Home

Flanging/Start Up Kit - GE Healthcare Life Sciences

image

Contents

1. The Note sign is used to indicate information important for trouble free or optimal use of the product Should you have any comments on this instruction we will be pleased to receive them at GE Healthcare Bio Sciences AB SE 751 84 Uppsala Sweden Safety WARNING Hot surface Risk for fire or injury if soldering tip or element is not handled with care WARNING A fire may result if the appliance is not used with care therefore be careful when using the appliance in places where there are combustibles do not apply to the same place for a long time do not use in the presence of an explosive atmosphere be aware that heat may be conducted to combustible materials place the appliance on its stand after use and allow it to cool down do not leave the appliance unattended when it is switched on Please read the instruction leaflet delivered with the soldering iron for safe use of the flanging heater WARNING Connect to grounded mains outlet only WARNING Be careful when removing hot cooling collars Disconnect the device and wait 15 minutes before changing the cooling collar Selecting the proper cooling collar Mains voltage differences cause temperature variations in the flanging tool s tip With certain voltages the tip becomes overheated and it melts the tubing To solve this problem there are two cooling collars used singly or together for different mains voltages Use the appropriate colla
2. 0 Fax 01 69 41 98 77 e Germany Tel 0800 9080 711 Fax 0800 9080 712 e Greater China Tel 852 2100 6300 Fax 852 2100 6338 e Italy Tel 02 26001 320 Fax 02 26001 399 e Japan Tel 81 3 5331 9336 Fax 81 3 5331 9370 e Korea Tel 82 2 6201 3700 Fax 82 2 6201 3803 e Latin America Tel 55 11 3933 7300 Fax 55 11 3933 7304 e Middle East amp Africa Tel 30 210 96 00 687 Fax 30 210 96 00 693 e Netherlands Tel 0800 82 82 82 1 Fax 0800 82 82 82 4 e Norway Tel 47 815 65 777 Fax 47 815 65 666 e Portugal Tel 21 417 7035 Fax 21 417 3184 e Russia amp other C I S amp N I S Tel 7 495 956 5177 Fax 7 495 956 5176 Spain Tel 902 11 72 65 Fax 935 94 49 65 e Sweden Tel 018 612 1900 Fax 018 612 1910 e Switzerland Tel 0848 8028 10 Fax 0848 8028 11 e UK Tel 0800 515 313 Fax 0800 616 927 e USA Tel 1 800 526 3593 Fax 1 877 295 8102 imagination at work 56 0426 00 AO 12 2006 E Elanders sterv la 2006
3. GE Healthcare Short Instructions 56 0426 00 AO Flanging Start Up Kit Flanging Start Up Kit Code No 19 5079 01 120 V and 19 5090 01 230V is used to flange tubing ends 0 5 0 8 mm i d so that the tubing is retained inside the tubing connector With the flanging kit it is possible to prepare tubing of any length to fit a specific system The Flanging heater is based on a standard soldering iron with a special tip for flanging of capillary tubings Flanges are made by pushing the capillary tubing onto the heated flanging tip As the tubing heats up it flares out the flanging tip is removed and the tubing is pressed against a flat cool surface in order to fix the flange Check the packing list to ensure receipt of all necessary parts Important user information A Meaning Consult the instruction manual to avoid personal injury or damage to the product or other equipment AN Meaning Hot surface Risk of injury and fire WARNING The WARNING sign is used to call attention to the necessity to follow an instruction in detail to avoid personal injury Be sure not to proceed until the instructions are clearly understood and all stated conditions are met CAUTION The CAUTION sign is used to call attention to instructions or conditions that shall be followed to avoid damage to the product or other equipment Be sure not to proceed until the instructions are clearly understood and all stated conditions are met Note
4. gehealthcare com GE Healthcare Bio Sciences AB Bjorkgatan 30 751 84 Uppsala Sweden GE imagination at work and GE monogram are trademarks of General Electric Company 2006 General Electric Company All rights reserved All goods and services are sold subject to the terms and conditions of sale of the company within GE Healthcare which supplies them A copy of these terms and conditions is available on request Contact your local GE Healthcare representative for the most current information GE Healthcare Bio Sciences AB Bjorkgatan 30 751 84 Uppsala Sweden GE Healthcare Europe GmbH Munzinger Strasse 5 D 79111 Freiburg Germany GE Healthcare UK Limited Amersham Place Little Chalfont Buckinghamshire HP7 9NA UK GE Healthcare Bio Sciences Corp 800 Centennial Avenue P O Box 1327 Piscataway NJ 08855 1327 USA GE Healthcare Bio Sciences KK Sanken Bldg 3 25 1 Hyakunincho Shinjuku ku Tokyo 169 0073 Japan Asia Pacific Tel 85 65 62751830 Fax 85 65 62751829 e Australasia Tel 61 2 8820 8299 Fax 61 2 8820 8200 e Austria Tel 01 57606 1613 Fax 01 57606 1614 e Belgium Tel 0800 73 890 Fax 02 416 8206 e Canada Tel 1 800 463 5800 Fax 1 800 567 1008 e Central East amp South East Europe Tel 43 1 972 720 Fax 43 1972 722 750 e Denmark Tel 45 70 25 24 50 Fax 45 45 16 2424 e Eire Tel 1 800 709992 Fax 44 1494 542010 e Finland amp Baltics Tel 358 9 512 3940 Fax 358 9 512 39439 e France Tel 01 69 35 67 0
5. m i d 0 5 mm 19 7477 01 2 m Tubing o d 1 7 mm i d 1 1 mm 19 0041 01 5m Tubing connectors 19 7476 01 5 Wrench 19 7481 01 1 2 Short Instructions 56 0426 00 AO Troubleshooting Problem 1 Flange is uneven 2 Diameter of flange is too small 3 Tubing end does not start easily onto the flanging tip 4 Flange rolls back on itself 5 Tubing protuberance bends and collapses when pushed onto flanging tip Flange Nipple screw Fig 1 Nipple screw and nipple on tubing Fig 3 Tubing end parallel with flanging tool surface Fig 5 Pressing the warm flange against a cool flat surface Solution Center the flanging tip in the tubing bore Heat the tubing for 5 seconds no longer Excessive heating could cause the tubing to melt unevenly Make sure the tubing has been cleanly cut to a 90 angle When heating the tubing be sure the entire 1 5 mm of tubing is on the flanging tip projection Heat the flanging tool for at least 20 minutes before use Heat the flanging tool for at least 20 minutes before use Make sure the tubing has been cleanly cut to a 90 angle The correct length of tubing protuberance is important it should be 1 5 mm Measure tubing protuberance see solution no 4 Fig 2 Measuring the tubing protuberance Fig 4 Tubing end pushed against the flat surface of the flanging tip pa a Fig 6 Completed tubing flange Short Instructions 56 0426 00 AO 3 www
6. pple This ensures that the correct length of tubing 1 5 mm protrudes for flanging CAUTION Only spare parts approved or supplied by GE Healthcare may be used for maintaining and servicing of Flanging heater The supply cord cannot be replaced If the cord is damaged 5 Position the tubing end onto the flanging tip Make the appliance should be scrapped sure the tubing end is parallel to the flat surface of the flanging tip figure 3 Read the instruction leaflet delivered with the soldering iron for maintenance of the flanging heater 6 Push the 1 5 mm of tubing onto the flanging tip projection and heat for about 5 seconds Then push hard until the heated 1 5 mm of protruding tubing flares out against the flanging tip base figure 4 Spare parts CAUTION Only spare parts approved or supplied by GE Healthcare may be used for maintaining and servicing of Flanging heater 7 Remove the tubing from the flanging tip and press the newly formed flange against a flat cool surface figure 5 8 Ensure that the flange is not narrower than the tubing by 9 The flange is now finished figure 6 It should be Flanging heater 120 V 19 5080 01 1 concentric with the tubing bore and slightly smaller than or 220 V 19 5098 01 1 the diameter of the tubing nipple a Flanging tip 19 7487 01 1 Tubing clamp 19 7844 01 1 Cooling collars A B 19 7825 01 2 Accessories Designation Code No No per pack Capillary tubing o d 1 8 m
7. r or collars depending on the main voltage from Table 1 WARNING Be careful when removing hot cooling collars Disconnect the device and wait 15 minutes before changing the cooling collar Table 1 Mains voltage and recommended cooling collars Technical specification Cooling collars 100 120 V AC Model 19 5079 01 Mains voltage volts Power requirements 90 unnecessary 220 240 V AC Model 19 5090 01 110 B 10 mm Frequency 50 60 Hz a A Power consumption 14W 132 A B 15 mm 198 unnecessary Safety standards This product meets the requirements 220 A 5 mm of the Low Voltage Directive VD 240 Bomi 73 23 EEC through the harmonized 264 A B 15 mm standards EN60335 2 45 Note The declaration of conformity is valid for the How to make a fla nge instrument when it is 1 Heat the flanging tool for at least 20 minutes before use e used in laboratory locations e used in the same condition as it was delivered from GE Healthcare except for alterations described in the user manual 2 Cut with a sharp blade at a 90 angle the appropriate length of capillary tubing 3 Thread the tubing through the nipple screw and the nipple figure 1 e used asa stand alone unit 4 Grasp the tubing with the tubing clamp behind the Maintenance nipple Insert the tubing into the small hole in the black support on the flanging tool figure 2 and slide the nipple up to the support Reposition the clamp closely behind the ni

Download Pdf Manuals

image

Related Search

Related Contents

Notice - Great Hobbies  N° 19 - Mairie de Morzine Avoriaz  Samsung HT-X810 Manuel de l'utilisateur  USER MANUAL - Keene Electronics  Submittal - Space Ray  Honda 08E02-SHJ-100B User's Manual    Dicota Blossom  2.1.1 User Manual  User Manual - CEO Knowledge Center  

Copyright © All rights reserved.
Failed to retrieve file