1. ETNZ Safe Rigging Practices for the New Zealand Version Draft Andrew Gibson Steve Sanders Sam Johnston and Grant Gilbert 7 1 2013 Scope The aim of this guide is to provide an overview of acceptable entertainment rigging practises for venues throughout New Zealand There is a number of well written entertainment rigging texts on the market and it is not our intent to create another of these For the purposes of this document the term venue extends beyond the traditional theatre space and includes e Arenas e Ballrooms e Conference rooms e School halls e Any other indoor area that is being used for the purposes of entertainment event Outdoor structures staging and consideration for persons climbing or being suspended from trusses are not considered in this document We propose to broaden the scope of this document to include these topics in future versions Administration This guide has been produced for the Entertainment industry of New Zealand through ETNZ The major contributors are Andrew Gibson Steve Sanders Sam Johnston Grant Gilbert The primary contact for this guide is Andrew Gibson 26 Saville Row Johnsonville Wellington 6037 andrew productionservices co nz This guide has been presented to the industry in July 2013 during the ETNZ conference as a draft for industry feedback Copies of the draft can be obtained via the ETNZ website www etnz org Following consideration of the feedba
2. current standards and is serviceable proof of load test PAT test and service record Inform venue of any late changes e g needing to move points elsewhere Ensure all points are designed with suitable redundancy so that the failure or one component will not result in catastrophic failure This can be achieved by the use of a secondary suspension at each point where the secondary point is appropriately installed to handle the transfer of load onto it Where a venue stipulates a secondary suspension point safety must be provided it is the responsibility of the Contractor Client to prove that there is sufficient redundancy in their rigging to omit the safeties and obtain a written exemption from the venue management Ensure that where it is not possible or practicable to install secondary points a detailed and job specific risk assessment and method statement must be produced which will stand up to peer review or be approved by an industry based engineer supply to the contractor client Publish and make available a service load manual to users and sub contractors upon request Publish additional requirements that the venue has e g all riggers to have completed a safety at height course Have stamped or permanently labelled and dated on beams allowable loads and load distribution Check proposed loads from production companies against venue service load manual seek additional advice e g peer review engineer Provide a compe
3. must never be choked or prevented from twisting freely in the hook as the twist could damage the chain and or lifting device and cause jamming References Donovan H 2002 Entertainment Rigging A Practical Guide for Riggers Designers and Managers Rigging Seminars ETNZ 2011 A Guide for Safe Working Practices in the New Zealand Theatre and Entertainment Industry version 12 ETNZ downloaded from www etnz org Higgs C 2008 An Introduction to Rigging in the Entertainment Industry 2 Edition Entertainment Technology Press MBIE Ministry of Business and Employment 2012 Approved Code of Practice for Load Lifting downloaded from http www business govt nz healthandsafetygroup information guidance all guidance items acop load lifting rigging PLASA 2010 PLASA National Rigging Certificate Handbook 2 edition Professional Lighting and Sound Association Prolyte Group 2008 Black Book Prolyte Technical matters 2 edition Prolyte Group downloaded from www prolyte com Prolyte Group 2009 Operating maintenance and Service Manual Prolyft PLE 11 12 13 series Chain Hoist Prolyte Group downloaded from www prolyte com Appendices 1 0 Truss DEFINE TRUSS AND KEY ELEMENTS HERE 2 0 Qualifications Currently the New Zealand qualification structure is going under a review ETNZ are heavily involved in this review and developing relevant qualifications for the industry which includes rigging 3 0 Gover
4. ans of documenting the process that will be undertaken to achieve the job It provides a time line a hierarchy of responsibility equipment to be used and how A Method Statement is a means of communicating how the risks identified in the Risk Assessment are to be managed for a particular job There is a Method Statement template in Appendix 7 0 as well as in the resources section on the ETNZ website e under the heading Job Safety Assessment The following six questions can be used to help perform this assessment If you answer NO to any of the primary questions the secondary questions can be used as an alternative approach If you can answer YES to all primary or the relevant secondary questions then proceed with the task If you answer NO to primary or subsequent secondary questions ask your supervisor for advice The task may require supervision by experienced personnel or if this is not available further input from specialists Have you performed this type of task before or is there a documented procedure Do you have suitable experience to complete this task Do you have access to suitable advice Are you experienced with the equipment to be used Do you have access to manufacturer s instructions and specifications Is specialist training or advice available Do you know the maximum point capacity and weight of every load to be rigged Can the venue and production provide detailed documentation Do you have access to specialist advic
5. ck version one of this guide will be released to coincide with the 2014 annual general meeting for ETNZ This document is to be reviewed again in 2015 and then reviewed every four years after that The review committee are to be endorsed by the ETNZ Executive after the release of each version of the guide Summary THIS SUMMARY WILL BE INCLUDED INTO A GUIDE FOR SAFE WORKING PRACTICES IN THE NEW ZEALAND THEATRE AND ENTERTAINMENT INDUSTRY Terms TO BE COMPILED Health and Safety Notifiable work Any rigging work that involves the following is considered notifiable e Involves lifting over 500 kg over five metres and or e Involves working where the worker could fall five metres or more Hazardous work notifications can be completed online at http www osh govt nz tools HazardousWork Pages HazardousWork aspx Risk Assessment A job risk assessment is the process of identifying the risks associated with a particular type of work and environment then assessing them on a likelihood of occurrence verses the severity of consequence matrix Control measures are stated and the corresponding reduction in the matrix score indicated on the assessment Risk assessments are covered in detail in A guide to Safe Working Practices in the New Zealand Theatre and Entertainment Industry which can be found with the following link http www etnz org files Guide Version12 pdf Method Statement Job Safety Assessment A Method Statement is a me
6. ductivity disruption impact PROBABILITY Highly Unlikely Unlikely likely Highly Likely Adventure Southland 810 North Road JSA Assessment Level of Risk Invercargill 3 6 2 Blank Risk Assessment Before Controls After Controls Consequences Likelihood compiled by Adventure Southland pee nae Job Safety Assessment Date Dept Approved by ob Location and details process property and environment Tags Barricades General Considerations ETNZ Job Safety Analysis 16 07 2013 compiled by Adventure Southland Job Step Hazard Identified Controls Action ETNZ Job Safety Analysis 16 07 2013 compiled by Adventure Southland Job Step Hazard Identified Controls Action ETNZ Job Safety Analysis 16 07 2013 Appendix 8 0 Blank Inspection Chart www busines govt nz Example register thorough examination of all chains ropes or lifting tackle SoS sah E spe Particulars of any defect found Gr which may affect the same working load and steps taken to remedy such a defect To be initialled and dated
7. e Have all safety issues and site hazards been identified and addressed Can additional measures be installed to reduce risks Can additional equipment be used to manage risks Do you have suitable access including necessary personal protection to all work areas Is suitable access equipment available Are you suitably experienced and qualified in advanced access methods Do you have clear communication channels to other workers in the area Are radios or mobile phones available Do you have a system of hand signals everyone can understand Adapted from North Sea Lifting 2001 The International Working at Height Handbook North Sea Lifting Aberdeen Equipment Truss Aluminium and to a lesser extent steel truss is standard product used for suspending lighting audio visual and scenic equipment in the events industry There are numerous shapes and sizes of truss available to meet the job requirements When selecting truss take into account the following considerations Know the potential loads and distribution of loads along the truss Know the span lengths distance between support points you require Truss must have a label stating o Manufacturer o Type of truss o Serial batch number The supplier of the truss must be able to provide The materials used to manufacture the truss The dimensions and engineering properties of the truss The standards the truss was manufactured to eg EN 13814 Discard criteria for the t
8. ipment the supplier must be able to present a maintenance policy and service log for the equipment e When using more than one hoist to lift a load e g a truss line suspended on two hoists the WLL of the hoist must be reduced by a factor of 0 75 to allow for discrepancies such as the truss not being perfectly level Prolyte Group 2009 e Ground support towers often use a combination of truss and a lifting device These towers need to have an accompanying engineering report stating the allowable height of the tower allowable loads that can be suspended and any bracing required to ensure structural stability e When using ground supported structures the load carrying capacity of the ground needs to be factored into load calculations Rigging Accessories Rigging accessories are considered to be items that are required to connect the truss to the lifting device and the lifting device to the venue This includes e Steel hardware such as shackles Masterlinks and Quicklinks e Steel cable such as slings stingers and drifts tracers e Synthetic slings such as web slings and polyester round endless slings e g Spansets e Chain slings and clutch chains e Lifting brackets and spreader beams Rigging accessories need to display e Working load limit e Manufacturer e Batch serial number As with other rigging devices the supplier must be able to provide documentation as to the standards the equipment complies with and an ins
9. ning legislation STATE RELEVANT LEGISLATION HERE Health and Safety Load lifting Cranes Scaffolding 4 0 Information ADITIONAL INFORMATION SOURCES E G ENGINEERS AND WHAT TYPE OF QUESTIONS TO ASK AND INFORMATION TO PROVIDE LIKE PROPOSED METHOD OF ATTACHMENT TO THE STRUCTURE 5 0 Useful calculations TO BE EXPANDED with better diagrams All good rigging texts have the key calculations required for day to day rigging These include Donovan 2002 Higgs 2002 and PLASA 2010 The following calculations refer to the diagram below H1 3000 7000 3000 vi Calculating the length of a bridle leg is performed using Pythagoras theorem For bridle leg one L JV H For bridle leg two Lz 4V2 H2 V and V are the vertical distances from the respective beams to the point H and H are the horizontal distances from the respective beams to the point Calculating Bridle leg tension Wili For the first bridle leg T V Hy VoHy LG For the second bridle leg T MH V2Hy Where W is the load to be lifted Calculating the resultant loads from a series of point loads on a truss W 800 kg 2500 7500 H2 Ry Span R2 EE EE The resultants for a single point load can be calculated as follows _ WH Span 1 _ WH Span 2 The above formula can be used for each point load and the values for R and R can be summed to give the total resultants Resultants from dis
10. pection and discard criteria as well as in a rental situation a maintenance and service log Rope Rigging As ropes are used in numerous applications in event rigging it is important to consider the following when selecting the appropriate rope e The purpose of the rope rigging e g a haul line for points cable picks to hang banners or as part of a working at height system e The loads imposed on the rope e The temperature properties of the rope e And the abrasion resistance properties of the rope The properties of ropes can be provided by the supplier and further information on appropriate use can be found in the Approved Code of Practice for Load Lifting and Rigging MBIE 2012 Ropes need to be inspected for damage from temperature chemicals including rot and abrasion prior to use Inspection and Maintenance All equipment must be visually inspected prior to each use In addition to this all equipment must be periodically inspected by a competent person and documented e The inspection chart must state the asset number or serial number of the piece of equipment the date put into service the condition and outcome and the name of the inspector e The length of period will be defined by the manufacturer or governing legislation and is adjusted according to amount of use and or the environmental conditions In any case the minimum requirement is twelve months MBIE 2012 e An example of an inspection char
11. russ O 0 0 0 Ideally a load table that has some standard spans and standard load configurations e When renting truss the supplier must be able to present a maintenance policy and service log for the equipment Lifting Devices The electric chain hoist is another staple piece of equipment in the entertainment industry Other equipment commonly used for lifting including manual chain blocks and wire rope winches often mounted to stands Like truss there are a range of sizes configurations and manufactures of chain hoists and the type required depends on the proposed use The following considerations need to be taken e What loads are to be lifted e What speed do the loads need to be lifted at it is important to consider the dynamic loads imposed on the supporting structure e How many points is the structure is to be lifted by and the load distribution through these points e The following information must be stated on the lifting equipment o Manufacturer o Type of hoist WLL As there is an infinite number of load configurations it would be impossible to tabulate them all however a structural engineer would be able to calculate the suitability of design based on the dimensional and engineering properties supplied o Serial number and o If applicable electrical requirements voltage number of phases required amperage draw e Electrical equipment needs to have a current PAT test tag e When renting lifting equ
12. t can be found in Appendix 8 0 Methodology Paperwork Plans Plans are an easy way to communicate key information to relevant parties In order to achieve this they need to e Be specific to the venue e Beofa suitable scale i e readable e Be accurate Key measurements should also be stated on a plan and elevations should also be included especially where venue height could be a limiting factor Load calculations In order to ensure a rigging system can support a show there needs to be an accurate assessment of the loads imposed in the system Once the loads of the show have been calculated the resultant loads on the rigging and into the venue can also be calculated Resultant loads can be greatly increased by minor adjustments to the rigging for example making a bridle shallower or taking an extra wrap on a sling around a truss to gain a slightly higher trim height Where there is a complex load distribution calculations should be checked by a suitably qualified structural engineer Most rigging texts have a number of useful formulas for determining resultant loads and some are reproduced in Appendix 5 0 Contractor Client to supply to the venue Venue to Provide a load plan of the proposed rig in the venue at least ten working days prior to arrival Provide a method statement as outlined above Provide a risk assessment for particularly hazardous situations Provide if requested proof that equipment complies with
13. tent person knowledgeable of both the venue and current rigging practices during all major rigging and de rigging procedures It is envisaged that ETNZ would work with venues to ensure they provide the information required and could hold a copy of this information Factors of Safety The factor of safety is the ratio between the designated working load limit WLL or safe working load SWL and the load the equipment is expected to fail at The following are the minimum factors of safety are extracted from the Approved Code of Practice for Load Lifting Rigging ACPLLR MBIE 2012 Equipment Factor of Safety Flat web and round slings 6 1 Steel rope 5 1 Chain and accessories 4 1 e In high risk situations i e when suspended over people the above safety factors must be doubled Trusses are treated differently to other rigging accessories and typically the allowable load tables use a factor of safety a lot lower than above For example Prolyte use a factor of safety of 1 7 for plastic deformation and 2 5 for failure Prolyte Group 2008 This is in line with engineered aluminium structures in the construction industry Likewise in high risk situation the loads within the load tables must be halved to double the safety factor How the rigging equipment is to be used may affect the WLL of the equipment MBIE 2012 Treatment Multiplication factor Straight pull 1 0 Basket hitch 2 0 Choke hitch 0 7 Chains from lifting devices
14. tributed and linearly increasing loads can be obtained by applying the total load as a point load through the centre of gravity of the element Appendix 6 0 Risk Assessment 6 1 Analysing risk adapted from resources from www ETNZ org HAZARD ASSESSMENT PROBABILITY 5 medium medium far faer 4 fom fom Jmdium fam faer 5 fom fom fom fmedum faer CONSEQUENCE members with an authorized sign off members Evaluation StudyHealth Risk Low level medical surveillance Health Risk Consider medicalfHealth risk periodic review No health surveillance monitoring required Review controls Review controls Health Risk immediate mandatory medical surveillance Change controls after immediate review CONSEQUENCES Maximum Reasonable Consequences People Plant Property Process eS ae r More than 500K damage and or i Fatality Permanent Disability f Major environmental impact production disruption p 100K 500K damage and or Significant environmental impact Lost day injury or illness i i i ETE production disruption license violation OFRE 50K 100K damage and or On or off site environmental Restricted duties injury production disruption harm er S5K 50K damage and or Onsite environmental Medical treatment injury i i j production disruption degradation or minor offsite i os Under 5K damage and minimal Minor onsite environmental First aid injury _ pro
Download Pdf Manuals
Related Search
Related Contents
Irrigation avec l`eau géothermale salée dans le Sud tunisien Samsung SGH-D500 Vartotojo vadovas Kodak ESP 9200 User's Manual Der Einfluss von kalorischer Restriktion und Melatonin auf die Sony WSX10FB User's Manual Manhattan 176668 computer TV tuner User manual PySyCache 3.0 Copyright © All rights reserved.
Failed to retrieve file