Home

Pergola Room Kit (Costco Canada)

image

Contents

1. Model Name Model Number Box Labels Date Purchase Purchased From A A MM DD YY How would you rate this product for quality O Excellent O Very Good O Average O Below Average O Poor How would you rate this product for ease of assembly O Excellent O Very Good O Average O Below Average O Poor How would you rate our instructions O Excellent O Very Good O Average O Below Average O Poor How would you rate the quality of packaging O Excellent O Very Good O Average O Below Average O Poor Would you recommend the purchase of our products to friends and family O Yes ONo Comments MAILTO amp Yardistry c o Solowave Design IST 375 Sligo Road W Mount Forest Ontario Canada NOG 2L0 Yardistry would like to say Thank You for your time and feedback Attention Customer Service REVISION 10 18 11 CUT ALONG LINE
2. 6 1 B Repeat Step A three more times so you have four assemblies Note that two of the Beam Ends should be on the same side as the cut out and two should be on 060 Beam the opposite side fig 6 1 and 6 2 Fig 6 2 Two Beam Ends attached on cut out side 10 x 4 Wood Screws XY 192 Beam End 34 1 4 A E 069 Beam End 10 1 2 Wood Parts Hardware 4 x 192 Beam End 34 1 4 FSC 38 1 x 139 7 x 870 mm 2 x 6 x 34 1 4 12 x 10 x 4 Wood Screw 4 x 069 Beam End 10 1 2 FSC 38 1 x 139 7 x 266 7 mm 2 x 6 x 10 1 2 20 support yardistrystructures com Step 7 Attach Beams to Corner Post Assemblies It is important the proper hardware gets placed in the places shown You instal Fig 7 1 AseomBly Flat Washer the Wafer Bolt first and then the screws kanel Rosi 1 4 x 4 114 Wafer Bolt A Attach one Beam End assembly from 069 Beam Step 6 to each Corner Post assembly with the cut out side facing out using one 1 4 x 4 1 4 Wafer Bolt with 5 16 flat washer and 1 4 connector nut Cut out Note Beams should be flush to top of posts 1 4 x 3 3 4 Wafer Bolt Flat Washer Beam End Fig 7 2 Assembly 068 Beam 81 1 2 Beam End Assembly B Fit one 068 Beam 81 1 2 in between two Corner Post Assemblies and attach to Beam End assemblies and Panel Post as shown in fig 7 1 and 7 2 with one 1 4 x 3 3 4 Wafer Bolt with 5 16 flat washer and 1 4 con
3. 6 x 20 3 4 8 x 8 x 2 1 2 Wood Screw 23 support yardistrystructures com Step 10 Assemble Trellis Ends A Ona flat and level surface fit together one 062 Trellis End 33 1 2 and one 061 Trellis End 110 1 2 fig 10 1 B Place one Trellis Clip over the joined ends and attach with one 1 4 x 2 Wafer Bolt with 1 4 lock nut fig 10 2 C Repeat Steps A and B until there are 9 Trellis End Assemblies ide enp 061 Trellis End 110 1 2 062 Trellis End 33 1 2 Trellis Clip 1 4 x 2 061 Trellis Wafer Bolt gt End 110 1 2 Wood Parts Hardware 9 x 062 Trellis End 33 1 2 FSC 38 1 x 63 5 x 850 9 mm 2 x 3 x 33 1 2 9 x Trellis Clip 9 x 061 Trellis End 110 1 2 FSC 38 1 x 63 5 x 850 9 mm 2 x 3 x 110 1 2 9 x 1 4 x 2 Wafer Bolt 1 4 lock nut 24 support yardistrystructures com Step 11 Attach Trellis End Assemblies Part 1 A Measure 59 1 4 from the inside of each Beam 81 1 2 and place one Trellis End Assembly on the Arch Beam Offsets and Arch Beam Fronts This should be centred and both ends should hang 9 3 4 over the edges fig 11 1 and 11 4 B Attach with three 10 x 4 Wood Screws in the places indicated in fig 11 1 and 11 2 C Attach Trellis Clip to Arch Beam Offset with two 10 x 1 1 4 Pan Screws as shown in fig 11 1 and 11 3 10 x 4 Wood Screw Fig 11 1 Arch Beam Fig 11 2 EL j Ki a U pal VA
4. Arch Gussets Part 1 Note The bevelled ends on each Arch Gusset should always face away from the wood it is attaching to A At two corners of the assembly attach one 193 Arch Gusset Right to the Panel Post with one 8 x 3 Wood Screw and flush to the inside bottom edge of the Arch Beam Front with two 8 x 2 1 2 Wood Screws as shown in fig 12 1 and 12 2 These should be opposing corners Attach a 194 Arch Gusset Left on the other two corners B Repeat for opposite side Bevelled End rch Beam ront Wood Screw Arch Gusset Right or Left Arch Beam Front 194 Arch Gusset Left Jl 193 Arch Gusset Right a A le gt X Inside view facing out Pieces removed for clarity N De AS Wood Parts Hardware 2 x 193 Arch Gusset Right FSC 36 x 127 x 453 2 mm 2 x 5 x 17 27 32 8 x 8 x 2 1 2 Wood Screw 2 x 194 Arch Gusset Left FSC 36 x 127 x 453 2 mm 2 x 5 x 17 27 32 4 x 8 x 3 Wood Screw 27 support yardistrystructures com Step 12 Attach Left and Right Arch Gussets Part 2 Note The bevelled ends on each Arch Gusset should always face away from the wood it is attaching to B Attach one 193 Arch Gusset Right or one 194 Arch Gusset Left to the remaining Panel Posts flush with the top of the Cross Brace Insert using one 8 x 3 Wood Screw and to the 080 Arch Beam Offset with two 8 x 2 1 2 Wood Screws as shown in fig 12 3 and 12 4 Each corner of t
5. FSC 12 support yardistrystructures com z pa 5 N T o o y x lt o Dog TO SSS a RRA EH i x 2 o cl SS 00 a TEX ES oo yn HW 0 gll 323 lt coc lo e ied L S lt o o a aw 3 ET Step 2 Attach Corner Panel Assemblies to Corner Posts Part 2 2 8 0 0 Ol MOLO xg Step 3 Attach L Mount Brackets TN A Pre drill with a 1 8 drill bit and attach two L Mounts one L Mount Right and one L Mount Left flush to the inside edge at the bottom of each Corner Panel Assembly with two 10 x 1 1 4 Pan Screw per L Mount as shown in fig 3 1 3 2 and 3 3 L Mount Right L Mount Left Note orientation of tabs 10 x 1 1 4 Pan Screw x 2 per L Mount L Mount Right L Mount Left Flush to bottom of posts L Mount Right Hardware 16 x Room L Mount Right and Left 32 x 10 x 1 1 4 Pan Screw 14 support yardistrystructures com Step 4 Attach Plinths to Corner Post Assemblies Part 1 A Place one 034 Short Plinth B Assembly with one 035 Short Plinth AAssembly tight to each other and attach using two 6 x 30 mm Trim Screw at the opposite corners per Plinth Fig 4 1 and 4 2 Note Plinths will be attached to four corners LSS qs NN Z N ZN Plinths rest on top of the L Mounts Flush to corners 034 Short Plinth B Assembiy 035 Short Plinth AAssembiy 6 x 30 mm Trim Screw Wood Parts 4 x 035 Short Plinth A Assembly FSC 34 9 x 152 4 x 49
6. or damaged pieces or you need assistance with assembly please contact the consumer relations department directly Callus before going back to the store 1 888 509 4382 support yardistrystructures com Read the assembly manual completely paying special attention to ANSI warnings notes and safety maintenance information on pages 1 4 e Follow the instructions in order This structure is designed to be assembled and installed ideally by two people DO NOT attempt to install alone e Consider the slope of elevation where you plan to install the structure Also check for gas telephone other utilities or sprinkler line locations prior to excavating any holes Before you discard your cartons fill out the form below e The carton I D stamp is located on the end of each carton e Please retain this information for future reference You will need this information if you contact the Consumer Relations Department PRODUCT NUMBER YM12514 CARTON I D STAMP CARTON I D STAMP CARTON I D STAMP 11 support yardistrystructures com Step 2 Attach Corner Panel Assemblies to Corner Posts Ban Part 1 8 Note Only pre drill one post per assembly A On Engineered Corner Panel Assemblies pre drill two holes from the inside at the places shown in fig 2 1 and 2 2 Pre drill in the centre of the panel and on a slight angle Pre drill on a slight angle Wood Parts 4x 024 025 Assemblies Corner Panel Assemblies
7. product is free from defect in materials and workmanship for a period of one year from the original date of purchase In addition all lumber is warranted for 5 years against rot and decay This warranty applies to the original owner and registrant and is non transferable Regular maintenance is required to assure the integrity of your product and is a requirement of the warranty This warranty does not cover any inspection cost This Limited Warranty does not cover e Labor for replacement of any defective item s Incidental or consequential damages Cosmetic defects which do not affect performance or integrity Vandalism improper use or installation acts of nature Acts of nature including but not limited to wind storms hail floods excessive water exposure Minor twisting warping checking or any other natural occurring properties of wood that do not affect performance or integrity Yardistry products have been designed for safety and quality Any modifications made to the original product could damage the structural integrity of the product leading to failure and possible injury Yardistry cannot assume any responsibility for modified products Furthermore modification voids any and all warranties This product is warranted for RESIDENTIAL USE ONLY Yardistry disclaims all other representations and warranties of any kind express or implied This Warranty gives you specific legal rights You may have other rights as well w
8. 2 1 mm 4 x 034 Short Plinth B Assembly FSC 34 9 x 152 4 x 492 1 mm 15 Hardware 16 x 6 x 30 mm Trim Screw support yardistrystructures com Step 4 Attach Plinths to Corner Post Assemblies Part 2 B On the outside of the Corner Post Assembly place two 033 Long Plinth Assembly tight against eachother using 2 6 x 30 mm Trim Screws per Plinth Be sure they are flush and tight Fig 4 3 and 4 4 EL EX SN 033 Long Plinth Assembly ASS 6 x 30 mm Trim Screw x 2 per board Wood Parts Hardware 8 x 033 Long Plinth Assembly FSC 34 9 x 152 4 x 598 5 mm 16 x 6 x 30 mm Trim Screw 16 support yardistrystructures com Step 4 Attach Plinths to Corner Post Assemblies Part 3 C Place one 032 End Plinth Assembly onto each Corner Post Assembly Line them up with previously placed Plinths Make sure they are flush and tight to each other and then fasten with two 6 x 30 mm Trim Screw per end Fig 4 5 and 4 6 032 End Plinth Assembly Trim Screw x 4 per board Wood Parts 8 x 032 End Plinth Assembly FSC 34 9 x 152 4 x 141 3 mm 6 x 30 mm Fig 4 6 Trim Screw 032 End Plinth Assembly Note Loosen screws as necessary to align all edges Hardware 16 x 6 x 30 mm Trim Screw support yardistrystructures com Step 4 Attach Plinths to Corner Post Assemblies Part 4 Note Make sure all plinths are lined up flush and level before installing remaining screws D Af
9. 4 Wafer Bolt Panel Post 195 Arch Beam Front Hardware 12 x 8 x 3 Wood Screw 4 x 1 4 x 4 1 4 Wafer Bolt 5 16 flat washer 1 4 connector nut 4 x 1 4 x 3 3 4 Wafer Bolt 5 16 flat washer 1 4 connector nut support yardistrystructures com Step 9 Attach Arch Beam Offsets It is important the proper hardware gets placed in the places shown Fig 9 1 em m Front A Attach one 080 Arch Beam Offset Dim om Wood thr h centre of groov f Corner Panel 10 x 4 Wood Scre ough centre of grooves of Corner Pane ey A Ss Assembly with one 8 x 2 1 2 Wood Screw x3 gt and through Beam 81 1 2 with three 10 SS x 4 Wood Screws per side shown in fig gt lt 9 1 and 9 2 Complete for two Arch Beam 068 Beam K Offsets ds gt Engineered B In between Arch Beam Fronts and Arch E NN Panel Post Beam Offsets next to the Engineered Panel gt Posts install four 067 Beam 20 3 4 and E i 067 Beam attach with one 8 x 2 1 2 Wood Screw and Panel Post Se 20 3 4 six 10 x 4 Wood Screws per Beam 20 3 4 as shown in fig 9 1 and 9 2 10 x 4 Wood Screw x3 Fig 9 2 080 Arch te A Beam Offset 067 Beam 20 3 4 Arch Beam Front 067 Beam 20 3 4 080 Arch Beam Offset Wood Parts Hardware 2 x 080 Arch Beam Offset FSC 38 1 x 241 3 x 3048 mm 2 x 6 x 120 36 x 10 x 4 Wood Screw 4 x 067 Beam 20 3 4 FSC 38 1 x 139 7 x 527 1 mm 2 x
10. 8pc 032 End Plinth Assembly FSC Box 1 Y70219 032 34 9 x 152 4 x 141 3mm 8pc 024 025 Assembled Corner Panel Assembly FSC Box 2 9 support yardistrystructures com Hardware Identification Dimensions are approximate and are shown to assist in the identification of parts for assembly Actual dimensions may be smaller or larger 48pc Wood Screw 8 x 2 1 2 Y06427 522 50pc Pan Screw 10 x 1 1 4 Y06427 911 9pc Wafer Bolt 1 4 x 2 Y07427 220 Wafer Bolt 1 4 x 4 1 4 Y07427 241 32pc Wood Screw 8 x 3 Y06427 530 83pc Wood Screw 10 x 4 Y06427 940 8pc Wafer Bolt 1 4 x 3 3 4 9pc 1 4 Lock Nut Y08427 203 16pc 5 16 Flat Washer Y05427 301 9 pc 2 x 3 Trellis Clip Y00419 003 A amp Y07427 233 IX _3 29 O I o 33 O ou 1 4 Connector Nut a 103457 205 w eee ee Se Y1000Z6 JBAUG UOSU99OY Z X ZH ody support yardistrystructures com Step 1 Inventory Parts Read This Before Starting Assembly A This is the time for you to inventory all your hardware wood and accessories referencing the parts identification sheets This will assist you with your assembly e Each step indicates which bolts and or screws you will need for assembly as well as any flat washers lock washers t nuts or lock nuts B If there are any missing
11. PERGOLA ROOM KIT Installation and Operating Instructions YM12514 12 3 66 m Toll Free Customer Support 1 888 509 4382 info yardistrystructures com www yardistrystructures com Yardistry Selwood Products Europe pa h Customer Support 44 1284 852569 rE E UT parts selwoodproducts com E 3 05 m 10 4 HEIGHT www selwoodproducts com 3 66 m 12 8 2 or 2 49m Yardistry North America Ah Important Safety Notice Yardistry components are intended for privacy decorative and ornamental use only Product is NOT INTENDED for the following e A safety barrier to prevent unsupervised access to pools hot tubs spas or ponds e As load bearing support for a building structure heavy objects or swings e Used in structures that trap wind rain or snow that would create extra load on the product Permanent structures may require a building permit As the purchaser and or installer of this product you are advised to consult local planning zoning and building inspection departments for guidance on applicable building codes and or zoning requirements Wood is NOT flame retardant and will burn Grills fire pits and chimineas are a fire hazard if placed too close to a Yardistry structure Consult user s manual of the grill fire pit or chimnea fo
12. Trellis End 33 1 2 FSC 3 x 2 x 33 1 2 Box 3 Ea 9pc 061 Trellis End gt 3 A a m Ll lt 36 x 127 x 453 2mm 36 x 127 x 453 2mm 4pc 194 Arch Gusset Left FSC 2 x5 x 17 27 32 Box 3 Apc 193 Arch Gusset Right FSC 2 x 5 x 17 27 32 Box 3 38 1 x 139 7 x 266 7mm 38 1 x 139 7 x 527 1mm 4pc 069 Beam End 10 1 2 FSC 2 x 6 x 10 1 2 Box 3 4pc 067 Beam 20 3 4 FSC 2 x 6 x 20 3 4 Box 2 a O 38 1 x 139 7 x 870 0mm Apc 192 Beam End 34 1 4 FSC 2 x 6 x 34 1 4 Box 3 4 38 1 x 241 3 x 3048 0mm 2pc 080 Arch Beam Offset FSC 2 x 6 x120 Box 3 38 1 x 241 3 x 3048 0mm 2pc 195 Arch Beam Front FSC 2 x 6 x120 Box 3 38 1 x 139 7 x 2070 1mm 2pc 068 Beam 81 1 2 FSC 2 x 6 x 81 1 2 Box 3 Y N gt gt gt Y Y x 69 9 x 69 9 x 2311 4mm Apc 190 Corner Post FSC FSC 3x 3 x 91 Box 2 8 support yardistrystructures com Part identification Dimensions are approximate and are shown to assist in the identification of parts for assembly Actual dimensions may be smaller or larger 34 9 x 152 4 x 598 5mm 8pc 033 Long Plinth Assembly FSC Box 2 Y70219 033 34 9 x 152 4 x 492 1mm Apc 035 Short Plinth A Assembly FSC Box 2 Y70219 035 34 9 x 152 4 x 492 1mm Apc 034 Short Plinth B Assembly FSC Box 2 Y70219 034 34 9 x 152 4 x 141 3mm
13. annually Do not over tighten as to cause crushing and splintering of wood Check for sharp edges or protruding screw threads add washers if required WOOD PARTS e Unprotected they will appear weathered over time Periodic application of an exterior water repellent or stain water based will help improve appearance and life Check all wood members for deterioration structural damage and splintering Sand down splinters and replace deteriorated wood members As with all wood some checking and small cracks in grain is normal Assembly Guides Tools Required Tape Measure 8 Step Ladder Carpenters Level Safety Glasses Standard or Cordless Drill Adult Helper 2 Phillips Bit or Screwdriver Gloves 7 16 Wrench or Socket Hard Hat Symbols Throughout these instructions symbols are provided in the top right hand corner of the page Use Help where this is shown 2 or 3 people e Use a measuring tape to assure proper are required to safely complete this step location To avoid injury or damage to the assembly make sure to get some help e Pre drill a pilot hole before fastening y vi screw or lag to prevent splitting of wood 8 If you dispose of your Yardistry structure Please disassemble and dispose of your unit so that it does not create any unreasonable hazards at the time it is discarded Be sure to follow your local waste ordinances 3 support yardistrystructures com Limited Warranty Yardistry warrants that this
14. he assembly should have one Arch Gusset Right and one Arch Gusset Left Fig 12 3 Bevelled Panel End Beam 20 3 4 Arch Gusset Right or Left 8 x 3 Fig 12 4 Wood Screw Beam 20 3 4 gp 193 Arch ai NE E usset Rig E dy 7 ll i Al ma H A 080 Arch Beam Offset fs TE Y a 194 Arch Gusset Left Cross Brace Insert po A ES A fof ee M i a il a oo nll E 7 E A me Ne os A a 15 Outside view facing in lt a 5 ii Pieces removed for clarity po A a A h Wood Parts Hardware 2 x 193 Arch Gusset Right FSC 36 x 127 x 453 2 mm 2 x 5 x 17 27 32 8 x 8 x 2 1 2 Wood Screw 2 x 194 Arch Gusset Left FSC 36 x 127 x 453 2 mm 2 x 5 x 17 27 32 4 x 8 x 3 Wood Screw 28 support yardistrystructures com NOTES 29 support yardistrystructures com NOTES 30 support yardistrystructures com NOTES 31 support yardistrystructures com YARDISTRY Consumer Registration Card First Name Initial Last Name i Pi Street Apt No ee 0 0 A A O O O O O O O A O City State Province ZIP Postal Code A 0 S SA 0 0 A A A Ltt tt Country Telephone Number a A b E Mail Address ALAALA AAAA
15. hich vary from state to state or province to province This warranty excludes all consequential damages however some states do not allow the limitation or exclusion of consequential damages and therefore this limitation may not apply to you 4 support yardistrystructures com Permanent Installation Examples Note It is critically important you start with square solid and level footings concrete pad or deck to attach your Pergola Room We supply Room L Mounts with this structure which gives you the flexibility to permanently install your structure to a pre existing or new wood or concrete surface e The hardware to attach the Room L Mount to the structure is included The hardware to mount the structure permanently will need to be purchased separately at your local hardware store If you are mounting to concrete footers see below for the correct locations and placement Please double check for possibility of any underground utilities such as gas telephone cable or sprinkler lines Following are some examples of how to mount the structure to wood or concrete surfaces Refer to your local building and city codes ordinances neighbourhood covenants or height restrictions regarding this type of structure for guidance on accepable installation requirements Concrete Footer 16 1 8 Groove 23 4 1 412 HH lid L Mount Room L Mount EN 10 x 1 1 4 Pan Screws Included Corner Post m Anchoring Hardware not i
16. ncluded Panel Post Reguired Depth 169 11 16 5 support yardistrystructures com Permanent Installation Examples cont Concrete Patio min 10 2 x 10 2 with 12 clearance on all sides lt _ 10 x 1 1 4 Pan Screws Included gt 10 x 1 1 4 Pan Screws Included lt Anchoring Hardware not included gt m MM Z ZE aa a a tt i y a a ee et Ve ma 10 x 1 1 4 Pan Screw Room L Mount support yardistrystructures com pajquuasso 50 40 ISO4 JOJO JOTIUNOW T JUST JURO 7 4 7E0 AIQWOSSY 8 yu HOUS y o SEO ACUISSSY y UNU HOUS N X ZO quasy Ululld DUS i N Y JT K N 6 A A AN 061 0g JQUIO SEO Aquas Yula BUC 1 gt 4 A S61 UEN 95519 US N Z IN 681 SUT SIDE SO uN ZN a OA Gay Ju K 7 Wall aT RO TEN 890 2 1 18 os N Y a 90 271 011 DUS SION WW af LAN p pa 261 p 1 7 PU UDS APS 690 2 1 O1 pug OTAN SSO WD UN ZL YK LY 080 8540 WD LON 290 ZE PUES ME AS 661 UOJJ UDI yoly O SMAI EXT 190 p 78 07 Wee Part identification Dimensions are approximate and are shown to assist in the identification of parts ier assembly Actual dimensions may be smaller or larger 38 1 x 63 5 x 850 9mm 9pc 062
17. nector nut ei C Attach six 8 x 3 Wood Screws ame ho D Repeat Steps A B and C to the opposite pair of Panel Corner Post Assemblies to make a front and back a EA Wood Parts Hardware 2 x 068 Beam 81 1 2 FSC 38 1 x 139 7 x 2070 1 mm 2 x 6 x 81 1 2 12 x 8 x 3 Wood Screw 4 x 1 4 x 4 1 4 Wafer Bolt 5 16 flat washer 1 4 connector nut 4 x 1 4 x 3 3 4 Wafer Bolt 5 16 flat washer 1 4 connector nut 21 support yardistrystructures com Step 8 Attach Arch Beam Fronts It is important the proper hardware gets placed in the places shown Make sure you install the Wafer Bolt first and then the wood screws A Attach one 195 Arch Beam Front in between two Corner Post Assemblies as shown in fig 10 2 and attach to Corner Post Assembly with one 1 4 x 4 1 4 Wafer Bolt with 5 16 flat washer and one 1 4 x 3 3 4 Wafer Bolt with 5 16 flat washer and 1 4 connector nut per side fig 8 1 B Attach three 8 x 3 wood screws per side C Repeat for the opposite side N ZN AYA LY av La LWA was K AZ 195 Arch Beam Front Z AYA Z WAS A AWE Li AN N ZAN NIZ 4 Wood Parts 2 x 195 Arch Beam Front FSC 38 1 x 241 3 x 3048 mm 2 x 6 x 120 22 Corner of Corner Post Assembly Connector Nut 1 4 x 4 1 4 Wafer Bolt Flat Washer 495 Arch Beam Front Washer Outside 1 4 x 3 3
18. r safe distances from combustible materials Wear gloves to avoid injury from possible sharp edges of individual elements before assembly During installation follow all safety warnings provided with your tools and use OHSA approved safety glasses Some structures may require two or more people to install safely Check for underground utilities before digging or driving stakes into ground General Information General Information Wood components are manufactured with Cedar C Lanceolata which is protected with factory applied water based stain Knots small checks cracks and weathering are naturally occurring and do not affect the strength of the product Annual application of a water based water repellent sealant or stain will help reduce weathering and checks www yardistrystructures com Questions Call toll free or write us at 1 888 509 4382 info yardistrystructures com Patents Pending 2 support yardistrystructures com Instructions for Proper Maintenance Your Yardistry structure is designed and constructed of quality materials As with all outdoor products it will weather and wear To maximize the enjoyment safety and life of your structure it is important that you the owner properly maintain it HARDWARE Check metal parts for rust If found sand and repaint using a non lead paint complying with 16 CFR 1303 Inspect and tighten all hardware after completion of assembly after first month of use and then
19. ter the End Plinths have been placed go back and install the two remaining 6 x 30 mm Trim Screws per end to the assembled Plinth on the Corner Post Assemblies Fig 4 7 and 4 8 E Attach 2 6 x 30 mm Trim Screws to each end side as shown in fig 4 7 and 4 8 6 x 30 mm Trim Screw Hardware 48 x 6 x 30 mm Trim Screw 18 support yardistrystructures com Step 5 Placement of Corner Post Assemblies Si A Move your Corner Post Assemblies to the final location Make sure the ground is flat and level before continuing assembly B Stand all four complete Corner Post Assemblies so they form a square as shown in fig 5 1 The distance from the outside of one Corner Post to the outside of a second Corner Post should be 120 See fig 5 1 and 5 2 for accurate placement and additional measurements pibes 169 11 16 on C Depending on what you are placing the Pergola Room on will determine how you anchor it to that surface Please refer to pages 4 and 5 for installation examples Any hardware or extra materials for mounting will have to be purchased in advance 19 support yardistrystructures com Step 6 Assemble Beam Ends a Fig 6 1 Two Beam Ends attached on opposite side of cut out 10 x 4 Wood Screws SA A On a flat and level surface attach one 192 Beam SS 069 Beam End 10 1 2 to 192 Beam End 34 1 4 End 34 1 4 with three 10 x 4 Wood Screws as shown in fig
20. u trait BH ae ee pa 7 ll p IG T i j a ere aim oe Wee a at a i a z Y k r F rip pe HW 11 a pe y E H a al Lale a gt j p ie zi a ii a A Ti l at Sas 25 Fig 11 3 10 x 1 1 4 Trellis End Pan Screw Assembly A a ez i i Y y F se aN tS a y Arch Beam Offset a itn St E hi SX at SH oe 1 Qu La Trellis End P A bl Fig 11 4 A n Both Sides of Trellis End Assembly a Arch Beam Front Hardware 3 x 10x4 Wood Screw 2 x 10 x 1 1 4 Pan Screw support yardistrystructures com Step 11 Attach Trellis End Assemblies Si Part 2 D Starting at the centre Trellis End Assembly and working outwards attach four Trellis End Assemblies on either side alternating each Trellis End Assembly so the Trellis Clip is on opposing sides to the assemblies next to it fig 11 5 Note The distance between assemblies should be 12 fig 11 6 Note Refer to previous page fig 11 2 and 11 3 for attaching trellis clip il Lor 3 2 at AL pe E i d Al a ai a sl ett m Start here and move outwards on either side alternating trellis yF assemblies so Trellis Clip Y A varies from side to side m me yas s SS EZ Hardware 24 x 10 x 4 Wood Screw 16 x 10 x 1 1 4 Pan Screw 26 support yardistrystructures com Step 12 Attach Left and Right

Download Pdf Manuals

image

Related Search

Related Contents

  Document - Université catholique de Louvain    自衛隊千葉地方協力本部 品 名 携帯電話及び通信料 作成年月日 平成2  Features - Farnell  Manual Aristo Mig U5000i  取扱説明書(基本編) ブラシレスモータ MINAS-BL GV・GP  FP20SA2  esquemas normalizados de protecciones para líneas - lapem  MDR221A User Manual  

Copyright © All rights reserved.
Failed to retrieve file