Home
UU SS EE RR MM AA NN UU AA LL UCN-BL
Contents
1. 24 KU 24 TABLES AND CHARTS m 26 o TER Te 26 9 2 STANDARD UCN BL OVERALL DIMENSIONS ssesssssesessessessesuseessssesscsuceucsnssssesucescsessessecuceessessessesucesssesaeseecueeesaesaeseeeueeesseesteateeaeeaeenes 2 Pag 4 CDR Pompe S p A UCN BL User Manual MIENO21 00 CDR POMPE S p A General Terms amp Conditions 1 The following terms and conditions apply to the sale of machinery components and related services and products of C D R Pompe S p A hereinafter the products 2 C D R Pompe S p A the manufacturer warrants only that a its products as being free of defects in material design and workmanship at the time of original purchase b its products will function in accordance with CDR Pompe S p A operative manuals CDR Pompe S p A does not guarantee that the product will meet the precise needs of the Customer except for those purposes set out in any invitation to render documents or other documents specifically made available to CDR Pompe S p A before entering into this agreement 6 high quality materials are used in the construction of the pumps and that machining and assembly are carried out to the highest standards Except as expressly stated above CDR Pompe S p A makes no warranties express or implied concerning the products including all warranties of fitnes
2. E ENEE 11 D MEET Q 11 STRUCTURAL DESCRIPTION ies iet retenen ERE Un O QN IER PIONEER ONUS FRI PO TU PE E IP 12 Al DESCRIPTION NERTNORR 12 MEE TT AAE A A A 12 INSTALLATION AND EN MORE OR NEUES 17 5 1 RISE PEPEE EEEE eent 17 32 A E 17 33 PLUMBING E 17 5 3 1 General e A E A Ne E ERE 17 5 3 2 Max acceptable Stresses on flanges iussi eere ertt he ek denies bed err est GmbH d dxtedoenkadudawaneseenaeheaneay dd arbor Esta gus 17 5 3 3 Delivery dea 18 5 3 4 Suction PIPINE ENTIRE 18 5 3 5 E E E EE T 18 eT ey ged gaat essen tea aie serena dace ead ascetic A E 19 OPERATING THE PUMP csccenevesecerencneverewescovectantvenecedeeevescnewenewedeonsstaneveneuesecesercreuiiaecies 20 CDR Pompe S p A UCN BL User Manual Pag 3 CDR MIENO21 00 POMPE SpA 6 1 GENERAL PRESCRIPTION RR RRRNONDRROSKC 20 62 STARING THE PUMP reece e E E E 20 6 3 RE STARTING AFTER POWER CUT OFF
3. CDR Pompe S p A UCN BL User Manual MIENO21 00 5 4 Connecting the Motor WARNING Ground motor before A connecting to electrical power supply Failure to ground motor can cause severe or fatal electrical shock hazard Do not ground to gas supply line Electrical connection must always be executed by a certified electrician Follow the prescriptions of the local electricity board for the connection Never connect the electrical motors directly to mains and place in between a suitable electric switchboard equipped with a circuit breaker and suitable safety devices The motor must be protected from overloads by suitable meanings POMPE S p A Match voltage to nameplate voltage on motor pump Incorrect voltage can cause fire or seriously damage motor voiding warranty Connection is stated on the motor data plate and can be Y star or A Delta according to the power supply of the motor see figure Before applying power to the motor check that the motor impeller is free to turn by manually moving the motor cooling fan Always verify the motor rotation before starting regular operation The motor must turn in the same direction as the arrow shown on the pump lantern The rotation however must always be clockwise looking at the pump on the motor side Y Collegamento a stella A Collegamento a triangolo CDR Pompe S p A UCN BL User Manual Pag 19 POMPE SpA MIENO21 00 6 Ope
4. ene em 6 1 5 P MP IDENTIFICATION 7 sigdngm es 8 21l INTRODUC TION REN UTR 8 DES ENNS e e 8 23 OPERATOR QUALIFICATION AND TRAINING 2 222 0 0 2 rats Ee rtt E 8 2A SAFETY INSIRUCTIONS sca areca earners secs neh ee enc xima up DDR tu same E AE ccm NULL ENDE LIT MM OM Dc UA D Pu OP IDEAE 8 0 006 M 9 2 6 MODIFICATIONS AND OR tetett tttttt S e ru Donc a c M MEE 9 2 7 SAFETY IN EXPLOSIVE ENVIRONMENTS ccccccssssssseseececcsccceccuecsesseseececcscsseeeueuesssesescecesessescusueuseseececesessssaueuessseseececeseeseseueusssseseececeseeeeeaqees 9 28 MECHANICAL 9 VELO NETTE 10 2 10 TEMPERATURE LIMITS RT 10 PACKAGING amp RUPEE tint EEE EDU 11 3 1 PACKAGING 1 MER AND RECEIVING ee 1 E E EE
5. In case diameter reductions are required it is recommended to use appropriate conical reductions possibly eccentric on suction side and concentric on discharge side and the distance from pump flanges must be equal or more than five diameters 5 3 3 Delivery Piping A foot valve and a cut off regulation valve are normally fitted on the discharge piping The foot valve protects the pump from possible backflow The cut off regulation valve excludes the pump from the line and adjusts output Never adjust flow rate using the valve on the suction pipe 5 3 4 Suction Piping The suction piping is very important for the correct operation of your pump UCN BL pumps are single stage centrifugal type and non self priming therefore the suction must be flooded at start up Also the suction line must provide sufficient pressure and smooth flow to pump inlet to prevent pump cavitation The suction piping must be as short and as direct as possible Elbows fittings or valves installed close to the suction can disrupt liquid flow and cause malfunctions If a long suction line is needed the diameter should be large enough to ensure low friction losses Air entrapment in the suction line because of leaks or improper design may cause the pump to lose prime and fail It is always necessary to install a foot valve in all those cases where the static height of the liquid is lower than the suction height of the pump The suction piping mu
6. 550 1 Remove the casing 102 from the adapter ring 500 connected to the lantern 341 Remove the gasket 412 1 In order to pull out the suction cover 106 from the casing 102 pull down the tooth and turn the suction cover counter clockwise 4 Loosen the screws 901 4 and pull out the impeller 230 the stuffing box 161 and the splash guard 507 CAUTION the static and rotating rings of the mechanical seal are usually made from very fragile sintered material and hence must be handled with extreme care Remove the rotating ring and O ring of the mechanical seal 433 from the impeller Remove the stuffing box flange 471 loosen the screws 901 1 and washers 550 4 and pull out the seal casing and o ring 412 2 Do not remove the static ring from the seal Make sure that the seal ring faces have not been damaged in any way 7 4 Maintenance Schedule The UCN BL pumps have been designed and tested to run for a minimum operating time of 8000 hours assuming ideal working conditions This figure is conservative and can change according to the duty point of your pump compared with the BEP on the typical curve Moreover factors such as intermittent operation type of pumped liquid installation and location in the plant may affect the life of those components subject to wear and tear C D R Pompe S p A also recommends to perform preventive maintenance service on the pump at least once a year even when used in ideal operating cond
7. a long period of inactivity start the pump for about five minutes periodically about twice a month The same applies to pumps in stand by POMPE S p A The pump is removed and stored If the pump has to be removed and stored proceed according to the instructions contained in paragraphs 6 4 Stopping the pump and 7 1 General Maintenance Information Protect the suction delivery nozzles use the caps supplied When handling the pump follow the instructions contained in paragraph 3 2 Pump handling and then store the pump as described in paragraph 3 4 Storage CDR Pompe S p A UCN BL User Manual Pag 21 POMPE SpA Maintenance 7 1 General Maintenance Information During the warranty period no operations must be performed other than by personnel from or authorized in writing by C D R Pompe S p A All the stages described in this chapter must be carried out by qualified personnel following all the procedures described herein step by step Each service operation executed on the machine must always be carried out only after all the electrical contacts have been disconnected and make sure it cannot be started accidentally Before servicing any of the parts in contact N with the pumped liquid make sure that the pump has been fully emptied and thoroughly washed When draining the liquid make sure that the N operation does not pose any danger for the people or the environmen
8. as valves fittings filters expansion joints instruments etc The way the piping is arranged and the positioning of the components have a great influence on operation and the life of your pump The pump cannot be used as a support for the components connected to it All piping should be independently and properly supported Piping should not exert any stress on the pump flanges Before installation remove the pump suction and delivery protection caps 5 3 2 Max acceptable Stresses on flanges The forces and momentum transmitted to the pump by the piping system shall never exceed the values reported in the following table Pump flange sizes 25 32 40 50 Force N Pump flange sizes 65 80 Force N X Y Z X Y Z Torque Nm Pag 17 POMPE SpA The thermal expansion of pipelines requires the installation of expansion compensators All flanges must be centred before tightening the bolts DO NOT try to pull or straighten the piping by tightening the bolts of the flanges or threaded fittings The suction and delivery piping valves or filters installed nearby must be self supported and so that no strain is discharged on the the pump The piping must be clean and free from debris welding slag chip etc The flow of liquid from and to the pump must be as even as possible We suggest to avoid any tight bends or drastic reductions of diameters that may cause major friction losses in the plant
9. On POMPE S p A UCN BL USER MANUAL INSTALLATION USE AND MAINTENANCE MANUAL UCN BL 00 First edition May 2006 This manual is published by CDR Pompe S p A without any warranty Improvements and changes to this manual necessitated by typographical errors inaccuracies of current information or improvements to equipment may be made by C D R Pompe S p A at any time and without notice Such changes will however be incorporated into new editions of this manual Drawings and technical instruction for assembling installation and maintenance of the machinery including the manual and information provided with the machine are exclusive property of C D R Pompe S p A The same cannot be transferred to any third party without prior written authorizations by C D R Pompe S p A All rights reserved CDR Pompe S p A 2006 Trademarks Viton is a registered trademarks of DuPont Dow Elastomers MIENO21 00 CDR POMPE S p A Index ANNEX t Warranty terms ee eee ee eee 4 GENERAL INFORMATION ic vccusstesccaedaescows scans 6 IS EN MN CONN see e 6 1 2 PURPOSE OF THE 6 i APPLICA TNON FIELDS 6 MEE SPKK X
10. POWER SUPPLY Possible danger caused by the presence of electric fields or live wires DANGER MAGNETIC FIELD Indicates the presence of high intensity magnetic fields GENERAL DANGER Potential source of danger for whoever working on the pump unit Non compliance with safety instructions described herein can be a source of danger for people the environment and the machine and voids any right to make claims to C D R Pompe S p A The limits provided in this manual or in any documents provided with your pump must never be exceeded Do not start nor execute running tests before filling the pump with liquid 2 3 Operator qualification and training The personnel in charge of the installation the operation and maintenance of the pump unit we produce must be qualified and able to perform the operations described in this manual C D R Pompe S p A shall not be held responsible for the training level of personnel and for the fact that they are not fully aware of the contents of this manual Pag 8 MIENO21 00 2 4 Safety Instructions FOR YOUR OWN SAFETY Sean BEFORE UNDERTAKING ANY SERVICE OPERATION ON YOUR PUMPS PLEASE MAKE SURE TO WEAR THE PROPER PROTECTIVE GEAR Do not perform any maintenance operation on the pump while it is running or before it has been disconnected from the power supply Always disconnect the unit Avoid any possible hazard that might be caused by electric power for details s
11. a Whenever there is a danger of explosion If flammable liquids are pumped provide all pump components with proper grounding static currents may cause sparks and explosions 5 2 Installation The pump motor unit must be installed to a solid structure strong enough to support the entire area on which the unit stands Concrete foundations on a firm ground are the most satisfactory Once the pump motor unit is in position complete levelling by adjusting or adding metal shims placed between the feet and the surface on which it stands CDR Pompe S p A UCN BL User Manual POMPE S p A and assembly The shims must be placed in direct contact with the foundation bolts and they must be sufficiently wide to cover the largest possible surface Check that each foot of the pump motor unit stands steady and flat on the foundation however this position must be set before tightening the nuts of the foundation bolts The surface on which the foundation stands must be flat and horizontal If the pump unit is fitted on a steel structure make sure that it is properly supported and the feet do not bend CDR recommends to fit some rubber vibration dampener between the pump and the brickwork The UCN BL pump is close coupled type thus pump motor alignment is not required 5 3 Plumbing 5 3 1 General Instructions A pump is generally part of a plumbing system that can include a number of components such
12. ad on the right column causes workplace safety our service centre will not the reference number Look for the probable reason repair nor work on pumps and components that for the malfunctioning and or solution on Table B have not been perfectly cleaned We regret that Page 27 Excluding the causes not applicable to we shall be forced to return any pump that in the case being examined you can identify the our indisputable opinion is not sufficiently source of the problem clean If the pump malfunctioning is identified with a number marked with we recommend to contact our after sales service for further support Table A Problems Possible Causes Pump does not have required head 1 2 3 4 9 10 11 12 14 15 17 18 19 24 29 32 Insufficient flow rate 2 3 4 5 6 7 8 9 10 11 12 14 15 17 18 29 32 Low delivery pressure 9 12 14 15 17 18 21 29 Pump unmprimes after startup Abnormal power absorption Vibrations and unnatural noises 2 3 6 7 9 10 11 16 19 21 24 26 27 28 29 30 31 32 Pag 24 CDR Pompe S p A UCN BL User Manual MIENO21 00 POMPE S p A Table B O O N Oo 5 WO MN lt kh O N a O The Pump is not primed Suction height too high Suction piping or pump is not completely filled with liquid Suction piping with air pockets Insufficient suction pressure Vapour pressure is too high Suction piping has higher friction losses than calculated Insufficient suction head Too muc
13. ccccccccccccccsccssssseseecccccesseucesusesescecesesesseucusssseseececeseseeeaucuessseseececesesseueuausssnseccececeseseusauausseseseeceseess 20 04A SITOPPINGTHEPRUMP ee eee ee 20 5 9 PERIODS OF LONG INACTIVITY 21 6 5 1 Tbe left gun poe eae aan road 21 6 5 2 The pumpis removed and ttd tetto 21 MAINTE NANCE P EEE EEE E TEO A AT 22 7 1 GENERAL MAINTENANCE INFORMATION x5iivsoteniokRCGExko Mat nasa ERR DEN SS Md esteet tt t saab boaadsaudeawshaadoaedsanseadsantaimadsanaiedboatavcetsauoeanl 22 7 2 JDEMPIANDEINLLOS UEM GEM E IRR MEE 22 YS MEM QUT ET 22 TA MAINTENANCE 22 J CHECA Sec ec e A E E EEE e esac E E 23 1 0 23 T ECONNENDEDIOUCESIN TORQUE cane cee A TA 23 TROUBLESHOOTING 52454991 1209 inana
14. charge suction valve changing in liquid properties due to temperature variations 2 8 Mechanical seal max permitted operating limits of the respective seal type size must be observed by all means The material combination of the mechanical seal as well as the physical and thermal parameters of the process quench or barrier fluid have a major influence on the operating limits The correct selection of the appropriate seal arrangement is of vital importance for an faultless operation The seal arrangements mostly used are various single or dual seal arrangements Refer also to e g ISO 5199 Further additional measures are flushing or thermal barriers e g cooling flange cooling housing integrated in the equipment Regarding a seal selection by media please refer to CDR sales staff The generated heat of the mechanical seal has to be dissipated to the medium to be sealed or the barrier fluid e g by means of a circulation or cooling to avoid that the seal is overheated A possible failure of a mechanical seal if used in accordance with the specified operating conditions is indicated by a considerable increase of the leakage as compared to the normal average leakage A regular monitoring of the leakage is recommended The user has to take care that the permitted operating limits are observed and not exceeded Pag 9 POMPE SpA The user employer has to observe EC guide lin
15. d with a data plate containing the following information d CDR CDA Ponpe S p aia laa FEIA 38D30 Raraege IW iti Hz HAHEI Far ET CIR 1 Pump model 2 Serial No mis 3 Item when requested 4 Capacity 5 Head 6 Material in contact with liquid 7 Impeller diameter For applications with Ex proof requirements an additional label is placed on the pump On the label you will find the following information 8 CE logo 9 Ex protection Logo a C C x H2GT4 10 Equipment Group 9 e 11 Explosive Atmosphere class G Gas 12 Temperature class The maximum effective surface temperature depends above all from the operative conditions of the process liquid of the user UNI EN 13463 1 art 6 1 3 When requesting spare parts assistance or information concerning the pump supplied the serial number must be always provided Please make sure to have the serial number handy before contacting CDR Pompe S p A service CDR Pompe S p A UCN BL User Manual Pag 7 POMPE SpA 2 Safety 2 1 Introduction This manual contains all the information needed for the correct installation use and maintenance of your new CDR pump It should be read and understood by all the personnel involved in installation operating and servicing of the pump before it is started 2 2 Symbols and signs WARNING Indicates an operation that requires extreme care DANGER
16. de immediately by notifying the carriers and have them to sign the claim In addition check that the material received meets the order specifications number and type of goods CDR Pompe S p A UCN BL User Manual T KEEP DRY VOID MOISTURE Storage In case of storage the pump must be placed in a dry covered place and stored in its original packaging or equivalent protection The protecting caps and lids must be kept on the pump flanges until it is installed If the pump needs to be stored for long periods and or in particularly severe environmental conditions it is recommended to seal the pump packaging and use some hygroscopic substance silica gel to prevent moist damages Pag 11 CDR MIENO21 00 POMPE SpA 4 Structural Description 4 1 Description particular moulding technology called transfer that allows to mould the corrosion resistant layer The UCN BL is a centrifugal single stage directly on the metallic shell providing optimal grip mechanical seal pump It is available both in close on the metallic shell coupled execution The external parts are made of metallic material Cast Iron painted with one coat 4 2 Available option of epoxy varnish dry thickness 60 um and two coats of polyurethane enamel RAL 1017 dry The standard available option for this pump type is thickness 50 um Different painting coats or different finishing colours must be requested prior to pump casing with
17. e 1999 92 EG ATEX 137 The directive includes minimum requirements regarding an improved health protection and the safety of the employees who might be endangered by potentially explosive atmospheres 2 9 Lubrication The design of machines in which mechanical seals are applied has to be such to ensure that there is always a sufficient quantity of lubricant available If using liquid lubricated seals on the atmosphere side media containing a high percentage of gas should not be sealed It is of vital importance that the seal chamber supply systems and the machine are constantly filled with process medium quench or barrier fluid If the user is not able to ensure this suitable monitoring measures have to be applied by all means e g measurement of level pressure and or flow rate Continuous monitoring or appropriate checks or inspections are possible Dry run in will cause a prompt temperature rise of the mechanical seal resulting in a complete failure endangering personnel and environment CDR Pompe S p A UCN BL User Manual Pag 10 MIENO21 00 2 10 Temperature limits The max permitted limits of the seal type size used must be observed by all means seal arrangement design sliding material combination as well as the secondary sealing elements and the physical and thermal parameters of process quench or barrier medium have a major influence on the max temperature limits Th
18. e permitted operating temperature of process quench or barrier medium has to be below the max surface temperature specified by the prescribed temperature class in accordance with the respective mode of operation Special attention has to be paid to the temperature difference between specified temperature class and operating temperature of the process medium at the outboard mechanical seal Media with poor lubricating properties and or media with a low specific thermal capacity are responsible for a relatively high temperature increase at the sliding face On principle the user of the equipment has to ensure that the permitted operating temperature of the process medium is observed If the user is not able to ensure this suitable measures have to be applied to prevent temperature increase above the max surface temperature MIENO21 00 POMPE S p A 3 Packaging amp Handling 3 1 Packaging C D R Pompe S p A pumps or pumping units are normally packed either in cartons maximum dimensions 800x600x400mm held in place by foam or fixed on pallets and wrapped with plastic film In case of pumps ordered without electric motor they are packed with the external magnetic core loose which is kept in the packaging separated from the pump and protected with foam padding Special packaging according to customer s request are available on demand to suit the type and means of transport Packaging must be opened and handl
19. ed according to the instructions shown on it 3 3 Handling To move cartons crates or pallets weighing more than 20Kg use a suitable means for the weight shown on the shipping document and always wear proper safety garments and gear After un crating your pump always use hoist eyebolts when available Close coupled pumps especially those with ADPE Eex D motors could have unbalanced masses on the hoist fittings therefore you should handle the units with all the necessary care While moving the unit avoid any impact that may damage the pump or the electric motor When lifting fasten the crate as shown nil To ensure that the crate cartons or pallets are handled and lifted properly read the symbols on the package see the following legend Shipping and Receiving The goods we deliver undergo a control procedure and are approved before being released It is however recommended to verify your incoming packages The contents of each package are described in the packing list or in the delivery note Run your check list carefully at the time of collection and possibly with the driver carrier on site check the integrity of the goods and packaging Any claim must be ma
20. ee current regulations in force Check the electrical specifications on the motor data plate and make sure they correspond to the power supply to which it will be connected Avoid pumping liquids even at different N times that may cause chemical reactions Always clean the pump thoroughly before changing liquid N Mag Drive pumps use wide range high intensity magnets All pacemaker carriers must not approach magnetic components intense magnetic fields can disturb heart pace The cold or hot parts of the pump unit must be protected to avoid accidental contacts We remind you that the maximum effective surface temperature depends above all from the operative conditions of the process liquid of the user UNI EN 13463 1 art 6 1 3 Do not tamper with the protection of the rotating parts do not touch or approach rotating parts while running Always avoid the dry operation of the pump Start the pump when it is completely filled and with the delivery valve almost closed limiting this condition to the time that is strictly necessary to start the pump It is not recommended to use liquid with suspended solids especially if sensitive to magnetism In case dirty liquids are to be pumped and this was not mentioned at the time of ordering it is necessary CDR Pompe S p A UCN BL User Manual MIENO21 00 to contact C D R Pompe S p A s technical service before activating the pump Do not submit pumps to abrupt t
21. emperature variations Clean the pump before performing service on it Corrosive and dangerous liquids contained in the pump could present a thread to your safety After service start the pump again following all the safety instructions described in chapter 6 Starting and stopping 2 5 Noise Level UCN BL pumps including the motor in normal operating conditions Q opt produce a sound level below 80 dBA The major sources of noise are liquid turbulence in the plant cavitation or any other abnormal operation that does not depend from the pump construction nor the pump manufacturer The user must provide suitable protective means if the sources of noise could produce a harmful noise level for operators and for the environment in compliance with current regulations 2 6 Modifications and Spare parts Any changes concerning the service of the pump as originally purchased can be executed only after written approval from C D R Pompe S p A It is recommended to use only genuine CDR spare parts and approved accessories The use of non original spare parts or non approved accessories will void warranty and removes any responsibility on our behalf for any damage caused to people or things 2 7 Safety in explosive environments It is user s responsibility when ordering the pump to verify that the fluid temperature is suitable for the classification zone of the plant We remind you that the maximum effective surface
22. flanged drain ordering The parts in contact with the pumped liquid are made of thermoplastic material either PP or PFA The pump casing lining is manufactured with a Code DIN Description Material a 360 Blind flanges AISI 304 PTFE FPM EPDM FPM FEP 550 Washer AISI 304 550 1 AISI 304 Drain flange connection pipe AISI 304 PFA PTFE 901 Screw AISI 304 901 901 1 Screw Aisi 304 901 1 920 Nut Aisi 304 550 1 901 1 412 Pag 12 CDR Pompe S p A UCN BL User Manual POMPE SpA MIENO21 00 CDR On BOO 161 412 2 412 1 471 500 914 1 680 914 2 550 5 900 341 550 3 901 3 EN pn Wins S is SRE G55 WILLA tee Nee L e f Aha 230 A ini HREAN 901 4 A N ca ARS I 5S F SQISSSS ESD AMA SQN k 5 TITEL YA 7 Mie O ELIT ISE i LU HH 210 PELAN ASA zenu SS SSO RYE RS BAS li 433 Gee is RUN SN F S 550 1 NELLA SIN SS 901 1 E XU Ede VAS RY N LASS NS A Cw B 181 550 4 901 1 550 901 507 901 5 920 1 901 7 181 1 550 2 901 2 914 3 Fig 1 UCN BL 160 series typical section with 90 motor size and FC35 mechanical seal Open recessed radial impeller execution details CDR Pompe S p A UCN BL User Manual Pag 13 CDR MIENO21 00 POMPE SpA Code DIN Descrizione Materiale Descripti
23. h air or gas in the pumped liquid Suction piping not sealed Foot valve not sealed or clogged Low rotation speed High rotation speed Wrong direction of rotation The plant total required head higher than what delivered by the pump The plant total required head lower than what delivered by the pump Liquid density differs from the expected one specified at purchase time Liquid viscosity differs from the expected one specified at purchase time Pump operating without liquid dry running Operating flowrate too low Operating flowrate too high pump cavitates Material not suitable for the pumped liquid Pumped liquid with suspended solid Liquid temperature too high Liquid temperature too low Insufficient pressure or bushing lubrication cooling flushing flow Shaft is not straight Rotating parts are rubbing against casing isolation shell Damaged impeller Internal bushings worn or damaged Rotating unit out of balance Magnetic coupling damaged demagnetized or insufficient Wrong assembly dirt solids presence or liquid non compatible CDR Pompe S p A UCN BL User Manual Pag 25 CDR MIENO21 00 POMPE S p A 9 Tables and Charts 9 1 Features Table Pump Model Close coupled centrifugal pump with mechanical seal Pumped Liquids CORROSIVE INFLAMMABLE AND TOXIC LIQUIDS Performances 3 _ Range Qmax 80m h gt H 65 mcl Temperature 0 C gt 0 C PP version Range 15 C gt 120 C PFA
24. ike to thank you for choosing our products We believe that with a correct installation and proper use of this product you will achieve the best results therefore please read this manual carefully before undertaking any operation on the pump motor unit Any use other than that described herein is considered incorrect and therefore C D R Pompe S p A shall not be held responsible for any damages to people or things In case of doubt or enquiries please apply to our technical service directly at the following address CDR Pompe S p A Via P Togliatti 26 a 20030 Senago Tel 39 02 990 1941 Fax 39 02 998 0606 www cdrpompe com info cdrpompe com 1 2 Purpose of the Manual This manual supplies the user of the pump motor unit manufactured by C D R Pompe S p A the necessary information for the correct installation use and maintenance in compliance with safety conditions prescribed by the current CE standards 1 3 Application Fields The centrifugal pumps in close coupled execution with mechanical seal model UCN BL are designed to transfer a variety of different liquids with temperature ranging viscosity and maximum system pressure specified on chapter 9 Such figures however depend on the size of the pump the type of materials used and the pumped liquid Pag 6 The UCN BL pumps do not have Self Priming capabilities The operating conditions and hence the proper working range for which the pump and its comp
25. itions CDR Pompe S p A UCN BL User Manual MIENO21 00 CDR POMPE S p A 7 5 Pump mounting 7 6 Wear Parts Check and Replacement In order to assembly the pump please repeat the same steps mentioned for the dismantling however We suggest replacing the casing gasket O rings proceeding from the bottom up to the first steps and spring cups every service job or every time the pump is opened Mechanical Seal when it shows wear signs on the seal ring faces The static and rotating rings of the mechanical seal are usually made from very fragile sintered material and hence 7 7 Recommended locking torque must be handled with extreme care Please refer to the following table to set proper Fitting of the O ring 412 1 must be made wrench torque when locking the pump screws with extreme care and make sure that its bolts and nuts sealing capabilities are not affected or compromised con eee Nm 9014 901 901 4 aoi Casing screws 490 Motor size 90 shaft screw Motor size 100 112 132 160 shaft screw CDR Pompe S p A UCN BL User Manual Pag 23 CD MIENO21 00 POMPE SpA 8 Troubleshooting 8 1 General Information The following tables can help you to identify some possible causes for pump failures or problems you WARNING might encounter during operation Identify on the left column of table A symptoms the problem In compliance with the Italian law 626 94 on encountered and re
26. o FEP m22 Oring SSS Viton EPDM Vito FEP 1 O 3 3 33 FC35 Mechanical seal SIC ETFE Viton EPDM FFKM T Seal flange Aisi 304 4 500 Casing adaptor ring Carbon steel 50 Splash guard 5 Aisi 304 550 1 Aisi 304 550 2 550 3 550 4 550 5 550 6 90 301 a12 Screw i Nsi34 s 50 680 1 Ce Q D ep Q D 9014 915 Screw i NsS34 901 6 9017 CoD Q D cr 901 3 Aisi 304 cr 901 8 914 1 914 2 914 3 9144 920 020 2 Pag 16 CDR Pompe S p A UCN BL User Manual MIENO21 00 Installation 5 1 General Instructions C D R Pompe S p A shall not be held responsible for any damage to people or objects due to incorrect assembly performed by unqualified personnel Install the pump in a place where servicing can be carried out easily The delivery and suction piping as well as the foundation work must be prepared in compliance with the dimensions shown in the overall drawing or installation plan The diameter of the piping shall never be smaller than the suction delivery nozzles of the pump Electrical parts that operate in areas in which there is a danger of explosion must comply with current regulations in force this must be shown on the motor data plate follow the prescriptions concerning Ex protection and the test certificate Tale certificato deve essere conservato sul luogo di impiego della macchin
27. on Material 230 Impeller PP PFA FC35 Mechanical seal SIC ETFE Viton EPDM FFKM 507 Splash guard PP O Carbont O 901 4 Screw Aisi 304 901 5 Screw Aisi 304 16 Screw 917 sew Aisi 304 942 O 943 Screw y O 01 Mt O Asi304 Pag 14 CDR Pompe S p A UCN BL User Manual MIENO21 00 CDR POMPE SpA 99 161 412 2 412 1 471 500 914 1 680 914 2 550 5 900 341 901 3 550 3 920 2 914 3 iN AS HE X py 77 Nd f A M AA AN ae AL 7 q Y BL 230 CZ 774 ANN SR Lb m T Yi AE wna mi Res Nw 2 ZA Hs WE Oe PE EER n t iod Baz zz ZA 433 AX xm Wt d SS 122 Ws ZA ZH lt I 901 8 qi IU E IN E a SS EN NIZZZ S B VW 2 E A Y l 727Z eLA RN AY ime e yy N noe E AA Bb LAE Wz UMMM We 901 1 7 A rcm 181 550 4 901 1 550 901 507 901 5 181 2 920 1 901 7 181 1 550 2 901 2 9144 Fig 2 UCN BL 200 series typical section with 132 160 motor size and FC35 mechanical seal Open recessed radial impeller execution details CDR Pompe S p A UCN BL User Manual Pag 15 CDR MIENO21 00 POMPE SpA Description Material Wear ring PFA AISI 304 PTFE PP GS400 12 PFA GS400 12 Baseplate GS400 12 81 1 812 210 0 230 1 230 2 O NO OIN N 34 GS400 12 Viton EP Vit
28. on to the terminals of the electric motor Par 5 4 Motor connection and repeat the procedure described above All eventual auxiliary connections must be connected and verified 6 2 Starting the Pump UCN BL pumps can be started with straight electrical motor connection Pag 20 Start the electric motor and open the delivery adjustment cut off valve gradually until the desired output has been reached The pump must not turn more than two or three minutes with the cut off valve closed A longer Operation in these conditions could seriously damage your pump If the pressure shown on the pressure gauge on the delivery piping does not increase turn the pump off immediately and carefully release pressure Repeat the connection procedure Paragraph 5 3 Piping connection If there are changes of flow rate head density temperature or viscosity of the liquid stop the pump and get in touch with C D R Pompe S p A s Technical Service Pumps equipped with optional heating jackets normally used to pump liquids that solidify with low temperatures do require extreme care at start up CDR strongly recommends to pre heat your pump up to the required temperature at least 2 hours prior start up 6 3 Re starting after power cut off In case of accidental stopping make sure that the non return valve has prevented backflow and check that the motor cooling fan has stopped Start the pump again following the instr
29. onents have been selected are described in the technical sheet released with the order Should you need to change the type of service for which the pump has been selected and purchased please contact C D R Pompe S p A s_ technical service before any change is applied The user is responsible for any damage caused to person or property if such damage is determined by non compliance with the operating conditions agreed at the time of the Order Confirmation and the information contained in this manual It is also Customer s responsibility to Verify the suitability of the pump motor unit to the working environment Provide operators with proper protection and safety devices Provide operators users with complete information concerning proper use and functioning of the pump 1 4 Copyright Il presente manuale di proprieta della C D R Pompe S p A che si riserva il diritto di modificarne il contenuto senza preavviso Esso contiene informazioni tecniche e disegni di propriet della C D R Pompe S p A e non pu essere quindi in nessun caso riprodotto in toto o in parte senza previa autorizzazione scritta della C D R Pompe S p A stessa The e logo and name are registered trademarks of C D R Pompe S p A The name ILS is registered Trademark and Trade Name of C D R Pompe S p A CDR Pompe S p A UCN BL User Manual MIENO21 00 CD POMPE S p A 1 5 Pump Identification Each pump is provide
30. or a period in accordance to the current law from the date of delivery under the condition that notice of the alleged defect to the products or parts thereof be given to CDR Pompe S p A in written within the mandatory term of 8 days from the discovery 6 Repair or replacement under the terms of this warranty shall not give a right to an extension to or a new commencement of the period of warranty Repair or replacement under the terms of this warranty may be fulfilled with functionally equivalent reconditioned units CDR Pompe S p A qualified personnel shall be solely entitled to carry out repair or replacement of faulty parts after careful examination of the pump Replaced faulty parts or components will become the property of CDR Pompe S p A 7 The products are built in accordance with standard CE normative and are tested where applicable by C D R Pompe S p A Approval and tests by other control authority are for the customer s account The products shall not be considered defective in materials design or workmanship if they need to be adapted changed or adjusted to conform to national or local technical or safety standards in force in any Country other than that for which the unit was originally designed and manufactured This warranty shall not reimburse such adaptations changes or adjustments or attempt to do so whether properly performed or not nor any damage resulting from them nor any adaptation change or adjustments to upgrade the
31. products from their normal purpose as described in the products operative manual without the prior written consent of CDR Pompe S p A 8 Installation including electric and other connections to utility mains according to C D R Pompe S p A drawings is for the cost and responsibility of the customer unless otherwise agreed in writing 9 CDR Pompe S p A will not be liable on any claim whether in contact tort or otherwise for any indirect special incidental or consequential damages caused to the customer or to third parties including loss of profits arising by any possible infringement of par 3 above or by the customer or third parties being in the impossibility of using the products Steady the above CDR Pompe S p A liability to the customer or third parties from any claim whether in contract tort or otherwise shall be limited to the total amount paid by the customer for the product that caused the damages 10 This agreement shall be interpreted construed and governed by the Italian law Any dispute arising out of or in connection with this agreement shall be submitted to the exclusive jurisdiction of the Court of Milan CDR Pompe S p A UCN BL User Manual Pag 5 POMPE SpA MIENO21 00 1 General Information 1 1 Introduction This manual refers to single stage centrifugal mechanical seal pumps model UCN BL in close coupled execution according to DIN 24256 and ISO 2858 standards C D R Pompe S p A would l
32. rating the Pump 6 1 General Prescription Check manually that the motor is free to turn moving the motor cooling fan Make sure that the piping is not clogged and is free from residues solid particles or crystals from the pumped product In case of installation on new or modified plants it is recommended to use temporary filters strainers socket type placed on the suction line Should the liquid to be maintained at a prescribed temperature to avoid crystallization or solidification heat piping in accordance with the type of piping or plant needs Make sure that the liquid flows regularly into the pump The pump and piping connected to the suction type must be flooded Any air or gas must be carefully released In case of suction with negative head fill the suction piping and check how the bottom valve works It must guarantee that the liquid does not flow back emptying therefore the suction pipe with consequent un priming of the pump The suction cut off valve if any must be completely open The cut off regulation valve on the discharge side must be almost completely closed The motor must turn in the same direction as the arrow shown on the pump The direction of rotation is always clockwise looking at the pump on the motor side check by starting briefly then looking at the direction of rotation of the motor fan through the fan lid If it is wrong the motor must be stopped immediately Change the connecti
33. s for a particular purpose 3 This warranty shall not be applicable in circumstances other than defects in material design and workmanship In particular warranty shall not cover the following a Periodic checks maintenance repair and replacement of parts due to normal wear and tear seals O rings rubber items bushings etc b Damage to the product resulting from b 1 Tampering with abuse or misuse including but not limited to failure to use the product for its normal purposes as stated at the time of purchase or in accordance with CDR Pompe S p A instructions for use and maintenance of the product or the installation or improper ventilation or use of the product in a manner inconsistent with the technical or safety standard in force b 2 Repairs performed by non skilled personell or use of non original CDR parts b 3 Accidents acts of God or any cause beyond the control of CDR Pompe S p A including but not limited to lightning water fire earthquake and public disturbances etc 4 The warrantee shall cover the replacement or repairing of any parts which is documentedly faulty due to construction or assembling with new or repaired parts free of charges delivered by C D R Pompe S p A Parts subjected to normal tear and wear shall not be covered by the warranty CDR Pompe S p A shall decide as to whether the defective or faulty part shall be replaced or repaired 5 The warrantee of the products shall be valid f
34. st be designed to prevent air from being trapped in high spots in the piping This condition may cause the pump to vapour lock as the air bubble moves into the pump Pag 18 MIENO21 00 Critical points in the system could be the seals between flanges and the seals of the valve stems UCN BL pumps can become self priming if equipped with a priming barrel for any further information please get in touch with C D R Pompe S p A s technical service 5 3 5 Instruments In order to ensure a reasonable control of the performance and the conditions of the pump installed we recommend to use the following instruments a vacuum gauge on the suction piping a pressure gauge on the delivery piping The pressure intakes must be made on straight pieces of piping and placed at minimum five diameters from the pump inlets The pressure gauge on delivery must always be fitted between the pump and the cut off regulation valve The output can be read on the pressure transformed into meters and then compared with the typical curves The electric power absorbed by the motor can be measured with watt meters Optional instruments can warn about abnormal operating conditions of your pump such as valves accidentally closed missing liquid overloads etc for any further information please contact C D R Pompe S p A s technical service If the temperature of the pumped liquid is a critical element provide a thermometer best on suction
35. t For Pump Handling procedures please see paragraph 3 3 Handling on page 11 7 2 Pump handling The pumps motor pumps weighing over 20 Kg must be handled and positioned using suitable hoisting means Always use hoisting eyebolts when available The close coupled pumps can have unbalanced masses on the hoisting fittings therefore transport the units with all the necessary care While moving the parts avoid any impact that may damage the pump or the electric motor 7 3 Pump dismantling When dismantling the pump please make sure that the typical drawing of your pump type are available see typical section with FC35 mechanical seal page 13 and 15 For different mechanical seals please contact CDR technical department Dismantling the motor with pump installed 1 Remove the screws pos 914 2 and the carter 680 Locking shaft 210 with screws 901 7 intercept shaft holes Loose the shaft screw 914 3 through the apposite lantern hole For UCN BL pumps with drive size 100 112 132 or 160 B5 frame Pag 22 MIENO21 00 2 Loose the nuts 920 2 and remove the screws 901 3 and the washers 550 3 For UCN BL pumps with drive size 90 B5 frame 2 Loose the screws 901 3 and the washers 550 3 Warning The shaft must be locked before dismantling the motor for not damage mechanical seal Dismantling the wet end with pump removed from piping 3 Remove the screws 901 e 901 1 and washers 550 e
36. temperature depends above all from the operative conditions of the process liquid of the user UNI EN 13463 1 art 6 1 3 UCN BL pumps are built in accordance with 94 9 CE ATEX Group class 2G standards The maximum operating temperature allowed for this pump model is 120 C The user must verify and insure that such temperature limits are not exceeded Grounding The pump motor unit a base plate are provided with separate grounding to prevent electrostatic load formation Their positioning is marked through international symbols CDR Pompe S p A UCN BL User Manual POMPE S p A Motor When the motor is purchased separately from the pump please make sure it does meet the protection parameters specified for the application area indicated by the Customer User It is the user s responsibility to grant that the pumps operating limits are strictly observed If this cannot be granted it is the users responsibility to use proper devices in order to make sure that the pump remains within the given parameters Recommended Options The user has to make sure that the pump units operating limits are observed A most important issue is the operating temperature If the user cannot grant the operating temperature is kept within the limits he shall use appropriate control devices Wattmetric Units Will stop the pump in case of dry running conditions or overloads due to accidental closing of the dis
37. uctions of paragraph 6 2 Starting the Pump If the pump intakes from a lower level it can un prime during the standstill and therefore you must check again before starting that the pump and the suction piping are full of liquid 6 4 Stopping the Pump Close the delivery adjustment cut off valve gradually and stop the motor immediately after Make sure that the motor has an even deceleration Stopping the pump before closing the cut off valve is not recommended especially with larger pumps or long delivery piping That is to avoid damages due to liquid backflow hammering ram head If a suction cut off valve has been installed it is advisable to close it completely In some applications e g if the pump is used to empty tanks or tank trucks it may occur that the liquid stops flowing into the pump while still operating In this case the pump runs without liquid and can be seriously damaged if the condition persists Pump must be stopped immediately If no CDR Pompe S p A UCN BL User Manual MIENO21 00 automatic safety devices optional are installed it is necessary to ensure the constant presence of an operator who can promptly stop the pump and perform the above mentioned operations Consult C D R personnel to choose the proper instrument for your pump suited to prevent dry running operation 6 5 Periods of long inactivity 6 5 1 The pump is left in place To avoid substances settling inside the pump because of
38. version System Pressure PP max 2 Mpa 20 C to 1 2 Mpa 70 C Ratings PFA max 2 Mpa 20 C to 0 8 Mpa 120 C Viscosity 400 cSt max Concentration 5 in weight Max Hardness 800 Vk Size 500 Pag 26 CDR Pompe S p A UCN BL User Manual MIENO21 00 9 2 Standard UCN BL overall dimensions Dna DNm suction flange Delivery flange Pump type Holes for WAI Holes for UNI 2223 29 PN15 ANSI 2223 29 PN16 ANSI B165 150 RF B16 5 150 RF H 208 for UCN BL 80 50 125 motor size 160 CDR Pompe S p A UCN BL User Manual 180 150 150 o 150 180 150 POMPE S p A Pag 27 CDR MIENO21 00 POMPE S p A Pump type we 3 Motor weight Pag 28 CDR Pompe S p A UCN BL User Manual MIENO21 00 CDR POMPE S p A CDR Pompe S p A UCN BL User Manual Pag 29 CDR MIENO21 00 POMPE S p A Pag 30 CDR Pompe S p A UCN BL User Manual Tech Books and User Manuals SS e CDR POMPE S p A Qn Via P Togliatti 26 a 20030 Senago MI POMPE SPA 43902 990 1941 Fax 439 02 998 0606
Download Pdf Manuals
Related Search
Related Contents
User's Guide DS1000Z Series Digital Oscilloscope Physics 476LW Modern Physics Laboratory Cozy Products FWB Instructions / Assembly Pioneer F60 Operation Manual Instituto Tecnológico de Costa Rica TABLA DE CONTENIDOS Pfister SGL-CBLK Installation Guide DF-320E - Keison Products 493130 280 Operators Manual 1982 - Hagie Help Copyright © All rights reserved.
Failed to retrieve file