components and software please find it on the TED website www theenergydetective com Every effort has been made in providing for the safe secure installation of TED The installation of TED requires the cover of the main electrical circuit breaker panel to be removed After the circuit breaker panel cover ha
15. d to use multiple MTUs f your main service circuit conductors wires are larger than 1 25 inch diameter see Appendix B Rogowski Coil options Other TED models and accessories may be available for these applications Please see 1 800 561 8187 www i information itm com k OK OK Gk ck k k k ck ck ck kt OOK ck Copyright 2013 Energy Inc All rights reserved www theenergydetective com TED OK k OK OK k k GB ck TED MTU 3 PHASE OPERATION 3 Phase Services TED is designed to work on most 3 phase 50 60HZ electrical services worldwide TED will work on 3PH 4W Wye 3 PH 3W Delta 1 or 3PH 4W Hi Leg Delta services anywhere where the line line nominal voltage is between 200VAC and 600VAC For specific connection drawings for each type of service see Appendix Common 3 Phase Electrical Services around the world include 200V 3PH 3W Delta Japan 208Y 120V 3PH 4W Wye North America 240V 3PH 3W Delta North America 240 120 3PH 4W Hi Leg Delta North America 380Y 220V 3PH 4W Wye or 380V 3PH 3W Delta Asia 400Y 230V3PH 4W Wye 380V 3PH 3W Delta Europe 415Y 240V 3PH 4W Wye or 380V 3PH 3W Delta UK Australia NZ India 480Y 277V 3PH 4W Wye or 480V 3 PH 3W Delta North America 600 347V 3PH 4W Wye 600V 3PH 3W Delta Canada t
16. diction in the installation location it is generally acceptable If a 3 pole circuit breaker is not available then use an approved handle tie to create one If the circuit breakers the panel being monitored are greater than 30 amps an in line 15 or 20A fuse should be added to each power cable connection Pre made cables with in line fuses are available in our Accessory Store http www theenergydetective com tedprostore html Please refer to NEC CEC and your local electrical code An alternate method would be to run a 3 phase power circuit from a 15 or 20A circuit breaker in a nearby panel to a junction box or terminal block near the panel being monitored and make all MTU power connections there The circuit must be from the same source as the load being measured by the MTU IE it must be from the same service and at the same voltage without any transformers between E If there is no spare circuit breaker the black red blue wires can be attached to any 15 20 or 30 Amp 3 pole circuit breaker in the panel provided that the circuit breaker is approved for 2 conduc tors and this is acceptable to the authority having jurisdiction in the installation location it is generally acceptable If a 3 pole circuit breaker is not available then use an approved handle tie to create one F Do not connect the Power Cable to the MTU until you have the CTs connected NOTE 1 The black red and blue wires will normally connect to
17. ect to the following two conditions TESTED TO COMPLY WITH FC FCC STANDARDS 1 This device may not cause harmful interference F FCC Part 15 SubPart B EU EN 61326 1 and 2 This device must accept any interference received m Bem 1 800 561 8187 wow FUT information itm com k OK k k k ck Rev 3 3 Page 8 OK OK k OK CR k OK GB PART III INSTALLATION BEFORE YOU START Do not begin installation until you have read the Safety section of this manual e Read all instructions before beginning installation Estimated Installation Time Professional Installer 30 minutes Equipment Needed Flathead screwdriver small and large Phillips screwdriver small and large Flashlight QUALIFIED ELECTRICIANS OR PROFESSIONAL INSTALLERS FAMILIAR WITH ALL ASPECTS OF ELECTRICAL WIRING AND THEORY MAY USE THE FOLLOWING INSTRUCTIONS FOR INSTALLATION OF TED Pro MTU TED will work on single phase services however TED Pro Residential will prove to be a smaller and more cost effective solution For services where there are two or more main circuit breaker panels you will need one additional MTU for each main circuit breaker or panel For services with Wind Solar or Standby Generator an additional MTU will be required to mea
18. ermine where the MTU will be mounted Communication Options MTU Pro mounted INSIDE Panel ECC PLC Power Line Carrier MTU Pro mounted OUTSIDE Panel ECC Ethernet directly to ECC MTU Pro mounted OUTSIDE Panel to Hub to 0 PLC Power Line Communication only be used if all of following conditions met ECC The ECC 15 not separated from the MTU by a transformer The panel where the MTU 15 being installed has a neutral and the ECC can be plugged into an outlet that shares one of the phase connections and neutral IE it is a 208 120V Wye system 480 277V Wye system 240 120V Hi Leg Delta System There is not an excessive amount of noise on the powerline usually caused by electronic equipment dimmers inverters variable speed drives fluorescent lighting with noisy ballasts etc NOTE 1 PLC installations can be made inside the panel but it is recommended that all MTU instal lations be made outside of the panel for ease of performing future firmware updates ease of access without the need for an electrician or access to directly connect an MTU to a computer should raw data be desired NOTE 2 PLC connections using 277VAC to Neutral may require modifying ECC power cord with I 7 20 277 AC nino and recentacle Pleace review vonr electrical eode reaniremente 1 800 561 8187 www GEER com information itm com ROCK Ck OK OK Gk ck k k k
19. fy with order Single Phase Services TED Pro is to work on 3 Phase services however it is to it for Be rm m 1 800 561 8187 information itm com k k k ck Rev 3 3 Page 6 OK OK k OK k OK GB Pro can be configured to work any single phase service where the line line nominal voltage or to neutral nominal voltage is between 200VAC and 277VAC For specific connection drawings for each type of service see the Appendix Common 1 Phase Electrical Services around the world include e 208Y 120V 1PH 3W Single Phase service derived from 3 Phase system North America e 240 120V 1PH 3W North America e 230V 1PH 2W Europe and most other countries in the world TED Pro MTU Pro will not work on 120V 1PH 2W services SYSTEM COMPONENTS TED Pro Energy Monitoring System includes One 1 MTU3000 Measuring Transmitting Unit MTU Pro One 1 ECC with Footprints firmware embedded One 1 wired or wireless Display if purchase included Display Associated cables power supplies installation brochure TED Pro 400A Three 3 400A Current Transformers CTs TED Pro 800A Six 6 400A Current Transformers and Three 3 CT Harnesses TED Pro 1200A Nine 9 400A Current Transformers an
20. h sheet metal or machine screws iii If installed outside the panel it may be mounted directly to the wall using the mounting lugs on the MTU or it may be mounted in a suitably sized junction box H Arrange and tie wrap all wiring in a neat and tidy manner Turn the power back on Do not close the electrical panel until you have completed the installation of the ECC and verified that correct data is being received from the MTU Close the Electrical Panel only after you have confirmed the correct operation Step 5 ETHERNET WIRING Neatly run a CAT V cable from the MTU to the customer s router or network location Be sure to use plenum rated cables where required Neatly route protect and secure the cable Make the connections and plug into MTU and Router or Network Drop Check that the LEDs on the Ethernet jack indicate activity 1 800 561 8187 www GEER com information itm com KK KKK KKK KK KKK KKK KKK GR Gk KK Gk k Gk GB k KK Rev 3 3 Page 16 OK k OK k GB OK OK GB Step 6 TESTING AND CONFIGURING THE SYSTEM It is extremely important that the installing electrician verify correct operation prior to leaving the site TESTING DEFAULT CONFIGURATION The following instructions are for the most common type of installation and assumes no configuration is required See CONFIGURATION OPTIONS in nex
21. itm com k OK OK k k k K ck ck k ck Rev 3 3 Page 10 ook OK ok ock ck ock ok OK ok ok ok ok ok ok ok OK ok ok Ok ok ck ok ok ok ck ok ok k Incoming Power Lines MAX 600V MAX 1200A m Main Circuit Breaker y Phase A MAX 1200A T Wz u A Phase C PT L Phase B Neutral Ethernet cable aw to Router S 1 ee vem E Sd SA Ethernet MASS Cable ees ELECTRICAL gr c Connectors Ethernet TE Port Z 7 Neutral ee Bus gt Approved Cable Connector or Bushing White neutral Power Blue phase C Connector Black phase A MTU Measuring Transmitting Unit Red phase B 15 20 or 30A Circuit Breaker Figure 3 b Installation of MTU communication via Ethernet information itm com Ei pen Im com 1 800 561 8187 www k ck OK OK k k k k k k CK ck ck CK OOK ck ck www theenergydetective com Copyright 2013 Energy Inc All rights reserved OK k k k k k k GB ck Installation Detail STEP 1 Determine communication method to be used between MTU and ECC PLC Communica tion over existing power lines or TCP Ethernet and det
22. nd the wires E The CT inputs on the MTU Pro are left to right Phase A Phase B Phase C and must be matched to the corresponding conductors for proper readings Important if phasing is not cor rect the device will not measure current power and energy correctly See Appendix A for High Leg Delta exception F Parallel Conductors and Large Services 1 800 561 8187 www GEER com information itm com Gk k OK k k ck OK Copyright 2013 Energy Inc All rights reserved www theenergydetective com TED rs OK k OK OK CR k k GB NOTE All connectors polarized and can only be inserted way do not force NOTE Ifinstalled on a 208Y 120V 1 PH 3 W system only install two of the CTs and connect to the two applicable ports on the MTU The third CT is not used NOTE The TED Pro MTU is available in kits for 400A 800A for 2 parallel conductors 1200A for 3 parallel conductors and Rogowski Coil kits for 2000A and 5000A Services NOTE Appendix B for Rogowski Coil instructions G Determine the best location to mount the MTU i Choose location where it will not interfere with existing equipment or wiring If installed in the panel the MTU may be attached using double sided tape if allowed in your jurisdiction or wit
23. nd viewing this short video found on our website http www theenergydetective com proct to be sure you understand the connections Incorrect Ridge Correct Ridge Tab Correct Tab Note that the CT cable connector has a small tab on the end This tab should ALWAYS slide under the ridge shaped lock to hold the connection in place Looking from above the black wire is on the left If the connection is not made this way the data will be incorrect The MTU CT will have a lock connector also so be sure the tab is securely connected underneath Removable Black Loop Jumper CT Ada pte r Harness e o 1 800 561 8187 www GEER com information itm com k OK k k k k ck Rev 3 3 Page 14 k OK OK OK OK OK OK OOK For 800A systems you should have three CT adapter harnesses Each harness will have small black loop jumper connected to one of the connectors For 800A system you will have 6 CTs Two for phase A two for phase B and 2 for Connect 2 CTs to each harness Be sure the tab goes under the locking ridge as shown in the Correct image above After connecting your CTs to the Harness plug the end of the harness into the correct Phase slot in your MTU either A B or C
24. nnect the Ethernet cable from ECC to Local Area Network or router If using TCP POST Communication connect the MTU Ethernet port to Local Area Network or router C Go to the TED website Download the ECC User s Manual http www theenergydetective com downloads ECCUsermanual pdf D Download and RUN the TED Installation Utility http www theenergydetective com downloads documents The Utility will scan the local network for TED devices Installation Utility ther ieee LS ca ep ern Farg IE ier eee prar H mag cee 5 Appr hk s eer eee pe Kum eee unnm eee Lever m Address MAC Address 187 1450 1 25 00 25 21 40 33 152 188 1 1234 00 25 H ee B Ph 155 1 1347 B5 24 M 13 05 TB E When TED6000 is found in the window select it and click LAUNCH IN BROWSER to open the Footprints Dashboard F Follow the instructions in the ECC User s Manual for entering settings in System Settings Wizard Once on the Product Identification Tab carefully ENTER MTU IDs If using TCP Post Ethernet communication from MTU to ECC select TCP checkbox and 1 800 561 8187 www GEER information itm com k OK k k ck Rev 3 3 Page 18 Gk OK k OK
25. nnections Page 12 Current 5 Page 13 Testing the Page 16 Configuration 5 Page 17 Appendix Appendix A Wiring Diagrams Page 20 Appendix B Rogowski Coils Page 24 Appendix C Firmware Update Page 26 1 800 561 8187 www MU IM com information itm com k OK k k k k ck Rev 3 3 Page 4 OK CK k k k k ck k k ck PART INTRODUCTION SAFE OPERATING RANGE AND CONDITIONS E EM S Use x Indoor x Indoor Outdoor Condition Dry x Dry Damp Temperature 10 40 C 40 to 50C Relative Humidity 80 i lt 95 Altitude 3 300 3 300M Voltage 95 277 200 600 VAC Maximum Power 5W u 4 5W Current Transformer Inputs 1200 A PLC Link amp RxTx LEDs Power 200 600VAC Reset Spyder Port In 3 Phase Ethernet Limitations Please note the following limitations f you have a Single Phase service TED Pro will work Use TED Pro Home in most cases for a less costly solution f your main circuit breaker or fuse panel is larger than 1200 Amps see Appendix B Rogowski Coil options f you have more than one main circuit breaker or switch you will nee
26. rowser Address Follow ECC User Guide Instructions for System Setup On Product ID tab carefully enter MTU ID and check TCP checkbox Enter 192 168 7 3 as MTU IP Address and save settings NOTE If Installation has multiple MTUs each MTU will be require a unique IP address be set in the MTU network settings i e 192 168 7 5 192 168 7 6 etc Label any device that has been assigned a new IP F Ifthe IP address is lost on the MTU or ECC holding the reset button for 20 seconds will return the device to factory default IP address and clear settings 1 800 561 8187 www GEER com information itm com k OK k k k k ck Rev 3 3 Page 20 ROCK kK CK OK k k Ck k OK Gk ck kt k kK ck Appendix 1 OOOENLW JAM M Y Hd INVHOVIC XIGNAddV dNl3s NI 3dAL NOLLVTIVISNI 135 01 A8 SV SNV3IA NOILVOISILN3SGI 3SVHd 351 0356 38 590105 3MIAA LN3333JIQ LVHL SSINLNNOD 3SVHd 3IAVS JHL NC LON 34V f LIN NO 34IM 92 v718 41 a3avuoac A13483A3S 38 TIIM NOISSIINSNVML 21d 3NTE NMOG 3NNILNOD 3SVHd M9 OL SHIN JAOW LINDYID V 3SVHd OL 193NNOC V 3SVHd NO SI M9 JHL OL NOI
27. s been removed the potential hazard of shock burn or even electrocution now exists Do not attempt to complete this installation unless you are a licensed electrician familiar with the electrical components and operation of the circuit breaker panel Even when the main circuit breaker has been turned to the OFF position certain areas within the circuit breaker panel may still be electrified Do not attempt installation unless you know where these electrified areas are This symbol will be found throughout B ANGER the instructions where there is a po x i tential for electric shock burn or even ELECTRICAL electrocution Do not attempt to com HAZARD a plete the noted section if you are not u an electrician or qualified installer WARNING These servicing instructions are for use by qualified personnel only To reduce the risk of electric shock DO NOT perform any servicing other than that contained in these operational instruc tions unless you are qualified to do so WARNING The MTU must be connected to a switch or circuit breaker in close proximity to the equip ment and within easy reach of the operator It must be marked as the disconnecting device for the MTU WARNING If the equipment is used in a manner not specified in these instructions the protection provided by the equipment may be impaired ENERGY Inc TED3000 TED Pro This device complies with part 15 of the FCC Rules Operation is subj
28. s needed MTU and ECC files must be compatible Consult TED website or support with any questions before updating MTU Pro updates are performed through the MTU Ethernet port Caution Some firmware updates will reset settings including network configuration If network settings are reset to defaults the network configuration will be DHCP default IP will return to 192 168 7 3 Procedure 1 MTU firmware and User Interface files will be in the format MTU3K_date_revision bin and MTU3000UI date revision bin Save files to a convenient location on computer From the MTU UI page select Update Firmware Browse to the MTU3K firmware file select and click Upload Firmware WAIT 2 MINUTES after file is uploaded while firmware is written to memory before proceeding Select Update Firmware and repeat upload for the MTU3000UI file W O 1 800 561 8187 www GEER com information itm com Gk k OK k k ck OK Copyright 2013 Energy Inc All rights reserved www theenergydetective com Gk k k OK OK k k ck Notes 1 800 561 8187 www GEER com information itm com ROCK Ck OK OK Gk ck k k k OK ck k k ck Rev 3 3 ENERGY Inc
29. sure GENERATION and NET All wiring in the United States must be installed in accordance with the latest adopted edition of the Na tional Electrical Code ANSI NFPA 70 NEC and state or local requirements All wiring in Canada must be installed in accordance with the latest adopted edition of the Canadian Electrical Code CSA C22 2 CEC Part and any provincial or local requirements Wiring in other countries and jurisdictions should be done in accordance with the rules and regulations in effect for the installing location Contact your local power authority or local regulator for more information 1 800 561 8187 www GEER com information itm com Gk k OK k k ck OK Copyright 2013 Energy Inc All rights reserved www theenergydetective com ROCK OK CK CK kK ck k k Gk k Ck Ck k k ck Incoming Power Lines MAX 600V Main Circuit Breaker MAX 1200A MAX 1200A CT s Phase A Phase C Phase B Neutral En DANGER QU A Neutral QI umaq f au C White neutral Measuring Transmitting Unit Blue phase C Black phase A Red phase B 15 20 or 30A Circuit Breaker Figure 3 a Installation of MTU communication via Power Line Carrier 1 800 561 8187 www GEER com information
30. t section to make changes where required then return to this section to verify operation Default configuration is as follows PLC Communication is to be used ECC Settings are pre configured with MTU IDs ECC will be accessed on the LAN Local Area Network or through a router Phase connection type is 3 Phase 4 wire Wye 1 VERIFY PLC COMMUNICATION Power Line Carrier Once the ECC has been configured with the MTU ID s PLC Communication can be verified Plug the ECC into an outlet on the same phase as the black wire of MTU power cable The left LED on both the MTU and the ECC will become solid GREEN once the PLC LINK has been established LINK time could be 3 to 5 min utes ECC Link Light MTU Link Light 2 ACCESS ECC FOOTPRINTS DASHBOARD from LAN or router A Connect the Ethernet Cable from ECC to LAN drop or router B Goto TED website to download and RUN the TED Installation Utility http www theenergydetective com downloads documents C The Utility will scan the network for TED devices Once TED6000 is displayed in the win dow select it and click LAUNCH IN BROWSER Installation Utility lal Oti tere hing fer TED 2H o mag Dae mulus dcs a appear ce at Once mue device leges plage vacet Hee pretu ne of rati Devica Name Adiress MAC Addrass 192 EB 14 95 00 25 2f 21 49 53 j 1 800 561 8187 w
31. ww EU i com information itm com k OK k k k k k ck Copyright 2013 Energy Inc All rights reserved www theenergydetective com TED sen OK k OK OK k k k k GB 3 VERIFY DASHBOARD READINGS A System Overview in upper right corner of Dashboard will display i Real time KW Voltage Power Factor Current Virtual LED blinks Green Good Yellow Fair or RED Poor to indicate PLC reception quality If reception is poor ECC may not be on same phase as black wire from MTU Power Cable B Under HELP select TED Pro Statistics Page Verify i MTU REC Packets Received is increasing If not a Verify MTU ID is correct in Table b Monitor Last MTU ID near bottom of page This will show MTU IDs that have been detected by the ECC It will update once per minute ii Active Power is a positive number Unless the MTU is monitoring Generation a negative number would indicate a The CTs are connected with the wrong polarity OR b CTs and Power Cable connections are not matched with the same phase connections SYSTEM CONFIGURATION OPTIONS 1 ECC ON LOCAL NETWORK router The following instructions are for configuring the ECC settings on a Local Area Network If ECC is not to be connected to Network see section III A Co

Download Pdf Manuals

image

Related Search

Related Contents

Manual, PMX09  Samsung RT38DASW دليل المستخدم  manual de usuario plataforma virtual    Sony MDS-JE530 User's Manual  900 manual.indd  Pfister F-048-CB0Y Installation Guide  

Copyright © All rights reserved.
DMCA: DMCA_mwitty#outlook.com.