Home
Mincon MX4550
Contents
1. When changing the drill bit please follow this procedure e Please follow the opening instructions from section 2 3 2 e For external flush model hammers lift the chuck sleeve over the threads of the chuck e Liftthe chuck up along the shank of the bit to push the retaining pins out from the chuck e Inspect the splines and threads of the chuck for damage excessive wear or galling e Inspect the sample tube end wear Be careful checking sample tube wear as the end can be extremely sharp Always change the sample tube before it is worn out e Inspect the face of the piston for any pitting or cracking on the strike face If there is any damage then it should be replaced Please do not inspect the piston while it is suspended on the drill rig Always do this with the hammer in a horizontal position If the piston nose is damaged it Is likely that the Aligner Bearing bush is damaged as well e Inspect the Aligner Bearing bush for any damage If there is any damage then it should be replaced e Grease the threads on the chuck and place the chuck down over the splines of the bit e Insert retaining pins in to place within the chuck drive sub with the flat side facing outwards e Inthe case of external flush hammers place the Chuck sleeve on to the chuck encapsulating the retaining pins e Screw the chuck bit assembly in by hand to ensure that the sample tube does not get jammed up in the bit when fully shouldered up e Torque up the hammer with th
2. 4 Remet O Ring O Ring Air Screen Backhead 4 Remet Check Valve Seal Nitrile U Seal Check Valve Check Valve Spring 10 11 12 13 14 15 Steel Make up Ring Lock Ring Spacer Sample Tube O Ring Sample Tube Mount O Ring O Ring O Ring Seating Ring 17 18 19 0 21 22 2 2 25 26 27 N Inner Cylinder Piston oo Wear Sleeve N Piston Retaining Ring Aligner O Ring Chuck Sleeve 117mm Dia 27 Bit Retaining Pin 28 Chuck Outside diameter Bit Size Spanner Flat Size 4 290 4 5 5 0 114mm 94mm Length Less Bit Backhead Shoulder to Chuck 1165mm Bit Shank Type MX4550 Backhead Thread 4 Remet 4 Metzke Adaptor Tube Thread 4 Remet 4 Metzke Weight Stand Off 123 Lbs 0 036 56 Kgs 0 9mm Page 9 Leaders in the Field of Mincon Rockdrills The Driller s Choice GELLIT G Tecnology Page 10 Leaders in the Field of Drilling lechnology BA 4 2 Hammer Service Log New Dimension As Measured Wear Actual Clearance Piston OD DECO of so e 0 25 ee A end CLLLiLL LLAMA AM AAM MMMM Me OM a New Dimension As Measured Wear Actual Clearance Discard Clearance Cylinder ID 3 370 85 61mm Sonia C D a Piston OD B 3 365 85 46mm 0 25mm VL LLL TT Y A Z f _ ARA RAN LA PITT TRA Lf Y Vy Yi fff 1 77 VA fp ff f ALL LLL DIS YI y cS jp ff ff LLLLLLLLLLALL LL
3. and tear Failure to follow recommended operating and maintenance procedures which result in component failure will not be considered for warranty This warranty is in lieu of all other warranties other than title expressed or implied Limitation of Liability Mincon will not accept any remedies to the user other than those set out under the provisions of warranty above The total liability of Mincon or its distributors with respect to the sale of DTH Hammers or spare parts therefor whether based on contract negligence warranty indemnity or otherwise shall not exceed the purchase price of the product upon which such liability is based Mincon and its distributors shall in no event be liable to any party relating to this sale for any consequential indirect special or punitive damages arising out of this sale or any breach thereof or any defects in or failure of or malfunction of the Mincon DTH Hammer or spare parts Warranty will be voided where There is evidence of damage resulting from insufficient or incorrect lubrication There is evidence of misuse through the application of heat welding or of being struck There is evidence of distortion or bending however caused There is damage caused as a result of using incorrect servicing tools or procedures If it is evident that the hammer or its components have achieved a reasonable proportion of their anticipated life
4. LLL 2 M LLL tL LLLL LLLLLLLLL ld 77 777 TTT 77 77 777 ATT TIZ Uf P TIT 7777 ff f LLL Li LLL New Dimension As Measured Wear Actual Clearance Discard Clearance Piston Nose OD B 2 952 74 99mm 0 38mm LLL 7 AAA A PPP PPP PITT PRA Leaders in the Field of Drilling Jechnology ES 5 Warranty Mincon DTH HAMMERS Warranty October 2002 Mincon warrants that the Mincon DTH Hammers and spare parts therefore manufactured by Mincon and delivered to the initial user to be free of defects in materials or workmanship for a period of 3 months after initial operation or 6 months from the date of shipment to the initial user whichever occurs first Mincon may elect to repair the defective part or issue full or partial credit towards the purchase of a new part The extent of credit issued will be determined on a pro rata basis bearing in mind the service life of the defective part against the normal service life of that part The part will be replaced or repaired without charge to the initial user at the place of business of an authorized Mincon distributor during normal working hours The user must present proof of purchase at the time of exercising the warranty The warranty applies only to failures resulting from defects in the material or workmanship and does not apply to failures occurring as a result of abuse misuse corrosion erosion negligent repairs and normal wear
5. Mincon MX4330 DTH Hammer Operation amp Service Manual Copyright 2006 Mincon International ISO 9001 2000 All Rights Reserved pa y ae ite ES a N JO PH9 91 J sul RG6o po0ouy331 1 UII Leaders in the Field of Drilling Technology NA Table of Contents T APPR CC TON eein cai 3 2 INSTALLATION AND OPERATION iii ctenscovenewiesy ctevseaventetesssteveesneceetessene 3 Ll AA dao 3 22 CAER GARE A as 3 a OE a A oe ES 3 22 COMMISSIONING A A AA AA A A AS AA 3 NI hh Ss aot ed ated ones ee tote acl nate ne cet 4 224 O NP A OA en E ee 4 2 3 SERVICING A A aa 5 A eacetancactaus a E cose e ate deles baacedieseancnaieeleae A E cadens tats aatadeemen ade 5 232 Opening Chuck ana BaChneae oaoa o a a Ne e o ale ees 5 233 Dismantling Hammer tO Chane BA Al a acid 5 2 3 4 Disassembly for Full Servicing Of HAMMEL 1cccccssecccccseseccsaneeecsauseessaneeessaeeessauaeessaneeessaasessaaesessaganes 5 2 3 9 HISDCCHON oiiiz ic asencausauric T E wats aucmeuuinieandsantaus 6 200 GHECKING Wear LIMIS tati nach a EA assets AAA RA A AAA 6 297 gt A tick nine Marae acta us neuen a a onic AG Mean nae omens 6 3 TROUBLE SACO Gian 8 A APPRENDI Semen ene aeons se a ne ee ne me em eee near ee oe emer een ey eee mene eee omen cee Sere er eee her ean ance 9 4 1 REVERSE CIRCULATION HAMMER EXPLODED VIEW AND PARTS LIST AND TECHNICAL DATA c0ssssseeeeeeeessseeees 9 4 2 HAMMER SERVICE LOG ria ceed a Ea a Aarne E a
6. a a E aE auc aa 11 du WARRANTY ca E sujsmamnysesnaces lt nensueessurnccnetenesaessenacerstencs 12 Leaders in the Field of Drilling lechnology BA 1 Introduction Thank you for choosing the Mincon MX4550 reverse circulation hammer Please read this manual carefully before using your hammer in the interests of safety warranty and best operational care The Mincon MX4550 is manufactured with specially selected materials and heat treatment to withstand the stresses of drilling in the most extreme conditions Internal components are manufactured to meet finely matching tolerances to provide fast drilling reliability and efficient use of air without waste With correct care your Mincon MX4550 hammer should provide you with top performance reliability and long service life Warranty is provided by Mincon as per the warranty section 5 m Please keep this instruction manual as a permanent record for your reverse circulation hammer The specifications and instructions contained in this manual are based on the up to date information as at publication date 2 Installation and Operation 2 1 Safety Be sure to work safely at all times Wear protective clothing and safety equipment and observe all safety regulations as prescribed by your employer Government or the site on which you work Do not wear loose clothing that may get caught in rotating parts and cause serious personal injury Remember that a Reverse Circulation percussiv
7. ammer horizontally in a clean dry environment Long Term storage e g 1 month or longer Using high pressure air blow the hammer clear of all water Break out the back head and chuck on the rig as it is easier to do it here than back in the workshop Disassemble the hammer Inspect and clean all hammer components Lubricate all the internal components with rock drill oil Reassemble the hammer and seal the back head and chuck end Store horizontally in a clean and dry environment Before restarting any hammer after prolonged periods of inactivity disassemble and inspect all internal parts Clean and remove any oxidation with an emery cloth Re lubricate all internal components with rock drill oil and reassemble the hammer Full assembly and disassembly instructions can be found further on in this manual 2 2 2 Commissioning Always use drill bits in good condition sharpened Using overrun bits can affect the life of the bit chuck chuck sleeve and reduce penetration rates which can damage internal components due to the non transference of energy in to the rock being drilled Leaders in the Field of Drilling Technology RA When starting a hammer for the first time or a hammer that has been stored for a prolonged period please follow the following instructions e Grease the threads on the back head and chuck and fit to the hammer complete with drill bit e With the bit in the breakout pot torque up the hammer until the stand
8. and with the chuck end facing up Insert the piston retaining ring in to the groove provided Ensure the extraction groove on the retaining ring is facing the chuck end of the hammer e Insert the Aligner with the smaller outside diameter facing the piston retaining ring in to the wear sleeve Using a soft steel drift tap the aligner in to place against the piston retaining ring Screw the chuck and chuck sleeve on external flush models in to the wear sleeve Seal up the chuck end of the hammer Turn the hammer over so the back head end is facing up Insert the Piston in to the wear sleeve refer to the exploded view for orientation Insert the Sample tube mount in to the inner cylinder and fit the seating rings around the round holes on the inner cylinder Insert the Inner cylinder assembly in to the wear sleeve Tap the assembly in to place using a soft steel drift Fit the spacer on to the sample tube with the flat face facing down to the drill bit end of the sample tube Place the lock ring on top of the spacer Place the steel make up ring on top of the lock ring Place the check valve spring on to the locating recess on the spacer and fit the check valve in to place e Spray the area under the rings of the sample tube with penetrating oil e g CRC WD40 If hammer oil is used then the sample tube will not go in to place properly because a hydraulic lock will occur between the sample tube shoulder and the sample tube mount e Insert t
9. ation speed of 12 15 per second 300 380mm Place chalk mark on drill rod and check the advance revolution If greater than Y 12mm per revolution increase rotation until the advance per revolution is a maximum of between 3 8 Y 10 12 Low penetration Inspect piston inner cylinder wearsleeve and bearing against Low pressure discard measurements and discard as necessar Lack of oil Ensure there is an oil film coming from bit spline and bit parts Sudden loss of Over run blown out sample tube Check sample tube wear regularly and change before it is worn pressure out Cracked wear Abuse of wearsleeve sleeve external part distortion Worn wearsleeve Outside diameter has worn beyond the discard point Measure casing O D approx 75mm 3 from chuck end and backhead end and replace if necessary If drilling in a corrosive environment wash internal and external parts regularly to avoid corrosive impact on the drill Avoid welding heating or torque wrenching in the wrong place as outlined in section 1 4 Note also section 1 6 Bogged Drill can lead to reaming If such danger is imminent use a dig out sub i overheating distortion of the rill Drill bogged can lead to chuck Inspect all parts thoroughly if drill is recovered and replace wear sleeve and chuck sleeve to parts where necessary distort Piston cracked Lack of lubrication causes micro Check lubricator and ensure oil film on the bit splin
10. e bit in a bit break out pot to ensure it does not run loose 2 3 4 Disassembly for Full Servicing of Hammer For full disassembly please follow these instructions e Where possible carry out disassembly in a clean work shop environment Break out the back head and chuck as described previously Mark the ends of the wear sleeve as chuck and back head end Secure the hammer in a chain vice to hold steady Remove the check valve and spring from the top of the Sample tube Leaders in the Field of Drilling Technology RA e At the chuck end of the hammer push the sample tube end in to the hammer with a piece of wood Be careful as this end can be very sharp from wear From the opposite end pull the sample tube out of the hammer Remove the steel make up ring lock ring and spacer from the sample tube From the chuck end insert a soft steel drift in to the hammer against the piston strike face Carefully knock the piston out the backhead end of the hammer This will push the Inner cylinder sample tube mount assembly out of the hammer as well Do not use the sample tube for this process as it would damage it e To remove the Aligner bearing bush reverse the direction of the piston the strike face towards the backhead end and with the soft steel drift against the piston strike face carefully knock the Aligner out the chuck end of the hammer e Push the piston out of the back head end of the hammer e As the wear sleeve for MX series RC ha
11. e hammer emits noise and you should therefore take every precaution to safeguard your hearing against damage by using proper ear protectors Use eye protection at all times Rock chips and dust which may be discharged from the face of the bit or bore hole at high velocities and can cause severe injury Hammers can be heavy Always use proper and approved lifting equipment and take every precaution to safeguard yourself against injury Keep hands clear at all times Beware of getting fingers trapped between the chuck and bit and do not use hands or feet to clear the top of the borehole at any time Other safety advice is given throughout this document which you are advised to read 2 2 Hammer Care 2 2 1 Storage It is important to take the following steps in order to ensure smooth operation when hammer is to be re used When the hole is completed and the hammer is to be inactive for some time the following steps should be taken Short Term Storage e g 1 2 weeks e Using high pressure air blow the hammer clear of all water Turn automatic oiler up full and cycle hammer until oil is running out the shank of the drill bit If there is not an automatic oiler pour 1 litre 2 pints of rock drill oil in to the back head Top sub Turn the air on and cycle for 10 seconds This will lubricate the internal parts Seal the hammer at the back head top sub and chuck drive sub end with a rag to exclude any dust or foreign particles e Store the h
12. e used whenever possible as the hammer is a high frequency tool however where the pump cannot pump the oil in colder conditions a lower viscosity of oil can be used as per the graph below Remember Insufficient lubrication or incorrect lubrication grades may result in damage being caused to the hammer and its components Hydraulic oils engine oils gear oils and diesel are not recommended for lubricating DTH reverse circulation hammers Litres Hour Pressure Bar 6 9 13 8 20 7 27 6 34 5 A oe ee 120 Lt 48 9 u 100 A PS 37 8 gt 2 A 2 S D on A l 1586 A D E 3 l D gt m 2 4 4 S lt S a oe 6 7 E Z ISO150 ISO40 N 0 15040 PP 100 200 300 400 500 Pressure PSI US Pints Hour At low temperatures of 5 C 41 F and in hot humid conditions with higher air pressures when hammers can freeze up Anti freeze additive may be required at a rate of 1 2 litres 2 4 pints per hour or more as necessary 2 2 4 Operation Be sure to familiarise yourself with the controls of the rig and work in accordance with the rig manufacturers recommendations The hammer begins to operate as the air supply is turned on and when the drill bit is pushed firmly into the hammer Excessive thrust pressures are not needed to make the piston cycle The thrust controls on the drill should be adjusted to the correct pressure and should be readjusted to take account of the weight of any extra drill rods added so that the thru
13. es through large cracks leading to breakage diameter Feeding hard through voids on Use light feed and ensure the hole is kept clean and broken ground can cause consolidated Use foam or mud if necessary wearsleeve to distort causing heat cracks and galling on the piston Using wrench over wrong area to Use wrench only in the sleeve to distort Piston strike end Increase feed until rotation binds and pressure pulses and then breaking back off until the rotation and pressure becomes smooth Over running sample tubes will Replace sample tubes before they are worn out allow ingress between the two striking faces and cause piston nose to crack Leaders in the Field 4 Appendix 4 1 O O o O O O O S Mincon Rockdrills The Driller s Choice of Drilling Technology Reverse Circulation Hammer exploded view and Parts List and Technical Data MINCON MX4930 PARTS LIST AND SPECIFICATIONS Item Part Number MX4550AA01 MX4550AA11 1300 0780 BS 226 MX5053AT01 BS 224 BS 040 MX5053SC01 MX4550BH01 8406 175 N8 MX5053CV01 MX5053SP04 MX45505M01 MX4550LR01 MX4550SS01 MX4550ST01 BS 225 MX4550DR01 BS 225 BS 231 BS 040 MX4550SR01 MX4550 1C01 MX4550PNO01 MX4550WS01 MX4550PRO1 MX4550BB01 BS 152 MX4550CS117 MX5053BR01 MX4550CK01 109mm 12 mm Description Mincon MX4550 4 Remet Ext Flush Mincon MX4550 4 Metzke Ext Flush Internal Circlip O Ring Adaptor Tube
14. f contaminants and smooth out with emery paper making sure to clean thoroughly afterwards Where galling of the piston has occurred substantial heat has been generated and quite often micro cracking has occurred on the piston In these cases the piston should be replaced if there is evidence of such cracking Check the strike face of the piston for cracking or damage Inspect the Aligner for any galling or cracks If either is present then the aligner should be replaced All internal hammer O rings check valve and check valve seal should be examined and replaced periodically to ensure optimum performance and effective sealing from borehole ingress 2 3 6 Checking Wear Limits The performance of the hammer is dependent on the designed running clearances of critical components These should be measured and recorded in the Service log in the appendix The service log gives the location of where measurements should be made Depending on how many parts need to be replaced to bring the hammer back to optimum performance it may be economical to replace the hammer all together 2 3 7 Reassembly The hammer can be reassembled in the following manner referring to the exploded view of the hammer in the appendix Ensure all components except for the sample tube are liberally coated with good quality rock drill oil and threads with thread grease Replace all O rings and check valve seal before re assembly e Identify the chuck end of the hammer and st
15. he sample tube assembly in to the hammer Leaders in the Field of Drilling Technology NA e Pour hammer oil in to the hammer e Fit the screen to the adaptor tube and insert the assembly in to the back head Insert the circlip in to the back head to lock the assembly in to place e Screw the back head assembly in to the wear sleeve There should be a standoff gap of between 0 5mm 1mm 0 020 0 040 between the back head and wear sleeve shoulders If the shoulders meet up then the lock ring needs to be replaced so that all internal parts are properly locked in place Seal up the top of the hammer e Store the hammer on its side and rotate it periodically if it is being stored for an extended period of time e Ifa hammer is to be stored for a long period of time we would recommend that the hammer be disassembled oiled up and stored in a clean dry environment Leaders in the Field of Drilling Technology ER 3 Trouble Shooting Low penetration External drill clearances are worn Change or re sharpen the drill bit Make sure that the running and high pressure clearance on the bit seal is what you need for the drilling conditions Contamination in hammer Open hammer and clean the obstruction Rough or erratic Too much feed pressure Set the feed pressure until the rotation starts to bind Then back operation off the feed pressure until the rotation runs smooth Rotation speed too slow Drill bit peripheral rot
16. mmers are not reversible it is not necessary to remove the piston retaining ring However if required please do as follows e Insert a long flat head screw driver in to the groove in the piston retaining ring and lever the ring clear from the wear sleeve groove Using a hook pull the ring out of the wear sleeve e The back head is disassembled as so remove the circlip from its groove and lift the adaptor tube out with the screen assembled around it 2 3 5 Inspection Prior to inspection thoroughly clean all parts using a suitable cleaning agent Diesel is not recommended for cleaning as it can cause corrosion to components and damage to health All parts should be visually inspected for any signs of damage wear or cracking The inner cylinder wear sleeve and lock rings can be checked for unseen cracking by suspending them and lightly tapping with a screw driver If they emit a ringing tone then they should be sound However a dull flat tone if emitted may indicate cracking and the part should be replaced Take particular care to check the internal bore of the wearsleeve for pick up marks and galling If these are present the barrel of the wear sleeve should be honed out using a hand hone to remove them It is usual that if there are signs of damage or heat checking on one part that there is also the same on mating parts Inspect surface of the piston for pick up marks and galling usually caused through poor lubrication or the presence o
17. off between the backhead and wear sleeve has closed up e Before adding the first drill rod pour 1 litre 2 pints of rock drill oil in to the back head e Ensure all drill rods are blown clean of any dirt and debris and that all threads are cleaned greased and all o rings are in good condition before coupling together e Turn on air and blow until oil starts to run out of the bit shank e Cycle the hammer on half air for the first few minutes to run in internal parts 2 2 3 Lubrication It is vital for DTH hammers to receive a constant supply of proper rock drill oil in to the air stream to lubricate and protect the internal components and to provide a good air seal between the piston and its matching component parts for efficient drilling It is recommended that an automatic oiling system be used when operating your hammer Too much oil can cause hydraulic locking in the hammer Drilling with insufficient lubrication will cause the hammer to run dry and cause premature wear or failure The correct consumption of oil oil type is dependent upon the air volume and ambient conditions Please refer to the lubrication graph below for recommendations There should be visual evidence of oil around the drill bit shank and within the tube joints when changing tubes The recommended grade of oil is dependent on the ambient temperature in which drilling is taking place as well as the operating pressure As a rule of thumb ISO320 grade rock drill oil should b
18. sier if the chuck threads are regularly greased and the backhead threads are well greased any time the hammer is opened for servicing We recommend that a good quality thread grease be used and in acidic conditions we do not recommend copper based greases as this can trigger a galvanic reaction with corrosive effect to damage the root of the threads and cause failure 2 3 2 Opening Chuck and Backhead To open Mincon DTH hammers please adhere to the following instructions e The threads used in Mincon hammers are right hand threads Therefore they loosen in an anti clockwise direction Please use a bit breakout pot to hold the drill bit when opening the chuck Please ensure that the wrench is not placed on the threaded section or the piston running area of the wear sleeve Break out wrench jaws should be in good condition It is good practice to keep a spare set of jaws with the rig Do not strike or hit the outer components as this could weaken the heat treated steels and distort accurate running diameters e Hitting the hammer may also cause hard metal fragments to be chipped off which may be projected and cause personal injury or eyesight loss e Donot apply heat to the hammer as this can alter the metallurgical composition and result in premature failure e Take care when dismantling the hammer to make sure that parts and drill bits do not become detached and cause damage or personal injury 2 3 3 Dismantling Hammer to Change Drill Bit
19. st pressure remains constant and not excessive Insufficient thrust pressure will make the hammer drill erratically and less efficiently and cause premature wear to the bit and chuck splines with likely damage to the hammer components and threads When the hammer is lifted from the rock face the drill bit extends from the chuck and the percussive action ceases The air will pass through the hammer which can be used to flush the hole clean Rotation speeds should be selected to suit drilling conditions and drill bit diameters High rotation speeds can cause premature wear of drill bits hammers and drill rods Too slow a rotation speed can cause binding in the borehole and damage to drill bit inserts through the snatching rotation action In hard and soft formations of rock the aim of the hammer is to penetrate smoothly at the rate of 10mm 0 375 per drill rod revolution Generally in softer geology higher rotational speeds can give better results The controls of the drill should be adjusted in order to provide the largest drill chip size with the smoothest rotation and feed characteristics Rotation speeds should be set to suit the rock conditions being drilled Leaders th tre Field of Drillilng Technology RA Some ground conditions may cause binding within the hole with the added risk of the hammer drill bit and drill string becoming jammed Any excessive pullback forces or high rotation speeds used in an attempt to recover the drill s
20. tring may generate heat zones around the hammer which may affect the metallurgy of the components to cause damage and ultimate premature failure A backreamer sub may help reduce jamming in bad ground conditions and prevent heat damage It is recommended that you do not pour diesel into the hammer if it becomes bogged However if this is done there is the risk an internal combustive effect if the hammer is fired while there is diesel in it This will damage the hammer and its components Any heat induced failures are not covered by our terms of warranty Before adding drill rods make sure that the threads are clean well greased and all O rings are in good condition Ensure that there are no contaminants likely to enter the hammer to cause damage and early wear It is recommended that proper drill guides and break out systems be used which suit the diameter of the hammer All tools and spanners used for the drill bit and break out flats should fit properly Make certain that the hammer is stationary when applying spanner or breakout tools Do not rotate the hammer with a spanner attached to the drill string unless it is safely captivated within the breakout clamp All internal hammer O Rings check valve and check valve seal should be examined and replaced periodically to ensure optimum performance and effective sealing from borehole ingress 2 3 Servicing 2 3 1 General Dismantling the Hammer for servicing or to change the bit can be made ea
Download Pdf Manuals
Related Search
Related Contents
Sony AD-5200A Black LG 42LU60 User's Manual MANUAL GRAFICO DE INSTALACION DEL SEGUIDOR SOLAR GP Batteries Super Alkaline Mercury Free Alkaline Cylindrical Cell Model No.: GP910A Manual de instalação Philips Speed-XL Electric shaver HQ8160 取扱説明書 - デイトナ FS1A Safety Controller DOWNLOAD User manual / Bedienungsanleitung / Инструкция по Copyright © All rights reserved.
Failed to retrieve file