1. Implementation Notes Solar Group The Solar Array Hardware The solar array is made up of 42 panels each rated at 0 5V and 125mA in noon sunlight Each individual cell contains a solder strip on the top that is the negative terminal and anywhere on the back of the panel is the positive terminal The cells are soldered together in a manner to get a voltage that is higher than the battery voltage at full charge and to get the highest possible amount of current This is done by wiring three sets of 14 cells in series Then each one of these cells is solder together in parallel to produce a theoretical 7V 375mA in full noon sun To stop current from flowing back into the solar cells and wasting energy diodes were placed on the positive terminal of each of the 3 series sets The diodes that were used are 1N4003 diodes rated at 12V 1A maximum which is below the maximum output the solar array can produce The cells are attached to a 6 x8 piece of perf board using foam double sided tape They are arranged in six rows of seven to fit on the perf board with little room to spare All of the spare wire is taped to the perf board using electrical tape to prevent short circuits The perf board is attached to the robot using 3 long bolts Two of the bolts are attached to the back of the BoeBot through the predrilled holes The third bolt is attached to the front of the robot through a precut slot that was drilled out to accommodate the girth of the
2. arging the batteries The solar array must be achieving a potential higher than that of the batteries in order to successfully charge the batteries The circuit is designed in such a way that if the solar array is enabled when it is not producing sufficient power to charge the cells it will not be damaged A diode is placed in line with each set of solar panels in order to prevent current from flowing into the array and wasting power and possibly damaging the cells This configuration also prevents current from one series of panels from flowing into its neighbors this scenario could happen one half of the solar array was shaded while the other half was receiving bright sunlight Software The relay is controlled by I O pin 6 and is wired so that it is normally off We did this in order to prevent overcharging e g the robot is turned off and left out in the sun The downside of this is that the robot must be powered on to activate the solar array In other words you must have batteries with at least a little power left in them to begin the charging process Voltage monitor Vbatt Hardware 681k Q To measure the battery voltage the battery is used to charge a capacitor through a resistor The voltage is then calculated from the charging time of the PS capacitor using the Stamp s rc
3. bolt Each bolt is attached to the BoeBot and perf board using four washers and four nuts with one set on each side of a surface Light Seeking Vdd Hardware The Photoresistors that were used to design the light seeking work by varying their resistance with the amount of light it senses A high resistance indicates very low light and a low resistance indicates bright light A simple RC circuit is used to measure the resistance of the photoresistors by measuring the time it takes a capacitor to discharge through the photoresistor to ground Refer to the diagram for a schematic of the RC circuit used To achieve our light seeking algorithm two photoresistors were mounted on the front corners of the perf board using electrical tape These two photoresistors worked in conjunction for navigational purposes Also one resistor was placed flat on the top of the Vss perf board to measure the strength of the light shining directly down on the solar array to indicate when the robot has reached an area with bright enough light To increase the sensitivity of the top photoresistors to bright light the RC time constant had to be adjusted to bring the final discharge time into the range of the Basic Stamps RCTIME function The formula to calculate the discharge time is based on a constant times the values of R and C which are the resistance of the photoresistors and capacitance When in bright light the value of R will decrease dramatically cau
4. hen multiplying it by five If the difference between the resistors is not less then the deadband then the robot has to tum toward the light To do this a simple if then statement compares the two values and turns toward the direction of the lower of the two It will continue turning until the difference between the two resistors falls below the deadband The figure above is sample code taken from a loop in the program that loops until the top photoresistor is indicating that light has been found Early tests when using a static deadband resulted in the robot shacking back and forth when it was far from a light source This is because it could not get the difference between the left and right photoresistors to less then the deadband Using the dynamic deadband the robot is more likely to travel toward the light from far distances because the deadband is larger The dynamic deadband ultimately lead to a very sufficient light seeking algorithm Sonar Object Avoidance Hardware One simple sonar sensor was used for elementary object detection and avoidance The sensor consisted of one transmitter and receiver and connected to the Basic Stamp using two pins one for input and one for output The sonar device was mounted using plastic that was cut and bent to form an L shaped piece Holes were drilled to attach the sonar device to the plastic then that piece was attached to the robot using the front mounting bolt of the perf board solar arra
5. ion is an approximation but it works well because the charging curve is near linear since the battery voltage is several times higher than the 1 3 volt threshold of the BASIC stamp Also the battery voltage will be fairly constant around 5 to 7 2 volts for our six volt battery pack Note that you can t use a value of greater than 65535 for Cl due to the 16 bit limitations of the stamp USER S MANUAL Self Sustaining Solar Power Robot SSSPR POSS VU Yeates caw does Lei ARI Pasta 9 1 Battery Installation SLEPT ances ho lander 1 Solar Array Attachment Sep iease 1 Cable Connections Step 3 lle oO a AO 2 OPERATION pull EN ei lia 2 TROUBLESHOOTING oerrinne ai aiaa a e abay lak asiaa 2 ASSEMBLY The following components are needed to assemble and operate the SSSPR e Solar array with on board circuitry e BOE bot with on board circuitry e Battery Charger compatible with rechargeable AA alkaline 1 5 volt batteries e 4 Rechargeable AA alkaline 1 5 volt battery e 3 Nuts e 6 Washers NOTE It is recommended that steps be performed in the order presented in the manual Battery Installation Step 1 The SSSPR is equipped to hold 4 AA 1 5volt alkaline batteries which come charged and ready to use They may be installed as follows l place the body of the SSSPR upside down so that it rests on the three bolts extending from the body 2 place the batteries as indicated on the battery compartment CAUTION Do not mix old ba
6. oard 2 the white cable extending from the SSSPR body connects the right jack on the solar array board this jack is wired to the white cable on the solar array board WARNING Do not plug cables into the wrong jacks as this could cause serious damage to the circuitry on both the SSSPR body and solar array board OPERATION The SSSPR is self sustaining and should need no intervention from humans to operate once it is turned on Follow these steps to turn on the SSSPR l press the reset button on the SSSPR body the black reset button is located on the green board between the green LED and a wheel 2 with the reset button pressed plug in the power cord coming from the battery pack into the power insert located on the SSSPR body the black power insert is located on the green board next to the 9 volt battery connection 3 place the SSSPR on a clean floor and release the reset button TROUBLESHOOTING In order for the SSSPR to function properly it must be initially started with a charged set of batteries Ifthe robot does nothing after putting in the batteries the batteries should be charged by placing it in the charger Any damaged to the solar array SSSPR body or any circuitry can cause complete failure If any such damage is noticed or suspected return the SSSPR Course Debriefing Solar Group Did your group management style work Our group management style worked very well We did not assign official roles or position
7. s advertised Can you think of any relevant situations in which you haven t tested your product s If you were to do this project again what additional verification and testing procedures might you add We tested our robot to ensure that its light tracking and object avoidance worked properly both the sensors and the algorithms We also tested our robot s charge circuit to verify that it was properly charging the batteries and that the voltage readout was functioning We have not tested our robot under a work light for an extended period of time the robot was designed to charge in sunlight and we are just using the work light for demonstration purposes The halogen bulb of the lamp heats the solar array to much higher temperatures than leaving it outside in the sun and it is unclear whether or not this higher temperature will adversely affect the performance of the solar panels If we were to do this project again we would certainly spend more time testing the object avoidance behavior of the robot While our robot performs object avoidance fairly well we believe it could be improved through further testing
8. s but rather decided as a team what needed to be done and then individually did what was necessary to achieve our goals During the course of the project it was interesting to see each group member naturally settle into an efficient and effective team role This management style is very simplistic and most likely would not have worked if we had more than three members on our team If you were to do the project again what would you do the same what would you do differently One of the best things we did as a group was to setup regular weekly meeting times We would meet at a minimum twice a week Having a minimum was good in that it ensured we were communicating and that our project was on track My only suggestion for doing something different would be to limit the length of our meetings even though this would require us to meet more often It seemed that our productivity started to really wane after about four hours Are there any particular safety and or ethical concerns with your product s What steps did your group take to ensure these concerns were addressed Are there any additional steps you would have taken if you were to do the project again There really are not any particular ethical concerns with our robot Perhaps there could be a minor safety issue with the heat of the solar panels But since they do not get hot enough to burn a person we have not done anything to address this issue Did you test your product s Do they work a
9. sing the resolution of the calculated discharge time to drop to the point of uselessness To correct this a 0 luF capacitor was used on the top photoresistor instead of a 0 01uF capacitor like the ones used on the navigational circuits Software To seek light the code was written to store the values of all three photoresistors using the Basic Stamp s RCTIME function Then a decision was made based on the value of the top resistor If the value was smaller than 60 then the robot goes into charge mode Otherwise the robot will seek out light by first calculating a deadband The deadband is a value that will be used when comparing the if abs lt photo rt photo gt deadband then skipl values of the left and right if if object 0 then skip avoid photoresistors If the difference gosub avoid obi between the left and right goto skip0 skip avoid gosub straight if moved then skip0 photoresistors is less then the deadband then the robot will navigate straight which ultimately skipl means that the light source is if lt photo lt rt photo then skip directly in front of it To make the gosub right tura robot navigate more smoothly we te Ee STIEN used a dynamic deadband that is if iE photo Set photo tieni less sensitive in dark light and gosub left turn more sensitive in bright light This if moved then skip0 skip0 is done by taking the square root of ante the lowest value of the left and right photoresistors t
10. time command I O pin 15 is used to charge the circuit and measure the time to discharge See the following circuit diagram Software 01 pF A simple stamp test program to measure the battery voltage is as follows ret var word rctime value vmeasured var word voltage value Vss CI con 52313 constant one C2 con 7 constant two low 15 rctime 15 0 rct vmeasured Cl ret C2 debug home dec rct dec vmeasured debug Vmeasured dec vmeasured 10 decl vmeasured This program displays the raw rctime value and the calculated voltage You will see that as you increase the applied voltage the time to charge up the capacitor up decreases Note that we could have simply used the value returned by rctime to make decisions in the code but it is more intuitive to work with an actual voltage value To convert the rctime value to a voltage value constants CI and C2 are calculated empirically in the following manner Measure the applied voltage at two points V1 and V2 and the corresponding raw values from the rctime command TI and T2 Having these values it is possible to linearly interpolate between the two in order to find an approximate voltage for any given value returned by the rct ime command VI lower voltage applied to circuit TI corresponding raw rctime value V2 higher voltage applied to circuit T2 corresponding raw rctime value Cl LOS VI V2 E e D2 12 SEL C2 10 VI CI T1 The eguat
11. tteries with new batteries or use batteries with varying charge level when placing them in the SSSPR Only use rechargeable AA alkaline 1 5 volt batteries Solar Array Attachment Step 2 The solar array and BOE bot are separated during transportation to prevent damage to the solar array The board may be attached to the SSSPR body by the following steps l place three washers on the three bolts extending from the SSSPR body so that it rests on the nuts 2 gently place solar array board so that it rests on the washers by aligning holes on the board with bolts extending from the SSSPR 3 if board is not level with the ground make adjustments to the nuts underneath so that the board is parallel to the ground NOTE Make sure to leave clearance for circuitry on the body of the SSSPR and enough bolt exposed above the board to place a washer and a nut 4 place three washers on the three bolts extending through the solar array board 5 screw nuts onto bolts to secure the board onto the SSSPR CAUTION Solar array arrangement is fragile If any of the solar cells look damaged do not use the array as this may prevent correct operation of the SSSPR Cable Connections Step 3 The SSSPR has two cable connections to be completed before operation The connections are to be made as follows 1 the blue cable extending from the SSSPR body connects the right jack on the solar array board this jack is wired to the blue cable on the solar array b
12. y The sonar works by transmitting a wave then measuring the time it takes for the echo to reach the receiver The wave travels at a constant speed so the distance to an object can be calculated by dividing the perceived distance in half Software The light seeking algorithm incorporated object detection into its decisions to call a separate function for object avoidance An object was considered detected if the value calculated from the sonar sensor was less than 30 which relates approximately to 30 inches Once an object was detected a function was called to avoid the object Object avoidance also incorporated a bit of light seeking When an object is detected a decision is made on what direction to turn based on the direction of the strongest light The robot then turn in that direction until it no longer detects an object in front of it It then will turn a little further to create enough clearance for the solar array to clear the object Then the robot drives straight for a set distance then returns to the light seeking algorithm Charge circuit Hardware A simple charge circuit is used to control the solar array and to charge the batteries on the BOE bot The charge circuit really only consists of a handful of diodes and a relay The solar array is wired to the batteries in such a way that when the solar array is enabled the array forces current through the batteries opposite the normal flow and reverses the chemical process thus ch

Download Pdf Manuals

image

Related Search

Related Contents

Ziplevel ZLP-100 Use and Care Manual  la consultation par consensus informé  Sociedad Mexicana de Ingeniería Estructural  取扱説明書  Seagate Constellation 2TB SAS 3.5"  Mode d`emploi  200, 201 Series Radio Telemetry Transmitters  Longshine LCS-C844MT network media converter  Using this Manual  ナチュラルカラーの透明感。  

Copyright © All rights reserved.
Failed to retrieve file