Home

Certificate of Accreditation

image

Contents

1. 8 Aeration tank Material Height Diameter Length Volume Min Working volume Buffer capacity Effluent tank Material Height Diameter Volume Sludge wasting tank Material Volume Floating decanter Material Polyethylene 1900mm 1900mm 2510mm 5000L 3460L 1070L Polyethylene 2300mm 470mm 350L Polyethylene 350L Polyethylene Disinfection equipment Chlorinator Contact volume Contact time Trichlor tablet dispenser 226L 30 minutes Air blower Reichle Thomas LP 80HN Type Weight Air flow volume Pressure Power consumption Power Source diaphragm compressor 8 3kg 80L min 16kPa 80W 240V 50Hz Effluent pump Ozzi Kleen Type Flow rate Motor Power Power Source centrifugal submersible 40L min at 8m Head 750W 240V 50Hz Motor and blower control box Material Location Equipment contained Date of issue 13 November 2015 Polyethylene Mounted on aeration tank Air blower control panel decanter solenoid Director Building Control delegate of Minister for Workplace BSRO389 2015 4 Page 16 of 16
2. e inspection and sampling procedures to be followed as part of the on going monitoring and program required by the permit authority Any proposed modifications to the system s specified processes equipment materials fittings or manuals must have prior authorisation in writing from the Director and may be subject to additional verification or testing Each application to a permit authority to install a system must be accompanied by a site and soil evaluation report and design report in accordance with AS NZS 1547 as appropriate The supplier must provide the following information to each permit authority where it is intended to install a system in their jurisdiction Manufacturers statement of warranty Statement of service life Quality Assurance Certification Installation Manual Service Manual Owner s Manual Service Report Form Engineering Drawings on A3 format Detailed system Specifications Copy of Certificate of Accreditation and Schedules Date of issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 6 of 16 Department of Justice Certificate of Accreditation BSRO389 2015 2 10 2 11 2 12 2 13 2 14 At each anniversary of the accreditation date the supplier must submit to the Director a list of all systems installed in Tasmania during the previous 2 months The Director may randomly select up to 10 of the installed systems from each
3. 7 2 8 2 9 General This Certificate of Accreditation is valid until 14 August 2020 Any application for variation or renewal must be accompanied by Product Certification to AS NZS1546 3 that has been issued by a JAS ANZ accredited Conformity Assessment Body CAB and other required documentation in accordance with the latest Application for Accreditation Form The Certificate of Accreditation may be withdrawn by the Director at any time and is not transferable This certificate supersedes all previously issued certificates The system must be supplied constructed and installed in accordance with the design submitted and accredited by the Director The system must not be installed or used in a plumbing installation other than in accordance with the conditions of the permit issued by the Permit Authority Each system must be permanently and legibly marked on a non corrosive metal plaque or equivalent attached to the lid with the following information a The brand and model name or designation of the system b The manufacturer s name or registered trademark c Top load limitations and d The month and year of manufacture The supplier must supply the owner and occupier of each installation with a user manual setting out the following a the treatment process b procedures to be followed in the event of a system failure c emergency contact number d care operation monitoring and maintenance requirements and
4. Justice Certificate of Accreditation BSRO389 2015 3 5 3 6 3 7 3 8 3 9 3 10 3 11 3 12 4 0 4 1 42 43 44 The system requires 240V AC power supply A weather proof isolating switch must be provided at the power outlet The power supply must have its own clearly marked designated circuit breaker in the electricity supply fuse box Each system installation must be inspected and checked by the designer or the designer s agent The designer on completion is to certify that the system has been constructed installed and commissioned in accordance with its design the conditions of accreditation and any additional requirements set out in the permit Note Where the designer is not available to supervise the installation the designer should obtain signed certification from the installing plumber stating that the installation has been constructed installed and commissioned in accordance with its design and the conditions Permit Where discharging wastewater to a land application system by irrigation a lockable sampling tap or gate valve is to be provided on the outlet pipe to the irrigation system A report is to be prepared by the installing plumber detailing the inspection of the installation and the results of the commissioning tests and be accompanied by a certificate certifying that the system is operating and performing adequately see 2 15 Copies of the following reports certificates must be submitte
5. and maintenance service reports The system is to be de sludged every five years OR in accordance with the manufacturer s recommendations and the sludge is to be disposed of in accordance with the Tasmanian Biosolids Reuse Guidelines and the conditions of permit Only persons with a waste transport business Environment Protection Notice are to be engaged for the removal transporting and disposal of accumulated sludge removed from the system Any waste material removed from the system must be collected and disposed of or utilised by an approved facility or agency Measures are to be put in place so that during servicing activities all persons and the environment will be protected from the results of the servicing activities Permitted uses The effluent is suitable for land application by any of the following methods a sub surface by i shallow subsurface drip irrigation ii trenches beds mounds evapo transpiration LPED systems b above ground by i spray irrigation or ii covered surface drip irrigation Note Each of the above forms of Land Application is subject to consent from the permit authority and must be in accordance with the relevant provisions of AS NZS 547 Where it is not practicable for effluent from the system to be applied in accordance with AS NZS 1547 the method of discharge must satisfy contemporary relevant regulatory requirements to the satisfaction of the permit authority Date of
6. for Workplace Page 10 of 16 Department of Justice Certificate of Accreditation BSRO389 2015 5 2 Water Quality Limits Treated effluent from the system must not exceed the following limits for the uses specified in section 7 0 or those specified by the Permit Authority whichever are the more stringent Water Quality Limits For sub surface irrigation 5 day Biochemical Oxygen Demand BOD Ninety per cent of the samples must have a BOD of less than or equal to 20 g m with no sample greater than 30 g m Total Suspended Solids TSS Ninety per cent of the samples must have a TSS of less than or equal to 30 g m with no sample greater than 45 g m For surface irrigation 5 day Biochemical Oxygen Demand BOD Ninety per cent of the samples must have a BOD of less than or equal to 20 g m with no sample greater than 30 g m Total Suspended Solids TSS Ninety per cent of the samples must have a TSS of less than or equal to 30 g m with no sample greater than 45 g m E coli Free Available Chlorine concentration FAC The FAC concentration must be between 0 5 2 The average E coli concentration must be 10 cfu per 100 mL with no more than 20 of samples exceeding 20 cfu per 100 mL g m at the maximum flow rate for the wastewater treatment unit 6 0 6 1 6 2 6 3 6 4 On going management The mandatory servicing and monitoring is to commence 3 months afte
7. site domestic wastewater treatment units Part 3 Aerated wastewater treatment systems AS NZS 3000 means AS NZS 3000 2007 Electrical installations AS NZS 5667 means AS NZS 5667 1 1998 Water quality Sampling Part 1 Guidance on the design of sampling programs sampling techniques and preservation and handling of samples BOD means 5 day Biochemical Oxygen Demand Council means the Municipal Council having jurisdiction Commissioned means when the test results from a NATA Certified Laboratory show that the water quality requirements for the system have been met and all pre commissioning tests have been carried out in accordance with AS NZS 1547 on all associated equipment including the land application system Designer means a person who is accredited under the Building Act 2000 or a Plumber who has a specialty in the area of designing on site waste water management system installations Director means the Director of Building Control EC means electrical conductivity E coli means Escherichia coli of the family Enterobacteriaceae which is a bacterium used in public health as an indicator of faecal pollution EP means Equivalent Population or Equivalent Persons Note The minimum EP is based on the number of bedrooms g m means grams per cubic metre which is equivalent to milligrams per litre mg L Informative defines the application of Schedule which is for inf
8. year of installation The Director will notify the supplier s nominated NATA accredited laboratory which systems to be sampled and tested for and TSS and Chlorine residual The sampling and testing of the selected systems is to be done at the supplier s expense The following results must be reported to the Director Address of premises Date inspected and sampled Sample identification number Chlorine Residual BODS TSS E coli and Service history Where due to a design fault the system has been found not to operate satisfactorily during its service life and as a result requires modification to achieve the required water quality limits all installed systems are to be modified accordingly When granting a permit the permit authority is to satisfy itself that the designer s choice of the system configuration is optimal for the proposed use and site conditions The system must not be installed in areas where seasonal climatic conditions will adversely affect its proper operation refer to manufacturer s specifications Doc No P002 Rev L Date 8 8 2008 Prior to the granting of a permit to install the following reports see AS NZS 1547 Clause 7 4 must be submitted with an application to the permit authority e Site and soil evaluation report The site and soil evaluation report is to detail results of an assessment of the individual lot s for the public health environmental legal and economic factors whi
9. AILS Volume L Sedimentation Chamber Anaerobic Filtration Chamber Aerobic Contact Filtration Chamber Clarification Chamber Pump Chamber Total Volume Weight kg ee me D _ AERATION TANK CONTACT TANK GENERAL DESIGN ser oc PROJECT OZZIKLEENAWTSRPI0 PROCESS FLOW DIAGRAM Coast Waste Water Management re ee Tee a y OZZI KLEEN System Components and dimensions Dimensions mm 1 114 Max Width 1 440 982 Max Length 2 510 580 Max Height Standard 1 870 281 Max Height with 300mmH risers 2 170 803 Inlet Invert Standard 460 3 265 Inlet Invert with 300mmH risers 760 430 Inlet Pipe Nominal Size Dia 100 Outlet Pipe Nominal Size Dia 25 Date of issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 14 of 16 AXIMUM DEPTH OF FINISHED GROUND LEVEL EFFLUENT TANK TANK ANCHORAGE EXTENSION T T SEWAGE INLET FFLUENT TO IRRIGATION LUDGE TANK GROUND LEVEL 111111 AN ws TANK ANCHORAGE EXTENSION ae delegate of Minister for Workplace Director Building Control Date of issue 13 November 2015 Page 15 of 16 Department of Justice Certificate of Accreditation Appendix B System component list and specifications l 2 3 4 5 6 7
10. Tasmanian Government Certificate of Accreditation On Site Waste Water Management System This Certificate of Accreditation is hereby issued by the Minister for Justice and Workplace Relations pursuant to Section 59 2 of the Building Act 2000 and Part G2 of the Tasmanian Plumbing Code System Ozzi Kleen Model RP10 Neatport Pty Ltd trading as Suncoast Waste Water Management ACN 063 770 534 Manufacturer Supplier of 59 Industrial Avenue Kunda Park QLD 4556 This is to certify that the Ozzi Kleen Model RP I0 Aerated Wastewater Treatment System the system as described in Schedule has been accredited for use as an on site waste water management system in single dwellings within plumbing installations in Tasmania This accreditation is subject to the conditions and permitted uses specified in Schedule 2 and in accordance with the Tasmanian Plumbing Code Dale Webster Director of Building Control Delegate of the Minister for Justice and Workplace Relations Date of Issue 13 November 2015 Certificate No BSR0389 2015 This Certificate of Accreditation is valid until 14 August 2020 subject to conditions unless withdrawn earlier by the Director Department of Justice Certificate of Accreditation BSRO389 2015 SCHEDULE Specification Informative Ozzi Kleen Model RP I0 Aerated Waste Water Treatment System General Description The Ozzi Kleen Model RP10 the system collects and treats domestic wastewate
11. ch are likely to impinge on the location and design of a land application system Refer to AS NZS 1547 Clause 5 2 4 and Appendices B C D E amp G e Design report The Design Report is to include the following a Relevant aspects of the Site and soil Evaluation Report b A report on the selection of the land application system Refer to AS NZS 1547 Clause 5 5 7 c A report on the selection of the wastewater treatment unit Refer to AS NZS 1547 Clause 5 5 4 Appendix H and J d Sufficient information to show that the relevant performance requirements set out in the PCA have been met e A loading certificate which sets out the design criteria and the limitations associated with use of the system and incorporates such matters as i System capacity number of persons EP and daily flow ii Summary of design criteria iii The location of and use of reserve areas iv Use of water efficient fittings fixtures or appliances Date of issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 7 of 16 Department of Justice Certificate of Accreditation BSRO389 2015 2 15 2 16 2 17 3 3 3 4 v Allowable variation from design flows peak loading events vi Consequences of changes in loading due to varying wastewater characteristics vii Consequences of overloading the system viii Consequences of underloading the system ix Consequences of lac
12. d to the council and the owner as soon as practicable after the commissioning of the system and after each scheduled or unscheduled service or inspection for the period specified in the permit a The initial plant installation and commissioning report b All required laboratory analytical test reports and c All inspection and maintenance reports Copies of any report or certificate required by the conditions of accreditation must be made available to the Director on request The designer is to provide a statement warning the user of which items and products that must not be placed in the system To verify that the plant is commissioned sampling must be carried out by a council approved person for BOD5 TSS and Free Residual Chlorine The samples are to be tested and reported on by certified laboratory Maintenance and monitoring Each installation must be serviced and monitored at not less than 3 monthly intervals in accordance with the conditions of accreditation the conditions of permit and manufacturer s requirements Notes l Only a plumber can carry out the maintenance and required monitoring of the system other than electrical work unless licensed to do so 2 The plumber may need to complete training by the supplier before carrying out any maintenance on the system 3 The maintenance and monitoring intervals may be combined provided the monitoring frequency remains at 3 month intervals The own
13. ents of the system including the associated land application system as appropriate 4 10 The monitoring servicing and reporting of the installation must include but not be restricted to the following matters as appropriate a Reporting on weather conditions ambient temperature effluent temperature b Odour c Check and test pump d Check and test air blower fan or air venturi and clean replace air filters e Check and test alarm system f Check and report operation of sludge return sludge level and de sludging g Check and record water meter reading if fitted h Check and record operation of irrigation area irrigation fittings i Check and clean replace irrigation filters j Check and report on water quality testing for pH Turbidity EC and dissolved Oxygen k Check and replenish chlorine disinfection system Cleaning of the following items at or above the waterline i clarifier ii pipework iii valves iv walls of chambers 5 0 Performance 5 1 Hydraulic and Organic Loading The system is accredited for treatment of domestic wastewater from a single dwelling with the following MAXIMUM hydraulic and organic loads Maximum Hydraulic and Organic Loading Model Max Hydraulic load L day Organic Loading g day RPIO 2000 BOD 700 g TSS 700 g Nitrogen 150 g Phosphorus 25 g Date of issue 13 November 2015 Director Building Control delegate of Minister
14. er of the system must enter into and maintain a maintenance contract with the council the supplier of the system or plumbing contractor The owner must enter into an agreement with the council to maintain the maintenance contract where that contract is with the supplier of the system or plumbing contractor The system must be operated and maintained to ensure it performs continuously and without any intervention between inspections carried out by the plumber Date of issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 9 of 16 Department of Justice Certificate of Accreditation BSRO389 2015 45 A service report is to be prepared by the plumber who carried out the work detailing the inspection of the installation and the results of all servicing tests and conditions at the completion of all scheduled and unscheduled services or inspections 4 6 The service report is to be accompanied by a signed document certifying that the system is operating and performing adequately 47 copy of the service report and certifying document is to be provided to the occupant and council Each service report is to contain a statement reminding the user about items and products that must not be placed in the system 48 Each service must include monitoring the operation of the system and associated land application system 49 Maintenance must be carried out on all mechanical electrical and functioning compon
15. ettling cycle After the aeration cycle aeration ceases for approximately 30 minutes allowing the activated sludge to settle to the bottom of the aeration tank A layer of clarified water is then formed at the top of the aeration tank 3 Decanting Cycle After the settling period a decanting operation takes place The decanter device draws off clarified effluent from the top of the aeration tank into the effluent holding tank passing through a basket filter installed to catch any remaining floating matter The decanting cycle continues until either the liquid level in the aeration tank reaches the minimum level or the process timer puts the system back into the aeration cycle which in turn stops the decanting cycle While decanting the effluent is chlorinated by being passed over chlorine tablets and stored in the effluent holding tank for a short period to ensure disinfection of pathogenic organisms prior to discharge When a pre determined level is reached in the effluent holding tank the effluent pump will pump out the disinfected effluent to the land application irrigation area The pump in this chamber is controlled by a high and low water level float switch Sludge wasting storage and disposal The sludge wasting programme is activated when there is sufficient biomass as determined at the time of each service Sludge wasting is carried out simply by operation of the sludge wasting time clock system which operates a sludge air lif
16. ill overflow if the emergency storage volume of approximately 1000 litres is exceeded De sludging The tank should be de sludged every five years or as deemed necessary by the service agent Hydraulic and organic loading and effluent quality The system is designed to treat all household wastewater from the kitchen bathroom toilet and laundry Influent Maximum Design flow as specified by the manufacturer e Daily flow maximum hydraulic load 200 litres per person 0EP 2000 litres Organic loading as specified by the manufacturer e Daily BODs 70 grams per person OEP 700 grams per day e Daily TSS 70 grams per person 0 700 grams day e Daily Nitrogen 15 grams per person OEP 150 grams per day e Daily Phosphorus 2 5 grams per person OEP 25 grams per day Effluent The system when tested gave the following results for 90 of samples e BODsless than or equal to 20 0 mg L e TSS less than or equal to 30 0 mg L e coli less than or equal to 10 cfu 100mL Date of issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 4 of 16 Department of Justice Certificate of Accreditation BSRO389 2015 Schedule 2 Conditions of Accreditation Normative 1 0 Definitions Where included in this Certificate of Accreditation and Schedules AS NZS 1547 means AS NZS 1547 2012 On site domestic wastewater management AS NZS 1546 3 means AS NZS 1 546 3 2008 On
17. issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 12 of 16 Department of Justice Certificate of Accreditation BSRO389 2015 Appendix A Ozzi Kleen RP 10 Drawings PLC CONTROL BOX AIR BLOWER MOTOR BOX GROUND LEVEL EFFLUENT PIPE SEWAGE INLET lt lt lt CHLORINATOR SYS EFFLUENT TANK SLUDGE TANK EFFLUENT PUMP STILLING WELL AERATION TANK ELEVATION AIR DIFFUSER FLOATING DECANTER EFFLUENT PIPE AERATION TANK EFFLUENT TANK SLUDGE TANK EFFLUENT PUMP AIR DIFFUSER PLC CONTROL BOX CHLORINATOR MOTOR BOX AIR BLOWER STILLING WELL SEWAGE INLET PLAN VIEW 59 INDUSTRIAL AVE cuent GENERAL DESIGN AP 0z 77 LEEN a 7 5459 4900 SoS Water amp Waste Water RP IO PACKAGE SIE ERE 28 08 08 GENERAL REVISION SYSTEM DIAGRAM DATE 02 09 13 oa Suncoast Waste Water Management Date of issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 13 of 16 Department of Justice Certificate of Accreditation INHOUSE ALARM PANEL FOR HIGH WATER AND LOW AIR BSRO389 2015 Schematic diagram of treatment process SOLENOID VALVE CONTROL BOX WITH PLC EFFLUENT TO IRRIGATION YY SLUDGE TANK NOTE FOR DETAILS OF ARRANGEMENT REFER TO SWWM DRAWING NO GD RP10 HD01 REV 1 SYSTEM DET
18. k of operation maintenance and monitoring attention and x other relevant considerations related to the use of the system The following reports must be submitted to the permit authority and owner and be made available to the Director upon request after commissioning of the system e Installation and commissioning report The Installation and Commissioning Report is to cover the as constructed records of the system installation together with the results of commissioning tests to demonstrate correct construction and installation and is to be provided to the owner and permit authority on completion of the work Refer to and AS NZS 1547 Clause 6 2 5 4 e Inspection and Maintenance Report Maintenance reports cover ongoing inspection and maintenance operations in order to monitor the operation of the installation Refer to AS NZS 1547 Clause 6 3 5 Appendix T amp U Where the supplied pump is not suitably rated for the proposed land application area it must be replaced with a pump which has a rated capacity that matches the hydraulic characteristics of the irrigation system and be capable of discharging at least 50 more than the 30 minute flow rate For drip irrigation systems ensure that drip emitter flow rates do not vary more than 10 from the design rate over the whole of the system when installed on a sloping site Note The pump selection is to be based on flow head loss and pressure requirements Effluen
19. ormation and guidance only Manufacturer means Neatport Pty Ltd NATA means National Association of Testing Authorities Normative defines the application of Schedule 2 which is an integral part of the Certificate of Accreditation PCA means Vol 3 of the National Construction Code series Plumbing Code of Australia Permit means a Permit issued by the council permit authority pursuant to section 82 of the Building Act 2000 Permit authority means a person or body authorised for that purpose by the council of the municipal area in which the on site waste water management system is installed Plumber means a person who holds an appropriate class of licence under the Occupational Licensing Act 2005 as a contractor and Plumber Practitioner Certifier Supplier means the party that is responsible for ensuring that products meet and if applicable continue to meet the requirements on which the certification is based The supplier for the Ozzi Kleen Model RP10 is Neatport Pty Ltd System means Ozzi Kleen Model RP10 TN means Total Nitrogen TP means Total Phosphorus TPC means the Tasmanian Plumbing Code TSS means Total Suspended Solids Date of issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 5 of 16 Department of Justice Certificate of Accreditation BSRO389 2015 2 0 2 1 2 2 2 3 2 4 2 5 2 6 2
20. ovember 2015 Director Building Control delegate of Minister for Workplace Page 2 of 16 Department of Justice Certificate of Accreditation BSRO389 2015 Energy consumption Estimated electricity usage is for a 4 person household with average wastewater flows and loads Note that the irrigation pump hours of operation may vary depending on influent flow volume and that a pump with different specifications to the one below may have to be substituted if the head and flow performance is not adequate for the site conditions This will result in changes to the estimated cost Electrical Equipment Watts Daily operation kWh year Estimated hours Annual Cost specified by 0 28283 kWh manufacturer As at 28 11 2013 Aurora Energy tariff 3 Irrigation Pump Ozzi Kleen submersible 750 0 5 137 39 00 Blower Reitchle Thomas 100 12 438 124 00 Controller amp remote alarm 15 24 131 37 00 Description of Treatment Processes The system uses a cycled aeration process within a single tank designed to accept and treat domestic waste water The cycled aeration process consists of three main cycles 1 Aeration cycle The incoming waste water is aerated with oxygenated air supplied by the air blower thus creating an aerobic environment for micro organisms in the waste water These organisms establish an activated sludge which will oxidise the organic waste during this cycle 2 S
21. r from a single household The system comprises A single roto moulded vertical axis polyethylene tank with a design capacity of 4150 litres and 1070 litres of emergency buffer capacity Contained in this tank is e 350 L effluent chamber with attached chlorine disinfection unit irrigation pump high and low level float switch e 350 L sludge wasting chamber e A floating effluent decanter e Air diffuser The motor box contains e 80 L minute Air Blower e Electrical control equipment for the pump blower and alarm monitor The remote alarm panel monitors power high water level and air pressure faults This is connected to an audio and visual alarm to alert the householder The system requires a 240 volt AC power supply The system has been issued with a certificate of conformity by SAI Global to AS NZS 1546 3 The system is designed to treat a maximum hydraulic load of 2000 litres of domestic wastewater per day from a single household It is reported that the raw influent used in the testing of the system met the requirements AS NZS 1546 3 2008 Appendix A4 1 The system is designed for domestic waste water flows in accordance with AS NZS 1546 3 and is capable of achieving BOD less than or equal to 20 g m and a TSS less than or equal to 30 g m For system drawings flow path schematic sectional diagram and components diagram refer to Appendix A For treatment system components list refer to Appendix B Date of issue 13 N
22. r the system is commissioned The servicing and monitoring is to coincide with the supplier s required on going routine scheduled maintenance program Where a system installed at a site has been found not to operate satisfactorily during its service life and as a result requires modification to achieve the required performance requirements in particular water quality limits the installed system is to be modified accordingly Any modifications must be recorded on the service report In the event of failure to comply with the water quality limits set out in these conditions fortnightly sampling and testing for BODs TSS and Free Available Chlorine must be carried out until the plant is re commissioned The method of preserving and the handling of samples taken from the plant must satisfy the relevant requirements of AS NZS 5667 Date of issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 11 of 16 Department of Justice Certificate of Accreditation BSRO389 2015 6 5 6 6 6 7 6 8 6 9 7 0 7 1 7 2 Copies of the following reports and certificates must be submitted to the permit authority and the owner as soon as practicable after the commissioning of the system and after each scheduled or unscheduled service for the period specified in the permit a the initial plant installation and commissioning report b all laboratory analytical test reports and c all inspection
23. t distribution by sub surface application may be permitted where the Permit Authority is satisfied that the application for a permit to install the system has demonstrated that the a effluent can be retained within the authorised land application area b where applicable the land application system has been designed and is capable of being installed and maintained in accordance with AS NZS 1547 c the location of the land application system satisfies the relevant requirements of the State Policy on Water Quality Management 1997 and d the discharge is capable of satisfying the relevant water quality limits see 5 2 Installation and Commissioning The installation and operation of the system must comply with the conditions of accreditation and the manufacturer s instructions All plumbing work carried out in connection with the system installation must satisfy the requirements of the Building Act 2000 TPC and the Tasmanian Plumbing Regulations and be carried out by a registered plumber with appropriate training and competencies All installations of the system must satisfy the installation requirements set out in Appendix Al On site Waste Water Management Systems of the TPC All electrical work must be carried out by a licensed electrician and in accordance with relevant provisions of AS NZS 3000 Date of issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 8 of 16 Department of
24. t unit This air lift unit is connected by pipework from the aeration tank to the sludge wasting tank Date of issue 13 November 2015 Director Building Control delegate of Minister for Workplace Page 3 of 16 Department of Justice Certificate of Accreditation BSRO389 2015 The waste sludge timer will only operate for its set period at the beginning of each aeration cycle and is set to only operate for a few seconds The waste sludge timer setting can be adjusted to regulate the wasting period so as to maintain the desired level of sludge or suspended matter in the mixed liquor in the aeration tank In the sludge storage tank there is an overflow drain pipe which allows supernatant to discharge back to the stilling well where raw sewage enters the system As sludge is settling and thickening in the sludge tank a separation of water and sludge occurs With continual use the sludge storage tank will fill with concentrated solids and will have to be emptied and the contents disposed of The need for emptying is determined at the time of servicing Alarm panel A high water level sensor and alarm is fitted to alert the user in the event that the water level in the aeration tank rises above a predetermined maximum level A blower failure alarm is fitted to alert the user in the event that the air blower fails The alarm panel will also indicate a power failure In the event of power failure no effluent is pumped out and the system w

Download Pdf Manuals

image

Related Search

Related Contents

air - Makita  Samsung YP-T9JBAB Brugervejledning  - Power/Energy Monitors  Energy Sistem 4200  歩行車「ハッピー  betriebsanleitung  User Manual - Inscape Data  PRODUCT SPECIFICATION  Notification Urgente de Sécurité Générateurs d`Ablation RF Multi    

Copyright © All rights reserved.
Failed to retrieve file