BDS-256 Commissioning Procedure and Acceptance Test for the
Contents
1. TEST CURRENT CALIBRATION EE E EET E E E EE E E R 7 4 DISCHARGE CURRENT CALIBRATION eseseerererercrertrtrtrtrtrtrtrtrtr tetett trte etete r rtr rtr r r r r r rer r rer r rererere TS INTERTIER VOLT CALIBRATION vertit a E EE E E E EE E E A t 7 6 TEMPERATURE CALIBRATION n a n e A a 7 7 SEND CALIBRATION TO THE DCM arice n reei 1 Introduction This manual describes how to check the integrity of the BDS 256 installation and functionality of the BDS 256 monitor This procedure is only a guideline and is not a standalone procedure Because of this only properly trained personnel should perform the operations described in this manual WARNING High voltage or current may be present in the equipment Only qualified personnel should perform the operations described in this manual Refer to the Battery Monitor Data Manager Software User s Guide for installing and setting up the software on system computers Before continuing verify the power switch is in the off position 2 Verifying Connections Thoroughly check all power and harnessing sense leads connections before applying power to the units There are AC and DC power connections to the DCMs External Load Modules and BDS Controller Refer to the BDS 256 installation manual and site drawings when performing this step Verify all other connections are properly terminated according to the installation
2. 5 6 Figure 2 Switch Bank 1 Settings 4 BDS Controller Configuration The BDS Controller has a DIP switch on the rear panel that allows the Controller to be used with up to two Alb rcorp Serial Port Multiplexers The DIP switch settings are as follows DIP Switch Number 1 2 3 4 5 6 7 8 Telco Port Line ON ON OFF OFF X X X X Telco Port Fiber Optic to Serial Port Multiplexer OFF OFF ON ON x x x x Rear Local Port RS 232 x X X X ON ON OFF OFF Rear Local Port Fiber Optic to Serial Port Multiplexer x x x x OFF OFF ON ON Figure 3 Configuration DIP Switch Settings 5 Initial On Site Set Up This section describes the initial on site setup of the BDS 256 system Refer to the Battery Monitor Data Manager Software User s Manual for the required setup procedures WARNING Do not perform this procedure using Battery Monitor Data Manager Software version 3 01 or earlier Contact Alb rcorp to obtain a copy of the latest software release 1 Oot o Oy 10 11 12 13 14 15 After confirming all connections are terminated correctly power on the BDS Controller Verify the DCM front panel Status lights blink about once a second After the Controller completes the boot sequence the Controller Status light stays lit Start the Battery Monitor Data Manager software on the computer PC you will use to set up the system and set up the database information t
3. 1 In the Cell Measurement Point field select the cell number you wish to measure This cell must be connected to the DCM you are calibrating 2 Measure this cell with the DVM Click the Measured Value field type the DVM reading and press Enter NOTE Verify the Actual Reading column displays the following raw counts 2000 counts 200 for 2V cells and 4V modules on float 3650 counts 400 for 6V 8V and 12V modules on float 7 2 Overall Voltage Calibration Perform overall voltage calibration on DCM 1 1 Click the Overall Voltage Measured Value field 2 Measure the overall battery voltage with the DVM Type the DVM reading and press Enter NOTE Verify the Actual reading column displays the following 2650 counts 200 for 540 volts 2060 counts 200 for 420 volts 7 3 Test Current Calibration Calibrate one test current for each DCM Refer to the system information to determine the load step numbers controlled by the DCM you wish to calibrate WARNING Do not perform test current calibration until test current cable connections have been verified Approximately 30 amps flows through the test current cables and measurement shunt when the load step is activated Do not connect or disconnect cables during load step activation Allow a ten second cool down period between multiple load step activation 1 Connect 100amp 100mV shunt in series with the load cable corresponding to the load step to be calibrated 2 Connect
4. The current temperature and intertier measurements are optional If these optional inputs are not configured disregard the sections of the procedure relating to them WARNING High voltages exist inside the system components and on the CS 2000 terminals Calibration must be performed only by technically qualified persons Observe electrical safety precautions when removing and installing equipment covers and when connecting leads and making adjustments 6 1 Equipment Required The following equipment is required for checking calibration e Calibrated 4 1 2 digit voltmeter DVM e Oto 200 millivolt source Alb rcorp CS 2000 or equivalent e 100 amp 100 millivolt shunt 0 1 tolerance or equivalent measuring device e Temperature probe Fluke 80T IR or equivalent 6 2 Cell Voltage Using the DVM measure the voltage on three cells per DCM Verify the readings match the readings on BDS 256 on the Current Cell Values screen within 0 2 of reading 2mV for 2 volt cells 25mV for12 volt modules Record the values in the appropriate columns on the BDS 256 Acceptance Report 6 3 Overall Voltage Using the DVM measure the Overall Voltage and verify it matches the readings on the BDS 256 on the Cell Voltages screen within 0 1 of reading 0 5 volts at 540 volts Record the values 6 4 Discharge Current Measuring Using a Shunt If the discharge current is measured by a shunt remove the leads connected to the shu
5. procedure Visually inspect each cell sense lead and load cable termination Terminations must be connected securely and connections physically made to the batteries must be coated with a no oxide grease After checking all connections install the 20 amp slow blow fuses into the load cable fuse holders Using a voltmeter measure the DC voltage of every load cable to verify connection and numbering of cables 3 Assigning DCM Addresses If more than one DCM is connected via the fiber optic bus each unit must have a unique address This is accomplished by setting Switch Bank 1 on the processor board This is normally done at the factory If you need to change DCM addressing turn off the power remove the top cover and set Switch Bank 1 On newer DCMs the switch is accessible through one of the two slots in the top cover Refer to the following figures for setting this switch C closed or on O open or off WARNING If changing Switch Bank 1 through the slot in the cover be sure to use the slot closer to the unit edge WARNING If the sense leads are connected to the DCM high voltage may be present inside the unit String DIP SW7 DIP SW6 DIP SW5 1 2 3 4 5 6 7 O O 8 Figure 1 Switch Bank 1 Settings DCM DIP SW4 DIP SW3 DIP SW2 DIP SW1 1 2 3 4
6. the sense points of the shunt to the DVM In the Test Current Measurement Point field select the load step to calibrate 4 NOTE Perform the following within ten seconds of clicking in the Test Current Measured Value field Click the Test Current Measured Value field to activate the selected load step Type the DVM reading in millivolts and press Enter NOTE For a value of 30 amps the Actual Reading column displays 1950 counts 200 5 After ten seconds the test stops Confirm the test has stopped by verifying the DVM indicates zero After the test remove the shunt and reconnect the leads 7 4 Discharge Current Calibration Calibrate the discharge current on the DCM connected to the current sensor 1 Disconnect the discharge current sense leads from the current sensor Refer to Alb rcorp drawing BDS 135 A396 Rev E 2 Connect the millivolt source output to the discharge current sense leads I and I Gnd Connect the DVM to the millivolt source output Adjust the millivolt source until the DVM reads 100mV 4 Click the Discharge Current Measured Value field type the DVM reading and press Enter NOTE For 100mV the Actual Reading column displays 860 counts 100 5 Reconnect the leads after the test 7 5 Intertier Volt Calibration Calibrate one intertier for each DCM that has one or more assigned intertiers 1 2 6 Disconnect the intertier sense leads from the intertier Connect the millivolt source output to th
7. BDS 256 Commissioning Procedure and Acceptance Test for the DCM 480 System 990 South Rogers Circle Suite 11 oca Raton FL 33487 Tel 561 997 2299 Fax 561 997 5588 m Safety Information e Except as explained in this manual do not attempt to service Alb rcorp equipment yourself Opening the equipment may expose you to dangerous voltages Refer servicing beyond that described in this manual to authorized personnel e Do not allow liquids or moisture to get into the equipment If liquid does get into the equipment unplug it immediately and contact your nearest authorized service center or Alb rcorp directly e Ensure equipment is provided adequate ventilation Do not block equipment ventilation openings e Do not exceed equipment voltage or power ratings and capabilities e Make sure that equipment is properly grounded e Do not let unauthorized persons operate the equipment Alb rcorp 990 South Rogers Circle Suite 11 Boca Raton FL 33487 Information in this document is subject to change without notice BDS 256 Commissioning Procedure and Acceptance Test for the DCM 480 System Book Revision 2 2 P N 4200 009 2000 2001 Alb rcorp 990 South Rogers Circle Suite 11 Boca Raton FL 33487 This manual may not be copied in whole or in part without express written permission from Alb rcorp Printed in the United States of America Table of Contents 1 INTRODUCTION fessssssssssscvssevessssessscsesendecsssenioniessscossuv
8. G High voltages exist inside the system components and on the CS 2000 terminals Calibration must be performed only by technically qualified persons Observe electrical safety precautions when removing and installing equipment covers and when connecting leads and making adjustments To access the calibration screens select SetuplCalibration from the String View screen You must type the correct password to make changes to the calibration The default password is alber The Calibration screen displays the following DCM This is in the top center of the screen It indicates which DCM will be calibrated Use the arrow buttons to select the DCM to be calibrated Measurement Point Column Allows the selection of specific input channels when calibrating Measured Value Column This is where the measured value is typed when calibrating Actual Reading Column This is the input value of the selected channel before the calibration factor is applied Calibration Factor Column The constant used by the software to display a value on the screen Equipment Required The following equipment is required for calibration e Calibrated 4 1 2 digit voltmeter DVM e Oto 200 millivolt source Alb rcorp CS 2000 or equivalent e 100 amp 100 millivolt shunt 0 1 tolerance or equivalent measuring device e Temperature probe Fluke 80T IR or equivalent 7 1 Cell Voltage Calibration Calibrate the cell voltage for all DCMs in the system
9. e intertier sense leads Connect the DVM to the millivolt source output Adjust the millivolt source output for a DVM reading of 10mV Click the Intertier Volts Measurement Point field and select the cell number of the intertier to be calibrated Click the Intertier Volts Measured Value field type the DVM reading and press Enter NOTE For 10mV the Actual Reading Column displays 95 counts 10 Reconnect the leads after the test 7 6 Temperature Calibration Calibrate the temperature for every temperature sensor 1 With the temperature probe Fluke 80T IR or equivalent measure the temperature of the temperature sensor connected as Temperature 1 of the DCM being calibrated Click the Temperature 1 Measured Value field type the reading from the temperature probe and press Enter NOTE For 77 F the Actual Reading displays 1100 counts 300 If there is a second temperature sensor connected to the DCM with the temperature probe measure the temperature of the temperature sensor connected as Temperature 2 of the DCM being calibrated Click the Temperature 2 Measured Value field type the reading from the temperature probe and press Enter NOTE For 77 F the Actual Reading displays 1100 counts 300 7 7 Send Calibration to the DCM Send calibration to each DCM 1 After all the parameters are calibrated click the Send button to transfer the calibration factors to the DCM memory After calibration has been sent cl
10. ed DCMs and the Tx and Rx LEDs on the Controller and DCMs flash To exit the Battery Setup window click Close To disconnect from the string click File then Exit NOTE If possible it is strongly recommended that you complete the commissioning procedure and acceptance test for each string before sending battery information for the next string to the Controller Select the string of the Controller you just set up and connect by clicking the Connection button 16 When the message This string needs to be set up appears click OK NOTE If the string was set up using a Central computer the string names are already set up and the message does not appear In this case click SetuplCheck Settings to open the Check Settings window 17 To upload the factory calibration constants from the DCMs click Upload 18 Click the Calibration tab and verify the calibration constants transferred to the database 19 Complete the commissioning procedure and acceptance test for this string 20 Repeat steps 9 to 19 for all remaining strings that will be assigned to the Controller 6 Checking System Calibration This section describes the tests that confirm BDS 256 calibration Although the system was factory calibrated you must verify the calibration of the system If any parameters are not correct recalibrate the parameters according to Section 7 As you check each parameter complete the section in the Acceptance Report at the end of this document
11. enscsdescesenbsssesseiessodectasessestesssidvcteossdbecedsbecesesestecsessssossveessoe 2 VERIFYING CONNECTIONS nssccsisssrsesissessrisisssssoscessosissosesssesssos esso iseeescsis ssiri os veo osis ste sas 3 ASSIGNING DCM ADDRESSES vissiscsscocssssssessssecsesoccbinsossossnbonsessesedievouscedsvessossbbcbivecesossuvesdcodesce scossooseuiecsosess 4 BDS CONTROLLER CONFIGURATION ssscccsssssccssssccssssccccssssccssssccccssscccesscsccsensccccsseccsessseccessaseecesss 5 INITIAL ON SITE SET 6 CHECKING SYSTEM CALIBRATION sccssssssccssssccsssscccsssscccssscccccssccccsssscccessncecscsssescssacescssseccscsseceeses 64 SEQUIPMENT REQUIRED D L EEE EEE E EE A E AEE D i A AAO BINE E E AE E E E ER 6 3 OVERALT VOLTAGE e E ae aa t eo oki 6 4 DISCHARGE CURRENT alate e e be can bess pos ee E a aE eee a e a a e di 6 5 DEMPERATUR E r E a te 6 6 RESISTANCE TEST CURRENT e a seu a e a E e e NEN ESS 6 7 INTERTIER VOL TAGE E E E E EE E A A E E E 7 BDS 256 CALIBRATION PROCEDURE eseesseeessecssoseessececssecesssecssoceessooecsseceessecsscseessoceesseceessecessseessoceesseceees TAs VOLTAGE CALIBRATION 7 2 OVERALL MOLTAGE CALIBRATION E R E A a A
12. er Cell Voltage DCM 1 DCM 2 DCM 3 DCM 4 DCM 5 DCM 6 BDS 256 Value must be within 0 2 of Actual Value 4200 009 Acceptance Report Page 2 of 3 BDS 256 Acceptance Report Parameter Actual Value BDS 256 Value Pass Fail Intertier 1 Intertier 2 Intertier 3 Intertier 4 Intertier 5 Intertier 6 Intertier 7 Intertier 8 Intertier 9 Intertier 10 Intertier 11 Intertier 12 Intertier 13 Intertier 14 Intertier 15 BDS 256 Value must be within 0 1 mV of Actual Value 4200 009 Acceptance Report Page 3 of 3
13. ick the right arrow button on the top center of the screen to begin calibration of the next DCM BDS 256 Acceptance Report Customer Name Customer Contact Location Name Location Contact Battery Name String Name Installation Date System Installed By BDS Controller Serial Number BDS Controller Firmware Version DCM Firmware Version BMDM Software Version Commissioning Agent Date of Commissioning Acceptance Report Received By Of Company Name Parameter Actual Value BDS 256 Value Pass Fail Overall String Voltage BDS 256 Value must be within 0 1 of Actual Value Parameter Actual Value BDS 256 Value Pass Fail Discharge Current BDS 256 Value must be within 0 1 of Actual Value For example 1amp for a 1000 amp sensor Parameter Actual Value BDS 256 Value Pass Fail Temp Temp 2 Temp 3 Temp 4 Temp 5 Temp 6 Temp 7 Temp 8 Temp 9 Temp 10 BDS 256 Value must be within 1 F of Actual Value 4200 009 Acceptance Report Page 1 of 3 BDS 256 Acceptance Report Parameter Actual Value BDS 256 Value Pass Fail Test Current DCM 1 DCM 2 DCM 3 DCM 4 DCM 5 DCM 6 BDS 256 Value must be within 0 2 amps of Actual Value Parameter Cell Actual Value BDS 256 Value Pass Fail Numb
14. nt used for measuring discharge current and connect them to the 100mv source Adjust the source to 100mV and verify the displayed value is within 0 1 1 amp For example if the shunt rating is 1000 100 the reading on the BDS 256 should be 1000 amps Record the values After this test reconnect the leads to the shunt Measuring Using a Current Transducer If the discharge current is measured by a Hall Effect current transducer verify supply voltages at the connector before connecting to the current transducer Do not connect the transducer at this time WARNING The current transducer can be permanently damaged if the supply voltage connections are incorrect Refer to drawing BDS 135 A396 Rev E in the BDS 256 Installation Procedure Connect millivolt source to the I and I Gnd connector pins of the current transducer harness Adjust the source to 100mV and verify the displayed value is within 0 1 1 amp For example if the transducer rating is 1000 100 the reading on the BDS 256 should be 1000 amps Record the values After this test remove the millivolt source and connect the harness to the current transducer 6 5 Temperature Using the temperature probe measure the temperature of the appropriate temperature sensor and verify the BDS 256 is displaying the temperature within 1 degree Record the values 6 6 Resistance Test Current WARNING Overheating can occur if the load modules are exercised excessively Although
15. o match the strings the DCMs are connected to Choose the following to connect a Ifno Local computer will be on site connect the PC to the front Local port of the BDS Controller Verify the Port Select switch is set to Front Port b Ifa Local computer will be permanently installed connect the PC to the rear Local port of the BDS Controller Verify the Port Select switch is set to Rear Port Ifusing a LAN connection refer to the External Network Interface User s Guide to connect to the BDS Controller Select the string to set up and click the Connection button on the menu bar The message This string needs to be set up appears Click OK Click Close when the Check Settings screen appears Click DiagnosticsIDCM Comm Error Type the default password alber then click OK Click the Check DCM Address button The DCM Status lights flash the following sequence Two quick flashes flashes that indicate the string number flashes that indicate the DCM number then two quick flashes If this does not occur check the fiber optic cable connections and routing Verify all DCMs are addressed correctly Close the Diagnostics screen On the menu click SetupI Battery On the General tab click Set BDS Default Values then click Yes to continue Click the Parameters tab Enter any optional parameter information verify the parameter settings for each DCM in the string then click Send The BDS Controller attempts to communicate to the assign
16. they time out and turn off automatically there is no limit on how many times they can be turned on Allow the load modules to cool ten seconds between each test Perform this test for one load step per DCM Refer to the system information to determine the load step numbers controlled by the DCM you wish to calibrate For the first DCM connect the 100 amp 100 millivolt shunt in series with load cable 1 of the DCM External Load Module Connect a DVM across the shunt Open the Load Module Diagnostics and energize the first load module of the first DCM Verify the current displayed is within 0 2 amp of the DVM reading Determine which load steps are assigned to the next DCM and connect the shunt in series with the load cable used for the first step and activate that load step Continue testing until calibration has been checked on all DCMs Record the values 6 7 Intertier Voltage Click DiagnosticslIntertier to view the voltage values of the assigned intertiers Remove the sense leads from an intertier connector and connect them to the millivolt source Set the millivolt source for 10 mV Verify the reading is 10mV 0 1mV Record the values After this test reconnect the leads Close the Diagnostics window 7 BDS 256 Calibration Procedure This procedure is for use by a technician who has been trained in the operations of the BDS 256 system Battery Monitor Data Manager software and safety procedures involved in battery maintenance WARNIN
Download Pdf Manuals
Related Search
Related Contents
Emerson ET419 CRT Television User Manual Samsung SHV-E270K User Manual "取扱説明書" High Pressure Transducer Mounting instructions 4 - L`affectation du résultat des sociétés Catalogo Pannelli operatore Betriebsanleitung - Steinle Industriepumpen Installation/Care/Use Manual Manual de Instalación/Cuidado Copyright © All rights reserved.