1.     as a  reminder  Click the primary mouse button at a location where you want to enter text  The mouse  pointer changes to a cross and any character you enter from the keyboard will be in the lower  right quadrant of this cross  You can position the cross and click again to adjust the location     Type    Runoff from Area  1     Be careful because errors can be corrected only by using the Erase  a rectangle tool     You may relocate the cross pointer and enter other items of text     Press either the Escape or End key to restore the    writing hand    mouse pointer  At this stage  only  the Enter Text Mode and the Font items are enabled in the Edit menu  This allows you to alter  the style and colour of text     To finish entering text  click on the checked menu item Enter Text Mode to return to the normal  mouse icon and re enable the menu items     
2.   Continue with the automatic processing to use the Combine and Confluence commands  This yields an  inflow to Pipe  2     5  with a peak of 0 895 c m sec  You can see from record 276 in the Control Panel  that the pipe capacity is 0 564 c m sec  so this pipe is surcharged as well  If the capacity had been  greater than the inflow from Junction node 2 you would have had to check if any fraction of the major  system flow from reach  4   2  could have been captured by the minor system at this point     The process of separating the major and minor flow hydrographs is repeated here  You should do the  following     e Run the Pipe command from the input database and accept the surcharged design  e Revert to Manual mode by pressing the  MANUAL  command button in the Control Panel      e Use the Diversion design to generate the hydrograph file DIVO0002 HYD with a peak of 0 331  c m sec  Note that you will need to specify a node number of    2    instead of accepting the default  of    1        e Select the Hydrograph Next Link command to make the inflow to the pipe equal to the pipe  capacity of 0 564 c m sec     e Use the Automatic Run Miduss Mdb command to resume automatic processing     e Run the Route command and when prompted to do so  press the  Yes  button to copy the Inflow  to the Outflow at node 5  The peak outflow is equal to the pipe capacity of 0 564 c m sec     e Complete the automatic processing by pressing the  EDIT  button to execute the    EXIT     command This cl
3.   The Graph window will be empty and the tabular form will have an extra row added with all the 36  cells having a value of    0 00        S STORM COMMAND      blaszs Curve    Rainfall depth 4r oaa mam    Duration 180 minutes i  Display    ff Check to set raintall to zero  Cancel    Accept       Figure 11 25     The Historic tab of the Storms window with 21 values entered     Defining the Historic Storm     The Historic table is initially blank  unless you deliberately wanted to copy the previous storm intensities   and the first cell should have a slightly heavier gray outline  If it does not show this  click on it with the  mouse ponier     You can now start typing in the intensities shown in Table 11 3  As soon as you type a number  even the  first    1     you will notice that the first bar of the storm hyetograph is plotted and the Rainfall depth in the  Storm window is updated  As each cell value is entered  use the Right arrow key on the keyboard to    282 Chapter 11     A Detailed Example    advance the active cell  When you are at the right end of a row  pressing the Right arrow will    wrap     around to the first cell of the next row     Figures 11 26 And 11 27 show the Table and Graph respectively at a point where 21 values have been  entered  At this point the total rainfall depth is 47 833 mm as shown in Figures 11 25 and 11 26        a  Historic     OF x   Total depth 47 533 mm Maximum 36 000 mmhr Insert   Delete          o hoo jso feon feso 30 0 jaso Jano faso
4.  Use the Show Graph command to create one or more graphs to print out     Setting up the Necessary Files    After MIDUSS 98 has started and you have selected Metric units  you should define a new output file  called    C  MyJobs Temp out     Next  generate a new input data base    Miduss Mdb    by selecting the  File Open Input File command using the previous output file    C  MyJobs Chap11B out        Once the database has been created  use the Automatic Edit Miduss Mdb Database to review the  commands  Assume that you want to display a figure showing all three runoff hydrographs from areas 1   3 and 4 together with a plot of the historic storm hyetograph     e Using the  Next  command button on the Edit Panel  move the arrow indicating the active record  to record  65  immediately after the Catchment 3 command  Using the mouse pointer  click with  the primary mouse button on or in front of the Command 40 in column 2  If the    40    is  highlighted  type in     40    in column 2 of the    HYDROGRAPH Add Runoff    command  If the value  is not highlighted simply type          negative  in front of the    40        e Repeat the process at record  132  immediately after the    Catchment 4    command     e Repeat the process again at record  214  after the    Catchment 1    command  Note that this is  the largest of the three runoff peaks with a value of 1 154 c m sec     You can now close the Edit Panel by clicking the  Close  command button  You are now ready to start  the se
5.  action of replacing the previous extension     005hyd    with the new file extension     100hyd        Continuing with the New Storm    The Control Panel should now show the next record   25  as the start of the Catchment command for  area 3  Click on the  EDIT  button to cause the results of this command to be displayed  The peak flow  is now 0 46 c m s  Click on  Accept  and then on  EDIT  to execute the Add Runoff command  Click on  the  OK  button and again on  EDIT  to run the Channel Design command  The depth in the channel has  increased from 0 308 m to 0 458 m     Continue in this way to Route the flow through the channel  add the runoff from area 4 and check the  design of the pipe from node 4 to Junction node 2  When the Pipe Design form is displayed a message  is also shown warning you that the pipe is surcharged  see Figure 11 29   Click on the  Yes  button to  accept this design and return to the Pipe Design window  Then use the  Accept  command button to  close the form     I Fipe Surcharged Ea    Curent peak inflow of 0 796 cm sec  is greater than pipe capacity of O22 cm sec   Hydraulic grade line  HGL  is 3 4272  le this design acceptable        Figure 11 29     A Warning of surcharge in Pipe 4 2     284 Chapter 11     A Detailed Example    Separating the Major System Flow    At this point you must split the Inflow hydrograph into two components   e A minor system fraction which does not exceed the capture capacity of the pipe  and    e Amajor system fraction
6.  adjusted to suit the maximum flow rate which was 1 154 c m sec for catchment  1     e Select the menu item Scale Plot Rainfall on    and click on Top Axis if this is not already the  default     e Select Scale Lower fraction 0 650   A small window opens prompting you to enter the desired  lower fraction of the plotting area on which the hydrographs will be plotted  Change the default  of 0 65 by typing in 0 75     e Select Scale Maximum flow 0 500 c m sec and type in a peak flow rate of 1 2 in the text box     When you have set the Scale factors the Scale menu should be as shown in Figure 11 39       Graph Styles Help    Maxinum time  360 0 minutes  basimum Flow  1 2 cm sec  Maxinium Fain  125 0 mmhr  Plot Rainfall on Top asis  Lower fraction  0  7500    sa ete Eire  Oli    w Turn Cross Hairs Off       Figure 11 39     Setting the Scale factors    Chapter 11     A Detailed Example 293    Select and click on the menu command Plot Select Hydrograph    Runoff  The menu items  Plot View Selected Item and Plot Draw Selected Item are enabled and modified to read  Plot View Runoff hydrograph and Plot Display Runoff Hydrograph respectively and the mouse  pointer is positioned between them  Move the mouse pointer down to highlight the   Display Runoff Hydrograph item  Click on it to draw the first hydrograph with a small text legend to  show the peak value of 0 460     Adding the Rainfall Hyetographs    To add the storm hyetograph  select the menu command Plot Select Rainfall    Stor
7.  assumptions     The crest elevation corresponds to 80  of the maximum depth   The coefficient of discharge is 0 9   The weir breadth is estimated to pass the peak inflow with a  critical depth  breadth  ratio of 0 2     The side slopes are vertical   w OUTFLOW Control Data Min x     E WEIRS Crest WEI Crest Left Right  elevation   coefficient   breadth eee neon    107 60 0 90 1 70    Compute   Cancel   HEP    Figure 11 13     Defining a Weir for the Outflow Control       Change the side slopes to 1H 1V  i e  45    but leave the other parameters unchanged in the meantime as  shown in Figure 11 13  Press the  Compute  button  As shown in Figure 11 14  the column of  discharges is updated for elevations above 101 6  Press  Accept  to close the data form        Level Discharge  Yolume   al    Figure 11 14     The H Q V grid after defining a Weir     You can plot a graph of the storage and or discharge characteristics by selecting the Plot V  Q   f H   menu item  You can enlarge the plot  Figure 11 15  by dragging the corners of the graph window  The  highly non linear nature of the blue  stage discharge curve is clear  You may notice a small convex  segment of the orifice discharge curve below an elevation of 100 2 which is caused by the orifice  operating as a circular weir     274 Chapter 11     A Detailed Example       a  Pond data graph     OF x           Figure 11 15     Plot of the functions V  Q   f H      Refining the Pond Design    You can now press the  Route  button to
8.  do this     either intentionally or in error     a  warning message is displayed     Adding the Other Hydrographs to the Plot    Once the Graph window has been iconized you can press  RUN  on the Control Panel once again  There  are a few steps associated with the surcharged pipe which require you to confirm the action but  processing is otherwise automatic until the runoff from area  4 has been calculated     Use the Show Graph command to re open the Graph window  From the graph menu select the Runoff  hydrograph with the Plot Select Hydrograph Runoff command and add it to the plot with the  Plot Draw Runoff Hydrograph command     294    Chapter 11     A Detailed Example    You can repeat the process to     Iconize the Graph window   Run the input database to compute the runoff from area  1  Re open the Graph window   Select the third runoff hydrograph  and   Add it to the plot     You should now have a plot showing three hydrographs and three hyetographs     Adding Explanatory Text    Before printing it you should add some text to identify the area from which each hydrograph is generated   The following steps describe the process      1      2     Use the Edit Erase a rectangle command to draw a space  i e  erasing a portion of a grid line  to  the right of  Say  the value of 1 154 on the hydrograph from area  1  You may clear similar  rectangles to the right of the other two values     Select the Edit Enter Text Mode command  The mouse pointer changes to a    writing hand
9.  drop down list     W Edit Panel  Of x    Next Command   M  4  MIDUSS 98 Dutput     all COMMANDS    Next   Previous   Close      All Records   Al COMMANDS  All HYDROLOGY  Time Parameters       Description  TIME PARAMETERS  STORM Chicago storm    Storms CATCHMENT 3  Catchments Hy DAROUGRAPH 4dd Runoff  Lag  amp  Route CHANNEL DESIGN    Basetlow ROUTE Channel Route     C  8S  40  O HYDROGRAFH Nest link   Py 32  33  CATCHMENT 4   E 128 40  sO HYDROGRAPH Add Runoff   Py 131  51  PIPE DESIGN     140  S  OO  ROUTE Pipe Route   ho  6152  40   O  HYDROGRAPH Combine 2   C 189  40  OQ  HYDROGRAPH Start  New Tributary    ee 162  33 O CATCHMENT 1  4       Figure 11 23     Displaying a sub set of the Database in the Edit Panel    Starting the Automatic Run    Select and click on the Automatic Run Miduss Mdb menu item to start the run  The Control Panel  shown in Figure 11 24 Is displayed in the lower right of the screen  In its default size it displays only 9  records at a time but you can increase the height of the window by dragging on the top or bottom edge of  the form     When initially displayed  only the first 3 records have been read and the current record     indicated by the  right arrow in the left margin of the grid     is about to read the units used  Note that if you have specified  the wrong type of units for this input file  MIDUSS 98 will change the units for this design session to  match these used when the previous run was made     W  Control Panel Bie ES    Se ee EDIT 
10.  for a description  Type a brief description such  as    Node 2     junction of links 1 and 4     The textbox will expand to accommodate a second line        After entering a description  press  Add  to add this to the List of Junction Nodes  The   Add  button has been enabled  Click on it to cause the node number and description to appear  in columns 1 and 3 of the multiple list box  The middle column shows a value of 0 000  This will  be updated to hold the current peak value of the accumulated flows at the junction  If the  description is longer that the width of the descriptor column  a horizontal scroll bar is added to  column 3 of the list box        Click on a node in    Junction Nodes Available    to highlight the node to which the current  Outflow will be added  When you click anywhere on the desired row  the entire row is  highlighted and the  Combine  button is enabled                2 0    Chapter 11     A Detailed Example    w COMBINE  Number of Junction Nodes i  Node   Description    Node 2   junction of links 1 and    dunchon Me    Cancel    Node 2   junction of links 1    Fomine    Accept    p       Figure 11 9     Final display of the Combine dialogue form     Press  Combine  to add the current Outflow to the selected node  Click on the  Combine   button  MIDUSS 98 shows a warning message to advise you that a new file HYD00002 JNC  will be created in the currently defined Job directory  Press the  Yes  button to confirm this  The   No  option is provided in c
11.  hydrographs is shown in Figure 11 16     Results  Peak outflow 0 298 C  msec    Maximum level 101 753 metre    MHasimum storage 646 5 c m    Centroidal lag Th 56 minutes    Figure 11 16     Results of the Pond Route operation     Chapter 11     A Detailed Example 275    A Inflow  amp  Outflow hydrograph    mintes  n  l 0 2008  Otho 2578    i   i     i  I              I     L  I    10 20 30 40 50   l 7  0 90 100 110 120 130 140   gt  15 23 35 4 35 65 73 85 95 105 113 125 133    Plat duration Ki i pian        Figure 11 17     Graphical display of Pond Inflow and Outflow    Press the  Accept  button to close the Pond Design forms  Since this is the only Pond design in this  project  you can leave unchecked the box labelled    Keep all Design Data     You can review the iterations  during this design in the Design log  If you want to keep a record of this you can use the  Design Design Log Print Total Log File or Design   Current Design Log menu items to print a  hardcopy of the Design Log     Saving the Inflow Hydrograph File     As it is possible that you may want to revise the pond design when you subject it to the historic storm  it  might be useful to save the pond inflow file before continuing  Select the Hydrograph File I O command  to open the File Input Output dialogue window  Perform the following steps  working in a clockwise  fashion around the form     Confirm the File Operation as    Write to    or    Save a file    by selecting the lower radio button     Set the T
12.  json    155 0       Figure 11 26     The Historic Storm table after 21 intensities have been entered     w Rainfall Miel x       minutes  Ramntall    dd         100 120 140  1  0   0 F0 20  110 130 150 170       Figure 11 27     The Rainfall Graph after 21 intensities have been entered     After entry of the Historic storm is complete  the total rainfall depth should be 99 167 mm  Press  Accept   to close all three forms  The Storm Descriptor window is opened and contains the value of    005    used for  the minor storm  If not already highlighted  click on this text box to highlight the value and replace it with     100     When you press the  Accept  key  MIDUSS 98 displays the message shown in Figure 11 28     Chapter 11     A Detailed Example 283    Storm Descriptor x   ooo Hydrograph files created during this session will have  fle names of the form   lt  ourFilenarne  1 00hyd       Cz  uui When nning in Automatic mode hydrograph files with the    previous extension   lt 005hpd  e g  Outflow 23 005hyd  Ac will be changed to   lt 100hyd gt e g  Outflow 23 1 00hyd       Press  OF  to accept this  or  Cancel  to change the extension    Cancel            Figure 11 28     The result of changing the Storm Descriptor     The change in file extension means that if any hydrograph files are created they may have the same  name and share the same directory as previous hydrograph files but are distinguished by a unique file  extension  Click on the  OK  button to accept the default
13.  open another row in the data table by  clicking again on the up arrow of the spin button  The computed area is just over 1000 sq m but the   aspect ratio is only 1 4  To get the aspect ratio at elevation 102 0 to be 2 1 you must increase the aspect  ratio at elevation 100 0  To do this click on the cell containing the aspect ratio of 2 0 in the first row  The    272 Chapter 11     A Detailed Example    outline of the cell is slightly thicker when it is selected  Type in a value     say 3 5  The effect is not shown  until you select another cell either by clicking on one or by using one of the arrow keys on the keyboard   With 3 5 at the bottom elevation  the aspect ratio at level 102 0 is 1 84     STORAGE Geometry Data    a LAYER  Bottom   Aspect   Bottom Top Average  area ratio   elevation   elevation   sideslope   E 33 4 000 100 00 102 00 4 000   4 A  10200 102 00 4 000       Compute   Cancel   ACCEPT      Figure 11 11     Defining the pond geometry as a single layer     By trial you will find that an aspect ratio of 4 1 at the pond bottom will yield a ratio of just under 2 1 at the  top  The surface area at level 102 0 is 1093 sq m  This design is shown in Figure 11 11  Press the   Compute  button again to refresh the column of volumes and enable the  Accept  button on the data  form  Click the  Accept  button to close the data form  It can be re opened and edited later if you wish   Note that it is more usual to have a number of    layers    with different side slopes bu
14.  over 8  mm  These changes are consistent with a less pervious soil type  When the initial abstraction is    reduced still further to 7 5 mm  the only change you will see is a slight reduction of the ratio Ja S from the  default of 0 1 to 0 0935     Now select the Impervious tab  note the area and flow length and leave the slope at 1 5   Enter the    three parameters from Table 11 2  As with the Pervious parameters  you will see the ratio Ja S increase  when you type in an initial abstraction of 2 0 mm     266 Chapter 11     A Detailed Example    w  Runoff Hydrograph      OR      Total volume 479 30 c m Maximum Flow 0 189 c m sec 50 0 minutes A        o0 hoo fiso feao jeso faon jasa jaoo faso  son a  E       50  0000 0 000 0 000 0 000 0 000 0 000 0 002 0 014 0 099   550 0 153 0 081 0 070 0 064 0 064 0 065 0 062 0 060 0 057 0 054  105 0  0 051 0 048 0 044 0 041 0 037 0 033 0 028 0 025 0 022 0 019  155 0 0 018 0 016 0 015 0 014 0 013 0 012 0 012 0 011 0 010 0 009  205 0 0 009 0 008 0 007 0 007 0 006 0 005 0 005 0 005 0 004 0 004  255 0  0 003 0 003 0 003 0 002 0 002 0 002 0 002 0 001 0 001 0 001       Figure 11 4     Table of the Runoff hydrograph for Area 3    Finally  select the Catchment tab again and press the  Display  button  The rainfall hyetographs are  displayed briefly followed by the graphs of runoff from the pervious  impervious and total areas  The  peak flow of 0 189 c m s is mainly from the impervious fraction  Press the  Show Details  button to  display the tabl
15.  see how the pond performs  From the Pond Design form it is  clear that the design is very conservative  The peak outflow is only 0 129 c m s     well below the target  outflow of 0 3 c m s and the storage volume is too large at 857 c m  The weir is overtopped by only a  very small head  101 614     101 6 or 14 mm  and only for about 15 minutes     Of the various ways in which the outflow could be increased  reducing the land area required for the pond  will probably yield the greatest cost saving  Select the Storage Geometry Rectangular pond menu item  to re open the Storage Geometry Data form again  Reduce the base area to 150 sq m and click on  another cell to see the result  The surface area is reduced to under 900 sq m  Press  Compute  to  update the    Volumes    column and then press  Route  again  The peak outflow increases to 0 233 c m s   the volume is reduced to 725 c m  and the head over the weir increases to 0 115 m     Try reducing the base area still further     say to 115 sq m  The surface area is reduced to 800 sq m   the  maximum storage is 647 c m   which is within 10  of the initial estimate  and the peak outflow is still just  under 0 3 c m s  A fragment of the Pond Design form is shown in Figure 11 15  From the Outflow  hydrograph Table  you may notice a small error in the volume continuity as the pond outflow hydrograph  is longer than the maximum hydrograph length so that the tail of the recession limb is truncated  The  graph of the Inflow and Outflow
16.  that is rejected by the minor system and which will flow on the surface      typically on the street     You can do this by introducing a diversion device that simulates one or more catchbasins at the  upstream end of the pipe  The following steps summarize the process      1  Revert into Manual mode for steps  2  and  3  noted below  You may find this is not always  necessary but it is included here for completeness      2  Design a diversion structure that will split the inflow hydrograph into two components  The  outflow should have a peak equal to the capacity of the pipe and the remainder will flow on the  major system     typically the street      3  Make the Outflow from the diversion the Inflow to the pipe      4  Return to Automatic mode and execute the next command that will Route the captured flow  through the pipe to node 2      5  Continue in Automatic mode     Figure 11_ 30 illustrates the technique of substituting a diversion structure plus a pipe when the pipe is  surcharged  At a later stage you can recover the diverted hydrograph and check the capacity of the road  system to convey this flow  The procedure is described in more detail in the topics which follow     aie    Inflow 4        Major system flow  DIV00004 HYD         4a     Inflow 4a     Diversion  device  CB      gt Q         gt     Figure 11_30     Separating major and minor flow at a surcharged pipe     Design of a Diversion Device     After you have accepted the surcharged pipe design the next 
17.  the Input Database    Before running the Input Database  it is worth taking a moment to review the file Miduss Mdb  Obviously   this is an essential first step if you want to edit any of the command parameters or even just make one of  the commands negative to force a continuous run to stop and revert to manual mode  Select the  Automatic Edit Miduss Mdb Database command  The window shown in Figure 11 22 Is displayed   The Edit Panel controls let you navigate through the file to verify or change data     a  Edit Panel  Next Command   M  4  MIDUSS 98 Dutput    fai COMMANDS    Next   Previous   Close      All Records   Al COMMANDS  All GY DROLOGY    TIME PARAMETERS   Wie eercetcie STORM Chicago storm  Storms CATCHMENT 3  Catchments H    DAROGRAPH Add Runoff  Lag  amp  Route CHANNEL DESIGN  Basetlow ROUTE Channel Route         40  sO HYD ROGRAPH Nest link   O  82  33  CATCHMENT 4   O  128  40  sO HYDROGRAPH Add Runoff   Py  131  5  CO PIPE DESIGN   C  40  m  ROUTE Pipe Route   C  q  40   OHYOROGRAFH Combine 2  hy  6189  40   O  HYDROGRAPH Start  New Tributary      162  33 OLCATCHMENT 1       Description       4    Figure 11 22     Reviewing the Input Database     280 Chapter 11     A Detailed Example    To provide an overview of the session  you can also review a subset of the records by clicking on the  down arrow and selecting a particular type of command  Figure 11 23 shows only the command lines for  the total database  This was done by clicking on    All COMMANDS    on the
18.  the remainder of this chapter and can be  summarized as follows     e Run MIDUSS 98 and define a new output file     e Use the previous output file to create an Input Database called Miduss Mdb that resides in the  MIDUSS 98 directory     e Run MIDUSS 98 in Automatic mode using the database as input     e Step through the database in EDIT mode to allow you to modify the design parameters as  desired     e When the previous Chicago hyetograph is displayed  reject this and replace it with a historic  storm     e Continue with the design  making any adjustments that you may feel are appropriate  These  may include some refinement of the Pond design and separation of major and minor flow  components if a pipe is surcharged under the more severe storm     e Complete the run and compare peak outflows for the two events     First Steps    When you launch MIDUSS 98 and define the units  you will see a message prompting you to define an  output file and reminding you of the last output file used  When the File Output file Create New file  opens  reject this and move the mouse pointer to select instead the File Open Input File command     Two windows will open  One window titled    Create Miduss Mdb    is immediately overlain in part by an     Open    file dialogue window that will show the previously selected Job Directory and the previous output  file as the defaults  You can select any output files available but in this case you will convert the contents  of the previous output fil
19.  the sum of the runoff volumes from the two catchment areas  You can confirm  this by using the Show Output File command  or by pressing Ctrl O  which lets you browse through the  output file to recall the details from each of the two Catchment commands  You can also see that the  time of concentration of the impervious runoff differs by almost 2 minutes  Because the hydrographs are  very    peaky    this causes the total peak  0 256  to be over 35  smaller than the sum of the two  constituent runoff hydrographs  0 189   0 216   0 405 c m s      Designing a Pipe    You can now use the Design Pipe command to size the pipe leading to junction node 2  The Pipe  window shows the peak inflow and a table of diameter gradient pairs that would carry this flow when  running full  Double click on the row containing the 525 mm diameter  The gradient is rounded up to  0 4  and pressing  Design  shows that this design will run just over   full with an average velocity of  1 43 m s  Figure 11 8 shows this result  You can  of course  experiment with different designs or  different roughness values until you have an acceptable design  Press  Accept  to close the window     Chapter 11     A Detailed Example 269    PIPE DESIGN  Current peak Flow           0256 cm sec  Digmater Gradert  Velocity a     Manning  r TEN  mete f  msec    Diameter 0525 metre  Gradient fo 4 z   Design PUPEPPES ULES EPEC ALLEL LLLLLOCLLLLLLLELLLLLLECL EEL LELLL LLL LELLLELLLELEL  Depth of iow 0405 melre    Pipe capacit
20. 68 c m  Diverted filename DM OO004  1 00hyd    Description Enter description here       Figure 11_31   The initial state of the Diversion Command window     Figures 11 31 and 11 32 show the result of the Diversion operation  Before closing the form with the   Accept  button you should enter a description such as    Major flow hydrograph at Node 4     In Figure 11   32 the Outflow hydrograph exhibits a plateau or constant value because 100  of the excess inflow is  diverted  If the diverted fraction is less than 1 0 the    plateau    will show some increase above the  threshold flow rate     W  Inflow  Outflow  amp  Exfiltration hydrograph    20 120  160 200  140 220    Plot duration al      360  minutes       Figure 11 32     Graphical display of the Diversion operation     The outflow from the diversion can now be converted to the inflow to the pipe by using the  Hydrograph Next Link command  The result is seen in the Peak flow summary table of Figure 11 33     286 Chapter 11     A Detailed Example          W PEAK FLOWS  11  IOJ   No Command  Punoi inflow  Outflow  unction a    T  Catchment 4 0 399 0 452 0 452 0 000  o Add Aunott 0 399 0 796 0 452 0 000  3   Pipe Design 0 399 0 796 0 452 0 000  10 Diversion 4 0 395 0 796 Ue 0 000  11 Next link            All       Figure 11 33     Peak flows summary after the Diversion    Continuing in Automatic Mode    You can now resume the automatic processing of the commands in the Input database file  Select the  Automatic Run Miduss Md
21. Chapter 11     A Detailed Example 261    Chapter 11   A Detailed Example    This chapter presents a simple example that makes use of many of the commands presented in earlier  chapters  For brevity  the size of network is very small but the techniques illustrated will be found  adequate for the design of drainage systems of significant size  You may find it useful to work through  this example on your computer while reading this chapter     Two design sessions will be described  The first is in manual mode and will design the system for a 5   year storm  The second session in automatic mode will test the design under the action of a more severe  storm  A final section describes how to use the Show Graph command to plot 2 or more hyetographs  and or hydrographs     The MIDUSS 98 CD contains a folder called    Tutorials    which holds a number of audio visual lessons on  the basic operations in MIDUSS 98  Most of these lessons have been based on the examples presented  in this chapter  If you have a sound card on your computer you will find it useful to view these lessons  while you are reviewing this chapter  The lessons can be run directly from the CD or they can be invoked  from the Help Tutorials menu item     A Manual Design for the 5 year Storm    Catchment 1    Catchment 3    ond    Gare a  Pipe 350m a Pipe 400m O  A    Figure 11 1     A four link drainage network             Figure 11 1 shows a network comprising 5 nodes and 4 links  Link  3 is intended to be an open ch
22. Design  button is pressed again   The depth is increased to 0 308 m and the critical depth is just over half that  so the flow is tranquil or  sub critical  Figure 11 6 shows a fragment of the Channel Design window  Press the  Accept  button to  close the form  The peak flows in the summary table are unchanged but another record is added for    Chapter 11     A Detailed Example 267    information     Basewidth  0 60 Sete  Left bank slope  3 00 Hy    Right bank slope 400 H  1    Channel depth li OO metre  Gradient  0 25 A    Design  Depth of flow 0 308 metre  Channel capacity 2 910 C  m sec          Velocity 0 404 rr Sec  Critical depth U 164 metre       Figure 11 6     A fragment of the Channel Design form     If you have enabled the Options Other Options Show Next logical menu item  the mouse pointer will  automatically point to the Design Route command  Click on this to open the Route window  The default  length  initially 500 m  is highlighted and you can type in the actual reach length of 300 m  This will  cause the values of the X factor and K lag to be reduced which means reduced attenuation of the outflow  hydrograph     Press the  Route  button to show the graphical comparison of the inflow and outflow and also the tabular  display of the outflow hydrograph  The peak is reduced from 0 189 c m s to 0 160 c m s and lagged by 5  minutes  Since the hydrographs are plotted at 5 minute increments  very    peaky    hydrographs may  sometimes show some truncation of the outfl
23. SKIP BACK  MANUAL CLOSE    Hext Comani eae A D atal ACi    Nd   Cmd  value  Description s  m       Figure 11 24     The Control Panel for using Automatic Mode     Chapter 11     A Detailed Example 281    The default command button is  RUN  which processes the commands sequentially and continuously  without giving you a chance to change or even monitor the results  In this automatic run you will use the   EDIT  button to pause after each command to display the result and give you a chance to modify the  parameters     Click on  EDIT   MIDUSS 98 displays the Time Parameters and the mouse pointer is automatically  positioned on the  Accept  button of the form  The maximum storm duration is 180 minutes  which is  enough for the historic storm  Click  Accept  to close the form     Change the Storm Event    After you have accepted the time parameters  the mouse pointer is relocated over the  EDIT  button on  the Control Panel and the next record  number 14  is seen to be the Storm command  Click on  EDIT  to  show the Storm window with the 2 hour Chicago hyetograph     To change the storm the first step is to click on the Historic tab on the Storms form to display the data for  the Historic storm  You should     e Check the box labelled    Check to set rainfall to zero     and  e Increase the duration from 120 to 180 minutes  e Click on the  Display  command button     The Historic tab should be similar to Figure 11 25 below  with the exception that the Rainfall depth will be  zero
24. annel   links  4 and  2 are to be pipes and link  1 is to be a detention storage pond  The sub catchments which  generate overland flow enter the system at nodes  1    3  and  4  and have the characteristics  summarized in Table 11 1     262 Chapter 11     A Detailed Example    Table 11 1    Catchment data for the network of Figure 11 1    Percent impervious 65    Area  ha     2 0    Manning    n     The impervious fractions in the three contributing sub  catchments are assumed to have roughness and    imperviousness values as indicated in Table 11 2  The runoff from these catchment areas is to be  computed using the SCS infiltration method and the triangular unit hydrograph method for overland flow        Table 11 2  Characteristics of impervious areas  Catchment number 1 3 4    SCS CN or Runoff coeff  C       Design Storms    The drainage system is to be designed for a 5 year design storm of the Chicago hyetograph type and  tested under a more severe historic storm  The 5 year synthetic storm is to be based on the intensity   duration frequency relation shown in equation  11 1   with a value or r   0 35 anda storm duration of 2  hours     ie g es ee     tu  b   6        The historic storm is defined by the table of rainfall intensities in mm hour at 5 minute intervals as shown  in Table 11 3  The total duration is 3 hours     Chapter 11     A Detailed Example 263    Table 11 3    Historic storm hyetograph in mm hour for 5 minute intervals     E  20 24 38       Setting the I
25. arameters you may see a prompt that you can now define  a storm and on closing the message box the Storm command is opened automatically and the mouse  pointer is moved over it     These two prompting features can be toggled off or on in the Options Other Options menu  If you open  this menu you can see whether or not the options Show Prompt messages after each step and   Show Next logical menu item are checked  For the first few design sessions  you may find it useful to  use both options  After some experience with the program you may decide to omit the Prompt  messages     Click the Storm command to open the Storm window  Using the Chicago tab of the form  enter the  parameters given in equation  11 1  above and press  Display   The hyetograph is displayed in graphical  and tabular form     Chapter 11     A Detailed Example 265    W Chicago storm  Ol      Total depth 39 230 mm   asimum 152 102 mmr B0 minutes A  Interisity        o hoo fiso feno jaso faon faso aoo  45 0  50 0    50  420 482 567 669 881 12 24 19 89 48 92    550 132 59 21 46 15 84 12 50 10 31 6 77 7 63 6 76 607 5 51  105 0 5 04 4 66 432 4 04       Figure 11 2     Table of the Chicago rainfall hyetograph    The resulting hyetograph is shown Figure 11 2  The peak intensity is 152 1 mm hour at 45 minutes   After you press the  Accept  button the storm descriptor window is opened as shown in Figure 11 3  The  default string of    005    is for a 5 year storm  This is acceptable for the design storm so click on  A
26. ase you have made an error  When you press  Yes  the value of  0 242 is entered in the middle column of the list box as shown in Figure 11 9  Also  another  message is displayed showing the operation and the node number in the title bar  the name of  the file created and the peak flow and volume of the accumulated hydrograph  This is a modal  form and you must click on the  OK  button to continue     Click  OK  and press  Accept  to finish the Combine operation  Press the  Accept  button  that is now enabled  The Combine form is closed and the peak flow summary table is updated  with another record showing the Combine operation  the node number and the updated peak  flow of the Junction hydrograph as shown in Figure 11 10 below  Note that the height of the  Peak Flows table has been increased by dragging the top edge of the window upwards     w PEAK FLOWS  11  Mel x     Chicago storm 0 000  Catchment 3 0 169  Add Runatt 0 1859  Channel Design 0 159  Channel Route 0 1859  Hest link  0 1859  Catchment 4 0 216  Add Runoff 0 216  Pipe Design 0 216  Fipe Route 0 216  Combine 2 0 216       A  4  4  5  B  H  E  4             Figure 11 10     Peak flow summary for branch  3   4   2     Chapter 11     A Detailed Example 271    Adding Catchment Area 1    Before the new tributary branch from node 1 to junction node 2 can be designed  you must clear out the  Inflow hydrograph left over from the analysis of the previous branch  You can do this by clicking on the  Hydrograph Start New Trib
27. ay wish to refine the design of the pond still further in a  separate design session  so it would be useful to save the Inflow for the historic storm as well  Should  this not be required you could easily avoid processing this command by pressing the  SKIP  button   However  assume that this is not the case     When the Hydrograph Filel O command is executed from the Input database  a message is displayed  as shown in Figure 11 35     Filename Change       Extension of hydrograph file read from input database  pondinflow 005hyd  will be changed to the current extension  lt 100hyd gt      New file name willbe  pordinflow 100hyd    Press  res  to accept this new fle name  or    Nol to edit the name yourself in the File 1 0 form  cr  Cancel  to restore the orginal name        Figure 11 35     MIDUSS 98 automatically changes the file extension     MIDUSS 98 recognizes that the hydrograph file extension has been changed for the historic storm and  gives you the choice to accept the modified filename  keep the original name  most unlikely   or enter a  special filename     Click on the  Yes  button to accept the change in the file extension  The File Input Output window  remains open to allow you to edit the description should you wish to do so  Add to the previous    288 Chapter 11     A Detailed Example    description so that it now reads    Inflow to Pond from area  1 for the Historic storm     Finally  press the   Accept  button to close the form     Designing the Final Pipe   
28. b command  The Control Panel will re open at the point where it was  interrupted  Although the pipe flow has been reduced to the full pipe capacity  flood routing is not  physically possible  MIDUSS 98 displays a warning message that gives you the choice to simply copy  the Inflow to the Outflow  i e  with neither attenuation nor lag  or cancel the route operation to re design  the pipe  Click on the  Yes  button to choose the first option     You can continue with the automatic processing  using the  EDIT  command to store the outflow from the  pipe at junction node 2  start the new tributary at node 1 and compute the runoff from area 1  The flow  entering the pond now has a peak of 1 154 c m sec  The peak flow is 16  greater than previously but   at 4176 c m the volume is almost three times larger  It is likely  therefore  that the outflow control can be  left unchanged but the storage will have to be increased by using more area     Refining the pond Design     When the Pond design is executed in automatic mode the concern expressed in the previous topic is  confirmed by MIDUSS 98 with a warning message in the Pond window to the effect that the upper limit of  either the discharge or storage is too small to route the increased hydrograph  The storage routing  function  Q   2S At  involves both discharge and storage volume and the design could be adjusted by  either increasing one or the other or both  Assume that you will provide more storage since the Pond  Design form sh
29. ccept    This means that any hydrograph files saved during the session will have a default extension of    OO5hyd        wW STORM DESCRIPTOR kl E4  Supply up to 5 characters to serve as a  pos Cancel    file descriptor for hydrograph files created   In this session     Figure 11 3     Defining the storm descriptor       Runoff Analysis    The simulation and design does not need to follow the sequence of node numbers  You should first  design the channel and pipe conveying the runoff from areas 3 and 4 to the junction node 2     Now that a design storm has been defined the Catchment command is enabled in the Hydrology menu   Click the Hydrology Catchment command to open the 3 tab Catchment form  On the Catchment tab   enter the first 5 items of data given in Table 11 1 for area 3  On the same part of the form select the  Triangular SCS response as the routing method and select the Equal Lengths option which assumes that  the overland flow lengths on the pervious and impervious fractions are equal     Select the Pervious tab  The area and flow length are shown and cannot be changed but the slope of  1 5  could be changed if necessary  For this example leave it at 1 5      Select the SCS method as the infiltration method and fill in the remaining three parameters from Table  9 1 to define the Manning    n     SCS Curve Number and Initial Abstraction depth Ja  As you enter a CN of  76 you will see the runoff coefficient increase to 0 223 and the initial abstraction reduce to just
30. cond run in automatic mode     A Second Automatic Run    Select the Automatic Run Miduss Mdb menu command to open the Control Panel  This time  instead  of using the  EDIT  button  click on the  RUN  command button  Depending on the speed of the  computer  you may see some of the detail as the commands are processed in sequence  When  MIDUSS 98 encounters the negative command number it does three things     292 Chapter 11     A Detailed Example    e The negative command number is restored to the same positive value   e The automatic mode reverts to the  EDIT  mode instead of the continuous  RUN  mode     e MIDUSS 98 displays a message advising you what has been done as shown in Figure 11 38     Negative Command encountered    40  Command hat been set as positive again and  MIDUSS 9S has reverted to Edit A  utomatic mode        Figure 11 38     Message displayed when MIDUSS 98 encounters a negative command number     Plotting a Hyetograph and Hydrograph    You may prefer to revert to Manual mode by clicking on the  MANUAL  button on the Control Panel but  this is not necessary     Select the Show Graph menu command  A blank plotting form is displayed  approximately full screen  size for 640 x 480 screen resolution  together with a special menu  Assume that you want to plot the  hydrograph on the bottom edge and the inverted storm hyetograph on the top edge of the form   Remember that you will want to plot two other hydrographs on this diagram so the vertical scaling should  be
31. e    Chap11 out    to a database file called Miduss Mdb which will be the Input for  this second run     When you click on the  Open  command button the dialogue box closes and you will probably see a  standard warning message advising you that a file called Miduss Mdb already exists in the Miduss98  folder  Click on the  Yes  button to proceed  After a few seconds processing the    Create Miduss Mdb     window  see Figure 11 21  will show the source data file  the number of commands processed and the  number of records in the data file  If the path of the source file is too long for the form you can re size it  by dragging on the right edge  Close the form by clicking on the  FINISH  button that is now enabled     Chapter 11     A Detailed Example 279       a  Create Miduss Mdb Min    Source Output file  CNM Wwhobs  Chap 1  out   Command  processed   22   Records processed  290       Source Output fle C  hMalobs Chap7 1  out  has been successtully processed and  database Miduss Mdb has been created        Figure 11 21     Creating an Input Database from an Output file     Finally  in order to enable items on the main menu  you must use the File Output file Create New file  command once again to specify a new filename  If you are quite certain that you will not need the old  output file you can use the same filename again and ignore the warning that the current contents will be  lost  For this example  use a different filename such as    C  MyJobs Chap11B out        Reviewing
32. e shown in Figure 11 5  The pervious fraction contributes more than half the volume of  runoff  The table of runoff flows  Figure 11 4  shows zero runoff for the first 30 minutes  this is due to the  relatively high initial abstraction of 7 5 mm which is apparent if you click on the Pervious tab and press   Display         Figure 11 5     Details of the Runoff from Area 3     The contribution of area 3 to the drainage network is completed by pressing the  Accept  button to end  the Catchment command  Then use the Hydrograph Add Runoff command which causes the  summary peak flow table to show a peak of 0 189 c m s in the Inflow  see Figure 11 10      Designing the Channel    When you click on the Design Channel command the form opens with the default trapezoidal  parameters of 3H 1V side slopes  a base width of 0 6 m and a roughness of n   0 04  With the default  design of 1 0m depth with a slope of 0 5   clicking on the  Design  button shows a depth of 0 262 m  If  you want to review alternate designs you can click on the  Depth Grade Velocity  button to display a table  of feasible values of depth and gradient  Velocity is also shown for information  You can    import    any of  these designs by double clicking on the appropriate row of the grid  The gradient is rounded up to the  nearest 0 05      Flatten the channel grade to 0 25   Notice that any change to the design parameters causes the plot of  water surface to be deleted and the  Accept  button is disabled until the  
33. eration Type of File Show graph    f  Read or Open a file C Rainfall Hyetograph z  C    Write to or Save a file f Flow Hydrograph Ehow table    Copy a file into a rainfall or hydrograph array v     div00004 100hyd  5 c   C B00T     Flow Hydrograph      C Runoftt  dvO0002  1 0  hyd i Into    Outflow    Event Hydrograph    100hyd   C Temporary    Description Major syst  flow at node 4 oe    E dit  Masmum Fow 0 524 cm sec  Time Step 5 00 minutes Cancel  Humber of values 300 6 698 11 31 40 PM       Figure 11 36     Use the File Input Output command to recover the Diverted flow hydrograph    Click on the    Inflow    Flow hydrograph radio button to import the hydrograph in file    divO0004 100hyd  into  the Inflow  The hydrograph has a peak of 0 524 c m sec  a volume of 1501 c m and an effective duration  of only 85 minutes     Defining a Road Cross section as a Channel    You can check the capacity of the major system by defining a channel cross section which approximates  a typical urban road cross section     Select the Design Channel command to open the Channel Design window  Before sketching the cross   section  set the horizontal and vertical scales  in the top right corner of the form  to contain a width of 20  m and a depth of 1 0 m     You can sketch the shape approximately by watching the coordinates of the mouse pointer  Use 7 or 8  points to define boulevard slopes of around 2 5   curb heights of 0 15 m and a road crossfall of 2  over  a road width of 10 m between curb
34. he  File Print Miduss Window menu command to make a hard copy of any of the screens  However  you  will quite likely require a customized plot of one or more hydrographs  together with a storm hyetograph   In addition  you may need to compare data from different design sessions     such as pre  and post   development hydrographs     or add information to illustrate a point  This section will illustrate how you  can do this for the design which you have just completed using the Show Graph menu command     To do this you will run MIDUSS 98 a third time using the second output file in automatic mode  The  object is to produce a diagram to show the three runoff hydrographs from areas 1  3 and 4 together with  hyetographs of storm rainfall and effective rainfall on the impervious and pervious fractions respectively      This design session will use the previous output file to generate an input database and write the results to  a temporary file in the same Job directory  The procedure is described in the topics that follow  These  can be summarized as follows     e Run MIDUSS 98 and define a new output file  Use the previous output file to create an Input  Database called Miduss Mdb that resides in the Miduss98 directory     e Run MIDUSS 98 in Automatic mode using the database as input     e Set one or more points in the input database where you want to carry out some manual  operations     e Run MIDUSS 98 in automatic mode using the  RUN  command button in the Control Panel     e
35. he two hydrographs you can use the Hydrograph Add Runoff command  This is one of the  situation in which MIDUSS 98 will issue a warning that perhaps you should have used the  Hydrograph Start New Tributary command  However  you can press  Yes  to force the addition in this  case     The total major system flow is 0 845 c m sec with a volume of 2230 c m     A Second Channel Command    When you use the Design Channel command to check the road section capacity from node  2  to the  outlet  it appears as though the previous cross section has been lost  However  when you check the     Define arbitrary cross section    box  the data is restored  Pressing the  Design  button shows that for the  same roughness and gradient  the maximum depth is increased only slightly from 0 131 m to 0 161 m     As with the previous routing operation  no significant attenuation occurs between node  2  and the outlet  at node  5   Then  using the Hydrograph Combine command to add the outflow of the major system to  the minor flow  you will obtain a total outflow peak of 1 414 c m sec with a volume of 7724 c m     This concludes the design session  A copy of the output file    Chap11B out    is provided in the      Samples  sub directory     Chapter 11     A Detailed Example 291    Generating a Custom Plot    Once the design has been completed you may want to generate one or more figures for inclusion in the  report  During both the manual and automatic design sessions you have the opportunity to use t
36. hyd       Description    Inflow  bo pond hom area  1     bl arinmum fow 0 990 c misec  Time Step 5 00 minutes  Humber of vwalsss 30             Figure 11 18     The File I O form is used to save the Pond inflow     Adding Flow from the Two Branches     When the Pond Design form was closed  the peak flows summary table was updated with a new record  showing the value of 0 298 in the Outflow column  If you assume that the outflow from the pond is close  to the junction node 2  you can add the pond outflow to the junction by using the Hydrograph Combine  command again     The process is simpler this time as the junction node has been created  Follow the directions in the  yellow box as before to     Click on the row describing Node 2 to highlight it  This enables the  Combine  button     Click the  Combine  button to update the peak of the total junction hydrograph to 0 534 c m s   MIDUSS 98 displays a message to confirm the junction file name  the peak flow and the total volume     Click  OK  and then  Accept  to close the form     Designing the Last Pipe    The final step in the design is to recover the accumulated flow from the Junction node 2 and design a  pipe to carry this flow over the last 400 m reach     To recover the hydrograph at Junction node 2 select the Hydrograph Confluence command  Notice  that in the Hydrograph menu  the Hydrograph Combine command is disabled because a new Outflow  hydrograph has not been created since the last use of Combine  This is to protec
37. l an acceptable output filename has been selected  or defined     The name of the output file will be displayed at the right hand end of the status bar  If you want this  display to include the full path of the file  you can do this by selecting the Options Other Options item  from the menu and click on the item Include Path on Status Bar  If you have used the suggested name   you should see the path    C  MyJobs Chap11 out    at the right end of the status bar      Define the Time Parameters    The third required step is to define the time parameters  Click on the Hydrology item in the main menu   Only the Time parameters item is enabled at this stage  Click on the command to open the Time  Parameters dialogue box  The three items to be defined and their default values are     Time Step 5 minutes  Maximum Storm length 180 minutes  Maximum Hydrograph 1500   minutes    These are acceptable for the current example although you may prefer to reduce the hydrograph length  to  say  1000 minutes  However  too short a hydrograph length may result in truncation of a long outflow  hydrograph from a detention pond that will result in continuity errors in hydrograph volume  For other  projects you can change these default values easily by clicking on a value to highlight it and then type in  the desired value     Specifying the Design Storm    In the Hydrology menu the Hydrology Storm item is enabled only after the time parameters have been  defined and accepted  On accepting the time p
38. m and click on it   The bottom item on the Plot menu changes to Draw Storm Hyetograph  Click on it to draw the storm  rainfall inverted on the top edge of the window  with values of intensity shown on the right hand vertical  axis  If you want to estimate the value of intensity at any point with greater accuracy  you can move the  mouse pointer with the primary button held down to display the cross hairs  In this mode the title bar of  the GRAPH window displays the coordinates of the mouse pointer expressed in the units of the most  recently plotted object  Figure 11 40 shows a fragment of the window with this feature after plotting the  storm hyetograph  In the title bar  X is the time in minutes and Y is the intensity in mm hr        Figure 11 40     Using the cross hairs to interrogate the storm hyetograph     If you want to add the effective rainfall hyetographs for the impervious and pervious fractions you can do  this easily by repeating the process for these items  Note that since each plotted item overlays the  previous one s  you must draw the filled bar graphs in this order in order to see all of them     In order to continue with the automatic run  you should use the File Minimize Form command to reduce  the window to an icon  Later  you can use the Show Graph menu command to restore it without loss of  data  Note that you cannot return to the main menu  with the File Main Menu command  without losing  all of the data that has been plotted so far  Should you try to
39. ng with a table of the modified hydrograph     Adding the Next Catchment    When you select the Hydrology Catchment command to generate the runoff from area 4  the default  values reflect the values entered for the previous catchment area  From the data in Tables 11 1 and  11 2 the parameters for the pervious and impervious fractions are unchanged and only the first 5  parameters on the Catchment tab need to be changed  You may find it convenient to enter the top item  first  the ID number  and then press the Tab key on the keyboard to move down and highlight the next  item     The increased impervious fraction and steeper slope more than compensates for the smaller area and  peak runoff is 0 216 c m s  Pressing  Show Details  reveals that the volume is just under 400 c m and  that more than 60  of this is generated from the impervious fraction  You should also notice from the  graph and from the time of concentration shown in the details  that the time to peak is different for the  pervious and impervious fractions  As a result  the total flow peak of 0 216 is significantly less than the  sum of the two individual peaks  0 037   0 209   0 246      Press  Accept  to close the Catchment form and select the Hydrograph Add Runoff command to add  the runoff to the current inflow  A total peak flow of 0 256 c m s is shown in the peak flow summary grid   see Figure 11 10   You may also note from the table of the new inflow hydrograph that the total volume  of 878 46 c m is equal to
40. nitial Parameters    Three steps are required at the start of a MIDUSS 98 design session  These define   e The system of units to be used  e The name of an output file to be used  and  e The time step parameters for modelling     These are detailed in the steps which follow and are also described in Chapter 2     Structure and Scope  of the Main Menu     Selecting the Units    When you launch MIDUSS 98 the Options Units menu item is opened automatically and the mouse  pointer is moved over the Metric or Imperial choices  This is to force you to select from either Metric  S I    or Imperial  U S  Customary  units  In this example metric units are used  Note that your choice can be  changed up to the point where the time parameters are selected  After that  you cannot alter the  selection for the session     When you click on your choice  MIDUSS 98 displays a prompt suggesting that the next step should be  define an output file for the session  For your convenience  the directory and name of the last used  output file is displayed  You can close these message boxes either by clicking with the mouse pointer on  the  OK  button or simply by tapping the space bar or any other printing key on the keyboard     Specifying an Output File    When you accept the units  the menu item File Output file Create New file is opened automatically and  the mouse pointer is positioned over this item  A job specific output file is not a requirement but it is  strongly recommended  If you don   t s
41. oses the Input database     e Click on the  CLOSE  button to close the Control Panel     Checking the Major System Flow     The remainder of the design can be completed in Manual mode  This involves the following steps   Save the pipe outflow at node  5  with the Combine command     Recover the major system flow in the surface link from node  4  to  2       1    2    3  Check the capacity of a typical road profile assuming a road grade of 0 5     4  Route this over some fraction of the reach length     say half of the length of 350 m    5  Add the routed flow to the surface flow from file DIVO0002 HYD    6     Check the total major system flow on the road cross section from the junction node  2  to  the Outlet node  5       7  Add the minor and major flows at node  5      Before starting on the major system analysis  select the Hydrograph Combine command and accumulate  the outflow from the pipe at node  5   The total volume of the minor flow is 5494 c m  with a peak of 0 564  c m sec     Chapter 11     A Detailed Example 289    Defining the Road Cross Section    Select the Hydrograph Filel O command and in the    File Operation    frame click on the    Read or open a  File    radio button  Next  navigate to your job directory by double clicking on Drive C  and then double  click on directory    MyJobs     Select the File type of    Event Hydrograph    100hyd      You should see the  File Input Output window as shown in Figure 11 36          FILE INPUT OUTPUT Ei Ed    File op
42. ow  Press  Accept  to close the form  Another record is  added to the peak flow summary table showing the peak inflow and outflow        N ROUTE AAS  Pam conduit     Peak Inflow 0 169 em sec  Tye TEE T lhc   Reach length  300 mete  Channeldepth 1 000 mete   Xfactor  lt   0 5 0 311  Gradient O20  amp   Kag 278 2 seconds  Manning  n  0 040   Peak Outflow 0 160 cm sec   Depth of flow 0 308 metre    7 Specify values for X and K  Flow capacity   Gfull cmc     Using 2 reaches of length 150 0 metre    Using 1 limesteps of duration 300 0       Figure 11 7     Final result of the Route command    268 Chapter 11     A Detailed Example    Moving Downstream    When an outflow hydrograph is computed you can do one of two things     1  If this is the last link on a tributary you should probably use the Hydrograph Combine command to  store the outflow at the junction node  adding it to any previous outflows which may have been  accumulated previously     2  lf this is not the last link in the tributary  you should use the Hydrograph Next Link command to  convert the computed outflow from the present link into the inflow to the next node and link  downstream     In this example  the second case is true and we want to add the runoff from area 4 and design the pipe  to carry the total flow to the junction at node 2  Press the Hydrograph Next Link menu item and note  the change in the peak flow summary table  With most of the Hydrograph     commands a brief  explanatory message is displayed alo
43. ows that a required volume of over 2000 c m  is necessary to reduce the outflow to less  than 0 6 c m sec     Click on the Storage Geometry Rectangular pond menu item to re open the data table  Previously   only one layer covering the total depth of 2 0 m was used  Make the changes shown in Figure 11 34   This introduces a 15 m wide step in the side slope at a level of 101 2  This greatly increases the land  area required  from 1094 to 2745 sq m  but more than doubles the maximum volume from 1238 c m  to  2516 c m     Chapter 11     A Detailed Example 287       Sa STORAGE Geometry Data    mi LAYER  Bottom   4spect  Bottom Top   Average  area   ratio   elevation   elevation   sideslope  Laver 1 115 00 4 000 100 00 107 20  4 000  Laver 24645 2 075 101 20 107 35 100 00    Laver 2744 8 1 356 101 35 102 00 4 000    Compute   Cancel   ACCEPT         Figure 11 34     Providing extra storage capacity in the pond     The stage discharge curve remains unchanged but the increase in storage is sufficient to enable routing  to be completed with a peak outflow of 0 623 c m sec and maximum storage of almost 2200 c m  You  can experiment further with changes to both geometry and discharge control  but for this example you  should accept this design and continue with the automatic design session     Completing the Automatic Design Session    If you check the next record in the Control Panel you will see that this was the point at which the 5 year  Inflow to the pond was saved as a file  You m
44. pecify one  all output will be written to a default file in the Miduss98  directory     This is a good point at which to specify a special sub directory for the project that will contain all of the  relevant files  When you click on the Create New file or Open existing file menu items  a file dialogue  box is displayed  If you want to create a new directory for this project  click on the    Create New Folder     icon  A new directory with the temporary name    New Folder    is displayed ready for editing  Type in an  appropriate name  for this example use a directory called    MyJobs    in drive    C        Hint  You may have to  click anywhere on the    white space    of the dialogue box to get Windows95 to recognize your new folder  name      264 Chapter 11     A Detailed Example    Double click on the new directory or folder to open it  You can then type the name of the required output  file in the File name text box  For this example  use a filename    Chap11 out    or another of your choice     When you click on the  Open  command button  the file dialogue box closes and a message is displayed   Typically  if a new file has been specified  MIDUSS 98 will ask you to confirm that you want to create this  file  If you select an existing file as the output file  the message will warn you that if you continue  the  existing contents of the file will be lost  Close the message box by clicking either  Yes  or  No   If you  press  No  the Open file dialogue box is re opened unti
45. press  Accept  to continue        Figure 11 20     The information message following use of the Confluence command     The Final Pipe Design    You can now select the Design Pipe command and design a pipe to carry the peak flow of 0 534 c m s   Assuming the default value of n   0 013  a 675 mm diameter at 0 5  will carry the peak flow with a depth  of 0 5 m  Note  however  that the critical depth is only slightly less than the uniform flow depth  This  implies a Froude number close to 1 0 which is close to the condition of easy wave formation  You may  prefer to flatten the slope slightly to  say  0 45      278 Chapter 11     A Detailed Example    Finally  using the Route command again yields an Outflow peak flow of 0 530 c m s with almost  negligible attenuation and lag     This finishes the design for the 5 year storm  You can now end the session by selecting the File Exit  command  Before closing down MIDUSS 98 reminds you of the name of the output file  A copy of the  file    Chap11 out    is provided for your information in sub directory C      Miduss98 Samples      An Automatic Design for a Historic Storm    When the design for the 5 year storm has been completed  you can check how this drainage system will  respond to the more extreme event described by the historic storm defined in Table 11 3  You can use  the Automatic mode to do this without having to re enter all of the commands and data from the  keyboard     The procedure is described in the topics that follow in
46. s  Remember to use the secondary mouse button to define the last  point     You can refine the coordinates by clicking on one of the X or Y coordinate cells and typing an accurate  value  You can move the active cell by means of the left and right arrow keys  A trial section is shown in  Figure 11 37  Note that the  Design  command is not enabled until you press the  OK  button to indicate    290 Chapter 11     A Detailed Example    that editing of the cross section coordinates has been completed      A CHANNEL DESIGN    cmsec Depth   Grade   Vel    Use the lett mouse button to mark poms and  ihe ght route bulbon fee the last pari  Egi  ihe table of coordinates bo madly the  cross section Prass  OK  to accept                                  D 11  120  u3  02 U5  458 4 58 00  wid  D10  0 15  4360  43 60 0 13       Figure 11 37     Sketching the road cross section for the major flow     To complete the design you must specify a value for Manning s    n    and a longitudinal road gradient  Try n    0 02 and a grade of 0 5   The final design is shown in the figure     You can use the Design Route command to get the Outflow from the major system at node  2   An  average reach length of  say  175 m would be reasonable but in practice  the attenuation is negligible     At junction node  2  the added contribution to the major flow can be obtained by using the  Hydrograph Next Link command and then importing the file    divO0002 100hyd    into the Runoff flow  hydrograph     To add t
47. se an orifice and an overflow  broad crested weir with a trapezoidal  shape     e The ground available is roughly rectangular in plan with an aspect ratio of 2 1     Click on the Design Pond command to open the Pond form  The form shows the current peak inflow  and the hydrograph volume of 1410 c m  The default peak outflow is 0 495 c m s and for this a storage  volume of approximately 439 c m is required  Edit the Target outflow by typing a value of 0 3 c m s  The  required volume is increased to 590 c m     Enter the minimum and maximum levels as 100 0 and 102 0 m  leave the number of stages as 21 which  implies 20 depth increments  This will cause the Level     Discharge     Volume table to show levels  increasing by 0 1 m  Before you can route the inflow hydrograph through the pond  you must define two  characteristics of the proposed pond     The storage geometry  and    The outflow control device     Defining the Pond Storage Geometry    Select the Storage Geometry Rectangular pond menu  This causes the Storage Geometry Data  window to be opened   Click once on the up arrow of the spin button to open up a single row in the table   This shows default data which will generate the required volume in a depth of roughly 2 3 of the  maximum depth of 2 0 m  You can test this by pressing the  Compute  button on the Geometry Data  form  The column of volumes is computed with a maximum value of almost 1150 c m     To check the size and shape of the surface area at elevation 102 0
48. t only one layer is used  at this stage for simplicity  MIDUSS 98 lets you define up to 10 layers     Defining the Outflow Control Device     To define the outflow control device select the menu item Outflow Control Orifices  A similar data entry  form is displayed  Click on the spin button to open a row to define an orifice  The default values  suggested by MIDUSS 98 are based on the following assumptions     The invert of the orifice will be at the bottom of the pond   The coefficient of discharge is 0 63  and    The suggested diameter is sized to discharge 25  of the target outflow with a head equal to 1 3 of the  maximum depth     The suggested values for the orifice are shown in Figure 11 12  Press the  Compute  button to fill in the  column of discharge as a function of water elevation  and then press  Accept  to close the data form     w OUTFLOW Control Data     OF x     E ORIFICES  Orifice  Orifice   Orifice  Number of  Invert   coefficient   diameter  orifices    Orifice 1  100 00 0 63 0 21 1 00       Compute   Cancel   eer          Figure 11 12     Defining an Orifice for the Outflow Control    Chapter 11     A Detailed Example 273    The outflow control should have a weir to pass the higher flows     particularly for the more severe historic  storm  Select the Outflow Control Weirs menu item to open a data form for the weir specification   When you open a data row by clicking on the spin button  the default data is displayed  These data are  based on certain simple
49. t you from making the  error of combining the same outflow twice     The Confluence dialogue form in Figure 11 19 is similar in appearance to the Combine form  The  New   and  Add  buttons are disabled as they have no relevance for the Confluence operation  The 3 column  list box shows the currently active junction nodes     Chapter 11     A Detailed Example 277    w  CONFLUENCE  Humber of Junction Nodes i Hew    Add    Junction Hodes Available    Cancel    Confluence    ALLE          Figure 11 19     Recovering the hydrograph at Junction node 2     Click on the row describing Node 2 to highlight it  This enables the  Confluence  button  Pressing   Confluence  causes a message box to be displayed as shown in Figure 11 20  This reports the file that  has been deleted  In fact  the file is not deleted but is renamed with the extension   JNK  You may  therefore recover the file by renaming it prior to the end of the session at which point it will be erased   Also reported is the peak flow and volume of the new Inflow hydrograph  Notice that if the current Inflow  hydrograph has not been used  MIDUSS98 will provide a warning message that you will lose some data if  you continue with the Confluence command     Confluence 2 E3    File  Co MytobsSHyDO0002 JAC   has been deleted and the junction flow   has been placed in the Inflow hydrograph   Modified Inflow   Peak flow rate 0 534 c rv sec   Total volume feos  2 C M   The Junction hydroagraph has been set to zero     Click OF  and 
50. two commands should be executed in  Manual mode  Click on the  MANUAL  command on the Control Panel to close it and revert to Manual  mode     Click on the Design Diversion command  In the top two rows  the form displays the peak flow of the  current Inflow hydrograph and the type and capacity of the last conduit  The node number is copied from  the last Catchment area  This may not always be appropriate and you may want to edit this  In this  example it is correct because the runoff from area 4 enters at node 4  When used following the design of  a surcharged pipe  the Diversion sets the threshold flow equal to the pipe capacity and assumes that the  diverted fraction is 1 0     i e  100  of the excess flow is diverted to the hydrograph file DIVO0004 HYD     Chapter 11     A Detailed Example 285    You may prefer to set the diverted fraction to a value less than 1 0 to allow for the increased carrying  capacity of the pipe under surcharged conditions  i e  when the hydraulic grade line is steeper than the  pipe gradient  Also  if the catchbasins are fitted with inflow control devices  ICDs  you may set the  threshold to a value less than the pipe capacity     w DIVERSION  Current peak inflow 0 796 c m Sec    Fipe capacity Ue  c m Sec    Node number  4 c m sec Design    Overflow threshold Tri  yvertlow thresho  0 272 C MEEL ea    Computed peak outflow 0 272 cm sec    Required diverted fraction    000 Accept    Peak of diverted flow 0 524 cm sec  Volume of diverted flow 1501 2
51. utary menu item  You can use this command either before or after  generating the runoff from catchment area 1     The next logical command is the Hydrology Catchment command  Because the parameter values are  different for both the pervious and impervious fractions you will have to edit the data on all three tabs of  the Catchment form  The impervious fraction is defined in terms of a runoff coefficient of 0 95 which  for  the currently defined storm  is equivalent to a Curve Number of 99 43     The resulting peak runoff is 0 990 c m s with the peak occurring 50 minutes after the start of rainfall  This  peak flow will be routed through a detention pond before adding the runoff to Junction node 2  After  pressing the  Accept  key  use the Hydrograph Add Runoff command to add it to the Inflow hydrograph   If you have forgotten to set the Inflow to zero  MIDUSS 98 warns you that you may be double counting  the inflow hydrograph from the previous branch  However  there may be situations where a new tributary  runoff should be added to the previous inflow  so you must make the decision as to whether the warning  is legitimate or not     Design the Pond    For this example assume that the following criteria will guide the design of the pond   e The pond will be a dry pond with no permanent storage   e The outflow peak should be approximately 0 3 c m s for the 5 year storm   e The maximum depth should be 2 0 m  with a top water elevation of 102 0 m     e Outflow control will compri
52. y 0272 msec    Velocity 1 429 E miret    Critical depth    Figure 11 8     Final result of the Pipe Design command    When you press the Design Route command  the form opens with the length of 300 m previously used  for the channel  Change the highlighted value to 350 m and click on the  Route  button  The outflow  hydrograph table reports a peak flow of 0 242 c m s which represents 5  attenuation  This is a little high  for a pipe  and the reason is apparent if you look at the graph  Click on the horizontal scroll bar to reduce  the plotted time base to about 120 minutes  The inflow hydrograph has a double peak     due to the  difference in time to peak from areas 3 and 4     and the outflow hydrograph tends to average out these  peaks despite the fact that the routing time step was only 2 5 minutes  However  the volume of outflow is  still correct     Defining a Junction Node    You must now siore this outflow hydrograph at junction node 2 while you design the highly impervious  area 1 and a detention pond  Use the Hydrograph Combine command to open the Combine dialogue  window  Since this is the first use of the command the form contains no data  The procedure can be  followed fairly easily by responding to the prompts in the yellow box  Thus     o Press  New  and enter the number and description of a new node  When you press the   New  button a text box is opened to define the Junction node number  Type    2     As soon as a  node number is entered  another text box opens
53. ype of File as a Flow Hydrograph by selecting the lower radio button  This causes the Flow  Hydrograph frame to be displayed     Select the desired Flow Hydrograph by clicking on the    Inflow    radio button   In the Drive and Directory list boxes  navigate to your Job directory  In the Hydrograph type drop down list box  select the    Event Hydrograph    005hyd        The file name box shows the default   005hyd     Edit this to  say     PondInflow 005hyd      Hint  click on the  default name to highlight it  press the    Home    key on the keyboard to position the text entry marker in front  of the asterisk  type the desired name and finally delete the asterisk      Press the  View  command button to display the Graph and or the table  This is necessary to enable the   Accept  button     Press  Accept   Some default text    Enter a description       is highlighted  Type in a description of at least  20 characters  about half the width of the text box  e g     Inflow to pond from area  1        Press  Accept  again to close the form     276 Chapter 11     A Detailed Example       A FILE INPUT OUTPUT      File operation Type of File Show graph                 Read of Open a hile        Rainfall Hyetograph a      White to or Save a file    Flow Hydrograph Ahon table  White contents of ramtall hyetograph or hydrograph to a file ie  pondinflow  005hyd     Sc  CBO0T     Flow Hydrograph        C Runoff  Se myob    i inio    C Qubtlow       Temporary        Event Hydrogragh    005
    
Download Pdf Manuals
 
 
    