Home

User Manual Energy

image

Contents

1. User Manual Energy V 0 1 myaEKKO Last update August 2012 All software related descriptions refer to the software V1279 We recommend to update older versions of the system Small devia tions in the description because of software changes are possible All listed brands and logos are registered trademarks of their respective owners Copyright All rights reserved Without the the prior written permission of the publisher no part of this document for any purpose be reproduced or transmitted and regardless of any form or by any means electronic or mechanical this is happening If this publication is made available on media by Ekon GmbH GmbH Ekon grant permission copies of the information con tained in this file is only for private use and not to download or print for redistribution No part of this publication may be changed modified or used for commercial purposes Ekon is not liable for damages resulting from the use of an illegal modi fied or altered publication CE The devices comply with the relevant guidelines and standards of the EU 2 myGEKKO Table of Content 1 PUISEINBUE o2456ec00cccereadeceteceavereseseneeresecte1eneressceoseseceiiens 4 2 Pulse input of the heat Meter cceccccccccsccsccccscsscccescesescesess 4 EE eT PEE E E EET ER EE EE e 4 4 STAlUSOUIDUE P E E E T T cites 4 5 Measuring transCucer ccccccccccccccccccccsccccccsscsscccsscesescesens 5 O Viral SUN near een 5 7 Power m
2. RIO 29 BEE with M Bus interface Ba max 20 60 RS232 depending on the M Bus USB COM 1 4 with M Bus interface and interface USB 4 fold RS232 interface distributor myGEKKO 7 Energy meter connection directly to the RIO29 The RIO 29 modules have an M Bus interface to which the M Bus meters can be connected directly without level converter A maximum of 3 M Bus meters can be connected to the RIO 29 module M Bus meters can be connected in series and or parallel to the interface Caution plus and minus are to be distinguished despite polarity protection myGEKKO RIO 29 en Art Rio 29 v a lem myGEKKO RIO 29 Art Rio 29 Bottom M Bus Interface Connection of the M Bus interface to the myGEKKO The M Bus interface ACC MBU20 ACC MBU60 is connected to an RS232 interface It can be con nected either to the RIO 29 directly to the RS232 interface on the myGEKKO Touch or to the interface distributor USB quadruple RS232 Art nr ACC RS201 myGEKKO RIO 29 i Art Rio 29 M Bus Interfaces xT RS232 Interface ly HH 24VDC D RxTx amp RxTx eo GND D ee Bags TxD 8 myGEKKO 8 3 M Bus meter software activation Log in as configurator Change to the system menu fl gt Energy Costs Tap the first free green bar and select IO configuration a Tap the title bar and give the counter a name eg power consumption Select an M Bus meter as measurement type Select
3. electrical connection of the cur rent transformers etc 5 Done Now you can use the individual outputs in the load shedding control or in the energy meters myGEKKO 1OStation e arems we lOStation 2 IOStation 3 0 0V 0 0V 0 0V 0 0V OV 0 0V OW OW OW Ow OW OW 0 00kW 0 00kW 0 00kWh Configure leset counter Configuration level of the power measurement Example Utilisation Sum of outputs in energy terminals meter myGEKKO 5 8 M Bus Meter 8 1 General information M Bus Meter Bus is a field bus for consumption data acquisition The transmission is made serially on a revers polarity protected two wire line from the connected slaves meters to a master As master we use the myGEKKO Touch with attached M Bus level converter which is connected to the Touch or Rio 29 via RS232 All counter values are securely saved in the M Bus slaves i e in the energy meters Hence no data is lost if there is a power failure myGEKKO reads the data continually saves it and makes it graphically formatted available M Bus characteristics Standardised field bus system EN1434 Two wire bus with power supply of the bus devices No special requirements on the bus cable electrical installation cable or telephone cable suffi cient Optional wiring topology skein skein with branches star Vast reach up to several kilometres Remote reading of consumption data heat water gas and electricity Com
4. a counter from the counter type eg current Now enter the secondary address of the counter This 8 digit number must be noted on the meter right or read on meters with a digital display in the menu 7 Inthe end you choose from the port interface to which the counter or level transformers are con nected oY St eS a iS After the meter is configured a new icon M Bus appears in the Energy Costs menu Power consumption IO Configuration came D E Standard Port 1 1 RS232 IO configuration energy meters Tap the M Bus icon and check the status of the meter If the field of the meter is green the meter works correctly If the field of the meter is red the meter is not connected or not configured properly TIMEOUT me ter is not found WRONGMETERT YPE improperly configured meter type Power consumption 07 02 12 14 24 04 OK 1801 3501 Stromzahler er Overview M Bus meter Status contro meter myGEKKO 9 e gt Gesamtanzahl T Aktuelle Auslesung 9 Energy counters parameterisation In menu field Nominal efficiency set out the units of measurement for the scale of trends Save the updated power water price under the menu item Costs per unit This way it s possible to monitor the concerning costs as well as the consumption If you are using a counter already in use it s possible to recover the current status of the counter Save units to the left field and decimal fractions to the
5. easurment terminal cccccccccccccccccccccccccccsecsecscccecs 5 8 M BUS Mleter s5 ss nn an nn a aa a ae 6 8 1 General information era aa aa Reh 6 8 2 Electrical GUEL ae en a ne aude to do 00e 6 8 3 M Bus Meter software activation 0 ccc ccc ccc cece cence nee eee eee nee ee eeeeenennees 9 9 Energy counters parameterisation cccccccccccccccccccccccccecccccece 10 myGEKKO 3 MyGEKKO allows to connect several energy counters and control different consumptions Log in as configurator 1 Change to menu Energy Costs 6 and select the first free energy counter 2 Change to IO configuration and select the desired type of counter under Type of measure ment 1 Pulse input For pulse input configure as DI the input of pulse counter connected to an IO station Enter the pulse value of the counter as well Type the unit of measurement in order to view a correct presentation 2 Pulse input of the heat meter For pulse input of the heat meter configure as DI the input of pulse counter and as Al the supply and the return temperature connected to an IO station Enter the pulse value of the counter as well 3 Status input For status input configure as DI the input previously connected to an IO station Enter an efficiency and a unit of measurement as well Once the status input has been switched on the entered output is set up 4 Status output For status output configure as DI the output connected
6. munication with sensors and actuators of any type Energy monitoring and optimisation Leak monitoring Usable in industry and private households Good availability of system components Excellent cost performance ratio Remote access with myGEKKO from anywhere via LAN myGEKKO amp M BUS 15 min trend day month lists with graphical presentation available Direct conversion of consumption in Euro and CHF Storage on USB flash drives external NAS drive with enabled NFS or system card 8 2 Elecrical outlet M Bus direct energy meter 3 phases 65A Technical data Voltage 4 phase meter 3x230 400V Stromaufnahme 20mA Rated current 65A Frequency 50 60 Hz ue 2 Outputs 1 SO Pulse output en Protection class Il Protection type IP 20 Dimensions 107 x 89 5 x 64 2 mm 6 myGEKKO M Bus energy meter 1 phase 32A ste kWh Le Tel 58 CEM Connection details Technical data Voltage Stromaufnahme Rated current Frequency Outputs Protection class Protection class Dimensioion Technical daa Standard loads per 1 5 mA power supply Protection Display for Mounting 2 phase meter 1x230V 20mA 32A 50 60Hz 1 SO Pulse output Il IP 20 17 5 x 95 6 x 68 2 mm max 20 60 Terminals external 12 24VDC or AC Versorgung Overcurrent and short circuit protec tion on the M Bus data transmission and system status Rail or wall Interface Connection via Energy meters max 3 we oo per RIO 29
7. right field e g counter status 3 52 right field 3 left field 0 52 The counter status will get automatically updated If you like you can view the first two counters on the main page Furthermore buttons Reset counter status and Delete daily and monthly lists are also available Power consumption Parameters Nominal power 10 00 Costs per unit h 0 2450 Actual count Actual total costs Show on startscreen Reset meter count Energy counters parameterisation Notice In order to save daily and monthly lists go to System menu gt Recording Log and define the desired storage location as well as one folder for the lists file and the trends file respectively For further details see data storage configurations manual 10 myGEKKO Notes myGEKKO 11 myGEKKO www my gekko com A first class product of Europe The result of a close collaboration between Italy Switzerland and Germany
8. to an IO station Enter an efficiency and a unit of measurement as well Once the status output has been switched on the entered output is set up 4 myGEKKO 5 Measuring transducer For measuring transducer configure as Al the input connected to an IO station Enter a measurement range min and max and a measurement unit as well 6 Virtual sum By adding together the efficiencies of different utilities you obtain the virtual sum For this purpose select the desired utilities lights ventilation system outputs or all of them It s possible to define the efficiencies of single utilities in the IO configuration of the respective utility Once the utility is on its efficiency is added to the sum 7 Power measurement terminal You need to be logged in as configurator and have to have completed the main configuration ex plained in the previous section Change again to main settings gt 1 0 configuration 1 Tap gt gt next to number of PWR terminals and you get to the configuration level of the power measurement terminals 2 Select Terminal 1 and tap Configure This step needs only be done once for each terminal 1 4 3 Define the current transformer ratio of the current transformers connected to the terminal E g for a 100 5A current transformer enter 20 as value 4 Now all current voltage consumption and output values should be visible If they are wrong or some show negative currents or consumption check the

Download Pdf Manuals

image

Related Search

Related Contents

Uso del tasto INFO (guida "Oggi e Domani") - Migros  ASUS (ME180A) User's Manual  VM101 VM101 - Compare Cellular  Lunchbox  Pioneer F20 Installation Guide  Quick Start Guide Guide de démarrage rapide Guía de  PDFファイル  Westinghouse Saf-T-Brace, 4 Teeth with Locking Screw with 1-1/2 Inch Deep Box 0101000 Instruction Manual  SERIE T154 ITA.pub  CONTRATO PARA EL OTORGAMIENTO DE UNA LICENCIA DE  

Copyright © All rights reserved.
DMCA: DMCA_mwitty#outlook.com.