1. 18 INSTALLATION INSTRUCTIONS FOR 8 16 24 Centres Copyright 2013 Intellimeter Canada Inc 2 of 18 Revision 5 0 2013 06 24 1 Measurement Canada Requirements Measurement Canada Notice to all Electrical Contractors and Owners Applies to milli Amp type CT s only This is to inform the electrical contractors who are installing any static type metering system that Current Transformers CT s are assigned to a specific meter and are required to stay with that meter Any CT s that are not installed on the meter assigned and sealed with will void the meters seal and be considered a non legal billing meter On the side of the CT s the serial number of the meter and the potential line is indicated as a guide for the contractor FOLLOW THE INSTALLATION DRAWINGS Match the CT s with the meter and install them on the correct line to the correct phase If there are any differences with the drawings compared to your distribution panel CALL US IMMEDIATELY CAUTION Phasing and CT installation are very important If the metering system is not installed according to the installation drawings the system will not work and any cost in correcting the installation by Intellimeter will be charged back to the installer developer INSTALLATION INSTRUCTIONS FOR 8 16 24 Centres Copyright 2013 Intellimeter Canada Inc 3 of 18
2. 17 19 MTR 20 MTR 18 100A 100A 100A 100A B AB AB B 21 23 24 MTR 22 100A 100A 100A 100A CA BC BC CA P TRACKER 01 P TRACKER 02 A 126 A B 2 7555 128 B SS 31 32 33 sss 35 5 36 B sse ES B 39 140 413 42 43 144 45 46 47 48 5 MTR 15 Q MTR 14 25 MTR 13 2 MTR 6 Q O io 5 Le MTR 19 25 18 5 17 8 20 2 E 03 P TRACKER 04 7 O MTR 21 Q 23 24 8 MTR 22 Q gt YELLOW 2 BLACK YELLOW LOAD Ke kee LINE A
3. BRK Meter Meter Transformer Transformer o Current MTR O1 2 MTR 03 22 2004 MTR 05 09 2004 200A MTR 02 MTR 04 MTR 06 MTR 08 P TRACKER 01 MTR02 MTR 07 200A 200A 200A FOR _ CONNECTORS ele le 4 04 200A 200A CA CA 05 06 200A 200A 07 MTRO8 200 200 PHASE PHASE 000000 2 8 000000 SDP AND EMP DESIGNATION SUITE NO METER NO SUITE METER NO ISMETEREDEY METER 01 ISMETERED BY METER 02 ISMETEREDBY METERED BY METER 04 IS METERED BY 5 IS METERED BY METER 06 IsMeTERED BY METER 07 ISMETERED BY METER 08 gt
4. CA CA 000000 000000 000000 0555509005569 0055655005560 MIB WC MIRAA 0060000 00000 800000 800000 000000 000000 00505060 0005050 SWITCH DISTRIBUTION PANEL 120 208 30 4W Transformer PHASE Current Breaker Breaker PHASE Transformer MTR 01 MTR 02 MTR 03 MTR 04 1 TR 05 Current 06 1 TR 07 1 TR 08 1 TR 09 1 TR 10 MT R 11 PIIN a a MT R 12 MT R 13 41 MT R 14 15 a gt TR 16 3 POLE IEUTRAL SDP AND EMP DESIGNATION SUITE NO MTR NO SUITE NO MTR NO S METERED BY MTR 01 S METERED BY MTR 02 S METERED BY MTR 03 S METERED BY MTR 04 S METERED BY MTR 05 S METERED BY MTR 06 S METERED BY MTR 07 S METERED BY MTR 08 S METERED BY MTR 09 S METERED BY MTR 10 S METERED BY
5. lt N lt Lu o lt 2 lt or lt E lt gt He gt m T ke 9 2 2 Se lt 9 gt lt O gt a N B PLEASE COMPLETE THE SHOP DRAWING WITH THE APPROPRIATE SUITE INDENTIFICATION SDP Switch Distribution Panel EMP Electronic Metering Panel CT Current Transformer cb Fe Fee bake Pickering Ontario L1W 3T9 ___ __ Phone 905 839 9199 ______ intellimeter on ca Innovative Metering Solutions M3 16 TYPICAL POWER SUPPLY PANE 01 P TRACKER 02 2 9 MTR 02 200A 8 e E AB 5 D 04 200 d H 5 2 a 4 2 8 Om gt D MTR O6 H 9 H D MTR 08 ES 2 gt CH gt MIRAIO 1 2 200 200 D 1 D H MIRAZ TR 1 wo TR 1 200 200 gt gt 1 MTR 1 200A 200A
6. fntellimeter CANADA INC service intellimeter on ca Innovative Metering Solutions intellimeter on ca M3 8 16 24 Centres Installation amp Operation Manual M39 M3 16 3 24 Copyright 2013 1125 Squires Beach Road Pickering Ontario L1W 3T9 Phone 905 839 9199 Fax 905 839 9198 Revision 5 0 2013 06 24 Pan 3 1 Measurement Canada Requirements 3 espe ee eee ee ee ee nee eee eee ee eee ee tee 4 4 E EE 5 EE ele 5 6 _ 6 E AEE ECESE 7 5 Wiring and 7 PAOI E 8 6 Meter Field Installation Testing and Troubleshooting Procedure 8 8 7 8 Part EE 10 8 Communication Cable 10 PENINO eege Ee Ee 11 9 Pr Site Visit Check 11 EE 11 Communication Terminations 12 Wiring for X00 5 GIS 13 Typical Layout M3 8 Panels 15 Typical Layout M3 16 Panels 16 Typical Layout 3 24 Panels uate sient 17
7. MTR20 MTR18 200A 200A 200A AB BC AB BC Gel BET lel 121918 MTR21 MTR23 MTR24 MTR22 200A 200A 200A 200A ODromromromromnrowrow gt row gt PHASE gt gt gt gt gt gt 02 gt PHASE CA BC BC CA Ge SEE Se 8078 HI M P TRACKER 01 P TRACKER 02 P TRACKER 03 P TRACKER 04 SDP AND EMP DESIGNATION METER NO SUITE NO METER NO IS METERED BY M ETE R 01 5 METERED BY M ETE R 02 15 METERED BY METER 03 aes METER 04 IS METERED BY METER 05 IS METERED B 6 ISMETEREDBY 07 8 15 METERED BY METER 09 ISMETERED BY METER 10 I
8. fe 05 Ga B 09 11 H B 15 17 19 21 23 0000000 gt gt gt x 01 03 04 2 100A 100 100A AB A A AB 05 MTR 07 MTR 08 MTR 06 100A 100A 100A 100A B AB AB B 09 MTR 11 MTR 12 MTR 10 100A 100A 100A 100A A B B A 13 MTR 15 MTR 16 MTR 14 Project Name 100A 100A 100A 100A AB A A AB Distributor Rev ___ MTR 02 2 as OY MTR 04 2 gt 7 MTR O7 2 MTR 06 8 5 05 3 2 N YELLOW BLACK YELLOW 1 LOAD LINE w O A 1125 Squires Beach Road Pickering Ontario L1W 3T9 Phone 905 839 9199 Fax 905 839 9198 intellimeter on ca MTR 09 Q 118 12 MTR 10 Q PHASE PHASE PHASE A B N gt
9. Revision 5 0 2013 06 24 2 Metering Rules 1 Current Transformers 5 are directional 2 Voltage references must be in phase with the load being metered and from the same source 3 CT s milli Amp are certified to an assigned meter and to the meters assigned phase Rule 1 If the CT s are mounted in the opposite direction the polarity of the CT will be opposite The arrow on the CT s indicates the direction from LINE to LOAD LINE LOAD Similarly the H1 is on the LINE SIDE All Intellimeter milliamp current transformers 200 0 1 2000 1 and 400 0 1A 4000 1 have self shorting protection built into the device They can safely be open circuited while under load All 5 Amp X00 5A Type Instrument Transformers Do Not Have This Protection And Are Required To Be Shorted Together While Under Load At All Times Rule 2 Check to verify that the voltage potential used as a reference voltage is the same phasing as the loads being metered ABC is ABC not CBA The reference voltage must come from the same source Voltage reference from another transformer is incorrect and causes inaccurate readings Connect the voltage reference to the meters disconnect or terminals making sure itis the same phase sequence Usually Line 1 Red or A phase Line 2 Black or B phase Line 3 Blue or C phase Neutral White INSTALLATION INSTRUCTIONS FOR 8 16 24 Centres Copyr
10. INQUISI CANADA INC 519 02 OWEN Palod Innovative Metering Solutions CT UP GRADE TO INTELLIMETER METERING CANADA INC Innovative Metering Solutions 2 09 5 2 x intellimeter on ca PHASE A PHASE PHASE BLACK LINE 1 1 BLACK LINE BLACK LINE WIRING FUR SCALING 00 5 AMP CI s 20 TURN 20001 AMP Lis NTS 20 Turn CT s WIRING FOR SCALING X00 5 AMP CT s 10 CT BOARD OR CANADA INC Innovative Metering Solutions BLACK 1125 Squires Beach Road Pickering Ontario L1W 3T9 Phone 905 839 9199 Fax 905 839 9198 intellimeter on ca Project Name Distributor 15 19 and 23 Meter 1 5 9 13 17 and 21 Meter 3 7 11 SHORTING LINKS Note AFTER CT s HAVE BEEN INSTALLED THE SHORTING LINKS MUST BE OPENED FOR THE METER TO OPERATE 20 Turn CT s M3 8 TYPICAL SWITCH DISTRIBUTION PANEL POWER 120 208V 30 4W SUPPLY
11. MTR 11 S METERED BY MTR 12 S METERED BY MTR 13 S METERED BY MTR 14 gt lt O O lt N lt 2 o N lt 2 lt 2 2 2 lt gt H 0 T 9 2 Se lt 2 lt O gt 5 METERED BY MTR 15 S METERED BY MTR 16 N B PLEASE COMPLETE THE SHOP DRAWING WITH THE APPROPRIATE SUITE INDENTIFICATION SDP Switch Distribution Panel EMP Electronic MTRing Panel cb Fe Fee bake CANADA INC Pickering Ontario L1W 3T9 ___ __ Phone 905 839 9199 ______ H P 905 839 9198 H G i intellimeter on ca Innovative Metering Solutions H M3 24 TYPICAL POWER SUPPLY SWITCH DISTRIBUTION PANEL 120 208 30 4W ween DAN E LHXX SUITE SUITE Transformer Transformer cl Current TI von MTRO3 04 TYPICAL ALL CONNECTORS 200A 200A 200A 200A CA CA AB GE See Cel Ek 18 Hees 05 MTRO7 MTRO8 MTRO6 200A 200A 200A 200A AB BC MTR11 MTR12 MTR10 200A 200A BC CA ET 612128 MTR16 MTR14 200A 200A CA AB 518 Ee Eeee
12. SMETEREDBY METER 11 12 5 METER 13 MEIERS A 15 METERED BY METER 1 5 15 METERED BY METER 1 6 IS METERED BY METER 17 METER 18 gt 9 lt a LU N lt D 2 lt T LU 2 lt D 9 2 LU 9 2 gt lt gt 2 H 2 m H 9 2 0 ee Kei lt 9 2 lt SS O 2 IS METERED BY METER 19 IS METERED BY METER 21 METER 22 IS METERED BY METER 23 IS METERED BY IS METERED BY METE R 20 IS METERED BY IS METERED BY METER 24 N B PLEASE COMPLETE THE SHOP DRAWING WITH THE APPROPRIATE SUITE INDENTIFICATION SDP Switch Distribution Panel EMP Electronic Metering Panel cb oa bake Pickering Ontario L1W 3T9 Phone 905 839 9199 H INC Fax 905 839 9198 Lt Innovative Metering Solutions inteliimeter on ca M24 INSTALLATION DRAWING PHASE PHASE PHASE A bd bi b S i MTR O1 MTR 03 Q CANADA INC Innovative Metering Solutions POWER SUPPLY gt 01 03
13. d to a maximum ambient temperature of 32 10 degrees Celsius 90 degrees Fahrenheit with a maximum relative humidity of 68 Is the PTLS located in an area with these requirements A communication cable CAT5 from the communication 11 cabinet to the phone board or network hub is supplied for remote communication 12 The metering panels are all energised and working There are no ORANGE lights indicated on any of the metering 18 panels 8 Job Name Job Date Company Office Number Forman Site Number Signature Date Requesting for Site Visit Intellimeter Canada Service Department Phone 905 839 9199 Fax 905 839 9198 INSTALLATION INSTRUCTION FOR 8 16 24 Centres Copyright 2013 Intellimeter Canada Inc 11 of 18 Revision 5 0 2013 06 24 GRANGE WHITE BLUE GREEN WHITE GREEN BLUE WHITE 6 DRANGE T O JJ U NOILVOINNNINOD YALAWITISLNI BPeUed RANGE WHITE 118 2 880 GREEN GREEN u BLUE WHITE 6 ORANGE 1125 Squires Beach Road 0 Pickering Ontario L1W 3T9 te 905 839 9199 Fax 905 839 9198 intellimeter on ca JO
14. ied and faxed back to Intellimeter before commissioning is scheduled NOTE The electrical contractor will provide an electrician for the duration of the commissioning for inspection and for any modification re work required Intellimeter is not liable to work on the electrical distribution and will only be terminating the communication lines All deficiencies will be recorded and sent to the electrical contractor for correction before returning to site 4 Service Types e Single Phase 120 240 Line 1 CT1 Line 2 Network Two Phase Three Wire 120 208 3 sets Typical Colour Code Line 1 CT1 A phase Red Line 2 CT2 B phase Black amp Line 1 phase Blue Line 2 CT2 A phase Red amp Line 1 phase Black Line 2 CT2 C phase Blue If the load is on 4 phase Line 1 CT1 is on phase and Line 2 CT2 is on C phase This staggering of phasing is to match the typical three phase four wire distribution panel for 2 phase loads Three Phase Meter Typical 120 208 277 480 347 600 Colour Code Line 1 CT1 A phase Red Orange Line 2 CT2 B phase Black Brown Line 3 C phase Yellow INSTALLATION INSTRUCTIONS FOR 8 16 24 Centres Copyright 2013 Intellimeter Canada Inc 6 of 18 Revision 5 0 2013 06 24 5 CT Wiring and Lengths Current Transformers are directional An arrow poin
15. ight 2013 Intellimeter Canada Inc 4 of 18 Revision 5 0 2013 06 24 Rule 3 intellimeter milliamp current transformers 200 0 1A 400 0 1A only When the metering system was tested at the factory the CT s were assigned to a meter and to a specific element of that meter Under Measurement Canada regulation for electronic static sub metering the CT s must be installed and used only with the meter and element that it was certified with We have identified each CT so it can be easily installed following the installation drawing that was designed for that particular distribution Follow the Installation Drawing If there is a discrepancy with the drawing in comparison to your distribution panel call us for assistance For all 5Amp type Instrument Transformers make sure you identify the phase that it was installed on for proper connection at the meter terminal block PLEASE CALL IF ANYTHING IS NOT CLEAR IT IS DIFFICULT TO CORRECT ERRORS ONCE INSTALLATION HAS BEEN COMPLETED Technical Assistance 905 839 9199 Part Three 3 Installation Instructions These installation instructions are generic for both types of multi customer sub metering systems Again call before you install if you require additional information on this process If any of these steps are incorrect call for assistance 1 Confirm the drawings that were sent with the metering system are accurate Verify the type of panel and that the d
16. istribution is the same It is important that all assigned breaker phasing is correct 2 Assign the proper panel to the identified distribution 3 Verify the number of loads is the same as the number of meters 4 Verify the type of system is the same as the meters supplied Ex 120 208V 100A or 200A 3 phase 4 wire single phase 3 wire network system etc 5 Mount the panel as indicated by the drawing Call to inquire if a different mounting configuration would work better 6 Refer to the drawings to sort out the CT s to be installed on the load feeders 7 One feeder at a time install the CT s so the arrow is pointing towards the load Confirm on the drawing the installed CT corresponds to the correct phase of the suite Continue until all CT s are installed INSTALLATION INSTRUCTIONS FOR 8 16 24 Centres Copyright 2013 Intellimeter Canada Inc 5 of 18 Revision 5 0 2013 06 24 8 Supply a voltage reference from the distribution panel Depending on the configuration minimum is a 15A breaker and the number of phases should match what is required on the drawing 9 If the system is automated a 5 4 pair 24 Network cable is required to pulled from one metering panel to the next until it reaches the communication cabinet that is usually mounted in the communication room or main electrical room Refer to single line drawing 10 Attached is a checklist that is to be completed verif
17. le Refer to the enclosed sheet for communication cable pathway connection and termination configuration between all automation M3 Series typically uses PT2000 only Refer to the PT2000 connection drawing for termination and specifications For any additional installation and troubleshooting questions please call and ask for technical help 905 839 9199 Technical Support INSTALLATION INSTRUCTIONS FOR 8 16 24 Centres Copyright 2013 Intellimeter Canada Inc 10 of 18 Revision 5 0 2013 06 24 9 Pre Site Visit Check List Description of Work Yes No Tech All loads have been identified and confirmed at the distribution panels Suite to Breaker Verification 2 The installation drawings are accurate All distribution metering equipment installed All suite feeders has been pulled and connected to their 4 designated breaker through the CT s provided for that position 5 Main feed are pulled connected and panel energised All suites or loads have been documented on the installation drawings All communication cables if applicable are pulled 7 accordingly to the single line drawing CAT5 cable 4 pair 24 In each metering cabinet the communication cable is identified and has enough length for proper termination 9 The PTLS communication cabinet is mounted in designated area and a 120VAC 15A circuit is assigned to it The PTLS is limite
18. ne PT2000 twin unit pulse recorders with 8 spare input zones The M3 16 model has the metering capability of up to 16 meters and one PT2000 twin unit pulse recorders with no spare zones The M3 24 has the metering capability of up to 24 meters and two PT2000 twin unit pulse recorders with 8 spare input zones These models are modular and can be interconnected along with the TX2005 meters to meter any number of loads any one location Each individual customer has its register mounted to the meter circuit board Quad has four electro mechanical registers and the twin has two electromechanical registers Each individual meter has two LEDs and a form A pulse output mapped to a given pin location for recording metered data Installation Refer to above 7 LED Indicators Dir1 Load1 Dir3 Load3 Dir4 Load4 Dir2 Load2 PWR kl bl 10 OC ORG RED ORG RED ORG RED Dir Load1 Dir2 Load2 PWR Continued on next page INSTALLATION INSTRUCTIONS FOR 8 16 24 Centres Copyright 2013 Intellimeter Canada Inc 8 of 18 Revision 5 0 2013 06 24 Dir LEDs When OFF it indicates CT is installed correctly When ON Orange CT is installed backwards majority of load is in the negative direction or phasing is incorrect Re verify the installation LOAD LEDs Under load this LED Red will pulse The more load the faste
19. r the pulsing Refer to attach label for pulse rate Ks PWR This LED Green indicates power is ON Accuracy test Referring to the LOAD LED pulse The Centre Meter has a LOAD LED Red that will allow the meter to register a pulse at attached label for pulse rate Ks This will enable you to determine the accuracy of the meter with a radian standard or to mathematically determine the time between pulses for a given load Voltage Phase to Neutral Amperage SUM of all currents 1 Voltage x Amperage Ks 3600 seconds per pulse This is the time in seconds between pulses in test mode Troubleshooting LOAD LED NOT load on service Apply some load ON or PULSING CT s installed incorrectly Refer to above wiring Phasing out of sequence Correct the install CT s and phasing should be matched CT1 on Line1 CT2 on Line2 and CT3 on Line3 DIR LED ON Indicates the majority of Correct the CT installation the load is in the negative Refer to above installation direction CT is installed directions backwards phasing is not correct POWER LED Power not connected or Verify the voltage reference NOT ON not ON 1 and Neutral is energised required to power the meter INSTALLATION INSTRUCTIONS FOR 8 16 24 Centres Copyright 2013 Intellimeter Canada Inc 9 of 18 Revision 5 0 2013 06 24 Part Eight 8 Communication Cab
20. ts to the load H1 also indicates Line Side LINE LOAD Typical Install CT1 on Line 1 Red CT2 on Line2 Black and CT3 on Line3 Blue Refer to Service Types above for your system External Current Transformers CT s Twisted Pair 18 14 stranded colour code 1 Intellimeter CT s White 200A ICI30CT21 Black 2 Intellimeter CT s Yellow Black trace 400A ICI30CT41 Yellow 3 Instrument Transformers CT s White X1 All X00 Type Black 2 The maximum length the CT leads can be extended is 400 feet for 1 amp 2 and 50 feet only for 3 1 twisted pair wire only for each CT Intellimeter CT s lt 50ft 18 minimum gt 50 to lt 150ft 16 minimum gt 150 to 250ft 14 minimum gt 250 to 400ft 12 minimum Instrument CT s 14 minimum Identify the polarity and the phase the CT is installed on for proper termination Always identify all wires Refer to installation drawings and terminal labels for polarity and connection INSTALLATION INSTRUCTIONS FOR 8 16 24 Centres Copyright 2013 Intellimeter Canada Inc 7 of 18 Revision 5 0 2013 06 24 6 M3 Meter Field Installation Testing and Troubleshooting Procedure The Centre is a solid state multi customer metering system that comes in three configurations M3 8 M3 16 amp M3 24 The 3 8 model has the metering capability of up to 8 meters and o

Download Pdf Manuals

image

Related Search

Related Contents

  PH 101 - HJS Værktøj A/S  Audiovox FPE2706DV TV DVD Combo User Manual  installation manual manuel d`installation - Pioneer Europe  Sitsang-PXA250 Evaluation Platform Linux User Guide  CUBE-60_OM  SIPLUS CMS4000 X-Tools - User Manual  XF2x - Manuale d`uso - FITRE SpA  Technical Bulletin Installing GX Works2 V1.48a on a Win7 64 Bit PC  Mode d`emploi  

Copyright © All rights reserved.
Failed to retrieve file