Home
        Ball Check Valve True Union Ball Check Valve Ball Foot Valve
         Contents
1.     ASAHI AV VALVES     5  Working pressure vs  temperature    Nominal size  15 50mm  1 2    2                                                                                                                                                                          Installation  Operation and Maintenance Manual    Nominal size  80  100mm  3                                                                                                                                                                   The measurement of the minimum pressure for opening  amp  closing the valve          Unit  MPa  kgf cm   PSI                                                     Test Items Vertical Piping Horizontal Piping  Nominal Size Min  Air Pressure to Min  Air Pressure to Min  Air Pressure to Min  Air Pressure to  mm inch open the valve shut the Disc perfectly open the valve shut the Disc perfectly  15 1 2 0 005  0 05   0 73  0 02  0 2   2 90  0 001  0 01   0 15  0 02  0 2   2 90   20 3 4 0 005  0 05   0 73  0 03  0 3   4 35  0 001  0 01   0 15  0 03  0 3   4 35   25 1 0 005  0 05   0 73  0 03  0 3   4 35  0 001  0 01   0 15  0 03  0 3   4 35   40 11 2 0 01  0 1   1 45  0 03  0 3   4 35  0 002  0 02   0 29  0 03  0 3   4 35   50 2 0 01  0 1   1 45  0 03  0 3   4 35  0 002  0 02   0 29  0 03  0 3   4 35   80 3 0 01  0 1   1 45  0 02  0 2   2 90  0 002  0 02   0 29  0 02  0 2   2 90   100 4 0 01  0 1   1 45  0 02  0 2   2 90  0 002  0 02   0 29  0 02  0 2   2 90         Data mentioned in the tab
2.   4  For the next step  refer to the user   s manual for the sleeve welder or the automatic welding machine   5  After welding  make sure that the ball  2   stop ring  A   5  and seat  9  are set   6  Set the end connector  3  and the union nut  4  directly on the valve   7  Tighten the union nut  4  hardly with hand   8  Using a strap wrench tighten union nuts  4  approx from 90   to 180   tums  1 4 to 1 2 turns      7  Disassembling Method for Replacing Parts    A   Be sure to conduct a safety check on all hand and power tools to be used before beginning work      Wear protective gloves and safety goggles as fluid remain in the valve even if the pipeline is empty    You may be injured     A S   Do not change or replace valve parts under line pressure    Caution   Do not use the pipe wrench   The valve can be damaged      Warning      Be aware of over tightening the Union Nut   The valve can be damaged       When installing  disassembling  or reassembling the piping  fix the End Connector      Before a water test  be sure that the Union Nut is tightly fastened      Fasten the Union Nut while avoiding the parallelism and axial misalignment of the flange surface      When connecting an ASAHI AV Valve to metal piping  take care not to let the pipe stress on the  ASAHI AV Valve                      85      Strap wrench   Safety goggles   Protective gloves   lt Disassembly gt   Procedure  1  Completely discharge fluid from pipes   2  Loosen the union nut  4  on the seat  9  side 
3. AHI AV VALVES Installation  Operation and Maintenance Manual     3  General instructions for transportation  unpacking and storage    A S   This valve is not designed to handle impacts of any kind  Avoid throwing or dropping the valve   Caution   Avoid scratching the valve with any sharp object     Do not over stack cardboard shipping boxes  Excessively stacked packages may collapse     Avoid contact with any coal tar creosote  insecticides  vermicides or paint    These chemicals may cause damage to the valve     d   Store products in their corrugated cardboard boxes  Avoid exposing products to direct sunlight  and  store them indoors  at room temperature   Also avoid storing products in areas with excessive  temperatures   Corrugated cardboard packages become weaker as they become wet with water or  other liquid  Take care in storage and handling       After unpacking the products  check that they are defect free and meet the specifications     se b m h ey    Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve 3    ASAHI AV VALVES Installation  Operation and Maintenance Manual     4  Name of parts    BALL CHECK VALVE  Nominal Size  15 100mm  1 2    4          Body Material  U PVC  C PVC  PP      PVDF      End Connector  Socket End  Threaded End  Flange End    1  Body material PP is only available for Socket End and Threaded End Connection            2  Body material PVDF is only available for Threaded End and Flange End Connection  Refer to the following page f
4. ASAHI AV VALVES Installation  Operation and Maintenance Manual       Serial No  H V014 E 12                Ball Check Valve  True Union Ball Check Valve   1  Be sure to read the following warranty    Contents     2  General operating instructions ENNEN AEI NE PEIEE AE 2     3  General instructions for transportation   unpacking and storage EEEIEE ETAETA AE EET 3    EE EE r     6  Installati on procedure E EET PENE EAE E ANTEE E E EEPE E E ETE 7   7  Disassembling meth od for replacing parts RO NRO 10     8  Inspection items a YY   9  Troubleshooting PPAS A E EE PEI IAE P EAE O 1 1     10  Handling of residual and  waste materials    rene 11       ASAHI AV VALVES    Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve    ASAHI AV VALVES Installation  Operation and Maintenance Manual  This user   s guide contains very important information for the proper installation  maintenance and safe use of  an ASAHI AV Product  Please store this manual in an easily accessible location     lt Warning  amp  Caution Signs gt        This symbol reminds the user to take caution due to the potential for serious injury or  Waming death        This symbol reminds the user to take caution due to the potential for damage to the valve  Caution if used in such a manner      lt Prohibited  amp  Mandatory Action Signs gt              S Prohibited  When operating the valve  this symbol indicates an action that should not be  taken    amp  Mandatory action  When operating the valve  this sym
5. and   A d    The parallelism and axial misalignment of the flange surface should be under the values shown in  Caution the following table to prevent damage the valve    A failure to observe them can cause destruction due to stress application to the pipe   Unit   mm  inch                               Axial Parallelism  Axial misalignment   Parallelism     Nam Size Miem  ab     15 25mm 1 0 05    yo   0 04   0 02     40 50mm 1 0 0 8  l  1 1 2    2      0 04   0 03   80 100mm 1 0 1 0 i  34      0 04   0 04                          3  Using a torque wrench  tighten the bolts and nuts gradually to the specified torque in a diagonal manner    Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve 7    ASAHI AV VALVES    Caution    Recommended torque value       Installation  Operation and Maintenance Manual    A S   Tighten the bolts and nuts gradually with a torque wrench to the specified  torque level in a diagonal manner     Ne             Unit  N m kef cm   Ib inch                          Nom  Size 15  20mm 25  40mm 50 mm 80  100 mm      1 2     3 4    1 1 1 2     2   3  4      pie 17 5 179  155    20 0 204  177    22 5 230  230    30 0 306  266   Rubber 8 0  82   71    20 0  204   177    22 5  230   230    30 0  306   266               Be sure to set the union nut  4  when it was removed or loosen from body  1    1  Attach ball  2   stop ring  A   5  and seat  9  in order  and tighten the union nut  4  by hand     2  Using a strap wrench  screw union nut  4  in b
6. bol indicates mandatory actions  that must be adhered to                  1 Be sure to read the following warranty clauses of our product      Always confirm the specifications of and the precautions and instructions on using our product      We always strive to improve product quality and reliability  but cannot guarantee perfection  Therefore  should    you intend to use this product with any equipment or machinery that may pose the risk of serious or even fatal  injury  or property damage  ensure an appropriate safety design or take other measures with sufficient consideration  i given to possible problems  We shall assume no responsibility for any inconvenience stemming from any action  on your part without our written consent in the form of specifications or other documented approval      The related technical documents  operation manuals  and other documentation prescribe precautions on selecting   constructing  installing  operating  maintaining  and servicing our products  For details  consult with our nearest  distributor or agent      Our product warranty extends for one and a half years after the product is shipped from our factory or one year after  i the product is installed  whichever comes first  Any product abnormality that occurs during the warranty period  or which is reported to us will be investigated immediately to identify its cause  Should our product be deemed  defective  we shall assume the responsibility to repair or replace it free of charge      An
7. ck back pressure   Foreign matter is in the valve  Clean the valve     Fluid leaks from the valve  even when the valve is  closed fully  The seat or ball is scratched or worn  Replace the seat or ball with a new one              The seat is scratched or worn  Replace seat with a new one        Fluid leaks from the valve    The O ring is scratched   True Union Ball  Check Valve only   The union nut is loosened  Tighten up the union nut     Replace O ring a new one                  10  Handling of residual and waste materials    A   Make sure to consult a waste treatment dealer for recommendations on the proper disposal of plastic  Waring valves   Poisonous gas is generated when the valve is bumed improperly      eas a a a a seme eae a cee a a Ge la a gm a a a a i a ee    Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve 11    ASAHI AV VALVES Installation  Operation and Maintenance Manual    Ball Check Valve  True Union Ball Check Valve  Ball Foot Valve         ASAHI AV VALVES       Information in this manual is subject to change without notice  2012 9    Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve    
8. d excessive tightening   The valve can be damaged      ASAHI AV VALVES Installation  Operation and Maintenance Manual  Socket type  Body Material  U PVC  C PVC        A S   When using an adhesive  ventilate the space sufficiently  prohibit the use of a fire in the vicinity   Warning and do not inhale adhesive vapors directly     If an adhesive gets into contact with your skin  wash it off immediately  If you feel sick or find any  anomaly  receive a physician s diagnosis and take appropriate measures promptly     Caution remain   Solvent cracks may occur  damaging the equipment   After assembling the piping  system  open both ends of the piping and use a fan  of the Low Voltage Type  or something similar  to ventilate the space  thus removing the solvent vapors    d     Use the appropriate Asahi AV cement     A S   Take care in doing work at low temperatures  Solvent vapors are hard to evaporate and are likely to  i   Conduct a water test at least 24 hours after joining the pipes with an adhesive cement     e Necessary items rrr      Adhesive for hard vinyl chloride pipes   Strap wrench  Example  Installation procedure of the end connector  on the seat side  of ball check valve   Procedure  1  Loosen the union nut  4  with a strap wrench   2  Remove the union nut  4  and end connector  3    3  Lead the union nut  4  through the pipe   4  Clean the hub part of the end connector  3  by wiping the waste cloth   5  Apply adhesive evenly to the hub part of the end connector  3  an
9. d the pipe spigot     A S   Do not apply more adhesive than necessary   The valve can be damaged due to solvent cracking      Caution    Adhesive quantity  guideline   15mm   20mm   25mm 40 50 80 100    aZ    GA     C   a   2 e     a   Quantity g  1 0 13 2 0 3 5 4 8 9 0 13 0    Nom  Size                                     6  After applying adhesive  insert the pipe quickly to the end connector  3  and leave it alone for at least 60 seconds   A D Do not try to insert a pipe into another fitting or valve by striking it under any circumstances  which  Caution may break the piping    7  Wipe away overflowing adhesive    8  Make sure that the ball  2   stop ring  A   5  and seat  9  are set    9  Set the end connector  3  and union nut  4  directly on the body    10  Tighten the union nut  4  hardly with hand    11  Using a strap wrench tighten union nut  4  approx from 90   to 180   turns  1 4 to 1 2 turns     Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve 9    ASAHI AV VALVES Installation  Operation and Maintenance Manual  Socket type  Body Material  PP            Necessary items    Strap wrench    Sleeve welder or automatic welding machine    User   s manual for sleeve welder or automatic welding machine    Example  Installation procedure of the end connector  on the seat side  of ball check valve   Procedure   1  Loosen the union nut  4  with a strap wrench   2  Remove the union nut  4  and the end connector  3    3  Lead the union nut  4  through the pipe 
10. e station beforehand   A S   Do not step on or apply excessive weight on valve   It can be damaged    Caution   Avoid using the valve in a line where the fluid flow is turbulent  The ball may excessively bounce  around  resulting in damage     Do not use the valve to fluid containing slurry   The valve will not operate properly      Do not use the valve in conditions where the fluid may have crystallized    The valve will not operate properly      Keep the valve away from excessive heat or fire   It can be damaged  or destroyed      Always operate the valve within the pressure vs  temperature range    The valve can be damaged or deformed by operating beyond the allowable range      Allow sufficient space for maintenance and inspection     Select a valve material that is compatible with the media  For chemical resistance information  refer to     CHEMICAL RESISTANCE ON ASAHI AV VALVE       Some chemicals may damage incompatible valve materials      Keep the valve away from places of direct sunlight  water and dust  Use cover to shield the valve    The valve will not operate properly      Perform regular maintenance    Leakage may develop due to temperature changes or periods of prolonged storage  rest  or operation      Use the valve at a pressure exceeding the minimum operating differential pressure   Check the effective head                                                                           4    Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve 2    AS
11. le above is reference only     Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve                ASAHI AV VALVES Installation  Operation and Maintenance Manual     6  Installation procedure    A S   Take care not to over tighten the Union Nut   The valve can be damaged    Caution   Do not use the pipe wrench   The valve can be damaged      The valve is applicable to both types  vertical and horizontal piping  In the case of vertical piping   use the valve in applications where the fluid travels upwards     Install the piping while matching the arrow on the valve body with the flow direction of the fluid     Horizontal Pipir rtical Piping                                                                                                          Flanged Type __  Body Material  U PVC  C PVC  PP  PVDF        A   Use flat faced flanges for connection to AV Valves     Caution   Ensure that the mating flanges are of the same standards       Be sure to use sealing gaskets  AV Gasket   bolts  nuts  and washers and tighten them to specified torques    When a non AV gasket is used  a different tightening torque specification should be followed        Necessary items    Spanner wrench   Bolt  Nut  Washer  For many flanges specification     Strap wrench          Torque wrench        AV gasket    Procedure  1  Set the AV gasket between the flanges     2  Insert washers and bolts from the pipe side  insert washers and nuts from the valve side  then temporarily tighten them  by h
12. or Flange End Connection                       i UE No  DESCRIPTION  POD ASX  2  Ball        3    End connector        4    Union nut       For instance   5    Stop ring  A     drawing shows Socket End Connector   9    Seat                   BALL FOOT VALVE  Nominal Size  15 100mm  1 2    4         Body Material  U PVC  C PVC  PP     PVDF      End Connector  Socket End  Threaded End  Flange End    3  Body material PP is only available for Socket End and Threaded End Connection     4  Body material PVDF is only available for Threaded End Connection only                             No  DESCRIPTION   1    Body   2    Ball        4  Union Nut    5    Stop Ring  A    8  Screen    9  Seat       For instance           drawing shows Socket End Connector                 Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve 4    ASAHI AV VALVES Installation  Operation and Maintenance Manual    TRUE UNION BALL CHECK VALVE  Nominal Size  15 50mm  1 2    2           Body Material  U PVC  C PVC  PP  PVDF   End Connector  Socket End  Threaded End  Flange End                       No  DESCRIPTION    1    Body    2    Ball    3    End connector  Flanged end type                  3c    End connector  Socket end type    3d    End connector  Threaded end type    3e    End connector  Spigot end type     4    Union nut   5    Stop ring  A    8    Stop ring B    9    Seat    10    O ring                                  Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve 5
13. with a strap wrench   3  Remove the seat  9   stop ring  A   5  and ball  2      4  Only for True Union Ball Check Valve  Loosen the union nut  4  on another side with a strap wrench and remove it        Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve 10    ASAHI AV VALVES Installation  Operation and Maintenance Manual   lt Assembly gt   Procedure  1  Attach the ball  2   stop ring  A   5  and seat  9  in order  and tighten the union nut  4  hardly by hand     A a   Check the seat and the stop ring  A  for their faces and backs  and ensure they are St p Rit  Caution installed properly they will not work properly if installed backwards  a eee   They can not be sealed   aa                                               2  Only for True Union Ball Check Valve  Set the end connector  3  directly on the body  1  without allowing the O ring  A   10  to come off and tighten the  union nut  4  hardly by hand        3  Using a strap wrench  screw them in by turning from 90   to 180   carefully without damaging them      8  Inspection items    A g    Perform periodic maintenance   Leakage may develop due to temperature changes or over periods  Caution of prolonged storage  rest or operation    OtInspect the follow items     Check for any flaw  cracks  or deformation on the outside   Check whether fluid leaks to the outside   Check whether the cap nut has been loosened                  9  Troubleshooting    Problem Cause Treatment          Insufficient back pressure Che
14. y repair or replacement needed after the warranty period ends shall be charged to the customer      The warranty does not cover the following cases     1  Using our product under any condition not covered by our defined scope of warranty     2  Failure to observe our defined precautions or instructions regarding the construction  installation  handling   i maintenance  or servicing of our product     3  Any inconvenience caused by any product other than ours     4  Remodeling or otherwise modifying our product by anyone other than us     5  Using any part of our product for anything other than the intended use of the product     6  Any abnormality that occurs due to a natural disaster  accident  or other incident not stemming from something  inside our product     Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve 1    ASAHI AV VALVES Installation  Operation and Maintenance Manual     2  General Operating Instructions    A ap   Using a positive pressure gas with our plastic piping may pose a hazard due to the repellent force  Waming particular to compressible fluids  even when the gas is under similar pressures used for liquids   Therefore  be sure to take the necessary safety precautions such as covering the piping with protective  material  For inquiries  please contact us  For conducting a leak test on newly installed piping  be sure  to check for leaks under water pressure  If absolutely necessary to use a gas in testing  please consult  your nearest servic
15. y turning from 90         Threaded type  Body Material  U PVC  C PVC  PP  PVDF     Caution      Sealing tape      Strap wrench   Spanner wrench      apply in case of said use  even when said use is unavoidable     to 180   carefully without damaging it       Make sure that the threaded connections are plastic x plastic   Metallic thread can cause damage      Wrap the threaded joints on our plastic piping with sealing tape  Using a liquid sealing agent or liquid  gasket may cause stress cracks  Environmental Stress Cracking   Our product warranty shall not    Example  Installation procedure of the end connector  on the seat side  of ball check valve     Procedure    1  Wind a sealing tape around the external thread of joint  leaving the end   about 3mm  free     2  Loosen the union nut  4  with a strap wrench     3  Remove the union nut  4  and the end connector  3      4  Tighten the external thread of the joint and the end connector  3  hardly    with hand     5  Using a spanner wrench  screw in the end connector  3  by turning    180    360      carefully without damaging it     6  Make sure that the ball  2   stop ring  A   5  and seat  9  are set   7  Set the end connector  3  and union nut  4  directly on the body   8  Tighten the union nut  4  hardly with hand    9  Using a strap wrench tighten union nut  4  approx from 90      Ball Check Valve  True Union Ball Check Valve and Ball Foot Valve    Sealing Tape      Dig       to 180   turns  1 4 to 1 2 turns     A S   Avoi
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
FZS 30002540-2 franz  Istruzioni operative MCA-MCM-MCS-MQA-MDxKS  ressonancia VANTAGE TOSHIBA  Samsung SGH-D800 Manual de utilizare  TMDB Service Request Portal User Manual  E-BS 800 Artikel-Nr.: 4466200  Greenheck Fan ERH-55 User's Manual  mode d`emploi 1.  はんだ印刷検査遠隔モニタリングシステム「SmartRIn」  e-py : les as du numérique    Copyright © All rights reserved. 
   Failed to retrieve file