Home
- SNC Lavalin O&M
Contents
1. 9 Frequently asked questions F A Q 9 1 9 2 9 3 9 4 9 5 Is there a drawing prototype for SNC Lavalin O amp M No because the protocol gives the consultant the freedom to choose his own method of working when it comes to colours and or thickness of lines Must I respect the colour chart No however if you do not respect the colour codes and we must plot the monochrome setting will be used The purpose of the colour code is to be able to plot plans with the proper modulation Can create new layers Yes layer names can be created in order to allow for a better understanding and usage of your plans While doing so it is essential to respect the nomenclature as described in the section Layer names When I use the blocks from the furniture and electrical menus may explode them in order to modify them No blocks have been designed to allow for modifications without having to explode them All the modification tools are found in the menu bar If you do happen to explode a block please regroup all unnecessary lines as these clutter the drawing Can modify the title block No these title blocks have been approved by our client Bell and must remain as such 19
2. D ELNOTE CH E ELNOTE CH F ELNOTE CH N ELNOTE CO D 7 ELNOTE CO E 7 ELNOTE CO F 7 ELNOTE CO N ELNOTE CON D ELNOTE CON E ELNOTE CON F aPESEP SS ra SUPRER FE SEP Sha S UE eae BSP EE ESP EE PppeSpeo ss CA Cu Cu CM CA Cu EN EN EN of CM CA et of CM Cu EN EN EN EN Cu EN EN of LM CM Cu of EN EN EN Cu CM EN EN EN EN EN Cu EN EN of Cu CM DD D D D D D D D a ET a ET ET ET EC EC ET ET ET EC ET EC EC D ET ET ET ET ET EC EC CT EC EC EC ET CT ET ET ET EC ET ET O0800002000000008S0808N08S000R08emOBCOMHOMMMO ET FA E lt lt gee r re X poi cea OS on a re el de Le 4 pa re og x re eg a o i Ei X es o y og X y x reg Ena t pr Le P Upon receipt of your project all layers labelled D are deleted All layers labelled N are merged to existing layers All new layers which you have created in accordance with the nomenclature as described above will remain as is This method will be use to create new Master Drawing and will replace the old one It will be archived for future needs and to serve as reference Do not hesitate to download the project examples present in our toolbox found on our web site With these you will have a clear understanding of how to perfectly apply Bell Canada s drawing standards In addition many of your questions will surely be answered 4 Layers
3. T 7 A FURN P STOR 7 A FURN P STOR T A FURN P TABL A FURN P TABL T 47 A FURN P TABL T T 7 A ROOM NAME F aa_2haworth ADDENDUM 1 AFUAC TX T 47 AFUFU 2D 3 2 The system and the layer names continued In order to standardize the drawings created by different users and to allow for easy access as well as to maintain a bank of master plans for each discipline everyone must meet the following method The first step is to identify all elements to be demolished and transfer these to a new layer with the same name and add the letter D for demolition at the end For instance partitions to be demolished would be named ARINTE D Similarly all newly designed elements walls electrical services ventilation ducts must be drawn on layers labelled N for new construction For example new sprinkler heads must be drawn on a layer name MSHEAD N This system allows us to quickly identify the items to be removed and those to merge to the existing layers therefore creating the new master plan ELACCE D ELACCE E ELACCEF 7 ELACCEN ELALAR D ELALAR E ELALAR F ELALAR N g ELBASE ELCADRE ELCHAU D 7 ELCHAU E ELCHAU F 7 ELCHAU N ELCOMM D ELCOMM 7 ELCOMM F ELCOMM N ELCONT D 7 ELCONT E 7 ELCONT F ELCONT N 7 ELDETA ow ELDETA E 7 ELDIME ELECLA D ELECLA E 7 ELECLA F 7 ELECLAN ELHATC ELNOTE AL D ELNOTE AL E ELNOTE AL F 7 ELNOTE AL N ELNOTE CADR ELNOTE CH
4. Toronto N102130123 This guideline is very important as we archive all emails received This allows us to easily search for information using the project number and or address Will b From ill be i returned for ig Laberge Francois corrections CE Subject Project new generator 100 Dundas For large files send the plans into sequential emails and mark them as such CAD Support Subject TQC 414132 100 Wynford Drive North York N111009472 1of4 Sent items that do not strictly comply with this directive will be returned for corrections 16 7 Important guidelines to follow very important 7 1 7 2 7 3 7 4 7 5 7 6 7 7 7 8 7 9 7 10 7 12 7 13 7 14 7 15 At the beginning of a new project consultants from all disciplines must ask for a new master plan This ensures that they will work with the most current information You should never crop or delete parts of the master plan Use the Layout mode in order to isolate sections thereof Please note that incomplete master plans where parts have been deleted will be returned for corrections All Bell Canada drawings have an insertion point of 0 0 0 and this should not be modified The plans are not to be moved as our system is based on this insertion point Due to this insertion point all plans from all disciplines fit perfectly within the architectural plan Furthermore the insertion point allows for our plans to be p
5. drawn have been scanned and stored as TIFF files The TIFF format allows us to keep the maximum quality while having reasonable file sizes In addition TIFF files can be viewed on any computer using the Windows operating system Simply use Microsoft Paint or Microsoft Picture Manager for those who have the Microsoft Office suite Upon request we are able to conduct a database search using specific keywords in order to quickly obtain the desired information Do not hesitate to contact us if you need to reference specific plans within your project framework for example wall sections and details structural plans details of the original generator installation amongst more This also applies to all projects made after 1998 with AutoCAD For the above mentioned reasons it is very important to email us your drawings in separate files that is to say one drawing file dwg per one drawing sheet For example if your project contains 15 sheets please send us 15 separate dwg files plus your title page Your files will then be named as seen in the following table project number followed by the discipline and then the page number in sequential order for the series of drawings The sequence will not include the title page 00 Mecanical Electrical Architectural Furniture Layout Project Project Project Project 10065837m00 10065837e00 10065837a00 10065837fu00 10065837m01 10065837e01 10065837401 10065837fu01 10065837m02 10065837e
6. in detail The following pages outline the method of implementing the official nomenclature for the different disciplines 4 1 Guidelines 4 1 1 4 1 2 4 1 3 4 1 4 Layer names must always be capitalized You can download the LAS file layer state for each discipline on SNC Lavalin O amp M s web site Cad Standards on the Home page The contents of these files can then be directly inserted into your drawing in order to create all the official layers at once When you start a project it is not necessary to rename the existing layers however it is pertinent that you add extensions to the new layers If you wish to rename existing layers add the extension E The following convention applies to all layers for all disciplines XXXXXX N New construction XXXXXX D Demolition XXXXXX E Existing 4 2 Mechanical layers Mechanical general Mechanical las Mechanical Layers Insert architectural drawing on this layer Details may be sub divided into multiple layers Dimensions Hatch General notes which are not found on master plans For the construction only Notes on drawing may be divided into sub layers and must always start with MENOTE e g MENOTE REVI MENOTE DEMO MENOTE CONG Schedules and legends Guide lines revision clouds Text and attributes for title block Mechanical sprinklers Mechanical las Sprinkler Layers Dimensions re
7. limited to the project number the drawing title the sequence of drawings the discipline etc Locati Yeal Type Project Page of Page Floo Floc Floo File Typ Description 413155 2011 A 10189004 0 22 03 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 COVER PAGE 3RD FLOOR PLAN 413155 2011 A 10189004 1 22 04 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 COVER PAGE 4TH FLOOR PLAN 413155 2011 A 10189004 2 22 05 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 COVER PAGE 5TH FLOOR PLAN 413155 2011 A 10189004 3 22 07 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 COVER PAGE 7TH FLOOR PLAN 413155 2011 A 10189004 4 22 09 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 COVER PAGE 9TH FLOOR PLAN 413155 2011 A 10189004 6 22 10 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 COVER PAGE 10TH FLOOR PLAN 413155 2011 A 10189004 7 22 07 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 DEMOLITION PLAN 7TH FLOOR 413155 2011 A 10189004 8 22 10 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 DEMOLITION PLAN 10TH FLOOR 413155 2011 A 10189004 9 22 09 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 DEMOLITION PLAN STH FLOOR 413155 2011 A 10189004 10 22 07 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 PARTITION PLAN 7TH FLOOR 413155 2011 A 10189004 11 22 09 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 PARTITION PLAN 9TH FLOOR 413155 2011 A 10189004 12 22 10 AUTOCAD 50 EGLINTON AVE EAST BRS STRA
8. the construction only Notes on the drawing may be sub divided and must begin with FUNOTE e g FUNOTE EQUI FUNOTE DEMO FUNOTE CONG Workstation number Guide lines revision clouds Acoustical panels Acoustical panels Tecknion Acoustical panels Steelcase Acoustical panels Haworth Standard furniture amp equipment all other furniture Steelcase Furniture Teknion Furniture Text amp attributes for the title block Attributes can be added to any layer Please note For furniture legends and symbols a menu will be required This can be found in our toolbox and inserted directly into the drawing Follow the installation instructions found at http www snclavalinom com en cad aspx Extract file nex2000eng ZIP on your hard drive ex C the directory nex2000eng will be created automatically In revised 04 12 2010 AutoCAD click the command appload load file select the file C inex2000eng insnexaeng vix and click OK A dialogue box Select installation nexacor add on will open Select the file Get_env_nex VLX in the directory C nex2000fre Install Nexacor and click OPEN 4 1 Structure layers Structure Structure las Structure layers Steel columns Steel braces Steel general Metallic deck Steel beams Steel girders Columns strips Framework bars Concrete general Concrete bases and pilasters Concrete col
9. 02 10065837a02 10065837fu02 10065837m03 10065837e03 10065837a03 10065837m04 10065837e04 10065837a04 10065837m05 10065837e05 10065837a05 10065837m06 10065837a06 10065837m07 Please note that projects not conforming to our structure of one dwg file per one drawing sheet as well as file names will be returned to you for corrections 3 Master plans the structure For each of the 1 200 buildings in Quebec and Ontario as well as everywhere else in Canada there is a master plan for the architectural furniture mechanical and electrical sets including a single line diagram As described above these plans are found in separate AutoCAD files as opposed to one drawing file 4 Currently these plans are not complete however over time our goal is to have a comprehensive collection of master plans by floor building and discipline With your help this has become a reality in several buildings We started with partial plans that have become over the years and throughout the projects thorough master plans At the beginning of your project depending on your needs we are able to send you either a complete or partial set of plans If the plan does not exist we will send you the architectural master plan we have them all and thereafter we will create a new plan reflecting your project Our goal is to either create a new master plan or to update existing master plans from the information contained in your project It i
10. Bell SNC LAVALIN O amp M Norms and standards for computer aided design CAD for Bell Canada Version Fran aise disponible Version 6 2 July 2013 TABLE OF CONTENTS Introduction About Bell Canada s archives Master plans the structure Layers in detail The color code Delivery of drawings Important guidelines to follow important The most common mistakes important Frequently asked questions F A Q a A O 16 17 18 19 1 Introduction This document is written for all Bell Canada consultants who in accordance with their contracts must use the software AutoCAD as a tool for computer aided design This user manual explains the technical standards required to comply with the requirements of Bell Canada s computer aided design Bell Real Estate Services BRES generates approximately 2000 projects every year These projects require about 1400 drawings they include architectural mechanical electrical and or furniture It goes without saying that the whole procedure must be regulated Throughout the course of this document you will find a detailed explanation regarding layers their respective nomenclature and the use of official title blocks electrical legends and furniture plans In addition we have included techniques for technical drawings that one must respect the process to follow when sending drawings frequently asked questions and a list of common mistakes In order to avoid loss of time and
11. TEGY 2010 PARTITION PLAN 10TH FLOOR 413155 2011 A 10189004 13 22 07 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 REFLECTED CEILING PLAN 7TH FLOOR 413155 2011 A 10189004 14 22 09 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 REFLECTED CEILING PLAN 9TH FLOOR 413155 2011 A 10189004 15 22 10 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 REFLECTED CEILING PLAN 10TH FLOOR 413155 2011 A 10189004 16 22 07 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 MILLWORK WALL TYPES DETAILS ELEVATIONS amp SECTIONS 413155 2011 A 10189004 17 22 09 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 MILLWORK WALL TYPES DETAILS ELEVATIONS amp SECTIONS 413155 2011 A 10189004 18 22 10 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 MILLWORK WALL TYPES DETAILS ELEVATIONS amp SECTIONS 413155 2011 A 10189004 19 22 07 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 DOOR amp FINISH SCHEDULE 7TH FLOOR 413155 2011 A 10189004 20 22 09 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 DOOR amp FINISH SCHEDULE 9TH FLOOR 413155 2011 A 10189004 21 22 10 AUTOCAD 50 EGLINTON AVE EAST BRS STRATEGY 2010 DOOR amp FINISH SCHEDULE 10TH FLOOR 413155 2011 A 10189004 22 22 09 AUTOCAD _50 EGLINTON AVE EAST BRS STRATEGY 2010 POWER amp COMMUNICATION PLAN STH FLOOR PLAN Bell Canada Real Estate has more than 100 000 drawings in its archive where the oldest ones date back to the 1920 s Project plans dating from before 1998 and which are hand
12. al system will be returned for corrections If you create blocks they must have properties of ByLayer Each element inside the block must be on a standard layer and not on layer 0 Standard blocks found in the furniture and electrical menus have been created to be able to modify them without having to explode them Therefore leave them intact as much as possible as this keeps the drawing light Hatches or fills must be set to the layers relating to the corresponding discipline for example architecture ARHATC furniture FUHATC electrical ELHATC SNC Lavalin O amp M s project number address location code project and drawing title must all be included in the title block in order to ease the archiving of drawings Bell Canada s title page and title blocks available online Toolbox must be used for all projects One copy of each file must be in DWG 2010 format Each page of the As Built project must be saved separately that is to say if the project has 5 pages you must send us 5 separate files Please purge completely your drawings before sending it to us The drawings must not contain 3D Items of any kind 3D faces 3D solids 3d Please note that drawings containing 3D items will be returned for corrections 17 8 The most common mistakes 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 8 10 The master plan has been moved Please do not move the insertion point or the drawing Mecanical el
13. ectrical architectural and furniture plans are aligned on this point Use the furniture and electrical menus available to you This is important because when you insert the block it will create the proper layers automatically The system of units has been changed and the plan is drawn with the imperial system Do not change the system of units as all our drawings use the metric system There is more than one floor on the same drawing It is imperative to place one floor per drawing You may only place parts of other floors for reference only There is more than one drawing per file at delivery Please use one file per drawing 12 drawings 12 Autocad files Use the Bind command and check Insert to import the architectural plan in each drawing Parts of the master plan have been deleted It is very important not to delete parts of a floor The entire floor must be present in the model space You may select certain parts in paper space The nomenclature for layers has not been respected It is very important to respect the convention created for the organization of layers Ventilation ducts were drawn using only one line All ventilation ducts must be drawn using 2 lines Project information does not conform to the required format in the Subject line of an email message Details in the subject zone must be formatted as follows AsBuilt location code Address City SNC LAVALIN O amp M s project number 18
14. erfectly aligned within our title blocks AO and A1 Please note that master plans displaced from their origin point will be returned for corrections Some consultants like to work with different floors on one sheet you will understand that our master drawing system does not aloud that practice therefore do not hesitate to create more sheet even though the real estate isn t fully used Please note that any drawing that uses more than one floor will be returned for corrections Some consultants like to work using multiple copies of the architectural plans within model space for example construction amp demolition or existing amp proposed This kind of layout is unacceptable since this will move the origin point of the plan see section 7 3 Please work with one single plan with all information found within it This is possible due to the layer tool filter freeze layers in Layout mode It is very important to use the following system construction demolition existing Plans which do not follow this direction will be returned for corrections All Bell Canada projects must be drawn with the official title blocks available at the following address http www snclavalinom en cad Plans not respecting this direction will be returned for corrections The measurement system for Bell Canada s projects is the official system declared by the Canadian Government that is to say the metric system Plans drawn to the imperi
15. ion only Notes on the drawing may be sub divided and must begin with ELNOTE e g ELNOTE BATT ELNOTE DEMO ELNOTE CONG Lighting notes Control notes Communication notes Security notes Schedules and legends Notes or dimensions relating to the single line diagram Revision clouds guide lines Security Feeder or Bypass panels only electrical transformers and electrical distributions Text and attributes in title block Please note For electrical legends and symbols a menu will be required This can be found in our toolbox and inserted directly into the drawing Follow the installation instructions found at http www snclavalinom com en cad aspx Extract file nex2000eng ZIP on your hard drive ex C the ory nexe2000eng will be created automatically In click the command appload load file select the ck OK A dialogue box Select installation nexaco will open Select the file Get_env_nex directory C nexe2000fre Install Nexacor and click OPEN 4 5 Furniture Layers 12 Furniture Furniture las Furniture Description Layers Insert the architectural plan on this layer Details Dimensions Electrical furniture components Electrical pole layout Equipment Finishes Hatching Haworth Furniture Organization Code Individuals names General notes which are not found on master plans For
16. ir piping network Combined Condensed Cold water piping network Dimensions related to plumbing equipment can be sub divided Rain water drainage Equipment Freon French drain Natural gas piping network Propane gas piping network Hatching related to the plumbing system Hot water piping network General notes that are not associated with the plumbing system but related to plumbing Fuel oil piping network Recycled water piping network Sanitary drainage Ultrasound Valves can be sub divided into multiple layers Vapour Vents 4 3 Architectural Layers Architecture Architecture las Architectural Layers Description Accessories ladders cable holes concrete foundation for equipment foot grilles Column grid columns staircases elevators vertical shafts fire cabinets All structural elements exterior walls amp doors windows Built in furniture Ceiling grid Details can be sub divided Dimensions Title block key plan north arrow Raised floor Hatching Non structural interior walls amp doors Interior fence partitions Temporary walls General notes which are not found on master plans For the construction only Notes on drawing can be sub divided and must always begin with ARNOTE e g ARNOTE PLUM ARNOTE DEMO ARNOTE CONG Plumbing fixtures found o
17. lated to sprinkler can be sub divided Equipment pump valves Hatch Sprinkler heads General notes which are not associated to the sprinkler network but related to sprinklers Piping network Mechanical ventilation Mechanical las Ventilation Layers Accessories Controls Diffusers Dimensions Return Ductwork Supply Ductwork Equipment Hatch General notes which are not associated to ventilation network but related to ventilation Systems Please note Duct work must be drawn in its entirety that is to say 2 lines must be used Nothing else will be accepted Mechanical plans showing ventilation shafts drawn with one line will be returned for correction Mechanical cooling Mechanical las Cooling Layers Dimensions related to cooling equipment can be sub divided Cooling equipment Glycol Hatching related to the cooling system General notes that are not associated with the cooling network but related to cooling Return Supply Ice Water Mechanical heating Mechanical las Heating Layers Dimensions related to heating equipment can be sub divided Heating equipment Hatching related to the heating system General notes that are not associated with the heating network but related to heating Return Supply Mechanical plumbing Mechanical las Plumbing Layers Compressed a
18. n architectural plans e g WC sink Revision clouds guide lines Roofing elements can be sub divided and must always begin with ARROOF e g ARROOF DRAI for roof drains Door numbers Room numbers Title block text Architecture Site las gt A A Site Plan Concrete base Building outline Border Dimensions Electrical Streetlights outlets etc Equipment manholes petrol pumps telephone poles etc Fence Hatching Notes Parking lots Plants amp landscaping Property line survey benchmark 11 4 4 Electrical layers Electrical Electrical las ELECTRICAL Description LAYERS Accessories Alarm equipment amp devices Insert the architectural plan on this layer UPS amp DC equipment related to telecommunications Communication equipment amp devices Control Details may be sub divided Single line diagram Single line diagram may be sub divided Dimensions Panels transformers distribution center Emergency equipment Hatching Heating equipment and wiring Lighting equipment MALT Network grounding of the alternating current MALT Network grounding of the direct current Monitoring system of UPS batteries Monitoring system of UPS circuit panels Monitoring system of the electrical network Monitoring system of UPS General notes which are not found on master plans For the construct
19. or walls architecture o ARAXES Axes architecture o ARSYMB Room amp Door numbers architecture e Layer names for electricity begin with EL o ELSERV Services electricity o ELALAR Alarm equipment electricity o ELLIGHS Lighting equipment electricity e Layer names for mechanical begin with ME Please refer to the section Layers in details as there are sub categories for this discipline o MVDIFF Diffusers mechanical o MENOTE General notes mechanical o MCSUPP Supply mechanical e Layer names for furniture begin with FU o FUTEKN Teknion Furniture Systems furniture o FUSCRE Acoustical panels furniture o FUCOLU Columns furniture In the following section entitled Layers you will find the primary layers used along with their detailed names and their respective meaning Our system is user friendly and easy to understand This allows for new layers to be created as long as they respect the nomenclature of our system Examples of layers that conform to our nomenclature are as follows ELNOTE CHGC Notes electricity ELNOTE UNIL Notes electricity MVNOTE DUCT SUPP Notes ventilation MVNOTE DUCT RETU Notes ventilation oo00 o MPSANI PP Drainage plumbing o ARDETA 3M Details architecture This process allows for considerable leeway when organizing your various entities in a simple and comprehensible manner within our system Please note that projects which do not meet our nomenclature standards will be ret
20. s essential to work with the architectural master plan that we send you and especially to never move it from its point of origin 0 0 0 which is found in the center of the environment This origin point is the fundamental link of our reference system as it determines the master plan locations of all disciplines as well as the title blocks For all the disciplines the architectural master plan must be placed in the drawing using the Bind Insert command No Xrefs will be accepted The title blocks must be inserted in Paper Space view Please note that all our plans are saved in AutoCAD 2010 version Please note that all projects with reference files will be returned In other words XREF s will be sent back for corrections without even opening them first Pease note that master plans which have been moved from their origin point will be returned for correction Please note that incomplete master plans which are found to have deleted parts will be returned for corrections 3 1 The system and the layer names The plans that you return to us will be used to update or create master plans relating to your particular discipline When a partial or complete master plan is sent to you it will have specific layers such as ARINTE ARDIME ARBASE AMTECK FUTEKN ELSERV ELEQUI MEGAIN These names are structured in such a way to identify a discipline and its content e Layer names for architecture begin with AR o ARINTE Interi
21. umns Concrete paving stones Hatching for concrete cross sections Concrete walls Concrete beams Saw cuts in the concrete slab Wire mesh in the concrete slab Wooden columns Wood general Wooden beams Wooden joists and trusts Axes lines and bubbles Cross sections and details Dimensions Hatch general Opennings Text annotations General notes Footings Pickets R visions 14 Colour code optional When you receive a master plan all layers will have the properties set to ByLayer and all objects lines points annotation will be in white The choice of colours for layers is left to the discretion of the individual user We suggest that you use the following table Colour Thickness mm Thickness in 0 007 0 010 0 012 0 014 0 020 0 024 0 028 0 003 0 031 0 039 0 047 0 055 0 007 0 010 0 007 2 3 4 5 6 7 8 k N O1 oO ak OO 6 Delivery of drawings By email directions When returning files by email they must be sent to the following address support cad toronto snclavalinom com When sending an email please write the following information exactly as shown in the Subject line AsBuilt Location Code Address City SNC Lavalin O amp M s project number To CAD Support ce Subject TQC 431105 76 Adelaide Street
22. unnecessary work it is very important to consult the section entitled Important guidelines to follow In addition it is imperative to read all notes which are written in blue and in red Please note that after trying unsuccessfully twice to get the drawings up to standards you will be referred to your SNC Lavalin O amp M Project Manager All necessary tools needed to implement Bell Canada s drawing standards can be found on SNC Lavalin O amp M s web site in the CAD _ Standards section The direct link is http www snclavalinom com en cad aspx This site contains among others the title blocks menus standards PDF version electrical legends amp symbols Bell Canada s CTB and the LAS files for each discipline For all questions related to standards please do not hesitate to contact us at the following coordinates Fran ois Laberge Jean Francois Denis CAD RESUS Manager Qu bec CAD RESUS Technician 87 Ontario Street West 87 Ontario Street West Montr al Qc H2X 0A7 Montr al Qc H2X 0A7 T l 514 840 8388 T l 514 840 8130 francois laberge snclavalinom com jean francois denis snclavalinom com 2 About Bell Canada s Archives In order to interpret and apply the norms and standards in our drawings it is essential to understand Bell Canada s system of archives Following receipt of your project all pertinent information is entered into the database The information entered in the database includes and is not
23. urned for corrections Here are a few examples to follow in green and to avoid in red Architecture Mechanical amp ABORD ES0S10 Unacceptable the dravings Fur vurrecliuns ABORD ES0SBD ABORD ES0SISSUED COL ADC ABORD ESDSKEYFLAN ABURL ESUSKEYFLAN IEXI 1 ABORD ESOSMMMLugu ABORD ESOSTEXT Cancut Defponts etable demu e cable es e cahle neu efa demo e fa 2xisl efanew Unacceptable the drawings will be return for corrections efa inte dema efa rote enst e fa rote new elight demo e light exist e light hatct elight mizc demo elight miecexict elight miscn2w elight new elight note demo elight note exict Unacceptable the drawings will be returned for corrections ARCH Defpoints E EDTL PATT_WIDE E TXT E_POWR_IDEN elmisc ELNOTE Layer 1 MENOTE LEGE MENOTE LEGE BORDER MEREVI METEXT MHSUPP E MPCWTR E MPCWTR E FIRE MPCWTR N MPCWTR N FIRE MPDIME MPDRAI MPEQUI N MPNOTE MPSANI Furniture 7 SAUDIT BAD LAYER Architecture 3632FR M 03 0 F PROT 47 A ANNO SYMB ARCADR ARDETA CSHE ARDETA E ARDETA INSU ARDETA MEMB ARDETA META ARDETA REFE ARDETA SCRE ARDETA STRU ARDETA VAPO ARFRAM ARHATC ARNOTE ARRO ARNOTE ASBU ARNOTE DETA ARROOF SLOP ARTEXT 7 A FURN ATTRIBUTE T A FURN FileNo A FURN HAWORTH ATT A FURN P FILE 7 A FURN P FILE T gt A FURN P FREE A FURN P FREE T T A FURN P FREE TEXT 7 A FURN P PNLS CON A FURN P SEAT 47 A FURN P SEAT
Download Pdf Manuals
Related Search
Related Contents
HTC Wildfire User's Manual HP MSM410 802.11n AP Installation Guide Bulletin 160 SSC™ Remote Keypad HP Color LaserJet CM6030 CM6040 MFP Service Manual Copyright © All rights reserved.
Failed to retrieve file