Home
Zetasizer Manual
Contents
1. 10 11 i 13 14 15 16 17 Zetasizer Manual Turn on the instrument by pressing the switch on the rear of the instrument and wait 30 minutes for the system to temperature stabilize Log on your session on FOM Start the software DTS Nano Open or create a measurement file in which to save the measurement record Fill a cuvette with the sample to be measured To reduce the risk of introducing bubbles use a pipette and slowly fill the cuvette Place the thermal cap on top of the cuvette Load the cuvette into the instrument by first pressing the button surrounded by lights to open the sample chamber Typically a cuvette has a small triangle on one of its sides ensure that this triangle is facing forward Give the cuvette a final push down to make sure the sample is properly loaded into the instrument Close the door to the sample chamber Under the Measurement tab you have the option to create your own standard operating procedure SOP or to open an existing SOP file To create a SOP select Measure gt Manual This will open the Manual measurement settings dialogue allowing any measurement types to be chosen and the settings to be configured Click on Material under the Sample tab and choose the material to be analyzed If your substrate is not on the list you can add a new one and indicate the Refractive Index and Absorbance of the material Click on Dispersant and select the solvent in which the mate
2. rial is immersed If the proper solvent is not already present it can be added manually to the list On the Measurement tab if Manual is selected then you can indicate how many runs you would like to perform per measurement and the duration of time between each runs Alternatively you can select Automatic to have the computer select these parameters for you Once all settings have been made select the Save as SOP button if required to store the settings Saving the SOP will allow the same experimental parameters to be retrieved at a later time Click the OK button to close the manual measurement settings dialogue and return to the measurement display Select the Start button to begin measurement To view the results select a measurement record from the measurement file Selecting one of the report tabs will show the measurement information in a predefined report When finished remove the cuvette from the sample chamber If you are the last user for the day shut down the instrument by pressing the switch at the rear of the instrument Log off your session on FOM Light source He Ne laser 633nm Max 5mW
Download Pdf Manuals
Related Search
Related Contents
aciseal dossier technique époxy joint anti acide Key Stage Three Sandberg Printer Cable IEEE 10 m Train User Manual Operating Instructions Réflexion sur une approche différente de la relation maître 1. SAFETY Modelo: M book 1200 Español Português Polski Regula Werk King Regula-Cita III Operating Instructions Copyright © All rights reserved.
Failed to retrieve file