THAILAND MODERNIZATION CNS/ATM SYSTEM PROJECT
Contents
1. BAPC Operation CWS
2. 4 color Laser Printer E 25 remote 5 from cws cws p n ieo Operation Room 8 floor 4 color M Laser Printer Pre tactical Operation Room 3 floor Figure 5 1 Conceptual Operator Role Layout of NAS MOPS at Tung Mahamek Site
3. Operation Room 4 floor 24 2 4 color Laser Printer is remote CMWS ELENE from CON TRA Equipment Room 5 floor BAPP MOPS Support Building BAPP CON TRA cws Pseudo Pilots PSPW CON TRA Room 3 Floor Pilot Room 37 Floor
4. 3 Floor Pseudo Pilots PSPWS PSPWS PSPWS PSPWS PSPWS PSPWS PSPWS E LCD 24 LCD 247 LCD E 24 LCD 24 LcD 24 LCD E LCD PSP FDO PSP FDO PSP FDO PSP FDO PSP FDO PSP FDO PSP FDO PSP FDO PSPWS PSPWS PSPWS PSPWS 24 LCD 24 LcD 24 LcD 24 LCD lt gt lt gt V PSP FDO lt gt V PSP FDO gt Pilot Room 3 Floor P FDO TECHSUP 8 4 color Laser Printer NAS CON TRA Equipment Room 15 Floor Existing Operation Building Essential WS C Optional WS Figure 5 2 Conceptual Operator Role Layout of NAS CON TRA at Tung Mahamek Site Future Expansion Voice Touch Entry Display Page 2 of 6 APP Operation APP Operation
5. ASDWS GSDWS FDDWS FDDWS FDDWS 24 24 P LCD LCD ar c5 4 color Laser Printer FDDWS Tower Control Room 7 Floor ASDWS GSDWS 24 24 LCD LCD ASDWS GSDWS 24 24 LCD LCD 24 lt gt Ji 4 color Laser Printer FDDWS 15022 Equipment 4 Floor 4 color Laser Printer ARO Office 274 Floor DMA Tower Building DMA RTS Level IV Air Defense Unit FDDWS MIL RTS Level I ASDWS GSDWS 24 24 LCD LCD ASDWS GSDWS 24 24 LCD LCD ASDWS GSDWS 4 color Laser Printer Tower Control room Tower Building ASDWS GSDWS 24 24 LCD LCD CAN FDDWS A4 color Laser Printer DMA APRON
6. 4 color Laser Printer 4 color Laser Printer NAS MOPS Essential WS Equipment room 274 floor New Operation Building Optional WS Future Expansion Voice Touch Entry Display Page 1 of 6 amp CON TRA CWS
7. 79 lt gt 4 color Laser Printer BAPP CON TRA Essential WS Optional WS Future Expansion V Equipment Room 3 Floor Emergency Building Figure 5 4 Conceptual Operator Role Layout of BAPP MOPS and BAPP CON TRA at Suvarnabhumi Airport Site Voice Touch Entry Display Page 4 of 6 Main Operation Area Emergency Operation Area ASDWS GSDWS ASDWS GSDWS ASDWS GSDWS ASDWS GSDWS ASDWS GSDWS 24 24 24 24 24 24 24 LCD LCD LCD LCD LCD LCD 24 24 24 LCD LCD LCD LCD gt gt gt c gt 2 73 93 v FDDWS FDDWS GSDWS 24 LCD 24 LCD FDDWS 21 FDDWS ASDWS GSDWS ASDWS GSDWS ASDWS GSDWS ASDWS GSDWS 24 24 LCD LCD 24 24 24 24 24 LCD LCD LCD LCD LCD gt gt v A4 color v
8. Part 2 2 1 Scope of Technical Specification Page 76 Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Terms of Reference volume 2 l of 1 0 Technical Specifications doc Location of Network Equipment Network Site Reference Building Floor Equipment Bandwidth Connector Code Name Type to from Type cloud Ubon Ratchathani 15 UBL Tower 7 Layer 3 1 Mbps RJ 45 Site Router Switch 10 100 1000 Udon Thani Site 16 UDN 6 Layer 3 1 Mbps RJ 45 Tower Router Switch 10 100 1000 Nakhon 18 Tower 7 Layer 3 1 Mbps RJ 45 Ratchasima Site Router Switch 10 100 1000 Surat Thani Site Al7 SUR Tower 3 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Other Remote Layer 3 1 Mbps RJ 45 Tower Sites Router Switch 10 100 1000 Table 27 Network Connection Description Other Remote Tower Sites include the following towers Location of Network Network Site Equipment on Tower TOU Bandwidth Type Floor yp To from cloud Samui Tower 3 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Nakhon Si Thamarat 5 Layer 3 1 Mbps RJ 45 Tower Router S witch 10 100 1000 Khon Kaen Tower 3 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Chiang Rai Tower 3 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Krabi Tower 5 Layer 3 1 Mbps RJ 4
9. i SSR WAM ADSS 29 RTSs 4 MIL WSs m Fiber Optics Link for between buildings connection under responsibility of AEROTHA Internal Network and TAMS External Systems connection under responsibility of Seller Network Link under responsibility of See AEROTHAI main and reserve 1 1 L Future Expansion Vratems coms IP Network Network A Other 858 CFDPS i systems Surveillance AMS Surveitiance AIMS Surveillance AIMS Surveillance AIMS Surveillance Surveillance AIMS Adj ACC AMS Systems Systems Systems i ond Systems Systems Systems Li LAMS 1 m I zl ZZ Mull External interfacing Systems Tung Mahamek SBA HTY PUT PSL HHN ADF Air Defenses Operator 4 New Operation Building FLOZ ildi i i HHN Hua hin Airport PSL Phitsanulok Airport 01 lew A12 HHN APC Building 102 Dependent Surveillance HTY Hat Yai n RTSs Remote oW Systems A02 Existing Operation Building FLO4 A13 AFL Building FLO1 AGDL Air Ground Data Link
10. HF 120 1 120 1 HF HF 126 7 126 7 HF AN APP RCA AE APP RCA AE APP RCA AE APP RCA AE APP RCA CB APP RCA UJ gt gt c CB APP RCA VHF lt H H H H H H H H Ti RCAG RCAG RCAG RCAG RCAG RCAG RCAG RCAG lt lt lt lt lt lt mm m mimm lt Ti VHF RCAG VHF RCAG lt H H H H H H Ti RCAG RCAG RCAG RCAG RCAG RCAG lt ES lt lt lt lt mmm lt Ti 5 5 5 5 5 5 5 5 5 5 5 D D D D D D D D D D D D VHF RCAG FIAS Site12 RCAG lt ee H gt lt gt 2 c VHF VHF Spare F1 Stb VHE Spare F2 Main Spare F1 Main VHF Spare F2 Stb VHF Spare F3 Main 246 247 A 264 Working Position LL ALL L L L L L L ALL ALL ALL ALL ALL LL LL AL L L ALL L L gt gt gt gt gt gt gt land fund iun gt gt gt gt gt Frequency MHz zs fasi fas esi igs izz as zs as as 23 T fan as 23 Connect to Spare F3 Stb Spare F4 Main Spare F4 Stb Spare F5 Main Spare F5 Stb Spare F6 Main Spare F6 Stb tb b
11. Fallback Room Figure 13 VCCS Composition of APP System The system has built in redundancy on vital parts have a distributed decentralized processing modular design and be free from single point of failures And for safety reason the interconnection between central racks and VCCS workstation facilities should use star topology A tested and operationally proven off the shelf system is preferred to avoid new costly developments and risk of delays It has a high availability and be fully re configurable and was fitted with interface for external alarm connections 8 1 VCCS Workstation Facilities Each user interfaces with the VCCS through VCCS workstation facilities which provide a means of communication for both ground ground and air ground applications The VCCS workstation facilities use a range of activation presentation and audio devices to provide access to all of the user functions implemented by a VCCS These devices are included but are not limited to e Touch Entry Device Panel TED panel e Headset Handset Part 2 2 1 Scope of Technical Specifications Page 97 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference Volume II Part 2 1 Scope of Technical Specifications doc tA 8 2 8 3 e Loudspeakers Push to talk PTT switch e Slave Clock Display HMI for oper
12. APP CON TRA Pseudo Pilots NMWS DAWS CMWS NMWS DAWS CMWS 24 247 24 p N E x 24 E 24 F top tcp top LcD LcD LoD Pilot Room ot Roo MTN EO CMWS is r
13. 2 40 42 4 44 3 5 4 46 47 4 5 5 5 5 5 5 5 5 5 e 5 6 6 6 6 6 7 7 7 7 7 7 7 7 7 9 0 1 2 3 4 6 7 8 9 2 3 4 5 yj 0 2 3 4 5 6 T 8 9 82 83 84 87 88 2 3 4 5 9 9 9 9 APPENDIX 3 5 5 Phitsanulok Main Fallback Voice Record Channels Capacity at least 72ch recorder 2 7 10 n D 1 121 900 Radio Record 121 900 Radio Record 118 900 Radio Record 118 900 Radio Record rf oo 2 2 2 2 2 2 2 2 1 1 3 Ww Got Go Hl nya 95 Woy uo 3 4 j 2 2 2 4 5 6 0 3 4 5 6 7 9 0 3 4 5 6 7 4 4 4 4 4 4 Telephone Record __ Telephone Record Ce Telephone Record All Telephone Record APPENDIX 3 5 6 Huahin Main Fallback Voice Record Channels Capacity at least 72ch recorder Channel 0 7 PCTWRI 11 12 13 14 15 16 17 18 Channel EE 5 um NS 2215521 7 18 220 4 2 22 2 24 5 25 133 000 Record 133 000 Radio Record 121 500 Radio Record
14. UPS _ O P Power Phase Type Type Responsibility Tenderer 1 Proposed Depending on Full Load Rate Type Tenderer Tenderer 2 Proposed Depending on Full Load Rate Type Tenderer 3 60 3 Phases TBP AEROTHAI 4 40 3 Phases TBP AEROTHAI TBP Information to be provided by AEROTHAI when requested Table 55 Summary of UPS Details at Tung Mahamek Site 10 8 1 2 Miscellaneous Electrical Components The Tenderer will also provide Bus Duct connecting between the metro electric engine at the ground floor of the New Operation Building to the UPS system on the 2nd and the 8th floor Please note that there are 2 paths which require Bus Ducts one path is outside of the New Operation Building while the other path is inside The site survey and site evaluation of Bus Duct placement are recommended The Tenderer will also provide static transfer switches cables connecting UPS to equipments main distribution board junction box installation materials and other necessary components Chiang Mai Site Hat Yai Site and Phuket Site The planned numbers of UPS and their respective loads at each of the following sites Chiang Mai Site Hat Yai Site and Phuket Site is described in table as follow Part 2 2 1 Scope of Technical Specifications Page 180 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference File Reference Date December 14 2012
15. enata atn sina 15 3 28 Hua Hin Approach Control Centre HHN 16 3 29 Hua Hin Airport HHN Local Tower 16 4 Intersystem Conn ctlon 4 ii is ide siio ron nba eeu aera erp 16 4 1 Data Integrity and Security ccsccssscessssessssssossesscsscsesectscscsesecisnscssnscienecsseassesesssees 16 4 2 The NAS MODS Pede HL e ec aae ria epu ad 17 4 3 24 4 4 Local Tower System LTS Remote Tower System RTS 28 5 Operator Roles and 8 1 eere eee eee eerte eene enano 37 5 1 BACC BAPC BAPP APPs CON TRA 37 5 2 E 52 6 Site Information and Network 3 3 59 6 1 Site Information 2 2 stss 59 Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 6 2 Network Infrastructure scsccsccsssscsssscccsssscssssssssccsssscescssssssssscssescsssssssessesceses 75 7 The Planned Worksta
16. 5 7 Quality Management Plan iiss cisssssesscsccsscessseaassscsscsnressscessecisacsecasecseasseacedasecasssescedacss 5 8 Project Management Plan 02 52 2 2 6 9 Risk management plan vasi ede esr 6 10 ra Cube 6 SECTION B Project Schedule Requirements eere eee eene ee eee eee 7 SECTION C 1 tea ea 9 Part 1 Scope of Project Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Vol II Part 1_Final 1 0 INTRODUCTION Volume II contains technical specifications requirement and necessary information for provision of system support services and implementation plan for TMCS Volume II is divided in to three parts where each part describes expectation and requirements for TMCS in different dimension The requirement will be proposed in each part and each requirement will be assigned with degree of mandatory which specifies with E for Essential specifications requirement and D for Desirable specifications requirement The overview of each parts of
17. Loop OwDTMF Sector 5 Wire Rind Loop Ow DTME Sector Ringin Loop Ou D TMF Sector 5 Ring Sector 5 wire Loop OuvDTMF Sector 6 D Wie Rinem fLoop Ou Sector 6 D wie Ring _ Loop Out D TMF Sector 6 Rinenn jLoop OwDTMF 5 t2 Jd n 5 NTN ce o SL APP VB FDO4 VB GND4 GS SRT3 N ocal Ol Sw RA A una gt 2 1 ta to to S Radar S TWR SCAR S4 N 1 NTN a N 1 ire un N N d d n N S_Radar KPS_ TWR SCAR 1 c lt NINININI GN4 7R SAT KBI DN 2 NTN GS_SRT2 UT_APP SCAR 55 WALLOW o z 2 DDN KULS SA N 1 NTN GN5 I APP F R SAT 5 Sector3 56 Sector3 7 58 Sector3 59 60 Sector pol Sector4 62 Sector4 63 Sector4 64 Sectord 65 Sector4 66 4 67 Sector4 68 4 69 Sector4 70 Sector4 1 Secor4 72 Sector4 3 Sector4 74 Sector4 15 4 6 Sectord 7 4 78 4 79 Sector 80 4
18. alal3 Q 2 G gt rg d CTR APP CTR APP CTR APP CTR APP CTR APP CTR APP CTR APP UHF NAN APP RCAG CTR APP CTR APP CTR APP CTR APP CTR APP CTR APP CTR APP CTR APP SAT FER SAT FER O SAT O FER O SAT FER O SAT O FER O SAT U O FR SAT ER O O O ER O SAT O CTR APP UHF PCB RCAG FR RCAG DDN ER EO DDN _ FER O FER O DDN FER DDN DDN FR O DDN AT F R AT F R AT F R AT F R AT F R AT F R AT F R AT F R AT F R AT F R AT F R DN F R DN F R DN F R DN F R DN F R DN F R DN F R DN F R DN F R DN F R DN F R DN F R FIAS Sitel FIAS Sitel VHF RCAG FIAS Site2 FIAS Site2 FIAS Site3 FIAS Site3 FIAS Site4 FIAS Site4 FIAS Site5 FIAS Site5 FIAS Site6 VHF RCAG FIAS Site6 FIAS Site7 VHF RCAG FIAS Site7 FIAS Site8 VHF RCAG FIAS Site8 FIAS Site9 FIAS Site9 FIAS Site10 FIAS Site10 FIAS Sitel 1 FIAS Sitell VHF RCAG FIAS Site12 Frequency MHz 240 0 240 0 STN APP RCAG 118 6 TRAT APP RCA 118 6 RAT APP RCA H RAT APP RCA H RAT APP RCA 120 05 TR APP RCA 120 05 TR APP RCA 257 8 CTR APP RCAG 257 8 TR APP RCA 120 25 NAN APP RCAG 120 25 AN APP RCA Connect to MEDIA STN APP RCAG gt rg 4 rg ro c ES Q
19. 2 2 2 2 2 2 2 2 o 2800 RadioRecrd Spare Telephone Record Spare Telephone Record Telephone Record Spre3 Al Telephone Record Spre3 Telephone Record Approach _ Wy Wo 921 Go AAT 40 A Wyo 9 3 4 5 32 2 3 1 5 Approach Approach Telephone Record 48 ATS 2412 Approach Telephone Record 6 7 9 6 7 4 4 4 4 4 4 49 50 51 Approach TelephoneRecord 66 SPARE Telephone Record 08 SPARE TelephoneRecord 609 SPARES TelephoneRecord APPENDIX 3 5 7 Tungmahamek CONTRA Voice Record Channels Capacity at least 224 ch recorder 4 Pesi onRecord Posion aeo 8 3 Ama Record LL 5e Record 25 __KMNRCAG_____ Radio Channel Record amp I Radio Channel Record 2638 Radio Channel Record 2638 Radio Channel Record 35 SMURCAG
20. 4 color Laser Printer Laser Printer FDDWS FDDWS FDDWS West APRON AOT Office Airport Operator Control Center Airport Operator Building Tower Control room T7 Floor SBA Tower Building ASDWS GSDWS 24 24 LCD LCD t v FDDWS ASDWS GSDWS LCD LCD S ASDWS GSDWS 24 24 LCD LCD 24 4 color Laser Printer ARO 4 color v Laser Printer k ARO Office Equipment Room 5 floor ATC Support Building East APRON SBA LTS Level IV Essential WS Optional ws Future Expansion Voice Touch Entry Display Figure 5 5 Conceptual Operator Role Layout of SBA LTS at Suvarnabhumi Airport Site Page 5 of 6 ASDWS GSDWS 24 24 24 LCD LCD LCD v
21. ASDWS GSDWS 24 24 LCD LCD c FDDWS ASDWS GSDWS 24 24 LCD LCD cm oS 3v DDWS A4 color Laser Print ler Equipment room Tower Control room Tower Building LTS RTS Level Ill Essential WS Optional WS Figure 5 6 Conceptual Operator Role Layout of LTS RTS at Local Tower and Remote Tower Future Expansion List of Air Defense Unit 1 Bigshell 2 Oscar 3 Focal List of RTS Level I 1 Korat 2 Takhli 3 U tapao 4 Kampangsan List of LTS RTS Level Il Phitsanulok Tower Hua Hin Tower Khon Kaen Tower Chiangrai Tower Ubonrachathani Tower Krabi Tower Suratthani Tower Sakhonnakhon Tower Nakhonpanom Tower 10 Nakhonrachasima Tower 11 Petchaboon Tower 12 Nan Tower 13 Phare Tower 14 Loei Tower 15 Buri ram Tower 16 Roi et Tower 17 Surin Tower 18 Chumporn Tower 19 Trat Tower 20 Mae Hongson Tower 21 Lampang Tower 22 Sukhothai Tower 23 Tak Tower 24 Mae Sod Tower 25 Ranong Tower 26 Trang Tower 27 Pattani Tower 28 Narathiwat Tower List of LTS RTS Level Ill 1 Chiang Mai Tower 2 Hat Yai Tower 3 Phuket Tower 4 Udonthani Tower 5 Samui Tower 6 Nakhonsithamarat Tower Voice Touch Entry Display Pa
22. System only Table 11 APPS Intersystem Interface Description APPS NAS MOPS NAS IBS The APPS connects with NAS MOPS NAS IBS using internal messages APPS LTS RTS APPS connects with associated Remote Tower System to coordinate in order to support corresponding APP System operation The connection may use internal messages However where applicable the Tenderer will provide ICD for this connection APPS End Systems End Systems consist of at least CWSs FDWS CMWS DSWS DAWS NMWS and printers APPS connects with End Systems using internal messages However where applicable the Tenderer will provide ICD for this connection Part 2 2 1 Scope of Technical Specifications Page 26 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 4 3 4 APPS AGDL System Depending on availability APPS connects with AGDL System to exchange all air ground data communications to pilot using the data format as previously described NAS MOPS AGDL System If APPS connects to AGDL System then the APPS will need to provide connections to both ARINC and SITA 4 3 5 APPS Surveillance Systems APPS connects with Surveillance Systems to receive at minimum the information as described previously NAS MOPS Surveillance Systems 4 3 6 APPS CON TRA APPS
23. 1 2 4 05 6 7 Specifications doc The Tenderer shall propose and detail the functions which support information to the airspace users for mitigating conflicting needs for airspace and aerodrome capacity The Tenderer shall propose and detail the functions which support information to the airspace user in the three stages Strategic Pre tactical and Tactical Air Traffic Flow Management The Tenderer shall provide product description of the proposed system detailing ATFM functionalities capabilities and benefits The Tenderer shall propose and detail the functions which support information where demand exceeds the sector capacity The Tenderer shall propose the range of the look ahead time of predicted traffic The Tenderer shall propose and detail the functions which support information for each sector within the selected look ahead time such as Number of flights per hour Transit ARR and DEP and Traffic Load Window The Tenderer shall propose and detail the functions which support information the Pre tactical activities research planning and coordination The Tenderer shall propose the number of day that the function can provide Pre tactical activities information The Tenderer shall propose and detail the functions which support sector capacity configuration in various conditions e g weather staffing and equipment serviceability
24. 2 1 2 Contingency Training System CON TRA ccsscccssscsssscsssccsssccssccesscccssccessccesscees 3 2 The Level of Contingency and Backup 5 2 1 Level I Redundancy Principles 5 2 2 Level II Fallback Processing System 6 2 3 Level III Surveillance Direct Access 6 2 4 Level IV Contingency System 2 1 2 2 2 6 2 5 Level V Independent 8 3 Operational 10 31 Aeronautical Fixed Telecommunication Network Aeronautical Telecommunication Network AF TN ATN ccssssscccsssssssssccccsescscsccccsesssscccceees 12 3 2 Flight Data Management Centre 12 3 3 UEM MOL iibri 12 3 4 Adjacent ACES sienna aa M 12 3 5 Regional Air Traffic Flow Management Unit RATFMU 12 3 6 Air Defense DU S 12 3 7 13 3 8 Bangkok Approach Control 13 3 9 Suvarnabhumi Airport SBA Local Tower 13 3 10 Don Muang Airport DMA Remote 13 3 11 Airport Operator AO ssessssssessssoeseosssosssossoseesssoseesosossesossossssososeeosseossosssssessssesssss 13 3 12 Bangkok Area Control Centre BACCO
25. Part 2 2 1 Scope of Technical Specifications Page 237 D D D D D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc 8 10 Traffic Synchronization 501 The Tenderer shall provide product description of the proposed system detailing TS functionalities capabilities and benefits 8 11 Arrival Manager 01 The Tenderer shall provide product description of the proposed system detailing AMAN functionalities capabilities and benefits 02 The Tenderer shall propose and detail the capability of the provide functions to support the sequencing in order to advices controllers enhance the orderly flow of traffic based on the first come first served principle AMANO3 The Tenderer shall propose and detail the capability of the provide functions to support the scheduling in order to advices controllers enhance the orderly flow of traffic based on the first come first served principle 04 Tenderer shall propose and detail the capability of the provide functions to support optimisation minimum overall average delay of sequencing and scheduling AMANOS The Tenderer shall propose and detail the methodology of sequencing scheduling and optimization calculations AMANO6 The Tenderer shal
26. 5 im c sisis isis AL E AREE 2 ALL ALL ALL ALL ALL 1 6 8 L APPENDIX 3 2 4 Phuket Main Fallback Telephone Channels Capacity Signaling No Working Positions Connect to Type Call In Call Out Remark PT ALL WATCH e Wire Loop DTMF Telephone Set Interface 2 ALL WATCH SE Loop DTMF Ring Out Telephone Set Interface Nye A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL 6 EN A APPENDIX 3 2 5 Phitsanulok Main Fallback Telephone Channels Capacity Signaling No Working Positions Connect to Type Call In Call Out Remark Pi ALL WATCH CE p Wire Coop IDTMF RingOut Telephone Set Interface F2 ALL WATCHSE p wire Loop IvDTMF Ring Telephone Set Interface gt gt gt Wire ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL LL E APPENDIX 3 2 6 Huahin Main Fallback Telephone Channels Capacity Signaling Working Positions Connect to Type Call In Call Out Remark 2
27. EO 2 1 1 1 Building DSO 1 10 1 1 1 1 1 Table 37 List of workstation quantities for HTY APP MOPS Part 2 2 1 Scope of Technical Specifications Page 83 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope of Volume II Terms of Reference Technical Specifications doc 1 0 7 5 2 HTY APP CON TRA HTY APP CON TRA Workstation Quantity Location Operator Role CWS FDWS PSPWS TMCWS CMWS DSWS PC APP 4 Equipment Room MN ES Training Building IME l FDO 4 DSO 1 Total 4 5 1 1 CMWS for APP CON TRA will be placed together with MTN workstations of APP MOPS Table 38 List of workstation quantities for HTY APP CON TRA 7 6 PUT APP System Located at Phuket airport the PUT APP System has two systems The planned quantities of positions are described in table format 7 6 1 PUT APP MOPS PUT APP MOPS Workstation Quantity Location Operator Role CWS FDWS CMWS DSWS DAWS NMWS EC PC APP 6 Operation Room FDO 1 PUT APC Building AMAN 1 TACTSUP 1 Equipment Room MTN EO 2 1 1 1 PUT APC Building DSO 1 Total 10 1 1 1 1 1 Table 39 List of workstation quantities for PUT APP MOPS 7 6 2 PUT APP CON TRA PUT APP CON TRA
28. Radio Channel Record DOIRCAG T Radio Channel Record UDNRCAG Radio Channel Record UDNRCAG Radio Channel Record 96 0 KKNRCAG Radio Channel Record 1339 UBLRCAG Radio Channel Record 10 UBERCAG Radio Channel Record Connect to Radio Channel Record Radio Channel Record adio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record adio Channel Record adio Channel Record adio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record CDC SB Main Radio Channel Record Radio Channel Record Radio Channel Record 154 155 156 Radio Channel Record 157 Radio Channel Record 158 Radio Channel Record 159 Radio Channel Record 160 Radio Channel Record 161 Radio Channel Record 162 Radio Channel Record 163 Radio Channel Record 164 Radio Channel Record 165 Radio Channel Record 166 Radio Channel Record 167 Radio Channel Record 168 Radio Channel Record 169 Record 170 Record 171 Record 172 Record Record 174 Record 175 Record 176 Record 177 Record 78 Record 179 Record 180 Record Record 182 Record 183 Record 184 Record 185 Record 186 Record 187 Record 88 Record 189 Record 190 Record 191 Record 192 Record 193 Record 194 Record 195 Record 196 Record 197 Record 1
29. 4 2 9 NAS MOPS Regional Air Traffic Flow Management RATFM NAS MOPS connects with RATFM to exchange at minimum the following information Message Data Data Format Input Output Reference ICD Slot messages TBD Input Tenderer provided ICD Flight plan data TBD Output Tenderer provided ICD Surveillance enhanced trajectories TBD Output Tenderer provided ICD Airspace structure TBD Output Tenderer provided ICD Sectorisation TBD Output Tenderer provided ICD TBD To be discussed later Table 7 NAS MOPS RATFM Information Exchange Description Part 2 2 1 Scope of Technical Specifications Page 22 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of of Reference Technical Specifications doc 4 2 10 4 2 11 4 2 12 4 2 13 4 2 14 NAS MOPS Air Defence Workstations The scope of TMCS includes Air Defence Workstations provided for appropriate Air defence units NAS MOPS connects to those Air Defence Workstations to coordinate information in order to support BACC BAPC operation The NAS MOPS Air Defence Workstation connection may use internal messages However where applicable the Tenderer will provide ICD for this connection NAS MOPS Military Tower Workstations The scope of TMCS also includes Military Tower Workstations provided for associated military airports
30. PSL201 6 floor PSL APC Building Floor Plan 9 36 2 floor PSL APC Building Floor Plan Attachment 6 1 5a The location of the Operation Room Equipment Room and Local Tower Control Room of PSL APP MOPS and PSL LTS 2 5 Pilots APP Room Room ADM302 ADM301 Equipment Room ADM303 3 floor PSL Administrative Building Floor Plan A Attachment 6 1 56 The location of CON TRA Room Pilot Room and Equipment Room of PSL APP CON TRA 1 50 2 00 2 00 2 09 310 4 00 500 500 E 310 imc umm cid auusuucHHE ADMIOI Lo IE I i a x d gt mem eet pa LS MPs oss mp pop em a niis LN eer oer mcm Mu o A di oue aca i id ae B ager 1 floor PSL Administrative Building Floor Plan bes oe 17 Qn we M A 5 d al a LA ge i i eu Attachment 6 1 5c The location of the UPS Room of PSL APP CON TRA Administrative Building Air Field Lighting Building Attachment 6 1 6 The location of HHN APC Building and Air Field Lighting Building at
31. 1 1 1 1 A o r2 Os N oo oo oo oo N oo oo oo uz un N 59 N 95 un N A E N 42 N Os N SO oO azi faci faci fazi o 1 C ale Working Positions Sector Sector Sector Sector Sector Sector Sector Sector Sector Sector Sector Sector Sector Sector Sector CTR Sector CTR Sector CTR Sector CTR Sector CTR Sector CTR Sector CTR Sector CTR Sector CTR Sector CTR Sector CTR Sector CTR Sector ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL o lt o o lt lt lt o lt c vn nA ni nl wm o lt G Connect to PN TWR TWR KS TWR UT_ TWR MU TWR TN TWR TWR SR STN 2 N d gt wW o es UT_APP Ss sl N el 2003 el 8613 el 9613 199 TWR AN_TWR AE TWR CB TWR SL APP a SC_APP el 2008 el 8614 el 9614 24 AREI ARE2 ARE3 4 ARES ARE 6 ARE 7 ARES ARE 9 10 ARE IT ARE 12 ARE 13 s gt N un 2 2
32. 108 104 105 19 107 19 110 111 12 19 14 Ere 16 Su 19 120 121_ 12 73 E24 155 16 E 127_ 78 2222077 130 13 132 153 15 136 137 158 142 5 1 ia 50 Connect to adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Channel Detail
33. 136 138 BET ES DDN MEDIA D vA gt 2 vA gt il 2 2 2 FIBER FIBER FIBER FIBER FIBER FIBER FIBER FIBER FIBER FIBER F R SAT F R SAT F R SAT F R SAT F R F R F R F R F R F R F R F R F R F R DDN F R DDN F R DDN F R DDN F R DDN F R DDN F R DDN F R DDN F R Channel 151 152 154 155 156 157 159 DVILNDIDIDIDID DID 1 2 189 190 Working Position KKN KKN KKN KKN KKN KKN KKN gt PP APP APP APP APP PP gt KKN APP KKN APP KKN APP KKN APP KKN APP KKN KKN e leo o ES NIN 921095 DID un G APP APP APP BL APP BL APP BL APP BL APP BL APP BL APP BL APP BL APP BL APP BL APP BL APP BL APP BL APP BL APP BL APP BL APP Z lt gt Jd gt Jd Frequency MHz 123 4 123 4 240 0 240 0 123 35 123 35 284 0 284 0 126 2 126 2 268 5 268 5 122 55 122 55 240 0 240 0 123 5 123 5 257 8 257 8 125 4 T T 119 45 119 45 H H 129 6 GISGIS TI Ti 305 4 129 6 129 6 305 4 305 4 119 75 Connect to KKN AP
34. ALL p wire Loop DTMF Ring Out Telephone Set Interface Briefing ACC SI SBA N gt gt gt w gt ce E N N re N TS 241 EL 520 EL 5201 EL 5291 EL 5292 TEL 520 830 TEL 522 097 Wing 53 MET KPS BUT N N N N N N N N N N N N N gt gt gt gt gt gt gt gt DOA BIO Spare Sparc 2 Spare 3 Spare 4 5 Spare 6 Spare 7 Spare 8 Spare 9 Spare 10 Spare Li gt gt gt gt gt gt gt cC gt um E E gt 3 gt a 4 3 5 gt z N gt c E E AL APPENDIX 3 2 7 Tungmahamek CONTRA Telephone Channels Capacity Signaling Working Positions Connect to Call In Call Out Remark Sector i Sector 1 i Sector 1 i Sector 1 oice i Sector Sector 2 oice i Sector 3 i Sector 3 Voice Call Interface Sector Sector 4 re re re re re re re re No lt 8 a gt gt gt lt lt To QIQ eie m o o gt gt N lt lt eo o e Qa o QIQ 1 S15 aio gt lt lt lt 219 o
35. DESPO05 DESP06 DESPO07 Specifications doc Design Principles The Tenderer shall propose and describe in detail of the maximum memory usage and CPU usage of each Server and Workstation grade computer whilst providing the maximum capacity The Tenderer shall propose and detail Database Management system used in the provided systems The Tenderer shall propose and detail the provided Operating System of Server and Workstation grade computer The Tenderer shall specify the rate of transmission of Ethernet frames 100 Mbps 1000 Mbps etc of all equipments servers workstation grade computer network equipment etc for the proposed system The Tenderer shall propose and describe in detail of each Networking equipment and Interface devices which specifies at minimum the following aspects features e Brand and Model e Technical specification data details e Power Supply and e Mean Time Between Failure value The Tenderer shall propose and detail the Time Reference System configuration and describe the Time synchronization methodology for the MOPS CON TRA IBS and external systems The Tenderer shall propose and describe in detail of Time Reference equipment which specifies at minimum the following aspects features e Brand and Model e Technical specification data details e Power Supply and e Mean Time Between Failure value Part 2 2 1 Scope of Technical Specifications Page 263 D E
36. Pilot lt gt Pilot ee A AQ AO 6 vPilot MET Meteorological PUT Phuket Airport PUT APC Phuket Approach Control Centre PSL Phitsanulok Airport PSL APC Phitsanulok Approach Control Centre RATFMU Regional Air Traffic Flow Management HTY Hat yai Approach Control Centre Unit SBA Suvanabhumi Airport Figure 5 Operational Context of TMCS Part 2 2 1 Scope of Technical Specifications Page 11 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 31 Aeronautical Fixed Telecommunication Network Aeronautical 3 2 3 3 3 4 3 5 3 6 Telecommunication Network AFTN ATN The BACC BAPC operation will exchange relevant information with external users using both AFTN and ATN Flight Data Management Centre FDMC AEROTHAI has implemented the FDMC to manage the flight data received through different means such as AMHS etc The BACC BAPC operation will then exchange relevant information with FDMC The underlying system supporting FDMC operation is Central Initial Flight Data Processing System CIFDPS The responsibilities of CIFDPS are as follow e Actas data repository f
37. are as follows PART 1 SCOPE OF PROJECT This part describes project details project information and requirements on project management Tenderers shall make an understanding of information and provide a complete response with form and details as specified in project schedule requirements This part consists of three 3 sections described below Section A contains guideline information for project schedule of TMCS The information includes for examples implementation plan project management plan Section B specifies all relevant issues related to project schedule requirements of TMCS for tenderers to propose their schedule milestone and details of them using guideline information from Section B Section C contains appendix for tenderer to submit their response PART 2 SCOPE OF SPECIFICATIONS This part is divided into 2 parts The first part describes concept minimum requirements and submittal requirements for main operational system contingency system and training system which is necessary for Tenderers to engage the Tender Tenderers should include description product brochures cut sheets technical manuals and other information in order to support the proposed system The second part provides format for Tenderers to submit their response on organization information and certification Part 1 Scope of Project Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Refer
38. sees 33 Table 15 Tower System AFL System Information Exchange Description sss 34 Table 16 Tower System CATIS System Information Exchange Description 34 Table 17 Tower System NAVAID System Information Exchange Description 34 Table 18 Mapping Table to support Operator Role of BACC BAPC BAPP 5 CON TRA 39 Table 19 Mapping Table to support Operator Role of Towers eee 54 Table 20 Summary of Tung Mahamek Site Information eese 60 Table 21 Summary of CMA APP Site Information esses eene 62 Table 22 Summary of APP Site Information sese nennen 64 Table 23 Summary of PUT APP Site Information eese nennen 66 Table 24 Summary of PSL APP Site Information 68 Table 25 Summary of HHN APP Site Information 70 Table 26 Summary of BAPP Site Information eese een nennen nennen 72 Table 27 Network Connection Description 2 77 Table 28 Network Connection Description for Other Remote Towers esses 78 Table 29 Communication Media Infrastructure between buildings esses 79 Table 30 List of workstation quantities for NAS MOPS 80 Table 31 List of workstation quantities for NAS CON TRA sese 81 Table 32 List of workstation quantities for BAPP 81 Table 33 List of w
39. 17 903 3 floor Existing Operation Building Floor Plan Attachment 6 1 1d The location of CON TRA Room of NAS CON TRA CON TRA Equipment Room EXO104 15 floor Existing Operation Building Floor Plan 58 8 d 8 za 6 o oO 90 00 1 AY Attachment 6 1 1e The location of CON TRA Room of NAS CON TRA 5 0 m Flight GND Data LCL Room CMA701 ordinator 0 7 floor CMA APC Building Floor Plan Lt Lk CMA Local Tower Control 3 Equipment Room CMA203 Q 3 amp e ee 254 floor CMA Building Floor Plan So w S Attachment 6 1 2 The location of the Operation Room CON TRA Room Equipment Room and Local Tower Control Room of CMA APP MOPS CMA APP CON TRA and CMA LTS gt y Q9 AS 31 20 1 floor APC Building Floor Plan Attachment 6 1 2b The location of the UPS Room T MEAE Training Building Se 2 Old Primary Radar building 3 PEY eT NOn Sees Hat Yai International Airpo
40. 81 Secor4 l 82 83 Sectors i 84 Sectr4 l 85 Sectors i 86 Sectors i 87 Sectors i 88 Sectors 89 Sector5 90 Sector5 91 Sectors 92 Sectors 93 Sector5 94 5 95 Sectors 96 Secor 97 Secor5 98 Secor 99 5 100 Sector 10 Sector 102 Sector 103 Sectors 104 Sector Sedor Sector6 d ua d ua d ua 4 d n d ua 4 d ua 4 9 n d ua 4 d ua d n d ua d d ua ua 51515 d ua 4 d n d ua 4 d ua 4 n d ua 4 d ua 4 d ua 4 NJA lt lt aod faci fa fee 212 Remark amp PABX Interface amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface
41. APPENDIX 3 1 3 Tungmahamek CONTRA POSITION CAPACITY POSITION IO n 13 15 16 17 19 21 22 23 24 25 26 27 29 31 33 35 PSP FDO17 Area amp Approach Option PSP FDO18 Area amp Approach Option 40 PSP FDO19 Area amp Approach Option 41 PSP FDO20 Area amp Approach Option APPENDIX 3 1 4 CMA HTY PUT PSL HHN CONTRA POSITION CAPACITY CONTRA RN Room pots Cl ll 3 2 Telephone lines capacity of each site APPENDIX 3 2 1 Tungmahamek Main Fallback Telephone Channels Capacity Signaling Working Positions Connect to Type Call In Call Out Remark SUP ALL ALL D Wire Loop In DTMF Ring Out Telephone Set Interface L elephone Set Interface Sector 1 PP El oice Call Interface Sector 1 2 2 Wire Voice Sector 1 5 Sector PPOW Wire Sector 2 PP EI Sector 2 PP 2 Sector 3 PP EI Secror3 APP E2 Sector 3 _5 Sector 4 PP EI i APPEL p N gt E to t9 t9 N z 53 1 Sector 4 Sector 4 Sector 4 Sector 4 1 Sector 4 1 Sector 4 1 TCI TC2 TCI TCI TCI C C PP E2 PPN PP_W PPN S PP_W lt lt lt 2 Q gt a D 1 N Voice Voice oice Call Interface oice Call Interface Voice W Wire D Wire Ring n Loop Ou DTMF PSTN amp PABX Interface Wire Ring In Loop Ou DTMF PSTN amp PABX Interface ir
42. Area Control Centre ADF Air Defense ADS B Automatic Dependent Surveillance Broadcast AFTN Aeronautical Fixed Telecommunication Network AGDL Air Ground Data Link AIS Aeronautical Information Service AMHS Aeronautical Message Handling System APP Approach Control APPS Approach Control Systems CMA APP HTY APP PUT APP PSL APP HHN APP Air Traffic Management ATN Aeronautical Telecommunication Network CCMS Central CNS ATM Monitoring System CIFDPS Central Initial Flight Data Processing System CMWS Control and Monitoring Workstation CON TRA Contingency and Training System CWSs Controller Workstation DAWS Data Analysis Workstation NAS MOPS Intersysiem AGDL Msg Data System Surveillance Systems Intersystem w ER Msg lt ADSE 4 WAMMLAT Intersystem Adjacent Msg Data gt ACC ATM Systems Intersysiem RATFM MsgDaa System Internal Msg gt ADF CWSs Internal Msg gt MIL CWSs Internal Msg gt RTS NAS Internal Msg 9 CONTRA Intersystem MET Msg Data System Intersysiem Msg Data COMS Intersysiem Msg Data 77 Other System External System DSWS Data Set Workstation FDWS Flight Data Workstation IBS Independent Backup System MET Meteorological MIL Military Tower Operator MLAT Multi La
43. CMWS for PSL APP CON TRA will be placed together with MTN workstations of PSL APP MOPS Table 42 List of workstation quantities for PSL APP CON TRA Part 2 2 1 Scope of Technical Specifications Page 85 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc tA Volume II Terms of Reference 7 8 APP System Located at Hua Hin airport the HHN APP System has two systems The planned quantities of positions are described in table format 7 8 1 HHN APP MOPS HHN APP MOPS Workstation Quantity Location Operator Role CWS FDWS CMWS DSWS DAWS NMWS PC APP 4 Operation Room FDO 1 HHN Building TACTSUP i Equipment Room 2 1 1 1 HHN APC Building DSO 1 Total 7 1 1 1 1 1 Table 43 List of workstation quantities for HHN APP MOPS 7 8 2 HHN APP CON TRA HHN APP CON TRA Workstation Quantity Location Operator Role CWS FDWS PSPWS TMCWS CMWS DSWS CON TRA EC PC APP 4 Room MTN 2 Air Field TMC 1 Lighting FDO 4 Building DSO 1 Total 4 5 1 1 CMWS for HHN APP CON TRA will be placed together with MTN workstations of HHN APP MOPS Table 44 List of workstation quantities for HHN APP CON TRA 7 9 Tower System The towers across BKK FIR are categorized i
44. Certification for CMMI level 5 Certifying Agency Certified date Mandatory Supporting Documents a The last valid CMMI Level 5 certificate of the company b A proof from the certifying agency stating that the renewal of the certification is under progress and the date when such renewal was applied for by the company Certification for ISO 27001 Certifying Agency Certified date Supporting Documents a copy of certificate as on the date of contract signing and the certificate should be valid for at least a period of one year from the date of submission of the bid THAILAND MODERNIZATION CNS ATM SYSTEM PROJECT Volume II Technical Terms of Reference October 2012 AERONAUTICAL RADIO OF THAILAND BANGKOK THAILAND Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume Part 3 Support and After Sale 1 0 Service_Final doc Volume II Technical Terms of Reference PART 3 SUPPORT AND AFTER SALE SERVICE Part3 SUPPORT AND AFTER SALE SERVICE Page 2 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference and After Sa le 1 0 Service_Final doc Table of Contents SECTION A INTRODUCTION sseseseeseseccorecsesosseseesesoesoroscesoe
45. N d ua 4 92 N d ua 4 92 d ua 92 d ua T 00 D lt d ua 4 TAPP KK nm lt a A N d 02 el 8611 Wir N amp PABX Interface Wire N amp PABX Interface Wire N PABX Interface RM IWR Wir N PABX Interface KRCTWR wie PABX Interface OT_TWR Wire N amp PABX Interface BL_TWR Wire N amp PABX Interface SR_UBL Wire N amp PABX Interface TAPP PABX Interface Wir N amp PABX Interface SC_APP m amp PABX Interface TN UB APP p Wire N amp PABX Interface Win N amp PABX Interface el 8612 Wire N amp PABX Interface BL Sector el 9612 ire N amp PABX Interface BL Sector 095 Wire N amp PABX Interface AYALA A DT ny RY w i TOT AJAJAJA el 9611 A 4 19 d 02 d A c d 02 c N gt d CA d ua 4 d n n to ro ro ro ro ro rto rto ro ro ro rto ro ro to ro to to tA d n a bw d 07 COF NY i T ta to ro to N d ua 4 ON N E Go ua lt A n ua lt ON E ua lt
46. Volume II Part 2 1 Scope of Technical Specifications doc Version 1 0 System System Description UPS 1 UPS 2 UPS 3 APP MOPS Data processing VCCS F VCCS End Systems X Data processing VCCS End System LTS Data Processing End System X Table 56 UPSs for CMA APP System HTY APP System and PUT APP System and their respective loads The summary of UPS details required at each of the following sites Chiang Mai Site Hat Yai Site and Phuket Site 1s described in table as follow UPS O P Power Phase Type Type Responsibility 1 20 3 Phases TBP 2 Tenderer Proposed Depending Full Load Rate Tenderer 3 10 single Phase TBP TBP Information to be provided by AEROTHAI when requested Table 57 Summary of UPS Details at Chiang Mai Site Hat Yai Site and Phuket Site Miscellaneous Electrical Components AEROTHAI will provide electrical cable connecting metro electric engine to the UPS However at each site the Tenderer will provide static transfer switches cables connecting all UPS to equipments main distribution board junction box installation materials and other necessary equipments The site survey and site evaluation of components placement are recommended Part 2 2 1 Scope of
47. as igs as zs Connect to Local Main Local Stb KMN RCAG KMN RCAG HHN RCAG Local Main Local Stb KMN RCAG KMN RCAG HHN RCAG HHN RCAG HHN RCAG HHN RCAG CPN RCAG CPN RCAG SMU RCAG Local Main Local Stb KKN KKN RCAG UBL RCAG UBL RCAG KRT RCAG KRT RCAG BRM RCAG Local Main Local Stb KKN RCAG KKN UBL RCAG UBL RCAG KRT RCAG KRT RCAG Local Main Local Stb KMN RCAG KMN RCAG TRAT RCAG Local Main Local Stb KMN RCAG KMN RCAG Local Main Local Stb NSW RCAG NSW RCAG PSL RCAG KKN RCAG MEDIA FIBER FIBER FIBER FIBER FIBER FIBER DN 7R DN T DN T DN DN T DN DN T DN T DN T DN T DN DN e 4 FIBER FIBER FIBER FIBER FIBER D SA D SA D SA D SA D SA F F SA SA F F SA SA SA F SA F F F R 5 DDN 53 F R 5 DDN 55 F R 56 FIBER 57 FIBER 58 DDN 59 SAT DDN 61 UHF FIBER 6 UHF FIBER 6 UHF DDN 6 UHF SAT 6 DDN SAT 7 71 7 7 7 75 VHF 76 VHF 77 78 1 81 8 8 8 8 88 91 9 93 9 9 98 SECTOR7 2465 UDNRCAG 99 SECTOR7 1215 Emergency INTRCAG Channel 100 Working Position Frequency MHz Connect to SECTOR 7 121 5 Emergency UDN RCAG 101 SECTOR 7 1 DN RCAG 102 SECTOR 7 1 DN RCAG 107 SECTOR 7 1 LOY RCAG 108 SECTOR 7 1 LOY RCAG 109 SECTOR 8 KKN RCAG 11
48. 1 0 Volume II Technical Terms Volume II Part 2 1 Scope of of Reference Technical Specifications doc 5 2 Towers 5 2 1 Tower Operator Role Tower Operator Role consists of Ground Controller GND Local Controller LCL Coordinator COR Clearance Delivery CDC Tower Tactical Supervisor T TACTSUP Departure Manager DMAN Tower Evaluation Officer T EO Tower Flight Data Operator T FDO Tower Data Set Operator T DSO Military Tower Operator MIL Flight Announcement Operator FAO Bay Allocation Operator BAO Aeronautical Reporting Office ARO and Tower Maintenance Engineer T MTN 5 2 2 Support Facility Support facility for operator roles for Towers consists of hardware and software characteristic a Hardware Characteristic Hardware characteristic for operator roles consists of TED panel and workstation amp monitor type Support facility for operator roles for Towers also use Type B workstation however there is one 1 additional type of workstation amp monitor as follow Part 2 2 1 Scope of Technical Specifications Page 52 Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc D consists of one worksta
49. Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 10 9 11 9 12 Specifications doc Traffic Synchronization Traffic synchronization function TS refers to the tactical establishment and maintenance of a safe orderly and efficient flow of air traffic TS conflict management and DCB are interrelated and will become fully integrated leading to a continuous and organized flow of traffic The TS encompasses both the ground and airborne part of ATM and will constitute a flexible mechanism for capacity management by allowing reductions in traffic density and adjustments to capacity in response to variations in demand Arrival Manager The Arrival Manager AMAN function will support the tactical flow into airports and to enable efficient sequencing and scheduling a support functions is required in order to reduce ATC workload The AMAN takes multiple constraints into account along with the Airports preferences The AMAN will be able to allocate arrival routes and set constraints such as controlled time of arrival on merging points with the objective of building an optimum sequence The controlled time of arrival technique fits well with time based spacing which would follow on after passing the controlled time of arrival point The use of improved trajectory data allows the AMAN process start earl
50. VRS20 VRS21 VRS22 Specifications doc recording for the archival media of the recorder units without necessitating any operator involvement The Tenderer shall detail the simultaneous retrieval and recording capability of the recorder units The Tenderer shall propose and detail the recorded content such as time stamps additional data etc of the recorder units The Tenderer shall propose and detail the capability capacity and performance of archival media type of the recorder units The Tenderer shall propose and detail the capability and configuration of the inter connection between the replay unit and the recorder unit The Tenderer shall propose the number of replay units for BACC BAPC CMA APC HTY APC PUT APC PLS APC and HHN APC The Tenderer shall provide product description of the replay units detailing functionalities capabilities and benefits The Tenderer shall propose the maximum number of channels for replaying simultaneous duplex channels of the replay units The Tenderer shall propose the maximum number of simultaneous duplex channels for live monitoring of the replay units The Tenderer shall propose and detail the capability to duplicate recordings to the standard analogue recording equipment of the replay units The Tenderer shall propose and detail the other type of control to play the recording media of the replay units The Tenderer shall propose and detail the synchronization methodology
51. a 2 40 42 4 44 3 5 4 46 47 Channel Remark 49 Radio Backup Approach Radio Record 1 natn WEN 5 nti nin OTL u oo oo 4 62 63 64 65 67 70 7 72 73 74 75 76 79 82 83 84 87 2 3 4 9 9 9 APPENDIX 3 5 3 Hatyai Fallback Voice Record Channels Capacity at least 96ch recorder 20 22 23 24 2 2 2 2 1 2 7 5 6 7 9 30 3 EN CSE EE 22 28727 0 55 25 99 50 3 34 42 42 Go Gof Go OL aA 48 2 40 42 4 44 3 5 4 46 47 49 0 RONDA O 5 5 5 4 nin 2 60 2 4 0 2 4 2 2 RONDAI ll m 6 6 6 6 6 7 7 7 7 7 7 7 7 8 83 84 8 4 3 5 7 3 5 6 7 9 7 SPARE16 5 oo 9 9 9 9 APPENDIX 3 5 4 Phuket Main Fallback Voice Record Channels Capacity at least 96ch recorder 20 22 23 24 2 2 2 2 1 2 7 5 6 7 9 50 3 EN CSE EE EE 22 5 He 25 EBE REND E297 50 2 34 42 42 Go Gof Go OL aA
52. e o QIQ e eio E m fare 5 Els ele o as gt gt o gt gt gt gt lt o 5 c gt gt lt 5 zi as gt gt lt 5 m 8 gt gt 4 TD Voice Sector 1 STN amp PABX Interface Sector 1 STN amp PABX Interface lt 5 8 x gt gt lt o 5 a gt Sector 4 PP 2 i Sector 4 i N d un N un N d Sector 1 STN amp PABX Interface Sector 1 Ring In STN amp PABX Interface HN_APP STN amp PABX Interface STN amp PABX Interface SCAR SI STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface Sector 2 VB_FDO2 STN amp PABX Interface Sector 2 VB_GND2 STN amp PABX Interface Sector 2 DSY Loop Out DTMF STN amp PABX Interface Sector 2 STN amp PABX Interface Sector 2 STN amp PABX Interface Sector 2 STN amp PABX Interface Sector 2 STN amp PABX Interface Sector 3 STN amp PABX Interface Sector 3 STN amp PABX Interface Sector 3 STN amp PABX Interface Sector 3 STN amp PABX Interface Sector 3 STN amp PABX Interface
53. ro ro un d Signaling Type Remark Wire Ring In Loop Ou DTMF PSTN amp PABX Interface Wire Ring In Loop Ou DTMF PSTN amp PABX Interface Wire Ring In Loop Ou DTMF PSTN amp PABX Interface ire IRingln Loop Out DTMF PSTN amp PABX Interface ire Ringin Loop Out DTMF PSTN amp PABX Interface ire IRingln Loop Out DTMF PSTN amp PABX Interface ire Ring In Loop Ou DTMF PSTN amp PABX Interface ire IRingln Loop Out DTMF PSTN amp PABX Interface ire Ring In Loop Ou DTMF PSTN amp PABX Interface ire Ring In Loop Ou DTMF PSTN amp PABX Interface re IRingln Loop Ou DTMF PSTN amp PABX Interface re Ring In Loop Ou DTMF PSTN amp PABX Interface ire Ring In Loop Ou DTMF PSTN amp PABX Interface re IRingIn Loop Out DTMF PSTN amp PABX Interface re Ring In Loop Ou DTMF PSTN amp PABX Interface ire IRingln Loop Ou DTMF PSTN amp PABX Interface ire Ring In Loop Ou DTMF PSTN amp PABX Interface ir Ring In Loop Out DTMF PSTN amp PABX Interface ire Ring In Loop Out DTMF PSTN amp PABX Interface ire Ring In Loop Out DTMF PSTN amp PABX Interface Wire Ringin Loop Out DTMF PSTN amp PABX Interface D Wire Ring n Loop Ou DTMF PSTN amp PABX Interface 2 Wire Ring In Loop Ou DTMF PSTN amp PABX Interface D Wire Ring In Loop Ou DTMF PSTN amp PABX Interface D Wire Ring In Loop Ou DTMF PSTN amp PABX Interface D Wire Ring
54. 183 Table 62 UPSs for DMA RTS and their respective loads seen 184 Table 63 Summary of UPS Details at Don Muang Airport 5 184 Table 64 UPSs for Samui Airport RTS Udon Thani Airport RTS and Nakhon Si Thamarat Airport RTS and their respective loads essent enne nennen 185 Table 65 Summary of UPS Details at Samui Airport Site Udon Thani Airport Site and Nakhon 51 Airport 51 ee Re e ree re e 185 Table 66 UPSs for each of Category II Airport RTS and their respective loads 185 Table 67 Summary of UPS Details at each of Category Level II Airport Sites 185 Table 68 Technical Specification for 3 phase UPS System sse 191 Table 69 Technical Specification for Static Transfer Switch 192 Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference File Reference Volume II Part 2 1 Scope of Technical Specifications doc Date December 14 2012 Version 1 0 This page is intentionally left blank Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Re
55. 240 VAC frequency range 45 65 Hz Front control module OSD LED backlight technology and Lamp lifetime gt 50 000 hours 24 LCD Monitor will have at minimum the following performance features Resolution 1200 x 1920 pixels portrait DVI port gt 1 Brightness 7 250 cd m2 Contrast ratio gt 1000 1 Display colors gt 16 7 M 24bit Power supply operates between 100 VAC 240 VAC frequency range 45 65 Hz VESA Mounting Support and LED backlight technology 10 1 2 2 LCD Monitor of Type B Workstation LCD Monitor of Type B Workstation will be 24 LCD Monitor and will have at minimum the following performance features Resolution 1920 x 1200 pixels at 60Hz refresh rate DVI port gt 1 Brightness 7 300 cd m2 Contrast ratio gt 1000 1 Display colors 7 16 7 M 24bit VESA Mounting Support LED backlight technology and Part 2 2 1 Scope of Technical Specifications Page 170 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Power supply operates between 100 VAC 240 VAC frequency range 50 Hz 3Hz 10 1 2 3 LCD Monitor of Type C Workstation LCD Monitor of Type C Workstation will be 30 LCD Monitor and will have at minimum the following performance features Resolution 2 2560 x 1600 pixels at 60Hz
56. 506 507 508 509 510 VCCSII VCCS12 VCCS13 VCCS 14 VCCSI5 VCCS16 VCCS17 Specifications doc The Tenderer shall provide product description of the proposed TED panel detailing functionalities capabilities and benefits The Tenderer shall propose and detail the capability of RX and TX buttons setting for each remote radio station on the TED panel The Tenderer shall propose and detail the status indication of telephone lines on the TED panel The Tenderer shall provide product description of the proposed headset handset detailing functionalities capabilities and benefits The Tenderer shall provide product description of the proposed loudspeaker for ground ground and air ground communication detailing functionalities capabilities and benefits The Tenderer shall provide product description of the proposed foot switch detailing functionalities capabilities and benefits The Tenderer shall provide product description of the proposed slave clock detailing functionalities capabilities and benefits The Tenderer shall propose and detail the receiver muting capability of radio line interface module RLIM when the transmitter is transmitting The Tenderer shall propose and detail the capability of VCCS Workstation facilities for radio frequency monitoring The Tenderer shall propose and detail the delay time adjustment of the RLIM transmit receive and PTT signal
57. 8 AIL 9 KBITWR FR p plo KBITWR SAT RANTWR FAR __ RANTWR SAT 2 13 SAIS E 15 5 2 16 ALL TELSSIB TELSSI8 AIL TEL 5819 19 TEL327195 2 24 Spared Type Call Out Wire Wire Wire TW Ls D Wire Wire Wire Wire Wire Nyy SIE 5 zu ru iey e PE APPENDIX 3 2 11 Phitsanulok CONTRA Telephone Channels Capacity Signaling Working Positions Connect to Type Call In Call Out Remark 2 ALL T BACCS4 Wire Ringin _ Loop OulDTMF PSTN amp PABX Interface ALL D Wire A D Wire A 2 Wire 2 Wire TS 7709 p Wire TS 7715 TS 7010 TS 7016 IL Dora N N N N N N N N N N N N TWR KT TWR TR AP TS 6709 z ry L L L L L L L L L L L L L L L L ICS 55988 EL 7000 A EL 7015 A EL 7016 A TEL 266 381 A TEL 301 425 A MET DOA Sparel ALL Spare ALL Spare ALL Spared 4 n M PALL E PALL E PALL l ALL E E APPENDIX 3 2 12 Huahin CONTRA Telephone Channels Capacity Signaling Working Positions Connect to
58. APP MOPS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities E levels that the system best suited for HTY APP CON TRA is capable of The Tenderer shall propose and detail all the contingency and backup capabilities E levels that the system best suited for PUT APP MOPS is capable of Part 2 2 1 Scope of Technical Specifications Page 197 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 10 11 12 13 14 15 16 Specifications doc The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for PUT APP CON TRA is capable of The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for PSL APP MOPS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for PSL APP CON TRA is capable of The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for HHN APP MOPS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for HHN APP CON
59. E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc 9 8 Uninterrupted Power Supply 501 The Tenderer shall propose and detail the UPS configuration best suited for all E systems at Tung Mahamek Site UPS02 The Tenderer shall propose and detail the connection between metro electric engine to the UPS at Tung Mahamek Site UPS03 The Tenderer shall propose and detail the wiring diagram from UPS to equipments E at Tung Mahamek Site UPS04 The Tenderer shall propose the list of supplies of UPS equipments and related E components for Tung Mahamek Site 505 The Tenderer shall provide product description Technical Characteristics of UPS D systems Static Transfer Switch and other related components at Tung Mahamek Site 506 The Tenderer shall propose and detail the UPS configuration best suited for all E systems at Chiang Mai Site UPS07 The Tenderer shall propose and detail the wiring diagram from UPS to equipments E at Chiang Mai Site 508 The Tenderer shall propose the list of supplies of UPS equipments and related E components for Chiang Mai Site 509 The Tenderer shall provide product description Technical Characteristics of UPS D systems Static Transfer Switch and other related components a
60. OPSUP Operational Supervisor PABX Private Automatic Branch Exchange PC Planner Controller PSL Phitsanulok Airport PSL APC Phitsanulok Approach Control Centre PSP Pseudo Pilot PSPWS Pseudo Pilot Workstation PSR Primary Surveillance Radar PSN Parking Stand Number PSTN Public Switched Telephone Network PTT Push to talk PUT Phuket Airport PUT APC Phuket Approach Control Centre QNH The barometric pressure QoS Quality of Service RAID Redundant Array of Independent Disks RAM Reliability Availability and Maintainability RATEM Regional Air Traffic Flow Management System Regional Air Traffic Flow Management Unit Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Document Reference File Reference Volume II Technical Terms Volume II Part 2 1 Scope of of Reference Technical Specifications doc Date December 14 2012 Version 1 0 Abbreviation FullName RDBMS Relational Database Management System REC Recording REC REP Recording and Replay REP Replay RLIM radio line interface module RMON Remote Network MONitoring RPF Route Planning Feature RPLs Repetitive Flight Plans RTS Remote Tower System SBA Suvanabhumi Airport SDP Surveillance Data Processing SDPS Surveillance Data Processing System SFPL System Flight Plan SID St
61. Over Temperature Inverter Under Over Voltage amp Inverter Overload INDICATIONS The UPS should be provided with Multi function LCD Panel for monitoring amp control UPS COMMUNICATION RJ 45 10 100 Base T Directly through LAN connection using SNMP NETCOM Card UPS SOFTWARE The UPS should be provided with Software compatible to Windows for real time monitoring of all the vital parameters such as Input Voltage Output Voltage Battery Voltage Output Load etc and Control the UPS using LAN connection ADDITIONAL FEATURES Automatic Bypass Switch Maintenance bypass switch Display of status health of UPS on LCD with data logging ENVIRONMENTAL Operating Temp 0 to 40 degree C Relative Humidity 0 to 95 PARAMETERS RH ACOUSTIC NOISE lt 75 dBA meter Part 2 2 1 Scope of Technical Specifications Page 190 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope of Technical 1 0 Specifications doc Details Criteria ADDITIONAL FEATURE The UPS System should use the most advanced Microprocessor technology and have state of the art technology with high degree of reliability in operation for continuous operation 24 hrs and 365 days a year The UPS System will provide external connection via IP Network for external system to execute the control and monitoring feature using Simple Net
62. Terms of Reference of Technical 1 0 INCO22 INCO23 INCO24 INCO25 INCO26 INCO27 INCO28 INCO29 Specifications doc exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the APPS any other internal systems information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the list of external system interface of system best suited for all Tower Systems which shall include at minimum communication protocol dimension of external system and numbers of channel of each external interface The Tenderer shall propose and detail the Tower System AGDL System information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the Tower System Airport Surveillance Systems information exchange for Tower System Level III including all necessary standards documents and ICDs The Tenderer shall propose and detail the Tower System CATIS System information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the Tower System CCMS information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the Tower System Other System information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the Tower System any other interna
63. and pilots Hat Yai Approach Control Centre HTY APC The HTY APC provides approach control services within terminal control areas TMA and control zones of the 4 airport areas HTY APC operators coordinate with four 4 groups of operators BACC BAPC HTY local tower associated remote towers and pilots Hat Yai Airport HTY Local Tower HTY Local Tower is under responsibility of HTY APC HTY local tower operators coordinate with three 3 groups of operators APC AO and pilots Part 2 2 1 Scope of Technical Specifications Page 14 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 3 21 Remote Towers associated with 3 22 3 23 3 24 3 25 3 26 3 27 There are three 3 Remote Towers associated with HTY APC Remote towers operators coordinate with three 3 groups of operators HTY APC respective AO and pilots Phuket Approach Control Center PUT APC The PUT APC provides approach control services within terminal control areas TMA and control zones of the 3 airport areas PUT APC operators coordinate with four 4 groups of operators BACC BAPC PUT local tower associated remote towers and pilots Phuket Airport PUT Local Tower PUT Local Tower is under responsibility of PUT APC PUT local tower
64. e APPIBS SDP31 The Tenderer shall propose and detail the maximum number of simultaneous Graphic RADAR weather picture that are supported by Weather information processing of both MSDP and FSDP of the system as follow e NAS MOPS e NAS CON TRA e NAS IBS e APP MOPS APP CON TRA e APP IBS SDP32 The Tenderer shall propose and detail the methodology and parameters used to configure the Multi Sensor Fusion processing SDP33 The Tenderer shall propose and detail methodology to display Weather information to the ATC SDP34 The Tenderer shall propose and detail the methodology and capability to manage the redundant surveillance data input of both MSDP and FSDP SDP35 The Tenderer shall propose and detail the methodology and capability to detect the communication problems and or low quality data SDP36 The Tenderer shall provide product description of the proposed system detailing surveillance data input firewall functionalities capabilities and benefits SDP37 The Tenderer shall propose and detail methodology to analysis and filter out the incomplete surveillance messages SDP38 The Tenderer shall propose and detail the capability and notification of plot Part 2 2 1 Scope of Technical Specifications Page 225 D D D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Refe
65. e Layered network security that uses routers switches and firewalls to set up virtual network and demilitarized zone and Part 2 2 1 Scope of Technical Specifications Page 16 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc e Centralized security monitoring that allows specific users to monitor and log system status and security events such as all user access and intrusion 4 2 The NAS MOPS Figure 6 summarizes the context where the NAS MOPS operates exchanging data with the External Systems and the pertinent Internal Systems Part 2 2 1 Scope of Technical Specifications Page 17 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference File Reference Volume II Part 2 1 Scope of Technical Specifications doc Date December 14 2012 Version 1 0 Intersystem gt AMHS Msg Data Intersystem gt CIFDPS _ Msg Dsta 55 4 Internal Msg gt APP IBS Internal Msg 1 Internal Msg 1 Internal Msg 1 Internal Msg 1 Internal Msg 1 Internal Msg Internal Msg Internal Msg End Systems
66. flying into an Approach Path Monitoring area APM volume of airspace with a heading within an adapted range The Tenderer shall propose and detail the methodology and parameters used to define APM volumes of airspace The Tenderer shall propose and detail how the APM perform for both precision and non precision instrument approaches The Tenderer shall propose and detail the methodology to inhibit APM alerts for the predefined the APM volume of airspace or individual flights to suppress unnecessary alerts Monitoring Aids The Tenderer shall provide product description of the proposed system detailing monitoring aids MONA functionalities capabilities and benefits The Tenderer shall propose and detail all information used to improve the MONA The Tenderer shall propose and detail the methodology to enable and or disable each MONA feature The Tenderer shall propose and detail the methodology to prevent unauthorized user to enable and or disable each MONA feature The Tenderer shall provide product description of the proposed system detailing conformance monitoring functionalities capabilities and benefits The Tenderer shall propose and detail all types of trajectory used by MONA The Tenderer shall propose and detail all types of conformance monitoring Part 2 2 1 Scope of Technical Specifications Page 233 D D D D D D D D E Project Name Date Thailand Modernization Decembe
67. such as controlled airspace danger areas prohibited areas restricted areas and temporary restricted areas The APW will issue an alert when an aircraft is about to infringe a defined volume within a pre defined time interval and when an aircraft has entered a APW volume of airspace based on the surveillance data and or flight plan data The APW volume of airspace will be defined in adaptation data and their activation times should be modified on line Moreover the APW volume of airspace will be created dynamically on line The APW will outline the APW volume of airspace on the CWSs in an adapted format to alert the ATC at an adaptable time interval before APW volume of airspace becomes active at pre warning stage The APW volume of airspace will be outlined in another adapted format when the APW volume of airspace becomes active active stage It may be necessary to inhibit alerts for predefined volumes of airspace e g exercise areas or for specific flights e g Military Aircraft s to suppress unnecessary alerts In addition APW will be capable of using different parameters for generation of alerts Different parameters may be applied in the case of system degradation e g unavailability of one or more RADAR ADS B stations Approach Path Monitoring The Approach Path Monitoring APM is a safety net which uses surveillance data prediction to assist and warn the ATC when an aircraft is or is predicted to be flying into an
68. workstations for NAS The Tenderer shall propose the list of supplies for all Software for Optional workstations for all Level II Category Tower Systems The Tenderer shall propose the list of supplies for all Software for Optional workstations for all Level III Category Tower Systems The Tenderer shall propose the list of supplies for all Network Equipment for Optional workstations for NAS The Tenderer shall propose the list of supplies for all Network Equipment for Optional workstations for all Level II Category Tower Systems The Tenderer shall propose the list of supplies for all Network Equipment for Part 2 2 1 Scope of Technical Specifications Page 210 E E E E E E D D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 PLQN20 21 PLQN22 PLQN23 PLQN24 PLQN25 PLON26 PLQN27 Specifications doc Optional workstations for all Level III Category Tower Systems The Tenderer shall propose the future expansion capabilities of NAS The Tenderer shall propose the future expansion capabilities of CMA APP System The Tenderer shall propose the future expansion capabilities of HTY APP System The Tenderer shall propose the future expansion capabilities of PUT APP System The Tenderer shall pro
69. 151 SMU RCAG 152 PUTRCAG 153 PUT RCAG 154 Emergency SMU RCAG 158 SRT RCAG 156 SRTRCAG 157 SRT RCAG H 158 5 155 159 SMU 160 123 95 SMU RCAG 123 95 161 NKS RCAG 162 HTY RCAG 163 HTY RCAG 164 SMU RCAG 165 SMU RCAG 166 HTY RCAG 167 HTY RCAG 168 Emergency SMU RCAG 169 DOI RCAG 170 DOIRCAG 7i LPN RCAG 172 UDN RCAG 173 UDN RCAG 174 LOI RCAG 175 DOI RCAG 176 DOIRCAG 177 UDN RCAG 178 UDN RCAG 179 Emergency INT RCAG 180 Emergency UDN RCAG VHF VH 182 UDN RCAG 183 LOY RCAG 184 LOY RCAG 185 UDN RCAG 186 UDN RCAG 187 LOY RCAG F F F F F F F F F F F F 188 U LOY RCAG 189 KKN RCAG 190 KKN RCAG 191 UBL RCAG 192 UBL RCAG 193 ROL RCAG 194 KKN RCAG 195 KKN RCAG 196 UBL RCAG 197 UBL RCAG 198 Emergency UBL RCAG 199 Emergency Local Main 200 Emergency Local Stby 201 Emergency Local Main Channel 2 243 0 2499 132 05 132 05 124 1 124 1 0 20 204 205 20 20 20 209 210 21 212 213 214 215 216 217 218 219 220 221 2 2 2 228 22 2 22 2 22 22 22 230 231 232 233 234 235 236 237 238 gt 2 2 2 2 2 2 2 2 248 2 250 251 252 2 3 6 7 8 3 4 5 6 7 9 0 3 4 5 6 7 9 4 4 4 4 4 4 4 4 Detail Emergency Local Stby F C Mainl F C Stby1 F C Main2 F C Stby2 Backup 1 Main Backup 1 Stby DM Backup 1 DM Backup 2 DM
70. 2 1 IP Cloud Network Equipment From the diagram the detailed of each connection are listed in table below Please note that all ATS related systems will share the same network infrastructure and bandwidth when connecting to cloud Location of Network Equipment Network Site Reference Building Floor Equipment Bandwidth Connector Code Name Type to from Type cloud Tung Mahamek 01 New 2 Layer 3 100 Mbps RJ 45 Operation Router Switch 10 100 1000 Building 02 Existing 1 Layer 3 100 Mbps RJ 45 Operation Router Switch 10 100 1000 Building SBA A03 ATC 5 Layer 3 100 Mbps RJ 45 Support Router Switch 10 100 1000 Building A04 Emergency 3 Layer 3 100 Mbps RJ 45 Building Router Switch 10 100 1000 DMA 14 DMA 4 Layer 3 10 Mbps RJ 45 Tower Router Switch 10 100 1000 Chiang Mai Site 05 2 3 10 Mbps RJ 45 Building Router Switch 10 100 1000 Hat Yai Site 06 2 Layer 3 10 Mbps RJ 45 Building Router Switch 10 100 1000 A07 Training 1 3 10 Mbps RJ 45 Building Router Switch 10 100 1000 Phuket Site 08 1 Layer 3 10 Mbps RJ 45 Building Router Switch 10 100 1000 09 Admin Bld 2 Layer 3 10 Mbps RJ 45 Router Switch 10 100 1000 Phitsanulok Site 10 PSL 1 Layer 3 10 Mbps RJ 45 Building Router Switch 10 100 1000 All Admin Bld 3 Layer 3 10 Mbps RJ 45 Router Switch 10 100 1000 Hua Hin Site A12 Operation 5 Layer 3 10 Mbps RJ 45 A13 AFL Bld 1 Layer 3 10 Mbps RJ 45 Router Switch 10 100 1000
71. 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 2 2 2 3 2 4 For TMCS all systems servers with the exception of CON TRA s servers in the scope of this project will be duplicated and operate simultaneously Furthermore all systems in the scope of this project will achieve the dual redundant network capability Level II Fallback Processing System The Fallback Processing System is another system running in parallel with the Main Processing System It comprises at minimum the Fallback Surveillance Data Processing System F SDPS As the name implies the F SDPS acts as the fallback mechanism when the Main Surveillance Data Processing System M SDPS fails Users can choose the F SDPS at any time without interruption to their operation Moreover to ensure protection from software anomaly failure F SDPS will use different software algorithm from the M SDPS For TMCS the NAS the NAS IBS the APP IBS the BAPP System the CMA APP System the HTY APP System the PUT APP System the PSL APP System and the HHN APP System will achieve this level II Level III Surveillance Direct Access This Surveillance Direct Access supports the situation when all duplicated Surveillance Data Processing System SDPS fail unexpectedly The system will be able to provide direct surveillance information Surveillance Dire
72. 247 8 20 Data Set Management sccc ccsccecsceseisteccsseccesessssoocessedeasssosessssodensssoadsboasescaecsosssenscets 247 8 21 Network Management 249 8 22 Control and Monitoring System ccsccssscsssscsssscsssscsssccsssccsseccssccssssesssscssscees 249 8 23 Contingency Training System c cccsscccsssccssscsssscsssscsssscsssscsscccssecessesesssscsscsens 250 8 24 Computer Based Training Software 252 8 25 Tower Surveillance Data Processing 253 8 26 Tower Flight Data Processing 4 eee eerte eee eee ette eet tene tetas tetas tetas tna 254 8 27 Tower Controller Workstation T CWS 255 9 Technical Characteristic Submittal eere 257 9 1 Workstations Characteristic 257 9 2 Server enini 260 9 3 SA 260 9 4 LU 260 9 5 Reliability Availability and Maintainability 261 9 6 Performance and Capacity eee ee eee teens teens tas etas etas setas euo 262 Part 2 2 1 Scope of Technical Specifications Project ate Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 9 7 Design N 263 9 8 Unin
73. 4 4 4 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 N N 2 Approach Sector 3 5 6 7 8 9 0 1 2 3 5 6 7 9 0 2 3 3 95 95 95 3 Il Il Il Il Il Il Il Il Il Il Il Il Il Uo Go Gof Gof Go aA 40 Connect to Local Main Local Stby Local Main Local Stby Local Main Local Stby Local Main Local Stby Local Main Local Stby Local Main Local Stby Local Main RCAG NTW RCAG NTW RCAG NTW RCAG NTW Local Main RCAG TRN RCAG TRN Local Main RCAG PT RCAG PT CATIS BACKUP Emergency Emergency Emergency Emergency Flight Check Emergency Emergency Main Stby Main Stby Main Stby Main Stby APPENDIX 3 3 4 Phuket Main Fallback Radio Channels Capacity Connect to Local Main Ground 121 900 Local Stby Ground HF Local Main Ground UHF Local Stby Local 118 100 Local Main Local 118 100 Local Stby Local 236 600 Local Main Local 236 600 Local Stby Approach 124 700 Local Main Approach 124 700 Local Stby Approach 284 000 Local Main Approach 284 000 Local Stby Approach 120 700 Local Main Approach 120 700 Local Stby KBI Approach 120 050 Local Main DDN KBI Approach 120 050 RCAG KBI KBI Approach 120 050 RCAG KBI RAN Approach 125 100 RCAG RAN RAN Approach 125 100 RCAG RAN All 128 000 CATIS A 122 450 BACKUP All 121 500 Emergency All 121 500 Emergency All 243 000 Emergency A 243 000 Emergency Approach 132 050 Flight Check Area PUT S5 Emergency Appr
74. 6 1 4b VCCS Administrative Building 2 Floor Equipment Room PAD 203 Attachment 6 1 4b End System PUT LTS PUT Local Tower PUT APC Building 9 Floor Local Tower Control Room PUT901 Attachment 6 1 4a Equipment Redundant Data processing PUT APC Building 2 Floor Equipment Room PUT102 Attachment 6 1 4a UPS UPS 2 Administrative Building 1 Floor UPS Room PADIOI Attachment 6 1 4c Table 23 Summary of PUT APP Site Information Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume Part 2 1 Scope of Technical Specifications doc Volume II Terms of Reference 6 1 5 Phitsanulok Site The facilities at Phitsanulok Site related to TMCS consists of two 2 building which are The Phitsanulok Approach Control Centre PSL APC Building and Administrative Building Attachment 6 1 5 illustrates the location of the buildings a PSL APC Building There are three 3 rooms allocated for the TMCS in the PSL APC Building b Administrative Building There are three 3 rooms allocated for the TMCS in the Administrative Building Each room is planned for specific operation purpose Please be advised that at the present there are others equipments installed in some rooms The site survey and site evaluation are recommended The following table describes the TMCS equipments and their planned installed rooms at Phitsanulok Si
75. AND AFTER SALE SERVICE REQUIREMENTS 17 1 Service e 17 2 b fieri M 18 3 D 18 Part3 SUPPORT AND AFTER SALE SERVICE Page 3 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume Part 3 Support Volume II Technical Terms of and After Sale 10 Service_Final doc 4 19 5 Spare 19 6 Tools and Test Equipments ssiccccsscsssdssscisseisisssassccrscenssssenctsaniesssssssanscaressssancnaice 19 Part3 SUPPORT AND AFTER SALE SERVICE Page 4 of 19 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference System Name File Reference Volume Part 3 Support and After Sale Service_Final doc Date December 14 2012 Version 1 0 INTRODUCTION PART 3 describes supported items and post implementation Activities requirement for TMCS in order to sustain its operability through to the end of system lifecycle Such requirement including but not limited to Training Documentation and Spare Part will be provided In addition PART 3 contains guideline information for Tenderers to understand the purpose of AEROTHAI s require
76. ATM System TMCS Document Reference File Reference Version Volume Part 3 Support Volume II Technical Terms of and After Sale 10 Service_Final doc 010 The Tenderer shall propose and describe the support to develop the training D and refresher training course for future in house maintenance training 011 The Tenderer shall propose the list of training materials that will be provided for all training courses 4 Documents DOC001 Tenderer shall provide the list of delivery document of the TMCS project including detail of document such as number of document language document format 5 Spare parts 5 001 Tenderer shall propose the scope of supply of spare parts for TMCS D 6 Special Tools and Test Equipment 001 Tenderer shall propose the scope of supply of tools and test equipments for D TMCS that will be provided for software and hardware maintenance including but not limited to software tools and ASTERIX test tools Part3 SUPPORT AND AFTER SALE SERVICE Page 19 of 19 Attachments for Site Information 1 id Queso 10 11 12 13 14 15 16 17 18 19 20 Attachment 6 1 1 location of New Operation Building and Existing Operation Buildings at Tungmahamek Site Attachment 6 1 1a The location of the Operation Room Fallback System Room and UPS 2 Room of NAS MOPS Attachment 6 1 1b The location of the Pre tactic
77. Backup 3 DM Backup 4 SB Backup 1 SB Backup 2 SB Backup 3 SB Backup 4 SB Backup 5 SB Backup 6 SMU Backup 1 SMU Backup 2 KMN Backup UBL Backup CDC SB Main CDC SB Stby CDC SB Main CDC SB Stby CDC SB Main CDC SB Stby CDC SB Main CDC SB Stby KKN APP RCAG KKN APP RCAG KKN APP RCAG KKN APP RCAG SKN APP RCAG SKN APP RCAG SKN APP RCAG SKN APP RCAG UDN APP RCAG UDN APP RCAG UDN APP RCAG UDN APP RCAG LOY APP RCAG LOY APP RCAG LOY APP RCAG LOY APP RCAG UBL APP RCAG UBL APP RCAG UBL APP RCAG UBL APP RCAG ROT APP RCAG ROT APP RCAG Connect to Radio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio
78. COTAO6 COTAOT COTAOS8 COTAO09 TRAOI 02 TRAO3 TRAO4 TRAOS Specifications doc The Tenderer shall propose and detail the methodology to synchronize all information between NAS CON TRA and NAS MOPS The Tenderer shall propose and detail the methodology to synchronize all information between each APP CON TRA and its corresponding APP MOPS The Tenderer shall propose the software version of NAS CON TRA in Contingency mode software in comparison to NAS MOPS software The Tenderer shall propose the software version of each APP CON TRA in Contingency mode software in comparison to its corresponding APP MOPS software The Tenderer shall propose and detail the methodology to reconfigure the CON TRA from the Training mode to Contingency mode and vice versa The Tenderer shall propose the usage time to reconfigure the CON TRA from the Training mode to Contingency mode and vice versa The Tenderer shall provide product description of the proposed system detailing CON TRA in Training mode functionalities capabilities and benefits The Tenderer shall propose and detail the capability of games feature in the CON TRA in Training mode The Tenderer shall propose and detail the capability of session feature in the CON TRA in Training mode The Tenderer shall propose and detail the capability of exercise feature in the CON TRA in Training mode The Tenderer shall propose and detail the capability i
79. CWS The CMA APP System can accommodate the concurrent operation of additional 6 workstations as listed below be further expanded with additional 6 CWS The HTY APP System can accommodate the concurrent operation of additional 6 workstations as listed below be further expanded with additional 6 CWS The PUT APP System can accommodate the concurrent operation of additional 6 workstations as listed below be further expanded with additional 6 CWS The PSL APP System can accommodate the concurrent operation of additional 4 workstations as listed below be further expanded with additional 4 CWS The HHN APP System can accommodate the concurrent operation of additional 4 workstations as listed below be further expanded with additional 4 CWS The NAS IBS can accommodate the concurrent operation of workstations as listed in the table below NAS IBS Workstation Quantity Location Operator Role CWS FDWS DAWS CMWS NMWS DSWS EC PC ACC 32 TBD PC APP 20 AMAN ACC 3 Part 2 2 1 Scope of Technical Specifications Page 93 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope of Technical Specificati
80. Call In Call Out Remark 6 p Wie Ringin Loop OwDTMF PSTN amp PABX Interface ALL p Wire Ringin Loop OwDTME PSTN amp PABX Interface L9 ALL 5291 Wire Ringin Loop OuvDTMF PSTN amp PABX Interface 3 3 Radio lines capacity of each site APPENDIX 3 3 1 Tungmahamek Main Fallback Radio Channels Capacity Channel Working Position SECTOR 1 SECTOR 1 SECTOR 1 SECTOR 1 SECTOR 1 SECTOR 1 SECTOR 1 SECTOR 1 SECTOR 1 ECTOR 1 Upper ECTOR 1 Upper ECTOR 1 Upper ECTOR 1 Upper SECTOR 1 1 SECTOR 1 1 SECTOR 1 1 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 2 SECTOR 3 SECTOR 3 SECTOR 3 SECTOR 3 SECTOR 3 SECTOR 3 SECTOR 3 SECTOR 3 SECTOR 3 SECTOR 4 SECTOR 4 SECTOR 4 SECTOR 4 SECTOR 4 SECTOR 4 5 5 5 5 N NIN WIN p gt A Alul Aju ER CU Ec E3071 gt a des em 20 Ep 22 E99 3 EE 2 28 53017 E pe 40 24 2 pasen ENT B _48_ Frequency MHz 120 5 120 5 120 5 120 5 120 5 256 6 256 6 256 6 256 6 lt
81. Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record Radio Channel Record Radio Channel Record m Connect to Radio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record Channel Detail 253 ROT APP RCAG UHF 136 255 123 6 KRT APP RCAG 256 123 6 KRT APP RCAG 257 KRT APP RCAG U U 258 KRT APP RCAG U U 259 119 45 BRM A
82. E E E E D E E D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 UPS38 UPS39 UPS40 UPS41 Specifications doc systems Static Transfer Switch and other related components at Nakhon Si Thamarat Airport Site The Tenderer shall propose and detail the UPS configuration best suited for systems at all Level II Airport Sites The Tenderer shall propose and detail the wiring diagram from UPS to equipments at all Level II Airport Sites The Tenderer shall propose the list of supplies of UPS equipments and related components for all Level II Airport Sites The Tenderer shall provide product description Technical Characteristics of UPS systems Static Transfer Switch and other related components at all Level II Airport Sites Part 2 2 1 Scope of Technical Specifications Page 267 E E D Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference SECTION D Appendices File Reference Volume II Part 2 1 Scope of Technical Specifications doc Date December 14 2012 Version 1 0 Part 2 2 1 Scope of Technical Specifications Page 268 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference
83. EC PC APP Room FDO 1 CMA AMAN Building TACTSUP Equipment Room CMA APC Building DSO Part 2 2 1 Scope of Technical Specifications Page 82 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope of Volume II Terms of Reference Technical Specifications doc 1 0 CMA APP MOPS Workstation Quantity Location Operator Role CWS FDWS CMWS DSWS DAWS NMWS Total 10 1 1 1 1 1 Table 35 List of workstation quantities for CMA APP MOPS 7 4 2 CMA APP CON TRA CMA APP CON TRA Workstation Quantity Location Operator Role CWS FDWS PSPWS TMCWS CMWS DSWS EC PC APP 4 CON TRA Room MTN 2 CMA APC TMC 1 Building FDO PSP 4 DSO 1 Total 4 5 1 1 CMWS for CMA APP CON TRA will be placed together with MTN workstations of CMA APP MOPS Table 36 List of workstation quantities for CMA APP CON TRA 7 5 HTY APP System Located at Hatyai airport the HTY APP System has two systems The planned quantities of positions are described in table format 7 5 1 HTY APP MOPS HTY APP MOPS Workstation Quantity Location Operator Role CWS FDWS CMWS DSWS DAWS NMWS 6 Building AMAN TACTSUP 1 Equipment Room
84. Hua Hin Site ey 6 00 m HHN Local Tower Control Room HHN801 Operation Room HHN601 pec th tas 8 floor HHN APC Building Floor Plan 6 floor HHN APC Building Floor Plan Attachment 6 1 6a The location of the Operation Room and Local Tower Control Room of HHN APP MOPS and HHN LTS 7 floor HHN APC Building Floor Plan Attachment 6 1 6b The location of the Equipment Room of HHN APP MOPS and HHN LTS 0 Toilet CON TRA Room AFL101 1 floor Air Field Lighting Building Floor Plan Attachment 6 1 6c The location of the CON TRA Room of HHN APP CON TRA AU Lu ATC Support Building SBA Tower Building Attachment 6 1 7 The location of ATC Support Building SBA Tower Building and Emergency Buildings at Suvarnabhumi Airport Site Operation Room b 4 floor ATC Support Building Floor Plan Attachment 6 1 7a The location of the Operation Room of BAPP MOPS ATS Data backup System Trunk Radio Network Equipments VCCS Equipments Equipment Room ATC521 Jg EE 2 58 Be Control amp Monitor Equipments 5 floor ATC Support Building Floor Plan Attachment 6 1 7b The location of the Equipment Room of BAPP MOPS 7 floor SBA Tower Buil
85. MTN 2 1 1 1 ATC Support Building DSO 1 Total 26 2 1 1 1 1 Table 32 List of workstation quantities for BAPP MOPS Part 2 2 1 Scope of Technical Specifications Page 81 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference File Reference Volume II Part 2 1 Scope of Technical Specifications doc Date December 14 2012 Version 1 0 7 2 2 BAPP CON TRA BAPP CON TRA Workstation Quantity Location Operator Role CWS FDOWS PSPWS TMCWS CMWS DSWS PC APP 16 CON TRA Operation MTN 1 Room TMC 1 Emergency Building FDO PSP 10 DSO 1 Total 16 11 1 1 Table 33 List of workstation quantities for BAPP CON TRA 7 3 Air Defense Units BACC BAPC operation will exchange information with Air Defense Unit in order to coordinate The planned quantities of role positions are described in table format Air Defense Units Workstation Quantity Location Operator Role CWS Big Shell ADF 1 Oscar ADF 1 Focal ADF 1 Total 3 Table 34 List of workstation quantities for Air Defense Units 7 4 CMA APP System Located at Chiangmai airport the CMA APP System has two systems The planned quantities of role positions are described in table format 7 4 1 CMA APP MOPS CMA APP MOPS Workstation Quantity Location Operator Role CWS FDWS CMWS DSWS DAWS NMWS Operation
86. N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N amp PABX Interface N N aei fas aei jaci ial ias AJAJAJA 91 9 TOT AJAJAJA 91 9 aei faci fai iae AJAJAJA Signaling Working Positions Connect to Type Call In Call Out Remark PABX Interface N amp PABX Interface 109 N amp PABX Interface WALLOW N amp PABX Interface SCAR S6 Wire N amp PABX Interface ie PABX Interface Wi N amp PABX Interface _DDN Wire N amp PABX Interface UL6 SA Wire N amp PABX Interface Wire N amp PABX Interface GNS PABX Interface R N amp PABX Interface AT N amp PABX Interface SL APP N amp PABX Interface N amp PABX Interface cal Wi N amp PABX Interface Wire N amp PABX Interface Wir N amp PABX Interface SCAR 57 Wire N amp PABX Interface TN_N Wire N amp PABX Interface Wire N
87. Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 TFDPO07 8 8 27 TCWSOI TCWS02 TCWSO023 TCWS04 505 TCWS06 TCWSO7 TCWSOS TCWS09 Specifications doc The Tenderer shall provide product description of the proposed system detailing Correlation with Surveillance data features The Tenderer shall provide product description of the proposed system detailing SSR code assignment and management features Tower Controller Workstation T CWS The Tenderer shall provide product description of the proposed system detailing T CWS functionalities capabilities and benefits The Tenderer shall provide product description of the proposed system detailing ASD functionalities capabilities and benefits In case of the servers fail The Tenderer shall propose how the ASD present the actual traffic situation The Tenderer shall provide product description of the proposed system detailing Track presentation of ASD The Tenderer shall provide product description of the proposed system detailing Label presentation of ASD The Tenderer shall provide product description of the proposed system detailing GSD functionalities capabilities and benefits In case of the servers fail The Tenderer shall propose how the GSD present the actual ground traffic situation The Tenderer shall provide product description of the proposed system detailing configuration of multiple view layout pop
88. Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference File Reference Volume II Part 2 1 Scope of Date December 14 2012 Version 1 0 Technical Specifications doc Message Data Data Format Input Output Reference ICD GRIB messages GRIB Input Tenderer provided ICD Weather Radar data TBD Input Tenderer provided ICD TBD To be discussed later Table 8 NAS MOPS MET System Information Exchange Description 4 2 15 NAS MOPS CCMS NAS MOPS connects with CCMS to send update information of system status warning and alarm messages using the following format Message Data Data Format Input Output Reference ICD System Status data TBD Output Tenderer provided ICD TBD be discussed later based on Simple Network Management Protocol SNMP Table 9 NAS MOPS CCMS Information Exchange Description 4 2 16 NAS MOPS Other Systems NAS MOPS connects with other systems to exchange AIM related information using at minimum the following format Message Data Data Format Input Output Reference ICD AIM AIXM messages AIXM Version 4 5 or better Input Output Tenderer provided ICD Table 10 NAS MOPS Other Systems Information Exchange Description 4 3 APPS Figure 7 summarizes the context where the APPS operates exchanging data with
89. STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface 1 d d d d 9 d d d d d d d d d d d d d d Signaling Working Positions Connect to Type CallIn Call Out Remark SMU Sector el 2003 2 Wire STN amp PABX Interface SMU Sector el 9613 STN amp PABX Interface SMU Sector el 02 286 0199 STN amp PABX Interface CTR Sector TR_TWR STN amp PABX Interface CTR Sector AN_TWR STN amp PABX Interface CTR Sector AE TWR STN amp PABX Interface CTR Sector CB TWR STN amp PABX Interface CTR Sector STN amp PABX Interface CTR Sector STN amp PABX Interface CTR Sector el 2008 STN amp PABX Interface CTR Sector el 9614 STN amp PABX Interface CTR Sector el 02 286 0224 STN amp PABX Interface Sparel pare STN amp PABX Interface Spare2 STN amp PABX Interface Spare3 are STN amp PABX Interface Spare4 STN amp PABX Interf
90. Specifications doc Additionally a consistent presentation method for depicting object statuses alerts warnings co ordination etc between different presentation objects and windows provides an intuitive appreciation of the condition Traffic Situation Presentation The Traffic Situation Presentation is the primary tool providing traffic data to support the EC and is a secondary tool for supporting other users PC OPSUP etc to obtain situation awareness The Traffic Situation Presentation is composed of selectable maps upon which the traffic and weather if available are projected Traffic data will consist of a representation of the track plot complemented by the label It contains all the information available in the correlated system track This information can be made available to the TMCS operators In order to meet the needs of both BACC and APPs operation the traffic display can be selected from either the system track picture or from a picture based on a single source This latter exploiting the higher update rate and increased accuracy of the target allows a reduction in the radar separation within parts of the APPs A number of graphical tools graphical flight leg projection range and bearing and the presentation of the ATC tools MONA Safety Nets etc are also incorporated in the Traffic Situation Presentation Map configurations are defined as part of the offline environment Each configuration comprises a numb
91. System IBS Independent Backup System RATFMS Regional Air Traffic Flow s Support Building ATC Complex Tone eres AIMS Airport Information Management System Nakhonrachasima Airport Management System 04 Emergency Building FLO3 A16 UDN Tower FLOS Aeronautical Message Handling System CIFDPS Central Initial Flight Data System CCMS Central CNS ATM Monitoring System Chiangmai Airport Contingency and Training System Don Muang Airport NAS Nationwide ATMC System MET Meteorological MIL Military Tower Operator MLAT Multi Lateration Surveillance System PUT Phuket Airport SBA Suvanabhumi Airport SSR Secondary Surveillance Radar SUR Suratthani Airport UBL Ubonrachathani Airport UDN Udonthani Airport WAM Wide Area MLAT 05 Building FL02 AD6 APC Building FLO2 Training Building FLO1 AD8 PUT APC Building FLO1 Admin Building FLO2 A10 PSL APC Building FLO1 A11 Admin Building FLOS Figure 10 Network Diagram System Capabilities Level III and IV A17 A18 SUR Tower FLOS Tower FLO7 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference File Reference Volume II Part 2 1 Scope of Technical Specifications doc Date December 14 2012 Version 1 0 6
92. TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 RECI6 REC18 REC19 8 15 DAANOI DAANO2 DAANO3 DAANO4 DAANOS DAANO6 DAANOT Specifications doc The Tenderer shall propose and detail the replay speeds that are suitable for replay function The Tenderer shall propose and detail the specific tool for screen image capture The Tenderer shall propose and detail the specific tool for exporting short period replay The Tenderer shall propose and detail all type of archive media for the purpose of record and replay data including export short period replay Data Analysis The Tenderer shall provide product description of the proposed system detailing Data Analysis functionalities capabilities and benefits The Tenderer shall propose and detail the facility to collect the recorded data and make them available for statistic and analysis The Tenderer shall propose and detail all statistical and analytical data that are created by data analysis function The Tenderer shall propose and detail all format of reports that are created by data analysis function The Tenderer shall propose and detail the facility to view the statistical data report and analytical data report The Tenderer shall propose and detail the methodology to create reports The Tenderer shall propose and detail the specific tools that are use
93. TRA is capable of The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for the following towers are capable of Korat Tower system Takhli Tower system U tapao Tower system and Kampangsan Tower system The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for the following towers are capable of Phitsanulok Tower system Hua Hin Tower system Khon Kaen Tower system Chiang Rai Tower system Ubon Ratchathani Tower system Krabi Tower system Surat Thani Tower system Sakon Nakhon Tower system Nakhon Phanom Tower system Nakhon Ratchasima Tower system Petchaboon Tower system Nan Tower system Phare Tower system Part 2 2 1 Scope of Technical Specifications Page 198 E E E E E E E Project Name Thailand Modernization CNS ATM System TMCS Document Reference File Reference Version Volume II Terms of Reference of Technical 1 0 COBAI17 18 19 20 21 22 Volume II Part 2 1 Scope Specifications doc Loei Tower system Buriram Tower system Roi Et Tower system Surin Tower system Chumporn Tower system Trat Tower system Mae Hong Son Tower system Lampang Tower system Sukhothai Tower system Tak Tower system Mae Sod
94. Technical Specifications Page 181 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference File Reference Date December 14 2012 Volume II Part 2 1 Scope of Technical Specifications doc Version 1 0 10 8 1 3 Phitsanulok Site and Hua Hin Site The planned numbers of UPS and their respective loads at each of the following sites Phitsanulok Site and Hua Hin Site is described in table as follow System System Description UPS UPS 2 UPS 3 APP MOPS Data processing X VCCS X F VCCS X End Systems X APP CON TRA Data processing X VCCS X End System X LTS End System X Table 58 UPSs for PSL APP System and HHN APP System and their respective loads The summary of UPS details required at each of the following sites Phitsanulok Site and Hua Hin Site is described in table as follow UPS O P Power Phase Type Type Responsibility 1 20 3 Phases TBP AEROTHAI 2 Tenderer Proposed Depending on Full Load Rate Type Tenderer 3 10 single Phase TBP AEROTHAI TBP Information to be provided by AEROTHAI when requested Table 59 Summary of UPS Details at Phitsanulok Site and Hua Hin Site Miscellaneous Electrical Components AEROTHAI will provide electrical cable connecting metro electric engine to the UPS However at each site the Tenderer will provide static transfer
95. Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Depending on availability tower system connects with AGDL System to exchange all air ground data communications to pilot using the data format as previously described NAS MOPS AGDL System If tower system connects to AGDL System then the tower system will need to provide connections to both ARINC and SITA e Tower System Airport Surveillance Systems Tower system connects with Surveillance Systems to receive at minimum the following information Message Data Data Format Input Output Reference ICD SSR data ASTERIX Cat 001 002 Input Tenderer provided ICD SSR Mode S data ASTERIX Cat 034 048 Input Tenderer provided ICD PSR data ASTERIX Cat 001 002 Input Tenderer provided ICD MLAT WAM data ASTERIX Cat 019 020 Input Tenderer provided ICD ADS B data ASTERIX Cat 021 Input Tenderer provided ICD SMR data ASTERIX Cat 010 Input Tenderer provided ICD System Track data ASTERIX Cat 062 063 065 Input Tenderer provided ICD Table 13 Tower System Surveillance Systems Information Exchange Description f Tower System AIMS Tower system connects with AIMS Airport Information Management System to coordinate information in order to support its operation using at minimum the following information Message Data Data Format Input Output Reference ICD Estimated Time of Arrival ETA Tenderer Act
96. The Tenderer shall propose and detail all aeronautical data that are imported from external system The Tenderer shall propose version of AIXM message format which supported by data set management function The Tenderer shall propose and detail the facility to backup and restore data set to from archive media The Tenderer shall propose type of archive media that are supported with the purpose of backup and restore the data set The Tenderer shall propose and detail the map editor s features and functionalities in order to create edit all aeronautical maps The Tenderer shall propose and detail all aeronautical maps that are supported by map generator The Tenderer shall propose and detail the facility and methodology to upload data set to all related systems functions Part 2 2 1 Scope of Technical Specifications Page 248 E D D E D D E E D E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 DSMI5 8 21 NMS0I NMS02 NMS03 822 CMSOI 502 Specifications doc The Tenderer shall propose and detail the facility and methodology to activate the new data set Network Management System The Tenderer shall provide product description of the proposed system detailing NMS functionalities capabilities and
97. The Tenderer shall propose and detail the audio level adjustment of the RLIM both in transmitting and receiving directions The Tenderer shall propose and detail the RLIM capability to interface using digital format The Tenderer shall propose a maximum number of radio lines per each RLIM Part 2 2 1 Scope of Technical Specifications Page 212 E E E D E E E D E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 VCCSI8 5 19 520 VCCS21 VCCS22 VCCS23 VCCS24 VCCS25 VCCS26 VCCS27 VCCS28 VCCS29 VCCS30 Specifications doc The Tenderer shall propose the main and standby transmitter and receiver channeling throughout The Tenderer shall propose and detail both quantity and type of telephone line interface modules The Tenderer shall propose a maximum number of telephone lines per TLIM The Tenderer shall propose and detail the audio level adjustment capability of the TLIM both in transmitting and receiving directions The Tenderer shall provide product description of the proposed Technical Control Unit TCU detailing functionalities capabilities and benefits The Tenderer shall propose and detail the authentication method when the user logs into the TCU The Tende
98. Tower system Ranong Tower system Trang Tower system Pattani Tower system and Narathiwat Tower system The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for the CMA LTS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for the HTY LTS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for the PUT LTS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for the UDN RTS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for the SMU RTS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities levels that the system best suited for the NST RTS is capable of Part 2 2 1 Scope of Technical Specifications Date December 14 2012 Page 199 E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc 3 Intersystem Connection Submittal INCOO1 INCOO INCOO3 INCO04 INCOOS INCOO6 I
99. Udon Thani Site The Tenderer shall propose and detail the network configuration for all systems at Surat Thani Site The Tenderer shall provide product description Technical Characteristics of network equipments and related components at Surat Thani Site The Tenderer shall propose and detail the list of supplies of network equipments and related components for Surat Thani Site The Tenderer shall propose and detail the network configuration for all systems at all Level I Category Tower Site The Tenderer shall provide product description Technical Characteristics of network equipments and related components at all Level I Category Tower Site The Tenderer shall propose and detail the list of supplies of network equipments and related components for all Level I Category Tower Site The Tenderer shall propose and detail the network configuration for all systems at all Level II Category Tower Sites The Tenderer shall provide product description Technical Characteristics of network equipments and related components at all Level II Category Tower Sites The Tenderer shall propose and detail the list of supplies of network equipments Part 2 2 1 Scope of Technical Specifications Page 208 E E D E E D E D E E D E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume I
100. Version Volume II Technical Terms of Requirements Vol II Part 2 2 2 Final 1 0 PART 2 SCOPE OF SPECIFICATIONS 2 2 OTHER QUALIFICATIONS Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Requirements Vol Part 2 2 2 Final 1 0 Table of Contents SECTION Other Qualifications ecce ee eee eee eee eene e sette eset en 3 1 Details of the aedi tanta Ua na dL 3 2 Financial Strength sur 4 3 Proof of Project Experiences sccsicssscscsscssciscassscsscdesessasaaceasssesesincanccadsnnszasbaasedesssavecases 5 4 Proof of Certification cisissccccsscsisceccccssiasssesscseccssdstececduasecasecdesesosersbedeccesssscossesedsasocens 7 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Requirements Vol II Part 2 2 2 Final 1 0 SECTION A Other Qualifications Tenderers are requested to submit their responses in four 4 categories Each category shall be detailed as per the format and enclosing the supporting documents listed in the format 1 Details of the Organization Detail of the Organization Name Nature
101. air traffic control operations reduce workload and to enable information sharing as well as Collaboration Decision Making CDM the FDP must be supported by a strip less operations The strip less will replace paper strips and enable the ATC to reduce manual coordination This is possible since clearances etc traditionally written on paper strips can now be directly entered via the track label or flight lists Once the ATC enters a clearance e g a cleared flight level the information will be known to the system and accessible by all operators From a system level point of view these inputs may be used to update functions in FDP Some functionality that improves safety or enhances automation is totally dependent on receiving this data At an operational level the information is automatically distributed to the relevant ATC which reduces and in some cases eliminates voice coordination between thereby reduce overall workload System Track Association Disasociation The FDP will support automatic and manual associate disassociation for discrete and non discrete codes callsign or aircraft address When association is successful the track display for the flight will change Automatic association uses the SSR code assigned to the flight and attempts to find a corresponding track transmitting that code In addition for Mode S or ADS B tracks aircraft callsign can also be used When a surveillance track is received from the SDP a
102. aircraft within the airspace sector to ensure no deviation from the clearances Provide radar separation between all IFR flights within the airspace sector Part 2 2 1 Scope of Technical Specifications Page 40 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Coordinate when required with other controllers authorized to perform air traffic control within the same airspace sector Initiate transfer of aircraft leaving the airspace sector for the next adjacent airspace sector Maintain an awareness of pertinent weather information which might influence the conduct of flights within the airspace sector Ensure that the display set up provides adequate coverage of the airspace sector and that the selected display complies with a Minimum Required Data defined to support the duties of an EC Maintain an awareness of significant system downgrades which affect the actual radar range operational coverage and system behavior Check routinely of the accuracy of the displayed label information on all own flights under control particularly when establishing initial contact Ensure that all radar tracks in respect of known traffic within the airspace sector are correctly correlated Keep the Operational Supervisor informed of any irregularities
103. amp PABX Interface PABX Interface Y N amp PABX Interface N amp PABX Interface N amp PABX Interface PABX Interface i N amp PABX Interface SAT Wire N amp PABX Interface Wir N amp PABX Interface Wire N amp PABX Interface Wir N amp PABX Interface Wire N amp PABX Interface Wire N amp PABX Interface Wire N amp PABX Interface Wire N amp PABX Interface SC_APP Wire N amp PABX Interface TN UD APP p Wire amp PABX Interface el 2005 Wir N amp PABX Interface KK KK d n 1 d ua d n d ua 4 EEE d Jd n N N d ua 4 UJ d H d un 4 gt N d ua 4 T N dl duly AJAA aaan N Fg N s E mgr uw gt Alo NINN a N d ua 4 N N d ua N d ua 4 N gt d ua 4 N CA bw d 07 5 i N d 9 n A lt Q Z N un N oo JE N xo gt m WW Qt Go WIN aei ial Gand Bend Band fae NINITNININ IN 5 mn s 5 KK 992 gt d un OY TWR KP KN TWR DN TWR X X SR UDN KKN N N N N N N CA NTN 9 n 92
104. an input control system to manage select the suitable radio and telephone lines to the Main Fallback and CON TRA VCCS according to the situation and mode of operation Power Disp workstations 3 floor 15 floor workstations 8 floor Clock Sys Disp _ workstations Power 3e floor 2 4 floor Figure 12 VCCS Composition of NAS Part 2 2 1 Scope of Technical Specifications Page 96 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc tA Volume II Terms of Reference Power Disp workstations Power Clock CONTRA Room Voice Rec CONTRA Room __ workstations Disp Approach Room EQPM Room Disp workstations Tower Room
105. and Switch over Times The time required for complete system start up from cold i e switched off such that full system capabilities are available will not exceed 15 minutes Part 2 2 1 Scope of Technical Specifications Page 175 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 10 7 10 7 1 Specifications doc The time required for automatic switchover of a failed component of the radar processing chain radar interfaces and tracking will not exceed 20 seconds In case of server and or network failure the switch over of redundant server and or network will be executed automatically and transparent to the users without any data loss or service interruption The time required to configure a workstation already powered up and allocated to the MOPS for complete operation at a sector will not exceed 25 seconds The aforementioned 25 seconds will includes the time between the instant that the OPSUP enters the reconfiguration command and the instant that the reconfigured workstation is available for operational use The time required for complete start up of a CWS from a powered off state to complete operation at a sector will not exceed 5 minutes Design Principles Hardware All components will be commercial off the shelf COTS and be field proven commercially available
106. and detail the inter connection configuration between VCCS workstation facilities and the VCCS central racks The Tenderer shall propose and detail the Position Record configuration of the VCCS and the proposed Digital Voice Recorder amp Replay System DVR The Tenderer shall propose and detail the Lines Record configuration of the VCCS and the proposed DVR The Tenderer shall propose and detail the methodology to monitor voice input output of any interfaces of both telephone and radio communications The Tenderer shall propose and detail the capability and performance of the fallback VCCS The Tenderer shall propose and detail the VCCS workstations facilities configuration and inter connection between main and fallback VCCS The Tenderer shall propose and detail the radio and telephone lines configuration and inter connection between main and fallback VCCS The Tenderer shall propose and detail the AC DC input power capability of the Fallback VCCS The Tenderer shall propose and detail the capability and performance of the CON TRA VCCS The Tenderer shall propose and detail the AC DC input power capability of the CON TRA VCCS Part 2 2 1 Scope of Technical Specifications Page 216 E E E E D E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Ref
107. arrivals If this results in an unbalanced situation between arrivals and departures it is envisaged that the arrival manager AMAN will start increasing the spacing of the arrivals to allow for departures and the DMAN would use the gaps as good as possible Controller Pilot Data Link Communication The purpose of the Controller Pilot Data Link Communication CPDLC function is to provide air ground data communication for the ATC service At the highest level the concept is simple with the emphasis on the continued involvement of the human at either end and the flexibility of use This includes a set of clearance information request message elements which correspond to voice phraseology employed by ATC procedures The ATC is provided with the capability to issue level assignments crossing constraints lateral deviations route changes and clearances speed assignments radio frequency assignments and various requests for information The pilot is provided with the capability to respond to messages to request clearances and information to report information and to declare rescind an emergency The pilot is in addition provided with the capability to request conditional clearances downstream and information from a downstream Air Traffic Services Unit A free text capability will be provided to exchange information not conforming to defined formats An auxiliary capability will be provided to allow a ground system to use data link
108. automatically processed Develop and distribute NOTAM s and meteorological messages and Assign of SSR codes to flights when not performed automatically h Tower Data Set Operator Tower Data Set Operator T DSO is responsible for fulfilling the following specific tasks at minimum Produce the complete set of parameters in a dataset that is specific for the current user environment and a specific system software version Evaluate the dataset when changes occur in order to ensure the validity of dataset Produce exercises to the simulator used for training and testing and Distribute the validated dataset to the system i Tower Evaluation Operator Part 2 2 1 Scope of Technical Specifications Page 56 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc The Tower Evaluation Operator T EO is responsible for at minimum e Prepare evaluations on recorded system data e Run evaluations on recorded system data Replay recorded data for incident analysis safety assessments as well as for technical analysis and evaluations and e Perform operational data analysis j Military Tower Operator The Military Tower Operator MIL is responsible for at minimum e Deliver of ATC clearances to departing IFR flights and e Issue departure ti
109. benefits The Tenderer shall propose and detail the capability of all functions in NMS application that are provided including at a minimum e network resource monitoring e routes analytics e Network configuration management e fault management e performance management The Tenderer shall propose and detail the NMS application in order to enhance management of network equipments resources such as network switches and routers etc Control and Monitoring System The Tenderer shall provide product description of the proposed system detailing CMS functionalities capabilities and benefits The Tenderer shall propose and detail all system control capabilities of CMS including at a minimum e Manual redundant servers switchover e Manual redundant external input switchover Part 2 2 1 Scope of Technical Specifications Page 249 E D E E D E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc e nhibit exhibit data line inputs Manual Start Stop function 503 Tenderer shall propose and detail all system monitoring capabilities of CMS E including at a minimum e Functions status such as SDP FDP etc e External interfaces status including channel in used channel problem etc e Internal network status incl
110. between the corresponding output from the Replay feature REP and other relevant recordings capability of the replay units The Tenderer shall propose and detail the archival media replay capability at the Part 2 2 1 Scope of Technical Specifications Page 219 E E E E E D D D E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc dedicated replay units VRS23 The Tenderer shall propose and detail the capability of the replay units to select any recording from recorder units VRS24 The Tenderer shall propose and detail the variable playback speed and pitch interval controller capability of the replay units VRS25 The Tenderer shall provide product description of the DVR supervisor units detailing functionalities capabilities and benefits VRS26 The Tenderer shall propose and detail the operations and parameter settings capability of the DVR supervisor units VRS27 Tenderer shall propose and detail all alert alarm indication methods of the DVR supervisor units VRS28 Tenderer shall propose and detail the capability and configuration of AC power supply of the recorder unit and the DVR supervisor unit VRS29 Tenderer shall propose and detail the configuration of the Fallback and CON TRA DV
111. collision between aircraft in surveillance coverage area It will alert on the potential infringement Predict Conflict Alert and actual infringement Conflict Alert by using the separation standards area of conflict between two 2 or more aircraft at any time Part 2 2 1 Scope of Technical Specifications Page 125 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 3 2 9 3 3 Specifications doc Two 2 stages of STCA warning will be provided a Predicted Conflict Alert PCA will alert when two 2 or more aircraft are predicted to enter an area of conflict within an adaptable time which will take into account of the velocities of concerned aircraft b Conflict Alert CA will alert when two 2 or more aircraft are within an area of conflict In addition STCA will take into account a RVSM aircraft RVSM Reduced Vertical Separation Minimum and whether the aircraft is are in the RVSM airspace The STCA will be capable of using different parameters to generate alerts in different STCA volumes of airspace at different moments in time A large number of volumes of airspace may need to be defined so that parameters can be tuned according to the use of individual volumes of airspace including which flights are eligible for the generation of alerts The authorized user
112. connects with corresponding CON TRA to synchronize their databases For essential data the update should be instantaneous in order to provide the complete operable system in case of contingency situation For synchronization of the whole database the update procedure should include specific time interval configuration Consequently the connection between APPS and CON TRA will need to be robust and has enough bandwidth for the synchronization purpose AEROTHAI will provide communication link between Buildings Therefore the Tenderer will provide cabling and configure network connection with enough performance to satisfy APPS to APP CON TRA synchronization 4 3 7 APPS MET System APPS connects with MET System to receive at minimum the information as described previously NAS MOPS MET System 4 3 8 APPS CCMS APPS connects with CCMS to send update information of system status warning and alarm messages using the format as described previously NAS MOPS CCMS 4 3 9 APPS Other Systems NAS MOPS connects with other systems to exchange AIM related information using the format as described previously NAS MOPS Other Systems Part 2 2 1 Scope of Technical Specifications Page 27 Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 4 4 Local Tower
113. console and seats to support the E operation in Operational partition CON TRA partition of BACC BAPC CMA APC HTY APC PUT APC PSL APC HHN APC and LTS RTS The Tenderer shall propose the conceptual design for each type of consoles that showing all design details dimensions colour scheme and materials to be used for Part 2 2 1 Scope of Technical Specifications Page 260 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 503 504 9 5 02 RAMAO4 RAMAOS RAMAO6 Specifications doc each component of the console The Tenderer shall propose the conceptual design of console layout arrangement of each room of the operation in Operational partition CON TRA partition of BACC BAPC CMA APC HTY APC PUT APC PSL APC HHN APC and LTS RTS The Tenderer shall propose and describe in detail the specific characteristics of each type of console as follows e Heat ventilation Console Illumination e Power distribution unit e Equipment Housing and cabinet e Material amp Color and e Noise attenuation characteristic Reliability Availability and Maintainability RAM The Tenderer shall propose and detail the RAM predictions and analysis for the proposed system The Tenderer shall prov
114. display in order to allow the operator to compare the broadcast message with the displayed weather data As soon as the text changes all operators should be notified a message and the aural signal and the changes should be highlighted on the display The highlighting should be cleared when the operator accepts the notification client positions should be notified with system control messages about the state of connection to CATIS Message Data Data Format Input Output Reference ICD CATIS Data TBD Output Tenderer provided ICD TBD To be discussed later Table 16 Tower System CATIS System Information Exchange Description i Tower System NAVAID System Tower system connects with NAVAID to acquire the NAVAID systems status Tower system receives the status of navigation aids in order to present to controllers Message Data Data Format Input Output Reference ICD NAVAID System TBD Output Tenderer provided ICD Status Data TBD To be discussed later Table 17 Tower System NAVAID System Information Exchange Description Part 2 2 1 Scope of Technical Specifications Page 34 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc j Tower System CCMS Tower system connects with CCMS to send
115. el 2006 el 9612 el 02 286 0095 PN TWR TY TWR KS TWR UT TWR MU TWR TN TWR RD TWR SR STN es es n UT_APP Signaling Type 2 Wire Wire ire re ire re re re re re re re ire Ring In Loop Ou DTMF re re re re re re ire re re re re re re Wire N N N d H N N un ta rofro ro ro ro ro ro ro z ta ro to ro ro ro ro to rto to to N Remark STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface STN amp PABX Interface
116. en route clearances perform coordination transfer dialogue between ACC and to modify Part 2 2 1 Scope of Technical Specifications Page 123 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 2 16 9 2 17 Specifications doc any flight data up to and including complete rerouting of the flight The ATS Inter facility Data Communication AIDC enables safe handover of flights with assistance from the strip less Human Machine Interface HMI provided to the ATC and is available during coordination and transfer of communication dialogue between adjacent ACC s In order to provide a safe accurate transfer the flight progress control must be able to perform automatic checks that assure flight data consistency between received messages and related flights The FDP will support ICAO Asia Pacific Regional Interface Control Document for AIDC version 3 0 Flexible EC and PC Management amp Multi Sector Planning Area s of responsibility AoR have a high level of impact on several FDP progress control The flexible EC and PC Management allows ATC to assume split the responsibility of AoR and tasks being handled by another EC and PC depend on traffic situation The system will support Flexible Role Management Another form of flexibility is in the use of Multi sector Planner C
117. example by clicking on an aerodrome symbol on the situation display a page providing the meteorological information at that aerodrome may be displayed Update of the data is available according to access rights via the pages of the Paged Information Presentation or via the other dedicated displays Any change to the data that is displayed on a page immediately causes the page to be updated with the new data Additionally users may be notified of the arrival of important information via a warning facility Part 2 2 1 Scope of Technical Specifications Page 142 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 18 6 9 18 7 9 18 8 9 19 Specifications doc Operational Status Presentation Each TMCS operators requires information regarding the operational status of the system in terms of the available functionality and other miscellaneous information time QNH etc The particular items displayed may be customized for the particular TMCS operators HMI Functional Capability The HMI will be able to configure in both off line by adaptation and on line by authorized user For off line adaptation will allow decoration and layout of push buttons menus definition of the maps default range and offset definition and layout of the plot and track labels prefer
118. flight The RPF will be designed with the capability to modify the assigned route by and to display the selected route after ATC selection of the track Part 2 2 1 Scope of Technical Specifications Page 158 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 25 4 9 25 5 Specifications doc When the system interface with Air Field Lighting System AFL for airfield lighting control the route is chosen in such a way that routing functionality will be performed Guidance Feature GDF The GDF will provide the guidance to the pilot during taxiing This guidance is realized by the integration with the AFL to control and monitor stop bars and taxiway centreline lights The airfield lighting status for the taxiway centreline lights and stop bars on an airfield lighting segment basis is presented in term of on off status and availability alarm status The presentation will be configurable colour coding for the different indications When system start up or restart the status contained in the airfield lighting system database will be downloaded and presented on the displays Updates received from the airfield lighting system will be presented without undue delay of receipt To facilitate the GDF the system will be provided with the following capabilities o Interfaces
119. from 2 floor to 8 floor ZA Room ZZ 58 WALLA LAA m 2 NN y NIS WSS S 535 M SSM SS gt gt W 1 th i is SSS Operation room OPS806 1490 5 1655 pepe SN Z2 e a 2 Zo 2 Main Communication cables Shaft between 2 floor to 8 floor 8 floor New Operation Building Floor Plan Attachment 6 1 1a The location of the Operation Room Fallback System Room and UPS 42 Room of NAS MOPS Pre tactical Room 5301 M lt A 19 50 ma 3 floor 7 o New Operation Building Floor Plan Attachment 6 1 1b The location of the Pre tactical Operation Room of NAS MOPS 9 7 Le Equipment room d OPS201 Data processing Servers reserved area VCCS reserved Area 3 20 m 7 2 50 mY UPS 2 Room OPS202 Batter Q OPS203 8 2 floor New Operation Building Floor Plan Attachment 6 1 1c The location of Equipment Room of NAS MOPS Pseudo Pilot Room 02 CON TRA Room EXO301 55
120. of 10 of Reference Technical Specifications doc i e Configure NAS MOPS e Fte Maintenance Engineer will operate in day night shift 24 7 q Trainee The Trainee TRN is position of training the role of EC and PC r Pseudo Pilot Position The Pseudo Pilot Position PSP is responsible for fulfilling the following specific tasks at minimum Control the aircraft involved in the exercise through the execution of a broad range of instructions as received through the PSP interface Coordinate with respective Training Mission Control TMC and converting the received control commands into Air Traffic Generator instructions for execution s Training Mission Control The Training Mission Control TMC is responsible for fulfilling the following specific tasks at minimum Select a Session and the Games involved Configure the CON System including the CWS for Training Controller and PSP by assigning role configuration commands through the TRA interface Control the individual Exercises start stop times pause resume commands record and replay commands and Perform retime modify insert new delete SFPs weather messages wind amp temperature data QNH transition level ATM messages and component failures both timed and random Part 2 2 1 Scope of Technical Specifications Page 51 Project Name Thailand Modernization CNS ATM System TMCS Document Reference File Reference Date December 14 2012 Version
121. of business b Date of Commencement of Business a Address of the Headquarters Other Relevant Information Supporting Documents a Certificate of Incorporation b Relevant sections of Memorandum of Association of the company or filings to the stock exchanges to indicate the nature of business of the company Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Requirements 2 Financial Strength Details File Reference Vol II Part 2 2 2 Final Date December 14 2012 Tenderer shall provide only details in air traffic management business Financial Information 2011 10 2010 09 2009 08 2008 07 2007 06 Revenue Profit Before Tax Other Relevant Information Supporting Documents the assets not the entire balance sheet a Auditor Certified financial statements for the Last five financial years as on financial year 2012 Please include only the sections on P amp L revenue and Version 1 0 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Requirements Vol II Part 2 2 2 Final 1 0 3 Proof of Project Experiences The Tenderer shall provide a details of a proven track record of directly responsible for a successful implemention of project in the provi
122. operators coordinate with three 3 groups of operators PUT APC AO and pilots Remote Towers associated with PUT APC There are two 2 Remote Towers associated with PUT APC Remote towers operators coordinate with three 3 groups of operators PUT APC respective AO and pilots Phitsanulok Approach Control Center PSL APC The PSL APC provides approach control services within terminal control areas TMA and control zones of the 3 airport areas PSL APC operators coordinate with four 4 groups of operators BACC BAPC PSL local tower associated remote towers and pilots Phitsanulok Airport PSL Local Tower PSL Local Tower is under responsibility of PSL APC PSL local tower operators coordinate with three 3 groups of operators PSL AO and pilots Remote Towers associated with PSL APC There are two 2 Remote Towers associated with PSL APC Remote towers operators coordinate with three 3 groups of operators PSL APC respective AO and pilots Part 2 2 1 Scope of Technical Specifications Page 15 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 3 28 Hua Hin Approach Control Centre HHN APP 3 29 4 1 The HHN APP provides approach control services within terminal control areas TMA and control zones HHN APP opera
123. p Wire EL 4199 2 Wire EL 4822 LL EL 4835 L 2W PABX ALL TEL 277776 LL MET ALL AOT Wire LL ire ALL Spare LL Spare2 D Wire ALL Spare3 p Wire LL Spare 4 ALL Spare 5 LL Spare 6 ALL Spare 7 ALL Spare 8 PSTN amp PABX Interface ro LL LL LL 4 N 5 MP z ii 6 EN APPENDIX 3 2 3 Hatyai Main Fallback Telephone Channels Capacity Signaling No Working Positions Connect to Type Call In Call Out Remark F2 ALL WATCH SE wire Loop In DTMF JRing Out Telephone Set Interface LL BACCSS PR LL SAT P Wire LL BACC S6 FIR p Wire LL BACC S6 SAT Wire SMU APP Wire PUT APP p Wire KRABI APP NTW TWR TWR PTTWR SKLTWR TW ONDAT Wire __ SRT 63523 Wire N N N N N N N N N N N N N N N N gt gt w Iz E 63525 Dp Wire Wire EL 6812 EL 6813 EL 6817 EL 6818 EL 6833 EL 251 073 p Wire TEL 251 074 p Wire EL 474 570 EL 474 572 p Wire FIRE p Wire Emergency 1 p Wire Emergency 2 Emergency 3 Spare 1 Spare 2 PSTN amp PABX Interface ua z N gt ie E 4 3
124. pre requisites duration and approach for training personnel involved with the delivered equipment both hardware and software 002 The Tenderer shall propose Database Management System Training course which includes number of attendances venue and contents 003 The Tenderer shall propose Air Traffic Control Operational Train the Trainer Training course which includes number of attendances venue and contents TRAO04 The Tenderer shall propose Flight Data Operator Train the Trainer Training course which includes number of attendances venue and contents TRAOOS The Tenderer shall propose Training Supervisor Instructor Training course which includes number of attendances venue and contents 006 The Tenderer shall propose Pseudo pilot Training course which includes number of attendances venue and contents 007 Tenderer shall propose Factory Maintenance Training course which includes number of attendances venue and contents TRAO08 The Tenderer shall propose Local Maintenance Training course which includes number of attendances venue and contents 009 Tenderer shall propose Data Management System Technical Training course which includes number of attendances venue and contents Part3 SUPPORT AND AFTER SALE SERVICE Page 18 of 19 D D D D D D D D D Project Name System Name Date Thailand Modernization December 14 2012 CNS
125. pre set settings Common components for both modes of the CON TRA are VCCS End Systems etc The CON TRA synchronizes all information with the MOPS at all time regardless of its mode of operation Once the contingency situation occurs the CON TRA will be ready for operation as quickly as possible e g less than 15 minutes regardless of its mode of operation The CON TRA will be designed such that maintenance engineer can perform switch over from MOPS to CON TRA as easy as possible The CON TRA connects to the MOPS within 5 Km radius distance After the contingency situation passes and the MOPS must synchronize with the CON TRA to update the information Once the update completes then the MOPS is able to be utilized again Part 2 2 1 Scope of Technical Specifications BAPP System Main Operation System MOPS Remote Tower Main Operation System Systems MOPS D CON TRA Main Operation System MOPS 1 EE ERN TERME oe CON TRA MOPS CON TRA MOPS CON TRA CON TRA MOPS Figure 1 TMCS System Architecture Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scop
126. products whose performance meets or exceeds the needs for air traffic control environment The system will be constructed using open architecture using standard hardware and standard communication protocols servers will use similar configuration such as same brand model etc Also all workstations grade computers in the system will use similar configuration such as same brand model etc Therefore any equipment of server workstation workstations grade computer is 100 interchangeable with other equipment of the same type Upgrade and expansion options will be easily carried out so as to minimize planning and System configuration effort in order to implement any future expansion The maximum memory usage and CPU usage of each Server and Workstation grade computer will not exceed 5046 whilst providing the maximum capacity Part 2 2 1 Scope of Technical Specifications Page 176 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Each Hardware unit and module will be clearly labeled in English in accordance with its function and will include a type number and serial number for identification purposes 10 7 2 Software The Application Software programmes will be written in a popular structured high level language to facilitate ease of maintenance and developmen
127. progress control features of the FDP There will be support for temporary and or existing airspace structures required for the efficient use of the FUA concept The system should support on line redefinition and presentation of sectors including opening and closing The various airspace structures that should be supported are at minimum a Conditional Routes CDR s Part 2 2 1 Scope of Technical Specifications Page 133 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 8 9 9 Specifications doc b Temporary Reserved Areas TRA s c Temporary Segregated areas TSA s Demand and Capacity Balancing The Demand and Capacity Balancing function DCB will be to minimize the effects of ATM system constraints It will be capable of evaluating system wide traffic flows and capacities in order to implement necessary actions in a timely manner A collaborative process will allow for the efficient management of the air traffic flow through the use of information on system wide air traffic flows weather and assets The DCB will allow airspace users to optimize their participation in the system while mitigating conflicting needs for airspace and aerodrome capacity Collaborative usage of decision support tools will ensure the most efficient use of airspace resources provide
128. propose and detail the methodology and parameter used to define APW volumes of airspace activation time and look ahead time in their airspace both off line and on line The Tenderer shall propose and detail how the APW operates in case of system degradation e g unavailability of one or more RADAR ADS B stations The Tenderer shall propose the maximum number of APW volumes of airspace that can be defined The Tenderer shall propose the maximum number of APW volumes of airspace that can be activated simultaneously The Tenderer shall propose and detail the methodology to inhibit APW alerts for predefined APW volumes of airspace or individual flights to suppress unnecessary alerts The Tenderer shall provide product description of the proposed system detailing Part 2 2 1 Scope of Technical Specifications Page 232 D D D D D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 SAFE32 SAFE33 SAFE34 SAFE35 8 4 MONAOI 02 MONAOS3 4 MONAOS MONAO6 MONAOT Specifications doc Approach Path Monitoring APM functionalities capabilities and benefits The Tenderer shall propose and detail the methodology to detect and notify to the ATC when an aircraft is or is predicted to be
129. provide product description of the proposed system detailing Altitude Tracking functionalities capabilities and benefits The Tenderer shall provide product description of the proposed system detailing Stereographic Projection functionalities capabilities and benefits The Tenderer shall provide product description of the proposed system detailing Specific codes functionalities capabilities and benefits The Tenderer shall provide product description of the proposed system detailing Part 2 2 1 Scope of Technical Specifications Page 226 D D D D D D D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 SDP53 SDP54 SDP55 SDP56 SDP57 SDP58 SDP59 SDP60 SDP61 SDP62 SDP63 SDP64 SDP65 Specifications doc Test Targets Monitoring functionalities capabilities and benefits The Tenderer shall propose and detail type of test targets monitoring that are supported by SDP The Tenderer shall propose the maximum number of test target monitoring of each RADAR The Tenderer shall propose and detail the methodology and parameters used to define the test targets monitoring The Tenderer shall propose and detail the methodology to notify when the test target position falls out of to
130. provided previously in Site Information and the technical details are described in the UPS Characteristic section For the UPS systems under responsibility of the Tenderer the Tenderer will provide install and test a complete and operable UPS in specified locations UPS equipment must be new and factory tested The Tenderer is also responsible to demonstrate a complete full load field test and successful field testing the UPS compatibility with AEROTHAI emergency backup generator The details of UPSs at each site are as follow Tung Mahamek Site The planned numbers of UPS and their respective loads at Tung Mahamek Site is described in table as follow System System Description UPS 1 UPS 2 UPS 3 UPS 4 NAS MOPS Data Processing X VCCS X End System 3rd Floor X End System 8th Floor X F VCCS X Part 2 2 1 Scope of Technical Specifications Page 179 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc NAS CON TRA Data Processing X VCCS X End system X NAS IBS Data Processing X APP IBS Data Processing X Table 54 UPSs for Tung Mahamek system and their respective loads The summary of UPS details required at Tung Mahamek Site is described in table as follow
131. purpose Please be advised that at the present there are other servers and equipments installed in some rooms The site survey and site evaluation are recommended The following table describes the TMCS equipments and their planned installed rooms at Chiang Mai Site Part 2 2 1 Scope of Technical Specifications Page 61 System System ET Room Room Floor Name Description Building Floor Function Number Plan End System CMA APC CMA APC Building 2nd Floor Operation Room 201 Attachment 6 1 2a CMA APP Equipment MOPS Redundant Data processing APC Building 2nd Floor Equipment Room CMA203 Attachment 6 1 2a VCCS CMA APC Building 2nd Floor Equipment Room CMA203 Attachment 6 1 2a F VCCS APC Building 2nd Floor Equipment Room CMA203 Attachment 6 1 2a End System CMA APP CON TRA APC Building 2nd Floor CON TRA Room CMA202 Attachment 6 1 2a CMA APP Pseudo Pilot APC Building 2nd Floor Pilot Room CMA202 Attachment 6 1 2a CON TRA Equipment Data processing CMA APC Building 2nd Floor CON TRA Room CMA202 Attachment 6 1 2a VCCS CMA APC Building 2nd Floor CON TRA Room CMA202 Attachment 6 1 2a End System CMA Local Tower APC Building 7th Floor Local Tower Control Room CMA701 Attachment 6 1 2a CMA LTS P Equipment Redundant Data processing CMA APC Building 2
132. question pools C A tool for trainers to configure the passing mark of the test paper generated and Web based supporting The CBT should provide learning packages computer based assessments and training records for web based learning based on the Sharable Content Object Tower Surveillance Data Processing For airport with high traffic movement Tower system level IV Suvarnabhumi Donmaueng Chiangmai Hatyai Phuket Nakornsithamarat Samui and Udon Thani AEROTHAI requires the Tower Surveillance Data Processing function TSDP which includes Advance Surface Movement Guidance and Control Systems A SMGCS following the A SMGCS Manual ICAO doc 9830 With A SMGCS TSDP will be able to support airport surveillance routing guidance and control to all aircraft and vehicles on the runways taxiways aprons and the movement area at the airports and to support optimized Gate to Gate operations concept The surveillance functions will provide accurate information on the position and identity of all aircrafts and vehicles operating on the movement area This will be used to enhance the automated functions associated with conformance monitoring and conflict alert Also the surveillance information will be useful in refining the traffic planning functions associated with predicting taxi throughput and arrival departure times The automated functions will include the monitoring of conformance with taxi instructions and the dete
133. shall propose and detail the methodology to detect and notify to the ATC in preventing collision on the potential infringement and actual infringement between aircraft The Tenderer shall propose and detail the separation standards of potential infringement and actual infringement The Tenderer shall propose and detail the methodology and parameters used to define the STCA volume of airspace and separation in their airspace The Tenderer shall propose the maximum number of STCA volumes of airspace that can be defined The Tenderer shall propose the maximum number of STCA volumes of airspace that can be activated simultaneously The Tenderer shall propose and detail the methodology of STCA to process the aircraft s RVSM status whether or not the aircraft are in the RVSM airspace The Tenderer shall propose and detail the methodology to inhibit STCA alerts for the predefined STCA volumes of airspace or individual flights to suppress unnecessary alerts The Tenderer shall provide product description of the proposed system detailing Minimum Safe Altitude Warning MSAW functionalities capabilities and benefits The Tenderer shall propose and detail the methodology to detect and notify to the ATC about increased risk of controlled flight into terrain and or obstacles The Tenderer shall propose and detail the methodology and parameters used to define terrain obstacles MSAW volumes of airspace and look ahead time in their airspace T
134. shall propose and detail the system best suited for the NST RTS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc 2 Level of Contingency and Backup Submittal COBAOI 02 COBA04 5 COBAO6 7 COBAOS 09 The Tenderer shall propose and detail all the contingency and backup capabilities E levels that the system best suited for NAS MOPS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities E levels that the system best suited for NAS CON TRA is capable of The Tenderer shall propose and detail all the contingency and backup capabilities E levels that the system best suited for NAS IBS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities E levels that the system best suited for APP IBS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities E levels that the system best suited for CMA APP MOPS is capable of The Tenderer shall propose and detail all the contingency and backup capabilities E levels that the system best suited for CMA APP CON TRA is capable of The Tenderer shall propose and detail all the contingency and backup capabilities E levels that the system best suited for
135. switches cables connecting all UPS to equipments main distribution board junction box installation materials and other necessary equipments The site survey and site evaluation of components placement are recommended Part 2 2 1 Scope of Technical Specifications Page 182 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference File Reference Date December 14 2012 Volume II Part 2 1 Scope of Technical Version 1 0 Specifications doc 10 8 1 4 Suvarnabhumi Airport Site The planned numbers of UPS and its respective loads at Suvarnabhumi Airport Site is described in table as follow System System Description UPS 1 UPS 2 UPS 3 BAPP MOPS Data processing X VCCS X F VCCS X End Systems X APP CON TRA Data processing X VCCS X End System X SBA LTS Data Processing X End System X Table 60 UPSs for BAPP System and its respective loads The summary of UPS details required at Suvarnabhumi Airport Site is described in table as follow UPS O P Power Phase Type Type Responsibility 1 Tenderer Proposed Depending on Full Load Rate Tenderer 2 Tenderer Proposed Depending on Full Load Rate Type Tenderer 3 Tenderer Proposed Depending on Full Load Rate Type B Tenderer Table 61 Summary of UPS Details at Suvarnabhumi Airport Site Miscella
136. system Khon Kaen Tower system Chiang Rai Tower system Ubon Ratchathani Tower system Krabi Tower system Surat Thani Tower system Sakon Nakhon Tower system Nakhon Phanom Tower system Nakhon Ratchasima Tower system Petchaboon Tower system Nan Tower system Phare Tower system Loei Tower system Buriram Tower system Roi Et Tower system Surin Tower system Chumporn Tower system Trat Tower system Part 2 2 1 Scope of Technical Specifications Page 195 E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 ARCHI8 19 20 21 22 Specifications doc Mae Hong Son Tower system Lampang Tower system Sukhothai Tower system Tak Tower system Mae Sod Tower system Ranong Tower system Trang Tower system Pattani Tower system and Narathiwat Tower system The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for the CMA LTS The detail should include at minimum a diagram showing connections among all components such as servers components
137. system such as CMA APP Mode HTY APP Mode etc All modes of operation should utilize the Part 2 2 1 Scope of Technical Specifications Page 9 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc same hardware package software for each mode is a copy of its corresponding MOPS software such as CMA APP Mode is a copy of CMA APP MOPS By launching a specific mode on the respective server pack or in multi boot it configures feeds and interacts with the appropriate End Systems as configured by pre set settings At the present both IBSs do not require any End System hardware AEROTHAI procure end system hardware and use them for both IBSs without any software modification on both systems In summary for TMCS the NAS will achieve this level V using NAS IBS All APP Systems will also have another IBS to achieve level 5 using APP IBS 3 Operational Context This section emphasizes on the interaction within TMCS many Operators It also explains interaction between TMCS operators and other related operators Related Operators can be categorized into two groups a Direct supporting Operators These Operators include both AEROTHAT s internal Operators and external Operators Air defense Units Military Towers b Operator coordinating wi
138. to ensure proposed measures fit others operations Should monitor the effect of the taken measures for the best efficiency of the ATEM measures make adjustments where necessary and cancel ATFM measures when no longer required Should inform stake holders that do not follow the measures in order to reach an understanding for the whole process Should in the event of ATFM measures in adjacent FIR on request assist to the best of its ability to the benefit of all stakeholders Should log the taken ATEM measures either by support of a system or manually on a paper form or logbook m Flight Data Operator The Flight Data Operator FDO is responsible for ensuring that flight data aeronautical data and meteorological data within the ATM system remains current and complete In particular this consists of the following tasks Correct corrupted or invalid ATS messages and re entry into the system as necessary Enter aeronautical or meteorological data into the system if it cannot be automatically processed Part 2 2 1 Scope of Technical Specifications Page 49 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc e Develop and distribute NOTAM s and meteorological messages and e Assign of SSR codes to flights w
139. up views and pre selected area features The Tenderer shall provide product description of the proposed system detailing tools to operators to re arrangement of the screen Switching map overlays Part 2 2 1 Scope of Technical Specifications Page 255 E E D E E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 TCWS10 TCWSI1 TCWS12 TCWS13 TCWS14 515 TCWS16 TCWS17 TCWS18 TCWS19 TCWS20 TCWS21 TCWS22 Specifications doc Bearing Distance line The Tenderer shall provide product description of the proposed system detailing Track presentation of GSD The Tenderer shall provide product description of the proposed system detailing Label presentation of GSD The Tenderer shall provide product description of the proposed system detailing display customization features The Tenderer shall provide product description of the proposed system detailing FDD functionalities and features The Tenderer shall provide product description of the proposed system detailing bays presentation The Tenderer shall provide product description of the proposed system detailing tools of flight data management and update The Tenderer shall provide product description of the proposed system det
140. will be also allowed a sufficiently authorized user to define new ASTERIX categories as well as User Application Profile UAPs according to the specific requirements of an application All price shall be included in the Price Proposal SECTION C SUPPORT AND AFTER SALE SERVICE REQUIREMENTS 1 Service Life 5 001 The tenderer shall propose the service life of the proposed system and detail how the proposed system can be operated up to the end of service life 5 002 The tenderer shall propose the components that estimated service life is less than 15 years 5 003 The tenderer shall propose the solution to handle the components that estimated service life less than 15 years 5 004 The tenderer shall propose and detail the after sales support for the software of the system which includes details of that support Part3 SUPPORT AND AFTER SALE SERVICE Page 17 of 19 D D D D Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume Part 3 Support and After Sale 1 0 Service_Final doc Volume II Technical Terms of Reference 2 Warranty 001 The Tenderer shall propose the methodologies and Warranty Support Plan including warrantee period of TMCS hardware and software 3 Training 001 The Tenderer shall propose and describe the Training program which includes course syllabus objectives
141. will be provided in the techniques of troubleshooting fault diagnosis and remedial and routine preventive maintenance The training will include classroom instructions on theory as well as practical training using the Seller s equipment system similar to the one to be delivered under the Contract 3 8 Local Maintenance Training The Seller will provide On The Job training at AEROTHAI office and AEROTHAI will be in charge of providing classrooms with similar facilities a whiteboard projector and common stationery The training will include classroom instructions on theory as well as practical training using the AEROTHAI equipment System 3 9 Database Management System for Technical Training Data Management System DMS for Technical Training will be conducted at the Factory DMS will be provided at least two 2 surveillance engineer staffs to train them as Database Management System DMS specialist staff The course will achieve the following objectives a The DMS Technical Training will be designed to make surveillance engineer staffs understanding in the DMS logic architecture and work process b The DMS Technical Training will be designed to make surveillance engineer staffs understanding in all dataset system parameter system configuration of Main Operation System MOPS Contingency Training System CON TRA Independent Backup System IBS and Tower System c The DMS Technical Training will be designed to train parti
142. will provide the following basic features at a minimum a Surveillance b Control c Routing for Suvarnabhumi only d Guidance for Suvarnabhumi only Surveillance Feature SUF The SUF will provide identity and position of all traffic with an adequate update rate to give continuous traffic information which will include speed and direction The SUF will be able to receive and process plots tracked plots weather information status information from several types of data formats which comings from various types of interface as listed in the table Tower System Surveillance Systems Information Exchange Description at a minimum The systems will combine surveillance data from several sources to provide a single target with flight identification ID or vehicle ID for display to Tower Workstation The combine fusion algorithm will be designed to develop seamless coverage between Aerodrome control and Approach control a single picture combining all data sources and maintaining track ID continuity Updated track and identification data for each system track will be provided to the Tower Workstation at least once per second The SUF will output the data in the ASTERIX format The provided output data will contain at minimum as follows Part 2 2 1 Scope of Technical Specifications Page 156 Project Name Thailand Modernization CNS ATM System TMCS Document Reference File Reference Volume II Part 2 1
143. with the AFL via the Gateway o Monitor and control the Stop bars and Taxiway Centerline Lights o Allow the ATC to activate and de activate by manual or automatic controls of Stop bar and Lighting Segment Aerodrome Features Mapping ICAO Aerodrome Name location SUF COF RPF GDF Indicator SUVARNABHUMI VTBS DONMAUENG VTBD CHIANGMAI VTCC HATYAI VTSS VTSP Part 2 2 1 Scope of Technical Specifications Page 159 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 26 9 26 1 Specifications doc ICAO Aerodrome Name location SUF COF RPF GDF Indicator NAKHON SI THAMARAT VTSN SAMUI VTSM UDON THANI VTUD Tower Flight Data Processing In order to support gate to gate operation AEROTHAI requires the Tower Flight Data Processing Function TFDP to provide an operational display of flight data and vehicle data and auxiliary data e g Navigation Aids status TFDP should process display the necessary flight plan data and provide the status changes and key events for both IFR and VER traffic TFDP should provide a Tower Electronic Flight Strip TEFS use in an airport environment including aprons taxiways runways and Terminal control
144. 0 Specifications doc RADAR bias estimation Due to different factors such as noise in the radar detection and processing chain position estimates provided for a given aircraft by several radar sensors may differ In order to achieve maximum accuracy for system track position the SDP will be designed to dynamically compute radar biases to establish the system track position If SSR site monitor s are available in surveillance coverage the SDP will automatically calculating and recovering the range and azimuth bias errors Track overload protection The SDP will be designed to protect track overload Whenever the number of system tracks reaches the maximum number of system tracks of the SDP capacity no new system track should be created and the overload status should be sent and logged at CMWS Track cancelation The SDP will be designed to delete track that does not correspond to real aircraft or which are no longer detected by the surveillance detection coverage Automatic position report The SDP will be designed to automatically report the aircraft position every predefine point when aircraft fly over these points Surveillance data distribution The MSDP will be designed to simultaneously distribute the local track Multi RADAR track ADS B track MLAT WAM track and system track to other related functions via internal network with different multicast address and or port number Specific data such as aut
145. 0 SECTOR 8 KKN RCAG 111 SECTOR 8 UBL RCAG 112 SECTOR 8 UBL RCAG 113 SECTOR 8 ROI RCAG 114 SECTOR 8 KKN RCAG 115 SECTOR 8 KKN RCAG 116 SECTOR 8 UBL RCAG 117 SECTOR 8 UBL RCAG 118 SECTOR 8 Emergency UBL RCAG Sector 1 4 Emergency Local Main Sector 1 4 Sector 1 4 243 0 Sector 1 4 243 0 ALL 132 05 L 132 05 L 124 1 AL 124 1 Sector 1 4 122 75 Sector 1 4 122 75 Sector 1 4 120 5 133 1 135 5 128 1 Sector 1 4 120 5 133 1 135 5 128 1 Sector 1 4 120 5 133 1 135 5 128 1 Sector 1 4 120 5 133 1 135 5 128 1 Sector 1 4 120 5 133 1 135 5 128 1 Sector 1 4 120 5 133 1 135 5 128 1 Sector 1 4 120 5 133 1 135 5 128 1 Sector 1 4 120 5 133 1 135 5 128 1 Sector 1 4 120 5 133 1 135 5 128 1 Sector 1 4 120 5 133 1 135 5 128 1 Sector 5 6 125 7 123 95 Sector 5 6 125 7 123 95 141 Sector 1 3 120 5 135 5 KMN Backup 142 Sector 2 8 133 1 133 9 UBL Backup as zs 133 9 133 9 133 9 133 9 133 9 268 5 268 5 268 5 268 5 121 5 121 5 121 5 Emergency Local Stby Emergency Local Main c3 as 23 Emergency Local Stby F C Main1 F C Stbyl F C Main2 F C Stby2 Backup 1 Main Backup 1 Stb DM Backup 1 DM Backup 2 DM Backup 3 DM Backup 4 SB Backup 1 SB Backup 2 SB Backup 3 SB Backup 4 SB Backup 5 SB Backup 6 SMU Backup 1 SMU Backup 2 C eS 128 130 132 134 135 136 137 138 139 140 107 19 EA E 112 5211622 E18 22125 12 Edo 432 7 SBa 185
146. 1 4 F Channel peque 50 ERE CHEN Eos sd 55 a EE 60 5 65 58 pa 59 E n SB CDC S3 135 8 CDC SB Stby SB CDC S4 SB CDC S4 KKN APP KKN APP 128 7 128 7 123 4 123 4 240 0 123 35 123 35 284 0 126 2 126 2 268 5 122 55 122 55 240 0 123 5 123 5 257 8 125 4 CDC SB Main CDC SB Stby KKN APP RCAG KKN APP RCAG KKN APP RCAG SKN APP RCAG SKN APP RCAG SKN APP RCAG UDN APP RCAG UDN APP RCAG UDN APP RCAG LOY APP RCAG LOY APP RCAG LOY APP RCAG UBL APP RCAG UBL APP RCAG UBL APP RCAG ROT APP RCAG DDN F R 5 5 5 R SAT SAT F R SA SA R SAT SAT F R SAT SAT gt z 5 Non 4 siis oe Channel Frequency MHz 100 125 4 101 123 6 102 123 6 103 119 45 104 119 45 105 129 6 106 SMU APP 129 6 107 SMU APP 305 4 108 SMU APP 119 75 109 SMU APP 119 75 110 SMU APP 123 35 12335 S S S MEDIA R A Connect to ROT APP RCAG KRT APP RCAG KRT APP RCAG R BRM APP RCAG F R BRM APP RCAG F R SMU APP RCAG Khaophom SAT SMU APP RCAG Khaophom F R SMU APP RCAG Khaophom SAT NKS APP RCAG SAT NKS APP RCAG F R STN APP RCAG SAT STN APP RCAG F STN APP RCAG A TRAT APP RCAG SA TRAT APP RCAG F R CTR APP RCAG SAT CTR APP RCAG F R CTR APP RCAG SAT NAN APP RCAG SAT NAN APP RCAG F R PAE APP RCAG SAT PAE APP RCAG P
147. 13 Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 3 13 Bangkok Approach Control Centre BAPC 13 3 14 Remote Towers associated with 2 1 1 14 3 15 Pilots connected to BACC BAPC APCs LTSs RTSS 14 3 16 Chiang Mai Approach Control Centre APC sseessosssosscsssossocssosssossoesooso 14 3 17 Chiang Mai Airport CMA Local Tower 14 3 18 Remote Towers associated with CMA APC 14 3 19 Hat Yai Approach Control Centre 2 1 1 14 3 20 Hat Yai Airport Local Tower 14 3 21 Remote Towers associated with 15 3 22 Phuket Approach Control Center PUT 15 3 23 Phuket Airport PUT Local 1 aetas tne setae etas 15 3 24 Remote Towers associated with PUT 1 15 3 25 Phitsanulok Approach Control Center PSL APC 15 3 26 Phitsanulok Airport PSL Local Tower 15 3 27 Remote Towers associated with PSL
148. 3 11 Phitsanulok CONTRA Radio Channels Capacity 2 3 3 s ER 10 n D 3 14 15 E 19 APPENDIX 3 3 12 Huahin CONTRA Radio Channels Capacity Working Position Flight Check Main 19 Copper Spes Lei Sy Copper 1 2 3 4 5 7 10 11 12 13 14 15 16 17 18 19 20 APPENDIX 3 4 Headsets and Handsets provided and modification work Main and Fallback System CONTRA Modify Tungmahamek Equal to Provided Working Positions 200 sets Equal to Provided Working Positions Equal to Provided Working Positions 12 sets Equal to Provided Working Positions Remark Modify only Headset 3 5 Recording Channels capacity of each site APPENDIX 3 5 1 Tungmahamek Main Fallback Voice Record Channels Capacity at least 464ch recorder Channel Detail Area Area E Area PC Area Area PC Area 7 Area PC Area Area PC Area PC Area E Area PC Area Area Area Area Area Area 0 Area C o Area 2 Arca 22 Area 23 Area 24 25 26 Area 27 Area 28 29 Area 0 Area Area Area Area Area Area Approach Approach Approach Approach Approach Approach Approach 568 771 56 71 Ww N gt 3 3 3 gt 3 3 gt 4 3 Approach Approach Approach E Approach
149. 5 Router Switch 10 100 1000 Sakon Nakhon Tower 6 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Nakhon Phanom 6 Layer 3 1 Mbps RJ 45 Tower Router Switch 10 100 1000 Petchaboon Tower 6 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Nan Tower 2 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Part 2 2 1 Scope of Technical Specification Page 77 Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Terms of Reference volume fran 2 d Ee pi 1 0 Technical Specifications doc Location of Network Equipment Network Connector Site Equipment on Tower T Bandwidth T Floor ype To from cloud ype Phare Tower 6 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Loei Tower 3 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Buriram Tower 6 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Roi Et Tower 6 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Surin Tower 4 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Chumporn Tower 6 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Trat Tower 1 3 1 Mbps RJ 45 Router Switch 10 100 1000 Mae Hong Son Tower 6 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Lampang Tower 3 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Sukhothai Tower 3 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Tak Tower 3 Layer 3 1 Mbps RJ 45 Route
150. 85 386 387 388 389 39 391 393 35 396 E3975 38 399_ 400 401 9 403 402 403 404 405 Channel Detail 4 Area 1 4 Area 1 Area Area Area Area Area Area Area Area Area Area Area Area Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach Approach ALL 6 0 0 0 0 410 411 412 413 414 415 416 A mn 6 7 8 9 419 0 8 0 8 0 2 421 22 23 24 25 2 2 2 2 6 7 9 430 431 3 433 4 4 4 4 4 4 4 4 4 4 434 435 436 437 438 439 441 gt c 4 4 4 4 4 4 4 4 4 6 7 9 gt 4 4 4 4 4 4 4 4 4 4 5 m 451 gt as 2 2 2 lea C 3 4 5 5 3 4 5 gt ion ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL gt 4 4 4 4 gt 5 5 5 5 5 4 gt 3 am APPENDIX 3 5 2 Chiangmai Main Fallback Voice Record Channels Capacity at least 96ch recorder Channel 20 22 23 24 2 2 2 2 1 2 7 5 6 7 9 50 3 eo 22 28727 0 55 25 E 99 50 2 34 wj u 921921 95 Sj ojn
151. 98 Record 199 200 205 203 204 205 206 207 208 209 210 211 212 213 214 APPENDIX 3 5 8 Chiangmai CONTRA Voice Record Channels Capacity at least 48 ch recorder Channel Remark Position Record Position Record Position Record Position Record Position Record Position Record 7 Position Record Position Record Position Record Position Record Radio Record 12 Radio Record 13 Radio Record 14 Radio Record 15 Radio Record 16 Radio Record Radio Record Radio Record Radio Record Radio Record Radio Record Radio Record Radio Record Radio Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record Telephone Record All Telephone Record FIRE All 5 20 2 2 2 2 2 2 2 2 2 0 Channel NE HE E 6 90 2 99r E 3237 1 2 26 0 38 30 1 32 3 3 1 3 3 3 3 3 3 3 oo 1 8 1 0 1 9 2 3 4 5 6 7 9 2 3 4 5 7 9 2 3 4 FRE Al Telephone Record 5 Sparel 6 2 7 Spare3 48 Spare4 3 4 4 4 4 4 4 4 4 APPENDIX 3 5 9 Hatya
152. A APC HTY APC PUT APC PSL APC and HHN APC d One 1 APP Independent Backup System APP IBS APP IBS will be the backup system for any APP System This IBS can be configured to overcome the operation of any APP systems e Forty 40 tower systems There are six 6 Local Tower Systems LTS thirty 30 Remote Tower Systems RTS for remote towers at airports and four 4 RTS for Military towers The tower system supports the operation of Aerodrome Control at its corresponding airport Major System Component NAS and APP System comprise two 2 major system components as follows 1 1 Main Operation System MOPS MOPS is the main system supporting controllers operation the TMCS environment and is capable of handling future traffic growth whilst reducing workload and improving cost efficiency To achieve those objectives the MOPS must be flexible in order to utilize staff resources more efficiently an example being the reduction of active controllers at certain times by merging areas of responsibility for positions during low traffic situations whilst getting a higher level of automated support during peak traffic scenarios Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 1 2 The MOPS con
153. AT WAM aspws Internal Msg e SSR SMR Tower System Intersystem esows 4 Internal Msg Msg Data AIMS Foows Internal Msg Intersystem AFL Msg Data Internal Msg Intersystem tosws 4 Internal Msg Intersystem NAVAID Msg Data System Primer je Internal Msg Intersystem CCMS Msg Data End System Intersystem Other Msg Data System SBA only External System ADS B Automatic Dependent Surveillance Broadcast AFL Airfield Lighting System AGDL Air Ground Data Link AIMS Airport Information Management System APP Approach Control ASDWS Air Situation Display Workstation CCMS Central CNS ATM Monitoring System CATIS Computerized Automatic Terminal Information System FDDWS Flight Data Display Workstation GSDWS Ground Situation Display Workstation IBS Independent Backup System MLAT Multi lateration NAS Nationwide Air Traffic Management System PSR Primary Surveillance Radar SBA Suvanabhumi Airport SMR Surface Movement Radar SSR Secondary Surveillance Radar TCMWS Tower Control and Monitoring Workstation TDSWS Tower Data Set Workstation WAM Wide Area MLAT Figure 8 Tower System Context Diagram System Capabilities Level III and IV Part 2 2 1 Scope of Technical Specifications Page 31 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference
154. Approach 48 Approach 2 4 2 4 E 5 C2 2 C3 3 C4 4 C5 5 C6 6 C7 7 C8 C9 C2 2 C3 3 4 5 5 C6 6 7 0 6 7 4 4 4 4 4 4 Channel CH Name OPSUP TECHSUP ofo gt N lt 1 MTNI MTN2 TACTSUP MANI MAN2 MAN3 EC7 PC7 EC8 PC8 9 9 10 10 AMAN2 FISL1 FISL2 FISL3 FISL4 ASM FM2 FM3 ATFM SPARE POSITION 120 5 120 5 120 5 120 5 120 5 256 6 T 256 6 89 265 AY WD gt gt gt DIDI AID NPB 1 N 1 oo oo BY Ww dy Channel CHName E 5 52 EO 54 82 5 50 7_ 5 5 590 5 psg o Ce 3 6 EC pie qo 0 EO BE ___ PTO o 0 AMAN FIS 2 OB SL 75 __ 2 2 k M 2 89 SPARE POSITION 105 15 83 102 84 105 85 105 86 2566 87 2 oo VHF VHF 92 UHF 93 94 193 95 1333 1333 1331 1331 1331 u Detail Operation Operation Operation Pr
155. Approach Path Monitoring area APM volume of airspace with a heading within an adapted range APM should detect only deviations below the glide slope whereas in some cases APM also detects lateral deviations or deviations above the glide slope APM should perform for both precision and non precision instrument approaches However for circling approaches APM should not be expected to operate in circling area circling prescribed track Part 2 2 1 Scope of Technical Specifications Page 127 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc The APM will be capable of using different parameters for generation of alerts Different parameters may be applied in the case of system degradation e g unavailability of one or more radar stations 9 4 Monitoring Aids The Monitoring Aids function MONA is ATC assisting tool in the routine monitoring of the traffic situation warning the ATC with visual and aural when aircraft deviate from their planned route or clearances reminding the ATC of actions that need to be performed and keeping the trajectories updated with the progress of the flights The MONA should be designed to use information from Surveillance data Processing MONA s data set Flight Data Processing and possibly trajectory prediction in order to generat
156. Business Trajectory RBT The preparation of the arriving traffic sequence is expected to be completed by around 20 mins prior to touchdown and should start only as early as necessary to achieve the stated objectives It is thought that at least 1 hour will be needed to smooth out ripples in the traffic delivery which will be the result of RBT which is expected to be 2 or 3 minutes Monitor the progress of flight Give recommendation to EC PC using techniques to satisfy multiple constraints Coordinate among arrival managers AMAN ACC AMAN APP departure managers DMAN FM Airport Operator other relevant stake holders d Tactical Supervisor Tactical Supervisor TACTSUP is responsible for fulfilling the following specific tasks Assess quality the operation within TACTSUP s operational team Examine the operation within TACTSUP s operational team Provide when necessary the appropriate restrictions for air traffic operations due to equipment failures or staff shortages within the area of responsibility Lead together with the Operation Supervisor OPSUP for daily operational activities and Participate in management and development of operational activities as well as staffing and manning of sectors and positions e Civil Military Airspace Coordinator The Civil Military Airspace Coordinator CMAC is a centralized role within airspace management units for joint civil military activities
157. C Time Management The Tenderer shall provide product description of the proposed system detailing Time Management functionalities capabilities and benefits The Tenderer shall propose and detail the conceptual diagram of time synchronization protocol and standard date time format that are used for synchronize time The Tenderer shall propose and detail the methodology of Time Management in Part 2 2 1 Scope of Technical Specifications Page 243 D D D D D D E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 TIME04 8 18 CWSOI CWS02 503 CWS04 CWS05S CWS06 CWS07 CWSO8 CWS09 Specifications doc order to synchronize time with time source of the system as follow NAS MOPS APP MOPS e NAS CON TRA APP CON TRA e NAS IBS APP IBS e LTS e RTS The Tenderer shall propose and detail the accuracy of time over any 24 hours period in the event of time source failed CWS HMI The Tenderer shall provide product description of the proposed system detailing CWS HMI functionalities capabilities and benefits The Tenderer shall propose and detail Individual CWS HMI configuration which based on the operator s role login permissions preferences and the sectorization plan The Tenderer shall v
158. CB APP RCAG PCB APP RCAG RCAG RCAG RCAG RCAG RCAG RCAG RCAG RCAG RCAG RCAG RCAG RCAG Spare 1 Spare 2 Spare 3 Spare 4 Spare 5 Spare 6 Spare 7 Spare 8 Spare 9 Spare 10 Spare 11 Spare 12 Spare 13 Spare 14 Spare 14 ua ETE un a 4 12 240 0 118 6 i4 118 6 120 05 116 120 05 7 2575 12025 119 12025 1201 120 1 126 7 126 7 130 BI 132 133 154 155 156 Sparc T pare 2 Spare 3 159 Spare 4 140 Spare 5 Spare 6 142 Spare 7 145 Spare 8 Spare 9 Spare 10 Spare TI Spare 12 Spare 13 Spare 14 150 Spare 14 121 122 a a gt gig Z Z gt 12 123 124 2 2 2 0 125 126 7 8 9 gt 2 2 gt 2 1 1 1 gt 2 gt 12 gt 2 47172 gt 2 5 Uu oof 1 1 1 1 147 EN 44 45 46 49 APPENDIX 3 3 8 Chiangmai CONTRA Radio Channels Capacity 1 7 10 11 12 13 14 15 16 17 18 19 0 2 APPENDIX 3 3 9 Hatyai CONTRA Radio Channels Capacity PT Approach 126 000 RCAG PT PT Approach 126 000 RCAG PT DDN F R 121 500 FIBER 243 000 FIBER APPENDIX 3 3 10 Phuket CONTRA Radio Channels Capacity 1 7 10 11 12 13 14 15 16 17 18 19 0 2 APPENDIX 3
159. Computer Software configuration Items CSCIs describes the allocation of system requirements to the HWCIs and CSCIs and also provides overview the functional capabilities of the system and provides a basis for performing system integration Part3 SUPPORT AND AFTER SALE SERVICE Page 15 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume Part 3 Support and After Sale 1 0 Service_Final doc Volume II Technical Terms of Reference d System Segment Specification Document which provides describe in deep specify the technical requirements includes identify and describing function capabilities performance characteristics the external system components to which the TMCS is interfaced and system capability relationships for describe functionality when some function failure occurs e Interface Control Documents ICD which provides describe the interface defines the exchange of messages between TMCS and external system and each segment partition of TMCS the ICD document will be stated which data items using for transmit receive restriction from standard f Hand book and or user manual and or reference manual which provides instructions for using TMCS as follows e Data Base Management user manual and reference manual e All HMI user manual e NAS MOPS NAS CON TRA NAS IBS APPS APP CON TRA APP IBS LTS and RTS system us
160. D It should be noted that some data inconsistencies will be treated as warnings only whereas others will be treated as errors The operator can choose to submit flight plans or flight related input with Part 2 2 1 Scope of Technical Specifications Page 117 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 2 3 9 2 4 Specifications doc warnings effectively overriding the check As well as checking the flight plan data the FDP also performs a duplicate flight plan check based on aircraft callsign departure aerodrome destination aerodrome and estimated time of departure If the flight plan does not comply with the duplicate flight plan validation check the operator will be notified For flight plan related messages the flight plan and aircraft state are checked to ensure consistency between the received message and the flight plan and aircraft states All fields in the flight plan or flight plan related messages are processed fully to ensure all relevant information is extracted and committed to the system flight plan The Field 18 Other Information field is also processed to identify key data such as Medevac Head of State RVSM etc Route validation The FDP will validate route element in Bangkok FIR against the route infrastructure defined in the FDP database The FDP wil
161. DP will be used as an alternative surveillance data processing function It should be based on different algorithms to ensure that service continuity is maintained by the use of two independent surveillance chains Moreover the Surveillance Direct Access messages should be used as another surveillance data source as stated in the level of contingency and backup level III The CWS will allow ATC to choose and display surveillance information coming from any surveillance data source at any time without interruption to their operation Mono RADAR processing The SDP will be designed to receive mono RADAR target reports messages and mono RADAR services messages from single RADAR sensor source Then the SDP produces track namely local track and distributes these data to other functions via internal network Part 2 2 1 Scope of Technical Specifications Page 111 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Multi RADAR processing The SDP will be designed to receive mono RADAR target reports messages and mono RADAR services messages from multiple RADAR sensor source Then the SDP produces single track per aircraft namely Multi RADAR track and distributes these data to other functions via internal network ADS B processing The SDP should be designed to u
162. EL 57507 RTAF TEL 57521 RTAF TEL 3034028 gt gt E 4 gt 5 od ad oad oad gt gt TEL 4812 TEL 4813 TEL 4817 TEL 4818 TEL 277776 MET gt gt gt gt gt gt E gt FIRE Sparel Spare2 Spare3 Spare4 gt gt Ee ALL ek Ee ALL ek ALL E E e gt EH rem EH ALL FAN APPENDIX 3 2 9 Hatyai CONTRA Telephone Channels Capacity Signaling Working Positions Connect to Call In Call Out Remark PUT APP p Wir KRABI APP Wire BTW Ringin Loop Ou DTMF PSTN amp PABX Interface N TT AOT pwr BTW N 2 2 ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL LL EH al RE APPENDIX 3 2 10 Phuket CONTRA Telephone Channels Capacity Working Positions i Briefing 2 ALL BACCSS TOT BACC S5 F R BACC S6 TOT BACC S5 KBI SAT BACC S5 KBI F R SMU APP HTY APP KBI TWR F R KBI TWR SAT RAN TWR F R RAN TWR SAT SWALLO TEL 5812 TEL 5813 TEL 5818 TEL 5819 TEL 327 195 FIRE Sparel Spare2 Spare3 pare4 ALL f _ BACC Ss FR P 4 BACCS6 TOT 5 BACCSS KBI SAT 6 ALL BACCSS 7 SMUAPP
163. File Reference Volume II Part 2 1 Scope of Date December 14 2012 Version 1 0 Technical Specifications doc 4 4 1 Tower System Level and The tower system provides the following external interfaces to each of the external systems as follow External System comm System pe Protocol Dimension Ch A Ch B AGDL System TCP IP 1 1 1 Surveillance Systems 1 SMR TCP IP 2 2 2 2 PSR TCP IP 1 1 1 3 SSR TCP IP 2 2 2 4 ADS B TCP IP 3 343 5 MLAT WAM TCP IP 4 4 4 AIMS TCP IP 1 1 1 AFL TCP IP 1 1 1 CATIS TCP IP 1 1 1 NAVAID System TCP IP 1 1 1 CCMS TCP IP 1 1 1 Only for SBA Table 12 Tower System Intersystem Interface Description a Tower System NAS MOPS NAS IBS Tower System connects with NAS MOPS NAS IBS using internal messages b Tower System APPS APPS IBS Tower System connects with APPS APPS IBS using internal messages c Tower System End Systems End Systems consist of at least ASDWS GSDWS FDDWS TCMWS TDSWS and printers internal messages ICD for this connection d Tower System AGDL System Tower system connects with End Systems using However where applicable the Tenderer will provide Part 2 2 1 Scope of Technical Specifications Page 32 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical
164. HTY APP Equipment MOPS Redundant Data processing HTY APC Building 2 Floor Equipment Room HTY202 Attachment 6 1 3a VCCS HTY APC Building 2 Floor Equipment Room HTY202 Attachment 6 1 3a F VCCS HTY APC Building 2 Floor Equipment Room HTY202 Attachment 6 1 3a End System HTY Training HTY APP CON TRA Building 1 Floor CON TRA Room HTNIO2 Attachment 6 1 3b HTY Training HTY APP Pseudo Pilot Building 1 Floor Pilot Room HTNIOI Attachment 6 1 3b CON TRA Equipment HTY Training Data processing Building 1 Floor Equipment Room HTN103 Attachment 6 1 3b HTY Training VCCS Building 1 Floor Equipment Room HTN103 Attachment 6 1 3b End System HTY LTS HTY Local Tower HTY APC Building 6 Floor Local Tower Control Room HTY601 Attachment 6 1 3a Equipment Redundant Data processing APC Building 2 Floor Equipment Room HTY202 Attachment 6 1 3a UPS UPS 2 Training Building 1 Floor UPS Room HTN104 Attachment 6 1 3b Table 22 Summary of HTY APP Site Information Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume Part 2 1 Scope of Technical Specifications doc ho Volume II Terms of Reference 6 1 4 Phuket Site The facilities at Phuket Site related to TMCS consist of two 2 building which are The Phuket Approach Control Centre PUT APC Building and Adminis
165. I Terms of Reference of Technical 1 0 Specifications doc and related components for all Level II Category Tower Sites SINI34 The Tenderer shall propose and detail the network configuration for all systems at all Level III Category Tower Sites SINI35 The Tenderer shall provide product description Technical Characteristics of network equipments and related components at all Level III Category Tower Sites SINI36 The Tenderer shall propose and detail the list of supplies of network equipments and related components for all Level III Category Tower Sites SINI37 The Tenderer shall propose and detail the network configuration for all systems for all Optional workstations at all sites SINI38 The Tenderer shall provide product description Technical Characteristics of network equipments and related components for all Optional workstations at all sites SINI39 The Tenderer shall propose and detail the list of supplies of network equipments and related components for all Optional workstations at all sites SINI40 The Tenderer shall propose and detail the network configuration for support of all Future Expansion workstations at all sites 6 The Planned Workstation Quantities Submittal 01 The Tenderer shall propose the list of supplies for NAS PLQNO2 The Tenderer shall propose the list of supplies for Air Defense Units PLQNO3 Tenderer shall propose the list of supplies for CMA APP System PLQNO4 Tenderer sh
166. II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Workstation grade Computer b LCD Monitor and c Input Device 10 1 1 Workstation grade Computer Workstation grade Computer will be high performance computer equipped with at least the following high availability features and devices a Intel Xeon or AMD OPTERON CPU b RAM with error correction ECC c Dedicated Graphic Card d Multiple dedicated gigabit network interface cards e Mean Time Between Failures MTBF 30 000 hours and f Redundant power supplies if available 10 1 2 LCD Monitor 10 1 2 1 LCD Monitor of Type A Workstation LCD Monitor of Type A Workstation consists of one 1 2k x 2k LCD Monitor and one 1 24 portrait orientation LCD Monitor a The 2k x 2k LCD Monitor will have at minimum the following performance features Resolution 2048 x 2048 pixels at 60Hz refresh rate e Dual ports for DVI inputs e Brightness gt 150 cd m2 e Contrast ratio gt 700 1 e Display colors gt 16 7 M 24bit e Color temperature 7500 K typical e Dual power supply Part 2 2 1 Scope of Technical Specifications Page 169 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 b The Specifications doc Power supply operates between 100 VAC
167. In Loop Ou DTMF PSTN amp PABX Interface D Wire Ring In Loop Ou DTMF PSTN amp PABX Interface 2 Wire Loop In DTMF elephone Set Interface elephone Set Interface Voice oice Call Interface Voice Voice Call Interface 2 Wire Ring In Loop Out DTMF PSTN amp PABX Interface re re to to fro ro ro 5 t3 z ta to fro ro fro ro ro ro ro to W N NJN N oice Call Interface oice Call Interface N N 2 Wire Ring In Loop Ou DTMF PSTN amp PABX Interface D Wire Ring In Loop Ou DTMF PSTN amp PABX Interface D Wire Ring In Loop Ou DTMF PSTN amp PABX Interface D Wire RingIn Loop Ou DTMF PSTN amp PABX Interface 2 Wire Ring In Loop Ou DTMF PSTN amp PABX Interface D Wire Ring In Loop Ou DTMF PSTN amp PABX Interface ta ro rto ro APPENDIX 3 2 2 Chiangmai Main Fallback Telephone Channels Capacity Signaling No Working Positions Connect to Type Call In Call Out Remark 2 p wire Loop In DTMF Ring Out Telephone Set Interface 4 FIR BACC S4 SAT D Wire T BACC 57 FIR LL BACCS7 SAT PSL L BL 2603_ATS T EL 2605 T TEL 2611 ATS T TEL 6760 ATS LL TEL 3054028 Wire T AN LL EL 4812 LL EL 4813 p Wire N N N N N N N N N N N N N N N N LL EL 4817 EL 4818
168. List of workstation quantities for Level II Tower System eese 87 Table 47 List of workstation quantities for Level III Tower System eese 88 Table 48 List of workstation quantities for Level IV SBA LTS eee 89 Table 49 List of workstation quantities for Level IV SBA Emergency Tower System 89 Table 50 List of workstation quantities for Level IV DMA 8 2 2 424242 2 90 Table 51 List of workstation quantities for Level IV DMA Emergency Tower System 90 Table 52 Workstation Quantities of NAS 94 Table 53 Workstation Quantities of APP 5 94 Table 54 UPSs for Tung Mahamek system and their respective loads sss 180 Table 55 Summary of UPS Details at Tung Mahamek Site esses 180 Table 56 UPSs for CMA APP System HTY APP System and PUT APP System and their respective loads cce eto 181 Table 57 Summary of UPS Details at Chiang Mai Site Hat Yai Site and Phuket Site 181 Table 58 UPSs for PSL APP System and HHN APP System and their respective loads 182 Table 59 Summary of UPS Details at Phitsanulok Site and Hua Hin Site 182 Table 60 UPSs for BAPP System and its respective loads 183 Table 61 Summary of UPS Details at Suvarnabhumi Airport 224422 22
169. M December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference Vote TL Seopa ot 1 0 Technical Specifications doc 8 14 3 8 14 4 access by the input of time of day is possible The replay of simultaneous duplex channels can support one 1 to four 4 channels or higher The Tenderer will provide at minimum two 2 Replay units per duplicated Recorder units At the replay units an audio output is enabling to allow duplicate recordings to be made of replayed events on the standard analogue recording equipment The replay unit is available with any other type of control such as control from Replay feature REP of the Recording and Replay function REC REP for start stop pause resume play and reverse running of the recording media It is able to synchronize the voice recordings with the corresponding output from the REP and other relevant recordings to allow simultaneous replay on the dedicated replay unit at variable speed The replay units are also possible to replay archival media independently without connecting to the recording unit For investigations of non intelligible information immediate selection of any recording pitch interval controller feature and variable playback speed are possible DVR Supervisor Units The DVR is supervised and operated from a centrally placed DVR supervisor unit connected to the equipment through a standard serial or network interfac
170. M System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 8 19 FDOOI FDOO02 FDOO03 FDO04 FDOOS FDOO6 FDOO7 FDOO8 8 20 DSMOI DSM02 Specifications doc FDO HMI The Tenderer shall provide product description of the proposed system detailing FDO HMI functionalities capabilities and benefits The Tenderer shall propose and detail flight data list HMI The Tenderer shall propose and detail managing ATS messages and flight plan data to ensure flight data correctness and completeness of each flight plan for smooth transition of flight progress The Tenderer shall propose and detail free text input concerning individual flight plans to display in relevant Flight Data Block Electronic Flight Strip and Flight Data List The Tenderer shall propose and detail managing specific dynamic aeronautical data by modification creation and cancellation of the data as appropriate The Tenderer shall propose and detail the methodology of managing weather data including at least meteorological messages The Tenderer shall propose and detail the methodology for the operator to retrieve desired flight plans The Tenderer shall propose the capability to print at least flight plan data flight plan history aeronautical data and meteorological data onto a printer Data Set Management The Tenderer shall provide product description
171. MS The Tower System will be provided with the appropriate software for the previously mentioned additional 2 End Systems Only hardware and suitable operating system will be needed in order to expand the Level III Tower System for optional End Systems The Level III Tower System will be provided with appropriate network infrastructure including network equipment cable and wiring and installation for the previously mentioned additional 2 End Systems Only hardware will be needed in order to expand the Level III Tower System for optional End Systems 7 10 2 Future Expansion The TMCS will expand in the future therefore the system will be designed to support the following expansion capacity using hardware upgrade without software modification Part 2 2 1 Scope of Technical Specifications Page 92 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Re Volume II Terms of Reference ference File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc LA The BACC BAPC NAS can accommodate the concurrent operation of additional 52 workstations as listed below be expanded with additional 32 CWS be expanded with additional 20 CWS BAPP can accommodate the concurrent operation of additional 24 workstations as listed below be further expanded with additional 24
172. Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 SDP66 SDP67 SDP68 SDP69 SDP70 SDP71 SDP72 82 FDPOI FDP02 FDP03 FDP04 Specifications doc The Tenderer shall propose and detail methodology and criteria to filter the system track that are provided to SDP The Tenderer shall provide product description of the proposed system detailing surveillance data output firewall functionalities capabilities and benefits The Tenderer shall provide product description of the proposed system detailing surveillance data analysis tools functionalities capabilities and benefits The Tenderer shall propose and detail the methodology to collect all surveillance data The Tenderer shall propose and detail the type of data to be collected by surveillance data analysis tools The Tenderer shall propose and detail the capability of reconfiguration the surveillance data input output of SDP The Tenderer shall propose and detail list of provided hardware accessories related software integration procedure reference documents essential software tool s and training course for reconfiguration the surveillance port Flight Data Processing The Tenderer shall provide product description of the proposed system detailing FDP functionalities capabilities and benefits The Tenderer shall pr
173. Msg Data System Intersystem Msg Data CCMS Intersystem Other Msg Data System External System IBS Independent Backup System MET Meteorological MIL Military Tower Operator MLAT Multi Lateration Surveillance System Msg Messages NAS Nationwide Air Traffic Management System NMWS Network Management Workstation PSR Primary Surveillance Radar RTS Remote Tower System SSR Secondary Surveillance Radar WAM Wide Area MLAT Figure 7 Intersystem Connection Context Diagram for the APPS MOPS Part 2 2 1 Scope of Technical Specifications Page 25 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc In order to support the operation of BAPP APC PUT APC PSL and HHN APC each unit will have its own APPS The APPS provides the following external interfaces to each of the external systems identified External System Comm Protocol 4 Pu a AGDL System TCP IP 2 242 Surveillance Systems 1 SSR TCP IP 8 848 2 SSR Synchronous 2 242 3 PSR TCP IP 1 1 1 4 PSR Synchronous 1 1 1 5 ADS B 4 4 4 6 TCP IP 3 3 3 7 MLAT TCP IP 4 444 MET System TCP IP 1 1 1 5 TCP IP 1 1 1 4 31 4 3 2 4 3 3
174. N 2 1 1 Total 56 23 2 1 2 1 1 Note Table 30 List of workstation quantities for NAS MOPS The quantities of hardware in this table under the CWS column reflects the required minimum numbers of hardware for the NAS MOPS The quantities of hardware under the columns marked with optional are highly desirable additional numbers of hardware for the NAS MOPS Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Terms of Reference i Eat 2 Scope pr 1 0 Technical Specifications doc 7 1 2 NAS CON TRA NAS CON TRA Workstation Quantity Operator Location Role CWS FDWS PSPWS TMCWS CMWS DSWS EC PC 12 EC PC APP 8 CON TRA Room FISL 1 Existing Operation TECHSUP 2 Building TMC 4 FDO PSP 10 DSO 1 Total 21 14 2 1 CMWS for NAS CON TRA will be placed together with MTN or TECHSUP workstations of NAS MOPS in the operational building Table 31 List of workstation quantities for NAS CON TRA 7 2 BAPP System Located at Suvarnabhumi Airport the BAPP System has two systems The planned quantities of role positions are described in table format 7 2 1 BAPP MOPS BAPP MOPS Workstation Quantity Operator Role Location CWS FDWS CMWS DSWS DAWS NMWS Operation Room APP 22 Support TACTSUP 2 Building FDO 2 Equipment Room
175. N TRA and related systems and Receive status information of all system components and depending on the technical situation and determining in close collaboration with OPSUP the appropriate system configuration and the various maintenance actions to be undertaken by the technical staff TECH 1 Evaluation Operator The Evaluation Operator EO is responsible for at minimum Prepare evaluations on recorded system data Perform evaluations on recorded system data Replay recorded data for incident analysis and safety assessments as well as for technical analysis and evaluations and Perform operational data analysis j Airspace Manager The function of Airspace Managers ASM is a centralised one within Airspace Management Cells which are foreseen as a joint civil military activity The Airspace Manager s primary objective is to maximise the utilisation of available airspace by dynamic time sharing and at times by segregating airspace among various categories of users based on short term needs They collaborate in the planning of airspace usage in a way that balances the impact on civil air traffic flow and capacity management with military needs The Air Space Manager s responsibilities are but not limited to Identify expected capacity shortfalls between traffic demand and airspace capacity Part 2 2 1 Scope of Technical Specifications Page 46 Project Name Date Thailand Modernization CNS ATM Dec
176. NAS MOPS connects to those Military Tower Workstations to coordinate information in order to support BACC BAPC operation The NAS MOPS Military Tower Workstations connection may use internal messages However where applicable the Tenderer will provide ICD for this connection NAS MOPS Remote Tower System RTS NAS MOPS connects with associated Remote Tower System to coordinate in order to support BAPC operation The connection may use internal messages However where applicable the Tenderer will provide ICD for this connection NAS MOPS NAS CON TRA NAS MOPS connects with NAS CON TRA to synchronize their databases For essential data the update should be instantaneous in order to provide the complete operable system in case of contingency situation For synchronization of the whole database the update procedure should include specific time interval configuration Consequently the connection between NAS MOPS and NAS CON TRA will need to be robust and has enough bandwidth for the synchronization purpose AEROTHAI will provide fibre optics link connection between buildings However within corresponding building the vendor will provide cabling and configure network connection for both NAS MOPS and NAS CON TRA to connect to the available fibre optic connection nodes NAS MOPS MET System NAS MOPS connects with MET System to receive at minimum the following information Part 2 2 1 Scope of Technical Specifications Page 23
177. NCOO7 INCOO8 INCOO9 INCO10 The Tenderer shall propose and detail the mechanism to provide data integrity and security against unauthorized access intrusion and malicious computer attacks The Tenderer shall propose and detail the list of external system interface of system best suited for NAS MOPS which shall include at minimum communication protocol dimension of external system and numbers of channel of each external interface The Tenderer shall propose and detail the list of external system interface of system best suited for NAS CON TRA which shall include at minimum communication protocol dimension of external system and numbers of channel of each external interface The Tenderer shall propose and detail the list of external system interface of system best suited for NAS IBS which shall include at minimum communication protocol dimension of external system and numbers of channel of each external interface The Tenderer shall propose and detail the NAS MOPS AMHS information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the NAS MOPS CIFDPS information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the NAS MOPS AGDL System information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the NAS MOPS Surveillance Systems information exchange incl
178. ON Mode the bold arrows represent connections between CON TRA and other systems APP System and RTS APP System APP System Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Figure 3 Connections between NAS other systems Contingency Mode 2 5 For TMCS the NAS the BAPP System the CMA APP System the HTY APP System the PUT APP System the PSL APP System and the HHN APP System will achieve this level IV Level V Independent Backup Normally in the Contingency Situation of NAS it is assumed that air traffic controllers can still operate at the AEROTHAI Headquarter In case of Disaster Situation it is envisaged that air traffic controllers will not be able to operate at AEROTHAI Headquarter and must be evacuated Another Disaster Situation may imply that access to AEROTHAI Headquarter has been severely restricted and normal operations can not take place Therefore it is necessary to prepare another backup system for the NAS to handle Disaster Situation This backup system is called NAS IBS and will be implemented in a remote location further away from Headquarter in the future The same principle applies to all APP Systems therefore APP IBS i
179. ON TRA e APP IBS The Tenderer shall propose and detail the methodology and parameters used to configure the ADS B processing The Tenderer shall propose and detail methodology to display ADS B information to the ATC The Tenderer shall provide product description of the proposed system detailing MLAT WAM processing functionalities capabilities and benefits The Tenderer shall propose and detail the MLAT WAM data format the maximum number of MLAT WAM data input that are supported by MLAT WAM processing of both MSDP and FSDP of the following systems e NAS MOPS e NAS CON TRA e NAS IBS e APP MOPS APP CON TRA e APP IBS The Tenderer shall propose and detail the maximum number of simultaneous MLAT WAM track that are supported by MLAT WAM processing of both MSDP and FSDP of the following systems Part 2 2 1 Scope of Technical Specifications Page 223 D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 SDP23 SDP24 SDP25 SDP26 SDP27 SDP28 SDP29 SDP30 Specifications doc NAS MOPS e NAS CON TRA e NAS IBS e APP MOPS e APP CON TRA e APP IBS The Tenderer shall propose and detail the methodology and parameters used to configure the MLAT WAM processing The Tenderer shall propose and detail methodology to di
180. OPS connects with APPSs to coordinate in order to support BACC BAPC operation The connection may use internal messages However where applicable the Tenderer will provide ICD for this connection NAS MOPS APP IBS NAS MOPS connects with APP IBS to coordinate in order to support BACC BAPC operation This connection will be utilized in case of contingency situation when the APP IBS is configured to operate in place of an affected APPS The connection may use internal messages However where applicable the Tenderer will provide ICD for this connection NAS MOPS End Systems End Systems consist of at least CWSs FDWS CMWS DSWS DAWS NMWS and printers NAS MOPS connects with End Systems using internal messages However where applicable the Tenderer will provide ICD for this connection NAS MOPS AGDL System NAS MOPS connects with AGDL System to exchange all air ground data communications to pilot using the following format Message Data Data Format Input Output Reference ICD CPDLC message ACARS FANS 1 A ATN Input Output Tenderer provided ICD DCL message ACARS FANS 1 A ATN Input Output Tenderer provided ICD ADS C message ACARS FANS 1 A ATN Input Output Tenderer provided ICD Table 4 NAS MOPS AGDL Systems Information Exchange Description At the present the major air ground data link service providers in the world are ARINC and SITA Therefore NAS MOPS will need to provide connections to
181. P RCA KKN APP RCA KKN APP RCA KKN APP RCA SKN APP RCA SKN APP RCA SKN APP RCA SKN APP RCA UDN APP RCA UDN APP RCA UDN APP RCA DN APP RCA LOY APP RCA OY APP RCA OY APP RCA OY APP RCA BL APP RCA BL APP RCA BL APP RCA BL APP RCA OT APP RCA ROT APP RCA OT APP RCA ROT APP RCA KRT APP RCA KRT APP RCA KRT APP RCA KRT APP RCA BRM APP RCA BRM APP RCA BRM APP RCA BRM APP RCA SMU APP RCAG Airport SMU APP RCAG Airport SMU APP RCAG Khaophom SMU APP RCAG Khaophom SMU APP RCAG Khaophom SMU APP RCAG Mm m NKS APP RCAG MEDIA Q a lt Q Q S S S S S S S S S S S S 5 5 5 5 5 5 F R AT F R AT F R AT F R AT F R AT F R AT F R AT F R AT F R F R F R F R F R AT AT AT F R AT F R APP APP APP 123 35 123 35 F R 191 SISISISIE gt 193 194 d d un MUA d d N Channel 195 196 197 198 199 200 201 02 203 204 205 206 207 08 09 NIN 211 212 213 214 215 216 217 218 219 20 221 22 23 4 25 226 227 228 229 230 231 232 233 34 235 236 231 238 239 240 241 242 243 N N N N Working Position un un cic gt 5 G gt d gt
182. PP APPS and CON TRA consists of both hardware and software The characteristic of each category are described as follow a Hardware Characteristic Hardware characteristic for operator roles consists of Touch Entry Device TED panel and workstation type There are three 3 types of workstation as follow Type A consists of one workstation grade computer one 2K x 2K LCD monitor and one 24 LCD monitor Type B consists of one workstation grade computer and 24 LCD monitor Type C consists of one workstation grade computer and one 30 LCD monitor b Software Characteristic Software characteristic for operator roles are as follow Controller Workstation CWS Human Machine Interface HMI Function Control and Monitoring System CMS Function Network Management System NMS Function Hlight Data Operator FDO Function Data Set Management DSM Function Data Analysis DAA Function Pilot Function and Training Mission Control TMC Function Part 2 2 1 Scope of Technical Specifications Page 38 Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 5 1 3 Mapping between Workstations and Software Characteristics to support Opera
183. PP CON TRA Air Field Lighting Building 1 Floor CON TRA Room AFL101 Attachment 6 1 6c HHN APP Psuedo Pilot Air Field Lighting Building 1 Floor CON TRA Room 101 Attachment 6 1 6c CON TRA Equipment Data processing Air Field Lighting Building 1 Floor Equipment Room AFL101 Attachment 6 1 6c VCCS Air Field Lighting Building 1 Floor Equipment Room AFL101 Attachment 6 1 6c End System HHN LTS HHN Local Tower HHN APC Building 8 Floor Local Tower Control Room 801 Attachment 6 1 6a Equipment Redundant Data processing HHN APC Building 7 Floor Equipment Room HHN701 Attachment 6 1 6b UPS UPS 2 UPS Shelter 1 Floor UPS Room UPS101 Attachment 6 1 6 Table 25 Summary of HHN APP Site Information Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc 6 1 7 Suvarnabhumi Airport site The site consists of three 3 buildings which are ATC Support Building Aerodrome Control Tower and CON TRA Building Attachment 6 1 7 illustrates the location of the buildings a ATC Support Building There are three 3 rooms allocated for the TMCS in the ATC Support Building b Aerodrome Control Tower There are two 2 rooms allocated for TMCS in the Aerodrome Control Tower c Emergency Buil
184. PP RCAG 260 119 45 BRM APP RCAG 261 BRM APP RCAG 262 UHF BRM APP RCAG 263 129 6 SMU APP RCAG Airport 2 305 4 SMU APP RCAG Airport 129 6 MU APP RCAG Khaophom ua 266 MU APP RCAG Khaophom 267 268 SMU APP RCAG Khaophom NKS APP RCAG NKS APP RCAG NKS APP RCAG HF HF HF HF HF HF NKS APP RCAG F F F F F F F F F F F F F F F ua MU APP RCAG Khaophom 5 2 2 2 2 2 271 123 35 STN APP RCAG STN APP RCAG STN APP RCAG STN APP RCAG 277 TRAT APP RCAG 278 TRAT APP RCAG 2 H TRAT APP RCAG H 280 TRAT APP RCAG 281 CTR APP RCAG 282 CTR APP RCAG 283 CTR APP 284 CTR APP RCAG 285 NAN APP RCAG 286 NAN APP RCAG 287 NAN APP RCAG 288 NAN APP RCAG 289 120 1 PAE APP RCAG 2 120 1 PAE APP RCAG H PAE APP RCAG H 292 PAE APP RCAG 293 126 7 PCB APP RCAG 2 PCB APP RCAG 205 0 297 07 RCAG 298 RCAG __ ek H UH VH VH 299 VH RCAG VH VH VH H 2 2 2 N U PCB APP RCAG 4 64 65 69 70 72 73 74 75 76 79 90 94 95 96 97 300 301 30 RCAG 303 RCAG Connect to adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Chan
185. Qoo UO OUO e mel G OU 2 End System CWS CMWS FDWS DSWS DAWS NMWS Printer TMCWS PSPWS ESP Cn OM 3 VCCS 4 UPS 1 Processing System o SDP FDP Safety Net MONA MTCD AOM FUA DCB ATFM TS AMAN DMAN CPDLC REC REP DA AIM TM CWS HMI FDO HMI DSM NMS CMS 0 90 O OG Gc 2 End System CWS CMWS FDWS DSWS DAWS NMWS Printer 01 O 0 19 1 Processing APP IBS RTS LTS MOPS Level IV Level IV 1 Processing System System T SDPS o T SDPS o T FDPS o T FDPS 2 End System 2 End System o ASDWS o ASDWS o GSDWS o GSDWS o FDDWS o FDDWS TCMWS o TCMWS o TDSWS o TDSWS o Printer o Printer 3 UPS 3 UPS Level Ill Level 1 Processing 1 Processing System System o T SDPS o T SDPS o T FDPS o T FDPS 2 End System 2 End System o ASDWS o ASDWS o GSDWS o GSDWS o FDDWS o FDDWS o TCMWS o TCMWS o TDSWS o TDSWS o Printer o Printer 3 UPS 3 UPS Level II Level Il 1 APPs Remote Workstation o ASDWS FDDWS TCMWS o Printer 2 UPS Level I 1 NAS APPs Remote Workstation o FDDWS 1 APPs Remote Workstation o ASDWS o FDDWS TCMWS o Printer 2 UPS Project Name Date Thailand Modernization December 14 2012 CNS ATM Sys
186. R 8 System Functionalities Submittal 5 01 The Tenderer shall provide the breakdown diagram of all system functionalities and system capabilities of the proposed following systems NAS NAS IBS APP Systems APP IBS Level III LTS Level III RTS Level II LTS Level II RTS and Level I RTS 8 1 Surveillance Data Processing Part 2 2 1 Scope of Technical Specifications Page 220 E D E E E E D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 SDPOI SDPO02 SDPO03 SDP04 SDPO5 SDPO06 SDPO7 SDPOS SDPO09 SDP10 Specifications doc The Tenderer shall provide product description of the proposed system detailing MSDP functionalities capabilities and benefits The Tenderer shall provide product description of the proposed system detailing FSDP functionalities capabilities and benefits The Tenderer shall propose and detail the surveillance data processing algorithms used by MSDP and FSDP The Tenderer shall provide product description of the proposed system detailing Surveillance Direct Access functionalities capabilities and benefits The Tenderer shall provide product description of the proposed system detailing Mono RADAR processing functionalities capabilities and benefits The Tenderer shall propose and de
187. Scope Volume II Terms of Reference of Technical Specifications doc o Track Unique Identifier o Fusion Identifier o Contributing sensor information o Track Position in Cartesian co ordinates o Track Velocity in Cartesian co ordinates o Position standard deviation o Velocity standard deviation o Height o Heading o Size o Mobile type o Mode S code o Mode A code o Call sign o Registration Mark 9 25 2 Control Feature COF Date December 14 2012 Version 1 0 The COF will monitor the situation on the aerodrome surface and provide alerts when particular situations are detected The monitoring and alerting will be provided by the system upon detecting runway incursions taxiway alert situations and other hazardous scenarios and generating alerts to the ATC and possibly directly to the involved pilots and or vehicle drivers The COF will provide information to assist in warning ATC as follows Monitoring of aircraft and vehicles on the maneuvering area for compliances with clearances and instructions Determining that a runway is clear of traffic prior to a landing or take off Part 2 2 1 Scope of Technical Specifications Page 157 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 25 3 Specifications doc o Providing information on essen
188. Sector 3 SCAR_S3 STN amp PABX Interface Sector 3 STN amp PABX Interface Sector 3 STN amp PABX Interface Sector 4 STN amp PABX Interface Sector 4 STN amp PABX Interface Sector 4 SL_APP STN amp PABX Interface Sector 4 STN amp PABX Interface Sector 4 VB_GND4 STN amp PABX Interface Sector 4 STN amp PABX Interface Sector 4 S_TWR STN amp PABX Interface Sector 4 CAR_S4 STN amp PABX Interface Sector 4 STN amp PABX Interface Sector 4 GN4 STN amp PABX Interface Sector 5 2 STN amp PABX Interface Sector 5 KBI APP STN amp PABX Interface Sector 5 UT APP DDN STN amp PABX Interface Sector 5 GS SRT2 STN amp PABX Interface w 5 55 d Sector 1 Sector 1 Sector 1 Sector 1 Sector 2 N o 5 Bas an 92 o lt d Q lt Q alw gt un d d d lt 2 gt gt Sector 2 Sector 3 Sector 4 Sector 5 Sector 6 2 7 Sector3 8 Sector3 9 Sector3 10 54 1 4 12 54 13 Sector4 T n 15 16 7 18 Sector 19 Sector 20 21 2 Sector 23 Sector 4 Sector 25 Sector2 26 Sector2 7 Sector 28 2 29 Sector2 30 Sector2 1 Sector3 22 Sedor3 33 Sector3 34 Sector3 35 Seor3 36 Sect
189. Spare F7 Main Spare 7 5 Spare F8 Main Spare F8 St Spare F9 Main Spare F9 Stb Spare F10 Main Spare F10 Stb Spare 11 Main Spare F11 Stby Spare F12 Main Spare F12 Stb MEDIA APPENDIX 3 3 2 Chiangmai Main Fallback Radio Channels Capacity Local Main Local Stb Local Main Local Stb Local Main Local Stb Local Main Local Stb Local Main Local Stb Local Main Local Stb RCAG INT RCAG INT RCAG INT RCAG INT RCAG LPN RCAG LPN RCAG MST RCAG MST RCAG MHS RCAG MHS CATIS CATIS Emergenc Emergenc Emergenc Emergenc Flight Check Emergenc Emergenc T T T T Lg 20 22 24 25e i BE e 27_ 2821 2 UBL S8 Emergenc KKN S8 Emergenc CTR APP Emergenc 1 7 7 9 2 3 4 7 9 4 1 18 1 20 21 2 2 2 25 26 2 28 2 30 3 35 Main Stb Main Stb Main 40 Stb 921921 Uo poo FIBER FIBER APPENDIX 3 3 3 Hatyai Fallback Radio Channels Capacity Channel Frequency MHz 121 900 121 900 257 800 257 800 118 100 118 100 275 800 275 800 126 700 126 700 301 500 301 500 125 550 125 550 125 550 284 000 284 000 125 300 125 300 125 300 126 000 126 000 126 000 128 800 121 450 121 500 121 500 243 000 243 000 132 050 HTY S6 SMU APP Spare 1 Spare 1 Spare 2 Spare 2 Spare 3 Spare 3 Spare 4 Spare 4 1 7
190. Spare F9 Main Radio Channel Record Spare F9 Stby Radio Channel Record Spare F10 Main Radio Channel Record Spare F10 Stby Radio Channel Record Area Record Record Record Record Record Record Record Record Record Record Record Record Record Record 337 338 339 V V V V V V V V V V V V V V V V V V V V V APP 341 3 343 2 5 344 APP_W Area APP Area APP E2 Area 3 3 3 Area 348 Area 349 Area 350 Area 351 Area 352 Area 353 Area 354 Area 42 4 4 4 4 Channel Detail 355 Area 356 Area 357 Area 358 Area 359 Area 360 Area 361 Approach 362 363 364 365 Area Area 368 Area 369 Area Area 371 Area 372 Area 373 Area 374 Area 375 376 Area 377 Area 378 Area 379 Area 380 Area 381 Area 382 Area 383 Area 384 Area 385 Area 386 Area 387 Area 388 Area 389 Area 390 Area 391 Area Area 393 Area 394 Area 395 Area 396 Area 397 Area 398 Area 399 Area 100 Area 401 Area Area Area Area Area Channel 35 356 357 358 35 360 361 362 363 34 36 368 36 32 33 34 375 376 37 37 380 381 382 38 384 3
191. System LTS Remote Tower System RTS LTS and RTS under the scope of TMCS are categorized into 4 levels by their respective system capabilities The details are as follow Level I There are four 4 tower systems within this level e Korat Tower system e Takhli Tower system e U tapao Tower system and Kampangsan Tower system Level II There are twenty eight 28 tower systems within this level e Phitsanulok Tower system e Hua Hin Tower system e Khon Kaen Tower system e Chiang Rai Tower system e Ubon Ratchathani Tower system e Krabi Tower system e Surat Thani Tower system e Sakon Nakhon Tower system e Nakhon Phanom Tower system e Nakhon Ratchasima Tower system e Petchaboon Tower system e Nan Tower system e Phare Tower system Loei Tower system Part 2 2 1 Scope of Technical Specifications Page 28 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference Volume II Technical Terms Volume II Part 2 1 Scope of of Reference File Reference Version Technical Specifications doc Buriram Tower system Roi Et Tower system Surin Tower system Chumporn Tower system Trat Tower system Mae Hong Son Tower system Lampang Tower system Sukhothai Tower system Tak Tower system Mae Sod Tower system Ranong Tower system Trang Tower system Pattani Tower system and Narathiwat Tower system Level III There ar
192. THAILAND MODERNIZATION CNS ATM SYSTEM PROJECT Volume II Technical Terms of Reference November 2012 AERONAUTICAL RADIO OF THAILAND BANGKOK THAILAND Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Vol II Part 1_Final 1 0 CONTENTS 1 SCOPE OF PROJECT 2 SCOPE OF TECHNICAL SPECIFICATIONS 3 SUPPORT AND AFTER SALE SERVICES Part 1 Scope of Project Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Vol II Part 1_Final 1 0 PART 1 SCOPE OF PROJECT Part 1 Scope of Project Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Vol Part 1 Final 1 0 Table of Contents PNT 01 P18L Gd M CO Sem 1 SECTION A Scope Of 2 1 Pr ject Background 2n 2 2 2 3 Project NET 3 4 3 5 Project 4 6 CUO VOR
193. The CMAC s primary objective is to maximize the utilization of available airspace by Part 2 2 1 Scope of Technical Specifications Page 43 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc dynamic time sharing and at times by segregating airspace among various categories of users based on short term needs They collaborate in the planning of airspace usage in a way that balances the impact on civil air traffic flow and capacity management with military needs The CMAC s responsibilities are but not limited to Coordinate well in advance of major airspace events such as large scale military exercises or air shows which require additional segregated airspace Coordinate with Air Space Manager ASM and Bangkok Air Traffic Flow Management Unit Manager FMM to consider the expected capacity shortfalls between traffic demand and airspace capacity Develop and distribute of Airspace Use Plans AUP to accommodate significant short term realignment of traffic flows to meet extra ordinary demands imposed by major events Develop and distribute of Updated Airspace Use Plans UUP in case of changes or modifications to airspace allocation Develop and distribute of daily Conditional Route Availability Messages CRAM and Monitor the efficiency of th
194. UPS Details at Samui Airport Site Udon Thani Airport Site and Nakhon Si Thamarat Airport Site Miscellaneous Electrical Components AEROTHAI will provide electrical cable connecting metro electric engine to the UPS However at each site the Tenderer will provide static transfer switches cables connecting all UPS to equipments main distribution board junction box installation materials and other necessary equipments The site survey and site evaluation of components placement are recommended 10 8 1 7 Other Category Level II Airport Sites The planned numbers of UPS and their respective loads at each of the other category Level II airport sites is described in table as follow System System Description UPS 1 Category Level II Airport RTS End System X Table 66 UPSs for each of Category II Airport RTS and their respective loads The summary of UPS details required at each of the other category Level II airport sites is described in table as follow UPS O P Power KVA Phase Type Type j Responsibility 1 Tenderer Proposed Depending Full Load Type Tenderer Table 67 Summary of UPS Details at each of Category Level II Airport Sites Part 2 2 1 Scope of Technical Specifications Page 185 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Refe
195. Workstation Quantity Location Operator Role CWS FDWS PSPWS TMCWS CMWS DSWS EC PC APP 4 CON TRA Room MTN 2 Administrative 1 Building FDO 4 DSO 1 Part 2 2 1 Scope of Technical Specifications Page 84 Project Nam e Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Terms of Reference volume ILE 2 oF 1 0 Technical Specifications doc Total 4 5 1 1 CMWS for PUT APP CON TRA will be placed together with MTN workstations of PUT APP MOPS Table 40 List of workstation quantities for PUT APP CON TRA 7 7 PSL APP System Located at Phitsanulok airport the PSL APP System has two systems The planned quantities of positions are described in table format 7 7 1 PSL APP MOPS PSL APP MOPS Workstation Quantity Location Operator Role CWS FDWS CMWS DSWS DAWS NMWS 4 Operation Room FDO 1 PSL APC Building TACTSUP 1 Equipment Room MTN EO 2 1 1 1 PSL APC Building DSO 1 Total 7 1 1 1 1 1 Table 41 List of workstation quantities for PSL APP MOPS 7 7 2 PSL APP CON TRA PSL APP CON TRA Workstation Quantity Location Operator Role CWS FDWS PSPWS TMCWS CMWS DSWS PC APP 4 CON TRA Room MTN 2 Administrative 1 Building FDO 4 DSO 1 Total 4 5 1 1
196. ace Spare5 are STN amp PABX Interface Spare STN amp PABX Interface Spare7 are STN amp PABX Interface Spares STN amp PABX Interface Spare9 are STN amp PABX Interface Spare10 are STN amp PABX Interface Sparel 1 are STN amp PABX Interface Sparel2 are STN amp PABX Interface Sparel3 are STN amp PABX Interface Sparel4 pare STN amp PABX Interface Sparel5 are STN amp PABX Interface 16 STN amp Interface o oo olm gt Z lt D Ny BH un N N N N goj N 95 un 2 N gt N AAI nin gt 5 N oo un 2 Wo Wi WIN A 5 5 5 5 5 UJ UJ un ja UJ un UJ 4 5 5 5 5 CTRSector CTRSector CTIRSector 120 Spael S Spare Spare3 Sparl Sparel2 3 4 APPENDIX 3 2 8 Chiangmai CONTRA Telephone Channels Capacity Working Positions Signaling Call In Call Out BACCSA4 F R p Wire Ring In Loop Ou DTMF BACC 54 SAT p Wire Ring In Loop Out DTMF gt L L L L L L L L L L L L L L L L L L L L ALL 57 5 EL 2603 ATS TEL 2605 ATS TEL 2611 ATS TEL 6760 ATS T
197. ach flight plan The FDO Part 2 2 1 Scope of Technical Specifications Page 143 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc will be able to input free text concerning for individual flight plans to display in relevant Flight Data Block Electronic Flight Strip and Flight Data List 9 20 Data Set Management The Data Set Management function DSM will provide the facility to authorized user in order to preparing define data set and then to ensure consistency as the data is propagated through the system The intention 15 that a static environment data 15 entered once and then used by many functions e g CWS s Maps FDP and Monitoring Aids 9 20 1 Data Set The data set is set of static environment data It should be grouped in many categories depend on the system environment such as Operational OPS Training TRA and Contingency CON etc The data set should comprise of the following data but not limited to a b c d e f g h i 1 k 1 Points or Fixes Airports and runways SIDs STARs Airways Aeronautical maps Airspace zones and sectorisation QNH areas and related QNH parameters Aircraft performances Aeronautical information data RPL Surveillance data process parameters RADAR pa
198. ade by telephone buttons Part 2 2 1 Scope of Technical Specifications Page 214 D D E E E E E E D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 VCCS42 VCCS43 VCCS44 VCCS45 VCCS46 VCCS47 VCCS48 VCCS49 550 551 VCCS52 VCCS53 VCCS54 Specifications doc The Tenderer shall propose and detail the connection disconnection operation principle capability of the DA and IA call The Tenderer shall propose and detail the connection disconnection operation signaling tones characteristic of the DA and IA call The Tenderer shall propose and detail the telephone function capability such as Hold Conference Transfer etc and buttons configuration of the DA and IA The Tenderer shall propose and detail the Intercom function capability of the system The Tenderer shall propose and detail the voice page function capability of the system The Tenderer shall propose and detail the capability and characteristic of the short time or term recording function The Tenderer shall propose and detail the capability and characteristic of ambient noise recording facility at each VCCS workstation facility The Tenderer shall propose and detail the capability and configuration of the GPS mast
199. adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record Channel Detail 100 KKN RCAG 10i UBL RCAG 102 UBL RCAG 103 KRTRCAG 104 KRTRCAG 105 RCAG 106 Local Main 107 Local Stby 108 KKN RCAG KKN RCAG 10 UBL RCAG im UBL RCAG 112 KRT RCAG 113 KRT RCAG 114 Local Main 115 Local Stby 116 KMN RCAG 117 KMN RCAG 118 119 Local 120 Local Stby 121 KMN RCAG 122 KMN RCAG 123 Local Main 124 Local Stby 125 NSW 126 NSW 127 PSL 128 KKN RCAG 129 KKN RCAG 130 Local Main 131 Local Stby 132 NSW 133 NSW RCAG 134 KKN RCAG 135 KKN RCAG 136 Local Main 137 Local Stby 138 KAN RTAF RCAG KAN RTAF RCAG 140 KAN TOT RCAG 141 Local Main 142 Local Stby 143 KAN RTAF RCAG 144 KAN RTAF 145 SMU RCAG 146 SMU RCAG 127 CPN RCAG TAR PUT RCAG 149 PUTRCAG 150 SMU RCAG Channel 100 101 102
200. ail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for APP IBS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for CMA APP MOPS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for CMA APP Part 2 2 1 Scope of Technical Specifications Page 193 E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 ARCHOS 9 10 ARCHII ARCH12 14 Specifications doc CON TRA The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for HTY APP MOPS The det
201. ail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for HTY APP CON TRA The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for PUT APP MOPS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for PUT APP CON TRA The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for PSL APP MOPS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for PSL APP CON TRA The detail should include at minimum a diagram showing connections among all components such as servers components network components end syst
202. ailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference Volume II Part 2 1 Scope of Technical Specifications doc LA 8 7 8 8 8 9 The DA and IA disconnection will automatically occur when either party terminates a two party communication All incoming calls of the telephone lines are disabled enabled to announce by means of signaling tone from a buzzer It is able to switch off the signaling tone but a visual indication buzzer off on the allocated button is necessary It is also possible to adjust the signaling tone level The Hold Conference and Transfer function are available for DA and IA Each VCCS workstation facility is able to communicate with another position by selecting a button on the TED panel and directly connect to the predetermined VCCS workstation facility Intercom The VCCS workstation facilities are able to communicate together by selecting the designated button on the TED panel and then calling by voice without the need for signaling Voice Page Other Functions There is Short Time or Term Recording function on the TED panel for each VCCS workstation facility The Short Time or Term Recording function has a minimum duration of at least 30 minutes for each VCCS workstation facility According to ICAO ANNEXI1 each VCCS workstation facility should be equipped with ambient noise recording facility capable of retaining the i
203. ailing type of strip bay The Tenderer shall propose and detail all data contain in Tower Electronic Flight Strip TEFS and how to configure the data The Tenderer shall propose and detail all display formats for the TEFS The Tenderer shall provide product description of the proposed system detailing how to change state of the FPL The Tenderer shall provide product description of the proposed system detailing handwriting features The Tenderer shall provide product description of the proposed system detailing Free Text Insert features The Tenderer shall provide product description of the proposed system detailing notification display Part 2 2 1 Scope of Technical Specifications Page 256 E E E E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc TCWS23 Tenderer shall provide product description of the proposed system detailing E auxiliary data display TCWS24 Tenderer shall provide product description of the proposed system detailing E Runway in use management features TCWS25 Tenderer shall provide product description of the proposed system detailing E FDD degraded mode features TCWS26 Tenderer shall provide product description of the proposed system
204. al Operation Room of NAS MOPS Attachment 6 1 1 The location of Equipment Room of NAS MOPS Attachment 6 1 1d The location of CON TRA Room of NAS CON TRA Attachment 6 1 1 The location of CON TRA Room of NAS CON TRA Attachment 6 1 2a The location of the Operation Room CON TRA Room Equipment Room and Local Tower Control Room of CMA APP MOPS CMA APP CON TRA and CMA LTS Attachment 6 1 2b The location of the UPS Room Attachment 6 1 3 The location of APC Building and Training Building at Hat Yai Site Attachment 6 1 3a The location of the Operation Room Equipment Room and Local Tower Control Room of HTY APP MOPS and HTY LTS Attachment 6 1 3b The location of the CON TRA Room Pilot Room and Equipment Room of HTY APP CON TRA Attachment 6 1 4 The location of PUT APC Buildings and Administrative Building at Phuket Site Attachment 6 1 4a The location of the Operation Room Equipment Room and Local Tower Control Room of PUT APP MOPS and PUT LTS Attachment 6 1 4b The location of the CON TRA Room Pilot Room and Equipment Room of PUT APP CON TRA Attachment 6 1 4c The location of the UPS Room of PUT APP CON TRA Attachment 6 1 5 The location of PSL APC Building and Administrative Building at Phitsanulok Site Attachment 6 1 5a The location of the Operation Room Equipment Room and Local Tower Control Room of PSL APP MOPS and PSL LTS Attachment 6 1 5b The location of the CON TRA Room Pilot Room and Equipment Room of PSL APP CON TRA Attac
205. al Specifications Page 258 E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 WRKCO09 WRKCI0 WRKCII WRKCI12 WRKCI3 INPDOI Specifications doc e Brand and Model e CPU performance e and capacity of Memory e Graphic card e Network interface card and e Mean Time Between Failure value of each component The Tenderer shall propose and detail the Power supply of the Workstation grade Computers that are provided for Type C Workstation The Tenderer shall propose and detail The LCD Monitor of Type C Workstation which specifies at minimum the following aspects features e Brand and Model and e Technical specification data details The Tenderer shall propose the technical specifications data of the Workstation grade Computers that are provided for Type D Workstation including all attached devices which specifies at minimum the following aspects features e Brand and Model e CPU performance e and capacity of Memory e Graphic card e Network interface card and e Mean Time Between Failure value of each component The Tenderer shall propose and detail the Power supply of the Workstation grade Computers that are provided for Type D Workstation The Tenderer shall propo
206. al messages Part 2 2 1 Scope of Technical Specifications Page 36 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 5 Operator Roles and Workstations 5 1 BACC BAPC BAPP APPs CON TRA 5 1 1 Operator Roles Operator roles for BACC BAPC BAPP APPS and CON TRA consist of Executive Controller EC Planner Controller PC Arrival Manager AMAN Tactical Supervisor TACTSUP Civil Military Airspace Coordinator CMAC Operational Supervisor OPSUP Flight Information Specialist FISL Technical Supervisor TECHSUP Evaluation Operator EO Airspace Manager ASM Bangkok Air Traffic Flow Management Unit Manager FMM Bangkok Air Traffic Flow Management Unit Planner Coordinator FMC Flight Data Operator FDO Data Set Operator DSO Air Defense Operator ADF Maintenance Engineer MTN Trainee TRN Pseudo Pilot PSP and Training Mission Control TMC Part 2 2 1 Scope of Technical Specifications Page 37 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 5 1 2 Support Facility Support facility for operator roles for BACC BAPC BA
207. all propose the list of supplies for APP System PLQNOS Tenderer shall propose the list of supplies for PUT APP System Part 2 2 1 Scope of Technical Specifications Page 209 E D E D E D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 PLQNO6 07 PLQNOS 09 PLONIO PLONII 12 13 PLONI4 PLONIS 16 PLQNIT 18 19 Specifications doc The Tenderer shall propose the list of supplies for PSL APP System The Tenderer shall propose the list of supplies for HHN APP System The Tenderer shall propose the list of supplies for all Level I Category Tower Systems The Tenderer shall propose the list of supplies for all Level II Category Tower Systems The Tenderer shall propose the list of supplies for all Level III Category Tower Systems The Tenderer shall propose the list of supplies for all Optional workstations for NAS The Tenderer shall propose the list of supplies for all Optional workstations for all Level II Category Tower Systems The Tenderer shall propose the list of supplies for all Optional workstations for all Level III Category Tower Systems The Tenderer shall propose the list of supplies for all Software for Optional
208. ame Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference 4 9 h y k 1 m Vol II Part 1 Final 1 0 Any downtime cut over time Installation Testing procedures and schedules Project Completion date Training plan including available of CON TRA and all courses provided in Training of Part 3 Support and After Sale Service Testing and activation plan of TMCS including System Functionality etc A Work Breakdown Structure showing the work packages responsibilities and expected duration Each work package will be described with the input needed and expected deliverables Key risks and jeopardize to satisfactory project progress and how these will be managed Methods to manage and control the work performed under the project Method used to monitor internal communication and reporting Methods and procedures to manage Quality Control Project Meeting It is necessary for AEROTHAI to have meetings with Seller in every phases of project implementation in order to ensure the project will achieve the goal The meetings will provide the Seller opportunities to update implementation progress prevent any foreseen problems and review the project plan The Tenderers will ensure that the proposed schedule and implementation plan will include but not limited to the project meeting activities as foll
209. an SFPL e g input validation data presentation function activation etc throughout the different stages of its life a conceptual state model is described It should be noted that the actual existence of these states is not itself a requirement upon the system The model identifies the states Initial Notified Active and Terminated and is defined as follows A SFPL is considered in the Initial state from the time that the filed flight plan is received until an operational indication is made that the flight is confirmed The Notified state describes an SFPL for which an operational confirmation has been entered e g start up taxi notification prior to coordination etc but which is not active Part 2 2 1 Scope of Technical Specifications Page 119 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 2 6 9 2 7 Specifications doc An active SFPL may revert to the Notified state once the aircraft has left the system area of interest if it is due to re enter the area of interest Aol i e is re entrant Such flights may include aircraft departing the AoI to perform some kind of maneuvers abroad e g photographic practice touch and goes etc prior to returning and mixed rule IFR VFR IFR flights Strip Less In order to enhance the flexibility and the versatility of
210. and c Replicate a category or all data set Part 2 2 1 Scope of Technical Specifications Page 145 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc 9 20 5 9 20 6 9 21 9 22 Map Generator Map generator is the map editor used to construct and prepare map data for the TMCS Aeronautical maps generated by the map generator can be used by various systems for the CWS display and or PSP display Map generator should be able to construct types of following map a 2D maps for related aeronautical maps b 3D maps with the intention of displayed the airspace zone Data set distribution The DSM will provide the facility to upload data set to all related system function and activate all of them to use the new data set Network Management System The aim of Network Management System function NMS is to provide at minimum the following features a Network resources monitoring such as link bandwidth monitoring etc b Route analytics such as analyze route and structure of operation network c Network configuration management d Fault management e Performance management such as delay management throughput management etc Third party NMS application should be encouraged to perform NMS feature in order to enhance management of specific n
211. and or routes The Tenderer shall propose and detail the methodology to temporarily suspend the vertical conformance monitoring for aircraft notified as under control The Tenderer shall propose and detail the methodology to detect and notify the deviation of the aircraft from their clearances to the ATC The Tenderer shall provide product description of the proposed system detailing progress monitoring functionalities capabilities and benefits The Tenderer shall propose and detail the methodology to update trajectory to reflect the actual progress of the aircraft The Tenderer shall provide product description of the proposed system detailing automatic reminders functionalities capabilities and benefits Part 2 2 1 Scope of Technical Specifications Page 234 D D D D D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 20 8 5 MTCDOI MTCD02 MTCD03 MTCD04 05 8 6 AOMOI 02 Specifications doc The Tenderer shall propose and detail the methodology to remind the routine actions to the ATC Medium Term Conflict Detection The Tenderer shall provide product description of the proposed system detailing MTCD functionalities capabilities and benefits The Tenderer shall pr
212. andard Instrument Departure SMC System Monitoring amp Control SMM System Maintenance Manual SNMP Simple Network Management Protocol SPI Special Position Indication code SSR Secondary Surveillance Radar STAR Standard Arrival Route STCA Short Term Conflict Alert STS Static Transfer Switch SUF Surveillance Feature SUR Surat Thani Airport TA Transition Altitude TACTSUP Tactical Supervisor TBS Time Based Spacing T CMS Tower Control and Monitoring System TCU Technical Control Unit T CWS Tower Controller Workstation T DSM Tower Dataset Management T DSO Tower Dataset Operator TECH technical staff TECHSUP Technical Supervisor TED Touch Entry Device Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Abbreviation FullName TED panel Touch Entry Device Panel TEFS Tower Electronic Flight Strip TEG Traffic and Event Generator T EO Tower Evaluation Officer T FDO Tower Flight Data Operator TFDP Tower Flight Data Processing TL Transition Level TLIM telephone line interface module time management TMA Terminal Control Area TMC Training Mission Control TMCS Thailand Moderni
213. anual piloting mode vice versa Take off Landing Aircraft Create and delete aircraft Modify SSR code Aircraft ID Amend to the aircraft route Hold aircraft Input of complex maneuver commands ILS VOR DME flying Requests for simple or complex reports and Perform CPDLC exchanges with the ATC Part 2 2 1 Scope of Technical Specifications Page 150 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc 9 23 2 3 Training Mission Control The TMC feature controls the overall simulation environment e g manage session game exercises It controls the individual exercises and allows instructors to modify exercise parameters and simulation of system failures The main TMC commands are at minimum Start and end simulation Assign of the TRN to a group Start and stop exercises Pause and resume exercises Record an exercise Replay an exercise Change speed of an exercise Create Modify wind weather data Create Modify the QNH and Simulate individual surveillance data failure e g RADAR ADS B and MLAT WAM 9 24 Computer Based Training Software The Computer Based Training CBT is a self learning platform of the functions features capabilities and usage of the TMCS as well as background information on CNS ATM technologies s
214. apacity of each site is specified in the VCCS Appendix 3 5 The operating functions of the recording system are performed with the use Part 2 2 1 Scope of Technical Specifications Page 106 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference TL Seopa ot 1 0 Technical Specifications doc 8 14 2 of computer driven menus Recording during silent periods is not required but guarantee the actual duration of silence between periods of activity to be recovered during replay without any loss of information For the recording function at least date and time of recording is provided The recorder units consist of two media types short term media and archival media The short term media allow replays at the recorder unit to be made of recent events It also allows simultaneous recording and replay and is intended to provide immediate access within minute of replay initiation to operational recordings made up to 31 days as stated previously The archival media is intended for long term retention The media contains only voice recordings with the necessary time stamps The system permits the retrieval of recorded data for the purposes of playback or data extraction without interrupting the recording process It is possible to listen to an individual channel and to switch a number of channels at least four 4 to a comm
215. area TMA to replace the usual paper flight strips with centralized information system TFDP should provide all necessary information to ATC simultaneously data from other information sources e g from to AIMS are incorporated seamlessly reducing the effort for manual input and further amendment All updates are automatically distributed to other systems e g APP System NAS if necessary or where applicable to provide silent co ordination between Tower Approach Area Control Data Management and Update The TFDP should provide a database which stores and processes flight plan data and other flight related information for the purpose of track identification and labeling The TFDP should correlate registry information and respective flight plan information TFDP should store processing and displaying FPLs vehicle data and auxiliary data The TFDP should send receive FPLs data form FDP Part 2 2 1 Scope of Technical Specifications Page 160 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 26 2 9 26 3 Specifications doc The TFDP should transfer the aircraft to Approach Control by manually or automatically when that aircraft take off The coordination between TFDP and FDP the system should provide fully silent coordination for all inbound and outbound traff
216. art 2 2 1 Scope of Technical Specifications Page 13 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 3 14 Remote Towers associated with 3 15 3 16 3 17 3 18 3 19 3 20 There are nineteen 19 remote towers under responsibility of BAPC Remote towers operators coordinate with three 3 group of operators BAPC respective AO and pilots Pilots connected to BACC BAPC BAPP APCs LTSs RTSs BACC BAPC BAPP APCs LTSs and RTSs operation are able to coordinate with pilots via voice communication and where applicable air ground data link communication Chiang Mai Approach Control Centre CMA APC The CMA APC provides approach control services within terminal control areas TMA and control zones of the 4 airports CMA APC operators coordinate with four 4 groups of operators BACC BAPC CMA local tower associated remote towers and pilots Chiang Mai Airport CMA Local Tower CMA Local Tower is under responsibility of CMA APC CMA local tower operators coordinate with three 3 groups of operators CMA APC AO and pilots Remote Towers associated with CMA APC There are three 3 remote towers under responsibility of CMA APC Remote towers operators coordinate with three 3 groups of operators CMA APC respective AO
217. at are provided for Type A Workstation The Tenderer shall propose and detail The Main LCD Monitor of Type A Workstation which specifies at minimum the following aspects features e Brand and Model and e Technical specification data details The Tenderer shall propose and detail The Extended LCD Monitor of Type A Workstation which specifies at minimum the following aspects features Brand and Model and e Technical specification data details The Tenderer shall propose the technical specifications data of the Workstation grade Computers that are provided for Type B Workstation including all attached devices which specifies at minimum the following aspects features e Brand and Model e CPU performance e and capacity of Memory e Graphic card e Network interface card and e Mean Time Between Failure value of each component The Tenderer shall propose and detail the Power supply of the Workstation grade Computers that are provided for Type B Workstation The Tenderer shall propose and detail The LCD Monitor of Type B Workstation which specifies at minimum the following aspects features e Brand and Model and e Technical specification data details The Tenderer shall propose the technical specifications data of the Workstation grade Computers that are provided for Type C Workstation including all attached devices which specifies at minimum the following aspects features Part 2 2 1 Scope of Technic
218. atch Panel PUT L06 Fiber Single Mode Approximately 3000 m 10 Mbps Optic 12 Core Cable FC Patch Panel PSL 1 07 Fiber Single Mode Approximately 200 m 10 Mbps Optic 12 Core Cable FC Patch Panel HHN L08 Fiber Single Mode Approximately 100 m 10 Mbps Optic 12 Core Cable FC Patch Panel Table 29 Communication Media Infrastructure between buildings 7 The Planned Workstation Quantities This section describes in details the quantities of workstations for all operator roles of all systems planned for the operation of TMCS The dimension layout of workstations and operator roles are depicted in diagrams in Appendix 2 Part 2 2 1 Scope of Technical Specification Page 79 7 1 Nationwide Air Traffic Management System NAS Located at AEROTHAI Headquarter the NAS have two systems The planned quantities of workstations for operator role are described in table format 7 11 NAS MOPS NAS MOPS Workstation Quantity CWS FDWS DAWS CMWS NMWS DSWS Location Operator Role CWS Optional Optional Optional Optional Optional Optional PC 32 EC PC APP 12 8 AMAN ACC 3 2 Operation Room New Operation FSL Building TECHSUP 1 1 5 1 1 TACTSUP 4 1 FDO 2 Pre tactical FMM 1 Operation Room CMAC 1 New Operation Building FMC 3 Equipment Room DSO 1 New Operation 2 1 Building MT
219. ators is user friendly and preferably TED panel with the appropriate size easy to read out by the operators The TED panel is a single unit with its own processor included and not requires any external personal computer hardware Headsets and handsets at the VCCS workstation facility consists of a microphone ear cap and PTT switch and identical plugs will be used for headsets and handsets Each VCCS workstation facility has two loudspeakers one for air ground and another one for ground ground and each position is equipped with a slave clock display and a foot switch Radio Part The VCCS use radio line interface module RLIM to interface with radio transmitter radio receiver both local and remote stations which interface with the analog and digital format such as 1 In operation the RLIM will automatically mute the receiver when the transmitter 15 transmitting The amplifiers of the RLIM are adjustable both in transmitting and receiving directions For safety reason not more than 2 radio lines are connected to one RLIM and the main standby transmitter and receiver have their own channeling throughout The delay time of RLIM transmit receive and PTT signal need to be adjustable independently of other lines due to different media using interface to the radio equipment And the delay time will be adjustable in the range 0 to 1000 ms or more in step of 1ms For the purpose of training supervisory and traffic tracking any VCCS wor
220. ble for fulfilling the following specific tasks at minimum e Manage traffic on the maneuvering area with the exception of runways e Issue push back taxi clearances in coordination with Departure Manager DMAN when available and e Monitor and guide all the aircraft vehicle movements on the airport maneuvering area except for the runway Page 54 Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Coordinator Coordinator COR is responsible for fulfilling the following specific tasks at minimum e Coordinate with adjacent Approach Control Unit GND LCL Airport Operator Airline Operator other relevant stakeholders e Alert the rescue and fire fighting services in the event of an emergency and e Issue departure time ATD and arrival time ATA d Clearance Delivery Clearance Delivery CDC is responsible for fulfilling the following specific tasks at minimum e Deliver of ATC clearances to departing flights Remark In case of the Aerodrome Control Tower doesn t have Clearance Delivery Position the IFR flight plan clearances will be issued by Ground Controller e Tower Tactical Supervisor The Tower Tactical Supervisor T TACTSUP is responsible for fulfilling th
221. both ARINC and SITA Part 2 2 1 Scope of Technical Specifications Page 21 Project Name Thailand Modernization System TMCS CNS ATM Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 4 2 7 NAS MOPS Surveillance Systems NAS MOPS connects with Surveillance Systems to receive at minimum the following information Message Data Data Format Input Output Reference ICD SSR data ASTERIX Cat 001 002 Input Tenderer provided ICD SSR Mode S data ASTERIX Cat 034 048 Input Tenderer provided ICD PSR data ASTERIX Cat 001 002 Input Tenderer provided ICD Weather data from PSR ASTERIX Cat 008 Input Tenderer provided ICD MLAT WAM data ASTERIX Cat 019 020 Input Tenderer provided ICD ADS B data ASTERIX Cat 021 Input Tenderer provided ICD Table 5 NAS MOPS Surveillance Systems Information Exchange Description 4 2 8 NAS MOPS Adjacent ACC ATM Systems NAS MOPS connects with Adjacent ACC ATM System to exchange at minimum the following information Message Data Data Format Input Output Reference ICD Coordination messages ICAO AFTN AIDC Input output Tenderer provided ICD System Track data ASTERIX Cat 062 063 065 Input output Tenderer provided ICD Table 6 NAS MOPS Adjacent ACC ATM System Information Exchange Description
222. but not limited to 9 22 2 System Manual redundant servers switchover Manual redundant external input switchover Inhibit exhibit data line inputs Manual Start Stop function such as SDP FDP etc Monitoring The CMS will provide the facility to monitor the functions devices internal networks and external interfaces of TMCS as follow but not limited to Functions status such as SDP FDP etc External interfaces status including channel in used channel problem etc Internal network status including network equipment such as switches router etc GPS time server status and time synchronization status and Performance Monitoring such as CPU Memory Storage Network utilization etc The Simple Network Management Protocol SNMP usage should be encouraged for CMS function Part 2 2 1 Scope of Technical Specifications Page 147 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 22 3 9 23 9 23 1 9 23 2 Specifications doc Logging The CMS function will log all events that affect to the system such as redundant servers switchover etc then store in CMS log files The CMS log file will be automatically generated and recorded on a real time basis with a UTC timestamp The CMS log files should be able to keep 30 days as a minimum Continge
223. ccscccssccssssscsssecssccssscesssccsssccsecees 235 8 7 Flexible Use of Airspace FUA 4 236 Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 8 8 Demand and Capacity Balancing csccssccsscccssccsssccsssccssccessccesscscsscccssceessces 236 8 9 Air Traffic Flow Management e c eere esee ee tenete tn stans stans stan 237 8 10 naei nope 238 8 11 Arrival Manager P M 238 8 12 Departure Manager tos eot eos rotor areae a 239 8 13 Controller Pilot Data Link 1 240 8 14 Air Situation Recording and Replay 240 8 15 Data 22 242 8 16 Aeronautical Information 21 243 8 17 Time Manageme n 243 8 18 CWS 244 8 19 10 0101 2 D shies ES
224. ce Version Volume Part 2 1 Scope of Technical Specifications doc ke Volume II Terms of Reference 6 1 6 Hua Hin Site The facilities in Hua Hin Site related to TMCS consist of two 2 buildings which are Hua Hin Approach Control Centre HHN APC Building and Air Field Lighting Building Attachment 6 1 6 illustrates the location of buildings at Hua Hin APP Control Centre a HHN APC Building There are three 3 rooms allocated for TMCS in the HHN APC Building b Air Field Lighting Building There are three 3 rooms allocated for the TMCS in the Air Field Lighting Building Each room is planned for specific operation purpose Please be advised that at the present there are others equipments installed in some rooms The site survey and site evaluation are recommended The following table describes the TMCS equipments and their planned installed rooms at Hua Hin Site Part 2 2 1 Scope of Technical Specifications Page 69 p Number End System HHN APP HHN APC Building 6 Floor Operation Room HHN601 Attachment 6 1 6a HHN APP Equipment MOPS Redundant Data processing HHN APC Building 7 Floor Equipment Room HHN701 Attachment 6 1 6b VCCS HHN APC Building 7 Floor Equipment Room HHN701 Attachment 6 1 6b F VCCS HHN APC Building 7 Floor Equipment Room HHN701 Attachment 6 1 6b End System HHN A
225. cember 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc equipment alone is able to provide enough electric power for all equipments in the facility for a minimum of 15 minutes The Tenderer is responsible for electric current load calculation for each facility and each set of UPS equipment The output power of UPS will be 3 phases o Static Transfer Switch STS There is at minimum one 1 STS The STS connects to both groups of UPS equipments to receive electric power supply The STS automatically selects electric power from one group of UPS to provide to all single power supply equipments in the facility 10 8 2 3 Type B UPS Configuration The conceptual diagram is presented in figure below Equipment Single Power Supply Power Supply Bj Full Load Rate R1 Metro Electric Engi Figure 18 Conceptual diagram of half UPS configuration Part 2 2 1 Scope of Technical Specifications Page 188 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc In the diagram all equipments will only receive electrical power from UPS to ensure stable electrical current At minimum the half UPS configuration consi
226. change or ordered speed input which will result in a change to the existing trajectory for a flight An encounter denotes the predicted approach of an aircraft within a specified distance of another aircraft or a designated volume of airspace There are two 2 types of encounter classified respectively as aircraft to aircraft and aircraft to airspace encounters Aircraft to aircraft encounters Aircraft to aircraft encounters are further classified as either based on the Tactical Trajectory or on the Planned Trajectory a Tactical based encounters A tactical based aircraft to aircraft encounter represents a conflict between aircraft where the position of one or both aircraft is determined from the tactical trajectory It is further classified according to whether the aircraft are flying according to conflicting clearances or whether the conflict is a result of an aircraft deviating from its clearance b Plan based encounters Part 2 2 1 Scope of Technical Specifications Page 130 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc A plan based aircraft to aircraft encounter represents an encounter between two aircraft such that the possible actions available on each aircraft are limited by the presence of the other e g one aircraft flying 2000 feet above a
227. chedule Part 1 Scope of Project Page 11 THAILAND MODERNIZATION CNS ATM SYSTEM PROJECT Volume II Technical Terms of Reference November 2012 AERONAUTICAL RADIO OF THAILAND BANGKOK THAILAND Project Name Thailand Modernization Date December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc CONTENTS PART 1 SCOPE OF PROJECT PART 2 SCOPE OF SPECIFICATIONS 2 1 SCOPE OF TECHNICAL SPECIFICATIONS 2 2 OTHER QUALIFICATIONS PART 3 SUPPORT AND AFTER SALE SERVICE Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference File Reference Volume II Part 2 1 Scope of Technical Specifications doc Date December 14 2012 Version 1 0 PART 2 SCOPE OF SPECIFICATIONS 2 1 SCOPE OF TECHNICAL SPECIFICATIONS Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Table of Contents SECTION A 1 SECTION B System Description o 2 1 System Architecture 2 11 Main Operation System
228. cipants to be equipped with the necessary knowledge and skill required to customize the System for local environment maintain and update the site adaptation data preparation and generation of adaptation database etc d The DMS Technical Training will be designed to make surveillance engineer staffs able to manage Data System including the Data Preparation adjust Part3 SUPPORT AND AFTER SALE SERVICE Page 13 of 19 Project System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Documen Volume II Technical Terms of t Reference File Reference Version Volume Part 3 Support and After Sale 1 0 Reference Service_Final doc parameters according to their operational needs and be autonomous to build from scratch a dataset It will include integrated lectures and hands on sessions that allow participants to enhance their knowledge on data management and to practice the dataset building process 3 10 Support for In house Maintenance Training 3 11 Upon completion of the factory and local maintenance training the Seller will deploy the competent and experienced technical instructor trainer with skill and fully conversant with the System to work with the trainers from AEROTHAI to develop the future in house maintenance training and refresher training which includes at least the following e Training structure e Training content e Training schedule e Training materials and
229. configuration and e Other special tools and test equipment such as ASTERIX test tool The factory maintenance training will cover at least software training and hardware training Software training Detailed courses on the overall software system as well as individual software package will be provided The training will include the use of software keys and tools needed to access and maintain all the programmes The training will cover an overview of the Data Management System and the basic knowledge in preparing installing and updating the technical adaptation data Upon completion of this training AEROTHAT s engineer personnel will be fully trained with complete knowledge of fault diagnosis and maintenance of the software Hardware training The hardware training will be designed to train participants to be fully conversant with the system hardware and to be equipped with the necessary knowledge and skill required to effectively maintain the System The hardware training will at least include the following Part3 SUPPORT AND AFTER SALE SERVICE Page 12 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume Part 3 Support and After Sale 1 0 Service_Final doc Volume II Technical Terms of Reference The training will include a general appreciation of the overall system and its operation Comprehensive training
230. copy full version format free of charge Documents All documents and publications for the TMCS project are provided in English which will be provided at least 6 six hard copy paper and CD ROM document format such as Adobe Acrobat Microsoft word and Visio format The final edition of all documents and manuals should capture all the amendments up to the point of final acceptance and will reflect TMCS as handed over to AEROTHAI AEROTHAI has the right to a free license to copy the deliverable documentation called for under the contract and to circulate or use the copies within the establishments of Type of document The various types of documents should be provided but not limited to as following a b Global System Segment Design Document which provides describe and specify the organization of Configuration Items corresponding to the design of TMCS and high level designed including interface requirements of TMCS and system integration Global System Segment Specification Document which provides describe and specify the top level requirements allocated to TMCS and also identify the external systems with which the supplied equipment must interface in order to archive the overall functionality required for TMCS System Segment Design Document which provides describe high level design information of the TMCS presents the organization of the TMCS such as Hardware Configuration Items HWCIs and
231. ct Access enables appropriate End System to display Surveillance Track information directly without utilizing Multi Radar Tracking MRT function of SDPS Surveillance Direct Access allows user to choose and display surveillance track coming from any surveillance sources at any time without interruption to their operation For TMCS the NAS the NAS IBS the APP IBS the BAPP System the CMA APP System the HTY APP System the PUT APP System the PSL APP System and the HHN APP System will achieve this level III Level IV Contingency System The CON TRA synchronizes information with the MOPS at all time The CON TRA in Contingency Mode CON Mode will operate in place of MOPS therefore it will have connections to all input interfaces the same as MOPS Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc ER For example all systems which have been connected to the NAS MOPS e g 1 APP Systems and 2 Remote Tower Systems RTS will switch to connect to the NAS CON TRA in CON Mode instead Figure 3 displays the concept of the switch over from the NAS MOPS to NAS CON TRA in contingency situation The dashed arrows represent the connections between NAS MOPS and other systems APP System and RTS In C
232. ction of potential conflicts and their resolution Automation will also be used to control ground visual aids based on ATC and surveillance inputs Thus the ground visual aids will be set up for the runway configuration in use and runway taxiway intersections will be controlled based on precise knowledge of the location and movement of aircraft and vehicles The Surface traffic planning automation functions will be integrated with approach departure operations For arrivals the sequence for each runway and stand assignment will be used to make accurate estimates of arrival times at the stands This information will improve aircraft handling and turn around time For departures engine start and push back times can be coordinated and managed to gain optimum Part 2 2 1 Scope of Technical Specifications Page 155 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 25 1 Specifications doc departure sequencing taking into account the planned route Also aerodrome configuration changes will be timed and implemented more efficiently thereby minimizing any impact on the aerodrome utilization rate The TSDP will send receive data from the Tower Flight Data Processing function TFDP in order to provide FPLs correlation with the tracks and information support automated function The TSDP
233. d D specify the required scope of the system which Tenderers have to propose In the future the Tenderer proposed system as described following Section C and D will be the foundation system on which AEROTHAI will be able to expand to cover the full scope as described in Section B without any software modification on the proposed system Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc SECTION System Description 1 System Architecture The system architecture of TMCS including all systems situated at various sites across Thailand and their logical connections is conceptually depicted in Figure 1 The architecture comprises forty nine 49 systems as follows a One 1 Nationwide Air Traffic Management System NAS NAS support the operation of BACC BAPC Meanwhile NAS will be center for nationwide flight plan database The system will be situated at AEROTHAI Headquarter b One 1 Nationwide Air Traffic Management Independent Backup System NAS IBS NAS IBS will be established as the backup system for NAS in case of Disaster Situation at the NAS The location of NAS IBS will be at AEROTHAI Headquarter c Six 6 Approach Control APP Systems The APP System should support the operation of BAPP CM
234. d for in depth inspection such as Safety Nets analysis etc Part 2 2 1 Scope of Technical Specifications Page 242 E E E D D E D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 8 16 AIMOI AIMO02 AIMO3 AIMO4 AIMOS AIMO6 AIMOT 8 17 TIMEOI TIMEO2 TIMEO3 Specifications doc Aeronautical Information Management The Tenderer shall provide product description of the proposed system detailing Aeronautical Information Management functionalities capabilities and benefits The Tenderer shall propose and detail all Aeronautical Information that are provided supported to ATC The Tenderer shall propose and detail the specific software tools for management of information with the purpose of preparing the aeronautical information to ATC The Tenderer shall provide product description of the proposed system detailing the specific software tools functionalities capabilities and benefits The Tenderer shall propose and detail all aeronautical information that are provided by specific software tools The Tenderer shall propose and detail all aeronautical information that are received from AFTN ATN Other System The Tenderer shall propose and detail the AIM s capability and functionalities that are provided to AT
235. d quantities of positions of each level III tower system are described in table format Level III Tower System Workstation Quantity FDDWS T CMS Operator Role ASDWS GSDWS FDDWS Optional Optional LCL 1 1 1 Part 2 2 1 Scope of Technical Specifications Page 87 Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Terms of Reference volume ee 2 l pepe of 1 0 Technical Specifications doc Level III Tower System Workstation Quantity FDDWS T CMS Operator Role ASDWS GSDWS FDDWS Optional Optional GND 1 1 COR 1 1 1 T FDO 1 T MTN 1 Total 2 3 3 1 1 Table 47 List of workstation quantities for Level III Tower System Note The quantities of hardware in this table under the ASD GSD FDD column reflects the minimum numbers of hardware for the Tower System The quantities of hardware under the columns marked with optional are desirable additional numbers of hardware for the Tower System 7 9 4 Level IV Tower System There are two 2 tower systems within this level Their respective planned quantities of positions are separately described due to their uniqueness a Suvarnabhumi International Airport SBA Tower System SBA Tower System comprises of 2 systems SBA LTS The planned quantities of posi
236. dernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume Part 3 Support and After Sale 1 0 Service_Final doc Volume II Technical Terms of Reference 3 2 Database Management System Training The Database Management System Training DMST will be conducted at the Factory DMST will be provided at least four 4 operational staffs to train them as Database Management System DMS specialist staff The course will achieve the following objectives a Establish an expert DMS understanding in the DMS logic and architecture and b Establish expert competence in the adding modifying deleting adjusting manipulating validating and managing the DMS offline parameters The DMST course content will include at least the following a DMS structure logic and content b Operating of the DMS preparation toolbox c Creation modification and deletion of the adaptation database d Validating the created or modified adaptation database and e Managing and maintaining the adaptation database On completion of this course the participants will be able to successfully operate create and manage the DMS Additionally the participants will have an understanding cognizant with successfully training other officers as DMS specialists 3 3 Air Traffic Control Operational Train the Trainer Training The Seller will provide ATC Operational Train the Trainer Training ATCTT at Factory as f
237. description Technical Characteristics of network equipments and related components at Hua Hin Site The Tenderer shall propose and detail the list of supplies of network equipments and related components for Hua Hin Site The Tenderer shall propose and detail the network configuration for all systems at Ubon Ratchathani Site The Tenderer shall provide product description Technical Characteristics of Part 2 2 1 Scope of Technical Specifications Page 207 D E E D E E E E D E E D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 SINI21 SINI22 SINI23 SINI24 SINI2S SINI26 SINI27 SINI28 SINI29 SINI30 SINI3I SINI32 SINI33 Specifications doc network equipments and related components at Ubon Ratchathani Site The Tenderer shall propose and detail the list of supplies of network equipments and related components for Ubon Ratchathani Site The Tenderer shall propose and detail the network configuration for all systems at Udon Thani Site The Tenderer shall provide product description Technical Characteristics of network equipments and related components at Udon Thani Site The Tenderer shall propose and detail the list of supplies of network equipments and related components for
238. detailing E grouping re grouping of the role features TCWS27 Tenderer shall provide product description of the proposed system detailing T DSM functionalities capabilities and benefits TCWS28 Tenderer shall provide product description of the proposed system detailing T NMS functionalities capabilities and benefits TCWS29 Tenderer shall provide product description of the proposed system detailing T CMS functionalities capabilities and benefits 9 Technical Characteristic Submittal 9 1 Workstations Characteristic 0 Tenderer shall propose the technical specifications data of the Workstation grade Computers that are provided for Type A Workstation including all attached devices which specifies at minimum the following aspects features e Brand and Model e CPU performance e and capacity of Memory e Graphic card Part 2 2 1 Scope of Technical Specifications Page 257 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 WRKCO02 WRKCO03 WRKCO4 WRKCO5 WRKCO6 WRKCOT WRKCOS8 Specifications doc e Network interface card and e Mean Time Between Failure value of each component The Tenderer shall propose and detail the Power supply of the Workstation grade Computers th
239. devices a Intel Xeon or AMD OPTERON CPU b DDR3 RAM with error correction ECC c Multiple dedicated gigabit network interface cards d Hot plug redundant power supply units e Hot plug hard disks installed in multi channel hardware Redundant Array of Independent Disks RAID configurations f Mixed RAID configurations for RAID 1 and RAID 5 and g Mean Time Between Failures MTBF gt 30 000 hours Printers The Networked Color Laser printers are provided to support printing needs of the users controllers for general printing needs 1 flight plan data flight data statistics log reports etc Each printer contains an integrated LAN adapter for connectivity to the system network The networked Color Laser printers will be high quality quiet printing capabilities and features up to 35 pages per minute print speed A4 up to 1200 x 1200 DPI Console The console will be provided to accommodate the operation in Operational partition CON TRA partition of BACC BAPC BAPP CMA APC HTY APC PUT APC PSL APC HHN APC and LTS RTS In addition the Console for support Optional End systems will be provided as well Part 2 2 1 Scope of Technical Specifications Page 172 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc The consoles for ACC APP operat
240. ding There are four 4 rooms allocated for TMCS in the Emergency Building Each room is planned for specific operation purpose Please be advised that at the present there are others equipments installed in some rooms The site survey and site evaluation are recommended The following table describes the TMCS equipments and their planned installed rooms at Suvarnabhumi Airport Site Part 2 2 1 Scope of Technical Specifications Page 71 NEE Description paling Nene Function Numer End System BAPP Support Building 4 Floor Operation Room 419 Attachment 6 1 7a BAPP Equipment MOPS Redundant Data processing Support Building 5 Floor Equipment Room 521 Attachment 6 1 7b VCCS Support Building 5 Floor Equipment Room 521 Attachment 6 1 7b F VCCS Support Building 5 Floor Equipment Room 521 Attachment 6 1 7b End System BAPP CON TRA Emergency Building 3 Floor CON TRA Room EMG302 Attachment 6 1 7d BAPP Psuedo Pilot Emergency Building 3 Floor Pilot Room EMG303 Attachment 6 1 7d CON TRA Equipment Data processing Emergency Building 3 Floor Equipment Room EMG301 Attachment 6 1 7d VCCS Emergency Building 3 Floor Equipment Room EMG301 Attachment 6 1 7d End System SBA LTS SBA Local Tower SBA Tower Building T7 floor Local Tower Contro
241. ding Floor Plan Attachment 6 1 7c The location of the Operation Room Equipment Room and Local Control Room of SBA LTS 10 00 8 00 2 40 5 60 Equipment Room EMG301 CON TRA Room EMG302 Pilot Room EMG303 34 floor Emergency Building Floor Plan Attachment 6 1 3d The location of the CON TRA Room Pilot Room and Equipment Room of BAPP CON TRA UPS 1 Room 210 2 floor SBA Tower Building UPS 2 Room 101 1 floor SBA Tower Building UPS 3 Room EMG101 1 floor Emergency Building NENNEN NENNEN NENNEN ee eee m n Attachment 6 1 7e The location of the UPS 1 Room UPS 2 Room and UPS 3 at Suvarnabhumi Airport Site Dimension Layout of workstations and operator roles 1 Figure 5 1 Conceptual Operator Role Layout of NAS MOPS at Tung Mahamek Site 2 Figure 5 2 Conceptual Operator Role Layout of NAS CON TRA at Tung Mahamek Site 3 Figure 5 3 Conceptual Operator Role Layout of APP MOPS and APP CON TRA at Provincial Site 4 Figure 5 4 Conceptual Operator Role Layout of BAPP MOPS and BAPP CON TRA at Suvarnabhumi Airport SiteFigure 5 5 Conceptual Operator Role Layout of SBA LTS at Suvarnabhumi Airport Site 5 Figure 5 5 Conceptual Operator Role Layout of SBA LTS at Suvarnabhumi Airport Site 6 Figure 5 6 Conceptual Operator Role Layout of LTS RTS at Local Tower and Remote Tower BACC Operation CwS
242. documentation e Training facilities and equipment and e Training Assessment and Report Training Materials The training materials will be provided to support each training course including trainer guides training manuals notes handouts graph diagram workbooks posters video etc as necessary Twenty 20 complete sets of the training materials both in hard copy and soft copy will be provided AEROTHAI may make such further copies of the materials as are reasonably needed The training manuals for the technical training courses will cover detailed equipment description system diagrams and circuit drawings etc as appropriate A complete set of training manual in hard copy for each operational and technical training course will be provided to each attendee of the corresponding training course Part3 SUPPORT AND AFTER SALE SERVICE Page 14 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Volume Part 3 Support and After Sale 1 0 Service_Final doc 4 1 In addition to the training manual comprehensive trainer guides in hard copy for each train the trainer training course will be provided to each attendee of the corresponding train the trainer training course All amendment of the training materials to reflect any updates or modifications will be supplied in soft
243. e The DVR supervisor unit has all system management facilities including short term media and archival media management and appropriate indications of alarm conditions Playback operations and parameter settings are possible to do from the DVR supervisor unit A HMI is also enabled from the software running at the DVR supervisor unit And when DVR malfunction is detected the DVR supervisor unit will raise both visual and audible alarms Power Supply The recorder units and DVR supervisor unit use 2 sources of power supply 2 AC A duplicated power supply for each recorder is used which interface with a 210 230 VAC 50 60 Hz ac power Each unit of the duplicated power supply has AC input power supply and it has the capacity to feed the complete system In the event of a power source failure the recorder units and DVR supervisor unit are able to use another power source without any interruption to the operation of the systems Part 2 2 1 Scope of Technical Specifications Page 108 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc LA Volume II Terms of Reference 8 14 5 Fallback and CON TRA Voice Recorder The Fallback and CON TRA DVR requirement are the same as for the Main DVR but installed in the different locations Fallback VCCS equipment room and CON TRA VCCS equipment room 9 S
244. e Ring In Loop Out DTMF PSTN amp PABX Interface Wir IRingln Loop Out DTMF PSTN amp PABX Interface Wire Ring In Loop Ou DTMF PSTN amp PABX Interface C2 CAR Wire Ring In Loop Ou DTMF PSTN amp PABX Interface Sector 1 Wire Ringin Loop Ou DTMF PSTN amp PABX Interface Sector 1 Wire Ring In Loop Out DTMF PSTN amp PABX Interface Sector 1 Wire IRingln Loop Ou DTMF PSTN amp PABX Interface Sector 1 Wire Ring In Loop Ou DTMF PSTN amp PABX Interface Sector 1 HN APP Wire Ring In Loop Ou DTMF PSTN amp PABX Interface Sector 1 Wir IRingln Loop Ou DTMF PSTN amp PABX Interface Sector 1 Wire IRingln Loop Out DTMF PSTN amp PABX Interface Sector 1 Wir IRingln Loop Ou DTMF PSTN amp PABX Interface Sector 1 Wire Ring In Loop Out DTMF PSTN amp PABX Interface Sector 1 1 GN 2 Wire Ring In Loop Out DTMF PSTN amp PABX Interface Sector 1 1 D Wire Ring In Loop Ou DTMF PSTN amp PABX Interface Sector 2 2 Wire Ring In Loop Ou DTMF PSTN amp PABX Interface Sector 2 VB FDO2 p Wire Ring n Loop Ou DTMF PSTN amp PABX Interface Sector 2 VB GND2 2 Wire Ring Ih Loop Ou DTMF PSTN amp PABX Interface Sector 2 GS SRTI p Wire Ring nh Loop Ou DTMF PSTN amp PABX Interface Sector 2 2 Wire Ring In Loop Ou DTMF PSTN amp PABX Interface Sector 2 T APP Ring nh Loop Ou DTMF PSTN amp PABX Interface Sector 2 SCAR S2 p Wire Rin
245. e alerts In addition aircraft information through Mode S ADS B and MLAT WAM should be used to improve the MONA The MONA will provide alert information to CWS The authorized user such as OPSUP will be able to enable or disable each MONA feature The MONA will have at minimum the following features a Conformance monitoring and b Automatic reminder 9 4 1 Conformance monitoring The conformance monitoring feature compares the system track with the corresponding flight clearances in order to warn the ATC of any deviation of a flight from its clearance and where possible to establish the progress of the flight and to refine the prediction of the remaining trajectory to be flown The conformance monitoring function will be designed to performed varies according to the type of clearance issued In principle warnings of deviation are generated in cases where the controller might be required to act to re clear an aircraft that is assumed to be deviating from its clearance or to re coordinate an aircraft whose boundary estimate changes significantly Part 2 2 1 Scope of Technical Specifications Page 128 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc The MONA will use a planned trajectory and tactical trajectory to recalculates the trajectories that are ac
246. e application of the FUA Concept by use of predetermined FUA indicators f Operational Supervisor The Operational Supervisor OPSUP leads the daily operational activities at the TMCS OPSUP responsibilities Include Activate and deactivate of Special Procedures within the area of the OPSUP responsibility Provide when necessary the appropriate restrictions for air traffic operations due to equipment failures or staff shortages within the area of responsibility Part 2 2 1 Scope of Technical Specifications Page 44 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Provide when necessary the Bangkok Traffic Flow Management Unit Planner Coordinator FMC with requests for Air Traffic Restrictions and Establish the active runway s in use and informing all concerned via the information system after coordination with Tower and Approach Supervisor g Hlight Information Specialist Within Flight Information Services the Flight Information Specialist FISL has the responsibility of providing a Flight Information Service FIS Radar Information Service and Radar Advisory Service to aircraft operating in ICAO Class G airspace within Bangkok Area of Responsibility and to others that have specifically requested such a service The FISL w
247. e characteristics of the overall system which will be specified designed implemented tested validated and documented The methodology techniques processes and tools that the Tenderer intend to use to achieve the specified RAM objectives will be described or referenced in specific plans Reliability is the probability that an item will perform its intended function without error under stated conditions for a specified period of time Availability is defined as a ratio of the total time the system is capable of performing its mission against the time for which it is required to perform that mission expressed as a percentage Maintainability is the measure of the ability of an item to be retained in or restored to a specified condition when maintenance is performed by personnel having specified skill levels using prescribed procedures and resources at each prescribed level of maintenance and repair The Tenderer will provide in his Response RAM predictions and analysis and also substantiate his ability to meet the specified RAM by providing in his response a RAM model consisting of RAM block diagrams covering all functions of the system The system will be designed to operate 24 hours a day 7 days a week 365 days per year From a cold start power on as well as from a warm re start the servers should be configured to automatically start the application with all necessary services running in order to allow immediate use of the
248. e following specific tasks at minimum e Decide on staffing and manning of controllers in accordance with expected traffic demand e Alert search and rescue organizations in the event of an aircraft accident e Collaborate with adjacent Area Control Centre and Approach Control Unit and Maintenance Engineer MTN when available and e Select the most appropriate runway in use f Departure Manager The Departure Manager DMAN is responsible for fulfilling the following specific tasks at minimum Part 2 2 1 Scope of Technical Specifications Page 55 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Manage the target take off time TTOT and target start up approval time TSAT taking multiple constraints and preference into account and Coordinate and negotiate with appropriate units to maintain the optimal use of runway g Tower Flight Data Operator The Tower Flight Data Operator T FDO is responsible for ensuring that flight data aeronautical data and meteorological data within the ATM system remains current and complete In particular this consists of the following tasks Correct corrupted or invalid ATS messages and re entry into the system as necessary Enter aeronautical or meteorological data into the system if it cannot be
249. e g air miss loss of separation breach of regulations etc and where appropriate submits a report and Delegate tasks when appropriate to the PC to ensure an even distribution of workload within the airspace sector b Planning Controller The Planning Controller PC is responsible for fulfilling the following specific tasks Initiate prediction of potential traffic conflicts within the airspace sector Assess potential conflicts before the traffic enters the airspace sector and the appropriate acceptance or amendment of the traffic s entry configuration Part 2 2 1 Scope of Technical Specifications Page 41 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc e Modify established planning clearances and or co ordination exceptionally and when circumstances require immediate action e Plan conflict free flight paths through the area of responsibility e Effect radar co ordination according to laid down local criteria with adjacent subjacent airspace sectors or units e Apply manual correlation to an identified flight and its system flight plan when necessary due to loss of correlation or failure of automatic correlation e Ensure that the appropriate ATM system is kept updated with regard to control instructions within the airspace secto
250. e of 10 of Reference Technical Specifications doc i 2 The Level of Contingency and Backup The capability of contingency and backup for TMCS is conceptualized into five 5 levels corresponding to levels of situations Figure 2 displays the relationship between different components with regards to contingency amp backup level from level I to level IV The details of each level are described as follow Contingency amp Training System 3 2 1 Surveillance Fallback Main Direct Access Processing System Processing System Syne System F SDPS SDPS FDPS CONTRA Processing System Input interfaces Input interfaces Input interfaces Input interfaces Figure 2 Concept of Contingency amp Backup Level I Level IV 2 1 Level I Redundancy Principles All servers and internal network in the system have at minimum been duplicated and operate simultaneously When one server in the pair fails to function the other server takes over immediately without any interruption to the operation of air traffic controllers The network is also implemented using dual redundant network equipments This will interconnect every End System to every Server using two independent paths Failure of one link will be automatically detected and operation is switched over to the functioning network Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization CNS ATM December 14
251. e six 6 tower systems within this level Level IV Chiang Mai Tower system Hat Yai Tower system Phuket Tower system Udon Thani Tower system Samui Tower system and Nakhon Si Thamarat Tower system There are two 2 tower systems within this level Suvarnabhumi Tower system and Don Muang Tower system Part 2 2 1 Scope of Technical Specifications Page 29 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Figure 8 depicts the diagram of tower system context with system capabilities level III and IV Figure 9 depicts the diagram of tower system context with system capabilities level I and II Part 2 2 1 Scope of Technical Specifications Page 30 Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of ehe 1 0 of Reference Technical Specifications doc Pilot NESNE te Internal Msg IBS Intersystem AGDL Msg Data System APP Exposed from APP or NAS System System lt Internal Msg If Local AGDL is not available APP IBS Airport Surveillance Systems Intersystem pene Msg Data e ML
252. e tactical Maint Maint Maint Maint Area Option Area Option Area Option Area Option Approach Option Approach Option Approach Option Approach Option Approach Option Approach Option Approach Option Approach Option Approach Option Approach Option Operation Option Operation Option Operation Option Operation Option Operation Option Pre tactical Option Pre tactical Option Pre tactical Option Pre tactical Option SPARE Local Main Local Stby KMN RCAG KMN RCAG HHN RCAG Local Main Local Stby KMN RCAG KMN RCAG HHN RCAG HHN RCAG HHN RCAG HHN RCAG CPN RCAG CPN RCAG SMU RCAG Local Main Local Stby KKN RCAG Position Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record _ Radio Channel Record Radio Channel Record _ Radio Channel Record _ Radio Channel Record _ Radio Channel Record _ Radio Channel Record _ Radio Channel Record Radio Channel Record _ Radio Channel Record Connect to adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record
253. ect Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc List of Tables Table 1 NAS MOPS Intersystem Interface Description 19 Table 2 NAS MOPS AMHS Information Exchange Description esee 20 Table 3 NAS MOPS CIFDPS Information Exchange 2 4442221 20 Table 4 NAS MOPS AGDL Systems Information Exchange Description 21 Table 5 NAS MOPS Surveillance Systems Information Exchange Description 22 Table 6 NAS MOPS Adjacent ACC ATM System Information Exchange Description 22 Table 7 NAS MOPS RATFM Information Exchange Description 22 Table 8 NAS MOPS MET System Information Exchange Description usse 24 Table 9 NAS MOPS CCMS Information Exchange Description 24 Table 10 NAS MOPS Other Systems Information Exchange Description 24 Table 11 APPS Intersystem Interface Description 2 26 Table 12 Tower System Intersystem Interface Description sese 32 Table 13 Tower System Surveillance Systems Information Exchange Description 33 Table 14 Tower System AIMS Information Exchange Description
254. eer and related officer The Training program will include all aspects of the systems operation and maintenance The Training programs including a Schedule of the training courses b Objective syllabus and duration of each training course c List of training materials and documentation to be included with the training course d Qualifications and experience level necessary for the personnel to be trained e Qualification of the instructors and f Course method or training mode After awarding the contract Seller will conduct meeting with AEROTHAI to review the details of the Training Schedule and training course The Seller training manager will be assigned to be responsible for training and serve as the contact point for all matters related to training training will be conducted by personnel who are fully conversant with the subject they are teaching and have an excellent command of the English language training instructions and documentation will be in English language For those training courses to be conducted in AEROTHAI AEROTHAI will provide classroom with desks a whiteboard projector and common stationery The certificate of competence will be issued to AEROTHAI s staffs who have attended the training course s and pass the required examination All price shall be included in the Price Proposal Part3 SUPPORT AND AFTER SALE SERVICE Page 6 of 19 Project Name System Name Date Thailand Mo
255. eference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 26 4 9 27 9 27 1 9 27 2 Specifications doc enable such correlation which is required for both airborne flights and ground movements where available SSR Code Assignment Management The TFDP should provide the SSR code assignment management function used to adapt code allocating SSR codes automatically to flight plans at their time of activation The function should also support the manual allocation of codes Tower Controller Workstation T CWS The Tower Controller Workstation T CWS should form the Human Machine Interface HMI between the operator and the system it should be designed to provide an appropriate functionality to accommodate the operational role of Tower Controllers and supported roles which are generally divided into three 3 main functionality as Air Situation Display ASD Ground Situation Display GSD Flight Data Display FDD and two 2 support functionality as Tower Dataset Operator T DSO Tower Control and Monitoring T CMS Air Situation Display ASD The ASD should provide a reliable display of the actual air traffic situation superimposed on the synthetic maps to the Tower Controller Usually ASD is used to monitor air traffic situation It is preferable for The ASD HMI to be similar to CWS HMI for EC APP in order to give ATC familiarity with the display and HMI function In case of the serve
256. em components inputs outputs etc The Tenderer shall propose and detail the system best suited for HHN APP MOPS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc Part 2 2 1 Scope of Technical Specifications Page 194 E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 15 16 ARCH17 Specifications doc The Tenderer shall propose and detail the system best suited for HHN APP CON TRA The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for the following tower systems Korat Tower system Takhli Tower system U tapao Tower system and Kampangsan Tower system The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for the following tower systems Phitsanulok Tower system Hua Hin Tower
257. ember 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Inform all concerned of early access to weekend routes conditional routes Provide up to date information concerning current use of airspace at tactical level and Coordinate with relevant units to accommodate significant short term realignment of traffic flows to meet extra ordinary demands imposed by major events k Bangkok Air Traffic Flow Management Unit ATFMU Manager Bangkok ATFMU Manager FMM is responsible for fulfilling the following specific tasks Is responsible for the performance and initiation of the full ATFM process in Bangkok FIR and other area of responsibility in all phases of operation strategic pre tactical and tactical Should be responsible to perform and initiate the strategic phase at Bangkok FMC Is responsible for ensuring that the procedures established for is published in AIP ATC operational instructions etc Is responsible to establish good relations between the FMC and Bangkok ACC Bangkok Approach as well as with other ATC Units and aviation stakeholders in Thailand and other relevant stakeholders Should be consulted in issues that potentially could reduce the capacity to advice on how the capacity could be maintained as high as possible In this respect the FMC have to be informed of plan
258. emote CMWS MTN EO CMWS is remote CMWS from CON TRA from CON TRA DSWS DSWS amp j x ien gt A4 color ome rey A4 color A4 color Laser Printer Laser Printer Laser Printer 030 Equipment Room Equipment Room Equipment Room Approach Control Centre Building Approach Control Centre Building CON TRA Building APP MOPS APP MOPS APP CON TRA CMA APP HTY APP PUT APP PSL APP HHN APP CMA APP HTY APP PUT APP PSL APP HHN APP Essential WS m Optional WS Future Expansion V Voice Touch Entry Display Figure 5 3 Conceptual Operator Role Layout of APP MOPS and APP CON TRA at Provincial Site CW
259. ence File Reference Version Volume II Technical Terms of Reference Vol II Part 1_Final 1 0 PART 3 SUPPORT AND AFTER SALE SERVICE This part consists of requirements on supports and after sale services such as Training Documentation and Spare Part that the Tenderer will provide to complete the Project and enable sustainable operability of TMCS through to the end of system lifecycle Tenderer is requested to respond each requirement with full detail where a response such as yes understand comply response and response with this or similar phases is not an acceptable and will be considered unresponsive which will affect the evaluation score of Tenderer s Tender SECTION A Scope of Project 1 Project Background With the present aging air traffic management systems located at Tung Mahamek Chiang Mai Hat Yai Phuket Phisanulok and Hua Hin and the expected growth of air traffic of more than 200 percent within the Bangkok FIR in the next ten years AEROTHAI has incorporated a plan to replace all existing systems in those locations The project for modernization of Thailand CNS ATM System TMCS Project has been established with a purpose to support all aspects of Air Space Management ASM Air Traffic Services ATS and Air Traffic Flow Management ATFM operations in Thailand s airspace Therefore the Tender Document has been issued to invite firms for a provision of Secondary Surveillance System Automation named as Thailand Modernizatio
260. ences and manipulation of jurisdiction along with a set of functions defined on a jurisdictional basis and role the electronic flight strips and the layout of paper flight strips etc For on line roles and jurisdictions are modified on line enabling associated functions to become accessible based on the pre planned off line adaptation In addition authorized user can modify certain parameters within a defined roles and jurisdiction function set and save those changes as either personnel or system wide preferences Input Optimization Input optimization allows ATC to perform some repetitive tasks directly from the data block In addition the generally accessed functions that are not available from the data block have been mapped to quick action keys allowing rapid display and removal when not used Data block layout and functions along with quick action key mappings can be modified FDO HMI The FDO will have the full capabilities of managing ATS messages and flight plan data to ensure flight data correctness and completeness of each flight plan for smooth transition of flight progress The FDO will have the ability of managing specific dynamic aeronautical data by modification creation and cancellation of the data as appropriate The FDO will be able to manage weather data including meteorological messages The FDO will provide flight data lists which are able to access all records concerning messages actions and flight plan histories of e
261. enderer shall propose and detail predicted track vector The Tenderer shall propose and detail Full Data blocks The Tenderer shall propose and detail Limited Data blocks The Tenderer shall propose and detail control panels The Tenderer shall propose and detail geographical reroute HMI The Tenderer shall propose and detail electronic strip field The Tenderer shall propose and detail electronic strip presentation The Tenderer shall propose and detail Flight data Entry Interaction The Tenderer shall propose and detail Flight data list windows The Tenderer shall propose and detail the intensity adjustment of the graphical and tabular items displayed on CWS HMI The Tenderer shall propose and detail Meteorological Information Presentation The Tenderer shall propose and detail Aeronautical Information Presentation The Tenderer shall propose and detail Paged Information Presentation The Tenderer shall propose and detail operational status of the system The Tenderer shall propose and detail both on line and offline of CWS HMI configuring tool as follows e layout of push buttons menus Electronic Strip e definition of the maps e default range and offset e definition and layout of the plot and track labels e preferences and manipulation of jurisdiction Part 2 2 1 Scope of Technical Specifications Page 246 D D D D D D D E E Project Name Date Thailand Modernization December 14 2012 CNS AT
262. ent eee eese e eee ee eene etae tene stas stas tasto 134 9 10 Traffic Synchronization 02 eene etn ee etae eene areae orsa aa 135 9 11 Arrival Manager C 135 9 12 Departure Manager scssccssscossssossssessescesssossssessssesssenssssesssssssssessssessssessssessssenses 135 9 13 Controller Pilot Data Link 2 1 2 136 9 14 Air Situation Recording and Replay 1 1 2 eere sees seen 137 9 15 DICENDA 139 9 16 Aeronautical Information Management 1 ecce eee eee eee eee en estne tensa 139 9 17 Time 1e so nro e cea enero 139 9 18 1 esse 140 9 19 FDO HMI 143 9 20 Data Set Management 144 9 21 Network Management System 146 9 22 Control and Monitoring System ccscccsssccssccsssccsssccsssccsssccsscccssccssscscsscesseees 146 9 23 Contingency Training System eese eee ee eee ee ene tetas etas eta aestas stas etae sens 148 9 24 Computer Based Training Software eee ei
263. er a Y 4 Figure 2 Concept of Contingency amp Backup Level I Level IV 5 Figure 3 Connections between NAS CON TRA and other systems in Contingency Mode 8 Figure 4 Connections between NAS IBS and other systems in case of Disaster Situation 9 Figure 5 Operational Context 5 11 Figure 6 Intersystem Connections of the NAS 18 Figure 7 Intersystem Connection Context Diagram for the APPS MOPBS sess 25 Figure 8 Tower System Context Diagram System Capabilities Level III and IV 31 Figure 9 Tower System Context Diagram System Capabilities Level I and ID 36 Figure 10 Network Diagram System Capabilities Level and 75 Figure 11 VCCS composition at each 61 95 Figure 12 VCCS Composition 5 96 Figure 13 VCCS Composition of APP nennen 97 Figure 14 Simplified Configuration of Local and Remote Radio Stations for NAS 101 Figure 15 Simplified Configuration of Local and Remote Radio Stations for APP System 102 Figure 16 The Breakdown of TMCS Feature 110 Figure 17 Conceptual diagram of full UPS configuration esee 187 Figure 18 Conceptual diagram of half UPS configuration sese 188 Part 2 2 1 Scope of Technical Specifications Proj
264. er clock The Tenderer shall propose and detail the synchronization capability of the GPS master clock with the voice recorder or other master clocks The Tenderer shall propose and detail the configuration and lay out of the slave clocks on console The Tenderer shall propose and detail the AC DC input power capability and configuration of the central racks The Tenderer shall propose and detail the AC DC input power capability and configuration of other equipments The Tenderer shall propose and detail the principle operation between AC power supply system and DC power supply system of the central racks and other Part 2 2 1 Scope of Technical Specifications Page 215 D E D E E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 VCCS55 VCCS56 557 558 VCCS59 VCCS60 VCCS61 VCCS62 VCCS63 VCCS64 VCCS65 VCCS66 Specifications doc equipment The Tenderer shall propose and detail the interfacing configuration between the VCCS central racks and the main distribution frame MDF The Tenderer shall propose and detail the configuration and performance of the lightning protection which is equipped for all radio and telephone lines at the MDF The Tenderer shall propose
265. er manual e NAS MOPS NAS CON TRA NAS IBS APPS APP CON TRA APP IBS LTS and RTS system diagrams wiring diagrams e Control and Monitoring system user manual e TMCS maintenance manual and e Software install manual 5 Spare parts The number of spare for each type of workstations servers and network equipment for TMCS will be not less than ten percent 10 of the total number of that type of equipment These spare workstations servers and network equipment will be preloaded with all necessary licensed software and suitably pre configured to facilitate a prompt replacement of faulty equipment on site All price shall be included in the Price Proposal Part3 SUPPORT AND AFTER SALE SERVICE Page 16 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume Part 3 Support and After Sale 1 0 Service_Final doc Volume II Technical Terms of Reference 6 Special Tools and Test Equipment The software tools test equipment and diagnostics test programs will be fully provided to achieve the standard of software and hardware maintenance in particular the repair of equipment down to component level A suite of tools for map drawing and creation will be provided The ASTERIX test tools are fully graphical user interface that will be provided with fully supporting all currently standardized ASTERIX radar data categories It
266. er of map elements and defines their presentation attributes A user is able to choose a particular map configuration and then select for display individual elements within the configuration Maps may also be defined online and distributed to other users The display also contains tabular depictions of flight data and co ordination messages In order to achieve efficient use of the screen a user is able to select more than one independent Traffic Situation Presentations thus permitting a main display of the area of responsibility plus auxiliary displays showing inbound traffic flows Meteorological Information Presentation The Meteorological Information Presentation permits authorized users to enter aerodrome and area meteorological forecasts to use in the processing of flight data and to display as auxiliary information for ATC At certain working Part 2 2 1 Scope of Technical Specifications Page 141 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 18 4 9 18 5 Specifications doc positions e g in the APPs the meteorological information of certain aerodromes may be permanently displayed Therefore any change to the information is immediately displayed and highlighted to the for acknowledgement The Meteorological Information Presentation also provides a means fo
267. er shall propose and detail of all scenarios of Taxiway Conflicts The Tenderer shall propose and detail of all scenarios of Area Conflicts The Tenderer shall propose and detail of all scenarios of Special Conflicts The Tenderer shall propose and detail all alert alarm indication methods when COF detects a conflict situation The Tenderer shall propose the update time range of conflict alerts The Tenderer shall propose and detail all the parameters used for conflict alert detection Tower Flight Data Processing The Tenderer shall provide product description of the proposed system detailing TFDP functionalities capabilities and benefits The Tenderer shall provide product description of the proposed system detailing Data Management and Update features The Tenderer shall propose and detail how the TFDP transfer the aircraft to FDP The Tenderer shall propose and detail the coordination between TFDP and FDP The Tenderer shall provide product description of the proposed system detailing Runway Determination feature When the departure or arrival runway for a given flight changed the Tenderer shall propose and detail the affected time related information items and SID STAR Part 2 2 1 Scope of Technical Specifications Page 254 E E E E E E D E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II
268. er shall propose and detail the capability of audio level control of headset handset The Tenderer shall propose and detail the Receiver Voting function Best Signal Selection The Tenderer shall propose the maximum number of receivers used by Receiver Voting function The Tenderer shall propose and detail the capability and characteristic of the automatic selection of transmitter The Tenderer shall propose and detail the interfacing configuration of local radio stations and remote radio stations with all VCCS MOPS Fallback and The Tenderer shall propose and detail both quantity and characteristic of the provided voice multiplexers which interface the local radio stations and all VCCS MOPS Fallback and CON TRA at BACC BAPC via exiting AEROTHAI core optical fiber facilities The Tenderer shall propose and detail the alarm characteristic of the provided voice multiplexers for BACC BAPC The Tenderer shall propose and detail the interfacing system including configuration quantity characteristic etc which interfaces the local radio stations and all VCCS MOPS Fallback and CON TRA at CMA APC HTY APC PUT APC PLS APC and HHN APC The Tenderer shall propose and detail the automatic manual media selection function capability to use one of three communication media Digital Data Network DDN satellite and frame relay at a time The Tenderer shall propose and detail the types of telephone calls that can be m
269. erence of Technical 1 0 VCCS67 VCCS68 VCCS69 VCCS70 VCCS71 VCCS72 VCCS73 VCCS74 VCCS75 VCCS76 Specifications doc The Tenderer shall propose and detail the VCCS workstations facilities configuration of CON TRA VCCS The Tenderer shall propose and detail the list of supplies of VCCS and VCCS related equipments for MOPS Fallback and CON TRA at BACC BAPC CMA APC APC PUT PLS APC and HHN The Tenderer shall propose and detail the quantity of 2 Wire telephone set 2 Wire Voice Call PSTN and PABX TLIM for MOPS Fallback and CON TRA VCCS at BACC BAPC CMA APC HTY APC PUT APC PLS APC and HHN APC The Tenderer shall propose and detail the quantity of 4 Wire RLIM for MOPS Fallback and CON TRA VCCS at BACC BAPC CMA APC HTY APC PUT APC PLS APC and HHN APC The Tenderer shall propose and detail the quantity of EI RLIM for MOPS Fallback and CON TRA VCCS at BACC BAPC CMA APC HTY APC PUT APC PLS APC and HHN APC The Tenderer shall propose and detail the quantity of VoIP RLIM for MOPS Fallback and CON TRA VCCS at BACC BAPC CMA APC HTY APC PUT APC PLS APC and HHN APC The Tenderer shall propose and detail the quantity of headset and handset for MOPS and CON TRA VCCS at BACC BAPC CMA APC HTY APC PUT APC PLS APC and HHN APC The Tenderer shall propose and detail the modification of the existing headsets The Tenderer shall propose and detail the initial spare cards o
270. erify that the characteristic of CWS HMI meet standardization of Luminance and Contrast and Visual Displays The Tenderer shall propose and detail CWS HMI traffic situation presentation The Tenderer shall propose and detail CWS HMI Traffic Situation Presentation which relevant to each operator role The Tenderer shall propose and detail Number of Traffic Situation Presentation The Tenderer shall propose and detail Main Traffic Situation window presentation The Tenderer shall propose and detail Inset Traffic Situation window presentation The Tenderer shall propose and detail all windows on CWS HMI Part 2 2 1 Scope of Technical Specifications Page 244 D E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 CWS10 CWSII CWS12 CWS13 CWS14 CWSI5 CWS16 CWS17 CWS18 CWS19 CWS20 CWS21 CWS22 CWS23 CWS24 CWS25 Specifications doc The Tenderer shall propose and detail the transparent or opaque windows In order to avoid hidden windows the Tenderer shall propose and detail the indicator to inform what windows are obstructed The Tenderer shall propose and detail ATC tools on CWS HMI The Tenderer shall propose and explain all visual and audio alerts as follows e Hierarchical of aler
271. ernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 SINIOS SINIOO SINI10 SINII 1 SINI12 SINII3 SINI14 SINI15 SINI16 SINI17 SINI18 SINI19 SINI20 Specifications doc Hat Yai Site The Tenderer shall provide product description Technical Characteristics of network equipments and related components at Hat Yai Site The Tenderer shall propose and detail the list of supplies of network equipments and related components for Hat Yai Site The Tenderer shall propose and detail the network configuration for all systems at Phuket Site The Tenderer shall provide product description Technical Characteristics of network equipments and related components at Phuket Site The Tenderer shall propose and detail the list of supplies of network equipments and related components for Phuket Site The Tenderer shall propose and detail the network configuration for all systems at Phitsanulok Site The Tenderer shall provide product description Technical Characteristics of network equipments and related components at Phitsanulok Site The Tenderer shall propose and detail the list of supplies of network equipments and related components for Phitsanulok Site The Tenderer shall propose and detail the network configuration for all systems at Hua Hin Site The Tenderer shall provide product
272. ersion Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 14 2 9 14 3 Specifications doc Every twelve 12 hours or configured as desired the recorded data on record server master channel will be automatically archived for safe keeping beyond the retention period If the record server needs to archive data and no archive media is mounted in the unit the archive manager will alert on CMWS Replay The Replay feature REP will be designed to allow recorded information to be replayed on the CWS Multiple positions can be replayed simultaneously to analyze incidents or to provide instruction The replay function will be retrieval the recorded data based on specified condition including position name starting date and time media type and audio track number The replay feature will comprised of two replay modes as follows but not limited to a Passive mode where there is no interaction allowed with the presentation of data and b Interactive mode In this mode the user can interaction such as range scale pan zoom in out rotate track label and range bearing lines The REP will allow flexible control to replay the recorded data from record disk and archive media such as start stop pause resume and speed of replay The REP will be synchronized with DVR at normal speed and deviation of data and voice will be less than one second REP replay speed can also be slowed down so that the situation can be
273. et The Tenderer shall provide product description of the proposed system detailing Safety Nets functionalities capabilities and benefits The Tenderer shall propose and detail all information used to improve the Safety Nets The Tenderer shall propose and detail the methodology to enable and or disable each Safety Nets feature The Tenderer shall propose and detail the methodology to prevent unauthorized user to enable and or disable each Safety Nets feature The Tenderer shall provide product description of the proposed system detailing safety nets data analysis tools functionalities capabilities and benefits The Tenderer shall propose and detail the methodology to collect all safety nets data The Tenderer shall propose and detail the type of data to be collected by safety nets analysis tools The Tenderer shall provide product description of the proposed system detailing Part 2 2 1 Scope of Technical Specifications Page 230 E E E E D D E D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 SAFEO09 SAFE10 SAFE11 SAFE12 SAFE13 SAFE14 SAFE15 SAFE16 SAFE17 SAFE18 SAFE19 Specifications doc Short Term Conflict Alert STCA functionalities capabilities and benefits The Tenderer
274. ete archive restore and compare databases Safety Nets Safety Nets are functions that alert ATC in monitoring the air situation continuously with visual and aural warnings by detecting potential conflicts and infringements based on the surveillance data and providing timely information to enable the affected ATC to assess and if necessary resolve the situation by taking deliberate corrective action In addition the Safety Nets should be designed to use information from Surveillance Data Processing Safety Nets data set and possibly Flight Data Processing in order to generate alerts Furthermore aircraft information through Mode S ADS B and MLAT WAM should be used to improve the Safety Nets function The Safety Nets will provide alert information to CWS The authorized user such as OPSUP will be able to enable or disable each Safety Nets feature The Safety Nets will be established to ensure that Safety Nets are used in a safe and effective manner The pertinent data will be collected for purpose of operational data extraction and analyzed in order to monitor and optimize the performance of Safety nets The Safety Nets will have at minimum the following features a Short Term Conflict Alert STCA b Minimum Safe Altitude Warning MSAW C Area Proximity Warning APW and d Approach Path Monitoring APM Short Term Conflict Alert STCA The Short Term Conflict Alert STCA will assist and warn the ATC in preventing
275. etwork equipments resources such as Cisco switches and routers etc Control and Monitoring System The Control and Monitoring System function CMS provides the facility to authorized user in order to monitor and control the functionality and system devices of TMCS This activity will ensure that the overall of TMCS is available to users for a high percentage of the time In addition CMS also performs the logging all activities that affected to the system Part 2 2 1 Scope of Technical Specifications Page 146 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc The graphical presentation on CMWS screen assists the TECHSUP and MTN to visualize the situation more easily and manage the situation more effectively using manual control The color scheme will be used to show different status of TMCS in real time Both aural and visual alarm indications will be provided upon detection of equipment fault and or any out of tolerance parameters in the monitoring circuits authorized user will be able to acknowledge the aural alarm to mute the sound The visual alarm will remain on CMWS until the fault is resolved 9 22 1 System Control The CMS will provide the facility to authorized user to control functions external interfaces of TMCS as follow
276. expand the BACC BAPC NAS for optional End Systems d The Level II Tower System can accommodate the concurrent operation of additional 5 End Systems as listed below COR accommodated with optional 1 ASDWS optional 1 GSDWS and optional 1 FDDWS Part 2 2 1 Scope of Technical Specifications Page 91 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference Volume II Terms of Reference File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc LA e g h i T FDO can be accommodated with optional 1 FDDWS o T MTN be accommodated with optional 1 T CMS The Level II Tower System will be provided with the appropriate software for the previously mentioned additional 5 End Systems Only hardware and suitable operating system will be needed in order to expand the Level II Tower System for optional End Systems The Level II Tower System will be provided with appropriate network infrastructure including network equipment cable and wiring and installation for the previously mentioned additional 5 End Systems Only hardware will be needed in order to expand the Level II Tower System for optional End Systems The Level III Tower System can accommodate the concurrent operation of additional 2 End Systems as listed below o T FDO can be accommodated with optional 1 FDDWS o T MTN can be accommodated with optional 1 T C
277. experience Part 2 2 1 Scope of Technical Specifications Page 148 Project Name Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference Date File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 23 2 1 Specifications doc The training function will include sessions game and exercise as described below Sessions A Session defines the operational context during training A session includes information about an entire FIR with adjacent airspace structures of initial wind and temperature profile internal and external control units sectors Letters of Agreement aircraft types and their performance profiles as well as surveillance and communication sites with type coverage profiles etc Game A Game defines the flight plans and events template or templates and always connects to a specific Session A Game is loaded in preparation for performing one or more Exercises One Game template can be used for several Exercises and started at different times Each time an Exercise is started based on a specific Game a unique Exercise record is created that belongs to that Game Exercise An Exercise is always based on a Session Game template and the result of a Game being run from start to stop is an Exercise An Exercise contains not only the same prepared initial data set as defined by the Game but it is also based on a unique log of all flights events k
278. eystrokes and voice input that occur during the running of that specific Exercise The CON TRA in TRA also includes these features a b Traffic and Event Generator Pseudo Pilot PSP and Training Mission Control TMC Traffic and Event Generator The TEG feature will simulates all inputs to TRA as follows but not limited to e Flight creation for creating of the corresponding aircraft and flight plan e Flight plan messages generation e Aeronautical information data handling Part 2 2 1 Scope of Technical Specifications Page 149 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Wind and Weather data generation Aircraft simulation for aircraft trajectory initialization and management of the aircraft trajectory Surveillance data simulate such as RADAR ADS B MLAT WAM CPDLC message handling Time management Report generation 9 23 2 2 Pseudo Pilot The PSP feature will allows commands to be sent to the TEG to control the simulation for individual aircraft The PSP feature has two major purposes Maintain realistic air traffic situations and Simulate the pilot to ATC communications The main PSP actions are Modify aircraft heading flight level and speed Switch an aircraft from automatic to m
279. ference Technical Specifications doc SECTION Introduction Thailand Modernization CNS ATM System TMCS is an automation system under the modernization of Thailand Air Traffic Management ATM System Project TMCS offers an efficient and flexible ATM system in order to meet expected growth in traffic and also to provide support for AEROTHAT s air traffic management The main objective of Volume II is to describe TMCS in technical details This volume specifies guideline information and all requirements both essential and desirable to be used as a reference for implementation of TMCS The requirements consist of TMCS operational functional and capacity requirements hardware and software requirements and services requirements for commissioning the TMCS Each requirement statement is classified and labeled as a Essential requirement specification E b Desirable requirement specification D Section B contains guideline information for TMCS The information includes for examples System Architecture the level of Contingency and Backup Site Information etc All statements within this chapter are for Tenderers information only Section C specifies all relevant issues related to Provisional Requirements of TMCS for Tenderers to propose their solutions using guideline information from Section B Section D contains all appendixes Furthermore in this document Section B explains the full scope of TMCS while Section C an
280. full load FREQUENCY 50 Hz 5 at least CURRENT HARMONIC 5 at full load DISTORTION POWER WALK IN 0 100 gt 5 sec Part 2 2 1 Scope of Technical Specifications Page 189 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope of Technical 1 0 Specifications doc Details Criteria OUTPUT RATINGS Inverter Unit POWER RATING Proposed by Tenderer on continuous basis POWER FACTOR 0 9 or better VOLTAGE 380 to 415 V AC 15 96 3Ph N G VOLTAGE REGULATION 2 static load FREQUENCY 50 Hz 0 5 Nominal WAVEFORM Sine Wave with Total Harmonic Distortion lt 3 for linear loads lt 5 for non linear loads LOAD CREST FACTOR 3 1 without derating OUTPUT OVERLOAD 125 for 1 minute and 150 for 30 seconds BATTERY RATINGS TYPE Sealed Maintenance Free VRLA BACK UP TIME 15 minutes on full load on each UPS CABINET The batteries should be housed in a suitable cabinet for user safety along with ventilation louvers OVERALL EFFICIENCY gt 90 PROTECTIONS Overload amp Short Circuit at the output Over Temperature inside the UPS Over Discharge for Battery Under Over Voltage to the load in Normal mode Under Over Voltage to the load in Bypass mode Spikes amp Surges to the load AUDIBLE ALARMS Mains Failure Battery low
281. g In Loop Ou DTMF PSTN amp PABX Interface Sector 2 D Wire Loop Ou DTMF PSTN amp PABX Interface Sector 2 TN S D Wire Ring In Loop Ou DTMF PSTN amp PABX Interface Sector 3 D Wire RingIn Loop Ou DTMF PSTN amp PABX Interface Sector 3 HN APP fp Wire Ring In Loop Ou DTMF PSTN amp PABX Interface Sector 3 VB FDO3 p Wire Ring n Loop Ou DTMF PSTN amp PABX Interface N lt e e 3 S e e N un N HE wi w Zez gt t3a ro to ro ro to o TZ bw H gt 2 vs i un toa ro ro ro ro o gt 5 51 ing 5 N 29522365 ERE NTN o gt N J lt am D Fs EN Signaling Working Positions Call In Call Out SVB_GND3 Rimen _ 54 JBUT_APP Ring Loop OwDTMr Setor3 _JOSCAR_S3__P2 Wire Rime _Loop Out D TMF Setor3 D Wie Ring Setor3 SAT Rime Loop Ow DTMF Setori Wire Rinem Loop OwDTME Sector 4 Ringh Sector4 SAT Ring in Loop Ow DTME Sector 4 Loop Ow DTME Sector 4 Wire Sector 4 Ring Loop wDTME Secto
282. ge 6 of 6 3 1 Workstations capacity of each site APPENDIX 3 1 1 Tungmahamek Main Fallback POSITION CAPACITY NAME PCI C C C BCG EC 7 PCS PCIO PCH PCI2 ECIS PCI PCIA ECIS PCIS ECIG PCI6 TACTSUPI TACTSUP2 TACTSUPS PCI EC2 PC EG PC C BCS C C BCG TACTSUP POSITION d CA rg A N NIN WIN AL N 95 N es p N les B ALR gt N N AYA E SIT peo Hr 20 22 23 2 2 Em M o 28 29 2 E wor Ti poco 46 E NT A NAME 49 OPSUP TECHSUP CMAC EOI gt n lt MINI MTN TACTSUP MANT MANZ MAN3 ECT PCT PCR PCS ECIO PCIO AMANI AMAN FISLI FISL2 FISL3 ASM FMI FMS ATEN LL AM O POIO FISLA APPENDIX 3 1 2 CMA PUT PSL HHN Main Fallback POSITION CAPACITY Location Operation Role Position HTY PUT PSL HHN E Control Room sa Tower EC PC TWR Control Room TS TWR S 2 Fallback System Require Only at Control Rooms
283. h Control Centre BAPP Bangkok Approach Control CATIS Computerized Automatic Terminal Information System CBT Computer Based Training CCMS Central CNS ATM Monitoring System CDC Clearance Delivery CDM Collaboration Decision Making CDR s Conditional Routes CIFDPS Central Initial Flight Data Processing System CMA Chiangmai Airport CMA APC Chiangmai Approach Control Centre CMAC Civil Military Airspace Coordinator Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Abbreviation FullName CMS Control and Monitoring System CMWS Control and Monitoring Workstation COF Control Feature CON Contingency CON TRA Contingency Training System COR Coordinator COTS commercial off the shelf CPDLC Controller Pilot Data Link Communication CRAM Conditional Route Availability Messages CTA Control Time of Arrival CWS Controller Workstation DA Direct Access DAA Data Analysis DAWS Data Analysis Workstation DCB Demand and Capacity Balancing DDN digital Data Network DMA Don Muang Airport DMAN Departure Manager DSM Data Set Management DSO Data Set Operator DSWS Data Set Workstation DVR Digita
284. hall propose and detail project meeting plan including the list of all D deliverables that will be submitted for each meeting PRS 003 Tenderer shall propose and detail Cutover plan and process including the list of D all deliverables that will be submitted at the end of each activity PRS 004 Tenderer shall propose and detail Cutover expert team and their roles to D support in the pre and the pose step of the cutover time PRS 005 Tenderer shall propose and detail Quality Management plan and process D including the list of all deliverables that will be submitted for each activity PRS 006 Tenderer shall propose and detail Project Management methodology including the efficient and reliable tools for implement the project PRS 007 The Tenderer shall propose full detailed Project Management plan which outlines the timeline milestone and list of deliverables to be submitted during the course of the project PRS 008 Tenderer shall submit their response in the mandatory information tables D Appendix 1 of this PART PRS 009 Tenderer shall propose and detail Risk Management plan including the list of D all deliverables that will be submitted for each activity PRS 010 Tenderer shall propose and detail Risk Treatment plan including the list of all D deliverables that will be submitted for each activity Part 1 Scope of Project Project Name Date Thailand Modern
285. he Tenderer shall propose and detail how the MSAW operates in case of system degradation e g unavailability of one or more RADAR ADS B stations Part 2 2 1 Scope of Technical Specifications Page 231 D D D D D D D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 SAFE20 SAFE2I SAFE22 SAFE23 SAFE24 SAFE25 SAFE26 SAFE27 SAFE28 SAFE29 SAFE30 SAFE3I Specifications doc The Tenderer shall propose the minimum size resolution of MSAW volume of airspace supported by MSAW The Tenderer shall propose the maximum number of MSAW volume of airspace that can be defined The Tenderer shall propose the maximum number of MSAW volumes of airspace that can be activated simultaneously The Tenderer shall propose and detail the methodology to inhibit MSAW alerts for predefined MSAW volumes of airspace or individual flights to suppress unnecessary alerts The Tenderer shall provide product description of the proposed system detailing Area Proximity Warning APW functionalities capabilities and benefits The Tenderer shall propose and detail the methodology to detect and notify to the ATC when an aircraft is or is predicted to be flying into APW volumes of airspace The Tenderer shall
286. he start of the Contract signing date and shall continue till the completion of the project The project management plan must also describe the execution management and control of the project This information can be provided by referencing other documents that will be produced The details of project plan are as follow a The Tenderer will ensure that a full detailed project plan and management will outlines the timeline milestone and list of deliverables during the course of the project b The Tenderer will put in place a time schedule and phases to complete the required tasks such as analysis design delivery tests commissioning and project closing The detail of reports to be produced at each phase of the schedule will be defined Proposal without a time schedule shall affect the Tenderer s evaluation score c All deliverables and documents will be delivered at the end of each phase will be defined according to format in Appendix 1 of this PART 9 Risk management plan The risk management plan should propose applicable and effective controls for managing the risks A good risk management plan should contain a schedule for control implementation and responsible persons for those actions The stage immediately after completion of the risk assessment phase consists of preparing a Risk Treatment Plan which should document the decisions about how each of the identified risks should be handled Mitigation of risks often means selectio
287. hen not performed automatically n Data Set Operator Data Set Operator DSO is responsible for fulfilling the following specific tasks at minimum e Produce the complete set of parameters in a dataset that is specific for the current user environment and a specific system software version e Evaluate the dataset when changes occur in order to ensure the validity of dataset e Produce exercises to the simulator used for training and testing and e Coordinate with MTN to distribute the validated dataset to the system Air Defense Operator Air Defense Operator ADF supports military operation stationed at Air Defense Units which are Big Shell Oscar and Focal ADF is responsible for fulfilling the following specific tasks at minimum e Provide common situational awareness on traffic situation airspace activation route activation etc and e Coordinate with CMAC EC PC and other relevant stakeholders p Maintenance Engineer Maintenance Engineer MTN coordinates with various units to perform tasks such as TECHSUP OPSUP etc Maintenance Engineer performs maintenance operations include but not limited to e Operate and maintain the NAS MOPS e Manage NAS MOPS information Part 2 2 1 Scope of Technical Specifications Page 50 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope
288. hich airspace options are selected and applied to meet the needs of the ATM community Key conceptual changes include a All airspace will be the concern of ATM and will be a usable resource b Airspace management will be dynamic and flexible c Any restriction on the use of any particular volume of airspace will be considered transitory and d All airspace will be managed flexibly Airspace boundaries will be adjusted to particular traffic flows and should not be constrained by national or facility boundaries Coordinated planning among adjacent areas will be conducted with the objective of achieving a single airspace continuum The airspace within that continuum will be free of operational discontinuities and inconsistencies Airspace will be organized to accommodate the needs of the different types of users on a timely basis Transition between areas will be transparent to users at all times The AOM will provide the first layer of conflict management Effective airspace organization and management will enhance the ability of the ANSP and airspace users to accomplish conflict management and will also increase safety capacity and efficiency Flexible Use of Airspace FUA Coordination Flexible airspace configuration will be designed to support changes in TMCS services according to traffic flows airspace restrictions and runway configuration at major regional airports These dynamic changes are monitored and controlled by the flight
289. hment 6 1 5c The location of the UPS Room of PSL APP CON TRA Attachment 6 1 6 The location of HHN APC Building and Air Field Lighting Building at Hua Hin Site 21 22 23 24 25 26 27 28 29 Attachment 6 1 6a The location of the Operation Room and Local Tower Control Room of HHN APP MOPS and HHN LTS Attachment 6 1 6b The location of the Equipment Room of HHN APP MOPS and HHN LTS Attachment 6 1 6c The location of the CON TRA Room of HHN APP CON TRA Attachment 6 1 7 The location of ATC Support Building SBA Tower Building and Emergency Buildings at Suvarnabhumi Airport Site Attachment 6 1 7a The location of the Operation Room of BAPP MOPS Attachment 6 1 7b The location of the Equipment Room of BAPP MOPS Attachment 6 1 7c The location of the Operation Room Equipment Room and Local Control Room of SBA LTS Attachment 6 1 3d The location of the CON TRA Room Pilot Room and Equipment Room of BAPP CON TRA Attachment 6 1 7e The location of the UPS 1 Room UPS 2 Room and UPS 3 at Suvarnabhumi Airport Site Existing Operation Building 7 Attachment 6 1 1 The location of New Operation Building and Existing Operation Buildings at Tungmahamek Site 36 00 900 5320 mY 9 az LL SS IS 2 A 2 2 2 2 Communication d cables Shaft 24
290. i CONTRA Voice Record Channels Capacity at least 48 ch recorder 2 126 700 Approach Radio Record 301 500 Approach Radio Record 125 550 NTW Approach Radio Record 95 1 7 1 1 ll ll 0 Ke Reel 1 3 5 6 7 8 1 Approach Telephone Record 4 0 2 4 9 0 2 3 4 5 0 2 4 6 7 BTW 5 48 oo 3 5 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 6 7 APPENDIX 3 5 10 Phuket CONTRA Voice Record Channels Capacity at least 48 ch recorder 1 7 20 22 23 24 25 26 27 2 Channel 22 28727 HE 25 E ul 3 gt wf Go WEN 34 921 Got Go wj u 0 40 42 4 44 9 3 45 46 47 APPENDIX 3 5 11 Phitsanulok CONTRA Voice Record Channels Capacity at least 48 ch recorder 1 7 20 27 23 24 25 26 27 29 30 34 Channel EE RE 2 5 EA 99 25 50 E34 rj 40 42 4 44 3 5 4 46 47 APPENDIX 3 5 12 Huahin CONTRA Voice Record Channels Capacity at least 48 ch recorder Position Record Position Record SPARE SPARE T Position Record 10 Position Record 11 Radio Record 12 Radio Record Radio Recon D Raid Resid 15 Radi
291. ic from the FDP to TFDP and vice versa Dependent on operational flight plan status or any other flight plan data available The TFDP should perform the following at a minimum e Distribute flight plan update messages automatically without intervention e Inform the by notification to verify and manually accept or reject the update message e Provide alert or warning messages for critical changes to flight plans Runway Determination The calculation of Estimated Take off Time ETOT and Estimated Time of Arrival ETA depends frequently on the runway configuration to be used for take off and landing in the meteorological conditions pertaining at the time When the departure or arrival runway for a given flight changed the following should be calculated at a minimum e Estimated Off Block Time EOBT e Estimated Take off Time ETOT e Standard Instrument Departure SID e Standard Arrival Route STAR e Estimated Time of Arrival ETA e Estimated Parking Time EPT Correlation with Surveillance Data Track Labels are required to show information derived from the equivalent flight plan or abbreviated flight plan In particular the flight identification is required to be displayed in almost all cases Data is required to be made available to Part 2 2 1 Scope of Technical Specifications Page 161 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File R
292. icable The interfacing capacity of the Fallback VCCS is the same as MOPS VCCS VCCS contingency and training VCCS is used for training purpose in normal situation and used in contingency mode when the MOPS VCCS and Fallback VCCS are not applicable TUNGMAHAMEK SITE NAS Radio and CON TRA VCCS PHITSANULOK SITE PSL APC PSL APP SYSTEM PHUKET SITE PUT APC SUVARNABHUMI AIRPORT SITE BAPP APC PUT APP SYSTEM BAPP SYSTEM Radio and Telephone Radioand CONTRA vecs Telephone Lines Radioand CONTRA vecs Telephone Lines CHIANGMAI SITE HATYAI SITE HUAHIN SITE CMA APC HTY APC HHN APC CMA APP SYSTEM Radio and Telephone Fallback HTY APP SYSTEM Radio and Telephone HHN APP SYSTEM Radio and Telephone Fallback 5 Figure 11 VCCS composition at each site Part 2 2 1 Scope of Technical Specifications Page 95 Date Project Name December 14 2012 Thailand Modernization CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope of Volume II Terms of Reference Technical Specifications doc 1 0 The radio and telephone lines at each site are connected to all VCCS Main Fallback and CON TRA There is
293. ical Information Management AIMS Airport Information Management System AMAN Arrival Manager AMHS Aeronautical Message Handling System AO Airport Operator Aol area of interest AOM Airspace Organization and Management function Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Document Reference File Reference Volume II Technical Terms Volume II Part 2 1 Scope of of Reference Technical Specifications doc Date December 14 2012 Version 1 0 Abbreviation FullName AoR Area s of responsibility AOs Airport Operators APM Approach Path Monitoring APP Approach Control APP IBS APP Independent Backup System APPS Approach Control Systems BAPP CMA HTY PUT PSL HHN APW Area Proximity Warning ARO Aeronautical Reporting Office ASD Air Situation Display ASM Airspace Manager A SMGCS Advance Surface Movement Guidance and Control Systems ATA Actual Time of Arrival ATC Air Traffic Controller ATD Actual Time of Departure ATFM Air Traffic Flow Management Air Traffic Flow Management Unit ATM Air Traffic Management ATN Aeronautical Telecommunication Network ATS Air Traffic Services AUP Airspace Use Plans BACC Bangkok Area Control Centre BADA EUROCONTROL of Aircraft Data BAO Bay Allocation Operator BAPC Bangkok Approac
294. ication 05 Tenderer shall propose and detail the free text capability to exchange information CPDLO6 Tenderer shall propose and detail the auxiliary capability in order to forward CPDLC message to another ground system 8 14 Air Situation Recording and Replay RECOI The Tenderer shall provide product description of the proposed system detailing recording and replay functionalities capabilities and benefits 2 The Tenderer shall propose and detail the graphical user interfaces for recording and replay functions The Tenderer shall propose and detail all data that are recorded by recording function with the purpose of recalled for replay and or offline analysis 4 The Tenderer shall propose and detail types of record disk that used by record servers with the purpose of preventing loss of data during the recording replaying Part 2 2 1 Scope of Technical Specifications Page 240 D D E E D E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 RECOS5 RECO6 RECOT RECOS RECO9 RECI0 RECII RECI2 RECI3 REC14 RECIS5 Specifications doc and archiving media processes The Tenderer shall propose and detail the methodology to manage and report status
295. ide detail design of the system that will be continuously operated to meet the RAM values The Tenderer shall provide the duration for each running step of the operating and application software installed in all servers and workstations from cold i e switched off warm restart to full system capabilities are available The Tenderer shall propose and detail the RAM monitoring for each system The Tenderer shall provide the MTTR of each type of proposed equipment units The Tenderer shall propose and detail the availability of the proposed system Part 2 2 1 Scope of Technical Specifications Page 261 D D E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 6 SPFCOI SPFCO02 SPFCO3 SPFC04 5 5 SPFC06 SPFCOT SPFCOS Specifications doc Performance and Capacity The Tenderer shall identify the System Performance and Capacity of the proposed system including at least the following items e Maximum System Coverage Area Maximum Height e Maximum number of Received plots per scan per radar e Maximum number of Concurrent System Tracks e Maximum number of Concurrent System Flight Plans in all states e Display Range e Maximum Number of tracks displayable in Situation Display and e Maximu
296. ier to deliver traffic efficiently into the structured arrival route system at the optimal place and time which will enable all of the above to happen with minimum tactical intervention Therefore the preparation of the arriving traffic sequence is expected to be completed by around 20 minutes prior to touchdown and should start only as early as necessary to achieve the stated Departure Manager The Departure Manager DMAN is to help aerodrome control to build an optimized Departure sequence issue in accordance with departure demand and departure capacity DMAN is a planning function to improve departure flows at one or more airports by calculating the Estimate Take Off Time ETOT and Target Start Up Approval Time TSAT for each flight taking multiple constraints and preferences into account Part 2 2 1 Scope of Technical Specifications Page 135 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 13 Specifications doc The DMAN should adjust the plan in the background taking account of actual events Those adjustments are displayed to relevant tower workstation to support the tactical handling of departures and may result in exceptional TSAT changes DMAN will function also on runways used for arrivals and departures in mixed mode operations DMAN will plan initially around
297. ile Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc c Hot plug redundant power supply units and d Hot plug channel cards Each network router will be equipped with at least the following high availability features and devices a gt 100 000 hours b Modular chassis designed for plug in channel cards c Hot plug redundant power supply units and d Hot plug channel cards The network switch router will be able to enable IEEE 802 3ad link aggregation and port trunking for high availability connection to devices across multiple switches routers The network switch router will provide IEEE 802 1X Virtual LAN VLAN based and port based security features including firewalls and Quality of Service QoS features 10 7 5 Time Reference System The Time Reference System will be used to keep time synchronization in the MOPS CON TRA and IBS which will establish a common time source for all systems In addition outputs will exist to synchronize external systems with the common time source such as the DVR and slave clock display on each console The Time Reference System will be synchronized to GPS signals received by the antenna and it will be distributed to all net nodes by NTP through a network Ethernet instead of a serial interface And For this purpose a duplicated GPS receiver with antenna will be provided and installed The system will have the capab
298. ility to synchronize all systems to a common time source with a maximum deviation of 100 milliseconds System Mean Time Between Failures will be at least three 3 years Part 2 2 1 Scope of Technical Specifications Page 178 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc 10 8 Uninterrupted Power Supply The Uninterrupted Power Supply UPS system provides a continuous supply of electric power to systems when the power supplies at the facility are not available or stable The UPS System should also provide high quality AC power for sensitive electronic equipment loads 10 8 1 10 8 1 1 UPS facilities at each site For TMCS the UPS facilities information is provided for Tenderer for consideration Some UPS systems have already been implemented by AEROTHAI therefore the Tenderer may use those UPS systems for their implementation The Tenderer is responsible for consideration whether or not the current implemented UPS is suitable for their system based on the amount of power consumption required If the current implemented UPS is not suitable the Tenderer will be responsible to provide the UPS for the respective systems However the rest of UPS systems will be fully under the responsibility of the Tenderer The locations of those UPS systems are
299. ill be responsible for the following tasks within ICAO Class G airspace Monitor and performing all R T communication on frequencies allocated to Flight Information Service sectors Provide Flight Information Services to aircraft by providing pilots on request with any relevant aeronautical information such as o runways in use and serviceability of landing and navigational aids o weather both actual and forecasts o frequencies to use when contacting relevant ATC agencies information o un serviceability or unreliability of ground facilities o an aircraft s proximity to airspace which it is not authorized to enter ie controlled airspace danger areas restricted areas prohibited areas TS A s Receive air filed flight plans from aircraft requesting any form of ATC service in Bangkok Area of Responsibility and relaying the FPLs to the Flight Data Operator FDO for further promulgation and Part 2 2 1 Scope of Technical Specifications Page 45 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Provide information service to participating VFR aircraft within the area of responsibility h Technical Supervisor The Technical Supervisor TECHSUP is responsible for the following Maintain of the MOPS and CO
300. ime Example Implementation Plan Line Review Part 1 Scope of Project Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms of Reference Vol II Part 1_Final 1 0 Appendix 2 TEAM PROFILE Details shall be detailed per person Items Descriptions Note Name Current Designation Job Title Current job responsibilities Proposed Role in the Project Proposed Responsibilities in the Project Academic Qualifications e Degree Year of graduation e Specialization if any Professional Certifications if any Number of years with the current company Summary of the Professional Domain Experience Number of complete project implementations carried out Past assignment details For each assignment provide details regarding name of organizations worked for designation responsibilities Last project experience provide only relevant projects e Project name Client Key project features in brief e Location of the project e Designation e Role Part 1 Scope of Project Page 10 Project Name Thailand Modernization CNS ATM System TMCS Document Reference File Reference Volume II Technical Terms of Reference Vol II Part 1_Final Date December 14 2012 Version 1 0 Responsibilities and activities Project S
301. imited to as follows e Label color and label background color e Character size e layout e Label connection Label movement Displaying Customization The GSD should provide map creation modify tool to create and modify geographical map presentation The GSD should allow customization but not limited to as follows e Graphical symbols e Tracks trajectory e Label information Angle of scenario Part 2 2 1 Scope of Technical Specifications Page 164 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 27 3 Specifications doc Flight Data Display The Flight Data Display FDD should retrieve data from TFDP server and display the information on the display The FDD is a Tower Electronic Flight Strip TEFS used in an airport environment including aprons taxiways runways and airspace TMA The FDD should be touch sensitive LCD monitor for TEFS with stylus pen as the input device The FDDs should provide the following features but not limited to as follows e Display and process of flight plan data and vehicles data e Display of Notification Display of Auxiliary data e Display and process of the DMAN function e Display and process of runway in use FDD degraded mode e Grouping Regrouping of roles Display and process flight
302. in TX or RX modes are active and when the call is being received at the same time air ground audio will automatically be routed to loudspeaker It will be possible to configure whether only outgoing transmission will be transmitted to the active call in addition to frequencies in TX mode when PTT is pressed For safety reason audio level of loudspeaker will be adjustable by the volume control and with the volume control in a minimum position the audio level will remain sufficiently audible for monitoring purpose Part 2 2 1 Scope of Technical Specifications Page 99 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc LA Volume II Terms of Reference Because there are many radio frequencies and radio stations in a controlled sector the operators can access more than one normally at least 8 radio lines simultaneously for transmission and reception by way of loudspeaker or headset handset or both Receiver Voting function Best Signal Selection which is evaluated by signal to noise ratio will be used to automatically select a receiver with the best quality of signal within a group of minimum of 6 receivers While the Receiver Voting function is in operation the operators can manually select a receiver of their choice Automatic selection of transmitter function will be workable together with Receiver V
303. ine recording of all data such as surveillance data flight plan data weather information safety nets monitoring aids AMAN DMAN system events ATC interactions operator logons interface messages both received and sent maps all system alerts and other data This data will be rapidly recalled for replay and or offline analysis purposes without interfering with ongoing recording and all recorded data is time stamped with UTC time to the granularity required such that events are re generated correctly during a replay Each record server will use fault tolerant RAID disks level 1 or 5 to prevent data loss If one of record disk fails a disk failure status will be alert CMWS and recording will continue without impacts If one of record server fails there will be no impact on the other record server which simultaneously records the same data The RAID disks size will have the capacity to store data at minimum for the proposed data retention period of sixty 60 days The data retention period will be configurable as desired At the end of the data retention period the oldest data will be automatically overwritten by the new data being received The overwritten data will still be available on archive media until such time that the archive media is reused Part 2 2 1 Scope of Technical Specifications Page 137 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference V
304. ined off line for each surveillance sensor The plots tracked plots falling inside the blanking areas should not be used for tracking purpose 9 1 10 Surveillance processing area The surveillance processing area will be defined off line and the SDP should not process targets outside the defined surveillance processing areas 9 1 11 Barometric Altitude Correction The barometric pressure or QNH will be used to correct the altitude of all aircraft below the transition level The QNH value should be defined by one of the following methods as a minimum a Automatic extracted from METAR messages received via the AMHS b Manually input by OPSUP Part 2 2 1 Scope of Technical Specifications Page 113 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 1 12 9 1 13 9 1 14 9 1 15 Specifications doc The SDP will be designed to correct the altitude of the system track using the flight level replies and the QNH value according to the QNH area inside which the system track is located The QNH areas include the value of Transition Altitude TA and Transition Level TL should be system parameters off line defined Altitude Tracking The purpose of Altitude Tracking is to accurately follow the real flight profile when an aircraft changes its flight level It will update related sy
305. ion Bangkok Approach Control BAPP BAPP provides approach control service within Bangkok control zone and Bangkok Terminal Control Area TMA The BAPP operators coordinate with four 4 groups of operators BACC BAPC SBA Local Tower DMA Remote Tower and pilots Suvarnabhumi Airport SBA Local Tower SBA local tower is under responsibility of BAPP operation SBA local tower operators coordinate with three 3 groups of operators BAPP Airport Operator AO and pilots Don Muang Airport DMA Remote Tower DMA remote tower is under responsibility of BAPP operation DMA remote tower operators coordinate with three 3 groups of operators BAPP AO and pilots Airport Operator AO For DMA the airport operator will coordinate with DMA RTS AO usually sends essential information such as Flight Formality Check and Bay Allocation to DMA RTS Bangkok Area Control Centre BACC BACC operation is responsible for the provision of en route air traffic control and flight information services throughout the BKK FIR BACC operators coordinate and exchanges information with various operators such as AMHS FDMC APCs Adjacent ACCs etc Bangkok Approach Control Centre BAPC The BAPC provides approach control services within terminal control areas TMA and control zones of the 19 airports BAPC operators coordinate with three 3 groups of operators BACC associated remote towers under BAPC responsibility and pilots P
306. ion will be able to support one 2K x 2K LCD monitors which act as the Main display and two portrait orientation 16 10 aspect ratio 24 inch LCD monitors which act as the extended display if available The displays should be mounted onto the arm using the display screen mounting brackets The horizontal sub arm and brackets will be connected by slide tracks or hinges to freely adjust the inclination and swivel of display for easy viewing in the horizontal or vertical mode In addition the height of the displays should be adjustable using motorized mechanics The height of the working surface should also be adjustable using motorized mechanics The console will be equipped the main and fallback Touch Entry Device TED display include speaker footswitch slave clock display and appropriate number of communication socket The console design will minimize reflections from daylight or any other type of light source onto the screens To allow for the rapid replacement of the mouse keyboard the cable connection point s of the mouse keyboard to the CWS should be easily accessible to the user without the need for technical staff intervention The cup holder and A4 document holder module should be provided to prevent accidental liquid spilling and for easy access to the document Service lights will be provided inside all equipment cabinets and equipment cabinet bay the service lights will be controlled individually by manual switch Equ
307. ipment cabinets will be provided to house the equipment and mounted in the rear to allow cooling noise buffering and easy access to equipments if installation maintenance is needed without disruptions to ATC The consoles will have provision of airflow opening for cooling and heat dissipation effect The airflow opening will be filtered with filter to avoid accidental entry of foreign object and to prevent dust accumulation Overhead or desktop work lighting will be equipped to illumination of the desktop working surface with white light LED reading lamps and fully dimmable light fixtures when desired Each console will be equipped with three 3 power distribution units within the console each unit can be switched on off and provide safe supply to all the Part 2 2 1 Scope of Technical Specifications Page 173 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc consuming equipment individually One unit will be used for Workstation one unit will be used for VCCS TED panel and the other unit will be used for general purpose such as lighting etc Seats sufficiently maneuverable adjustable and durable will be provided for manning all of working positions 10 5 Reliability Availability and Maintainability RAM Reliability Availability and Maintainability ar
308. ization CNS ATM December 14 2012 System TMCS Document Reference Volume II Terms of Reference File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc LA a The BACC BAPC NAS can accommodate the concurrent operation of additional 30 End Systems as listed below APP be accommodated with optional 8 CWS AMAN ACC can be accommodated with optional 3 CWS AMAN APP can be accommodated with optional 2 CWS FISL can be accommodated with optional 4 CWS TECHSUP can be accommodated with additional 1 CMWS ASM can be accommodated with optional 1 CWS TACTSUP can be accommodated with optional 1 CWS FDO can be accommodated with optional 2 FDWS FMM can be accommodated with optional 1 CWS FMC can be accommodated with optional 3 CWS DSO can be accommodated with optional 1 DSWS EO can be accommodated with optional 1 DAWS MTN can be accommodated with optional 1 CMWS and optional 1 NMWS b BACC BAPC NAS will be provided with the appropriate software for the previously mentioned additional 30 End Systems Only hardware and suitable operating system will be needed in order to expand the BACC BAPC NAS for optional End Systems c The BACC BAPC NAS will be provided with appropriate network infrastructure including network equipment cable and wiring and installation for the previously mentioned additional 30 End Systems Only hardware will be needed in order to
309. ization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Vol II Part 1_Final 1 0 PRS 011 Tenderer shall propose and detail Quality Management plan including the list D of all deliverables that will be submitted at the end of each activity PRS 012 Tenderer shall propose and detail Installation plan and process including the D list of all deliverables that will be submitted at the end of each activity PRS 013 Tenderer shall propose and detail Training plan including the list of D deliverables that will be submitted at the end of each activity PRS 014 Tenderer shall propose and detail System testing plan and process including D list of all deliverables after the end of each activity PRS 015 The Tenderer shall propose and detail project expert team and submit their D response in mandatory information tables in Appendix 2 of this PART Part 1 Scope of Project Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference Date December 14 2012 SECTION C Appendices File Reference Version Vol Part 1 Final 1 0 Appendix 1 PROJECT PLAN Details shall be detailed per phase Expected time frame for this project is days Phase of project Deliverable Example Kick off Report Work Implementation Plan and T
310. ket APP Control Center SURVEY BY SUDSAKORN 5 AND PIPAT P DATE 21 03 01 Attachment 6 1 4 The location of PUT APC Buildings and Administrative Building at Phuket Site 00 Operation Room PUT101 00 Local Tower Control Room PUT901 SUPER 9 floor PUT APC Building Floor Plan 1 floor PUT APC Building Floor Plan Attachment 6 1 4a The location of the Operation Room Equipment Room and Local Tower Control Room of PUT APP MOPS and PUT LTS j il 2 rie 2 E A N Lo x Equipment Room Pilot Room CON TRA Room PAD203 PAD202 PAD201 4 00 d d 7 z Tooo ry E 22272727212221212221222227 a A a a ee 2 floor PUT Administrative Building Floor Plan Attachment 6 1 4b The location of the CON TRA Room Pilot Room and Equipment Room of PUT APP CON TRA 08 505 TE UPS Room 1 1 floor PUT Administrative Building Floor Plan Attachment 6 1 4c The location of the UPS Room of PUT APP CON TRA PSL APC Building Administraive Building Attachment 6 1 5 The location of PSL APC Building and Administraive Building at Phitsanulok Site PSL Local Tower Control Room PSL601 Equipment Room PSL202 00 5 m
311. kstation facility will have the capability to monitor all radio traffic on lines that are available at the VCCS workstation facility even if they have been selected at other VCCS workstation facilities Telephone Part The VCCS use telephone line interface module TLIM to interface with telephone lines The TLIM support a full range of digital and analogue interfaces for local regional national and international access to communications resources such as 2 Wire Telephone Set 2 Wire Voice Call and 2 Wire Public Switched Telephone Part 2 2 1 Scope of Technical Specifications Page 98 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference Volume II Part 2 1 Scope of Technical Specifications doc LA 8 4 8 5 Network PSTN Private Automatic Branch Exchange PABX VoIP The amplifiers of TLIMs are adjustable both in transmitting and receiving directions And for safety reason not more than 2 telephone lines are connected to one TLIM Technical Control Unit TCU The Technical Control Unit TCU is used for monitoring and configuration of the VCCS central racks Generally the TCU is composed of a personal computer equipped with a display a keyboard a mouse a loading device a color laser printer and software There 2 two set of TCUs is installed at equipment room and another one is installed at c
312. l systems information exchange including all necessary standards documents and ICDs 4 Operator Roles and Workstations Submittal ORWOOI The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for EC Operator Part 2 2 1 Scope of Technical Specifications Page 202 E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Role ORWOO2 The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for PC Operator Role ORWOO 3 The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for AMAN Operator Role ORWOO4 The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for TACTSUP Operator Role ORWOOS5 The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for CMAC Operator Role ORWO06 The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for OPSUP Operator Role ORWOO7 The Tenderer shall propose and detail the software characteristics functions capabilities of works
313. l Radio RX M S Local Radio TX M S Communication link and voice multiplexers supply by Tenderer Communication Links Room Simplified 1 for 3 Lines Comm Network Local Radio Figure 15 Simplified Configuration of Local and Remote Radio Stations for APP System 8 6 A remote station uses three 3 communication media digital Data Network DDN satellite and frame relay which have the different time delay There is only one RX and TX buttons set for each remote radio station on the TED panel the VCCS use one of three communication media at a time by automatic manual media selection function After the VCCS choose one of three communication media from each remote radio station the receiver voting function will be use to select only one of three remote radio station to the user Telephone Function There are two types of telephone calls that can be made by telephone buttons Direct Access DA and Indirect Access IA Function buttons such as hold conference and transfer etc are separated from the telephone buttons The status of telephone lines i e busy state call in etc are shown on the TED panel and after establishing a DA and IA connection and prior to the acceptance of the call by the called terminal a ring back tone is sent to the calling user Part 2 2 1 Scope of Technical Specifications Page 102 Project Name Date Th
314. l Room TWROT7 Attachment 6 1 7c Equipment Redundant Data processing ATC Support Building 5 Floor Equipment Room 521 Attachment 6 1 7b UPS for BAPP MOPS UPS 1 ATC Support Building 2 Floor UPS 1 Room 210 Attachment 6 1 7e UPS UPS for SBA LTS UPS 2 SBA Tower Building 1 Floor UPS 2 Room TWRIOI Attachment 6 1 7e UPS for BAPP CON TRA UPS 43 Emergency Building 1 Floor UPS 3 Room EMGIOI Attachment 6 1 7e Table 26 Summary of BAPP Site Information Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference cere at 1 0 Technical Specifications doc Remote Tower There are thirty 30 remote towers under responsibility of AEROTHAI located at airports throughout BKK FIR and four 4 Military towers associated with TMCS AEROTHAI may provide floor plan for each remote tower upon request However site survey of each remote tower may be conducted by Tenderer a List of Remote Tower WC Ov UR Don Muang Tower Udon Thani Tower Samui Tower Nakhon Si Thamarat Tower Khon Kaen Tower Chiang Rai Tower Ubon Ratchathani Tower Krabi Tower Surat Thani Tower Sakon Nakhon Tower Nakhon Phanom Tower Nakhon Ratchasima Tower Petchaboon Tower Nan Tower Phare Tower Loei Tower Buriram Tower Roi Et Tower Surin Tower Chumporn Tower Trat Tower Mae Hong S
315. l Voice Recorder amp Replay System EC Executive Controller EO Evaluation Operator EOBT Estimated Off Block Time EPT Estimated Parking Time ETA Estimated Time of Arrival ETOT Estimate Take Off Time FAO Flight Announcement Operator FDD Flight Data Display FDDWS Flight Data Display Workstation FDMC Flight Data Management Center FDO Flight Data Operator FDP Flight Data Processing FDWS Flight Data Workstation Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Abbreviation FullName FIS Flight Information Service FISL Flight Information Specialist FMC Bangkok Air Traffic Flow Management Unit Planner Coordinator FMM Bangkok Air Traffic Flow Management Unit Manager FPL Flight Plan FSDP Fallback Surveillance Data Processing F SDPS Fallback Surveillance Data Processing System FTI Free Text Insert FUA Flexible Use of Airspace GDF Guidance Feature GND Ground Controller GSD Ground Situation Display HFDS Human Factor Design Standard HHN Hua Hin Airport HHN APC Hua Hin Approach Control Centre HMI Human Machine Interface HTY Hat Yai Airport HTY APC Hat yai App
316. l be developed in accordance with the following requirements a The content will cover the full TMCS functions features capabilities and usage including at least System architecture The Level of Contingency and backup Intersystem Connection Operator Roles and Workstations VCCS System Functionalities HMI including at least Maps Track and Label presentation Window management Support tools Surveillance menu and picture Part 2 2 1 Scope of Technical Specifications Page 152 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Flight plan management System Monitoring System message management b In addition a number of learning units in relation to the background and or technical aspects of CNS ATM technologies will be applied to the CBT such as o CPDLC o AIDC o ADS B o 5 o MLAT WAM ADS C c The content will be organized into learning packages according to the training needs of different TMCS s roles of learners d Each learning package will comprise a number of learning units considered necessary for each TMCS s roles of learners Assessment questions will be given at the end of each unit e Each learning package will be organized structurally accordi
317. l check the continuity of route and part of the trajectory calculation The FDP will support the re enter flights as long as the route remains within the route infrastructure database The FDP will also checks aircraft equipage for compatibility with the route to be flown Trajectory Prediction The Trajectory Prediction TP is a fundamental requirement of the FDP in its role of monitoring and controlling flights TP calculations for each individual flight form the basis of timely flight plan data presentation to controllers This processing should be made at the time of the first FPL creation and after subsequent modifications due to an automatic event s e g position reports from SDP or manual input of certain data route and or performance modification The TP calculates all points at which the flight will enter into exit from sectors in order to determine a sector pattern These points referred to as a 4D trajectory are described in terms of latitude longitude altitude time and sometimes even type i e start of turn end of turn bottom of climb top of climb top of descent bottom of descent The 4D trajectory projected from the aircraft s current position on the planned route creates a sector pattern This data can be used by functions such as monitoring aids and MTCD to generate tubes representing the flight path with a Part 2 2 1 Scope of Technical Specifications Page 118 Project Name Date Thailand Modernization Dece
318. l propose and detail the functions which support minimum as following e sequencing in the multi airport multi runway configuration e maximum number of aircraft at each holding locations e manual adjustment of the flow rate e manual change of the runway in use closure e insert a flight with aircraft identification into the sequence e removal reserved arrival slots in the event of changing aerodrome Part 2 2 1 Scope of Technical Specifications Page 238 D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc conditions 07 Tenderer shall propose and detail the HMI functions which support minimum D as following e display sequence number of AMAN in full data block track label e graphical time line views of relevant calculated sequences and schedules of arrival flight e displays within the flight list flight data block and flight data list components e landing departure sequence displays for all runways AMAN report in various standard format such as Excel XML format 8 12 Departure Manager DMANOI The Tenderer shall provide product description of the proposed system detailing D departure manager functionalities capabilities and benefits DMANO2 Tenderer shall propose and detail the methodology and paramete
319. ld be configurable Each TEFS should be selectable to display at least three 3 formats as follows e Abbreviated strip format e Normal strip format e Expanded strip format The FDD should provide a set of control buttons and change state buttons to change state of flight for the selected FPL The FDD should support handwriting on tactical screens with stylus it should possible to maintain and transfer handwritten symbols or text between different operators The Free Text Insert should be named using free text The operator should be able to create modify and delete FTI The FTI should be able to place and move manually inside the workspace The notification display The FDD should provide a notification bay to present different type of messages at a minimum as follows e Message notes exchanged between different roles e Error messages e Warning messages Part 2 2 1 Scope of Technical Specifications Page 166 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc e Fte When a new notification is created it should be sorted into a list of pending messages according to the message category and the time Some of the messages will attract the attention of the operator with an aural signal depend on configuration The system should allow the ope
320. ler will provide factory maintenance training at Seller s factory for up to eighteen 18 surveillance engineer staffs and fourteen 14 VCCS engineer staffs who have basic software knowledge and will be involved in the factory acceptance installation acceptance training and subsequent maintenance of the System The training will include courses that will enable the engineer staff to gain an appreciation of the overall systems equipment used and its operation as follows a Basic level training for surveillance engineer staffs will include at least the following e TMCS system overview and system architecture e TMCS system network e Intersystem connection and external interface e Air Ground Ground Ground data link communication such as DCL CPDLC etc e Degrade mode of operation Part3 SUPPORT AND AFTER SALE SERVICE Page 10 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference File Reference Version Volume Part 3 Support and After Sale 1 0 Service_Final doc The level of contingency and backup The TMCS s hardware devices Software components of the TMCS Map TMCS functions to system hardware TMCS functionality State of flight and or flight plan life cycle Operator Roles All operator HMI System monitoring for verification of serviceability and system control as required for system mai
321. lerance The Tenderer shall provide product description of the proposed system detailing RADAR bias estimation functionalities capabilities and benefits The Tenderer shall propose and detail type of RADAR bias estimation provided to SDP The Tenderer shall propose and detail the methodology and parameters used to define the RADAR bias estimation The Tenderer shall provide product description of the proposed system detailing Track overload protection functionalities capabilities and benefits The Tenderer shall propose and detail the methodology to notify when the number of system tracks reaches the maximum SDP capacity The Tenderer shall provide product description of the proposed system detailing track cancelation functionalities capabilities and benefits The Tenderer shall provide product description of the proposed system detailing automatic position report functionalities capabilities and benefits The Tenderer shall propose and detail the methodology to distribute the local track Multi RADAR track ADS B track MLAT WAM track and system track and specific data to system of both MSDP and FSDP The Tenderer shall propose and detail the methodology to distribute the system track coupled with associated flight plan to external system Part 2 2 1 Scope of Technical Specifications Page 227 D D D D D D D D D D D Project Name Date Thailand
322. lies a racetrack pattern comprising two 180 degree turns lasting one minute interspersed with straight legs at a given heading each also of one minute duration The most common use of holding is in the form of a holding stack for regulating aircraft waiting to land at a congested airport or where the landings are interrupted e g due to a blocked runway or bad weather Aircraft normally join the stack at the top and are progressively descended when levels below become available The aircraft at the bottom of the stack is normally the first to leave to commence its approach to land As aircraft normally have a higher ground speed at higher levels the airspace required to protect the holding stack gets progressively larger at increasing levels The aircraft to airspace encounters feature will detects flights whose planned trajectory traverse active levels of a holding stack Part 2 2 1 Scope of Technical Specifications Page 132 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 6 9 7 Specifications doc Airspace Organization and Management Airspace Organization and Management function AOM will establish airspace structures in order to accommodate the different types of air activity volume of traffic and differing levels of service Airspace management is the process by w
323. ll systems at Samui Airport Site The Tenderer shall propose and detail the wiring diagram from UPS to equipments at Samui Airport Site The Tenderer shall propose the list of supplies of UPS equipments and related components for Samui Airport Site The Tenderer shall provide product description Technical Characteristics of UPS systems Static Transfer Switch and other related components at Samui Airport Site The Tenderer shall propose and detail the UPS configuration best suited for all systems at Udon Thani Airport Site The Tenderer shall propose and detail the wiring diagram from UPS to equipments at Udon Thani Airport Site The Tenderer shall propose the list of supplies of UPS equipments and related components for Udon Thani Airport Site The Tenderer shall provide product description Technical Characteristics of UPS systems Static Transfer Switch and other related components at Udon Thani Airport Site The Tenderer shall propose and detail the UPS configuration best suited for all systems at Nakhon Si Thamarat Airport Site The Tenderer shall propose and detail the wiring diagram from UPS to equipments at Nakhon Si Thamarat Airport Site The Tenderer shall propose the list of supplies of UPS equipments and related components for Nakhon Si Thamarat Airport Site The Tenderer shall provide product description Technical Characteristics of UPS Part 2 2 1 Scope of Technical Specifications Page 266 E E
324. ll be synchronized with the Installation plan of CON TRA and Main Operation System MOP The training will be completed prior to the Project Completion date at least sixty 60 days The Acceptance process of TMCS will include at minimum Factory Acceptance Test FAT Training Function Test TFT Infrastructure Test IFT Functional Test FUT Integration Test and System Continuity Test SCT which are specified in Clause 19 INSPECTIONS AND ACCEPTANCE OF GOODS of Tender Document Volume I Part II Section C Condition of Contract FUT is used for testing all of the equipment and functions of TMCS for each site after system installation at each site is completed After system installation process and FUT at all sites are completed and satisfactory ITT will be performed to verify the harmonization and integration of all systems in TMCS SCT is the process to ensure the reliability availability and maintainability of TMCS The SCT duration is at minimum 90 days and will be conducted after the ITT is completed and satisfactory 4 Implementation Plan A draft comprehensive TMCS Project implementation and deployment plan from kick off meeting until the final acceptance of the TMCS will be detailed but not limited to as follows a b Outline of work at each site System Configuration schedule the number of proposed system design workshops schedule and agendas for each workshop Part 1 Scope of Project Project N
325. llback and CON TRA VCCS at BACC BAPC will be at minimum 100 channels for each VCCS e The capacity of the VoIP RLIM for MOPS Fallback and CON TRA VCCS at BACC BAPC will be at minimum 100 channels for each VCCS e Each position equips with Headset and handset and the existing headsets and handsets are modified to use with the proposed system are specified in the VCCS Appendix 3 4 Part 2 2 1 Scope of Technical Specifications Page 105 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference Volume II Part 2 1 Scope of Technical Specifications doc LA 8 14 8 14 1 e Each site supply with initial spare parts generally at least 10 of cards modules of the system which itemized lists of initial spare parts including the quantity suggested for each spare part against the total quantity of each system in use e Fach site supply with technical manuals 2 Sets of hard copy and 2 sets of soft copy and the technical manuals for complete installation operation and maintenance instructions Digital Voice Recorder amp Replay System DVR The recording of all operational communications is mandated by ICAO Sufficient additional information is recorded to ensure that date and time can be determined at any point in the recording It has enough capacity to record also position ambient noise as per ICAO recommendation Further
326. m CIFDPS The statistical reports will include the statistics on a daily weekly monthly and yearly period such as total number of aircraft movement in an airspace sector total number of flights handled by the TMCS total number of messages exchanged in the TMCS total number of arrival flight to an airport in controlled airspace etc The analytical data will be used for an in depth inspection such as plotting trajectories from RADAR track ADS B track MLAT WAM track system track for Safety Nets analysis etc Aeronautical Information Management The Aeronautical Information Management function AIM will be designed to provide appropriate aeronautical information to ATC This information comprises of graphical and text based information such as eAIP Aeronautical charts restricted area information danger area information local restriction information all airspace definitions NOTAM Digital NOTAM MET etc The specific software tools will be provided for preparing the aeronautical information In addition some aeronautical information such as NOTAM MET Digital NOTAM etc will be received from AFTN ATN Other System Furthermore AIM will provide facility to ATC to retrieve and display related aeronautical information in related windows on the CWS Time Management The purpose of time management function TM is to synchronize time TM will use functionalities of NTP in order to synchronize time with GPS Time Server in Coo
327. m The planned quantities of positions are described in table format Part 2 2 1 Scope of Technical Specifications Page 89 Project Name Thailand Modernization CNS ATM Date December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference volume ee 2 l pepe of 1 0 Technical Specifications doc DMA RTS Workstation Quantity Location Operator Role ASDWS GSDWS FDDWS T CMS T DSO LCL 1 1 1 GND 2 2 DMA Tower T FDO CDC 2 DMAN 1 T TACTSUP 1 1 1 T MTN 1 1 1 1 Tem TDSO 1 1 1 1 ARO Office ARO 1 BAO AOT 2 AOT Office FAO AOT 1 Total 4 6 13 1 1 Table 50 List of workstation quantities for Level IV DMA RTS DMA Emergency Tower System The planned quantities of positions are described in table format DMA Emergency Tower System Workstation Quantity Location Operator Role ASDWS GSDWS FDDWS DMA LCL 1 1 1 APRON GND 1 1 TOWER T FDO CDC 1 T TACTSUP 1 1 1 Total 2 4 Table 51 List of workstation quantities for Level IV DMA Emergency Tower System 7 10 7 10 1 Additional requirements for workstations Optional workstations The TMCS will be designed to support the following optional End Systems without software modification Part 2 2 1 Scope of Technical Specifications Page 90 Project Name Date Thailand Modern
328. m SMRs Ground popup views and pre selected areas Labels attached to object track Information on selected tracks Arrival and Departure lists Alert information Guidance information Route planning information Maps displaying The GSD should be possible to set the configuration to display multiple view layout The GSD should be provided tools to operators but not limited to as follows Rearrangement of the screen screen zooming Set reset the screen center A set with predefined screen layouts including range Center and Orientation Scenario rotation in steps of 1 degree Switching any map overlays Bearing Distance line Part 2 2 1 Scope of Technical Specifications Page 163 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Target Presentation The Target presentation is synthetic information and or digitized radar video Tracks should be classified as Arrival Departure and Vehicle tracks colors should be different depend on the track classification Label Presentation The track label should contain of basic flight data following ICAO Doc4444 The data containing should be different depend on track classification The label presentation should be allow to configurable but not l
329. m number of Display Graphic Maps The Tenderer shall identify the Maximum response time on commands to execution completed at CWS and T CWS The Tenderer shall identify the Maximum response time on commands to execution completed involve flight plan handling e g route modification at CWS and T CWS The Tenderer shall identify the maximum time required for complete system start up from cold i e switched off to full system capabilities are available The Tenderer shall identify the maximum time required for automatic switchover of a failed component of the radar processing chain radar interfaces equipments and tracking processors The Tenderer shall identify the maximum time required in case of automatic switchover of any other failed component to its standby The Tenderer shall identify the maximum time required to configure a workstation already powered up and allocated to operational mission for operation at a sector The Tenderer shall identify the maximum time required for complete start up of a CWS from a powered off state to complete operation at a sector Part 2 2 1 Scope of Technical Specifications Page 262 E E E E E D E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 7 DESPOI DESP02 DESPO03 DESP04
330. mber 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 2 5 Specifications doc series of windows at each point along the trajectory that confirms if an aircraft is following the agreed trajectory or will conflict with another aircraft At the very least the following parameters should be used when calculating the trajectories e Aircraft categories e Aircraft category characteristics EUROCONTROL BAse of Aircraft DAta BADA e Sectors e Sub sectors The TP should also be capable of refining its prediction when new constraints from external systems or controller input become known Such constraints could come from weather data Demand and Capacity Balancing DCB function and Traffic Synchronization TS function or manual input by a controller Weather data such as wind and temperature have an effect on the flight profile since wind data affects ground speed and temperature affects rates of climb The system should be capable of processing incoming weather data and creating met areas that consider wind speeds wind direction and temperature in order to process trajectories in a realistic and dynamic manner Other related function should make use of the same Trajectory Predictions as the FDP for its initial calculations Conceptual Flight State Model In order to clarify the specification of the processing of a System Flight Pl
331. me and arrival time ATA k Flight Announcement Operator The Flight Announcement Operator FAO is responsible for at minimum e Issue flight announcement at the airport 1 Bay Allocation Operator The Bay Allocation Operator BAO is responsible for at minimum e Issue bay allocation for flight m The Aeronautical Reporting Office The Aeronautical Reporting Office ARO is responsible for at minimum e Insert FPL e Generate reports for flight plan related information e Retrieve and view FPL and e Issue DEP and ARR messages for flight n Tower Maintenance Engineer Part 2 2 1 Scope of Technical Specifications Page 57 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Tower Maintenance Engineer coordinates with various units to perform tasks such as TECHSUP OPSUP etc to perform maintenance operations include at minimum e Operate and maintain the tower system e Manage tower system information and e Configure tower system Maintenance Engineer will operate in day night shift 24 7 Part 2 2 1 Scope of Technical Specifications Page 58 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Sco
332. ment The Tenderer shall propose and detail the functions which support three levels of airspace management Strategic Pre tactical and Tactical Flexible Use of Airspace FUA Coordination The Tenderer shall provide product description of the proposed system detailing FUA functionalities capabilities and benefits The Tenderer shall propose and detail the functions which support the classification of any airspace The Tenderer shall propose and detail the functions which support Flexible airspace configuration using traffic flows airspace restrictions runway configuration at airports etc The Tenderer shall propose and detail the functions which support usage of Flexible airspace such as the conditions for transfer of the airspace the periods of availability of the airspace etc The Tenderer shall propose and detail the functions which support on line redefinition and presentation of sectors including opening and closing Demand and Capacity Balancing The Tenderer shall provide product description of the proposed system detailing DCB functionalities capabilities and benefits Part 2 2 1 Scope of Technical Specifications Page 236 D D D D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 DCB02 DCB03 8 9
333. ments and contains specifications requirement of related Activities and supported items for Tenderers to submit their response to the requirements SECTION B SUPPORT AND AFTER SALE SERVICE Service Life The TMCS should be designed to have a service life of at least fifteen 15 years The after sale supports including but not limited to the continued availability of spare parts for direct purchase by AEROTHAI and the supply of new application software if the Seller make an improvement or modification to accommodate the new operating system version and or hardware version will be available through the service life of TMCS Warrantee The warrantee of the TMCS is at least three 3 years on site services warranty for hardware and software The warranty period will be started after the project completion date The Seller will be liable to the logistics and maintenance support during the warranty period Such support consists of repair and or replacement of system equipments and parts Part3 SUPPORT AND AFTER SALE SERVICE Page 5 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume Part 3 Support and After Sale 1 0 Service_Final doc Volume II Technical Terms of Reference 3 Training 3 1 General The Training programs will be conducted to train AEROTHAI s staffs who are TMCS operator system operator maintenance engin
334. more ICAO recommends that thirty 30 days of data at minimum will be recorded The Digital Voice Recorder amp Replay System DVR is digital and comprise of a complete recorder units and replay unit with enhanced functionality in order to increase safety efficiency and save operator time The DVR s time will synchronize with the VCCS GPS master clock using NTP For reliability reasons DVR consist of two independent recorder units with a switchover function The two independent recorder units can also be configured to run in parallel A separate replay unit is included and preferably it is installed in a separate room The recorder unit allows simultaneous recording of all operational voice communications when used operationally All desk mounted loudspeakers microphones headsets and handsets are recorded It is possible to synchronize the with the corresponding Radar recordings to allow simultaneous replay A user friendly replay is included for accurate synchronous replay of radar data along with any other recorded data including audio System capacity has the capability of at least 31 days storage on short term media All data are time stamped when stored The DVR is fitted with an interface allowing for external alarm connections Recorder Units The recorder unit is a duplex analogue audio multi channels recorder which is pre wired for and allows an expansion to increase duplex channels in the future The recording channels c
335. more closely analyzed or speeded up to bypass sections of no interest It can also pause resume at any time While replay is running user can make a screen captures as standard graphic files such as jpeg format It will be possible to export short period replay both video and audio in suitable format for a replay on widely available media player software such as 264 4 AVI format Archive Media Two types of archive media will be used to record and replay data as follows a The Digital Data Storage Tape DDS will be used as archive media for record and replay data and b The DVD disc and or USB flash drive will be used as archive media for export short period replay purpose Part 2 2 1 Scope of Technical Specifications Page 138 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 15 9 16 9 17 Specifications doc Data Analysis The Data Analysis function DAA will provide the facility to collect the recorded data and make them available for statistic analysis DA will be able to generate reports in various formats such as Microsoft excel XML PDF text etc Reports generation will be performed in an automatic manner at a predefined time each day or in a manual manner by user action In addition report data should be suitable for export to an external syste
336. n Building 2 Floor Equipment Room OPS201 Attachment 6 1 1c VCCS New Operation Building 2 Floor Equipment Room OPS201 Attachment 6 1 1c F VCCS New Operation Building 8 Floor Fallback System Room OPS802 Attachment 6 1 1a End System BACC BAPC CON TRA Existing Operation Building 3 Floor CON TRA Room EXO301 Attachment 6 1 1d NAS Pseudo Pilot Existing Operation Building 3 Floor_ Pilot Room 02 Attachment 6 1 1d CON TRA Equipment Data processing Existing Operation Building 1 Floor Equipment Room 104 Attachment 6 1 1 VCCS Existing Operation Building 1 Floor Equipment Room 104 Attachment 6 1 1 NAS IBS amp Equipment APP IBS Redundant Data processing New Operation Building 2 Floor Equipment Room OPS201 Attachment 6 1 1c UPS for NAS MOPS UPS UPS 1 New Operation Building 8 Floor UPS 1 Room 5804 Attachment 6 1 1a UPS 2 New Operation Building 2 Floor UPS 42 Room OPS202 Attachment 6 1 1c Table 20 Summary of Tung Mahamek Site Information Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume Part 2 1 Scope of Technical Specifications doc to Volume II Terms of Reference 6 1 2 Chiang Mai Site The Chiang Mai Approach Control Centre CMA APC Building at Chiang Mai Site has allocated five 5 rooms for TMCS Each room is planned for specific operation
337. n CNS ATM System TMCS The TMCS relates to surveillance system with a role to collate data from surveillance sensors flight data and other flight information sources in order to generate air traffic information for AEROTHAT s operators 2 Project Objective The broad objectives of the TMCS Project are as follows a Improve an efficiency of air traffic automation b Handle the expected air traffic growth in BKK FIR for the next ten years while maintaining a high level of safety c Reduce workload and improving cost effective services d Enhance the flexibility and the versatility of air traffic control operations e Improve ATS efficiency Part 1 Scope of Project Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Vol II Part 1_Final 1 0 3 Project Goal The goals of TMCS Project are as follows a b 4 9 h The TMCS will be available within October 2014 The Contingency Training CON TRA System will be installed prior to the other component and will be available for training within August 2013 For training purpose The Computer Based Training CBT software will be available prior to the start of the training Besides CON TRA System Nationwide Air Traffic Management System NAS will be implemented in the first priority ATC and Technical Training course schedule wi
338. n and track E association disassociation FDP15 The Tenderer shall propose and detail the SSR Code Management E FDP106 The Tenderer shall propose and detail all types of flight clearance that the FDP can E support FDPI7 The Tenderer shall propose and detail the creating and defining the airspace E structure and sectorization in the FDP database FDP18 The Tenderer shall propose and detail the flight plan posting rule and condition E FDP19 The Tenderer shall propose and detail how the FDP define and configure FUA E FDP20 The Tenderer shall propose and detail the flight data distribution E FDP21 The Tenderer shall propose and detail the inter sector coordination E Part 2 2 1 Scope of Technical Specifications Page 229 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 FDP22 FDP23 FDP24 FDP25 8 3 SAFEBOI SAFEO02 5 SAFE04 5 5 SAFE06 SAFEOT 5 8 Specifications doc The Tenderer shall propose and detail the AIDC coordination The Tenderer shall propose and detail the flexible role management The Tenderer shall propose and detail the database organization and management in the FDP The Tenderer shall propose and detail the configuration tool for FDP database management Safety N
339. n of security controls which should be documented in a Statement of Applicability which identifies which particular control objectives and controls from the standard have been selected 10 Project Team One of the important factors that would determine the success of the TMCS Project implementation is the continuous availability of domain experts to the implementation team Tenderer will put together a team of domain experts with a minimum of 5 years of experience in the air traffic management system who will work on this project The Tenderer will provide evidence of Project Team members on participation in previous projects in the same domain and for the same services such evidence must cover at least three previous projects Part 1 Scope of Project Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Vol II Part 1_Final 1 0 Mandatory information tables to be filled by the Tenderer are presented in Appendix 2 of this PART SECTION B Project Schedule Requirements The Tenderer shall propose a Project Schedule which takes the requirements outlined in item 3 10 above into account The Tenderer shall propose and detail the following requirements PRS 001 Tenderer shall propose the implementation plan including the list of all D deliverables that will be provided for each activity PRS 002 Tenderer s
340. ncluding at a minimum Maximum number of Flight that TEG can create Maximum number of Flight plan messages that TEG create Detail of Aeronautical information data that TEG can handle Maximum type of Wind and Weather data that TEG can create Maximum number of Aircraft simulation that TEG can handle Part 2 2 1 Scope of Technical Specifications Page 251 E E E E D E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 TRAO6 TRAOT TRAOS 09 10 11 8 24 CBTOI 2 03 CBT04 Specifications doc e Maximum number and type of Surveillance data that TEG can simulate e Maximum number of CPDLC message that TEG can create e Time management e Maximum types of Report generation and their detail The Tenderer shall propose and detail all the PSP functions and capabilities The Tenderer shall propose maximum number of flights each PSP can assume The Tenderer shall propose and detail the TMC capability including at a minimum session management game management exercise management and CWS grouping The Tenderer shall propose maximum number of exercises that can be run simultaneously by TMC The Tenderer shall propose maximum number of TRN positions that can to run per o
341. ncy Training System This section describes the Contingency Training System CON TRA function which supports the CON TRA concept as described previously in System Architecture The in Contingency mode The CON TRA in Contingency mode CON is a scaled down copy of the MOPS with the same capability but with a reduced set of hardware configuration The CON TRA in CON should enable ATC to perform their duties during a contingency situation The CON TRA in CON will include but not limited to the following e Tasks and functionality as in the MOPS and e Performance and reliability as in the MOPS The CON TRA in CON needs to be connected to the same surrounding world as the MOPS This will make The CON TRA in CON an ideal location to test new software versions and datasets When performing this kind of testing it is important to ensure that information is not inadvertently sent from The CON TRA in CON to any unintended locations The in Training mode The CON TRA in Training mode TRA uses a similar operational segment as the MOPS For training purposes it is therefore required to have the fallback functionality provided together with the MOPS in order to enable students to practice a gradual method of system degradation The training function of CON TRA in TRA is a high fidelity air traffic simulator that is designed to provide realistic ATC training in an environment that accurately replicates that which ATC will
342. nd Floor Equipment Room CMA203 Attachment 6 1 2a UPS UPS 2 CMA APC Building Ist Floor UPS Room CMA101 Attachment 6 1 2b Table 21 Summary of CMA APP Site Information Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume Part 2 1 Scope of Technical Specifications doc Volume II Terms of Reference 6 1 3 Hat Yai Site The facilities at Hat yai Site related to TMCS consist of two 2 building which are The Hat Yai Approach Control Centre HTY APC Building and CON TRA Building Attachment 6 1 3 illustrates the location of the buildings a HTY APC Building There are three 3 rooms allocated for the TMCS in the HTY APC Building b Training Building There are two 2 rooms allocated for the TMCS in the Training Building Each room is planned for specific operation purpose Please be advised that at the present there are others equipments installed in some rooms The site survey and site evaluation are recommended The following table describes the TMCS equipments and their planned installed rooms at Hat Yai Site Part 2 2 1 Scope of Technical Specifications Page 63 System System pac Room Room Floor Name Description Bullding Name Poor Function Number Plan End System HTY APC HTY APC Building 2 Floor Interim Operation Room HTY201 Attachment 6 1 3a
343. nd will allow the ATC create dynamically on the CWS by defined the following data as a minimum e Activation status e Code group e Kind Alert Danger fuel dumping etc e Lead time e Description e Criticality e Volume definition Flight Data Distribution The flight data distribution allows the FDP to distribute flight information to other parts of the system and external systems The FDP will send information of all flights which having a trajectory intersection with the bounding area of interest around the sector airspace For external system the FDP will send flights information using standard protocol and format such as OLDI AIDC ICAO 4444 EUROCONTROL ATS Data Exchange Presentation ADEXP etc where applicable Part 2 2 1 Scope of Technical Specifications Page 122 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 2 14 9 2 15 Specifications doc Inter Sector Coordination The basic principle of sector coordination is that the EC are able to handover and assume flights to from an adjacent sector or FIR Generally during an inter sector handover procedure the following actions should be supported e Initiate Handover e Interrupt Handover Assume flight An important function for inter sector coordination is the ability of the system to monitor when a c
344. ndard message with Edition 15 Amendment 2 NEW FPL Format 2012 AIS message ICAO standard format Input ICAO Standard MET message ICAO standard format Input ICAO Standard DEP message ICAO standard format Doc 4444 Output ICAO Standard with Edition 15 Amendment 2 NEW FPL Format 2012 ARR message ICAO standard format Doc 4444 Output ICAO Standard with Edition 15 Amendment 2 NEW FPL Format 2012 Other ATS messages ICAO standard format Doc 4444 Input Output ICAO Standard with Edition 15 Amendment 2 NEW FPL Format 2012 Terminated FPL data Legacy Format Output Tenderer provided ICD System FPL data Legacy Format Output Tenderer provided ICD System Track data ASTERIX Cat 062 063 065 Output Tenderer provided ICD Other relevant ICAO standard format Input Output ICAO Standard AFTN AMHS messages Table 3 NAS MOPS CIFDPS Information Exchange Description Part 2 2 1 Scope of Technical Specifications Page 20 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 4 2 3 4 2 4 4 2 5 4 2 6 NAS MOPS is capable of using both AFTN and 5 for this CIFDPS connection Also NAS MOPS will use TCP IP as connection protocol NAS MOPS APPSs CMA APP APP PUT APP PSL APP NAS M
345. nding cognizant with developing and delivering conversion training courses to ATC 3 4 Flight Data Operator Train the Trainer Training The Flight Data Operator Train the Trainer Training FDTT will be provided as follows Part3 SUPPORT AND AFTER SALE SERVICE Page 8 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume Part 3 Support Volume II Technical Terms of and After Sale 10 Service_Final doc a FDTT will be provided for up to ten 10 staffs The objectives of this course will e Establish an expert level of theoretical understanding cognizant of writing documentation and practical training programs for operational staff e Establish an expert competency level of FDO operating ability cognizant of training operational FDO s and e Establish an expert level of system understanding cognizant of creating competency criteria for theoretical knowledge and FDO operating competency b The FDTT course content will include at least the following e Overview of system architecture e Concept of the Flight Data Processing e The role of FDO e FDO functions e Overview and description of controller functions e Message queue management e Creation and management of repetitive flight plans completion of this course participants will e have expert competence operating the FDO position and e have a
346. ne exercise The Tenderer shall propose maximum number of PSP positions that can be run per one exercise Computer Based Training Software The Tenderer shall propose and detail the Computer Based Training Software CBT for the learner to understand the functional features capabilities and usage of TMCS The Tenderer shall propose and detail the course contents of CBT and learner group for each course The Tenderer shall propose and detail the training record management feature and performance The Tenderer shall propose and detail the security management features of CBT Part 2 2 1 Scope of Technical Specifications Page 252 E E E E E E D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 05 06 CBT07 08 CBT09 8 25 TSDPOI TSDP02 TSDPO3 TSDP04 TSDPOS TSDP06 TSDPO07 Specifications doc The Tenderer shall propose and detail the procedure or solution to organize the training course for example classroom solution and or self learning solution online offline The Tenderer shall propose and detail the training assessment features of the CBT The Tenderer shall propose and detail the web based of CBT The Tenderer shall propose the maximum number of simul
347. ned airspace or ATC organizational changes Should work pro actively in suggesting ways for ATC to be able to increase the capacity Should propose capacity modifications to the management of Bangkok ACC if necessary Part 2 2 1 Scope of Technical Specifications Page 47 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference Volume II Technical Terms of Reference File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc Is the focal point in regard of ATFM activity for all Thailand and takes the lead in advising educating and assisting other ATS Units and Aircraft Operators in Thailand Should together with Bangkok ATFMU Planners Coordinators develop the ATFM work and the tools necessary for the best performance of Bangkok ACC and airports within area of responsibility Bangkok ATFMU Planner Coordinator Bangkok ATFMU Planner Coordinator FMC is responsible for fulfilling the following specific tasks Working in close cooperation with the Supervisors of Bangkok ACC as well as the Supervisors of Bangkok Approach and Towers Are responsible for monitoring the balance between traffic demand and agreed capacity and take necessary ATFM measures when demand is expected to exceed the sector capacity in Bangkok ACC Should analyze collect and distribute all relevant information such as meteorological conditions delays interrupti
348. nel Record adio Channel Record adio Channel Record adio Channel Record adio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Radio Channel Record Spare F3 Main Radio Channel Record Spare F3 Stby Radio Channel Record Spare F4 Main Radio Channel Record Spare F4 Stby Radio Channel Record Spare F5 Main Radio Channel Record VE VHF OVE v EI ___ l 7 Spare F5 Stby Radio Channel Record es 74 p Hp Wm 3 VEE fi ___ _ Ek 1 _ OVF APPEL Channel Detail 30 VHF RCAG RCAG RCAG RCAG 308 VHF RCAG 309 vm RCAG 310 RCAG 311 V RCAG 312 V RCAG V 13 1 VH VH VH VH VH VH VH H H VH 314 RCAG 317 RCAG 318 H RCAG 319 H RCAG 0 H RCAG 321 H Spare Main 322 H Spare F1 Stby 323 H Spare F2 Main 4 VH Spare F2 Stby H H H H H H H H H VH H H H H H H Wy DIN 32 32 32 32 32 5 6 7 328 329 330 331 332 333 334 335 336 5 6 7 Spare F6 Main Radio Channel Record Spare F6 Stby Radio Channel Record Spare F7 Main Radio Channel Record Spare F7 Stby Radio Channel Record Spare F8 Main Radio Channel Record Spare F8 Stby Radio Channel Record
349. neous Electrical Components AEROTHAI will provide electrical cable connecting metro electric engine to the UPS However the Tenderer will provide static transfer switches cables connecting all UPS to equipments main distribution board junction box installation materials and other necessary equipments The site survey and site evaluation of components placement are recommended Part 2 2 1 Scope of Technical Specifications Page 183 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc 10 8 1 5 Don Muang Airport Site The planned numbers of UPS and its respective loads at Don Muang Airport Site is described in table as follow System System Description UPS 1 DMA RTS Data Processing X End System X Table 62 UPSs for DMA RTS and their respective loads The summary of UPS details required at Don Muang Airport Site is described in table as follow UPS Power Phase Type Type Responsibility 1 60 3 TBP AEROTHAI TBP Information to be provided by AEROTHAI when requested Table 63 Summary of UPS Details at Don Muang Airport Site Miscellaneous Electrical Components AEROTHAI will provide electrical cable connecting metro electric engine to the UPS However the Tenderer
350. network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for the HTY LTS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for the PUT LTS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for the UDN RTS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for the SMU RTS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc Part 2 2 1 Scope of Technical Specifications Page 196 E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 ARCH23 Specifications doc The Tenderer
351. nformation recorded during at least the last twenty four hours of operation GPS Master Clock The GPS master clock has a time display on the front panel automatically operated without GPS receiver and it is synchronized automatically when reconnected to the GPS receiver The output of GPS master clock is synchronized with voice recorder or other master clocks All slave clocks timing signal at the VCCS workstation facility is synchronized with the GPS master clock and display on each VCCS workstation facility Also all slave clocks automatically operate without synchronization with GPS master clock and are synchronized automatically when reconnected to the GPS master clock Slave clocks should be placed in a comfortable and easy to read position Power Supply Power supply of the central racks is fed from 3 sources 2 AC and 1 DC A duplicated power supply for each rack is used which will interface with a 210 230 VAC 50 60 Hz ac power Each unit of the duplicated power supply has AC input power supplies and it has the capacity to feed the complete System The DC input power Part 2 2 1 Scope of Technical Specifications Page 103 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference Volume II Part 2 1 Scope of Technical Specifications doc LA 8 10 8 11 operates using the provided float charged batteries system and co
352. ng to the training needs of the TMCS s roles This will include at least objective general overview of the relevant TMCS functions system configuration operational concept and service modes in depth usage of each of the relevant TMCS functions and fallback and recovery functions f The learning units will provide simulation or animation that will demonstrate the HMI interactions and the use of menu button and computer aided means to perform the TMCS functions Part 2 2 1 Scope of Technical Specifications Page 153 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 24 2 9 24 3 9 24 4 Specifications doc The Training Records The training records will be managed with learning progress and history for at least 1 000 learners in accordance with the following requirements a Record the learning details of each learner including the learner s profile timestamps of log in and out of each learning session the access duration of each learning unit details of learning assessment and other training related information b Enable the trainer to select view and print the training records and c Enable the learner to view and print their training records Security The security measures against data alteration unautho
353. nge at minimum the following information Message Data Data Format Input Output Reference ICD FPL message ICAO standard format Doc 4444 Input ICAO Standard with Edition 15 Amendment 2 NEW FPL Format 2012 MET message ICAO standard format Input ICAO Standard DEP message ICAO standard format Doc 4444 Output ICAO Standard with Edition 15 Amendment 2 NEW FPL Format 2012 ARR message ICAO standard format Doc 4444 Output ICAO Standard with Edition 15 Amendment 2 NEW FPL Format 2012 Part 2 2 1 Scope of Technical Specifications Page 19 Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Message Data Data Format Input Output Reference ICD Other ATS messages ICAO standard format Doc 4444 Input Output ICAO Standard with Edition 15 Amendment 2 NEW FPL Format 2012 Table 2 NAS MOPS AMHS Information Exchange Description NAS MOPS is capable of using both AFTN and AMHS for this AMHS connection 4 2 2 NAS MOPS CIFDPS NAS MOPS connects with CIFDPS which supports FDMC operation to exchange at minimum the following information Message Data Data Format Input Output Reference ICD Pre processed FPL ICAO standard format Doc 4444 Input ICAO Sta
354. nnects directly to the equipments in central racks When both AC power supplies fail the DC input power has the capacity to feed the complete System for a minimum of 4 hours without any interruption to the operation of the systems The input power of VCCS workstation facilities such as TED panel slave clock etc and interfacing communication equipments in Operation Rooms and Tower Control Rooms have two sources AC AC or AC DC or DC DC power In the event of a power source failure all the systems will automatically switch over to another power source without any interruption to the operation of the systems There are two DC input power systems for each Operation Room and Tower Control Room Each DC input power system has the capacity to feed half of VCCS workstation facilities in each room for a minimum of 4 hours without any interruption to the operation of the systems The VCCS workstation facilities will be configured such that both DC inputs connect to VCCS workstation facilities alternately For example if 5 workstation facility in a console connects to DC input 1 then the VCCS workstation facility in the next console connects to DC input 2 Remark Interfacing communication equipment such as multiplexer optical fiber modem and so on is an interface between equipment racks and VCCS workstation facilities or remote stations Cabling and Interfacing System The VCCS central racks is interfaced with a main distribution frame MDF
355. nother aircraft A problem is further classified as either an entry problem an exit problem or an in sector problem Normally in two controller sector configuration the PC would be responsible for solving entry and exit problems depending on the tactical workload and the nature of the problem the PC might also solve or prepare a resolution for an in sector problem Thus an interaction will normally comprise a problem together with a number of context aircraft that constrain the resolution of the problem Occasionally a number of problems may be grouped under a single interaction where it is likely that they may all be solved by a single action Alternatively an interaction might contain no problems only context encounters indicating aircraft in proximity to one another and therefore airspace that is blocked to each other 9 5 2 Aircraft to airspace encounters Upon creation and each update of a flight s trajectory it is validated against airspace restrictions including conditional routes and temporary segregated airspace In addition the change of status of a temporary airspace restriction or the creation of a new airspace restriction requires the revalidation of all flights Aircraft to airspace encounters are further classified as airspace intrusion and hold intrusion a Airspace Intrusion Within the concept of the Flexible Use of Airspace FUA Temporary Reserved Areas TRAs and Temp
356. ntenance TMCS system start up and recovery procedures which are included NAS IBS switchover to NAS MOPS APP IBS switchover to any APPS and CON TRA contingency mode switchover to training mode and vice versa Line Replaceable Unit LRU maintenance and hardware replacement procedures Hardware configuration such as time server routers switches Operating system and application software installation and TMCS system troubleshooting b Intermediate level training for surveillance engineer staffs will include at least the following Operating system administrative TMCS system administrative In depth work process of TMCS software component and intersystem connection TMCS s standard and non standard protocols Part3 SUPPORT AND AFTER SALE SERVICE Page 11 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Volume Part 3 Support and After Sale 1 0 Service_Final doc 3 7 1 3 7 2 ICDs such ASTERIX AIDC e In depth work process of AIDC e In depth work process of Air Ground Ground Ground data link communication e System parameter system configuration of TMCS e Log and traces files analysis with the purpose of investigate analyze problem and recover TMCS e Surveillance data analysis tools e Surveillance data input output configuration re
357. nterface of system best suited for all APP MOPS which shall include at minimum communication protocol dimension of external system and numbers of channel of each external interface The Tenderer shall propose and detail the list of external system interface of system best suited for all APP CON TRA which shall include at minimum communication protocol dimension of external system and numbers of channel of each external interface The Tenderer shall propose and detail the list of external system interface of system best suited for APP IBS which shall include at minimum communication protocol dimension of external system and numbers of channel of each external interface The Tenderer shall propose and detail the APPS AGDL System information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the APPS MET System information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the APPS CCMS information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the APPS Other System information Part 2 2 1 Scope of Technical Specifications Page 201 E E E E E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II
358. nto 4 categories as follow 7 9 1 Level I Tower System The planned quantities of positions of each level I tower system are described in table format Part 2 2 1 Scope of Technical Specifications Page 86 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc tA Level I Tower System Workstation Quantities Set Operator Role MIL Military Tower Operator 1 Table 45 List of workstation quantities for Level 1 Tower System 7 9 2 Level II Tower System The planned quantities of positions of each level II tower system are described in table format Level II Tower System Workstation Quantity ASD ASDWS GSD GSDWS FDD FDDWS T CMS Operator Role WS Optional WS Optional WS Optional Optional LCL 1 1 1 GND 1 1 COR 1 1 1 T FDO 1 T MTN 1 Total 1 1 2 1 2 2 1 Table 46 List of workstation quantities for Level II Tower System Note quantities of hardware in this table under the ASD GSD FDD column reflects the minimum numbers of hardware for the Tower System The quantities of hardware under the columns marked with optional are desirable additional numbers of hardware for the Tower System 7 9 3 Level III Tower System The planne
359. o Record 16 Radio Record 17 Radio Record 18 Radio Record D Radio Record 2 Radio Record 21 Radio Record 2 Radio Record 2 Radio Record 2 Radio Record D phone Recor 2 SBA Telephone Record 3 Telephone Record 58 Telephone Record 2 31 Telephone Record 32 Telephone Record 33 All Telephone Record 3 All Telephone Record 35 All Telephone Record 3 Telephone Record Telephone Record 38 Telephone Record 39 BUT Telephone Record DOA Telephone Record 41 FIRE All Telephone Record B O All Telephone Record 4 Sparel 4 Spare2 4 Spare3 1 Spared
360. oach Sector SMU APP Emergency Approach APP PUT SUBI Local Main Approach APP PUT SUBI Local Stby Approach APP PUT SUB2 Local Main Approach APP PUT SUB2 Local Stby Approach CDC Local Main Approach D Local Stby Spare 1 Main A Spare 1 Stby Spare 2 Main All Spare 2 Stby All Spare 3 Main All Spare 3 Stby Channel Working Position Ground Frequency MHz 121 900 G 5 N N N N F N NIN aN N 95 N Q Channel EN WE O 8 mu M Eo 19 2 24 25 25 Eme E 32 4 A APPENDIX 3 3 5 Phitsanulok Main Fallback Radio Channels Capacity Channel Working Position Ground Ground Local Local Local Local Approach Approach Approach Approach TAK Approach TAK Approach All 1 1 1 1 gt gt N N gt N N F N N 5 4 N oo N Channel O6 NC EMI ERN 2 2 25 25 HAM 28 50 Frequency MHz 121 900 121 900 118 900 118 900 236 600 236 600 120 700 120 700 284 000 284 000 126 000 126 000 119 450 119 450 121 500 121 500 243 000 243 000 132 050 132 050 Spare 1 Spare 1 Spare 2 Spare 2 Spare 3 Spare 3 Spa
361. ocedure reference document facility and essential software tools will be provided Flight Data Processing The Flight Data Processing function FDP receives and processes ATS messages in order to provide Air Traffic Controllers with accurate and up to date flight information in a timely fashion for use in flight planning coordination and control Source of Flight Plans The FDP will be able to handle Flight Plan FPL from the following sources e Local Operator entry e Via AMHS e Automatic or manual activation of Repetitive Flight Plans RPLs Flight Plan and Flight Related Message Validation The FDP will validate the syntax and semantics of all the fields of filed flight plans current flight plans and flight plan related messages to ensure that all the data is syntactically and semantically correct in accordance with the relevant ICAO and Euro control standards When the errors or inconsistent data are detected operators will be notified Then the operators can correct flight plans and or messages without the need to re enter the entire set of data using provided tools For invalid messages received from external sources a rejection will be sent to the source and a local operator notified of the error Operator notifications will be explicit and indicate the nature of the detected error For example Aircraft type incompatible with Wake Turbulence Category or Flight Plan duplicates existing Aircraft Identification ACI
362. of Reference of Technical 1 0 Specifications doc FDD degraded mode In case of TFDP and or network fails the FDDs latest screen content should be displayed to maintain operations the operator should be able to print out of all active and pending FPLs via color laser printer In case of the failure of external systems and or communication with external systems the operator should be able to manual input facilities for the missing data Grouping Re grouping of the roles The system should allow T TACTSUP to combine split the role according to the appropriate situation The configurations include multiple roles such as LCL GND LCL GND DCL etc 9 27 4 Tower Dataset Management T DSM The T DSM should be similar to the DSM para 9 20 9 27 5 Tower Network Management System T NMS The T CMS should be similar to the NMS para 9 21 9 27 6 Tower Control and Monitoring System T CMS The T CMS should be similar to the CMS para 9 22 10 Technical Characteristic This chapter describes the physical characteristics of the system in terms of its components its performance and certain design principles to be followed 10 1 Workstations Characteristic All types of Workstation should be equipped with at least the following devices Part 2 2 1 Scope of Technical Specifications Page 168 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume
363. of Technical 1 0 Specifications doc Details Criteria ENVIRONMENTAL Operating Temp 0 to 40 degree Relative Humidity 0 to 95 PARAMETERS RH ACOUSTIC NOISE 65 dBA meter DISPLAY LCD Display and Mimic Diagram Table 69 Technical Specification for Static Transfer Switch Part 2 2 1 Scope of Technical Specifications Page 192 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc SECTION C Provisional Requirements 1 System Architecture Submittal 1 2 4 ARCHOS 6 The Tenderer shall propose detail the system architecture best suited for TMCS The Tenderer shall propose and detail the system best suited for NAS MOPS The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for NAS CON TRA The detail should include at minimum a diagram showing connections among all components such as servers components network components end system components inputs outputs etc The Tenderer shall propose and detail the system best suited for NAS IBS The det
364. of a cutover plan is to minimize disruption The purpose of this task is to plan system cutover activities in the appropriate sequence to ensure that preparatory steps are complete and that the right people resources are available when required The cutover plan covers activities for setting up and initializing the system environment It is important to keep in mind that as cutovers are not identical some new steps may need to be included in order to deal with unique characteristics from AEROTHAI services 7 Quality Management Plan Quality must always be planned into a project in order to prevent unnecessary rework waste cost and time Quality should also be considered from both a product and process perspective The organization may already have a standardized approach to quality however whether it is standard or not the approach must be defined and communicated to all project stakeholders Part 1 Scope of Project Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Vol II Part 1_Final 1 0 8 Project Management Plan The TMCS Project implementation is complex and the success depends on the role of Seller Hence Tenderer will design and implement a comprehensive and effective project planning and management methodology together with efficient amp reliable tools The Seller will commence the project management at t
365. of record function as follow Normal situation e One of record disk fails e One of record server fails and e Noarchive media mounted in the unit The Tenderer shall propose the maximum number of days in one retention period of record disk without overwritten by the new data The Tenderer shall propose and detail the methodology and parameters used to define the recording parameters The Tenderer shall propose the maximum number of CWS that can be replayed and managed by replay function simultaneously The Tenderer shall propose and detail all condition for the retrieval of recorded data that are supported by replay function The Tenderer shall propose and detail replay mode that are supported by replay function The Tenderer shall propose and detail the capabilities of replay control that are provided by replay function The Tenderer shall propose and detail the methodology to synchronize REP with DVR Digital Voice Recorder The Tenderer shall propose the maximum number of audio channels that can be selected by replay function The Tenderer shall propose the maximum deviation time of synchronization between data and voice The Tenderer shall propose the maximum number of audio track that can be selected by replay function Part 2 2 1 Scope of Technical Specifications Page 241 E E E E E E D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System
366. of the proposed system detailing Data Set Management functionalities capabilities and benefits The Tenderer shall propose and detail the methodology to prevent unauthorized user access to data set management facility Part 2 2 1 Scope of Technical Specifications Page 247 D D D D D D E D E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 DSMO03 DSM04 DSMO5 DSM06 DSMO07 DSMOS DSMO9 DSM10 DSMII DSM12 DSM13 DSM14 Specifications doc The Tenderer shall propose and detail the methodology to prevent inconsistent static environment data that are used by many functions e g CWS s Maps FDP and Monitoring Aids The Tenderer shall propose and detail list of provided hardware accessories related software integration procedure reference documents essential software tool s and training course for reconfiguration the data set system parameters The Tenderer shall propose and detail all data set that are supported by data set management The Tenderer shall propose and detail the facility to manage the data set which provided to data set management function The Tenderer shall propose and detail the facility for import the aeronautical data from external system in messages format
367. of workstation best suited for CDC Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for T TACTSUP Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for DMAN Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for T EO Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for T FDO Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for T DSO Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for MIL Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for FAO Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for BAO Operator Part 2 2 1 Scope of Technical Specifications Page 205 E E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Te
368. ollows a ATCTT will be provided for up to twenty four 24 Staffs The objectives for this course will be to e Establish an expert level of theoretical understanding cognizant of writing documentation and practical training programs for operational staff Part3 SUPPORT AND AFTER SALE SERVICE Page 7 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume Part 3 Support Volume II Technical Terms of and After Sale 10 Service_Final doc e Establish an expert competency level of CWS operating ability cognizant of training operational ATC and e Establish an expert level of system understanding cognizant of creating competency criteria for theoretical knowledge and CWS operating competency b The ATCTT course content will include at least the following e System overview e System architecture e Degraded modes of operation e Level of Contingency and backup e Intersystem Connection e Operator Roles and Workstations e VCCS e System Functionalities e State of flight and or flight plan life cycle e Automatic Dependent Surveillance ADS e Controller Pilot Data Link Communications CPDLC and e ATS Interfacility Data Communications AIDC c Oncompletion of this course participants will e Have expert competence operating the CWS position and e Have a theoretical and practical understa
369. omatic position report information the VLAN technique should be used in order to prevent disturbance to other unrelated functions The FSDP will be designed to simultaneously distribute the local track Multi RADAR track ADS B track MLAT WAM track and system track to other related functions via separated network with different multicast address and or port number Part 2 2 1 Scope of Technical Specifications Page 115 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 1 21 9 1 22 Specifications doc System track distribution to external system The SDP will be designed to distribute system track coupled with associated flight plan information in real time to external system using latest ASTERIX Cat 062 063 and 065 formats over the IP network and geographical filter previously defined in adaptation Firewall will be used for network secure The filter will have the following criteria at minimum a The system track s height altitude is below or above a predefined threshold or the height is between predefined range b The system track s location is within predefined area of interest or polygon of interest c The system track s SSR Mode Code is within predefined range or groups of predefined SSR Mode Codes d The system track s callsign is
370. on Tower Lampang Tower Sukhothai Tower Tak Tower Mae Sod Tower Ranong Tower Trang Tower Pattani Tower Narathiwat Tower Part 2 2 1 Scope of Technical Specifications Page 73 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope of Volume II Terms of Reference Technical Specifications doc 1 0 Each remote tower has been installed with equipments for existing systems It will be used for installation of equipments of the new RTS b List of Military Tower 1 Korat 2 3 U tapao 4 Kampangsan Each military tower has been installed with equipments for existing systems It will be used for installation of the Military RTS 6 1 9 Air Defense Units There are three 3 air defense units associated with BACC BAPC operation which are OSCAR BIG SHELL and FOCAL All equipments for air defense units will be initially installed and tested at Tung Mahamek Site Then the equipments will be transferred to corresponding air defense units Part 2 2 1 Scope of Technical Specifications Page 74 6 2 Network Infrastructure Network diagram provided for TMCS are depicted in figure xx Surveillance r Systems Surveillance Systems Surveillance Surveillance Surveillance Systems Systems AIMS Systems Other Surveillance Systems
371. on loudspeaker for monitoring The selection and de selection of individual channels is possible per channel To guarantee the continuity of recording an automatic system incorporated in each recorder is checking continuously the performance of power supplies and run out of recording capacity The archival media is recorded simultaneously with the short term and is for off line replays Generally the system permits recording over a 48 hour period for the archive media without necessitating any operator involvement for changing media etc Remote indication of alarms for Recorder Unit is possible In case of switchover function the alarms consist of 2 classes class A this type of alarm is given at any loss of redundancy without switchover to the second unit and class B this type of alarm is given when a switchover to the second unit occurs In case of parallel running an alarm is given when any of the recorder unit fails Replay Units The Replay units are connected to the recorder units through network interface for remote operation purpose such as Start Stop and Channel selection for monitoring and automatic search A replay at variable speed is possible without losing speech intelligence and it is possible to perform replays of recordings held on the short term media to a dedicated replay stations Channel selection random Part 2 2 1 Scope of Technical Specifications Page 107 Project Name Date Thailand Modernization CNS AT
372. on of communications and runway closures telecommunication failures deficient operation of computers and procedural changes affecting air traffic facilities This may be accomplished through various means available such as teleconferences e mail internet etc Should assist any other ATC Unit in Bangkok FIR and other area of responsibility where demand exceed the capacity and coordinate the ATEM measures Bangkok ATFMU is in charge of both publication and liaison of such ATFM measures A complete description of all measures for example ground delay programs Miles In Trail MIT should be recorded in a designated log which must include among other Part 2 2 1 Scope of Technical Specifications Page 48 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc data the time of start and end the affected facilities operations and the justification Should take immediate ATFM action and implement contingency plans as required following reports on sudden unplanned changes of capacity e g due to equipment failure or weather Should create and distribute the action plan based on prior consultation with the designated facilities and stakeholders Should coordinate procedures with the affected parties during the pre tactical and tactical phases
373. onfiguration best suited for all systems at Phitsanulok Site The Tenderer shall propose and detail the wiring diagram from UPS to equipments at Phitsanulok Site The Tenderer shall propose the list of supplies of UPS equipments and related components for Phitsanulok Site The Tenderer shall provide product description Technical Characteristics of UPS systems Static Transfer Switch and other related components at Phitsanulok Site The Tenderer shall propose and detail the UPS configuration best suited for all systems at Hua Hin Site The Tenderer shall propose and detail the wiring diagram from UPS to equipments at Hua Hin Site The Tenderer shall propose the list of supplies of UPS equipments and related components for Hua Hin Site The Tenderer shall provide product description Technical Characteristics of UPS Part 2 2 1 Scope of Technical Specifications Page 265 D E E D E E D E E D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 UPS26 UPS27 UPS28 UPS29 UPS30 UPS31 UPS32 UPS33 UPS34 UPS35 UPS36 UPS37 Specifications doc systems Static Transfer Switch and other related components at Hua Hin Site The Tenderer shall propose and detail the UPS configuration best suited for a
374. ons doc FISL OPSUP TECHSUP ASM TACTSUP AIN FDO DSO EO FMM CMAC FMC MTN O O Total 2 1 2 1 2 Table 52 Workstation Quantities of NAS IBS The APP IBS can accommodate the concurrent operation of workstations as listed in the table below APP IBS Workstation Quantity Location Operator Role CWS FDWS CMWS DSWS EC PC APP 12 EC APP 10 TACTSUP 2 TBD FDO MTN 2 TECH DSO Total 26 2 1 1 Table 53 Workstation Quantities of APP IBS Part 2 2 1 Scope of Technical Specifications Page 94 Date December 14 2012 Project Name Thailand Modernization CNS ATM System TMCS File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc Document Reference Volume II Terms of Reference 1 0 8 The Voice Communication and Control System VCCS The Voice Communication and Control System VCCS is an integrated component of MOPS and CON TRA It enables ground ground communication between NAS APP System RTS LTS and neighboring ATS units and air ground communications between air traffic controllers and pilots The VCCS for NAS and each APP System compose of MOPS VCCS is used in normal operation e Fallback VCCS is used when the MOPS VCCS is not appl
375. ontrol room TECHSUP position When the TCU application program is started up the operator needs to enter his her login name and a password The TCU software includes facilities to record an event log statistical package data for recorded traffic load in individual VCCS workstation facility telephone lines and radio lines To make online reconfiguration different configurations will be pre programmed and called up from the TCU by way of menus The online reconfiguration for each VCCS workstation facility should not affect the other VCCS workstation facility operation and should not require reboot of the whole system Furthermore the online reconfiguration will stay after the whole system is rebooted And when VCCS malfunction is detected the TCU will raise visual and audible alarm Radio Function The VCCS has air ground radio line selection and operation Receivers and transmitters main and standby channels can be selected deselected by touching the RX buttons and the TX buttons and VCCS will show the status of radio lines i e busy state squelch etc on the TED panel The main and standby channels of radio transmitter are interlock so that only one of the channels can transmit at a time even if both channels have been inadvertently selected by the controller When more than one radio lines are selected the operator is able to transmit at the same time on all the lines by only pushing the PTT switch Inadvertently when frequencies
376. ontrolled flight is due to pass from a sector controlled by one EC into another sector controlled by another EC If the EC working in the first sector is also controlling the flight assume state and does not initiate coordination the system must give a warning The warning should be given to both EC involved in the inter sector coordination It is important that the warning is given in different colours so that the EC can quickly identify if it is related to a Handover or Assume action The warning is triggered from a defined time should be a configurable system parameter before or after the flight s crossing of the sector boundary as determined from the trajectory Once the coordination is initiated or flight is assumed the warning should be removed The system should allow for the configuration of either automatic or manual transfers A configuration supporting automatic transfer results in reduced ATC workload since the system performs automatic assume control and automatic handover for activated flights Similar principles apply when the flight is due to pass from a controlled sector into a sector classified as an adjacent FIR However the system should allow for different parameter settings for triggering the following warnings e Warning for coordination with next sector e Warning for coordination with next FIR e Warning for exit from controlled airspace AIDC Coordination Flight progress control allows the ATC to issue departure and
377. ontroller MSP MSP is responsible for the medium term planning of the trajectories of aircraft that enter the region of airspace called a Multi Sector Area MSA with which he is associated As the name suggests a Multi Sector Area is comprised of number of traditional sectors ECs are still responsible for providing services within each sector however the purpose of the MSP is to ensure the ECs are never subjected to a workload that could jeopardise safety The system should be able to allocate an MSA to a specific MSP role Additionally the system should be capable of enabling coordination between MSP and the EC positions within the MSA On a strategic level the system should allow the MSP to coordinate with adjacent sectors associated with these EC Database Organization and Access The FDP will organize data into several databases for easy maintenance and retrieval of information There are many technical and operational databases The FDP will provide an access to these databases using on line commercially available query tools Tools are provided to perform Data Administration Part 2 2 1 Scope of Technical Specifications Page 124 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 3 9 3 1 Specifications doc Functions include the capability to create del
378. oordinator for periodic project review meetings during implementation to define the requirements for system readiness implementation testing and documentations Note that the Project Coordinator will require the last updated implementation and testing plan agenda in seven 7 days prior the meeting d System Startup Meeting and System Cutover Meeting The Seller s Project Manager will attend the startup of new system and be on site with the implementation team to assist the Cutover system e Monthly Conference Calls The Seller s Project Manager will host monthly conference calls with project key personnel during the design and implementation of the new system to update AEROTHAI on the progress system implementation plan development testing and the project schedule f On Site Project Closing Meeting The Seller will conduct after the completion of system commissioning an on site Project Closing Meeting at AEROTHAI head office in Bangkok Thailand and having Seller s Project Manager and Project Engineer attend such meeting The Seller will have an opportunity to summarize the activities assist and recommend necessary issues which will be beneficial to AEROTHAI service pass on the final documents and provision items to 6 Cutover plan The transition from a current system into TMCS is called cutover The detailed process that leads towards its successful implementation is known as cutover planning The main objective
379. opose and detail all sources of flight plan that the FDP can handle The Tenderer shall propose and detail the validation of flight plan and flight related messages The Tenderer shall propose and detail how FDP manage the NEW FPL format 2012 Part 2 2 1 Scope of Technical Specifications Page 228 D D D D D D D D E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc FDP05 The Tenderer shall propose and detail the checking of duplicated flight plans E FDP06 The Tenderer shall propose and detail the unique key of flight plan E FDPO07 The Tenderer shall propose and detail the route validation method E FDP08 The Tenderer shall propose and detail the use of field 18 information in FDP E FDP09 The Tenderer shall propose and detail flight plan trajectory prediction calculation E FDP10 The Tenderer shall propose and detail the Aircraft category characteristics used for E trajectory calculation FDPI1 The Tenderer shall propose and detail the conceptual flight state model E FDP12 The Tenderer shall propose and detail the flight plan progress and control E FDP13 The Tenderer shall propose and detail the strip less operation E FDPI4 The Tenderer shall propose and detail the flight pla
380. opose and detail the methodology and parameters used to define the MTCD parameters The Tenderer shall propose and detail the methodology of MTCD to detect and notify to the ATC in the probable loss of the required separation between aircraft based on tactical based encounters The Tenderer shall propose and detail the methodology of MTCD to detect and notify to the ATC in the probable loss of the required separation between aircraft based on plan based encounters The Tenderer shall propose and detail the methodology to detect and notify to the ATC when aircraft penetrating segregated or otherwise restricted airspace Airspace Organization and Management The Tenderer shall provide product description of the proposed system detailing AOM functionalities capabilities and benefits The Tenderer shall propose and detail the functions which support airspace organization or airspace structures Part 2 2 1 Scope of Technical Specifications Page 235 D D D D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 AOMO23 8 7 FUAOI 02 03 04 FUAOS 8 8 DCBOI Specifications doc The Tenderer shall propose and detail the functions which support dynamic and flexible airspace manage
381. or terminated FPL data and system FPL data for statistical and billing purposes e Actas data repository for all system track data for statistical and billing purposes MET Office The BACC BAPC operation will coordinate with MET office to receive meteorological information data Adjacent ACCs The BACC BAPC operation will coordinate with Adjacent ACCs If an Adjacent ACC possesses ATM systems the BACC BAPC operation should be encouraged to coordinate with the ATM systems using ground ground data communication Regional Air Traffic Flow Management Unit RATFMU RATFMU operates as an air traffic flow management for the BKK FIR and in the future RATFMU may operate as regional air traffic flow management for the Asia Pacific region The BACC BAPC operation will coordinate with RATFMU to exchange flow control information such as slot allocations slot modification etc Air Defense Units There are three 3 air defense units within BKK FIR which associate with the BACC BAPC operation Part 2 2 1 Scope of Technical Specifications Page 12 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 3 7 Military Towers 3 8 3 9 3 10 3 11 3 12 3 13 There are four 4 military towers within BKK FIR which coordinates with the BACC BAPC operat
382. or3 37 Sector3 38 9 Sector4 40 Sector4 1 Sectors 42 5 3 Sector4 4 Secor4 45 Sector4 6 4 7 Secor4 48 4 Secor 50 Secor5 1 Sectors 52 Sectors d Fer EJ 90 Ea E EA A c ON o Working Positions Sector 5 Sector 5 Sector 5 Sector 5 Sector 5 Sector 6 Sector 6 Sector 6 Sector 6 Sector 6 Sector 6 Sector 6 Sector 6 Sector 7 Sector 7 Sector 7 Sector 7 Sector 7 Sector 8 Sector 8 KKN Sector Sector Sector Sector Sector KKN Sector KKN Sector KKN Sector KKN Sector KKN Sector Sector KKN Sector Sector BL Sector BL Sector U Sector Sector Sector Sector lt 4 2 2 22 lt lt lt 2 o Z G o lt C o z Rn lt lt o Z Connect to SCAR_S5 UL 5 1 DDN UL 5 4 DDN o Fg GN5 KBI APP PUT APP DDN BGS HCM S KUL 6 1 DDN KUL 6 5 DDN O X lt 2 x s gt d T gt er MA APP SAT SL APP OCAL DN TWR SR_UDN NINITN un T APP SC APP el 9611 el 02 287 3181 RM TWR KR TWR OT TWR BL TWR SR UBL KRT APP ili lt lt SC APP TN UB APP
383. orary Segregated Areas TSAs are established in response to the need for civil military or activities of a temporary nature which due to the nature of their activities need segregation to protect both them and non participating traffic TRAs and TSAs are allocated by the Airspace Management Cell pre tactically Part 2 2 1 Scope of Technical Specifications Page 131 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc normally the day before operations in response to daily requests for specific periods and are activated tactically in accordance with the actual requirement Upon creation and each update of a flights trajectory it is validated against scheduled and actual airspace restrictions However an unscheduled change of status of a temporary airspace restriction or the creation of a new airspace restriction requires the revalidation of all flights The aircraft to airspace encounters feature will re validates flight trajectories upon activation and de activation of airspace restrictions b Hold Intrusion Holding is a procedure used to delay an aircraft whilst confining it to a designated portion of airspace holding procedure is defined in relation to a fix radio navigation aid significant point or designated location whereby the aircraft normally f
384. orkstation quantities for BAPP CON TRA esee 82 Table 34 List of workstation quantities for Air Defense 82 Table 35 List of workstation quantities for CMA APP 8 4 83 Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Table 36 List of workstation quantities for CMA APP 2 2 2 22 222 1 83 Table 37 List of workstation quantities for APP 83 Table 38 List of workstation quantities for APP 2 2 2 440222 2 84 Table 39 List of workstation quantities for PUT APP 8 2 24244222221 84 Table 40 List of workstation quantities for PUT APP 224424222 2 85 Table 41 List of workstation quantities for PSL APP 85 Table 42 List of workstation quantities for PSL APP CON TRA 22 2424424 85 Table 43 List of workstation quantities for HAN APP sese 86 Table 44 List of workstation quantities for HHN APP CON TRA 2242444 42 86 Table 45 List of workstation quantities for Level 1 Tower System 0244242221 87 Table 46
385. oting function and the operators can switch to manual selection whenever needed Each analog radio frequency interfacing of all VCCS MOPS Fallback and CON TRA at BACC BAPC connects to 2 local radio stations and 3 remote radio stations The local radio stations use AEROTHAI core optical fiber links connecting to the VCCS The voice multiplexers of these links are equipped with connect and not connect status signals and has an alarm signals both link and line level to show at the TCU and other remote locations Part 2 2 1 Scope of Technical Specifications Page 100 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc Volume II Terms of Reference Local Radio RX M S Local Radio TX M a Local Radio TX S Voice multiplexers supply by Tenderer Simplified 1 for 3 Lines niasa p Frame Relay DDN Local Figure 14 Simplified Configuration of Local and Remote Radio Stations for NAS Part 2 2 1 Scope of Technical Specifications Page 101 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference Volume II Part 2 1 Scope of Technical Specifications doc Loca
386. ovisional 5 1 21 1 193 1 System Architecture Submittal eee ecce e ee eene e 193 2 The Level of Contingency and Backup Submittal 197 3 Intersystem Connection Submittal eee eee eee eee eee eee eterne enu 200 4 Operator Roles and Workstations Submittal 202 5 Site Information and Network Infrastructure Submittal 206 5 1 Network Infrastructure 1 21 2 206 6 The Planned Workstation Quantities Submittal eres 209 7 The Voice Communication and Control System VCCS Submittal 211 8 System Functionalities Submittal ee ecce eee eee eerte eerte etna 220 8 1 Surveillance Data Processing 220 8 2 Flight Data Processing 2 0 eret o aire a inea anro ron 228 8 3 A 230 8 4 Monitoring AIS iss 233 8 5 Medium Term Conflict Detection 235 8 6 Airspace Organization and Management
387. owing clearances will be supported e Cleared level e Ordered Speed also cancel Speed instruction e Ordered Direction also cancel Direction instruction e Ordered Heading for holding also cancel heading holding instruction e Leaving holding addition the system should enable the ATC to be able to set coordination levels exit entry flight levels Sectorization The FDP will be able to define and maintain the division of airspace into units according to ATC jurisdiction All details of airspace structures and rules will be defined in the dataset relevant to sectorization plan which compose of the following e Subset of the positions in the ATSU e The main jurisdictional component which defining an area of responsibility and comprising one or more sectors Part 2 2 1 Scope of Technical Specifications Page 121 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 2 11 9 2 12 9 2 13 Specifications doc e Unit of jurisdiction e Specialized airspaces such as terminal and tower for which additional rules are defined Flight Data Posting The posting rules are adapted to operational needs of each position according to TP Flexible Use of Airspace The FDP will be able to configure Flexible Use of Airspace FUA via off line or automatically updated by NOTAM a
388. ows a b On Site Kick Off Meeting The Seller will conduct an on site Kick Off meeting at AEROTHAI head office in Bangkok Thailand and have the Seller s Project Manager and Project Engineer attend such meeting The meeting date will be set in relation to the contract signing date The Seller will have the opportunity to understand the working environment meet key personnel involved in the project present their proposed project implementation plan and schedule and review the project schedule System Design Review SDR Workshop The Seller will conduct a SDR Workshop at AEROTHAI head office in Bangkok Thailand and having Seller s Project Manager and Project Engineer attend such workshop The convened date will be set according to the latest reviewed version of Project Schedule The SDR Workshop will provide the Seller the opportunity to gather necessary information and understand user expectations from system engineer and supervisor of each ATC unit in order to ensure the design will achieve the requirement The workshop will be conducted until both parties accept final information for system development Part 1 Scope of Project Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Reference Vol II Part 1_Final 1 0 c Periodic Project Review Meeting The Seller s Project Manager will meet with the project c
389. pe B 1 0 Pilot Function PSPWS 19 TMC One 1 Type B 0 0 TMC Function TMCWS Table 18 Mapping Table to support Operator Role of BACC BAPC BAPP APPs CON TRA Part 2 2 1 Scope of Technical Specifications Page 39 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc CWS Controller Workstation CMWS Control and Monitoring Workstation NMWS Network Management Workstation FDWS Flight Data Workstation DSWS Data Set Workstation DAWS Data Analysis Workstation PSPWS Pseudo Pilot Workstation TMCWS Training Mission Control Workstation e Operator Role Description a Executive Controller The Executive Controller EC has executive authority and responsibility for the Air Traffic Management within the airspace sector delegated EC is responsible for fulfilling the following specific tasks Monitor airspace sector frequency s and performing all R T communication Identify aircraft which are not identified when entering the airspace sector Identify and accept of aircraft being transferred from adjacent airspace sector Provide clearance of aircraft within the airspace sector in accordance with the overall plan and the co ordination agreements established by the Planning Controller PC Monitor
390. pe B GSD Function GSDWS One 1 Type D FDD Function FDDWS 10 MIL One 1 Type D 0 0 FDD Function FDDWS Part 2 2 1 Scope of Technical Specifications Page 53 Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Facility Role HW Characteristic SW Workstation Workstation TED panel Printer Characteristic Name 11 FAO One 1 Type D 0 0 FDD Function FDDWS 12 BAO One 1 Type D 0 0 FDD Function FDDWS 13 ARO One 1 Type D 0 1 FDD Function FDDWS 14 T MTN One 1 Type B 1 1 ASD Function ASDWS One 1 Type B GSD Function GSDWS One 1 Type D FDD Function FDDWS One 1 Type B T CMS Function TCMWS One 1 Type B T NMS Function TNMWS Table 19 Mapping Table to support Operator Role of Towers 5 2 4 Tower Operator Role Description a Local Controller Local Controller LCL is responsible for fulfilling the following specific tasks at minimum e Ensure runway separation exists between aircraft e Issue takeoff and landing instructions clearances e Organize the sequence of the departures in coordination with Departure Manager DMAN when available and Authorize aircraft vehicle movements on or across runways b Ground Controller Ground Controller GND is responsi
391. pe of 10 of Reference Technical Specifications doc 6 Site Information and Network Infrastructure 6 1 Site Information 6 1 1 Tung Mahamek Site The facilities at Tung Mahamek Site related to TMCS consist of two 2 buildings which are New Operation Building and Existing Operation Building Attachment 6 6 1 illustrates the location of New Operation Building and Existing Operation Building at Tung Mahamek Site a New Operation Building There are six 6 rooms reserved for TMCS in the New Operation Building b Existing Operation Building There are three 3 rooms reserved for TMCS in the Existing Operation Building Each room is planned for specific operation purpose Please also be advised that at the present there are others servers and equipments installed in the some allocated rooms The site survey and site evaluation are recommended The following table describes the TMCS equipments and their planned installed rooms at Tung Mahamek Site Part 2 2 1 Scope of Technical Specifications Page 59 System System aas Room Room Floor Name Description Building Name Floor Function Number Plan End System BACC BAPC New Operation Building 8 Floor Operation Room OPS806 Attachment 6 1 1a Pre tactical New Operation Building 3 Floor Pre tactical Operation Room OPS301 Attachment 6 1 1b NAS Equipment MOPS Redundant Data processing New Operatio
392. plan data and vehicles data The FDD should be divided into bays representing different categories of data but not limited to as follows e Traffic lists Notification windows Auxiliary information windows Bay configuration of FDD should be configurable for each role The FDD should provide function to Find Modify Create FPL and Vehicle displays should be automatically updated when a flight plan is modified by an operator or by an external source The FDD should have two 2 types of strip bay for managing flight data as follows e The compulsory strip bay Part 2 2 1 Scope of Technical Specifications Page 165 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc e The non compulsory strip bay The non compulsory strip bay should be assigned to LCL and GND roles to manage flight strip by free placement using drag and drop The compulsory strip bay should be assigned to other roles e g T TACTSUP in order to automate management of the flight strip to the appropriate place according to its state transition Whenever the LCL or GND changes state of flight the flight state in the compulsory strip bay should be automatically updated The formatting of flight strip should consist of ICAO flight plan fields The Layout Font Color Commands shou
393. pose the future expansion capabilities of PSL APP System The Tenderer shall propose the future expansion capabilities of HHN APP System The Tenderer shall propose the future expansion capabilities of NAS IBS The Tenderer shall propose the future expansion capabilities of APP IBS 7 The Voice Communication and Control System VCCS Submittal 501 VCCS02 VCCS03 VCCS04 The Tenderer shall propose and detail the VCCS configuration of the MOPS Fallback and CON TRA at Tung Mahamek site Chiang Mai site Hat Yai site Phuket site Phitsanulok site and Hua Hin site The Tenderer shall propose and detail the configuration of radio and telephone lines connection to all VCCS MOPS Fallback and CON TRA at Tung Mahamek site Chiang Mai site Hat Yai site Phuket site Phitsanulok site and Hua Hin site The Tenderer shall propose and detail an input control principle which manages the radio and telephone lines of VCCS for the MOPS Fallback and CON TRA according to each mode of operation The Tenderer shall propose and detail the configuration of the VCCS Workstation facilities Part 2 2 1 Scope of Technical Specifications Page 211 E E E E E D D E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 505
394. r e Give assistance to the EC as required e Keep the Operational Supervisor informed of any malfunctions of equipment or facilities potential traffic overloads of the airspace sector and circumstances occurring in which any aircraft might be endangered e g emergency hi jack etc Note PC should be able to perform as Multi sector Planner Controller MSP MSP responsibilities are the same as for the PC but the MSP has responsibilities in more than one sector and serves multiple EC role positions The MSP makes assessments of potential conflicts before the traffic enters own sector s c Arrival Manager The Arrival Manager AMAN will be able to allocate arrival routes and set constraints such as Time Based Spacing TBS or Miles In Trail MIT on merging points with the objective of building an optimum sequence There should be several techniques available for example Control Time of Arrival CTA speed control radar vectoring etc Note that when appropriate the functions may be consolidated with other operator roles functions such as ATFM or PC The minimum tasks of arrival manager include Part 2 2 1 Scope of Technical Specifications Page 42 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Consider the Reference
395. r 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 MONAOS MONAO9 10 11 12 13 14 15 16 17 18 19 Specifications doc provided by MONA The Tenderer shall provide product description of the proposed system detailing lateral conformance monitoring functionalities capabilities and benefits The Tenderer shall propose and detail the methodology and parameters used to define the tolerance of lateral conformance monitoring in the airspace and or routes The Tenderer shall propose and detail the methodology to temporarily suspend the lateral conformance monitoring for aircraft notified as under control The Tenderer shall provide product description of the proposed system detailing longitudinal conformance monitoring functionalities capabilities and benefits The Tenderer shall propose and detail the methodology and parameters used to define difference of the time estimates on a coordination point of the routes The Tenderer shall provide product description of the proposed system detailing vertical conformance monitoring functionalities capabilities and benefits The Tenderer shall propose and detail the methodology and parameters used to define the tolerance of vertical conformance monitoring in the airspace
396. r 4 D Wire Rime Loop OwDTMF Sector 4 D Wire Rinenn Loop OwDTMF Sector 4 wie Rinenn Loop OwDTMF Sector 4 D Wie Rinem Sector 4 Ring In Loop Ow DTME Sector 4 ILoop owDTWr Sector 4 ire Rinem Loop Ow DTMF Sector 4 Wire Ring in Loop Ow DTME Sector 4 re Ring in Setori Wie Rime Loop Ow DTMF Sector 4 mgs _ Ring in Loor owDrwr Sector4 VINN Wire Rinn DTMF Sector4 YONA Wire Ring In Loop Ow DTMF Sector 4 1 APPW_ASS _2 Wire Ringin Loop OuvDTMF Sector 41 powire Ringin Loop OuvDTME Sector 4 1 p Wir Ringin Loop OuvDTMF Sector 4 1 Wire Sector 4 1 VB TD W Sector 27 Loop OwDTME Sector 27 Wire Ring In Loop Ow DTMF Sector ie Ring In_ Loop Out D TMF Sector Ring Loop Ow DTMF Sector Ring Loop Ow DTMF Sector 4 Sector 5 ie _ Ring In_ Loop Out D TMF Sector ie Ring in Loop Out D TMF Sector Rinn Loop Ow DTME Sector 5 Ring Loop Ow DTME Sector 5 Wire Ring _ Loop OuDTMF Sector 5 Rinenn Sector 5 Rinem Loop OwDTMF Sectors Rinem Loop Out D TMF Sector 5 D Wire Ring In Loop Out D TMF Sector 5 D Wire Ring In_ Loop Out DTMF Sector 5 Wire Ring _ Loop OuvDTMF Sector 5 ie
397. r Switch 10 100 1000 Mae Sod Tower 2 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Ranong Tower 5 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Trang Tower 2 3 1 Mbps RJ 45 Router Switch 10 100 1000 Pattani Tower 4 Layer 3 1 Mbps RJ 45 Router Switch 10 100 1000 Narathiwat Tower 5 Payar Router Switch 10 100 1000 Table 28 Network Connection Description for Other Remote Towers Part 2 2 1 Scope of Technical Specification Page 78 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc LA 6 2 2 Communication Media Infrastructure between buildings From the diagram the detailed of each communication media infrastructure between buildings are listed in table below Site Reference Media Technical Distance Bandwidth Code Type Description Building Building MK 101 Fiber Single Mode Approximately 200 m 100 Mbps Optic 24 core Cable FC Patch Panel SBA 1 02 Fiber Single Mode Approximately 500 m 100 Mbps Optic 12 Core Cable FC Patch Panel L03 Fiber Single Mode Approximately 500 m 100 Mbps Optic 6 Core Cable FC Patch Panel L04 Fiber Single Mode Approximately 500 m 100 Mbps Optic 6 Core Cable FC Patch Panel HTY 1 05 Fiber Single Mode Approximately 200 m 10 Mbps Optic 6 Core Cable FC P
398. r authorized TMCS operators to manually view repair meteorological messages that were not processed automatically Aeronautical Information Presentation The Aeronautical Information Presentation permits authorized users to enter aeronautical environment information and NOTAMS to use in the processing of flight data and to display as auxiliary information for ATC The Aeronautical Information Presentation also provides a mean for authorized TMCS operators to manually view and repair aeronautical messages that were not processed automatically and other unrecognized messages Paged Information Presentation The purpose of the Paged Information Presentation is to provide a flexible mechanism by which data can be organized to display as supplementary information to and other TMCS operators replacing the traditional array of dedicated displays and charts As such it brings together system environment data configuration data and text graphical information compiled specifically for the Paged Information Presentation The layout of the pages is defined in the Maintenance and Analysis Mission by use of the Interface Editor It may contain a mix of environment and configuration data together with prepared text or graphics Pages are selected for display by means of an index Additionally a page may be linked to an object in which case the page may be selected by simple designation on the object wherever it is displayed For
399. r modules against the total quantity of cards or modules of MOPS VCCS Fallback VCCS and CON TRA VCCS at BACC BAPC CMA APC HTY APC PUT APC PLS APC and HHN APC The Tenderer shall propose and detail the technical manual which includes at minimum complete installation operation and maintenance instructions Part 2 2 1 Scope of Technical Specifications Page 217 E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 VCCSTT VRSOI VRS02 VRSO3 804 VRSOS VRSO06 VRSO7 VRSOS VRSO9 VRS10 Specifications doc The Tenderer shall propose the quantity of technical manual both hard and soft copy for all VCCS at BACC BAPC CMA APC HTY APC PUT APC PLS APC and HHN APC The Tenderer shall propose and detail the capacity of duplex analogue audio channels to be recorded simultaneously of the recorder units at BACC BAPC CMA APC HTY APC PUT APC PLS APC and HHN APC The Tenderer shall propose and detail the synchronization mechanism between DVR s clock and VCCS s GPS master clock The Tenderer shall propose the maximum capacity of the channels expansion of each recorder units at BACC BAPC CMA APC HTY APC PUT APC PLS APC and HHN APC and detail the conditions for the proposed capacity for example numbe
400. r of empty slot channels available space in rack maximum available power supply etc The Tenderer shall provide product description of the proposed recorder units detailing functionalities capabilities and benefits The Tenderer shall propose and detail the recording during silent period capability of the recorder units The Tenderer shall propose and detail the capability and performance of the short term media type of the recorder units The Tenderer shall propose and detail the capability and performance of simultaneous recording and replay of the recorder units such as maximum time used for query data records in the short term media etc The Tenderer shall propose and detail the configuration type and performance of the media used for short term media recording in the recorder units The Tenderer shall propose and detail the simultaneously recording capability between archival media type and short term media type of the recorder units The Tenderer shall propose and detail the recording capacity in term of hours of Part 2 2 1 Scope of Technical Specifications Page 218 D E E E D D E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 VRSII VRS12 VRS13 VRS14 VRSIS5 816 VRS17 VRS18 VRS19
401. rameters ADS B parameters MLAT WAM parameters Flight data process parameters Part 2 2 1 Scope of Technical Specifications Page 144 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 20 2 9 20 3 9 20 4 Specifications doc p Safety nets areas and parameters q Monitoring Aids parameters r Medium Term Conflict Alerts parameters s Record and Replay parameters t Air Ground data link parameters u ATC HMI parameters v parameters w AMAN DMAN parameters X Airspace Management parameters y External interface parameters and 7 Exercise preparation Management The DSM will provide the facility to manage the data set in order to tailor the system for local condition and operational characteristics such as creating viewing modifying deleting printing and distributing data set Import AIXM data The DSM should provide the facility to import the aeronautical data in AIXM messages format from manual insert via USB flash drive and automatically import from Other Systems Backup and restore data set The DSM will provide the facility to backup and restore data set to from archive media and or removable storage media such as USB flash drive as following a Backup a category or all data set b Restore a category or all data set
402. ration Type A half UPS configuration Type B 10 8 2 2 Type A UPS Configuration The conceptual diagram is presented in figure below Part 2 2 1 Scope of Technical Specifications Page 186 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Equipment Power Supply Single Full Load Rate R1 Metro Electric Engine Metro Electric Engine Figure 17 Conceptual diagram of full UPS configuration In the diagram all equipments will only receive electrical power from UPS to ensure stable electrical current At minimum the full UPS configuration consists of the following components o UPS equipment set There are at minimum four 4 sets of UPS equipments A1 A2 B1 B2 Each set of UPS equipment has 2 inputs in separated main bypass configuration 1 and A2 connect with each other in Parallel redundant configuration and B2 connect with each other in Parallel redundant configuration Both the UPS sets in Parallel redundant configuration will share the load equally In case of failure of one UPS set the load should get automatically transferred to the second UPS set without any operational break Each set of UPS Part 2 2 1 Scope of Technical Specifications Page 187 Project Name Date Thailand Modernization De
403. rator to explain a full message from a list to display in a pop up window when the operator accepts the message the pop up window will be closed The system should allow the operator to create and exchange of message notes in free text between different roles A dedicated note window is used to enter the message to be dispatched to the selected roles The auxiliary data display The FDD should provide essential information to the operator to make the right decisions knowing that priority is given to the flight data display The windows should be displayed either permanently on the FDD or invoked on demand on the FDD The FDD should provide an auxiliary data to display at a minimum as follows e Current date and time NAVIDS status if available e CATIS if available QNH value if available e System status e g status of server e Fte Runway in use management The FDD should manage and display the assignment of runway configurations as departure and arrival flights for each aerodrome to provide automatic reassignment of SID STAR when a change of runway in use comes into effect and indicate automatically reassign SID STAR in the database TEFS and flight data list of the relevant flight plans Part 2 2 1 Scope of Technical Specifications Page 167 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms
404. rdinated Universal Time UTC format over internal network Part 2 2 1 Scope of Technical Specifications Page 139 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 18 9 18 1 Specifications doc For the remote control towers they should synchronize time over wide area network WAN The TM will use hierarchical client server model CWS HMI CWS is the heart of the system due to its interaction with the operator Any TMCS operator such as Tower Terminal Approach or Area Control center will be able to access Surveillance Flight and Maintenance and Supervisory data at any working position within their suitable working area Individual configurations will be based on the operator s role login permissions preferences and the sectorization plan Operator roles and permissions are off line definable and role based Once a role has been assigned to an individual that person can access the functionality mapped quickly and effectively The Characteristics of all CWS HMI will meet the requirements of FAA Human Factor Design Standard HFDS 5 1 6 Luminance and Contrast and FAA 2100G Clause 3 3 6 4 Visual Displays or comparable standards specified by ICAO or EUROCONTROL HMI Principles The presentation management described herein is based on the use of windows permitting
405. re 4 Spare 4 Spare 5 Spare 5 F R Flight Check Main APPENDIX 3 3 6 Huahin Main Fallback Radio Channels Capacity Channel Frequency MHz 121 900 121 900 122 700 42 720 D 300 126 200 236 600 236 600 ENS E d 133 000 121 500 121 500 243 000 243 000 132 050 132 050 Spare 1 Spare 1 Spare 2 Spare 2 Spare 3 Spare 3 Spare 4 Spare 4 Spare 5 Spare 5 ET Approach N Channel Z Z E BETON Erga Ta APPENDIX 3 3 7 Tungmahamek CONTRA Radio Channels Capacity SAT 5 FR FIBER DDN FIBER FIBER 10 DDN n 2 DDN SAT 14 DDN 15 SAT 16 FR 17 FIBER DDN D DDN 2 DDN 21 FIBER 2 FIBER 2 DDN 2 SAT 25 Channel 49 50 51 5 53 54 55 56 57 58 59 61 6 6 6 65 7 Working Position SECTOR 6 SECTOR 6 SECTOR 6 SECTOR 6 SECTOR 7 SECTOR 7 SECTOR 7 SECTOR 7 SECTOR 7 SECTOR 7 SECTOR 7 SECTOR 7 SECTOR 7 SECTOR 7 SECTOR 8 SECTOR 8 SECTOR 8 SECTOR 8 SECTOR 8 SECTOR 8 SECTOR 8 SECTOR 8 MEDIA DDN 5 DDN DDN DDN T SAT R DDN SAT R R R A A F A F DDN DDN F F D A A F D 5 5 5 z gt F R 7 Sector 1 4 7 Sector 13 DDN ER DDN FIR DDN FIR DDN FIR secs 158 CDCSBMain DDN FIR 71 7 IBER IBER IBER F R Sector 1 4 Sector
406. refresh rate DVI port gt 1 Brightness 7 370 cd m2 Contrast ratio gt 1000 1 Display colors gt 16 7 M 24bit VESA Mounting Support LED backlight technology and Power supply operates between 100 VAC 240 VAC frequency range 50 Hz 3Hz 10 1 2 4 LCD Monitor of Type D Workstation LCD Monitor of Type D Workstation will be 21 5 interactive pen display and will have at minimum the following performance features Resolution gt 1920 x 1080 pixels at 60Hz refresh rate DVI port gt 1 Brightness 7 230 cd m2 Contrast ratio gt 850 1 Display colors 7 16 7 M 24bit Operated with stylus pen battery free cordless and with side switches and Power supply operates between 100 VAC 240 VAC frequency range 50 60Hz Part 2 2 1 Scope of Technical Specifications Page 171 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 10 1 3 10 2 10 3 10 4 Specifications doc Input Device The Input Device and Pointing Device will be composed of a three button or two buttons with scroll wheel mouse and standard QWERTY keyboard Each CWS should have a maximum of one 1 keyboard and one 1 pointing device Server Computer Server Computer will be high performance computer equipped with at least the following high availability features and
407. rence of Technical 1 0 SDP39 SDP40 SDP41 SDP42 SDP43 SDP44 SDP45 SDP46 SDP47 SDP48 SDP49 SDP50 SDPSI SDP52 Specifications doc overloads protection The Tenderer shall propose the maximum number of plots per RADAR per sector and maximum number of plots per RADAR per antenna revolution that are used in plot overloads protection The Tenderer shall provide product description of the proposed system detailing Surveillance blanking areas functionalities capabilities and benefits The Tenderer shall propose and detail the methodology and parameters used to define the surveillance blanking areas The Tenderer shall propose and detail the surveillance blanking areas characteristics and minimum size of surveillance blanking area The Tenderer shall propose the maximum number of surveillance blanking area of each surveillance sensor The Tenderer shall propose and detail the methodology and parameters used to define the surveillance processing area The Tenderer shall propose the maximum size of surveillance processing area The Tenderer shall provide product description of the proposed system detailing Barometric Altitude Correction functionalities capabilities and benefits The Tenderer shall propose and detail the methodology and parameters to define the barometric altitude correction The Tenderer shall propose the maximum number of QNH area supported by SDP The Tenderer shall
408. rence of Technical 1 0 Specifications doc Miscellaneous Electrical Components AEROTHAI will provide electrical cable connecting metro electric engine to the UPS However at each site the Tenderer will provide static transfer switches cables connecting all UPS to equipments main distribution board junction box installation materials and other necessary equipments The site survey and site evaluation of components placement are recommended 10 8 2 UPS Characteristic 10 8 2 1 General Characteristics In the event of power loss or electric power instability all systems utilizing UPS System will not be affected and will not require re start even after the power stability is resumed Furthermore The UPS System will have a transformer for electrical isolation between input and output with current limiting overload protection and output neutral bonded to ground The main circuit and the bypass can use the same or different sources Generally the UPS equipment comprises standalone flame retardant sealed non hydrogen producing battery units installed in the equipment room The UPS battery unit will be maintenance free and require no special venting The UPS provides a continuous supply of electric power to all equipments at each facility There are generally two types of equipments for each site e Dual Power Supply Equipments and e Single Power Supply Equipments There are two 2 concepts for the UPS configuration full UPS configu
409. rer shall propose and detail the methodology of online reconfiguration from the TCU The Tenderer shall propose and detail all alert alarm indication methods at TCU when VCCS malfunction is detected The Tenderer shall propose and detail the capability to select deselect the receivers and transmitters main and standby channels The Tenderer shall propose and detail the status indication of radio lines on the TED panel The Tenderer shall propose and detail the capability and characteristic of the interlock between radio transmitter main and standby channels The Tenderer shall propose and detail the capability of the multi lines radio transmission reception at the same time The Tenderer shall propose and detail the capability and characteristic of the radio function when frequencies in TX or RX modes and the call are being received at the same time Part 2 2 1 Scope of Technical Specifications Page 213 E E E D E D D D E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 VCCS31 VCCS32 VCCS33 VCCS34 VCCS35 VCCS36 VCCS37 VCCS38 VCCS39 VCCS40 VCCS41 Specifications doc The Tenderer shall propose and detail the capability of audio level control of loudspeaker The Tender
410. rized access intrusion and malicious computer attacks and infection from computer virus and malicious software will be offered successful entries and intrusion attempts for viewing and printing by the administrators will be recorded Computer based assessment Computer based assessment for each learning unit of a package will be provided in accordance with the following requirements a The assessment questions provided at the end of each learning unit will be suitable for evaluation of the learner s understanding to the content of the unit b Multiple choice and or true or false style questions will be provided and c Result of the assessment will be presented to the learner at the end of the assessment Apart from the assessment given at the end of each learning unit a separate question pools and assessment tools will be provided by the CBT in assessing the overall understanding of different TMCS s roles of learners according to the following requirements a A question editor for trainers to create modify and delete the questions in the pool Part 2 2 1 Scope of Technical Specifications Page 154 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 24 5 9 25 Specifications doc b A tool for trainers to create new test papers by selecting questions from the
411. rkstation best suited for MTN Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for TRN Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for PSP Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for TMC Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for GND Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for LCL Operator Role The Tenderer shall propose and detail the software Part 2 2 1 Scope of Technical Specifications Page 204 E E E E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 ORWOZ2I ORWO22 ORWO23 ORWO24 25 26 27 28 29 Specifications doc characteristics functions capabilities of workstation best suited for COR Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities
412. rms of Reference of Technical 1 0 Specifications doc Role ORWO30 The Tenderer shall propose and detail the software E characteristics functions capabilities of workstation best suited for ARO Operator Role ORWO31 The Tenderer shall propose and detail the software E characteristics functions capabilities of workstation best suited for T MTN Operator Role 5 Site Information and Network Infrastructure Submittal 5 1 Network Infrastructure SINIO1 Tenderer shall propose and detail the network configuration for all systems at E Tung Mahamek Site SINIO2 Tenderer shall provide product description Technical Characteristics of D network equipments and related components at Tung Mahamek Site SINIO3 The Tenderer shall propose and detail the list of supplies of network equipments E and related components for Tung Mahamek Site SINIO4 Tenderer shall propose and detail the network configuration for all systems at E Chiang Mai Site SINIO5 The Tenderer shall provide product description Technical Characteristics of D network equipments and related components at Chiang Mai Site SINIO6 The Tenderer shall propose and detail the list of supplies of network equipments E and related components for Chiang Mai Site SINIO7 The Tenderer shall propose and detail the network configuration for all systems at E Part 2 2 1 Scope of Technical Specifications Page 206 Project Name Date Thailand Mod
413. roach Control Centre IA Indirect Access IBS Independent Backup System ID identification KRT Nakhon Ratchasima Airport LCL Local Controller LRU Line Replaceable Unit LTS Local Tower Systems MDF main distribution frame MET Meteorological MIB Management Information Base MIL Military Tower Operator MIT Miles In Trail MLAT Multi Lateration Surveillance System MONA Monitoring Aids function MOPS Main Operation System MRT Multi Radar Tracking MSA Multi Sector Area Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Document Reference File Reference Volume II Technical Terms Volume II Part 2 1 Scope of of Reference Technical Specifications doc Date December 14 2012 Version 1 0 Abbreviation FullName MSAW Minimum Safe Altitude Warning MSDP Main Surveillance Data Processing M SDPS Main Surveillance Data Processing System Msg Messages MSP Multi sector Planner Controller MTBF Mean Time Between Failures MTCD Medium Term Conflict Detection function MTN Maintenance Engineer MTTR Mean Time To Repair NAS Nationwide Air Traffic Management System NAS IBS Nationwide Air Traffic Management Independent Backup System NMS Network Management System NMWS Network Management Workstation OFBL Off Block ONBL On Block OPS Operational
414. rs fail the ASD should receive data directly from any surveillance sources by automatic preset or by manually Ground Situation Display GSD The Ground Situation Display GSD should provide to Tower Controller the situation awareness about ground traffic as far as surveillance control planning and guidance functions are concerned Ground tracks should be provided with labels for target identification and flight plan information acquisition and should be presented on the airport map Movement safety should be supported by conflict alert messages presentation Arrival flights and Departure flights with route presentation will be confirmed and or modified by ATC Part 2 2 1 Scope of Technical Specifications Page 162 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc ATC should be able to command lighting statuses presentation on airport map and light segment in order to perform guidance of outbound and inbound traffic when connect to AFL In case of the servers fail the GSD should be received data directly from any surveillance sources by automatic preset or by manually The following information should be presented but not limited to at the GSD Synthetic traffic situation on the digital map of the airport High resolution Radar raw video fro
415. rs used to D define the DMAN parameters DMANO3 Tenderer shall propose and detail the methodology to help aerodrome control to build an optimized departure sequence issue in accordance with departure demand and capacity DMANoO4 Tenderer shall propose and detail the methodology to improve departure flows at one or more airports DMANOS Tenderer shall propose and detail the methodology to adjust the plan which D supports the tactical handling of departures to aerodrome control DMANO6 Tenderer shall propose and detail the methodology to support the runways in D mixed mode operations Part 2 2 1 Scope of Technical Specifications Page 239 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc 8 13 Controller Pilot Data Link Communication CPDLO1 Tenderer shall provide product description of the proposed system detailing CPDLC functionalities capabilities and benefits CPDLO2 The Tenderer shall propose and detail the methodology and parameters used to define the CPDLC parameters CPDLO3 Tenderer shall propose and detail all message sets that are supported by CPDLC function CPDLO4 Tenderer shall propose and detail all CPDLC functionalities that are supported the controller pilot data link commun
416. rt Passenger Terminal Attachment 6 1 3 The location of HTY APC Building and Training Building at Hat Yai Site 590 Flight LCL Data GND E HTY Local Tower 6 floor E ControlRoom HYT APC Building Desk SUPERVISOR Floor Plan Cabinet HTY601 Contro 65 00 5 50 3 50 3 50 4 00 4 00 4 00 4 00 4 00 5 50 a E Existing Equipment Operation Room Room HTY202 i Interim Operation Room HTY201 HTY APC Building Floor Plan Attachment 6 1 3a The location of the Operation Room Equipment Room and Local Tower Control Room of HTY APP MOPS and HTY LTS Pilot Room HTN101 CON TRA Room HTN102 Equipment Room HTN103 EEXEETEXZXEIYYYZTXYXITETL 24 4 iil A Yat 1 milis ELIT 1 A UPS Room Hmm WERL HTN104 1 floor Training Building Floor Plan Attachment 6 1 3b The location of the CON TRA Room Pilot Room and Equipment Room of HTY APP CON TRA MAG VAR 0 18 Ww 2001 PHUKET INTERNATIONAL AIRPORT AERODROME ELEVATION 82 ft AERODROME LAY OUT SCALE 1 10 000 TURN AROUND PAD Sw 60 X 45 _ ANDAMAN SEA APCH LGT STATION E3 GP STATION POWER HOUSE m Phuket APP Control Center Building Administrative Building of Phu
417. s lay on separate cable ladders apart from MOPS VCCS cables The Fallback VCCS has separate radio fallback line distribution connected to radio lines There is a telephone fallback system directly connected to a separate telephone switching system The VCCS workstation facilities can be shared with the MOPS VCCS CON TRA VCCS The role of the CON TRA VCCS is to take over the ground ground and air ground communications in case of total failure of the MOPS VCCS and Fallback VCCS All components are independent and separated from the MOPS VCCS and Fallback VCCS including a separate power supply Compare to MOPS VCCS the CON TRA VCCS has the capability VCCS workstation facilities and external radio telephone line interfaces only to serve in Contingency situation The central racks of the CON TRA VCCS are installed in a different location as the MOPS VCCS The CON TRA VCCS has separate radio line distribution connected to radio lines There is a telephone system directly connected to a separate telephone switching system The VCCS workstation facilities are the same as the MOPS VCCS System Capacity e The VCCS workstation facilities capacity of each site is specified in the VCCS Appendix 3 1 and the TLIMs for each site for interface with 2 Wire telephone set 2 Wire Voice Call PSTN and PABX as specified in the VCCS Appendix 3 2 e The capacity of the 4 Wire RLIMs are specified in the VCCS Appendix 3 3 e The capacity of the 1 RLIM for MOPS Fa
418. s needed for Disaster Situation for all APP Systems This APP IBS will be able to operate in place of any APP MOPS including BAPP MOPS CMA APP MOPS HTY APP MOPS PUT APP MOPS PSL APP MOPS and HHN APP MOPS one at a time Figure 4 shows connection between the NAS IBS and various related systems in the Disaster Situation The bold arrow lines depict connection in the Disaster Situation while the dashed arrow lines depict connection in normal situation Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc APP System CON TRA P _ 5 5 MOPS Figure 4 Connections between NAS IBS and other systems case of Disaster Situation NAS CON TRA The NAS IBS should have the same hardware and software licenses to cover the quantities of Servers and network capabilities for the operation of NAS MOPS Since the APP IBS will operate in place of any APP Systems it will also have enough hardware to perform as such Therefore in the current configuration the APP IBS will have at minimum the hardware covering quantities of Servers and network capabilities at BAPP MOPS which has the highest quantities of hardware among APP System The APP IBS will be able to operate in many modes to support APP
419. se and detail The LCD Monitor of Type D Workstation which specifies at minimum the following aspects features e Brand and Model and e Technical specification data details The Tenderer shall propose the detail of input and pointing devices characteristic of workstation Part 2 2 1 Scope of Technical Specifications Page 259 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 2 SRVCOI 9 3 PRNTOI PRNTO02 9 4 CONSOI 502 Specifications doc Server Computer The Tenderer shall propose the technical specifications data of the provided Server Computers including all attached devices which specifies at minimum the following aspects features e Brand and Model e CPU performance e type performance and capacity of Memory e Network interface card e Power Supply e type performance capacity of Storage device and Mean Time Between Failure value of each component Printers The Tenderer shall propose the List of supply of the printers that are provided E The Tenderer shall propose and detail the Networked Color Laser printers which specifies at minimum the following aspects features e Brand and Model and e Technical specification data details Console The Tenderer shall propose the List of supply of
420. ses separated processor to receive and process ADS B messages from multiple ADS B ground stations and produces single track per aircraft namely ADS B track and distributes these data to other functions via internal network The ADS B validation techniques should be used for improve ADS B track s position and altitude MLAT WAM processing The SDP will be designed to receive Multilateration Target reports messages from multiple MLAT WAM stations and produces single track per aircraft namely MLAT WAM track and distributes these data to other functions via internal network Multi Sensor Fusion processing The SDP will be designed to fuse multiple sensor data together forming single track per aircraft namely system track that represents the consolidated estimate of physical position of the aircraft The SDP distributes these data to other functions via internal network Fusion process need to address the update rate of the various sources of data the integrity of the positional data received etc Weather Information processing The SDP will be designed to receive weather information from PSR and produces Graphic RADAR weather picture and distributes these data to CWS via internal network The RADAR weather picture should contain up to six 6 levels of weather map intensity Surveillance data input The SDP will be designed to handle surveillance data input including ability for future expansion and processing multiple types of me
421. sesoesosoesocossosoesecoesosossosose 5 SECTION B SUPPORT AND AFTER SALE 20 401 9 4 4 5 1 Service o c M M H 5 2 Warrantee e 5 3 cT 6 3 1 T 6 3 2 Database Management System Training 7 3 3 Air Traffic Control Operational Train the Trainer Training 7 3 4 Flight Data Operator Train the Trainer Training eese eere e eere ee enne 8 3 5 Training Supervisor Instructor Training eere eee eene eene ente etnanne 9 3 6 TRA Pseudo pilot Training eee crece eese eere eee eee eene enata es eas tease tasto 10 3 7 Factory Maintenance Training 10 3 8 Local Maintenance Training eee ecce eee eee eene eene etae eaa 13 3 9 Data Management System Technical Training e e eene ene 13 3 10 Support for In house Maintenance Training 14 3 11 Materials EREE 14 4 Documents mU D M 15 5 Spare KR Roa EROR o REN EUER UO 16 6 Tools and Test Equipment sssscccsscssssssscisscicisssossiercecssssanassancasssssssenacceedssssnaisanse 17 SECTION C SUPPORT
422. sion of system for air traffic management in the last 5 years as on 1st January 2011 as per project Project Past Experience as per project General Project Information Name of the project Client for which the project was executed Name and contact details of the client Project Details Description of the project Summary details of the scope of the project shall be provided which are part of evaluation criteria Scope of services Outcomes of the project Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Requirements Vol II Part 2 2 2 Final 1 0 Other Details Total cost of the project Duration of the project no of months start date completion date current status Other Relevant Information Supporting Documents a Letter from the client to indicate the successful completion of the projects b Copy of Work Order Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Volume II Technical Terms of Requirements Vol II Part 2 2 2 Final 4 Proof of Certification Version 1 0 The Tenderer shall provide a copy of certificate and details of assessment of the required certification CMMI Level 5 and ISO 27001 or above Format for the Proof of Certification
423. sists of various systems and possesses many capabilities in order to support different operation services such as en route control service and approach control service For example Data Processing System Server Voice Communication and Control System VCCS and End System clients printers etc etc are part of MOPS Data Processing System is the heart of the MOPS The system consists of many functions such as flight data processing function surveillance data processing function arrival management function departure management function flexible use of airspace function etc Communication is a vital part of the MOPS A main VCCS supported by a fall back VCCS will be incorporated along with other vital systems e g Digital Voice Recorder amp Replay System DVR Time Reference System TRS System Monitoring amp Control SMC etc Contingency Training System CON TRA The Contingency Training System CON TRA is an integrated design solution in support of the contingency and the training mission The CON TRA will be able to operate in two modes CON Mode and TRA Mode Both modes of operation should utilize the same hardware package The CON Mode Software is a copy of the MOPS software and it is completely separated from the TRA Mode Software By launching a specific mode the CON Mode or the TRA Mode on the respective server pack or in dual boot it configures feeds and interacts with the appropriate End Systems as configured by
424. splay MLAT WAM information to the ATC The Tenderer shall provide product description of the proposed system detailing Multi Sensor Fusion processing functionalities capabilities and benefits The Tenderer shall propose and the maximum number of simultaneous system track that are supported by Multi Sensor Fusion processing of both MSDP and FSDP of the following systems e NAS MOPS e NAS CON TRA e NAS IBS e APP MOPS APP CON TRA e APP IBS The Tenderer shall propose and detail the methodology and parameters used to configure the Multi Sensor Fusion processing The Tenderer shall propose and detail methodology to display Multi Sensor Fusion information to the ATC The Tenderer shall provide product description of the proposed system detailing weather information processing functionalities capabilities and benefits The Tenderer shall propose and detail the weather information data format the maximum number of Weather information data input that are supported by Weather Part 2 2 1 Scope of Technical Specifications Page 224 D D D D D Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference Volume II Terms of Reference File Reference Version Volume II Part 2 1 Scope of Technical 1 0 Specifications doc information processing of both MSDP and FSDP of the following systems e NAS MOPS e NAS CON TRA e NAS IBS e APP MOPS e APP CON TRA
425. ssages formats from various types of surveillance sensors as stated in Table 1 NAS MOPS Intersystem Part 2 2 1 Scope of Technical Specifications Page 112 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Interface Description Table 5 NAS MOPS Surveillance Systems Information Exchange Description Table 11 APPS Intersystem Interface Description and Table 13 APPS Surveillance System Information Exchange Description The redundant data input lines will be used all of them can be managed via the CMWS such as switching to alternative input line inhibiting exhibiting input line displaying input line in used data input line status etc When communication line problem and or low quality data have been detected the SDP should be automatically switched to alternate data input line and the SDP will be notified and logged at CMWS 9 1 8 Pre process The SDP will be designed to analyze the incoming surveillance messages filtering out errors to protect the next process from incomplete messages The SDP will also use plot overloads protection with the intention of filtering out excess plots such that when plot overloads are detected the SDP will be notified and logged at CMWS 9 1 9 Surveillance blanking areas The surveillance blanking areas should be def
426. stem track at reception of valid Mode C information from an associated local track The Mode S altitude and or ADS B altitude should also be used for altitude tracking Stereographic Projection Aircraft positions from RADAR are received in RADAR coordinates of slant range azimuth and altitude The SDP will be designed to convert all RADAR relative positions range and azimuth to system coordinates in a common system plane by applying a slant range correction and a stereographic projection Specific codes The SDP will be designed to receive the specific codes such as Special Position Indication code SPD emergency squawk codes 7500 7600 and 7700 and immediately reported to CWS Test Targets Monitoring The SDP will be designed to monitor the geographical position of the test targets If a test target position falls out of tolerance the SDP will be notified and logged at CMWS The following test targets monitoring are concerned a Primary test target test target report in the RADAR message b Secondary test target test target report in the RADAR message c Permanent primary target and d Fixed beacon transponder Part 2 2 1 Scope of Technical Specifications Page 114 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 1 16 9 1 17 9 1 18 9 1 19 9 1 2
427. sts of the following components o UPS equipment set There at minimum two 2 sets of UPS equipments 1 B1 Each set of UPS equipment has 2 inputs in separated main bypass configuration Also each set of UPS equipment alone is able to provide enough electric power for all equipments in the facility for a minimum of 15 minutes The Tenderer is responsible for electric current load calculation for each facility and each set of UPS equipment The output power of UPS will be 3 phases Static Transfer Switch STS There is at minimum one 1 STS The STS connects to both groups of UPS equipments to receive electric power supply The STS automatically selects electric power from one group of UPS to provide to all single power supply equipments in the facility 10 8 2 4 Technical Specification for 3 phases UPS System The minimum technical specification for 3 phase UPS System is described in following table Details Criteria TECHNOLOGY IGBT based Microprocessor Digital Signal Processing based Double Conversion On line UPS with complete isolation from the mains through inbuilt isolation transformer protecting the load from electrical noises spike and voltage surge with reverse phase sequence operation for three phase supply QUALITY STANDARD ISO 9001 and ISO 14001 Certification INPUT RATINGS Rectifier Charger Unit VOLTAGE RANGE 380 to 415 V AC 15 96 3Ph N G POWER FACTOR gt 0 98 at
428. system Monitoring systems intended for operation and maintenance will be part of the technical system making the maintenance activities more efficient thereby reducing the operation and maintenance costs Part 2 2 1 Scope of Technical Specifications Page 174 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc The Mean Time To Repair MTTR comprising the failure isolation replacement and subsequent restart and performance tests at the level of the Line Replaceable Unit LRU will not exceed 30 minutes The availability of a depiction of the current traffic situation comprising at least a plot display from a selected source and background maps at CWS on each suite will be at least 0 9999 10 6 Performance and Capacity 10 6 1 System Performance and Capacity The system will provide the following performance and capacity in the Operational and Contingency Facility at minimum ITEM Performance and capacity Received pios porsaan states 1 NM to 1024 NM 10 6 2 The Maximum response time commands to execution completed at CWS T CWS will be one 1 second with the exception of commands that involve flight plan handling e g route modification which will be four 4 seconds 10 6 3 Start Up
429. systems e NAS MOPS e NAS CON TRA e NAS IBS e APP MOPS APP CON TRA e APP IBS The Tenderer shall propose and detail the methodology and parameters used to configure the Multi RADAR processing The Tenderer shall propose and detail methodology to display Multi RADAR information to the ATC The Tenderer shall provide product description of the proposed system detailing ADS B processing functionalities capabilities and benefits The Tenderer shall propose and detail the methodology of ADS B validation techniques that are used to improve ADS B track position and altitude The Tenderer shall propose and detail the ADS B data format the maximum number of ADS B ground station that are supported by ADS B processing of both MSDP and FSDP of the following systems e NAS MOPS e NAS CON TRA e NAS IBS Part 2 2 1 Scope of Technical Specifications Page 222 D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 SDPI7 SDP18 SDP19 SDP20 SDP21 SDP22 Specifications doc APP MOPS e APPCON TRA APPIBS The Tenderer shall propose and detail the maximum number of simultaneous ADS B track supported by ADS B processing of both MSDP and FSDP of the following systems e NAS MOPS e NAS CON TRA e NAS IBS e APP MOPS e APP C
430. t For the design and implementation of relational databases in the System the System will use commonly used Relational Database Management System RDBMS software such as Oracle or equivalent 10 7 3 Operating System computers will use Linux operating systems 10 7 4 Networking Equipment The network equipment and interface devices will utilize high bandwidth communication technologies at least 1000 Mbps e g gigabit network cable gigabit switches and standard TCP IP and UDP IP communications protocols Each node of the MOPS CON TRA and IBS will be equipped with a dual network interface to provide redundant operational LAN connections Each network equipment will be equipped with at least the following networking management features and devices a Management Information Base MIB conforming to RFC1212 and RFC1213 and agents supporting Remote Network Monitoring RMON and SNMP standards b Sending the equipment status messages through SNMP by compiling MIB in conformance with RFC 3418 to the CMWS and c Synchronizing the equipment date time clock through NTP Each network switch will be equipped with at least the following high availability features and devices a gt 140 000 hours b Modular chassis designed for plug in channel cards Part 2 2 1 Scope of Technical Specifications Page 177 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference F
431. t MONA MTCD AOM FUA DCB ATFM TS AMAN DMAN CPDLC REC REP DA AIM TM CWS HMI FDO HMI DSM NMS CMS 2 End System CWS CMWS FDWS DSWS DAWS NMWS Printer Y ES 1 Processing 1 Processing System System o SDP o SDP FDR FDP Safety Net Safety Net o MONA o MONA o MTCD o MTCD o AOM o AOM o FUA o FUA o DCB o DCB o ATFM o ATFM o TS o TS o AMAN o AMAN o DMAN o DMAN o CPDLC o CPDLC o REC REP o REC REP o DA o DA o AIM o TM o TM o CWSHMI o CWSHMI o FDOHMI o FDOHMI o DSM o DSM NMS o NMS o CMS o CMS o CBT TEG 2 System 2 End System o CWS o CWS o CMWS CMWS o FDWS o FDWS o DSWS o DSWS o DAWS o DAWS o NMWS NMWS o Printer o Printer o TMCWS 3 VCCS F VCCS PSPWS o ESP 4 UPS 3 VCCS 4 UPS Figure 16 The Breakdown of TMCS Feature APP Systems MOPS 1 Processing System o SDP FDP Safety Net MONA MTCD AOM FUA DCB ATFM TS AMAN DMAN CPDLC REC REP DA AIM TM CWS HMI FDO HMI DSM NMS CMS CBT O 0 0 0 0 0 0 00 0 0 0 0 2 End System CWS CMWS FDWS DSWS DAWS NMWS Printer 0 0 3 5 5 Eun 1 Processing System o SDP FDP Safety Net MONA MTCD AOM FUA DCB ATFM TS AMAN DMAN CPDLC REC REP DA AIM TM CWS HMI FDO HMI DSM NMS CMS TEG SG Qoo cO
432. t Chiang Mai Site UPS 10 The Tenderer shall propose and detail the UPS configuration best suited for all E systems at Hat Yai Site The Tenderer shall propose and detail the wiring diagram from UPS to equipments E at Hat Yai Site UPS12 The Tenderer shall propose the list of supplies of UPS equipments and related E Part 2 2 1 Scope of Technical Specifications Page 264 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 UPS13 514 UPSI5 516 UPS17 UPS18 UPS 19 UPS20 UPS21 UPS22 UPS23 524 525 Specifications doc components for Hat Yai Site The Tenderer shall provide product description Technical Characteristics of UPS systems Static Transfer Switch and other related components at Hat Yai Site The Tenderer shall propose and detail the UPS configuration best suited for all systems at Phuket Site The Tenderer shall propose and detail the wiring diagram from UPS to equipments at Phuket Site The Tenderer shall propose the list of supplies of UPS equipments and related components for Phuket Site The Tenderer shall provide product description Technical Characteristics of UPS systems Static Transfer Switch and other related components at Phuket Site The Tenderer shall propose and detail the UPS c
433. tail type of RADAR RADAR data format supported by Mono RADAR processing of both MSDP and FSDP of the system as follow e NAS MOPS e NAS CON TRA e NAS IBS e APP MOPS e APP CON TRA e APP IBS The Tenderer shall propose and detail the methodology and parameters used to define the Mono RADAR processing The Tenderer shall propose and detail methodology to display Mono RADAR information to the ATC The Tenderer shall provide product description of the proposed system detailing Multi RADAR processing functionalities capabilities and benefits The Tenderer shall propose and detail type of RADAR RADAR data format maximum number of RADAR input and maximum number of RADAR in an overlap area that are supported by Multi RADAR processing of both MSDP and Part 2 2 1 Scope of Technical Specifications Page 221 D D D D D D D D D Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference Volume II Terms of Reference SDP11 SDP12 SDP13 SDP14 SDP15 SDP16 File Reference Version Volume II Part 2 1 Scope of Technical 1 0 Specifications doc FSDP of the following systems e NAS MOPS e NAS CON TRA e NAS IBS e APP MOPS e APP CON TRA APPIBS The Tenderer shall propose and detail the maximum number of simultaneous Multi RADAR track that are supported by Multi RADAR processing of both MSDP and FSDP of the following
434. taneous users supported by CBT The Tenderer shall propose and detail the hardware configuration best suited for CBT Tower Surveillance Data Processing The Tenderer shall provide product description of the proposed system detailing TSDP functionalities capabilities and benefits The Tenderer shall provide product description of the proposed system detailing SUF features The Tenderer shall propose and detail the combination algorithm of data from several sources to provide a single target The Tenderer shall propose the update time range used for Track identification The Tenderer shall propose and detail the format of data output of SUF The Tenderer shall provide product description of the proposed system detailing COF features The Tenderer shall propose and detail all types of automatic conflict detection and alerting Part 2 2 1 Scope of Technical Specifications Page 253 D D D D D D E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 TSDPOS8 TSDPO9 TSDP10 TSDPI1 TSDPI2 TSDP13 TSDP14 8 26 TFDPOI TFDPO02 TFDP04 TFDPO5 Specifications doc The Tenderer shall propose and detail of all scenarios of Runway Incursions The Tender
435. tation best suited for FISL Operator Role 08 The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for TECHSUP Operator Role ORWO09 The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for FMM Operator Role ORWO10 The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for FMC Operator Role Part 2 2 1 Scope of Technical Specifications Page 203 E E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 ORWOII ORWO 2 ORWO 3 ORWO14 ORWOIS ORWOIL6 ORWO 7 ORWOIS ORWO 9 ORWO20 Specifications doc The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for FDO Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for DSO Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of workstation best suited for ADF Operator Role The Tenderer shall propose and detail the software characteristics functions capabilities of wo
436. te Part 2 2 1 Scope of Technical Specifications Page 67 Naine Description End System PSL APC PSL APC Building 2 Floor Operation Room PSL201 Attachment 6 1 5a PSL APP Equipment MOPS Redundant Data processing PSL Building 2 Floor Equipment Room PSL202 Attachment 6 1 5a VCCS PSL APC Building 2 Floor Equipment Room PSL202 Attachment 6 1 5a F VCCS PSL APC Building 2 Floor Equipment Room PSL202 Attachment 6 1 5a End System PSL APP CON TRA Administrative Building 3 Floor CON TRA Room ADM301 Attachment 6 1 56 PSL APP Pseudo Pilot Administrative Building 3 Floor Pilot Room ADM302 Attachment 6 1 5b CON TRA Equipment Data processing Administrative Building 3 Floor Equipment Room ADM303 Attachment 6 1 56 VCCS Administrative Building 3 Floor Equipment Room ADM303 Attachment 6 1 56 End System PSL LTS PSL Local Tower PSL APC Building 6 Floor Local Tower Control Room PSL601 Attachment 6 1 5a Equipment Redundant Data processing PSL Building 2 Floor Equipment Room PSL202 Attachment 6 1 5a UPS UPS 2 Administrative Building 1 Floor UPS Room ADM101 Attachment 6 1 5c Table 24 Summary of PSL APP Site Information Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Referen
437. te eee setae setas etna seas 151 9 25 Tower Surveillance Data Processing 155 9 26 Tower Flight Data Processing 160 Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 9 27 Tower Controller Workstation T C WS 162 10 Technical 168 10 1 Workstations Characteristic 1 1 21 0 0 168 10 2 2 2 172 10 3 172 10 4 Sri c 172 10 5 Reliability Availability and Maintainability 174 10 6 Performance and Capacity ee eese eese teens teens tas eta seta setas 175 10 7 Design 176 10 8 Uninterrupted Power ee etes eta setae stans 179 SECTION Pr
438. tem TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 1 Specifications doc Surveillance Data Processing The surveillance messages from surveillance sensors should be a vital input data of the TMCS Such surveillance messages should be managed and processed in order to support functions for Air Traffic Controller ATC operation such as situational awareness flight data update ATC tools e g Safety Nets Monitoring Aids Medium Term Conflict Detection etc There are many types of surveillance technologies in the market such as PSR SSR Mode A C and Mode S ADS B and MLAT WAM which AEROTHAI currently deploys some of them These surveillance sensors may have different data format as well Therefore AEROTHAI expected that the TMCS should be able to process surveillance messages from every surveillance technology in the next ten 10 years To ensure of processing security AEROTHAI expected that the system should be equipped with an efficient firewall to protect an unrelated surveillance information As stated in the level of contingency and backup level II the TMCS comprised of two 2 surveillance data processing systems 1 The Surveillance Data Processing SDP working on Main Surveillance Data Processing System M SDPS is called MSDP and 2 The SDP working on Fallback Surveillance Data Processing System F SDPS is called FSDP The FS
439. teration Surveillance System MOPS Main Operation System Msg Messages NAS Nationwide Air Traffic Management System NMWS Network Management Workstation PSR Primary Surveillance Radar RTS Remote Tower System RATFM Regional Air Traffic Flow Management SSR Secondary Surveillance Radar WAM Wide Area Figure 6 Intersystem Connections of the NAS MOPS Part 2 2 1 Scope of Technical Specifications Page 18 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference File Reference Volume II Part 2 1 Scope of Date December 14 2012 Technical Specifications doc Version 1 0 The NAS MOPS provides the following external interfaces to each of the external systems identified as listed in table below External System System Protocol Dimension Ch A Ch B AMHS TCP IP 1 1 1 CIFDPS TCP IP 1 1 1 AGDL System TCP IP 2 2 2 Surveillance Systems 1 SSR PSR TCP IP 32 32 32 2 SSR PSR Synchronous 4 4 4 3 ADS B TCP IP 12 12 12 4 16 16 16 5 MLAT TCP IP 16 16 16 Adjacent ACC ATM TCP IP 6 6345 Systems TCP IP 1 1 1 MET System TCP IP 1 1 1 5 1 1 1 Other Systems TCP IP 1 1 Table 1 NAS MOPS Intersystem Interface Description 4 2 1 NAS MOPS AMHS NAS MOPS is capable of connecting with AMHS to excha
440. terrupted Power 264 SECTION D Appendices ssssssscisisessssssosscasssssissacesseiesaadssasensnscstecutsseasdseassaavesnuaassaarssanas 268 Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Document Reference File Reference Volume II Technical Terms Volume II Part 2 1 Scope of of Reference Technical Specifications doc Date December 14 2012 Version 1 0 List of Abbreviations Abbreviation FullName A01 New Operation Building FL02 A02 CON TRA Building FLO1 A03 Operation Building ATC Complex FLOS A04 CON TRA Building FL03 A05 Operation Building FL02 A06 Operation Building FL02 A07 Operation Building FLOI A08 ADM Building FL02 A09 Operation Building FLOI 10 ADM Building FLO3 All Operation Building FLOS A12 AFL Building FLO1 13 Operation Building FL02 14 Operation Building FL06 15 Operation Building FL05 16 Operation Building FLO3 Al7 Operation Building FL06 ACC Area Control Centre ACID Aircraft Identification ADEXP ATS Data Exchange Presentation ADF Air Defense Operator ADS B Automatic Dependent Surveillance Broadcast AFL Air Field Lighting System AFTN Aeronautical Fixed Telecommunication Network AGDL Air Ground Data Link System AIDC ATS Inter facility Data Communication AIM Aeronaut
441. th TMCS but not under the scope of TMCS These Operators need coordination mechanism with TMCS and some may require TMCS to adjust its external interface e g Airport Operators AOs Adjacent ACCs Figure 5 describes the operational context of TMCS Part 2 2 1 Scope of Technical Specifications Page 10 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Technical Terms of Reference File Reference Volume II Part 2 1 Scope of Technical Specifications doc Date December 14 2012 Version 1 0 Adjacent ACCs RATFMU Area Control Centre AFTN Aeronautical Fixed Telecommunication Network AMHS Aeronautical Message Handling System AO Airport Operators ATN Aeronautical Telecommunication Network BAPP Bangkok Approach Control BACC Bangkok Area Control Centre BAPC Bangkok Approach Control Centre CMA Chiangmai Airport CMA APC Chiangmai Approach Control Centre DMA Don Muang Airport FDMC Flight Data Management Centre HHN Hua Hin Airport HHN APC Hua Hin Approach Control Centre HTY Hat yai Airport Pilot External System 1 4 M lt AQ EN i PUTAPC f 4 bs EM PsLAPC
442. the External Systems and the pertinent Internal Systems Part 2 2 1 Scope of Technical Specifications Page 24 Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of page 1 0 of Reference Technical Specifications doc Pilot NAS NAS lt Internal Msg IBS Intersystem AGDL LTS RTS Internal Msg Msg Data gt System i I Internal Msg gt Exposed from NAS FDDWS If Local AGDL is not available Internal Msg Internal Msg APPS Internal Msg Internal Msg Internal Msg Internal Msg Internal Msg End System ADS B Automatic Dependent Surveillance Broadcast AGDL Air Ground Data Link APP Approach Control APPS Approach Control Systems BAPP CMA APP HTY APP PUT APP PSL APP HHN APP CCMS Central CNS ATM Monitoring System CMWS Control and Monitoring Workstation CWSs Controller Workstation DAWS Data Analysis Workstation DSWS Data Set Workstation FDDWS Flight Data Display Workstation FDWS Flight Data Workstation Surveillance Systems Intersystem SSR e ADS B Msg Data e WAM MLAT CON TRA Internal Msg 9 System Intersystem MET
443. the greatest possible access to airspace resources provide equitable access for all airspace users accommodate user preferences and ensure that demand on an airspace resource will not exceed its capacity The DCB will be integrated within the ATM system It will be undertaken at the strategic pre tactical and tactical stages Air Traffic Flow Management The main purpose of the Air Traffic Flow Management ATFM is to compare traffic demand with available sector capacity In cases where demand exceeds the sector capacity the system will be able to make the information available to the flow manager In conjunction with the Supervisor they would decide whether or not to implement a regulation delaying flights through the manual coordination with neighboring units and effectively moving the excess traffic out of the overload period Re routing of a flight will also be an option to resolve the situation is not only responsible for Tactical operations day of flight but also for significant period of the Pre tactical operations from 1 6 days prior to airborne ATFM function supports the flow manager by calculating traffic demand in every sector within the Bangkok FIR area using the FPL and RPL information gathered from the flight plan data acquisition phase The demand will be displayed for the day of flight and up to 6 days prior to airborne Part 2 2 1 Scope of Technical Specifications Page 134 Project Name Date
444. the grouping and selective presentation of the diverse data managed by the system Standard window operations are specified open close move resize However due to the nature of the ATC additional safeguards are valuable to ensure that critical data is not erased or obstructed A key factor governing the ease of learning how to use the system and the safety of its use is the consistency of its presentation and input methodology across all windows As such a style guide is necessary detailing generic features such as color usage window layout and decoration pointer button operation orientation of field label relative to a field etc that is used in the design of the HMI Describing the use of a Conceptual Object containing the world representation of an entity should specify the consistency of the presentation of a common data object in multiple windows From conceptual object Presentation Objects may be created to display the entity in various windows Any change to the conceptual object is reflected in all of its presentation objects Similarly a conceptual object may be updated by operating on any one of its presentation objects Part 2 2 1 Scope of Technical Specifications Page 140 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 18 2 9 18 3
445. theoretical and practical understanding cognizant with developing and delivering appropriate training courses to other FDO 3 5 Training Supervisor Instructor Training The Seller will provide Training TRA Supervisor and Instructor TRAS D training will be provided for up to twelve 12 Staffs The objectives of the TRAS I course will be Part3 SUPPORT AND AFTER SALE SERVICE Page 9 of 19 Project Name System Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms of Volume Part 3 Support and After Sale 1 0 Service_Final doc e Establish an expert level of TRA knowledge cognizant of managing the training operations of the TRA system e Establish an expert level of TRA knowledge cognizant of developing training exercises and e Establish an expert level of TRA pilot functions cognizant of developing and delivering training for TRA pilots e completion of this course participants will be able to successfully manage the TRAs operations develop and conduct training exercises and conduct simulator pilot training 3 6 TRA Pseudo pilot Training TRA Pseudo pilot TRAP training will be provided for up to thirty 30 Staffs On completion participants will be able to satisfy the assessment standard and to discharge their roles as pilot when they are engaged in SIM training session 3 7 Factory Maintenance Training The Sel
446. tial local traffic on or near the maneuvering area o Determining the location of aircraft and vehicles on the maneuvering area o Providing directional taxi information to aircraft when requested by the pilot or deemed necessary by the ATC o Providing assistance and advice to emergency vehicles The COF will be responsible for automatic conflict detection and alerting It will detect area incursion conflicts at a minimum comprised of o Runway Incursions e g conflicts between aircraft or vehicles on the runway and aircraft intending to land o Taxiway Conflicts e g aircraft taxiing with excessive speed o Area Conflicts e g an aircraft through into closed runways o Special Conflicts e g an aircraft through an activated stopbar When COF detects a conflict situation an alert message and audible alarm will be provided to the related ATC The TSDP will provide alerts updates to the ATC at a minimum of once per second The parameter of detection of conflict alert will be configurable e g range time etc Route Planning Feature RPF for Suvarnabhumi only The RPF will provide fully automated strategic and tactical planning of movements to optimize the use of runway and taxiway resources and minimize taxi times The RPF will determine and assign routes to individual aircraft and vehicles on the movement area The will accommodate ATC with the capability to manually select the routes for each individual
447. tion Quantities cccssssccsssssscsssssscsssssssssssccssescseees 79 7 1 Nationwide Air Traffic Management System NAS 80 7 2 5 t M 81 7 3 Air Defense Units E 82 7 4 APP VEI QM 82 7 5 APP System 83 7 6 PUTA PPS ystems 84 7 7 PSL APP Systemi a 85 7 8 HAHN APP SySteIn EN 86 7 9 Tower SYStOMS a codes Kn aE aa 86 7 10 Additional requirements for Workstations 90 8 The Voice Communication and Control System V CCS 95 8 1 VCCS Workstation 2 1 1 nene 97 8 2 98 8 3 98 8 4 Technical Control Unit odenecceseedesscectes 99 8 5 Radio 99 8 6 Telephone Function 102 8 7 Other 103 8 8 GPS Master EO Cd OR 103 8 9 Iun fo
448. tion grade computer and one 21 touch screen LCD monitor b Software Characteristic Software characteristic for operator roles are as follow ASD Function GSD Function FDD Function T CMS and T DSO 5 2 3 Mapping between Tower Operator Role and Tower Workstation Types In order to support the work of any operator role a set of hardware will be equipped configured with appropriate software The mapping table gives examples of mapping between hardware and software for all operator roles The Tenderers are encouraged to use this mapping example as an initial guideline and modify the content accordingly The operator role layouts are presented in attachments Facility Role HW Characteristic SW Workstation Workstation TED panel Printer Characteristic Name 1 LCL One 1 Type B 1 0 ASD Function ASDWS One 1 Type B GSD Function GSDWS One 1 Type D FDD Function FDDWS 2 COR One 1 Type B 1 0 ASD Function ASDWS One 1 Type B GSD Function GSDWS One 1 Type D FDD Function FDDWS 3 GND One 1 Type B 1 0 GSD Function GSDWS One 1 Type D FDD Function FDDWS 4 CDC One 1 Type B 1 0 GSD Function GSDWS One 1 Type D FDD Function FDDWS 5 T One 1 Type B 1 ASD Function ASDWS TACTSUP One 1 Type B GSD Function GSDWS One 1 Type D 1 FDD Function FDDWS 6 DMAN One 1 Type D 1 0 FDD Function FDDWS 7 T FDO One 1 Type D 0 0 FDD Function FDDWS 8 T DSO One 1 Type B 0 1 T DSO Function TDSWS 9 T EO One 1 Type B 1 0 ASD Function ASDWS One 1 Ty
449. tions are described in table format SBA LTS Workstation Quantity Location Operator Role ASDWS GSDWS FDDWS T CMS T DSO LCL 3 3 3 SVB Airport GND 4 4 Control CDC 2 2 Tower T FDO 4 T TACTSUP 1 1 1 5th Floor T MTN 1 1 1 Equipment 1 1 1 room T DSO Part 2 2 1 Scope of Technical Specifications Page 88 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope of Technical Specifications doc LA SBA LTS Workstation Quantity Location Operator Role ASDWS GSDWS FDDWS T CMS T DSO 4th Floor ATC Complex Information Sets 8 9 3 ARO Office ARO 1 AOT Office BAO 1 Total 14 21 21 1 1 Table 48 List of workstation quantities for Level IV SBA LTS e SBA Emergency Tower System The planned quantities of positions are described in table format SBA Emergency Tower System Workstation Quantity Location Operator Role ASDWS GSDWS FDDWS LCL 2 2 2 GND 2 2 West Apron T TACTSUP 1 1 1 T FDO 2 CDC 2 LCL 1 1 1 East Apron GND 2 T FDO 2 Total 4 10 14 Table 49 List of workstation quantities for Level IV SBA Emergency Tower System b Don Muang Airport DMA Remote Tower System RTS DMA Tower System comprises 2 systems e DMA Tower Syste
450. tive for a flight according to the actual behavior of the aircraft as follow a Lateral Conformance Monitoring b Longitudinal Conformance Monitoring c Vertical Conformance Monitoring and d Progress Monitoring 9 4 1 1 Lateral Conformance Monitoring The purpose of lateral conformance monitoring feature is to detect lateral position of aircraft which deviates from their planned or assign route will be warned when an aircraft is deviating and or estimated to deviate from its planned route or assign route 9 4 1 2 Longitudinal Conformance Monitoring The purpose of Longitudinal Conformance Monitoring feature is refines the time estimates in the planned trajectory and tactical trajectory ATC will be warned when due to large changes in the time estimates on a coordination point re coordination of the flight is necessary ATC will also be warned when the aircraft speed deviates from the assigned speed 9 4 1 3 Vertical Conformance Monitoring In the vertical plane the Vertical Conformance Monitoring feature monitors the vertical movement of the aircraft in order to warn the ATC of deviation from a cleared level assigned level or vertical rate and to refine the calculation of the planned and tactical trajectories 9 4 1 4 Progress Monitoring The purpose of Progress Monitoring feature is to detect significant flight events such as take off landing and control area sector entry exit 9 4 2 Automatic Reminders Au
451. to forward a CPDLC message to another ground system The sequence of messages between the ATC at an Air Traffic Services Unit and a pilot relating to a particular transaction for example request and receipt of a clearance is termed a dialogue There can be several sequences of messages in the dialogue each of which is closed by means of appropriate messages usually of acknowledgement or acceptance Closure of the dialogue does not necessarily terminate the link since there can be several dialogues between ATC and pilot while an aircraft transits the Air Traffic Services Unit airspace The CPDLC function comprise of three 3 primary features Part 2 2 1 Scope of Technical Specifications Page 136 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 14 9 14 1 Specifications doc a The exchange of ATC pilot messages with the current data authority b The transfer of data authority involving current and next data authority and c Downstream clearance delivery with a downstream data authority Air Situation Recording and Replay The Recording and Replay function REC REP will have at minimum the following features a Recording REC b Replay REP and Archive media Recording The Recording feature REC will be designed to provide automatic on l
452. tomatic reminders feature provide reminders to the ATC for routine events that are performed at a time or distance relative to a point in the planned trajectory as follows but not limited to Part 2 2 1 Scope of Technical Specifications Page 129 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 5 9 5 1 Specifications doc a Transfer an aircraft to the next sector b Coordinate a flight where automatic means are not available and Issue a maneuver clearance to the aircraft e g change of flight level heading Medium Term Conflict Detections Medium Term Conflict Detection function MTCD will be designed to assists the of interactions that occur in the medium term e g up to 30 minutes that might require aircraft to be re planed or re cleared or may affect the choice of a desired vertical or lateral clearance Based on the predicted flight trajectories the MTCD detects potential conflicts and airspace penetrations Then it provides timely information to enable the affected ATC to assess and if necessary resolve the situation by taking deliberate corrective action Additionally the MTCD provides a facility for handling tentative flight trajectories This facility enables ATC to assess the potential effects of an intended action a reroute cleared level
453. tor Role In order to support the work of any operator role a set of hardware will be equipped and or configured with appropriate software The mapping table gives examples of mapping between hardware and software for all operator roles The Tenderers are encouraged to use this mapping example as an initial guideline and modify the content accordingly The operator role layouts are presented in attachments Facility Role HW Characteristic SW Characteristic Workstation Workstation set TED panel Printer Name 1 EC One 1 Type A 1 0 CWS HMI Function CWS 2 PC One 1 Type A 1 0 CWS HMI Function CWS 3 AMAN One 1 Type A 1 0 CWS HMI Function CWS 4 TACTSUP One 1 A 1 0 CWS HMI Function CWS 5 CMAC One 1 Type A 1 0 CWS HMI Function CWS 6 OPSUP One 1 Type A 1 1 CWS HMI Function CWS 7 FISL One 1 Type A 1 0 CWS HMI Function CWS 8 TECHSUP One 1 Type 1 0 CWS HMI Function CWS One 1 Type B CMS Function CMWS 9 EO Two 2 Type A 2 CWS HMI Function CWS One 1 Type B 1 DA Function DAWS 10 ASM One 1 Type A 1 0 CWS HMI Function CWS 11 MTN Two 2 Type A 2 0 CWS HMI Function CWS One 1 Type B CMS Function CMWS One 1 Type B NMS Function NMWS 12 TRN One 1 Type A 1 0 CWS HMI Function CWS 13 FMM One 1 Type C 1 1 CWS HMI Function CWS 14 FMC One 1 Type C 1 0 CWS HMI Function CWS 15 ADF One 1 Type C 0 0 CWS HMI Function CWS 16 FDO One 1 Type B 0 0 FDO Function FDWS 17 DSO One 1 Type B 0 1 DSM Function DSWS 18 PSP One 1 Ty
454. tors coordinate with three 3 groups of operators BACC BAPC HHN local tower and pilots Hua Hin Airport HHN Local Tower HHN Local Tower is under responsibility of HHN APC HHN local tower operators coordinate with three 3 groups of operators HHN APC AO and pilots Intersystem Connection This section describes logical intersystem connections of NAS MOPS APP MOPS and LTS RTS following the operational context Tenderers may design their own appropriate physical connections and systems to achieve these logical connections Data Integrity and Security Tenderers will offer data integrity and security against unauthorized access intrusion and malicious computer attacks without reducing the intersystem connection capabilities The mechanism to provide data integrity and security will include at minimum e 32 bit cyclic redundancy check CRC to protect the integrity of all stored data e Permissions or access control to system databases and applications that users and user groups are assigned for specific functions and data required to complete their duties on the ATMS e Data security that protects the data and applications from infection by computer virus or malicious software e Secure operating system that includes hardening of operating system disabling automatic updates of operating system e Segregation of external data flows onto isolated networks e Data gateways for communication with external systems
455. trative Building Attachment 6 1 4 illustrates the location of the buildings a PUT APC Building There are three 3 rooms allocated for the TMCS in the PUT APC Building b Administrative Building There are three 3 rooms allocated for the TMCS in the Administrative Building Each room is planned for specific operation purpose Please be advised that at the present there are others equipments installed in some rooms The site survey and site evaluation are recommended The following table describes the TMCS equipments and their planned installed rooms at Phuket Site Part 2 2 1 Scope of Technical Specifications Page 65 None Description Nane Function Number 0 End System PUT APC PUT APC Building 1 Floor Operation Room PUTIOI Attachment 6 1 4a PUT APP Equipment MOPS Redundant Data processing PUT APC Building 1 Floor Equipment Room PUT102 Attachment 6 1 4a VCCS PUT APC Building 1 Floor Equipment Room PUT102 Attachment 6 1 4a F VCCS PUT APC Building 1 Floor Equipment Room PUT102 Attachment 6 1 4a End System PUT APP CON TRA Administrative Building 2 Floor CON TRA Room PAD201 Attachment 6 1 4b PUT APP Pseudo Pilot Administrative Building 2 Floor Pilot Room PAD 202 Attachment 6 1 4b CON TRA Equipment Data processing Administrative Building 2 Floor Equipment Room PAD 203 Attachment
456. ts e Distinguish of higher and lower priority of alerts The Tenderer shall propose and detail the number of different color palette of CWS HMI The Tenderer shall propose and detail the color configuration of CWS HMI The Tenderer shall propose and detail all available quick keys The Tenderer shall propose and detail the methodology to configure quick keys The Tenderer shall propose and detail Map contents The Tenderer shall propose and detail online and offline Map configuration The Tenderer shall propose and detail the suitable tools for Map drawing and creation The Tenderer shall propose a maximum number of maps that can present on CWS HMI The Tenderer shall propose maximum temporary maps that can be created and stored on each CWS HMI The Tenderer shall propose and detail track presentation position symbols The Tenderer shall propose and detail history trail of track plot The Tenderer shall propose and detail leader line Part 2 2 1 Scope of Technical Specifications Page 245 E D D E D D D D D D Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 CWS26 CWS27 CWS28 CWS29 CWS30 CWS31 CWS32 CWS33 CWS34 CWS35 CWS36 CWS37 CWS38 CWS39 CWS40 Specifications doc The T
457. u H 103 8 10 Cabling and Interfacing System 104 8 11 Fallback VOCS eT 104 8 12 NP M 105 8 13 System Capacity RE 105 8 14 Digital Voice Recorder amp Replay System 106 Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc 9 System Functionalities siscccicsssesscanssecscsensasesasserscaceadsveasecncssesesssasscannasvcanascenessess 109 9 1 Surveillance Data Processing 111 9 2 Flight Data Processing oco ceo erneuern oer ree no reo ooa oa reso oaa rena area inea aou 117 9 3 Sateiy Netso 125 9 4 hd CDI elita TL 128 9 5 Medium Term Conflict 8 2 1 1 1 130 9 6 Airspace Organization and 1 tense 133 97 Flexible Use of Airspace FUA 133 9 8 Demand and Capacity Balancing eee ee eee eee ee eese etes esten etta stans tasto sae 134 9 9 Air Traffic Flow Managem
458. ual Time of Arrival ATA ICAO Standard Output Actual Time of Departure ATD provided ED Parking Stand Number PSN Tenderer On Block ONBL ICAO Standard Input Off Block OFBL Table 14 Tower System AIMS Information Exchange Description Messages exchanged between them should be transferred via the Firewall Gateway g Tower System AFL System Part 2 2 1 Scope of Technical Specifications Page 33 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Tower system connects with AFL System to coordination Tower system should be able to control the air field lighting via AFL System and receive lighting status such as taxiway centreline lights stopbars etc Message Data Data Format Input Output Reference ICD AFL System Data TBD Output Tenderer provided ICD TBD be discussed later Table 15 Tower System AFL System Information Exchange Description h Tower System CATIS System Tower system is capable of interfacing with the Computerized Automatic Terminal Information System CATIS manufactured by AEROTHAI Messages transferred between them include at minimum CATIS messages based on ICAO standards The actual CATIS text information will be displayed as part of the weather
459. uch as ADS B CPDLC AIDC and ADS C etc The will include at least the following features a Management of user defined learning packages comprising of a number of learning units and the training records b Delivery of the learning package each comprised of a number of learning units to different groups of learners c Delivery of the different packages to different groups of learners selectable by the trainer on removable storage media Part 2 2 1 Scope of Technical Specifications Page 151 Project Name Thailand Modernization CNS ATM System TMCS Document Reference Volume II Terms of Reference Date December 14 2012 File Reference Version Volume II Part 2 1 Scope of Technical 1 0 Specifications doc d Evaluation of the learner s understanding on each of the learning unit contained in a package through computer based assessment e Provision of question pools and assessment tools to evaluate the overall understanding of the TMCS for different groups of learners f Management of security and information access based on configurable user profiles with different levels of access privileges including administrator trainer and different groups of learners and g Provision of graphical user interface for the administrators and trainers to manage the security access to the learning packages learning units and training records 9 24 1 The learning packages The learning packages wil
460. uding all necessary standards documents and ICDs The Tenderer shall propose and detail the NAS MOPS Adjacent ACC ATM Systems information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the NAS MOPS information Part 2 2 1 Scope of Technical Specifications Page 200 E E E E E E E E E E Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc INCOII INCO12 INCO13 INCO14 INCOI5 INCO16 INCOIT INCOIS8 INCO19 INCO20 INCO2I exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the NAS MOPS System information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the NAS MOPS CCMS information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the NAS MOPS Other System information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the NAS MOPS any other internal systems information exchange including all necessary standards documents and ICDs The Tenderer shall propose and detail the list of external system i
461. uding network equipment such as switches router etc e GPS time server status and time synchronization status and e Performance Monitoring such as CPU Memory Storage Network utilization etc CMS04 Tenderer shall propose and detail the following capability of CMS E e Alarm indication methods e Type of network management protocols e The method to keep log files and duration period for keeping log files available 505 Tenderer shall propose and detail authorization levels available for access to D the different CMS function sets and configuration methods for those levels 8 23 Contingency Training System 01 The Tenderer shall provide product description of the proposed system detailing D CON TRA in Contingency mode functionalities capabilities and benefits COTAO2 The Tenderer shall propose and detail the functional capabilities of NAS CON TRA E in Contingency mode in comparison to NAS MOPS functional capabilities COTAOS3 Tenderer shall propose and detail the functional capabilities of each APP E CON TRA in Contingency mode in comparison to its corresponding APP MOPS functional capabilities Part 2 2 1 Scope of Technical Specifications Page 250 Project Name Thailand Modernization December 14 2012 CNS ATM System TMCS Date Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 4 COTAO5
462. update information of system status warning and alarm messages using the format as described previously NAS MOPS CCMS Tower System Other Systems Tower system connects with other systems to exchange AIM related information using the format as described previously NAS MOPS Other Systems Part 2 2 1 Scope of Technical Specifications Page 35 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Internal Msg gt APPS APP IBS Internal Msg 5 5 5 End System APP Approach Control APPS Approach Control Systems BAPP CMA NAS Nationwide Air Traffic Management System APPLE PUT APP PSLAPP EN APP TCMWS Tower Control and Monitoring ASDWS Air Situation Display Workstation Workstation FDDWS Flight Data Display Workstation IBS Independent Backup System Figure 9 Tower System Context Diagram System Capabilities Level I and II 4 4 2 Tower System Level I and II The Tower System for system capabilities level I and II provides the following interfaces to pertinent internal systems as follow a Tower System NAS MOPS NAS IBS Tower System connects with NAS NAS IBS using internal messages b Tower System APPS APPS IBS Tower System connects with APPS APPS IBS using intern
463. utomatic association processing is initiated for the track If the track is already associated with a flight plan then the SSR code is compared with the assigned code for the flight If the codes do not match a warning may be provided to the ATC Part 2 2 1 Scope of Technical Specifications Page 120 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 2 8 9 2 9 9 2 10 Specifications doc SSR Code Management Aircraft Identification and SSR Code Management is a standard feature where SSR code allocation is performed according to regional agreement The FDP will provide a discrete SSR codes to flights in a way to avoid the exhaustion of available codes and reduce the number of mid flight code changes The FDP will be capable of handling and allocating SSR codes in accordance with these agreements having the availability of SSR codes being divided into groups Flight Clearance The FDP will allow entry of the full range of ATC clearances including clearance limit where expected further clearance time required instructions and restrictions That could be reflected to the trajectory calculation and related function The FDP will support difference type ATC clearances such as departure clearance tactical changes strategic planning trial probes and CPDLC integration The foll
464. where all necessary communications are connected and lightning protection is equipped for all radio and telephone lines at the MDF radio and telephone lines are connected to the proposed systems and such connection will be performed at a time advised by AEROTHAI The input output of any VCCS workstation facility voice signal of both telephone and radio communication is connected for recording to the proposed Digital Voice Recorder amp Replay System DVR Position Record The input output of any interfaces voice signal of both telephone and radio interfaces is connected for recording to the proposed DVR Lines Record Fallback 5 The role of the Fallback VCCS is to take over the ground ground and air ground communications in case of total failure of the MOPS VCCS However all Part 2 2 1 Scope of Technical Specifications Page 104 Project Name Date Thailand Modernization CNS ATM December 14 2012 System TMCS Document Reference File Reference Version Volume II Terms of Reference Volume II Part 2 1 Scope of Technical Specifications doc LA 8 12 8 13 components are independent and separated from the MOPS VCCS as much as possible including a separate power supply The Fallback VCCS has the same capability and external radio telephone line interfaces as the MOPS VCCS excluding the VCCS workstation facilities The central racks of the Fallback VCCS are installed in a different room as the MOPS VCCS with cable
465. will be able to inhibit STCA alerts for predefined volumes of airspace or individual flights to suppress unnecessary alerts Minimum Safe Altitude Warning MSA W The Minimum Safe Altitude Warning MSAW will assist and warn the ATC about increased risk of controlled flight into terrain and or obstacles by generating in a timely manner an alert of aircraft proximity to terrain and or obstacles It may be necessary to inhibit alerts for predefined volumes of airspace e g exercise areas or for specific flights e g Calibration Service Aircraft on a defined flight pattern to suppress unnecessary alerts In addition MSAW will be capable of using different parameters for generation of alerts Different parameters may be applied in the case of system degradation e g unavailability of one or more RADAR ADS B stations Alerts will be generated at least at CWS of the controlling ATC Area Proximity Warning The Area Proximity Warning APW is a safety net which uses surveillance data and flight path prediction to assist and warn the ATC when an aircraft is or is Part 2 2 1 Scope of Technical Specifications Page 126 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 3 4 Specifications doc predicted to be flying into a volume of notified airspace APW volume of airspace
466. will provide static transfer switches cables connecting all UPS to equipments main distribution board junction box installation materials and other necessary equipments The site survey and site evaluation of components placement are recommended 10 8 1 6 Samui Airport Site Udon Thani Airport Site and Nakhon Si Thamarat Airport Site The planned numbers of UPS and their respective loads at each of the following sites Samui Airport Site Udon Thani Airport Site and Nakhon Si Thamarat Site is described in table as follow System System Description UPS 1 Samui Airport RTS Udon Thani Airport RTS Nakhon Si Data Processing X Thamarat RTS End System X Part 2 2 1 Scope of Technical Specifications Page 184 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 Specifications doc Table 64 UPSs for Samui Airport RTS Udon Thani Airport RTS and Nakhon Si Thamarat Airport RTS and their respective loads The summary of UPS details required at each of the following sites Samui Airport Site Udon Thani Airport Site and Nakhon 51 Thamarat Site 15 described in table as follow UPS O P Power Phase Type Type j Responsibility 1 Tenderer Proposed Depending on Full Load Type Table 65 Summary of
467. within predefined range or groups of predefined callsigns e The system track s aircraft identification is within predefined range or groups of predefined aircraft identifications f The system track s aircraft registration address 24 bit address is within predefined range or groups of predefined values and g The time during which the filter is valid User will be able to configure parameters for filters to be used The configuration can be performed in real time or off line Also user can use multiple filters to sort desirable system tracks to be distributed For example user can specify system tracks with SSR Mode Code within predefined range and height above predefined threshold to be distributed Surveillance data analysis tools Plots and tracked plots from several sensors should be separately recorded for purpose of data analysis The software hardware analysis tools for this purpose will be provided Part 2 2 1 Scope of Technical Specifications Page 116 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference of Technical 1 0 9 1 23 9 2 9 2 1 9 2 2 Specifications doc Reconfiguration surveillance port The surveillance data input output ports should be configurable to allow for future expansion and or reconfiguration The hardware accessory related software integration pr
468. work Management Protocol SNMP AFTERSALE SERVICE The UPS System will have local representative distributor who conducts regularly maintenance activities during warrantee period for AEROTHAI Table 68 Technical Specification for 3 phase UPS System 10 8 2 5 Technical Specification for Static Transfer Switch The minimum technical specification for Static Transfer Switch is described in following table Details Criteria INPUT SOURCE 1 OR SOURCE 2 Nominal Voltage V rms 400 V Voltage Range 380 to 415 V AC 10 96 rms adjustable Frequency 50 Hz 5 at least Number of Phase 3Ph N G Number of Pole 3 Pole Non Switch Natural OUTPUT Power Rating A rms Proposed by Tenderer on continuous basis and equivalent to UPS s output power rating Technology Static Switch two input sources and double maintenance bypass with interlock Voltage Range 380 to 415 V AC 10 rms adjustable Frequency 50 Hz 5 at least Number of Phase 3Ph N G Number of Pole 3 Pole Non Switch Natural Overload Capacity 110 5 minutes or better Transfer Time lt 5 ms for automatic and manual transfer OVERALL EFFICIENCY gt 90 Part 2 2 1 Scope of Technical Specifications Page 191 Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Part 2 1 Scope Volume II Terms of Reference
469. ystem Functionalities This section describes the minimum system functionalities and system capabilities of the TMCS The system functionalities and system capabilities of the TMCS have been arranged into seven 7 groups following the TMCS system architecture as follow NAS NAS IBS APP IBS BAPP System APP Systems LTS and RTS Figure 16 displays the breakdown of all system functionalities and system capabilities in which their details are described in the following subparagraphs Part 2 2 1 Scope of Technical Specifications Page 109 TMCS NAS MOPS 1 Processing System o SDP FDP Safety Net MONA MTCD AOM FUA DCB ATFM TS AMAN DMAN CPDLC REC REP DA AIM CWS HMI FDO HMI DSM NMS CMS CBT Q Q Q Q 2 End System CWS CMWS FDWS DSWS DAWS NMWS Printer pero ware nero 1 3 VCCS F VCCS 4 UPS ES 1 Processing System o SDP FDP Safety Net MONA MTCD AOM FUA DCB ATFM TS AMAN DMAN CPDLC REC REP DA AIM CWS HMI FDO HMI DSM NMS CMS TEG 9 G G O UO Oo Oo Oe e Oe G 2 End System CWS CMWS FDWS DSWS DAWS NMWS Printer TMCWS PSPWS ESP 8 19 6 16 6 3 5 4 5 5 5 System MOPS 1 Processing System SDP FDP Safety Ne
470. zation CNS ATM System TMCWS Training Mission Control Workstation T MTN Tower Maintenance Engineer T NMS Tower Network Management System TP Trajectory Prediction TRA Training TRAs Temporary Reserved Areas TRN Trainee TRS Time Reference System TS Traffic Synchronization TSAs Temporary Segregated Areas TSAT Target Start Up Approval Time TSDP Tower Surveillance Data Processing function T TACTSUP Tower Tactical Supervisor TTOT target take off time TWR CMS Tower Control and Monitoring System UBL Ubon Ratchathani Airport UDN Udon Thani Airport UPS Uninterrupted Power Supply UTC Coordinated Universal Time UUP Updated Airspace Use Plans VCCS Voice Communication and Control System VLAN Virtual LAN WAM Wide Area MLAT Part 2 2 1 Scope of Technical Specifications Project Name Thailand Modernization CNS ATM System TMCS Date December 14 2012 Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc Abbreviation FullName WAN wide area network Part 2 2 1 Scope of Technical Specifications Project Name Date Thailand Modernization December 14 2012 CNS ATM System TMCS Document Reference File Reference Version Volume II Technical Terms Volume II Part 2 1 Scope of 10 of Reference Technical Specifications doc List of Figures Figure TMCS System Architecture rte epi eee o