1. RQCommancder Installation RQCommander software is easy to install First insert Installation CD Sommer CD and start the Setup exe program out of the CD_ RQCommander_V2 0 X X folder The dialogue process will guide you through the installation The easiest and the recommended way is to select standard installation and the default installation path C DME RQCommander Note Due to restricted admission rights it is important not to choose the Program files folder for installation path Note If you want to update your RQCommander installation please use always repair option 5 Connecting RQ 30 and PC What has to be done step by step 1 Open up the 4 side bottom screws of the RQ 30 and lift its cover to plug in the Sommer main cable at the RQ 30 Make sure that your connection is good by listening and feeling of the engaging noise and feel of the bayonet nut connector 2 Connect USB Nano 485 converter to the Sommer main cable by using the small clamps on the converter and the small slot screw driver o The yellow wire RS 485 A wire must be connected to the A clamp o The grey wire RS 485 B wire must be connected to the B clamp Note If the RS 485 bus system have another devices planned for e g a data logger separate them from the bus wiring while parametrisation Otherwise this could lead to many crash situations by double mastering of the bus system 3 Prepare power supply to be connected with RQ 3
2. maximum discharge of the river or channel In advance you can estimate the minimal and maximal water level of the site This guide is meant for averaged PC users and all guide parts are written in a common explanation form with intent because some windows dialogues can differ from windows to windows version 2 Required Equipment To check out the delivered RQ 30 equipment in the office you will need some additional things This is guide is written for a delivered Sommer main cable If you build the cable by your own see RQ 30 user manual chapter 2 4 check the wiring by your own specifications Total equipment list o RQ 30 delivered o Sommer main cable delivered o 9 24 Volt power source with capability of at least 200 mA current o Maybe some wirings an clips to do the power connection o USB nano 485 converter and an USB extension cable delivered o A PC or Notebook with a free USB port and a Windows operating system Win XP or later with administration rights and a CD ROM drive o A installation CD of RQCommander and in the case of no internet connection the installing CD of the USB nano 485 converter delivered o A small screwdriver to connect the USB nano 485 converter to the Sommer main cable o A medium Phillips screwdriver to open up the body housing of the RQ 30 to plug in the Sommer main cable 3 USB nano 485 Installation USB nano 485 converter installation consists of two separately drivers First driver to
3. confirm its safety retrieval You will see a new connection window with a progress bar and a lot of communication in the terminal window When this process is finished the RQ 30 is ready for first parametrisation If you don t have updated your RQ 30 version you don t have to do this procedure once again cause the RQCommander software now know all RQ 30s parameter names and ranges and stores this information in a schema locally 10 We recommend to close the RQCommander software now because then the next chapter shows as a first example what you normally doing with the RQCommander software 6 Setup RQ 30 6 1 Get actual Parameters from RQ 30 First you have to open a new RQ Commander session by starting the RQCommander exe file The most important thing for now to do is to connect with RQ 30 to get its actual parametrisation 1 Check your wiring and the power supply see chapter 5 2 Select parameters tab Check the right COM number see chapter 3 and its baudrate in the connection window see chapter 5 3 Push button Load Parameter on the left side of the screen to let the RQCommander fill the local stored Schema with the actual parameters of the RQ 30 Wait until the whole process is finished Note The RQ 30 is normal measurement mode while loading parameter This could lead to some data crash situations on RS 485 because the RQ 30 pushes out the measurement data from time to time The loading process of RQ
4. you can compare the values in the RQ 30 with them in the RQ 30 List on the profile tab screen Note It is not necessary to use the same units in the profile settings as they are on the RQ 30 RQCommander automatically adapting the meaning of the values 6 4 RQ 30a Analog Output Setup Only if you are using a RQ 30a with 4 20 mA analog outputs IOUT this part of setup the RQ 30 concerns to you All analogue output settings should be checked by the user because their settings are also strongly combined with the measuring site The usage of them is always technical stuff and it is not just part of the RQ 30 also the 4 20 mA input system has to be adjusted in a compatible way Here is a step by step guideline for set up the IOUTs correctly 1 2 Click on the sign before Technics if it is not already opened then click on sign before 4 20mA outputs Now all possible 4 20 mA output parameters are drop down Then choose your site dependant settings Note It is not too important to select the ranges and offsets absolutely closely to site In most cases it is better to do it in a balanced way especially if you have more than one RQ 30 and want to have the same settings for all sites In this case it is best to check out the settings with the biggest site o IOUT1 AUX In most cases IOUT1 settings are not relevant cause the input is has been turned off Otherwise the setting is strongly dependant of what you are measuring P
5. 0 o The brown wire wire must be connected to the side of the power supply o The white wire wire must be connected to the side of the power supply ATTENTION Make sure that there are no possibilities for electrical shortcuts in the power supply wiring Switch off the power supply and start RQ commander software Select the Parameter Tab and click in the connection so it becomes a blue frame 6 Choose at the Com Port field your COM X number of the USB Nano 485 converter see Chapter 3 Point 5 6 Select baudrate 9600 because it is the RQ 30s default baudrate The check marks in the connection field must be cleared 7 Click on terminal window so it becomes a blue frame and then click on the most left button which means connect The terminal should go online and shows the COM number and the baudrate in the terminal frame headline When an error message does occur check if you have the correct COM number X see chapter 3 of this guide 8 Switch on RQ 30s power supply and wait 5 seconds Now the boot message of the RQ 30 should appear at the black terminal window If it doesn t something is wrong with the RQ 30 or its wiring Also the settings in connection frame could be wrong Please check voltage and the correct polarisation of the power supply 9 Have a look at the left screen side There is a button Load Schema For the first usage of a new RQ 30 system you have to Load Schema first Feel free to push it and
6. 30 is doing its own recovery in these situations so don t care about some strange looking characters in the terminal window or some red written lines in the progress bar window 6 2 Units and Decimals lf all parameters are loaded the RQ Commander shows in the middle of the screen in the window Sensor parameters the filled out actual parameters of the RQ 30 You can have a look at the actual parameters set but please before you do any customizing set your own designed set of units and decimals This is very helpful because many parameters are dependant of these settings You can avoid a lot of work of reparametrisation if you choose your units first To do this 1 Click on the sign before Technics then the Technics sub menu is drop down Then click on sign before Units and decimals and you will see the actual default unit and decimal settings of the RQ 30 Select your combination of your preferred units and select well balanced decimals Dependant of your measuring site the decimals should not to be set to big cause the maximum amount of decimal digits of a output value are 7 For example A site with a maximal discharge of 9999 cubic ft per second should not have more than 3 decimals for the discharge otherwise the value could not be transferred in especially high water situations Note Most times the AUX measurement is not in use than the setting of its units is not important Per default the AUX is set for a IR t
7. A span AUX 4 20mA span Fill out gt 20 mA value Level W Level W IOUT2 level IOUT2 level 4 a 4mA value 20mA span level 4mA value level 4 20mA span Fill out gt IOUT3 Velocity v Velocity Fixed at IOUT3 Max v unit RQ 30 velocity blue red Fill out gt 0 IOUT3 Max velocity lOUT4 Discharge Discharge Fixed at lIOUT4 Max Q Q unit RQ 30 discharge grey pink Fill out gt 0 IOUT4 Max discharge The second table applies to a system with two possible flow directions tidal site The differences are due to the possibility of negative velocities and discharges physical Unit 4 mA value 4 20 mA span 20 mA value meaning entry AUX unit IOUT1 AUX IOUT1 AUX AUX 4mA value 4mA value 4 20mA span AUX 4 20mA span Fill out gt Level W IOUT2 level IOUT2 level level 4mA value sol 4mA value 4 20mA span level 4 20mA span violet Fill out gt IOUT3 Velocity Velocity IOUT3 Max 2 IOUT3 v v unit velocity Max velocity blue red Fill out gt IOUT3 Max velocity IOUT4 Discharge Discharge IOUT4 Max 2 IOUT4 IOUT4 Max Q discharge Max dischar discharge grey pink Fill out gt 7 RQ 30 Tests in Office We dont recommend to do measurement tests of the velocity radar and the level radar in the office because radar waves would be reflected crooked and absorbed by the office walls and its furniture many times and in an abs
8. city could be set closely to maximal estimated speed of the river To keep it easy use a straight number as for e g 20 ft s o lIOUT4 discharge Here applies absolutely the same as at the IOUTS velocity but the IOUT4 max discharge value can vary in a wide range from site to site It could be not feasible to use the same settings in more than one site if they are differ too much in the max discharge If you don t know the maximal discharge of the site please read chapter 5 1 6 of the RQ 30 user manual All changed parameters in the RQCommander are marked with light red colour and if your selection is ok you could send them to the RQ 30 by pushing the button Send Modified Parameters Afterwards all parameters will be sent in a stack to the RQ 30 and if the process finishes correctly all light red marks will be removed The next step is not for RQ 30 itself It is for parametrising 4 20 mA input system because you will need this information there Please fill out the values of your settings in one of the following table files to make sure all information for parametrising a 4 20mA input system is complete The first table applies to a measurement site with just one possible flow direction no tide The blue text in tables shows the RQ 30 parameter name whose parametrised values should be filled out Physical 4 mA value 4 20 mA span meaning entry AUX unit IOUT1 AUX IOUT1 AUX 4 AUX 4mA value 4mA value 20m
9. emperature measurement in degrees Celsius 2 All changed parameters are marked with light red colour and if your selection is ok you could send them to the RQ 30 by pushing the button Send Modified Parameters Afterwards all parameters will be sent in a stack to the RQ 30 and if the process finishes correctly all light red marks will be removed 6 3 From Profile to RQ 30 Discharge Table lf you already know your cross section profile and your favour level coordinate system W it is time to change the RQCommanders screen to profile tab In this guideline is not enough space to describe the process to be done at this tab but in the RQ 30s user manual the big chapter 5 1 describing this process in detail This guide just describes how you will send your profile based RQ 30 List to the RQ 30 If you have done all your settings in the profile tab screen and have good looking RQ 30 List then following steps transfer it from the RQCommander to the RQ 30 itself 1 Go to Parameter tab again 2 Push button Send Discharge Table on the left side of the screen and wait for the job to be done 3 When finished push Load Parameter button to check out the new written settings on the RQ 30 4 Click on all signs before in the Sensor Parameter window to get an overview of the RQ30 s main menu then click on sign before Discharge table Q so you will se the actual written discharge table Now
10. er default it is set for a IR temperature measurement o lIOUT2 level These 2 settings 4 mA value and 4 20 mA span are strongly dependant of the chosen level gage measurement system W Note Please don t use the 4 mA value for level W offset adjustments If you using relative level systems which values are always positive use for e g O ft for 4mA value The 4 20 mA span could be set to the near of the maximum level of the site E G If maximum level is 37 1 ft a good value for the 4 20 mA span is 50 ft If you are using absolute level measurement systems maybe based on definitive sea levels and you want to use one offset value for all your sites and your lowest measurable level of the lowest site is placed at 365 39 feet use for e g 360 ft for the IOUT2 level 4mA value for all the sites At 4 20mA outputs it is important to keep the span relative closely to maximum level change so probably in case of the example above you will not using a IOUT2 level 4 20 mA span of 420 ft to allow a 4 mA value offset of O This setting would lead to an extraordinary loss of resolution at the 4 20mA output So a good compromise would be 360 ft for the 4mA value and 60 feet for the 4 20 mA span so you can use the same settings for all sites between 360 and 420 ft minimum to maximum absolute level o lIOUTS velocity The 4 mA value output of the velocity is always 0 except tidal sites and the 4 20 mA span IOUT3 max velo
11. he driver Then let windows work to do the installation and close the dialogue when you will be prompted for 4 The next step in the driver installation is that automatically starts the installation dialogue once again that seems to be strange to many user but if you carefully read the windows messages you will see that a second driver should be installed which is called USB serial port From now it is completely the same process as before at the USB Nano 485 installation 5 When all dialoges finished a new USB serial port COM X is being released Once again in the Device Manager Start gt Control Panel gt System and Security gt System gt Device Manager you can find a new COM under Ports COM amp LPT The most important thing to know for the next chapters of this guide is the COM number X If you are not sure which USB serial port COM is the one of the converter detach and attach the converter from the USB slot and look which COM number disappears and reappears again in the Ports COM amp LPT list 6 Close all opened windows an notice the COM number X of the converter The installation process of the converter is finished and doesn t have to be done again in later sessions on this computer except if you have changed the converter by another one but in this case windows does the installation most times automatically Note It is not recommended to change the converters dip switch settings at all 4
12. ies implemented which should be set soon as possible To make sure your RQ 30 is delivering the information you will need we recommend to do the first settings in the office This guide leads you through the PC installation of delivered RQ 30 parametrising tools and the most important customer settings It is helpful to get familiar with the technics and needed information before mounting the RQ 30 system on the site O O The designed measurement site is suitable see RQ 30 user manual chapter 4 1 To get a valid discharge from the RQ 30 you have to fill out its discharge table RQCommander can build this table automatically but you have to put in the cross section profile of the river or channel Before you can setup the RQ 30 completely you must get the profile data of your measuring site see RQ 30 user manual chapter 3 3 and chapter 5 1 You have think about your level gage measuring coordinate system called W Character W represents the chosen Water level coordinate system and where your cross section profile is placed in this system Also the mounting height of the RQ 30 have to be placed in this coordinate system by doing a level adjustment or doing a direct setting of RQ 30 level WRQ parameter see RQ 30 user manual chapter 5 2 You have to choose your output units so the data collecting system e g a data logger can be set up as well Some of these settings are site size dependant so you should have an idea of
13. install is the USB nano 485 USB Controller and the second one is the USB Serial port driver A detailed explanation what to do follows afterwards USB nano 485 converter is shortly called converter 1 Put in the converter in one USB slot of your PC In most cases Windows detects a new USB device and starts the driver installation which is called USB nano 485 automatically If windows doesn t please make sure you have administration rights and then have a look at Start gt Control Panel gt System and Security gt System gt Device Manager and look there under Other Devices for USB nano 485 and start the driver installation from there 2 If you have an opened internet connection let windows search there for the most actual driver when you will be asked for by the installation dialogue This works fine in some cases but if windows can t find a matching driver start the installation dialogue once again until the point where it asks you Browse my computer for driver software and click on this option now Please insert the Installing CD for the converter CTI CD and give in the CD ROM path In most cases the root directory path of the CD ROM is deep enough and windows find the correct driver in the subdirectories by its own check mark option 3 At the next step in the dialogue Windows will tell you that the driver has no valid digital signature You have to accept this circumstance before you can install t
14. olute unpredictable way The internal inclination measurement of the RQ 30 and its influence on the interpretation of the measured Doppler frequencies makes it also difficult to get a correct distribution of moved test objects If you like you could change screen tab of the RQCommander to spectrum and push the spectral mode button to check out the RQ 30 sensibility for measuring moved objects but concern that the spectral distributions of these objects are mostly not typical for a river so RQ 30 software sometimes evaluate these spectral distributions as failure measurements Also level measurements sometimes work in the office but you have to wait at least 60 seconds after turn up the radar and you have to use are a good radar reflector as a metal plate in at least 1 m distance and perpendicular to the RQ 30 But if the test doesn t work it is not definitely the failure of the RQ 30 it could be also a failure of the test setup 8 Helpful Support Information To give you an optimal support in case of troubles we need possibly a lot of information of the site 1 At the end of all RQCommander sessions when parametrising the RQ 30 load the actual parameter set of the RQ 30 see chapter 6 1 and push Save Parameter File button to save it If you will use our support we can do it much faster when we can load this parameter file here at company to have an overview what is going on there 2 If you have completed your
15. profile in the RQCommander see chapter 6 3 in this guide or chapter 5 1 in the RQ 30 user manual please store your work To do this make sure your actual screen is the profile tab screen and then go right up to the file menu of the RQCommander There should be a menu point which is called Save Profile or press CTRL S Click it and so you can work further later if open the file once again It is important to know that the profile data have much more information than just the discharge table of the RQ 30 For example just the profile data file contains the whole geometry of the river bed For our support this information is also important too so please if you have any profile data please send us this file as well 3 Make some pictures of a site especially from river itself and the position of the RQ 30 It is also good to make a picture the rivers surface on the measuring spot If the RQ 30 shows sometimes strange data most times it gives us and you a lot of interesting information when you go to the site and make the pictures right then when RQ 30 is not working well And if you will be there throw a small piece of wood in the river and try to estimate the velocity of the rivers surface 4 lf you have any external information about the site and its specialities please tell us Helpful for us could be some answers of these questions o Are there another river mouths nearby the measuring site o Does the RQ 30 looking river upwa
16. rd or downward o Are there river power stations nearby o Is there a lake or the sea nearby o Are there any standing waves in the water This picture is just to have an idea what standing waves are and how big they can be o What are you think about the wave surface on the river do mean it is more or less than 3 mm 1 8 of an inch o Are there any moving objects nearby especially in the extension region of the water reflected radar spot Trees bushes grass wobbling in the wind railways streets o Is there any kind of a regularly ship movement on the river o If the measuring site is very windy is there a main wind direction or does direction change very often o Could there be any visible or sensible vibrations on the RQ 30 housing caused by traffic wind or something else o Is the RQ 30 mounted under the bridge or under a special roof Are there any possibilities of water down spouts in the radar cone area between radar spot and radar itself If you have the possibility to log all measured data so do this please For the supporting team especially the measured level velocity and quality are very helpful So if you have troubles and you have some timelines of these values please send us them as well
17. so er MESS SYSTEMTECHNIK Setting up operation RQ 30 RQ 30a firmware version 1_5x RQ Commander 2 0 X X document version R2 Discharge Measurement System Guideline to first settings Edition May 2012 All rights reserved PS OPE ae oe SS 7 8 1 Contents INTRODUC HON aos cas tse cesar E wes cada sesco cee cous na euceesoesicouee wa sacuesens sescuetnaunesvenseteaccnecesveukes 1 REQUIRED EOUIRMEN T aanren sd decan ct veseuat deetodet AE OTRA EEE E 2 USB NANO 485 INSTALLATION esseeeeecsccecccsccccccccccccccceccccccecoccccecccececcccscecccoccecccoccecoceccecccscecccoccecocscceeocscceecssceeeo 2 ROC OMINMANDER INSTALLATION osrand intaon eea ea oauan e ea Aaa ONE CTAA ReaD ASE Ee 3 CONNECTING ROSOAND FPC znonoroninano aa Aa Ea 3 SETEFRO SO aiee A AE EEE EE EEE EEE E 4 6 1 GET ACTUAL PARAMETERS PROM RO SO rnia E E NR 4 6 2 CNIS ANDDECMAL S an a T T A O E 4 6 3 FROM FROFILE TO RO 30 DISCHARGE ABLE ebesbesxiancalescndueicneneiacetiwt res veae ond 5 6 4 RO 0A ANALOG OUTPUTS DUP euen i a O A noes 6 RO30 TESTS TN OR BIC E coreia NE EA E S EEANN TELERON EAS 8 HELPFUL SUPPORT INFORMA TION wisesescciccevesesaliscesssckccassasseeccessscedscbescecesdecsessedeceessccenasessesvoeesscesceeseosneecseseess 8 This guide is meant for the first usage of an RQ 30 system right out of the box The RQ 30 needs some site specific information especially to calculate the discharge There are also many costumer specific setup possibilit

Download Pdf Manuals

image

Related Search

Related Contents

HP 3050A Setup Poster  傘 お願い  簡易作業指示システム コントローラ  Philips AVENT SCF663/28  Speco Technologies CVC-7445EXTP User's Manual  e-Coaching - Bundesministerium für Verkehr, Innovation und  EnGenius SP-688 Broadband 4-in-1 SOHO IAD Wi-Fi Black, Silver  Présentation démarche SimpA aux dpts_v1.3  The eGranary User Manual* - University of British Columbia  Recaro Young Sport  

Copyright © All rights reserved.
Failed to retrieve file