Home
        INSTALLATION
         Contents
1.   i E      INSTALLATION       s    TOMBSTONE TAILLIGHT 4992    CUSTOMER SERVICE    FITS    99  03 ROAD STAR     99 UP V STAR 1100 CLASSIC  AND    98 UP V STAR 650  CLASSIC   03 UP VULCAN 1600 CLASSIC AND CUSTOM APPLICATIONS       INSTALLATION QUESTIONS    PART   INCLUDED   1 Tombstone taillight bar  Light bar gasket  Kawasaki  Light bar gasket  Yamaha  L E D  housing  L E D  board    404991    404992 LIMITED WARRANTY    L E D  cover   Chrome license plate bracket   0 280 x 1 1 4  X  060 Fender washer  1 4    20 x 1 1 4  Ribbed neck bolt  8 32 x 1 2  PHPS   1 4  20 x 5 8  SHCS   1 4  20 Nylock nut   Taillight lens   L E D  board assembly   Lens housing   Taillight housing   Flat gasket   8 32 x 9 16  PHPS   1 4  20 Nylon insert   1 4  20 x 5 8  Ribbed neck DSHB  1 4  20 x 1 3 8  Ribbed neck DSHB  Wire Tap and Splice Kit  including   T Tap Female Quick Slide Scotch Lock connector  Male Scotch Lock Connector   4  Cable tie   Dielectric grease   Installation Instructions    404992B    404990G    904991    Ss nar Or Oy a ana nana unuwan ana et I OG a ana anaana a    Please read and understand entire instructions before starting installation     THANK YOU FOR CHOOSING KURYAKYN   ABOUT OUR CATALOG  WARNING  SHOCK HAZARD  DISCONNECT THE BATTERY BEFORE WORKING WITH      ANY ELECTRICAL CONNECTIONS     ATTENTION  This kit contains components to fit multiple manufacturers    models  be sure  to use the correct components for specific installations  The rubber mounting  pad that is pre mo
2. ITY SENSITIVE  USE A TEST LIGHT TO CHECK THE  POLARITY OF THE BIKE S WIRING BEFORE CONNECTING THE LED CIRCUIT BOARD   KURYAKYN IS NOT RESPONSIBLE FOR DAMAGE TO THE LED CIRCUIT BOARD  CAUSED BY REVERSED POLARITY     CAUTION  USE A TEST LIGHT TO VERIFY WIRE FUNCTIONS BEFORE CONNECTING THE LED  CIRCUIT BOARD TO NON STOCK WIRING  KURYAKYN IS NOT RESPONSIBLE FOR  DAMAGE TO THE LED CIRCUIT BOARD CAUSED BY NON STOCK WIRING     STEP 9 Connect the right turn signal ground wire  black  to the bike right turn signal ground wire  using the supplied Scotch Lock connectors  Connect the right turn signal power wire  brown  to the  bike right turn signal wire using the supplied Scotch Lock connectors     STEP 10 Connect the left turn signal ground wire  black  to the bike left turn signal ground wire  using the supplied Scotch Lock connectors  Connect the left turn signal power wire  violet  to the  bike left turn signal wire using the supplied Scotch Lock connectors     STEP 11 Reconnect the battery  Start the bike and test for proper function  If the turn signals flash  rapidly  or exhibit any other abnormal operation  you will need to install the load equalizer included  with the kit    PAGE     cont   3  TOMBSTONE TAILLIGHT INSTALLATION    INSTALL THE LOAD EQUALIZER   Remove the seat  Locate the wiring harness from the rear fender  Connect the black wire from the 0 0     load equalizer to the right turn signal ground wire in the wiring harness  Connect one violet wire Kurvakyn  from the 
3. is even with the end of the bolt  shaft  See PIC 2 Using a soft faced dead blow hammer  tap out the two top bolts     STEP 4 Remove the nuts from the loose bolts and turn the backing plate over  Place the top  1 3 of the backing plate back on the covered wood block and insert the threaded shaft of the  bolts into the upper holes  See PIC 3  Using the dead blow hammer  tap the bolt heads squarely  to seat the bolts into the backing plate     STEP 5 Install the backing plate onto the taillight and tighten the two fasteners to secure   Install the rubber gasket over the three mounting bolts in the backing plate  See PIC 4     STEP 6 Continue the taillight installation as outlined in the appropriate sections below     i     PROCEDURE FOR KAWASAKI AND ALL OTHER MODELS    REMOVE STOCK TAILLIGHT  STEP 1 The stock taillight assembly is held in place with nuts located under the fender  Loosen the nuts  and remove the taillight assembly  Disconnect the wiring harness       PAGE  STEP 2 Remove the license plate bracket        conte TOMBSTONE TAILLIGHT INSTALLATION    STEP 3 The stock turn signal light bar is held in place with bolts located under the fender  Loosen  the bolts and remove the turn signal light bar  Disconnect the wiring harness     STEP 4 Feed the wires for the new Tombstone Taillight through the rubber gasket then through    shee Kuryakyn    STEP 5 Mount the new taillight assembly to the fender using the existing holes  Fasten the  taillight using a supplied fender washe
4. load equalizer to the right turn signal power wire in the wiring harness and one violet wire   from the load equalizer to the left turn signal power wire in the wiring harness     CAUTION  DO NOT SECURE THE LOAD EQUALIZER TO THE CONTROL MODULE  EXCESS  HEAT FROM THE LOAD EQUALIZER COULD DAMAGE THE CONTROL MODULE     CAUTION  ALWAYS INSTALL THE LOAD EQUALIZER UPSTREAM OF ANY EXISTING AFTERMAR   KET MULTIFUNCTION CONTROL MODULES  DO NOT INSTALL A LOAD EQUAL   IZER BETWEEN A MODULE AND THE TURN SIGNALS AS THIS WILL OVERLOAD  THE MODULE  OVERLOADING WILL DAMAGE THE MODULE AND CREATE A FIRE  HAZARD     CAUTION  LOAD EQUALIZERS GENERATE HEAT WHEN IN USE  AVOID USING THE TURN  SIGNALS FOR AN EXTENDED PERIOD OF TIME  OTHERWISE THE LOAD EQUALIZER  WILL OVERHEAT  NEVER OPERATE THE FOUR WAY FLASHERS UNLESS YOU FIRST  REMOVE THE LOAD EQUALIZER  OVERHEATING DAMAGES THE LOAD EQUALIZER  CAUSING LOSS OF TURN SIGNAL OPERATION AND COULD CREATE A FIRE HAZ   ARD     STEP 12 Use the supplied 4  cable ties to secure the wires away from moving parts     WIRING THE HALOGEN TURN SIGNAL  P N 2336 OR 2337    ATTENTION  These instructions are applicable to multiple manufacturers    models  be sure to verify  the correct wiring connections using a factory service manual for your specific model    STEP 13 The halogen turn signals use a chassis ground  you must ground the taillight housing in   order for the turn signals to operate  Create a ground strap by crimping one end of a 5  length of 16   gauge gro
5. r and 1 4   20 Nylock nut for each bolt     WIRING THE TAILLIGHT AND LICENSE PLATE ILLUMINATOR  ATTENTION  These instructions are applicable to multiple manufacturers    models  be sure to verify  the correct wiring connections using a factory service manual for your specific model     STEP 6 Route the taillight and license plate illuminator wires under the fender and seat  following  the wiring from the stock taillight     STEP 7 Connect the ground wire  black  on the new taillight assembly to the ground  wire on the bike using the supplied Scotch Lock connectors     Connect the run function wire  red  on the new taillight assembly to the run function wire  on the bike using the supplied Scotch Lock connectors     Connect the brake function wire  white  on the new taillight assembly to the brake  function wire on the bike using the supplied Scotch Lock connectors     STEP 8 Connect the license plate illuminator power wire  red  to the run function wire  on the bike using the supplied Scotch Lock connectors        Connect the license plate illuminator ground wire  black  to the ground wire on the bike using the  supplied Scotch Lock connectors  See PIC 5 for proper use of the Scotch Lock connectors     WIRING THE L E D  TURN SIGNAL  P N 2366 OR 2367   ATTENTION  These instructions are applicable to multiple manufacturers    models  be sure to verify  the correct wiring connections using a factory service manual for your specific model     CAUTION  LED CIRCUIT BOARDS ARE POLAR
6. und wire  not included  with a 1 4  ring terminal connector  not included   crimp the other   end with a supplied Scotch Lock connector  male    STEP 14 Connect the ring terminal to one of the top two nuts that secure the taillight assembly to   the fender  Connect the Scotch Lock connector from the ground strap to a Scotch Lock connector    female  crimped to the existing ground wire on the bike     STEP 15 Connect the right turn signal power wire  black  to the right turn signal power wire on the  bike     STEP 16 Connect the left turn signal power wire  black  to the left turn signal wire on the bike   STEP 17 Reconnect the battery  Start the bike and test for proper function     STEP 18 Use the supplied 4  cable ties to secure the wires away from moving parts     Ride On     PAGE       TOMBSTONE TAILLIGHT INSTALLATION    
7. unted to the Tombstone Taillight is designed for Yamaha  applications  We suggest replacing the rubber mounting pad with the  additional pad supplied in the kit for installation on a Kawasaki Vulcan 1600  Classic     ATTENTION  It is the installer   s responsibility to ensure all fasteners  including pre assembled   are tightened before operation of the motorcycle  Kuryakyn will not warranty  components lost due to improper installation  Periodic maintenance may be  required     4992 15HD 0507   cont         TOOLS SUGGESTED ki  gt  k    Metric sockets  metric Allen wrenches  standard Allen wrenches  7 16  socket or combination wrench  Urvd UII    pliers  wire stripper crimper  dead blow hammer  for Kawasaki only                             PIC 1    PROCEDURE FOR KAWASAKI MODELS ONLY   ATTENTION  The press fit forward mounting bolts on the taillight backing plate must  be removed and re positioned for Kawasaki applications  Do not attempt  to perform this installation if you are not confident in your ability to  complete all steps in the procedure  consult a trained technician     STEP 1 Remove the nuts and washers from the bolts  remove the backing plate  from the taillight assembly  See PIC 1  Save the hardware     STEP 2 The two top press fit bolts must be removed from the backing plate  Place  the top 1 3 of the backing plate  with the bolts heads facing down  over a wood block  covered with a soft cloth    i     STEP 3 Thread the nuts onto the two top bolts until the nut 
    
Download Pdf Manuals
 
 
    
Related Search
 INSTALLATION  installation  installation assistant  installation directory  installation folder  installation media  installation file  installation manager  installation wizard  installation art  installation assistant windows 11  installation solar power system  installation made easy  installation status report  installation floater  installation of mini split air conditioner  installation definition  installation solar panels  installation synonym  installation status  installation guide  installation instructions  installation file download  installation manual  installation has failed discord  installation icon 
    
Related Contents
Maîtrise des charges Avez-vous un bon syndic ?  JTS-315SP_CE Manual Cover_20091030.DOC  dreamGEAR Lava Glow  MWHA 122.1 X - Ariston Appliances  fonds joseph cardin mg 31-d188 - Bibliothèque et Archives Canada  Massive Suspension light 36230/17/10  manual de instruções do self-booking da kondor viagens e turismo  SUGGE ESTIONS D DE LECTU URE POUR En 5e En 4e En 3e R    Copyright © All rights reserved. 
   Failed to retrieve file