        Spectra T950 Library Site Preparation Guide
         Contents
1.            Read text marked by the    Caution    icon for information you must know to avoid  damaging the library or the tape drives  or losing data           A WARNING Read text marked by the    Warning    icon for information you must know to avoid  personal injury   This document uses an arrow      to describe a series of menu selections   For example   Select Configuration      Partitions     New       means      Select Configuration  then select Partitions  and then select New   March 2015 Site Preparation Guide   Spectra T950B Library    CHAPTER 1       Library Overview    The Spectra T950 enterprise class libraries are designed and built to meet  the stringent requirements for data integrity  data security  and high  reliability in the enterprise environment     The following sections provide an overview of the library components   Depending on the options you ordered  some of the components shown  may not be included in your library  For detailed descriptions of the library  components and media  read the Library Overview chapter in the Spectra  T950 Library User Guide for your library     The library will be installed by a certified Spectra Logic field engineer  The  information in the following sections is provided for your reference only   This document is not an installation guide                             Topic   Front Panel Components page 11  Main and Drive Frame Expansion Rear Components page 13  Bulk TAP Expansion Frame page 14  Media Expansion Frames page
2.     Site Preparation Guide   Spectra T950B Library       A WARNING    A WARNING    A WARNING    CHAPTER 3       Preparing for Installation    The library will be installed by a certified Spectra Logic field engineer  This  chapter outlines the requirements for storing and moving the library and  its components  Make sure that you review these requirements carefully   The information is provided to ensure that the installation site meets the  necessary requirements before the Spectra Logic field representative arrives                       Topic   Receiving and Storing the Library page 32  Unpacking and Moving the Library page 33  Moving the Library After Installation page 35          Library frames are very heavy  see product specifications for details   Use extreme  caution and proper equipment when moving these  and ensure that your floor has  adequate structural integrity     Boxed and unboxed library components weigh from 200 to 400 pounds each  91 to  181 kg  or more  Use extreme caution and proper equipment when moving these     The ties around the shipping crates are secured very tightly  the tension may cause  them to whip outward when cut  Use care when cutting the ties so that you will not  be hit     31    Chapter 3   Preparing for Installation    Receiving and Storing the Library       RECEIVING AND STORING THE LIBRARY    Before the library arrives  make sure that your receiving and storage areas  can accommodate the pallet and boxes used to ship the library and i
3.  14  Library Capacity page 14       10    Chapter 1   Library Overview Front Panel Components    FRONT PANEL COMPONENTS    Figure 1 shows the front components of a multi frame T950B library and  Figure 2 on page 12 shows a T950 library  The figures also show the relative  locations of the main frame and the expansion frames  T950B main frames  have a centered center TAP and operator panel  T950 main frames have an  offset center TeraPack   Access Port  TAP  and operator panel  T950B  media expansion frames do not have a filter on the front at the bottom   T950 media expansion frames do           Window Bulk Operator Center Drive and media  panel TAP panel TAP expansion frames                                        L L i i  L L  X La P Di                      Bulk TAP Main frame Air filter and fans  expansion frame  behind cover panel of  drive expansion frames              Figure 1 T950B library with optional bulk TAP expansion frame        March 2015 Site Preparation Guide   Spectra T950B Library    Chapter 1   Library Overview Front Panel Components          Window Bulk Operator Center Drive and media  panel TAP panel TAP expansion frames                                                    Bulk TAP Main frame Air filter and fans  expansion frame  behind cover panel              Figure 2 T950 library with optional bulk TAP expansion frame        12  March 2015 Site Preparation Guide   Spectra T950B Library    Chapter 1   Library Overview    Main and Drive Frame Expansion Rear
4.  Components       MAIN AND DRIVE FRAME EXPANSION REAR COMPONENTS    Figure 3 shows the rear panel components of the library   s main and drive    expansion frames     Note  Any bays that do not contain components have covers installed  to maintain proper air circulation through the library        Tool storage bay                BlueScale Vision  camera connector       Media storage chambers   behind cover panel                             TeraPack Bay Assembly  TBA         behind cover panel                       Drive Bay Assembly  DBA        Library Control Module  LCM     Robotics Control Module  RCM    eee    Robotics power supply  modules  24 VDC                                                        Controller bay with a  controller installed   RIM     Flex bay for either TBA  or DBA  3     Empty drive bay   cover removed     Empty controller bay   cover removed     Drives    Power supply module  bays  5 12 VDC     Power Control  Module  PCM     Dual AC power module          Figure 3 Library rear components  main frame  doors removed         March 2015    13    Site Preparation Guide   Spectra T950B Library    Chapter 1   Library Overview Bulk TAP Expansion Frame    BuLK TAP EXPANSION FRAME       The bulk TeraPack Access Port  bulk TAP  expansion frame is used to  import or export up to 14 magazines in a single operation           TAP carousel filled  with magazines       Ei  a  a    Door release            button m Media storage  car    ar  3E Door       Bulk TAP    E 
5.  H Service Control  Module  SCM     Figure 4 The front of the bulk TAP media frame  Figure 5 The back of the bulk TAP media frame   doors removed                        MEDIA EXPANSION FRAMES    Media expansion frames are for media storage only and do not include any  active front or rear panel components     LIBRARY CAPACITY    The T950   s modular design makes it possible to increase media capacity or  the number of drives in the library to meet storage and performance needs  as they evolve  Expansion frames can be added to the basic single frame  library for a maximum of eight frames     14       March 2015 Site Preparation Guide   Spectra T950B Library    Chapter 1   Library Overview    Library Capacity       The following table shows the number of media storage chambers  slots   and drives in each type of frame in the T950                                                                                      Frame Type Number of Number of slots Maximum  Chambers    Number of Drives   LTO Library   T950 main      3 DBAs 3 TBAs 95 950 12      6 DBAs 83 830 24   T950B main      1 DBA shelves 100 1000 4     3 DBAs 3 TBAs or shelves 92 920 12      6 DBAs 80 800 24   T950B main with a bulk TAP     1 DBA shelves 110 1100 4      3 DBAs 3 TBAs or shelves 98 980 12      6 DBAs 80 800 24   Drive expansion  optional       3 DBAs 3 TBAs 101 1010 12      3 DBAs shelves 107 1070 12      6 DBAs 89 890 24   Media expansion  optional  130 1300 None   Bulk TAP expansion  optional  91 910 Non
6.  North America and Korea 200 240 VAC Power Cord The criteria for a  200 volt to 240 volt AC power cord in North America and Korea are as  follows              Parameter Specification  Power cordage SJT type  three conductor  14 AWG minimum  Power input connectors    Male  Connector must be of the proper type     rating  and safety approval  see Supply End  Connector Types on page 25         Female  IEC 60320 C13                International 200 240 VAC Power Cord The criteria for an international  200 volt to 240 volt AC power cord are as follows        Parameter Specification       Power cordage Flexible  HAR  harmonized  type HO5VV F  three  conductor  cord with minimum conductor size of  1 7 square millimeters  0 0026350 square inches         Power input connectors    Male  Connector must be of the proper type   rating  and safety approval for the intended  country  see Supply End Connector Types on  page 25        Female  IEC 60320 C13                24       March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements    Physical Requirements       Supply End Connector Types The supply end connector on the cord  depends on the country where the library will be installed  The following  table shows the supply end connector types used in some countries                                                                             Part Country of Use Plug Style Length Appearance  Number  9594 North America  NEMA L6 20P 14 8 ft  4 5 m       Kore
7.  Phone  44  0  870 112 2185  Toll free US and Canada  1 800 227 4637 Deutsch Sprechende Kunden  International  1 303 449 0160 Phone  49  0  6028 9796 507    Email  spectralogic stortrec de    Mexico  Central and South America  Asia  Australia  and New Zealand  Phone  1 303 449 0160       Spectra Logic Sales       Website  www spectralogic com shop    United States and Canada Europe   Phone  1 800 833 1132 or 1 303 449 6400 Phone  44  0  870 112 2150   Fax  1 303 939 8844 Fax  44  0  870 112 2175   Email  sales spectralogic com Email  eurosales spectralogic com       To Obtain Documentation       Spectra Logic Website  support spectralogic com documentation       March 2015 Site Preparation Guide   Spectra T950B Library    Contents       About This Guide 7  INTENDED AUDIENCE sina ccva nace cts cass ween ee eee Se kaa oeenewns 7   RELATED INFORMATION           cece cee ccc cec cee cecceececceceeeeuns 7   Chapter 1   Library Overview 10  FRONT PANEL COMPONENTS         cceecceecceecceecceuveeevvees 11   MAIN AND DRIVE FRAME EXPANSION REAR COMPONENTS            0  13   BULK TAP EXPANSION FRAME          cccccecceceecceceeeeeceeces 14   MEDIA EXPANSION FRAMES           0 0 cece sees eecceceeceeveuces 14   LIBRARY CAPACITY 25 o dcsis dew witariacke ocuela se dade aed wwe e wa ore  adcceide 14   Chapter 2   Site Requirements 16  PHYSICAL REQUIREMENTS          cc cece cece cee ee cece cess eeeecees 16   Data Center Flooring ous kah coe ed sav G ge EWed Sade Pee eee eA 16   Space Reguir
8.  Reference  LTO 1 through  LTO 4      IBM TotalStorage LTO Ultrium Tape Drive  SCSI Reference  LTO 5 and  LTO 6    For drive specific information  search for the product name  for example    LTO 5  on the documentation page on the IBM website  You can also search    the IBM Support Portal at   http   www 947 ibm com support entry portal Documentation        March 2015    Site Preparation Guide   Spectra T950B Library    About This Guide    Related Information       A Important  A Caution    TS11x0 Technology Drives    The following documents provide information that is applicable to TS11x0  technology drives       IBM System Storage Tape Drive 3592 SCSI Reference    IBM Tape Device Drivers Installation and User s Guide    Note  This guide also provides information about using the IBM Tape  Diagnostic Tool  ITDT  to troubleshoot drive problems     Spectra TKLM Server    For additional information that can assist you during the installation and  configuration of your server  see the following websites        IBM Tivoli Key Lifecycle Manager Information Center      Tivoli Key Lifecycle Manager Installation and Configuration Guide    Typographical Conventions    This document uses the following conventions to highlight important  information     Note  Read text marked with    Note    for additional information or  suggestions about the current topic        Read text marked by the    Important    icon for information that will help you  complete a procedure or avoid extra steps   
9.  gt   SPEC TRA  DEEP STORAGE EXPERTS    Spectra T950B Library    Site Preparation Guide                SPECTRALOGIC COM       Copyright    Notices    Trademarks    Copyright    2006     2015 Spectra Logic Corporation  All rights reserved  This item and the  information contained herein are the property of Spectra Logic Corporation     Except as expressly stated herein  Spectra Logic Corporation makes its products and  associated documentation on an    AS IS    BASIS  WITHOUT WARRANTY OF ANY  KIND  EITHER EXPRESSED OR IMPLIED  INCLUDING BUT NOT LIMITED TO  THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A  PARTICULAR PURPOSE  BOTH OF WHICH ARE EXPRESSLY DISCLAIMED  In no  event shall Spectra Logic be liable for any loss of profits  loss of business  loss of use or  data  interruption of business  or for indirect  special  incidental or consequential  damages of any kind  even if Spectra Logic has been advised of the possibility of such  damages arising from any defect or error    Information furnished in this manual is believed to be accurate and reliable  However  no  responsibility is assumed by Spectra Logic for its use  Due to continuing research and  development  Spectra Logic may revise this publication from time to time without notice   and reserves the right to change any product specification at any time without notice     BlueScale  CC  Spectra  SpectraGuard  Spectra Logic  TeraPack  and TranScale are  registered trademarks of Spectra Logic Corporation  Arch
10.  lt      gt   1 3 in  5 75 in    3 3 cm   14 6 cm   14 6 cm   14 6 cm   4 0 in    10 1 cm   1 875 in   4 8cm    s      lt     1 875 in   4 8 cm                   Figure 8 Ceiling cable access for main and drive expansion  frames        29 0 in   73 7 cm                             lt   gt   lt i a   gt   1 3 in  6 0 in  6 0 in  6 0 in                  3 3 cm   15 2 cm   15 2 cm   15 2 cm   4 25 in    10 8 cm   1 25 in   3 2 cm     lt      1 25 in   3 2 cm    e  le                   Figure 9 Floor cable access for main and drive expansion  frames        March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements Physical Requirements       Power Requirements    A  Caution    A Caution    A WARNING    This section provides an overview of the power requirements for the  library  All electrical cabling must be completed before beginning the library  installation           Failure to meet the cabling and power specifications could damage your library   result in data loss  or both           Power Input The main frame and the drive expansion frames include dual  AC power inputs  When using a redundant power configuration  connect  each input to a separate branch circuit  which allows for failover in the  event of a power failure in one of the circuits     To prevent problems switching between two AC power sources in a  redundant AC power configuration  the two AC inputs for each frame  must be on the same phase  Different frames can be on different
11.  must also include all prior versions of the Software       Export Restrictions  Export of the Software from the United States is regulated by the  Export Administration Regulations  EAR  15 CFR 730 744  of the U S  Commerce  Department  Bureau of Export Administration  You agree to comply with the EAR in  the export or re export of the Software   i  to any country to which the U S  has  embargoed or restricted the export of goods or services  which as May 1999 include  but  are not necessarily limited to Cuba  Iran  Iraq  Libya  North Korea  Sudan  Syria  and  the Federal Republic of Yugoslavia  including Serbia  but not Montenegro   or to any  national or any such country  wherever located  who intends to transit or transport the  Software back to such country   ii  to any person or entity who you know or have  reason to know will utilize the Software or portion thereof in the design  development  or production of nuclear  chemical  or biological weapons  or  iii  to any person or  entity who has been prohibited from participating in U S  export transactions by any  federal agency of the U S  government  You warrant and represent that neither the BXA  nor any other U S  federal agency has suspended  revoked or denied your export  privileges        March 2015    Site Preparation Guide   Spectra T950B Library       A WARNING    A WARNING    A WARNING    A WARNING    A document listing all warnings found in Spectra Tape Libraries  documentation  in English and 27 other languag
12.  phases           If the power sources for the dual AC inputs for a frame are not on the same phase   damage to the library could result        Also  the voltages of the two AC power sources must be the same within a  few volts  To ensure that this requirement is being met  measure the  voltages between the pins of the two input cables  IEC 60320 C19      Line voltage exists at these connectors     Only qualified personnel should attempt to conduct this test   Use extreme caution when taking measurements     22       March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements Physical Requirements       The two top pins are voltage inputs  The bottom pin is ground  As shown  in Figure 10  the top input voltage pins are labeled A and B  from left to  right  and the bottom pins are labeled C  Confirm the following  measurements       The voltage from A to A or B to B should be less than 4 V     The voltage from A to B or B to A should be between 200 and 240 V        The voltage between any A or B pin to either C pin should be about  120 V         lt 4V        lt 4V       240 V 240 V 240 V  A B A B                     120 V   m 120 V  c 120 V c                                                120 V                      ov             240 V          Figure 10 Dual AC input voltage requirements     Each library frame is rated at 200 240 VAC at 13 amps  2600 watts  maximum   This power rating is based on a main frame with 24 LTO drives  and 6 RIMs  w
13.  shipped individually     The size and weight of the component pallet depends on the number and type of components shipped  To calculate the    approximate weight of all    the components  add 11 6 Ib  5 3 kg  for each LTO drive  17 5 Ib  8 kg  for each TS11x0 drive  5 Ib  2 3 kg  for    each full LTO TeraPack magazine  5 6 Ib  2 5 kg  for each full TS11x0 technology TeraPack magazine  5 Ib  2 3 kg  for each RIM  and 4 Ib   1 8 kg  for each power supply     In preparation for the installation  locate the accessory box  which may  have shipped and arrived separately from the library  This box contains  option activation keys  the library documentation kit  and additional  information that you should read before the library is installed  Make sure  that you do not lose any of the option activation keys     Acclimating the Library    A Caution    Allow time for the library to acclimate to the working environment when  you move it from the loading dock           When the library is moved from a cold storage environment to a warm operating  environment  it must be acclimated in its packaging for at least 24 hours before  opening to prevent serious condensation damage from occurring           32       March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 3   Preparing for Installation Unpacking and Moving the Library    UNPACKING AND MOVING THE LIBRARY       The following sections describe the requirements to safely unpack and  maneuver library and component crate
14. 720 lb  327 kg     T950 800 Ib  363 kg   6DOT  954 Ib  433 kg    3D3T  750 Ib  340 kg    547 Ib  248 kg   3D3T  933 Ib  423 kg     T950B   T950B  6DOT  895 Ib  406 kg  538 1b  244 kg           Each tape drive      LTO 2 through LTO 4  11 5 lb  5 2 kg      LTO 5 and LTO 6  11 6 lb  5 3 kg     TS11x0 technology  17 5 lb  8 kg        N A                maximum weight          6DOT  1 722 Ib  781 kg   3D3T  1 608 lb  729 kg     T950B    6DOT  1 648 Ib  748 kg   3D3T  1 535 lb  696 kg        3D3T  1 447 lb  656 kg        Each TeraPack   with ten LTO cartridges  5 1 Ib  2 3 kg    magazine   with nine TS11x0 technology cartridges  5 6 Ib  2 5 kg    Each RIM 5 0 Ib  2 3 kg  N A   Each power supply 4 0 1b  1 8 kg  N A   Fully loaded   T950 6DOT  1 510 Ib  685 kg      T950 1 335 Ib  606 kg     1 210 Ib  549 kg       T950B  1 201 Ib  545 kg              oo    NA    d  These weights are with no drives  RIMs  power supplies  or media installed       The height of each frame can be adjusted to allow frame to frame leveling on uneven floors       These dimensions represent the frames without the side cover panels installed  The outermost frame on each end of the library has a  single side cover panel  Each side cover panel adds 1 inch to the width of the frame       These dimensions represent the frames with the front and back cover panels installed     17       March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements Physical Requirements       A  Cauti
15. AC input and include power supply  efficiency  The values are averages of observed hardware  In general  the  lighter the load on the power supplies  the less efficient they are  The  power supply efficiency in turn affects the power draw of all components                                                           Component Power Consumption Heat Load  Continuous   watts   BTU hour    Main frame    183 625   Drive frame    139 475   Media frame in frame   location 2 though 6 u o   Media frame in frame   location 7 or 8 a     Bulk TAP frame 125 427   5 12 VDC power supply 33 113   24 VDC power supply 29 99   RIM 12 41   LTO 6 Fibre Channel   Read write  28 Read write  95    Idle  8     LTO 5  Fibre Channel    Read write  37 Read write  126    Idle  19     LTO 4  Fibre Channel    Read write  37 Read write  123    Idle  17 5    LTO 3  Fibre Channel    Read write  29 Read write  99    Idle  15 gt    TS1150 technology   Read write  55 Read write  188    Idle  38     TS1140 technology   Read write  53 Read write  181    Idle  30            a  Assumes one 5 12 volt power supply and one 24 volt power supply  no drives or RIMs installed     b  No cartridge loaded     26       March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements Network Cabling Requirements    NETWORK CABLING REQUIREMENTS       The library can accommodate cabling from either the bottom or the top of  the library  See Floor and Ceiling Cable Access on page 21 for additional  infor
16. User   s Manual provides  detailed information about installing and using the black BlueScale  Vision Camera and software       The Spectra Tape Libraries Encryption User Guide provides detailed  information about using BlueScale Encryption Standard and  Professional Edition and the Spectra TKLM Encryption key  management system  It also provides useful information about  encryption best practices and recycling encrypted media       The Spectra Tape Libraries SCSI Developer   s Guide provides detailed  information about the SCSI and Fibre Channel commands used in the  library      The Spectra Tape Libraries XML Command Reference provides detailed  information about using the XML interface with the T950 library       The Spectra Tape Libraries Warnings document provides all of the  warnings found in Spectra tape libraries documentation  in English and  27 other languages     The following document is available after logging into your Support portal  account at  support spectralogic com       The T950 Library Release Notes and Documentation Updates provides the  most up to date information about the T950  drives  and media     LTO Ultrium Tape Drives    The following documents provide information that is applicable to all IBM  LTO tape drives       IBM Tape Device Drivers Installation and User   s Guide    Note  This guide also provides information about using the IBM Tape  Diagnostic Tool  ITDT  to troubleshoot drive problems       IBM TotalStorage LTO Ultrium Tape Drive  SCSI
17. a    7029 North America  NEMA L6 30P 14 8 ft  4 5 m  4  Korea S  6807 Japan NEMA L6 20P 13 9 ft  4 25 m           8665 United Kingdom    IEC 60309 15 ft  4 6 m   Continental  Europe  230V  2P E  lt   Power Outlet Location The twist lock supply end connector is considered  the power disconnect for the unit  The outlet must therefore be installed in  an accessible location near the library   Power Receptacles The power receptacles for the main frame and the  drive expansion frames are located in the lower right hand corner of the  frame as you face the back of the library  see Figure 3 on page 13    The following table shows the number of power receptacles on each frame  type   Frame Type Number of Power Outlets  Main Frame 2a  Drive Expansion Frame 2  Media Expansion Frame 0  Bulk TAP Media Frame 0  a  The second connection is the redundant or failover connection     a 25  March 2015 Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements    Physical Requirements       Power Consumption and Cooling Requirements    The power and cooling requirements for the library depend on the number  and type of drives installed  The following table provides the maximum  power consumption and heat load for the base library and for each  additional component added to the base library  Use this information to  calculate the total maximum power consumption and heat load values   which can be used to build a power budget for the library     All values are measured at the 
18. a corresponding punch out in the top of each  frame for the purpose of attaching a hose or nozzle from your site   s fire    extinguishing system           Fire extinguishing system punch out   main frame  top cover                 Figure 12 Location of the fire extinguishing system access opening in the top of the library     Shock and Vibration The library will operate normally after experiencing  shock loads as specified in the following table  The operating shock levels  indicate how much shock the library can withstand while the enclosed  drives are reading and writing data  The non operating and storage shock  levels indicate how much shock the library can withstand when it is not  operating  After experiencing this amount of shock  the library will operate                         normally   Storing and Shipping   Specification Operating  Non Operating Environment      Shock 2 g pk   sine wave for 10 msec 2 g pk   sine wave for 10 msec    3 axes  2 shocks per axis  minimum   3 axes  2 shocks per axis  minimum   Vibration 5 Hz   500 Hz   5 Hz 5 Hz   500 Hz   5 Hz   Swept Sine  5     22 Hz  0 01 inch DA displacement 5     31 Hz  0 02 inch DA displacement   22     500 Hz  0 25G pk     octave 31     500 Hz  1G pk     octave    minimum three axes   minimum three axes   Vibration 0 5 Grms  0     3000 Hz  single axis  1   200 Hz   1 156 Grms    Random  Bottom face only for 60 minutes        a  Specifications are for the library in its original packaging     30       March 2015
19. bient temperature    LTO  50   F to 90   F  10   C to 32   C   TS11x0 Technology  61   F to 90   F   16   C to 32   C        Maximum temperature change rate  gt    18   F per hour  10   C per hour    non condensing       Maximum wet bulb temperature 77   F  25   C   Altitude Sea level to 10 000 ft  3 048 m                    a  The maximum ambient temperature must not exceed 86   F  30   C  when G2 F QIPs are installed in the  library    b  The temperature and humidity must be allowed to stabilize in the specified ambient environment for  24 hours                 Storing    and Shipping  Non Operating  Environment Specification  Humidity 10  to 95   non condensing   Temperature    40   F to 149   F   40   C to 65   C   Altitude Sea level to 40 000 ft  12 192 m                 a  The library is in its original packaging  The packaging is designed to protect the library from  condensation caused by extreme temperature variations of 27   F  15   C  or more  When the library is  moved from a cold storage environment to a warm operating environment  it must be acclimated in its  packaging for at least 24 hours before opening to prevent serious condensation damage from occurring     29       March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements    Environmental Requirements       Fire Protection To comply with the OSHA Directive for Fixed  Extinguishing Systems  General  1910 160   the library has a punch out in  the cover for each frame and 
20. e   TS11x0 Technology Library   T950B main     1 DBA shelves 82 738 4      3 DBAs shelves 76 684 12     6 DBAs shelves 66 594 24   T950B main with a bulk TAP     1 DBA shelves 90 810 4      3 DBAs shelves 81 729 12     6 DBAs shelves 66 594 24   Drive expansion  optional       3 DBAs shelves 90 810 12      6 DBAs 75 675 24   Media expansion  optional  110 990 None   Bulk TAP expansion  optional  77 693 None             a  A single magazine is stored in each chamber  Each LTO magazine contains 10 slots  Each TS11x0 technology magazine contains 9 slots        March 2015    Site Preparation Guide   Spectra T950B Library    CHAPTER 2       Site Requirements    This chapter describes the site requirements for the library  Make sure that  the location where the library will be installed meets these requirements  before the Spectra Logic field engineer arrives to install the library                       Topic   Physical Requirements this page  Data Center Flooring page 16  Space Requirements page 18  Power Requirements page 22   Network Cabling Requirements page 27   Environmental Requirements page 29          PHYSICAL REQUIREMENTS    The following physical requirements apply to the location where the library  will be installed  Meeting these requirements sets the necessary parameters  for successfully operating the library  as well as ensuring adequate  clearances for  maintenance access to  and expansion of the library     Data Center Flooring    A WARNING    The flooring where y
21. ed before your library arrives     INTENDED AUDIENCE    This guide is intended for data center administrators preparing a site for a  T950 library installation  It provides reference information for facility  managers  electricians  IT professionals  and other specialists who will  have roles in preparing the site     RELATED INFORMATION    This section contains information about this document and other  documents related to the library and its drives     Spectra T950 Library    This guide and the following documents related to the Spectra T950B  Library are available as PDF files on the Spectra Logic website at   support spectralogic com documentation       The Spectra T950 Library User Guide describes how to configure  use   maintain  and troubleshoot the library  It also provides specifications  for the library       The Spectra T950 Library Quick Reference Guide provides a quick  reference for the user interface and instructions for performing day to   day library operations such as powering on and off  and preparing   importing  and exporting media     About This Guide    Related Information         The Spectra T950 Library BlueScale Toolbar Option Map provides a quick  reference for locating the options and commands available through the  BlueScale user interface       The Spectra BlueScale Vision Camera User Guide provides detailed  information about installing and using the white BlueScale Vision  Camera and software       The Vivotek FD8361 Fixed Dome Network Camera 
22. em  nts  s cise tresti teti iE r eee eoeqeaseanoe 18   Power Requirements  seosreiecerscerieeretetait eni e he a 22   NETWORK CABLING REQUIREMENTS          cece cece ees cceeceeevees 27   ENVIRONMENTAL REQUIREMENTS           cece cece cceecceecceeevees 29   Chapter 3   Preparing for Installation 31  RECEIVING AND STORING THE LIBRARY          ceeceeccecceceeceecs 32   Acclimating the Library shia 6 ik ee ea6s Ee eae ee SEE eee eS 32   UNPACKING AND MOVING THE LIBRARY           ccceccecececeececs 33   Structural Integrity of Flooring i    6c iocerbicreiensaad ee esos es 33   Required Equipment xh suwiacevexddovn oP Evid eo vee dd aaa eee es 33   Clearances           cc cece eee cence eee eeeeeeeneneas 34   VNC o Catt te Gaps Ald Laan Resa hate a e a a te 34   MOVING THE LIBRARY AFTER INSTALLATION           eccceecececeecs 35   Site Preparation Checklist 36       ABOUT THIS GUIDE       This guide describes site preparation requirements and guidelines for the  installation of a Spectra   T950B library  Unless otherwise specified  the  requirements for both T950 and T950B libraries are the same and    T950    is  used to refer to both  Where they are different  you can find the  information for a T950 library in the Spectra T950 Library User Guide  This  guide includes precautions for safety and handling  as well as facility  requirements for the library   s environment  cabling  and placement  It also  provides a checklist that you can use to help ensure that your site is  prepar
23. ements    on page 22                   Electrical and peripheral equipment cabling is complete and organized     Proper number and type of outlets are available at the required locations              Electrical circuits meet power consumption requirements                 Two separate branch circuits  meeting the power requirements  are available to  allow for failover in the event of a power failure in one of the circuits  optional         Network Cabling Requirements on page 27             Cabling for remote access to the library   s BlueScale web interface is complete  and organized           Cabling for host access to the library is complete and organized              Cabling for host access to the tape drives is complete and organized                       Cabling for access to the BlueScale Vision Camera s  is complete and organized           36       Site Preparation Checklist          Environmental Requirements on page 29             Airflow and air quality meet the library   s specifications           Temperature and humidity are within the library   s specifications              Fire suppression equipment is in place  optional                        Vibration and shock will not exceed the library   s specifications        Preparing for Installation       Receiving and Storing the Library on page 32             The receiving storage area can handle the size and weight of each crated library  frame as well as the crate s  of library components                    The de
24. es  is available on the  Spectra Logic website at support spectralogic com documentation     Library frames are very heavy  see product specifications for details   Use extreme  caution and proper equipment when moving these  and ensure that your floor has  adequate structural integrity    Line voltage exists at these connectors    Only qualified personnel should attempt to conduct this test    Use extreme caution when taking measurements     Boxed and unboxed library components weigh from 200 to 400 pounds each  91 to  181 kg  or more  Use extreme caution and proper equipment when moving these     The ties around the shipping crates are secured very tightly  the tension may cause  them to whip outward when cut  Use care when cutting the ties so that you will not  be hit        March 2015    Site Preparation Guide   Spectra T950B Library       Contacting Spectra Logic       To Obtain General Information       Spectra Logic Website  www spectralogic com    United States Headquarters European Office   Spectra Logic Corporation Spectra Logic Europe Ltd    6285 Lookout Road Venture House   Boulder  CO 80301 Arlington Square  Downshire Way  USA Bracknell  RG12 1WA   Phone  1 800 833 1132 or 1 303 449 6400 United Kingdom   International  1 303 449 6400 Phone  44  0  870 112 2150   Fax  1 303 939 8844 Fax  44  0  870 112 2175       Spectra Logic Technical Support       Technical Support Portal  support spectralogic com    United States and Canada Europe  Middle East  Africa   Phone 
25. he width of a T950 library  including the  recommended 3 ft  0 9 m  access clearance on each end of the library  The  depth of all libraries  including access clearance  is 9 6 ft  3 0 m                              Number of Frames Library Width  Total Recommended Access  Width     One Frame 2 6 ft  0 8 m  8 6 ft  2 6 m   Two Frames 5 0 ft  1 5 m  11 0 ft  3 3 m   Three Frames 7 4 ft  2 3 m  13 4 ft  4 1 m   Four Frames 9 8 ft  3 0 m  15 8 ft  4 8 m   Five Frames 12 2 ft  3 7 m  18 2 ft  5 5 m   Six Frames 14 6 ft  4 5 m  20 6 ft  6 3 m   Eight Frames 19 5 ft  5 9 m  25 5 ft  7 8 m              a  All dimensions are rounded to the nearest tenth        March 2015    20    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements Physical Requirements       A WARNING    Floor and Ceiling Cable Access    Figure 8 and Figure 9 on page 21 provide the dimensions for cable access  holes for main and drive expansion frames  See Figure 11 on page 27 to see  the location of these access holes in a frame  The dimensions are different  for the floor and ceiling access holes  Be sure to consider the structural  integrity of the floor before cutting holes in the floor for access     Library frames are very heavy  see product specifications for details   Use extreme  caution and proper equipment when moving these  and ensure that your floor has  adequate structural integrity               29 0 in   73 7 cm                                 3 25 in    8 3 cm   A  y    A 
26. hich is the configuration for maximum power consumption  by a single frame  The frames are not rated at 120 VAC due to the high  current required to supply the product     23       March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements Physical Requirements       Grounding Requirements Due to electromagnetic interference  EMI   filtering in each dual AC power supply  the leakage current for main  frames and drive frames is such that they require a secure connection from  the chassis of the unit to an earth ground     Use one or more of the following methods for securing a ground  connection when installing a main frame or drive frame     Note  Cord lock brackets and cords with locking connectors are not  compatible and cannot be used simultaneously       Add cord lock brackets  Spectra Logic part number 5497  to all drive  frames  See    Installing Cord Locks    in the Spectra T950 Library User  Guide for more information       Use a cord with locking connectors at both ends  such as L6 20P to  locking C19  Spectra Logic part number 9594         Use a dedicated external ground wire  Spectra Logic part number  91017013  from the chassis screw lug to the building   s earth ground     Power Cord Specifications The power cords included with the library are  considered part of the library and are not intended for use with any other  equipment  The power cord must meet the specifications for the country  where the library will be installed    
27. ith EMC requirements  provide a shielded Category 5   10 100BaseT connection  data grade cable or a similar Category 5 cable    from an active Ethernet network to each camera     28       March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements Environmental Requirements       ENVIRONMENTAL REQUIREMENTS    The following sections list the general environmental specifications for the  library     Air Flow Air flows through the library from front to back  In data centers  using a hot aisle cold aisle layout  position the library so that the cold aisle  is in front of the library  cold air in   and the hot aisle is behind the library   hot air out      Air Quality Keep the location as free of airborne particulates as possible   To eliminate obvious sources of particulates  do not permit anyone to  smoke  eat  or drink near the storage area  and do not place the library near  a copier or printer that may emit toner and paper dust     Temperature  Humidity  and Altitude The library is equipped with  internal fans that operate as much as is necessary for the number of DBAs  installed  The fans keep the library   s internal temperature within  specifications as long as the data center environment is within  specifications  The following tables outlines the necessary data center and  storage area specifications        Operating Environmental Specification             Humidity 20  to 80   non condensing   Humidity gradient Less than 10  per hour  Am
28. ith remote library sessions           Host Access Provide one or two optical fiber cables from the arbitrated  loop or switched fabric  to Fibre Channel port s  on a RIM in each partition  to provide the hosts with access to the medium changer  Depending on the  wavelength  the cables must comply with the following specifications in  the Fibre Channel standard  FC PI 2        50 micron   400 M5 SN I classification    62 5 micron   400 M6 SN I classification    Tape Drive Access Provide one optical fiber cable from the arbitrated loop  or switched fabric  to a Fibre Channel port on each drive  to provide the  hosts with access to the drives  Depending on the wavelength  the cables  must comply with the following specifications in the Fibre Channel  standard  FC PI 2        50 micron   400 M5 SN I classification      62 5 micron   400 M6 SN I classification  not supported for LTO 6 or  TS11x0 technology drives     The following table can be used to determine the maximum length for an  M5 cable                                Data Rate   Link M5  OM2  cable M5E  OM3  cable   M5F  OM4  cable  Speed   1 Gbps 1640 ft  500 m  Not Specified Not Specified   2 Gbps 984 ft  300 m  Not Specified Not Specified   4 Gbps 492 ft  150 m  1247 ft  380 m  1312 ft  400 m    8 Gbps 164 ft  50 m  492 ft  150 m  623 ft  190 m           BlueScale Vision Camera Access One BlueScale Vision camera is included  with the main frame  Additional cameras can be installed in the expansion  frames  To comply w
29. iveGrade  BlackPearl   IntraCloud  nTier Verde  and Verde are trademarks of Spectra Logic Corporation  All  rights reserved worldwide  All other trademarks and registered trademarks are the  property of their respective owners           Part Number 90940015 Revision H  Revision  History Revision Date Description   A June 2006 Initial release    B September 2007 Added support for up to eight frames    C December 2008 Specification updates    D September 2009 New template  general cleanup    E May 2012 New template  corrections  and updates    F July 2012 Added bulk TAP    G April 2013 Added T950B    H March 2015 Updated trademarks and grounding  requirements    Notes    To make sure you have the most current version of this guide  check the Spectra Logic Technical Support portal at  support spectralogic com documentation user guides       To make sure you have the release notes for the most current  version of the BlueScale software  check the Spectra Logic  Technical Support portal at support spectralogic com   documentation release notes    March 2015 Site Preparation Guide   Spectra T950B Library       End User  License  Agreement    You have acquired a Spectra product that includes software owned or licensed by  Spectra Logic from one or more software licensors     Software Suppliers      Such  software products  as well as associated media  printed materials and    online    or  electronic documentation     SOFTWARE     are protected by copyright laws and  international c
30. kaging and unpack the  boxes containing the additional components     Side to side clearance  Pallet 11 ft  3 4m              Minimum ramp clearance    17 ft  5 2 m       Allow a minimum of approximately 17 ft  5 2 m  on the ramp side of the  pallet to unload the library and approximately 4 ft  1 2 m  on each side and  above the crate to remove the packaging        Allow a minimum of 12 ft by 12 ft  3 7 m by 3 7 m  of open space for  maneuvering the individual frames from their crates        Doorways    Doorways  including thresholds  must be taller than 6 7 ft  2 m  and wider than  4 ft  1 2 m         Stairwell width and  height    Stairwells must be taller than 7 5 ft  2 3 m  and wider than 4 ft  1 2 m         Stairwell and  hallway corners    Elevator width   height  and weight  limit       Tilting    A  Caution    Stairwell and hallway corners should be wider than 5 6 ft  1 7 m      Elevators and elevator doors should be taller than 7 5 ft  2 3 m  and wider than  4 ft  1 2 m   If using an elevator to move the crates  it must be able to  accommodate the size and weight of the crates  See Receiving and Storing the  Library on page 32 for details        Make sure that you do not tilt the frames from vertical while moving them           If you tilt the library  Spectra Logic is not responsible for any damage caused to the  library or its components  or for any damage caused to your site           34       March 2015    Site Preparation Guide   Spectra T950B Library       Chap
31. livery and installation schedule allows 24 hours for the library to  acclimate before installation        Unpacking and Moving the Library on page 33             Floors to be traversed can handle the weight of the crated frames              Transportation equipment     forklift  pallet jack  and or stair crawler    is available  and can handle the weight of the crated frames              Doorways  stairwells  hallways  and elevators allow the size of the crated library  without tilting        Elevators can handle the weight of the crated library        Space is available in the data center where the library is to be installed for the  crates and crate ramp  with extra space for maneuvering                          If the path  transportation equipment  or data center is not able to  accommodate the crates  contact Spectra Logic Professional Services in advance  of the installation date  See Contacting Spectra Logic on page 5        37       March 2015    Site Preparation Guide   Spectra T950B Library       
32. ly  recommended        Single Frame Library Figure 6 shows the total space required for a single   frame library  including the recommended access clearance     Note  All dimensions are rounded to the nearest tenth           The recommended service access  clearance on each side of the library  is 3 0 ft  0 9 m                                                               gt    a Frame depth Total depth  3 6 ft  1 1 m  with clearance    9 6 ft  2 9 m   Lo Yo  Library width p    2 6 ft  0 8 m   L                     a o o   Y    a Total width with clearance __  8 6 ft  2 6 m              Figure 6 Dimensions of a single frame T950  including recommended service  access clearance     19       March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements    Physical Requirements       Multi Frame T950 Library Figure 7 shows the total space required for an  eight frame library  including the recommended access clearance     Note  All dimensions are rounded to the nearest tenth              The recommended service access  clearance on each side of the library       is 3 0 ft  0 9 m            Total depth with clearance __  9 6 ft  3 0 m                 Mite          8 Frame library width       19 5 ft  5 9 m       Frame depth _ A  3 6 ft  1 1 m                    Total width with clearance          25 5 ft  7 8 m                 Figure 7 Dimensions of the eight frame T950  including recommended service access clearance     The following table shows t
33. mation     Use Figure 11 and the descriptions that follow to plan network  connectivity for the library installation              Cable access cutouts                                 BlueScale Vision  camera Ethernet port                      Robotics Interface  Module  RIM                                              El Fibre Channel  ports  RIM RIM2  Fibre Channel Fibre Channel Fibre Channel    connectors  2  connectors  2  connectors  2                                                                       LTO 5 or LTO 6 Drive LTO 4 Drive TS11x0 Technology  Drive  Pe Library Control i  Module  LCM  oa       Ethernet ports       Cable access cutouts                   Figure 11 Locations for network cable connections     27       March 2015 Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements    Network Cabling Requirements       A  Caution    Library Access Provide a Category 5  10 100BaseT connection  data grade  Ethernet cable that is compliant with EIA TIA 568 from an active Ethernet  network  This cable will be connected to an Ethernet port on the LCM for  remote access to the library   s BlueScale web interface and to allow for the  library to automatically email notifications to users and AutoSupport  tickets to Spectra Logic Technical Support  During installation  the library   s  connection is set up with the library   s IP address  subnet  proxy server  and  other IP configuration settings        Some port scanning software can interfere w
34. n be compensated for using the  levelers on each library frame     Space Requirements    Library Frames Placement    The bulk TAP  if present  must always be the left most frame as viewed  from the front of the library  The main frame must be positioned as the  left most frame or the frame immediately to the right of the bulk TAP  Up  to four drive expansion frames can be located immediately to the right of  the main frame  Media frames can be located to the right of the main frame  and any drive frames  A maximum of eight frames is allowed     18       March 2015    Site Preparation Guide   Spectra T950B Library    Chapter 2   Site Requirements Physical Requirements       Space Planning and Service Access Requirements    Recommended Clearance Providing 3 ft  0 9 m  of clearance on each side  of the library is highly recommended     T950B Minimum Clearance A minimum of 2 ft  0 6 m  of clearance is  required on the left and right ends of the library to provide service access  to the library  If data center equipment is on rolling racks and can be easily  moved to provide 2 ft  0 6 m  of clearance on each end of the library  then  having equipment adjacent to the ends of the library is acceptable  In  addition  a minimum of 2 ft  0 6 m  of clearance at the front and back of the  main frame  each drive expansion frame  and the bulk TAP frame is  required for airflow and for service and operator access        Providing 3 ft  0 9 m  of clearance on each side of the library is high
35. on    A  Caution    Data center floors may require reinforcement to hold the library   s weight   Check your site   s flooring for load bearing specifications           Spectra Logic is not responsible for damage caused to the library or its  surroundings if the floor is not adequately reinforced  Inadequate floor  reinforcement can allow the library to sag  causing misalignment of the frames and  robotic motion failures           Weight Distribution Plates If you would like to install the library ona  weight distributing plates  Spectra Logic recommends steel plates with the  minimum dimensions of 36 x 30 x 0 25 inches  91 4 x 76 2 x 0 6 cm   Plates  should be placed under the feet at the front and back of each frame  junction and under the outer feet of the right most and left most frames of  a multi frame library     Note  After determining the positions for the plates  attach them to the  floor to prevent them from moving as you roll the frames into place     Flooring Type The floor where the library is to be installed must be level  and  must be hard flooring  such as cement or tile   do not install the library on  carpeting  This requirement is particularly important when installing a multi   frame library  because all frames must be precisely aligned  Carpeting also  increases the risk of static discharge when operating the library           The library must be installed on a level  hard surfaced floor such as cement or tile        A small amount of floor unevenness ca
36. opyright treaties  as well as other intellectual property laws and treaties     If you do not agree to this end user license agreement  EULA   do not use the Spectra  product  instead  promptly contact Spectra Logic for instructions on return of the Spectra  product for a refund  Any use of the Software  including but not limited to use on the  Spectra product  will constitute your agreement to this EULA  or ratification of any  previous consent      Grant of License  The Software is licensed on a non exclusive basis  not sold  This EULA  grants you the following rights to the Software       You may use the Software only on the Spectra product       Not Fault Tolerant  The Software is not fault tolerant  Spectra Logic has independently  determined how to use the Software in the Spectra product  and suppliers have relied  upon Spectra Logic to conduct sufficient testing to determine that the Software is  suitable for such use       No Warranties for the SOFTWARE  The Software is provided    AS IS    and with all  faults  The entire risk as to satisfactory quality  performance  accuracy  and effort   including lack of negligence  is with you  Also  there is no warranty against  interference with your enjoyment of the Software or against infringement  If you have  received any warranties regarding the SOFTWARE  those warranties do not originate  from  and are not binding on Software suppliers       Note on Java Support  The Software may contain support for programs written in Ja
37. ou plan to install the library is an important part of  the installation and operation planning  Make sure that it has adequate  structural integrity to handle the weight and leveling requirements of the  library     Library frames are very heavy  see product specifications for details   Use extreme  caution and proper equipment when moving these  and ensure that your floor has  adequate structural integrity     16       Chapter 2   Site Requirements    Physical Requirements       Library Weight The following table shows the size and weight  specifications for the library frames and other components       All dimensions and weights are approximate        To calculate the approximate weight of a loaded library  calculate the  total weight for all of the frames and then add the weight for each drive   RIM  and power supply  plus the weight of each TeraPack magazine full    of cartridges        To calculate the dimensions of the entire library  total the dimensions  for each frame and add 1 625 inches to account for the outer cover  panels on each side of the library        When calculating space requirements  include the service access  requirements described in Space Requirements on page 18  below                             3D3T  876 Ib  397 kg        Parameter Main Frame Drive Expansion Media Bulk TAP Media  Frame Expansion Expansion  Frame Frame  Height    79 125 to 82 in   201 0 to 208 3 cm   Width    29 in   73 7 cm   Depth     43 25 in   109 9 cm   Weight a   T950 6DOT  
38. s from storage to their operating  location           A c    Keep all library and components crated while moving them to the data center  If  aution the data center is not able to accommodate the crates  contact Spectra Logic  Professional Services in advance of the installation date  See Contacting Spectra  Logic on page 5           Structural Integrity of Flooring    Ensure that all floors that will be traversed can withstand the weights of  the crated components shown in Receiving and Storing the Library on  page 32     Required Equipment    Ensure that any equipment used to move the library components can  transport the weights shown in Receiving and Storing the Library on  page 32     Level Surfaces A pallet jack or forklift is required to move the crates on a  level surface     Stairways A stair crawler or other special equipment must be used to  traverse stairways  A ramp can sometimes be used to traverse one or two  stairs     33       March 2015 Site Preparation Guide   Spectra T950B Library    Chapter 3   Preparing for Installation Unpacking and Moving the Library       Clearances    Before moving the library and components to where they will be installed   make sure that you have access to necessary doorways  stairways   hallways  and elevators  as well as adequate clearance to move through  them with the equipment     Note  All lengths are approximate        Clearance for       Requirement       Unpacking    Sufficient space to both remove the library from its pac
39. ter 3   Preparing for Installation Moving the Library After Installation       MOVING THE LIBRARY AFTER INSTALLATION    A Important    The library hardware is configured to ensure proper thermal control  air  flow  and dust filtering  After the library is installed  do not move the  library     Moving the library without assistance from a Spectra Certified Field Engineer will  void your service contract  Contact Spectra Logic Professional Services for  assistance if you need to relocate your library  see Contacting Spectra Logic on  page 5         Contact Spectra Logic Technical Support before making any changes to  your library hardware or performing any service operations     35       March 2015    Site Preparation Guide   Spectra T950B Library    Site Preparation Checklist       Use this checklist to ensure that all of the requirements have been met prior  to delivery of your library        Site Requirements       Data Center Flooring    on page 16             Flooring is hard  not carpeted  and capable of supporting the weight of the  library           Weight distribution plates have been installed  optional                     Space Requirements    Flooring is level     on page 18             Space is available for the library   s height  width  and depth        Space is available for service and operator access              Space is available for future growth  optional                     Cables can be routed to the library   s cable access areas           Power Requir
40. ts  components  The library is shipped in multiple boxes  one for each library  frame and others for the library components such as drives  controllers   RIMs   TeraPack magazines  and media  The boxes are shipped on pallets   The following table provides the approximate dimensions and weights of    the pallet and boxes used to ship the library                                Height Width Depth Weight      Crated Frame    7 2 ft  2 2 m  3 5 ft  1 1 m  4 6 ft  1 4 m  1 200 to 1 300 Ib   544 to 590 kg    Crated VAX Column       8 ft  2 1 m  2 6 ft  0 8 m  2 1 ft  0 6 m  200 lb  91 kg   Crated HAX Rail        2 frame 6 1 ft  1 9 m  2 3 ft  0 7 m  1 0 ft  0 3 m  110 Ib  50 kg     3 frame 7 7 ft  2 3 m  3 0 ft  0 9 m  1 4 ft  0 4 m  150 Ib  68 kg     5 frame 12 5 ft  3 8 m  1 8 ft  0 5 m  0 7 ft  0 2 m  120 Ib  54 kg     6 frame 15 0 ft  4 6 m  1 8 ft  0 5 m  1 1 ft  0 3 m  120 Ib  54 kg     8 frame    7 3 ft  2 2 m  2 0 ft  0 6 m  1 4 ft  0 4 m  85 Ib  39 kg   Component Pallet  f   1 8 to 5 0 ft 3 5 to 14 9 ft 1 8 to 5 0 ft 200 to 400 Ib    0 6 to 1 5 m   1 1 to 4 6 m   0 6 to 1 5 m   91 to 181 kg        mOoOAnNn TDW         The weight does not include drives  media  RIMs  transporter  or power supply modules      Each frame is shipped in a separate crate      Asingle frame library ships with the VAX column installed in the frame      Shipped in a palletized package rather than a crate      Assumes multiple components are shipped together on a single pallet  Components may also be
41. va   Java technology is not fault tolerant and is not designed  manufactured  or intended for  use of resale as online control equipment in hazardous environments requiring fail safe  performance  such as in the operation of nuclear facilities  aircraft navigation or  communications systems  air traffic control  direct life support machines  or weapons  systems  in which the failure of Java technology could lead directly to death  personal  injury  or severe physical or environmental damage       No Liability for Certain Damages  Except as prohibited by law  Software suppliers  shall have no liability for any indirect  special  consequential or incidental damages  arising from or in connection with the use or performance of the Software  This  limitation shall apply even if any remedy fails of its essential purpose  In no event shall  Software suppliers  individually  be liable for any amount in excess of U S  two hundred  fifty dollars  U S   250 00        Limitations on Reverse Engineering  Decompilation  and Disassembly  You may not  reverse engineer  decompile  or disassemble the Software  except and only to the extent  that such activity is expressly permitted by applicable law notwithstanding this  limitation       Software Transfer Allowed with Restrictions  You may permanently transfer rights  under this EULA only as part of a permanent sale or transfer of the Spectra product   and only if the recipient agrees to this EULA  If the Software is an upgrade  any transfer 
    