Home

Picosun Atomic Layer Deposition

image

Contents

1. lt HOME gt Used to home the wafer elevator and lift wafer up from process chamber for unloading lt Z1 gt Used to move the elevator to intermediate position when pushing pulling the load lock rod lt Z2 gt Used to lower the elevator to the process position It also closes the process chamber Note In this manual all the buttons for load lock elevator control are bounded by lt gt to avoid confusion with the main process control buttons 7 3 Available Sources picosun 7 4 75 7 6 7 3 1 7 3 2 7 3 3 Chapter 6 24 TMA Trimethylaluminum Al CH3 3 which supplies aluminum source for the aluminum oxide process Source A TTIP Titanium Tetrakis Isopropoxide which supplies Ti source for the titanium oxide process Source B a heated source process temperature 80 C DI Water DI water vapor acts as oxidation agent Source C Available Recipes Material Precursor Nanolab Inventoried and Deposition Rate replenished Al203 TMA Standard Process Supported 1 A Cycle and Replenished TiO2 TTIP Supported Process Supported 0 25 Cycle and Replenished Process Notes 7 5 1 7 5 2 7 5 3 Samples with photoresist are not allowed in the Picosun ALD system The process chamber can accommodate one 6 or one 4 wafer at a time Many small samples can be loaded at a time on a 6 packet wafer which can be checked out from the office Please note the ALD depo
2. group such as Methyl CH3 which will ultimately leave a monolayer of metal oxide behind on the substrate metal is reacted with water vapor to form the metal oxide Source bottle Up to three sources materials precursors can be provided in source bottles installed on this particular ALD machine Injection The precursor source bottle is pulsed open in specific intervals defined by the process recipe A carrier N2 gas will then delivers the precursor material to the reaction chamber Typical source materials for this system are 4 5 1 TMA Trimethylaluminum Al CH3 3 is precursors used to deposit aluminum oxide 4 5 2 TTIP Titanium Tetrakis Isopropoxide which supplies Ti source for the titanium oxide process 4 5 3 Other sources may be available as an alternative to above sources i e TiCl4 Titanium Tetrachloride is a precursors used to deposit Titanium oxide The number of sources that can be installed on this tool are currently limited to three as per available source bottles hardware limited on this tool hPa Hectopascal 1 hPa 0 75006375541921 Torr picosun 5 0 Safety 6 0 7 0 Chapter 6 24 5 1 Follow all the NanoLab general safety rules 5 2 Source gas The system uses highly reactive source gases great care must be taken when source bottles are changed Also the source temperature needs to be lowered to room temperature before changing the source 5 3 Chemical Hazard Do not vent the chamber before purgi
3. on this tool picosun Chapter 6 24 9 0 Troubleshooting Guidelines 9 1 9 2 9 3 9 4 9 5 Problem Cannot log in 9 1 1 Cause The password is case sensitive 9 1 2 Solution On the graphic keyboard change to correct case Problem TP2 pressure does not change when the load lock 3 way valve is turned to pump 9 2 1 Cause The TP2 valve in the back of the tool should be opened manually 9 2 2 Solution Open TP2 valve Problem No source pressure spike during the pulsing step 9 3 1 Cause The source valve not open or the precursor in the source is running low 9 3 2 Solution Check the source valve If it is opened fully report the problem on WAND The precursor needs refill Problem Process completed without problem but no film on the wafer 9 41 Cause The precursor can not be absorbed on the substrate 9 4 2 Solution This is a surface chemistry problem Search literatures to find a surface preparation method for the substrate Problem The deposit film is not uniform 9 5 1 Cause The wafer surface not properly cleaned prepared 9 5 2 Solution Properly clean prepare wafer Dirty wafer not only create this problem but also contaminate the process chamber picosun Chapter 6 24 10 0 Figures amp Schematics Figure 1 PI Chart Screen Figure 2 Manual Screen No 3 picosun Chapter 6 24 Figure 3 Manual Screen No 1 Figure 4 Settings Screen picosun Chapter 6 24 Figure 5 R
4. with capital M in their center each representing a step that needs lab member s attention First one to open the source valves before deposition Second one to close the source valves after the deposition 7 2 4 3 In the center of the page there are several colored rectangular boxes that stand for process conditions Red means a process condition is not satisfied Green means the process is ok to run ACTIONS Contains some operation sequences used for routine system maintenance e g source line purge MANUAL Used to operate some system components manually e g open close valves set chamber source temperatures set purge gas flows TRENDS Used to view the charts of all the process parameters SETTINGS Used to set system settings Also used to log out the system BACK Used to go back to previous control page Note In this manual all the above main control buttons displayed on the bottom of the Select screen are in bold and capital case All the other control buttons on each control page are bold with only the first letter capitalized The wafer elevator and load lock gate valve are controlled via another small Select screen control located on the lower shelf under the main Select screen It is used along with two other manual valves for wafer loading unloading operations There are four Select screen buttons lt VALVE gt Used to open or close the gate valve between the process chamber and the load lock
5. Marvell Nanofabrication Laboratory University of California Berkeley 1 0 2 0 3 0 4 0 Nanolab Equipment Manual Chapter 6 24 Picosun Atomic Layer Deposition ALD picosun 586 Equipment Purpose 1 1 Picosun ALD is a microprocessor controlled system that can atomically deposit a thin layer of metal oxides pure metals and with an additional ammonia gas source not connected at this time should be able to deposit metal nitrides Metal oxide films grown by the ALD system are suitable for gate dielectric electroluminescent display insulators capacitor dielectrics and MEMS applications Metal nitride thin films grown by the ALD could be used for diffusion barriers and similar applications Materials Controls amp Compatibility 2 1 Polymer material and other low temperature substrates must undergo process review before use in picosun Applicable Documents 3 1 3 2 Picosun Sunale R Series ALD tool User Manual Copy in Office Material Safety Data Sheets for TMA and TTIP Copies in Office and Lobby Definitions amp Process Terminology 4 1 4 2 4 3 4 4 4 5 4 6 Atomic Layer Deposition A self limiting chemical process that uses metal precursors to coat an atomically thin layer of metal or metal oxide or metal nitride film on the substrate surface Precursor Source s used in the ALD machine contains the desired metal for deposition This metal is bonded to a hydrophobic alkyl functional
6. ator may lose its position hence this homing will recovers its memory resets Select lt Z1 gt button Check the elevator wafer holder stops lower than the wafer sitting in the load lock again by looking through the process chamber window port on the right side Gently push the wafer loading rod on the left hand side of the load lock all the way to the right until it stops Check that the wafer is now sitting on top of the elevator wafer holder Select lt HOME gt button Check the elevator lift the wafer up from the wafer loading rod Pull the wafer loading rod back to its left most position Select lt VALVE gt button to close the gate valve between process chamber and load lock Select lt Z2 gt button to lower the wafer into process chamber ready for deposition next ALD Deposition 8 8 1 8 8 2 8 8 3 8 8 4 8 8 5 8 8 6 8 8 7 8 8 8 Make sure the PT2 valve in the back of the tool is closed If it is open during ALD deposition the pressure gauge will be damaged Select RECIPE button Select 4 4 button on the top right corner of the RECIPE page Figure 7 Enter the desired deposition cycles in the field on the right side of the screen Select DEPOSIT button Select the Start button The ALD deposition process will start It will bypass Soft Pump Down Main Pump Down steps because the tool contains a load lock When the process is at the Flushing step open the lower cabinet doors in front of t
7. ecipe Screen No 1 Figure 6 Recipe Screen No 2 Marvell Nanofabrication Laboratory University of California Berkeley NanoLab Qualification Form TOOL NAME MERCURY TOOLNAME TOOL LOCATION Name Office Date Campus Phone Home Phone Login Trainer Equipment Qualification Test Passed Initial Oral Qualification Checklist O Superuser Login Name Date Superuser Signature
8. he tool and open the desired source bottle There are three source bottles in the cabinet Source A currently TMA for Al203 on the left Source B currently TTIP for TiO2 in the center and Source C currently DI water Hold the bottle with one hand securely and with the other hand open the source bottle s valves as per follows picosun 8 9 8 8 9 8 8 10 8 8 11 8 8 12 8 8 13 8 8 14 8 8 15 8 8 16 8 8 17 8 8 18 8 8 19 8 8 20 8 8 21 8 8 22 8 8 23 Chapter 6 24 For Al203 deposition open Source A and C For TiO2 deposition open C Source B will be controlled by the system automatically After Flushing step is completed the process bypasses the Heating step because the process chamber temperature needs to be at set point per Section 9 3 4 After Stabl Time step 4 or 5 minutes the process starts Pulsing which is the ALD deposition The screen will display the estimated process finish time To monitor the source pulsing pressure Select ACTIONS button Select 3 3 button on the top right corner of the ACTIONS page The PI page does not refresh fast enough to see the pulsing Select Pt10 button to monitor source A Select Pt20 button to monitor source B Select Pt30 button to monitor source C Pressure spikes are showed continuously on a data logging chart when the source valve pulses For source A and C the pressure spikes upwards For source B heated source the press spikes do
9. ion if a process recipe available 8 11 1 8 11 2 8 11 3 8 11 4 8 11 5 8 11 6 8 11 7 WARNN NG DO NOT LOAD SAVE EDIT RECIPE WHEN THE PROCESS IS RUNNING IT MAY CRASH THE SOFTWARE Select the RECIPE button at the bottom of the Select screen to select the recipe pages There are three recipe sub pages available under the recipe option menu Operator can easily toggle between these pages by simply Selecting the recipe page icon at the top right side of any recipe sub page Note Once a recipe is edited it will become the active recipe on the tool therefore it is highly recommended that members do not edit recipes in the standard recipe folder Such recipes can easily be copied into your own directory for your modification Enter common deposition parameters on the first recipe page Figure 5 Name current run number substrate ID substrate temperature stabilization time intermediate space and Flush reaction space See Figure 1 for more detail Enter the source parameters on the second recipe page Figure 6 Select desired source pulsing sequence on the forth recipe page Figure 7 Once all parameters are entered save the recipe at the first recipe sub page with the available save option icon at the bottom of the page One can also create directory change directory and save the new recipe in a private directory which is highly recommended for this machine as there are no user level hierarchy available
10. lock 3 way valve to the right pump Watch the PT2 reading and make sure it does not exceed 10 hPa when turning the valve After turning the 3 way valve fully to the right wait for the pressure reading of PT2 decreases to about 1 hPa picosun 8 10 8 9 5 8 9 6 8 9 7 8 9 8 8 9 9 8 9 10 8 9 11 8 9 12 8 9 13 8 9 14 8 9 15 8 9 16 8 9 17 Chapter 6 24 Close the PT2 valve in the back of the tool Do not tighten too much On the load lock elevator control screen Select lt VALVE gt button to open the gate valve between process chamber and load lock Select lt HOME gt button and wait for the elevator to lift the process wafer Check the wafer stops higher than the wafer fork in the load lock through the chamber window on the right side Push in the wafer loading rod all the way to the right Check the wafer fork in right below the process wafer Select lt Z1 gt button to lower the wafer onto the wafer fork Check the wafer is on the wafer ford securely Pull out the wafer loading rod all the way to the left Select lt Z2 gt button to lower the elevator and close the process chamber Select lt VALVE gt to close the load lock gate valve Slowly turn the 3 way valve located in the front of the load lock to left vent Watch the nitrogen flow meter mounted on the back wall The nitrogen flow should not exceed the maximum mark to avoid turbulence It takes a few minutes to vent the load lock to atmosphe
11. ly The nitrogen flow should not exceed the maximum mark to avoid turbulence lt takes a few minutes to vent the load lock to atmosphere pressure Open the load lock lid and load your wafer in Note On the wafer fork there are two indent positions for 6 and 4 wafer Samples wafers of other sizes have to be put on a 6 pocket wafer to be processed Close the load lock lid Pumping Down the Load Lock Note 8 6 1 8 6 2 8 6 3 8 6 4 8 6 5 8 6 6 8 6 7 8 6 8 8 6 9 8 6 10 8 6 11 8 6 12 8 6 13 8 6 14 8 6 15 The load lock and the process chamber share the same pumping system To avoid any damage the process chamber needs to be isolated before the load lock can be pumped down Select MANUAL button at the bottom of the screen Select 3 3 button on the top right corner of the MANUAL page Set MFC1 MFC10 MFC20 and MFC30 to 0 sccm See Figure 2 for more detail Select 1 3 button on the same MANUAL page Close V1 Close V2 On the right back side of the machine locate PT2 valve which has a blue knob Open this valve by turning it counter clock wise carefully If over tightened seek assistance from Equipment or Process Staff Select PI CHART button and locate the PT2 pressure reading Figure 1 Slowly turn the 3 way valve in front of the load lock to the right clockwise to gently pump on the load lock Watch the PT2 reading and make sure it does not exceed 10 hPa when turning the valve After tu
12. ng process is finished Please note chemicals and their vapor used in this system are highly flammable and toxic Any suspected leak s in the system needs to immediately be reported on the WAND 5 4 Emergency shutdown In case of an emergency shut down the whole system by pressing the red emergency button on the machine Process Data 6 1 Process Monitor SPC Available on MercuryWeb Date TBD 6 2 Available Processes Gases Process Notes 7 1 System Description 7 1 1 7 1 3 System Components Picosun ALD system comprised of the Oxford wafer loader station deposition chamber a source cabinet with the electronics and MFCs associated with it all of which are controlled by the ALD software installed on a user friendly Select panel controller PLC Precursor Sources There are currently three types of source bottle available on this system designed to address different precursor materials at specific vapor pressure ranges 7 1 2 1 Source A Liquid source with high vapor pressures above 10 mbar can be used in this source bottle Several source materials including the TMA current source can be used in this source bottle 7 1 2 2 Source B Pico Solid source bottle at this station can be used for liquid or solid sources with vapor pressures above 1mbar at temperatures less than 200 C Several source materials including the TTIP current source can be used in this source bottle 7 1 2 3 Source C This source has the same de
13. pe options Select Change Directory button and change the active directory to STANDARD then repeat recipe loading The source type is defined in the recipe Without loading the recipe the source temperature cannot be set Set Chamber Source Temperature 8 4 1 Select MANUAL button 8 4 2 Select 3 3 button on the top right of the MANUAL page Figure 2 8 4 3 Set the chamber source temperature as the following table Chamber Chamber Source Source Recipe Heater Temp Heater Temp TE1 Max TE2 TE21 Max TE20 Al203 450 C 300 C NA NA TiO2 450 C 275 C 100 C 80 C 8 4 4 It takes 1 5 hours for the chamber temperature to stabilize at set point After the chamber temperature stabilizes set TE1 Max to 400 C for better temperature control Note You can set TE1 to 500 C to shorten the chamber temperature time But you need to change TE1 to 400 C when the chamber temperature reaches 20 C below set point Otherwise the chamber temperature will over shoot and it picosun Chapter 6 24 takes even longer time to cool down to set point Do not set TE1 above 500 C or you may damage the chamber 8 5 Loading Wafer Into the Load Lock 8 6 8 5 1 8 5 2 8 5 3 Close the load lock gate valve lt VALVE gt should read closed Slowly turn the 3 way valve located in the front of the load lock to the left vent Note Watch the nitrogen flow meter mounted on the back wall make sure to vent slow
14. re pressure Open the load lock lid and unload the processed wafer The wafer may be still hot It should be cooled on a cooling block before put in plastic box To process additional run using the same setup load the wafer into the load lock and close the lid Restart the process from Section 9 4 4 again Otherwise go to next section to put the tool in idle mode Post ALD Process Idle 8 10 1 8 10 2 Follow Sections 8 6 1 to 8 6 17 to pump down the load lock Open the lower cabinet doors and double check that all the source valves are closed WARNN NG 8 10 3 8 10 4 8 10 5 8 10 6 8 10 7 8 10 8 8 10 9 If you run the Source Purge with the source valve open all the precursor in the bottle will be purged out It needs to be refilled again MAKE SURE THIS DOES NOT HAPPEN Select ACTIONS button In the center of ACTIONS page there is a Purge Source box with A B C D buttons Select A button if you ran Al203 recipe Do not run a purge on source B TiO2 recipe There is no shut off valve and you will use up a great deal of precursor by running a purge on source B Select MANUAL button Select 3 3 button in the top right corner of the MANUAL page Change TE1 Max to 160 C TE2 to 100 C If you ran TiO2 recipe Change TE21 to 0 C no heating Select SETTINGS button picosun Chapter 6 24 8 10 10 Select Log Out button to log out the system 8 11 Setting Up A Recipe Skip this sect
15. rning the 3 way valve all the way to the right wait for the pressure reading of PT2 to decrease to about 1 hPa Now close the PT2 valve in the back of the tool Do not tighten finger tight is acceptable Note If PT2 valve is left open during deposition process the pressure gauge will be damaged Select MANUAL button Select Open button next to valve V2 Select Open button next to valve V1 picosun 8 7 8 8 8 6 16 8 6 17 8 6 18 8 6 19 8 6 20 8 6 21 Chapter 6 24 Select SETTINGS button to bring up the setting page On the left side of the SETTINGS page Select Set button in the LINE FLOW PURGE FLOW box shown in Figure 4 Close the 3 way load lock valve by turning the knob to the center position arrow pointed up On the gate elevator control panel Select lt VALVE gt button to open the load lock gate valve Check the gate valve is open by looking through the process chamber window port located on the right side of the tool You are now clear to move the wafer into the process chamber as per following section Transfer Wafer Into Process Chamber 8 7 1 8 7 2 8 7 3 8 7 4 8 7 5 8 7 6 8 7 7 On the gate elevator control panel yellow small screen Select lt HOME gt button Check the elevator wafer holder moved to the top position by looking through the process chamber window port on the right side Note It is always a good practice to home the elevator after long idling The elev
16. sign as source A however it is currently dedicated to DI water as an oxidizing agent for metal oxide processes Note Other oxidizing agent such as Ozone requires additional ozone generator or Nitrous oxide N20 or Hydrogen Peroxide H202 in water can be used in these type of ALD systems however we are not currently set up with any of them MFCs There are 4 MFCs available on the system three of which are used for the sources and one for the intermediate space N2 7 2 System Control Description 7 2 1 The main control of ALD is a PLC based system with Select screen user interface The operations are divided into seven main pages which can be accessed by Selecting picosun 7 2 2 7 2 3 7 2 4 7 2 5 7 2 6 7 2 7 7 2 8 7 2 9 7 2 10 7 2 11 7 2 12 7 2 13 7 2 14 Chapter 6 24 graphic buttons on the bottom portion of the display screen Some of the pages contain sub pages The functions of these main pages are described below PI CHART Displays the system conditions including temperatures pressures gas flows and etc RECIPE Used to load edit and save process recipes DEPOSIT Used to start stop and abort a process run lt also displays the schematics of process steps 7 2 4 1 The DEPOSIT page contains a schematic drawing of the process flow Each circle stands for a process step The highlighted one stands for the current process step being executed 7 2 4 2 There are two circles
17. sition only goes on the topside of the sample Take extra care not to crash the elevator or the gate valve in the system as it does not have all the necessary sensors for a fully automated operation Equipment Acceptable Parameter Window 7 6 1 7 6 2 7 6 3 Chamber Temperature 150 350 C Number of cycles Up to 2000 Exceeding these limits requires staff approval picosun Chapter 6 24 8 0 Equipment Operation 8 1 8 2 8 3 8 4 Login Procedure 8 1 1 Select the Login button and enter the password using the graphic keyboard The password which is case sensitive is given only to qualified lab members Select the Pl button at the bottom of the page to go to PI Chart screen shown in Figure 1 System Check 8 2 1 Goto PI CHART page 8 2 2 Set the source purge nitrogen flows to 150 sccm 8 2 3 Set the chamber purge flow to 300 sccm 8 2 4 Set chamber temperature to 100 C and the source to room temperature 8 2 5 Check chamber pressure Should be 10 hPa 8 2 6 Move elevator to lt Z2 gt 8 2 7 Check parameters on mercury to determine last deposition material 8 2 8 If material deposited immediately prior differs from material being deposited in current run run dummy run for 100nm of deposition to ensure there is no flaking 200 cycles Loading Recipe 8 3 1 Go to the RECIPE screen 8 3 2 Select Open Recipe button 8 3 3 Select either the Al203 or TiO2 recipe Note If you do not see these two reci
18. wnwards due to gas flow setup The amplitude of the spike should be around 4 5 hPa If the pressure spike is decreasing or it is below 3 hPa report the problem on WAND The precursor in the source is low and need to be refilled Note You can only monitor the press spike of the source one at a time Wait till the data logging finishes then start monitor the other source lt you Select other Pt button during data logging you will get an access denied displayed warning Select DEPOSIT button again to display the DEPOSITION page After the deposition step finishes the process skips Cooling step because in the standard recipe the end temperature is set the same as the deposition temperature Note Do not set the end temperature in the recipe to lower temperature Doing so will make the process hold at Cooling step for a long time because the process chamber cools very slowly Open the lower cabinet doors in the front of the tool Close sources valves that have been opened in Section 9 5 5 Select Unload button The process will go to Vent step Select Open Lid button Select Shut Down button The last two buttons have no effect on the process flow because the tool has a load lock The processed wafer now is ready for unloading Unload Processed Wafer 8 9 1 8 9 2 8 9 3 8 9 4 Go to the right side of the tool and open valve PT2 Select PI CHART button and locate the PT2 pressure reading Slowly turn the load

Download Pdf Manuals

image

Related Search

Related Contents

Thermaltake Armor+ MX LCS  StarTech.com eSATA / USB 3.0 SATA III Hard Drive Docking Station SSD / HDD with UASP  LEDD-44001W-LS1  取扱説明書  Draper KT180 projection screen  Samsung NP780Z5E 用户手册 (Windows 8)  Home Decorators Collection 1140200210 Instructions / Assembly  IF APPN Collège  Applicant User Guide - Susan G Komen® Northwest North Carolina  STRIKE 324 User Manual Rev. 4  

Copyright © All rights reserved.
Failed to retrieve file