1.     8 9 Grounding Systems     1      2     Generally     a  The lighting protection for underground cables is specified in para  13 11  herein after      b  The light fittings  secondary cables and secondary wires of isolating  transformers shall be grounded for lightning protection      c  The grounding system shall be provided properly for safeguard to the person   equipment  light unit  and fitting  etc      d  The grounding of equipment shall be made mechanically and electrically to  ensure the continuous system  and shall be conductive      e  The common grounding counterpoise wires of the grounding system and  lightning system shall be used for light fitting and light units     Common Grounding Wires    The lightning protection wires shall be installed above underground cables and power  cables for linked circuits        Page   7    Air Transport Capacity Enhancement Project    Division 120 010 Particular Requirements Lukla    ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       9 0    9 1    9 2    9 3     3  Grounding Wires   a  The grounding wires to be used in this work shall be manufactured and tested in  accordance with the appropriate standards authorized in the country of  manufacture or equivalent thereto    4  Light Units   The grounding of the VAGS and APAPI shall be made by connecting 8 mm  600 volts   PVC insulated wire with the grounding terminal of each light unit to the main   common grounding wires     5  Equipment    a  
2.    Series Circuit Cable Joint    1  All joints of the series circuit cables including their extensions  as well as joints with   lead cables of the isolating transformer shall be made by means of the plug and the    receptacle      2  Prior to joining  the plug and the receptacle shall be thoroughly cleaned to be free  from greases  dust  etc      3  Unless otherwise specified  all plug joints shall be protected by 4 layers of self        Page   18    Air Transport Capacity Enhancement Project    Division 120 010 Particular Requirements Lukla    ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       13 9    13 10    13 11    bonding tape  topped by 3 layers of PVC tape  with the exception of all connections  with the secondary lead cable of the isolating transformer  whose receptacle shall be    joined to the plug of the light fittings by means of a cable clamp     Power and Control Cable Joint     1  Joints and terminations of the power cable and control cables shall be executed in a  manner to be approved by the Engineer  For the sake of easy access for maintenance   in principle all joints shall be made in the handholes     2  Full details of jointing materials shall be submitted to the Engineer for written  approval  before shipment    Installation    1  Power cable installation shall be executed in accordance with ICAO Aerodrome  Design Manual Part 5     Electrical Systems    4 5 installation of underground cables     2  The approximate rout
3.   600 V AC       Page   6    Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       No  of Pole  2 pole  Operation  Manual  8 8 Electrical Power Equipment    1  The electrical panels shall be of self contained cubicle type  floor standing  with a full  front face door  and or rear access  with cable entry from the bottom     2  Adequate ventilation shall be provided to enable the equipment to operate  continuously under the local ambient temperature designated hereinabove  and the  same time care should be taken into account of rodents     3  Precautions shall be taken to prevent overheating through hysteresis and eddy current  loss     4  All electrical equipment shall be provided with a suitable grounding terminal     5  All control panel wiring and secondary control wiring in circuit breakers  control gear  and the like shall be made in a neat and systematic manner  with cables supported  clear of the panels and other surfaces at all points to obtain free circulation of air     a  Wiring shall be colour coded as follows   Green   Grounding  Yellow   All wiring other than grounding circuit    b  All small wiring ends shall be marked to discriminate the circuits  voltage   current  fault circuit  etc     6  The miniature circuit breakers  MCB  shall be manually operated  trip free    mechanism with electromagnetic or thermal magnetic type tripping element 
4.   erection or on final completion  the Engineer  may reject the item or defective component thereof  whichever is considered necessary  and  after adjustment or modification as directed by the Engineer  the Contractor shall submit the  item for further inspection and or test  In the event of the defect of any item being of such a  nature that the requirements in the Specification cannot be fulfilled by adjustment or  modification  such item is to be replaced by the Contractor at his own expense  to the entire  satisfaction of the Engineer     TRAINING OF PERSONNEL    General   1  The following provisions are to be referred to in connection in this section   Phases of Training     1  The Contractor shall conduct training for technical personnel who will operate and  maintain the system equipment supplied under this Contract      2  Training for equipment operation and the maintenance of the equipment and systems  shall be provided as specified herein in phases as follows      a  Factory training    b  Local training      3  All training shall be conducted in English language and be suitable for trainees with  the appropriate level of education  A detailed programme for all training shall be  submitted to the Engineer not later than fifty six  56  days before any training is  started      4  The Contractor shall update  if deemed necessary by the Engineer  the detailed  programme under the Contract not later than twenty eight  28  calendar days before  the date when the Contrac
5.  Manual Part 5  The specification of AFL Secondary Cable  shall be     Type of cable  Two core cable   Type of outer sheath   Black Elastomer  Conductor  Stranded copper   Cross Section  3 5mm      Inner sheath  Blue and Brown Elastomer  Rated Voltage  600 Volt    The secondary cables shall be provided either with a factory moulded receptacle or  factory moulded plug  depending upon their location     13 4 Plugs and Receptacles     1      2     Specification of Plugs and receptacles for the Primary Cable shall be as follows     The Primary Cable Connector Kit shall comply with FAA Specification for L      823  Class B  AC No  150 5345 26D Plug and Receptacle Cable Connectors   The connector kit is to be used with primary cable with screen shall be suitable  for termination on primary cable as specified above  The connection shall be  made by using pins and sockets made of tinned copper to be crimped on the 6  mm  conductor  The kits shall also contain a special device allowing the  continuity of the cable screen  The external housing shall be filled with  Silicone Grease for water repellent and insulation  The specification of  Primary Connector Kit shall be as follows     Rated Current  25 Amps   Rated Voltage  5kV   External Housing  Thermoplastic Elastomer  Plug  FAA Class B  Type I  Style 3  Receptacle  FAA Class B  Type I  Style 10    Specification of Plugs and receptacles for the Secondary Cable shall be as follows   The Secondary Cable Connector kit shall comply with F
6.  Panel    8  Changeover Switch    9  Constant Current Regulator    CODES AND STANDARDS    Characteristics of the airfield lighting shall  except when clearly indicated otherwise in the  Specification  conform to the following ICAO Standards and Recommendations  Aerodrome  Design Manual  Airport Services Manual  IEC International Standards and other related  national or international regulations        Page   1    Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       32    3 3    4 0    4 1    4 2    4 3    4 5    5 0    5 1        Annex 14 Aerodromes  Fifth Edition     July 2009       Aerodrome Design Manual  Part 4 Visual Aids  Fourth Edition     2004       Airport Service Manual  Part 9 Airport Maintenance Practices  First Edition     1984     Unless specified otherwise in this Specification  design  materials  manufacture  and testing  of all works shall comply with the following Standards and recommendations     ICAO Aerodrome Design Manual  Part 5 Electrical Systems  1  Edition     1983     ICAO Airport Services Manual Part 8     Airport Operational Services  IEC International Electrotechnical Commission Publications  ISO International Organization for Standardization    Materials  devices and small parts may comply with the national or international authorized  Standard prevalent in the country of manufacture  However  adequate modification shall be 
7.  charges  overheads  profits and  taxes required to complete the work contained in this Section of the Specification  and or shown on the Drawings     The rates for cabling shall further include for     a  trenches excavated by hand or machine  and in all types of ground including  backfilling  disposal of surplus material  supports  protection and  maintenance of sides  dewatering  etc      b  PVC conduit  where not measured separately      c  terminations  including gland assemblies  lugs  ferrules  seals  earth tags   shrouds  markers and connections     d  cable supports and protection  including raceways  rigid or flexible conduits   cable trays  trunking  ladders  unless separate pay items have been  specifically included in the Bills of Quantities  and for all fittings  supports   brackets thereto     e  maintaining earth continuity     f  cable sleeves for casting into the structure and caulking between cables and  plugging sleeves with fire resistant material     g  all necessary marker post  marker tape  plates and tiles   h  fixing to and embedding in any surface the foregoing items including  providing all clips and fixings  cutting out holes  notices and chases  finishing    over and all making good    The rates for underground ducts  where measured separately  shall include for        Page   20    Air Transport Capacity Enhancement Project    Division 120 010 Particular Requirements Lukla    ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla 
8.  made for the point of interface with the facilities provided in accordance with relevant  Standards and regulations     DESIGN AND MANUFACTURE    All equipment and materials to be provided under this Specification shall be installed on the  Site and shall be capable of working continuously under the conditions as specified     The Contractor shall submit the design documents where applicable  to the Engineer for  approval within one hundred and twenty  120  days from the Commencement Date  The  Engineer shall be advised if any change in design is found necessary after original approval is  granted  The Engineer may require re approval if they involve changes in concept  approach   quantity  size or weight  power requirements  performance     LV Switch Board Panel for electrical power distribution equipment shall be provided with  proper ventilation grilles  and these ventilation grilles shall be designed to ensure rodents will  not enter into the cubicles    Not less than 60 days prior to the shipment of the related equipment or structures  two final    draft copies of installation instructions  drawings and maintenance and operation manuals  shall be submitted to the Engineer for approval     SPARE PARTS    General   1  The following provisions are to be referred to in connection with this Specification      a  The Contractor shall supply spare parts sufficient for two  2  years normal  operation of equipment      b  The Contractor shall assure the availability of spare par
9. 2 6    2 7    fibre or aluminium plate housing containing the optical projectors  filters  lamps  lead  cables  etc   with an adjustable positioning frame and mounting legs to give an  adjustment in lateral  transversal  horizontal and elevation angle      b  The colour transition from red to white in the vertical plane shall be such as to appear  to an observer at a distance to occur up to a vertical angle of not more than 3 minutes     c  The light distribution of each unit shall be in accordance with the specification of  Appendix 2  Figure 2 23 of ICAO Annex  14     d  The light unit housing shall be guaranteed against distortion due to sun or other  climatic conditions prevailing on the Site     e  Each light unit and supporting pipe shall be of lightweight  frangible  construction suitable for concrete mounting base and shall be of sufficient  strength to withstand aircraft engine blast     f  Exterior finished colour of light units shall be Yellow in colour    Installation    a  Each light unit shall be installed on top of concrete mounting base using a breakable  coupling or frangible pipe     b  Two  2 light units shall be in the level when checked by precision level meter and  electronic survey equipment     c  The lower edges of all the slots of light units shall be within 150 mm of average level  of the nearest point of both runway edge lines     d  Exact position of light units to be installed shall be subject to the approval of the   Engineer    Prior to erectin
10. AA  L 823 Class B     AC 150 5345 26D Plug and Receptacle Cable Connectors and shall be  suitable for termination on secondary cable as specified above  The       Page   16    Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       specification of AFL Secondary Connector Kit shall be     Current Rating  20 Amp  Voltage Rating  600 Volts    Housing   External housing in thermoplastic elastomer  Plug  FAA Class B  Type II  Style 5  Receptacle  FAA Class B  Type II  Style 12   3  The plug and receptacle shall be watertight and will withstand continuous use under    the designed ambient temperature range  The connector plug and receptacle shall  resist a pulling force equal to a static weight of 5 kg without becoming disconnected   All plugs and receptacles shall be identical and of uniform manufacture     13 5 Isolating Transformer     1  The types and characteristics of the isolating transformer to be supplied shall be as as  specified below     The Isolating Transformer shall comply with ICAO recommendations of  Aerodrome Design Manual  Part 5 with FAA L 831 AC 150 5345 47B  It shall  have two copper windings  primary and secondary  wound separately on a  magnetic core circuit  One side of the secondary winding shall be connected to an  external earthing terminal for its connection to the earth  It shall be completely  moulded in thermoplastic elastomer  wit
11. Air Transport Capacity Enhancement Project Section 120 000 Airfield Lighting Works  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       SECTION 120 000    AIRFIELD LIGHTING WORKS    Air Transport Capacity Enhancement Project Section 120 000 Airfield Lighting Works  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       SECTION 120 000 AIRFIELD LIGHTING WORKS    DIVISION 120 010  PARTICULAR REQUIREMENTS LUKLA eerren 1  LO  GENERAL wae seth A te 1  20    SCOPE OF WORKS wus dence eine A Wine ee 1  3 0     CODES  AND STANDARDS  caco decia diia fas 1  4 0 DESIGN  AND MANUFACTURE iaieineea ee e E EE AE 2  5 0  SPARE PARTS aninion nrin A E a e e a A E E A EE eects 2  6 0   lt  TOOLSAND APPLIANCES et e eaa e AER ne E ld it 3  T0     MEASURING EQUIPMENT cusco dais 4  8 0 EQUIPMENT REQUIREMENTS ennnen iaa nono nrnnn conc cnn cnn rca a aai 4  90    GTVIE WORK Sicuani aiii sites io eis a 8  10 0  TESTS  AND INSPECTION erea ee eee r D TENSE aeara e Ea REE 9  11 0  TRAINING  OFRPERSONNE Do cities 13  12 0 OPERATION AND MAINTENANCE MANUALS cooconcccccccnnnnnonnnancnnncnnnccnnoconccanccanccnnncnnos 14  13 0     CABLE WORKS  cusco 15  14 0  MEASUREMENT AND RATES ne aeret ee dino odres A e e a iane 20   DIVISION 121 000  AIRFIELD LIGHTING 0000    ccceeeecceseeseeeecaecaeeeeeesecaaeeceesecaeeaeeeeenaeeas 22  1 0 VISUAL ALIGNMENT GUIDANCE SYSTEM  VAGS  ocncococonocinononannnnnnonnncnnnconnccnnccnnacns 22  2 0 ABBREVIATED PRECISION AP
12. Airport        4      5      a      b    c    d      e    f     trenches excavated by hand or machine  and in all types of ground including  backfilling  disposal of surplus material  supports  protection and  maintenance of sides  dewatering  etc    bedding   concrete encasement   all short lengths and joints in the running lengths  including the provision of  all loose collars  coupling and similar items where required and all jointing  and sealing materials including gaskets  bolts and nuts    jointing assemblies    providing all necessary fittings including joints  marker plates or posts  plugs   draw cords and the like    The rates for electrical handholes shall include for      a      b    c    d    e     excavating by hand or machine  and in all types of ground  including all  backfilling  disposal of surplus material  supports  protection and  maintenance of sides  dewatering  etc    concrete  reinforcement and formwork   covers and frames and cable support    forming holes for building in ducts    forming rebates for and building in frames    The rates and lump sums shall further include  if not itemized separately in the BOQ  for the following Sections      a    b    c    d    e    f     Contractor   s design  where applicable   training for equipment and systems  spare parts   testing and commissioning  maintenance tools and special tools    protection       Page   21    Air Transport Capacity Enhancement Project Division 121 000     AFL  ICB 02  Supply and Install
13. Common grounding wire shall be installed in the cable pit  The wire shall be  connected to copper grounding rods and shall also be connected with the  grounding terminal of equipment     b  The copper grounding rods shall be installed underground to a depth of not  less than 1 0m  Grounding resistance of the system as a whole shall not  exceed 5 ohms    CIVIL WORKS   General    1  This work shall be applied for the installation of mounting light bases  handholes   foundations and outdoor cable trench     2  Foundations for equipment shall be sufficient size and thickness as recommended by    the equipment manufacturer     Excavation and Backfill Work     1      2     The depth and width of excavation shall be minimum for the installation of above  facilities  The bottom plane of excavation shall be flat     Excavated material may be used for backfill provided it is free of stones and other  objects that can cause cable damage  Backfilling shall be put in horizontal layers not  to exceed every 250 mm in depth  and shall be compacted to the satisfaction of the  Engineer     Concrete Works     1     Reinforcement Work   Reinforcement steel bar for the Concrete Chamber for Isolating Transformer Concrete  Chamber for Lightning Arrester shall be fabricated and installed in accordance with  the size and shape indicated in the drawing  Reinforcement steel bar for other blocks  and foundations which are not shown in the drawing shall be fabricated as per  recommendation of Manufacture
14. PROACH PATH INDICATOR  APAP     23   DIVISION 122 000  CABLE DUCTS AND MANHOLES 0000    cecceeeeeessecneeeeeeeeceaeeaeeeeeeaeeas 26  LO  SCOPE OF WORK orcino nnen earannan oe OA 26  20   MATERIALS cda ii aire iRnes 26  3 0 CONSTRUCTION METHODS OF CABLE DUCT oo    eeceecseeeeeeeeeeeeeaeeeeeeaeeenaes 26  4 0 CONSTRUCTION METHODS OF HANDHOLE 1 0    eecceseeeeeeeeeeeeeeeseeeaecnaeenseeees 28   DIVISION 123 000  REMOTE CONTROL AND MONITORING SYSTEM e 30  1 0     SCOPE  OB WORK  comicas antaras 30  20  SYSTEM REQUIREMENTS vuestras bles aeons teaches dsd 30  3007    DESIGN REQUIREMENTS cistitis liebe 30  40 RELAY PANEL  INTERFACE EQUIPMEND   oooococccocononcnonoconoconncnnncnnnnnnnnnna nono nonnnconac  nccnns 31  5 0 CONSTANT CURRENT REGULATORS  CCR ococonoconocnconncnnncnonnnannnnnnonnccnnoconccnnccnnccnnnannos 31  607    INSTALLATION ua aida 32    Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       DIVISION 120 010  PARTICULAR REQUIREMENTS LUKLA    1 0    1 1    2 0    2 1    2 2    2 3    2 4    2 5    2 6    3 0    3 1    GENERAL    This provisions of Division 120 010 are applicable to items of Airfield Lighting System   Aeronautical Ground Lighting System      SCOPE OF WORKS    This Specification concerns the design  where applicable   manufacture and testing at  manufacturer   s premises  delivery to Site  carrying out all works  installation  testing at 
15. Site   training  setting in operation and handing over in perfect operating and running condition     Works shown on the Drawings and not mentioned or described in the Specification  and  works described in the Specification and not shown on the Drawings  will nevertheless be  considered as included in this scope of Works and their execution will be deemed to be  included in the Contract Price     Integration of all Hardware required for installation and commissioning of AIRFIELD  LIGHTING SYSTEM as detailed in the Technical Specification shall be the full  responsibility of the Contractor  The quoted price shall be inclusive of all such costs and will  be deemed to be included in the Contract Price     Interfaces  equipment and accessories not specified in the Bid Document but found to be  essential for full commissioning of the system shall be deemed to be included in the scope of  Works and the full responsibility of the Contractor  The quoted prices shall be inclusive of all  such costs and will be deemed to be included in the Contract Price     Any matter not provided in the Specification shall be determined through consultation  between the Engineer and the Contractor     The Specification covers the following work items      1  Visual Alignment Guidance System  VAGS     2  Abbreviated Precision Approach Path Indicators  APAPI    3  Cable Ducts and Handholes    4  Control and Monitoring System    5  3 kVA Generator Set    6  3kVA Voltage Stabilizer    7  LV Switch Board
16. alled in parallel and their width exceeds  300 mm  the bare copper wire shall be installed each 300 mm width     The grounding rods shall be installed not more than 200 m apart around the entire  cable length  The grounding rods shall be made of copper clad steel  coupled type  2 0  m in length 15 mm in diameter  The grounding resistance as a whole shall be less  than 10 ohms  The grounding resistance of each electrode shall be not more than 20  ohms        Page   19    Air Transport Capacity Enhancement Project    Division 120 010 Particular Requirements Lukla    ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       13 12 Secondary Cable Installation    14 0    14 1    14 2     1  The extension wire to be used between the isolating transformer and light fittings  shall be installed inside PVC pipe on the lowest base of the piping pit     2  After the piping has been installed on dry condition  the backup materials shall be  provided on the pipes  Backup materials such as cement mortar shall be provided full  around these pipes in the pits  The backup materials shall be approved by the  Engineer  before installations    MEASUREMENT AND RATES   Measurement    Work under this Sub Section shall be measured according to the item classification and units  contained in the Schedule     Rates     1      2      3     The rates and lump sums shall be full compensation for all plant  materials  labour   equipment  transport  temporary works  establishment
17. at an anti corrosive paint shall be used      c  The dry film thickness of coating shall be not less than 0 02mm and the  coating weight shall be not less than 0 14kg m       d  The coating weight of finish coat shall be not less than 0 12kg m  for each  coat and the dry film thickness of finish coat shall be not less than 0 025mm     8 3 Rating Plates and Labels     1     Each main and auxiliary item of equipment shall have permanently attached to it in a  conspicuous position a nameplate and or a rating plate of incorrodible material upon  which shall be engraved identifying name  date of manufacture  type or serial number  together with details of the conditions under which the item in question has been  designed to operate  and such diagram plates as may be required by the Engineer        Page   5    Air Transport Capacity Enhancement Project    Division 120 010 Particular Requirements Lukla    ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       8 4    8 5    8 6    8 7     2      3      4      5      6     All equipment and cubicle doors shall be labelled in an approved manner to indicate  the service provided     Labels or appropriate identification marks shall also be provided to identify all items  of equipment or parts  and where applicable current ratings of fuses and setting of  relays  etc     Warning labels with red lettering shall also be provided on covers over equipment  carrying high tension voltage  as directed by the Enginee
18. ation of CNS ATM Equipments       DIVISION 121 000  AIRFIELD LIGHTING    1 0 VISUAL ALIGNMENT GUIDANCE SYSTEM  VAGS     1 1 Scope    This work includes the supply and installation of the Visual Alignment Guidance System   VAGS  for Runway 06     1 2 Lighting System     1      2     Visual Alignment Guidance System  VAGS  shall include of two Light Units  one  Master and one Slave  placed symmetrically on both side of the Runway threshold  supplying unidirectional rotating beam which gives a flashing effect     The Visual Alignment Guidance System  VAGS  shall consist of     a  One Master Unit and Optical Head     b  One Slave Unit and Optical Head    c  Frangible Legs     d  One Tool for Alignment and Horizontal adjustment    1 3 Technical Characteristics     a      b      c    d    e    f    g     Each Optical Head fitting shall be of the unidirectional type  Elevated light fittings  shall employ a halogen lamp 100 watt      Each fitting and supporting pole shall be of lightweight frangible construction  suitable for concrete mounting base and shall be of sufficient strength to withstand  aircraft engine blast    Exterior finished colour of elevated light fittings shall be yellow colour    Visual Range  not less than 10 KM   Operating Angular Sector  15 degree on both side of the approach axis    Flashes Frequency  1 Hz    Provision of Heating resistors    1 4 Installation     a     Exact position of light fittings to be installed shall be subject to the approval of the  Eng
19. e Contractor shall dispose of all the remaining materials     dirt and rubbish from the Site  The Contractor shall remove all tools and equipment from the  site and restore all disturbed areas to their original conditions        Page   28    Air Transport Capacity Enhancement Project    ICB 02  Supply and Installation of CNS ATM Equipments    Division 122 000 Cable Ducts  amp  Manholes       4 4 Quality Standards    The quality shall satisfy the standard values set for this type of work     4 5 Tolerance Standards    The tolerance of the work shall be controlled in the manner shown on Table 1     Table 1 Tolerance                      Work Item Test Item Test Method Frequency Standard Value  Finish By surveying   At points designated  10mm  Handholes elevation by the Engineer   Width By the   ditto    20mm   Engineer    s   Instruction  Depth   ditto     ditto    10mm  Thickness   ditto     ditto    20mm   10mm                      Page   29       Air Transport Capacity Enhancement Project Division 123 000 Remote Control and Monitoring System  ICB 02  Supply and Installation of CNS ATM Equipments       DIVISION 123 000 REMOTE CONTROL AND MONITORING    1 0    2 0    2 1    2 2    2 3    2 4    2 5    3 0    3 1    3 5    SYSTEM    SCOPE OF WORK    This work includes the supply and the installation of the Remote Control and Monitoring  System for the VAGS and APAPI    SYSTEM REQUIREMENTS    Remote operation of the VAGS and APAPI system shall be carried out from the Remote  Cont
20. e prime  coat  one undercoat before assembling and two finish coats at factory  as follows      a  Before prime coat  oil or grease shall be removed with benzine or other  solvent and scale  rust and other foreign substance on the surface shall be  thoroughly cleaned by sandblasting or bonderizing      b  For prime coat an anti corrosive paint shall be used  The dry film thickness of  coating shall be not less than 0 02mm and the coating weight shall be not less  than 0 14kg m       c  The coating weight of oil putty shall be decided in accordance with the  surface condition of the prime coat  The coating weight of filling shall be not  less than 0 15kg m  for each coat      d  The dry sanding with paper shall be applied after putty  The dry film  thickness of under coat shall be not less than 0 02mm and the coating weight  shall be not less than 0 14kg m       e  The coating weight of finish coat shall be not less than 0 12kg m  for each  coat and the dry film thickness of finish coat shall be not less than 0 035mm     Interior surface of metal enclosed switchgear and control gear  metal enclosed type   cubicle type  cabinet  switch box  transformer box  etc  shall be given one prime coat  before assembling and two finish coats at factory  as follows      a  Before prime coat  oil or grease shall be removed with benzene or other  solvent and scale  rust and other foreign substance on the surface shall be  thoroughly cleaned by sandblasting or bonderizing      b  For prime co
21. e switching at the existing Tower console      c  To indicate fault condition for power supply equipment such as CCR and so  on at existing Tower console     Remote Control Panel       Page   30    Air Transport Capacity Enhancement Project Division 123 000 Remote Control and Monitoring System  ICB 02  Supply and Installation of CNS ATM Equipments       4 0    5 0    5 1    5 2    This Panel shall be installed in the Blank space available in the existing two man console at  VER room      a  Operation Part for Light Operation   i  Major Components shall be as follows     Self illuminated push button switches for control    Ditto but for    Reset       Three segment indicators for brightness tap for APAPI    Three segment indicators for brightness tap for VAGS      Push button switch for lamp check    Power Supply equipment for control and other    RELAY PANEL  INTERFACE EQUIPMENT     The panel shall be constructed of steel plate and frame and shall majorly comprise as follows    a  Relays to be plug in type voltage relay  coil rating of DC 24 V      b  Miniature circuit breakers  MCB   s     CONSTANT CURRENT REGULATORS  CCR     General    The CCR   s shall provide stepped brilliances with a stable current to the APAPI system under  the specific conditions     Design Requirements    The Constant Current Regulator shall maintain a constant and adjustable output current  independent of load and input power supply frequency and voltage variations  It shall be full  digitally contr
22. enance Room and  control cable up to Control Tower as shown in the drawing  Where available  the existing  ducts shall be used for crossing  At the open drain crossing and other places appropriated  duct shall be provided for running of cables     The laying of power cable for other facilities shall be carried out either under the conduit   duct or buried direct in the trench  All the accessories for cable installation including    conduit duct shall be provided and shall be inclusive of installation work  The wiring shall be  carried out by the Contractor with the approval of the Engineer     ABBREVIATED PRECISION APPROACH PATH INDICATOR  APAPI     Scope    This work includes the supply and installation of the Abbreviated Precision Approach Path  Indicator System     Lighting System   a  Abbreviated Precision Approach Path Indicator System APAPI  for Runway 06 shall  comprise a total of two  2  light units placed at left side of the runway and right    angles to the runway centre line      b  Each light beam angle of elevation setting for 3 degree  Setting angle will be finalized  according to operational requirement  PAPI approach slope shall be 2  45    and 3  15         c  One Setting Tool set shall be provided  Light Units     a  Each unit shall contain two  2  halogen lamps 6 6A 100W and shall comprise a glass       Page   23    Air Transport Capacity Enhancement Project Division 121 000     AFL  ICB 02  Supply and Installation of CNS ATM Equipments       2 4    2 5    
23. es of the cables are shown on the Drawings  Actual laying  positions of the cable ducts and of cable supports shall be determined with due regard  to any obstacles that might exist as well as to accessibility of all such routes  subject  to the approval of the Engineer prior to the installation     3  PVC pipe ducts shall be used for cable laying work     4  The series circuit cables and power cables and control cables shall be allocated  separate duct pipes     5  When the supply and return circuits of a series circuit are routed together  the cables  for both directions shall be laid in the same duct pipe     6  All cables shall be buried at least 600 mm below finished graded except for  transformer secondary cable     7  Each underground cable shall bear cable identification circuit markers for a non     corrodible materials  as directed by the Engineer  Cable installation shall be in  accordance with the specification of FAA AC No  150 5370 10  Standard for  specifying construction of airport  Division VI  Lighting installation  Item L 108  Installation of Underground cable for airports     Grounding Systems     1      2      3     A stranded bare copper wire 14 mm  minimum size  shall be installed for lightning  protection of the underground cables in trenches     The copper wire shall be installed in the same trench for the entire length of the  insulated cables  it shall be placed at a depth of approximately 300 mm above the  insulated cables  Where the cables are inst
24. g the concrete base  the Contractor shall place temporary markings to  identify the actual installation positions of the light units determined by him through  detailed site survey  against the corresponding positions indicated on the Drawings   and shall notify the Engineer accordingly     e  In azimuth the axis of the beams of all light units shall be parallel with the center line  of the runway     f  Vertical beam angle checking foundation for the electronic survey equipment     theodolite  shall be installed on Runway 06 as instructed by the Engineer     Concrete Mounting Base    Concrete base for the mounting of A PAPI shall be as specified by the manufacturer of A   PAPI and cost shall be included in the installation cost     Handhole    Handhole for Isolating Transformer shall be erected beside the concrete mounting base  Each  Handhole shall be connected to the mounting base with 50 mm diameter PVC Elbow Tube    Isolating Transformer       Page   24    Air Transport Capacity Enhancement Project Division 121 000     AFL  ICB 02  Supply and Installation of CNS ATM Equipments       2 8    2 9    An Isolating Transformer for the APAPI shall be installed in each Handhole     Power Supply System    The Precision Approach Path Indicator System to be installed on Runway 06 shall be supplied  with power from Low Voltage Panel in the Maintenance Room at the ground floor of Control  Tower by means of constant current high voltage series loop circuit of 6 6 amperes at 100   bril
25. h excellent electrical and mechanical  properties  and resistance to oils  kerosene  other aircraft fuel  acids and alkalis  A  water resistant protective cap shall be supplied that protects the isolating  transformer lead connectors mating parts from both moisture and dirt during  shipping and handling     The specification of Isolating Transformer shall be     Nominal Rating in Watts  100 W    Primary Current Rating  6 6 Amps   Secondary Current Rating  6 53 6 67 Amps   Maximum Primary voltage  SKV   Frequency  50 Hz   The Primary Leads  FAA Class A  Type I  Style 2 Plug  60 cm  long     Note  This Plug is to be connected with  primary cable having FAA Class B  Type I   Style 10 Receptacle with Earth Continuity  Device     FAA Class A  Type I  Style 9 Receptacle   60 cm long    Note  This Receptacle is to be connected  with primary cable having FAA Class B   Type I  Style 3 Plug with Earth Continuity  Device     The Secondary Lead  FAA Class A  Type II  Style 8 Receptacle        Page   17    Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       13 6    13 7    13 8    120 cm long    Note  This Receptacle is to be  connected with FAA Class A  Type II   Style 1 Plug or FAA Class B  Type II     Style 5 Plug    2  All isolating transformers shall be suitable for use on series circuits with a current of  6 6 amperes    3  All isolating transformers shall be c
26. ineer  Prior to erecting the concrete base the Contractor shall place temporary  markings to identify the actual installation positions of the light fittings determined by  him through detailed site survey  against the corresponding positions indicated on the  Drawings  and shall notify the Engineer accordingly        Page   22    Air Transport Capacity Enhancement Project Division 121 000     AFL  ICB 02  Supply and Installation of CNS ATM Equipments       1 5    1 6    1 7    1 8    2 0    2 1    2 2    2 3    Concrete Base    The Contractor shall submit to the Engineer for approval structural calculation based on the  Manufacturer recommendation and drawings of proposed concrete base     Power Supply System    The VAGS shall be supplied with power from Low Voltage Panel in the Maintenance Room  at the ground floor of Control Tower     Remote Control of VAGS    The VAGS shall be controlled in three  3  brilliancy levels from the Control Tower   The remote control and brilliancy control  together with APAPI  Push Button switch  shall be installed at the appropriate place in the existing Console at Control Tower   All necessary hardware including control cable  cable tray  ducting shall be provided  by the Contractor and shall be inclusive of installation work and offer shall be  inclusive of such cost     Cabling Works    The power and control cables shall be laid in the prepared trench  in common trench with  APAPI primary cable  running along the runway and up to the Maint
27. liance     Remote Control of APAPI    The APAPI shall be controlled in five  3  brilliancy steps of 100   30  and 10  of  the full brilliance from the Control Tower  The remote control and brilliancy control   together with VAGS control  Push Button switch shall be installed at the appropriate  place in the existing Console at Control Tower  All necessary hardware including  control cable  cable tray  and ducting shall be provided by the Contractor and shall be  inclusive of installation work and offer shall be inclusive of such cost        Page   25    Air Transport Capacity Enhancement Project Division 122 000 Cable Ducts  amp  Manholes  ICB 02  Supply and Installation of CNS ATM Equipments       DIVISION 122 000  CABLE DUCTS AND MANHOLES    1 0    2 0    2 1    2 2    2 3    2 4    3 0    3 1    SCOPE    This item shall consist of the installation of underground ducts and handholes in runway strip  including where installed under paved road and shall also include cutting  trenching of any  paved areas  installation of pull wires and capping and other necessary works     MATERIALS    Cable Ducts   1  For cable duct  the PVC pipe and accessories shall be used     The PVC pipes shall be manufactured from high quality PVC  Polyvinyl  Chloride  compound  It shall have corrosion and chemical resistance to most  acidic and alkaline solution  It shall be of Heavy duty     Outer Diameter  50 mm  Pressure  6 Kgf cm   Ends  one end flared     Pipe to be manufactured according to rele
28. ll safety and maintenance materials for excavations so  as to meet the requirements of excavation as specified on the Drawings      3  Unless otherwise specified  the Contractor shall remove the timbers  covers  and  supports upon completion of the structures  The removal operation shall be performed  in a manner that neither will the ground surface be disturbed nor the completed  structures be damaged      4  The foundation bed for structures shall be compacted properly with compaction  equipment approved by the Engineer  After the excavation is completed  the  Contractor shall inform its completion to the Engineer  Concreting operations may  only commence after the Engineer has approved the depth of the excavation and the  condition of the foundation     4 2 Backfilling     1  After the structures are completed  the spaces adjacent to the structures shall be  backfilled with approved material  in a finished thickness of not exceeding 200mm in  a layer  and compacted properly with compaction equipment approved by the  Engineer  Each layer shall be compacted to the elevations designated on the Drawings      2  The backfilling shall not be made until 7 days after the concrete has been placed or  the concrete has attained sufficient strength to provide a factor of safety against  damage or strain in withstanding any pressure created by the backfilling  or by  vibrations of the compaction equipments     4 3 Clearing and Restoration of Site  After the backfilling is completed  th
29. mendations for maintenance as set out in ICAO Airport  Service Manual Part 9  Airport Maintenance Practices       f  The scope of tools and devices for assembly and maintenance shall include  all customary tools and all devices and tools which are specially made and or  required for complete assembling  dismantling  adjustment and maintenance  of all equipment     MEASURING EQUIPMENT    Measuring equipment necessary for normal maintenance shall be supplied but not limited to  those specified in the relevant sections hereunder     Measuring equipment with all necessary accessories for measuring shall be provided with  adequate supply of spares and also including operation manuals     Measuring equipment shall have sufficient measuring range and accuracy required by the  respective system for which it is intended        Measuring equipment except for the stationary type shall be easy to transport  If the weight of  the measuring equipment is such that it cannot conveniently be carried  suitable hand carts  with steerable rubber tired wheels shall be supplied     All measuring equipment to be used on AC shall be suitable for 50Hz  230V  single phase  two wire circuits and be capable of satisfactory operation within voltage variation of  10      All measuring equipment necessary for installation and testing shall be arranged by the  Contractor in addition to the measuring equipment for normal maintenance     The Contractor shall supply effective and efficient measuring equipment 
30. nal end of  duct opening shall be closed with the detachable taper plug designed by the pipe  manufacturer or with hard wood plug which shall accurately fit to the duct in shape  and having the plug end at least 6mm larger than the size of the duct     All ducts shall be firmly located and embedded throughout construction and shall be  plugged to prevent grout  storm water or mud from entering  Any duct section with  defective connection shall not be installed     Excavation     1      2      3     The excavation shall be performed true to the line  conforming to the width  depth  and dimension shown on the Drawings  The Engineer is authorized to change the  dimension and elevation involved in the excavations to ensure the stability of the  ground     The trench bottoms shall be compacted to not less than 90  of the maximum dry  density     Any surplus excavated material shall be removed or disposed of as directed by the  Engineer     Duct Signs    All terminating points of ducts shall be indicated with a stake  50mm x 50mm x 500mm   approximately 350mm above the ground  The signs shall be inscribed with the letter    DUCT     and placed at the terminating points or ends of all ducts except where the duct terminates at a  handhole  The Contractor shall inscribe  on the sign slabs  the number and size of ducts  buried under the signs     Backfilling     a      b     Backfilling of granular material  sand     The backfilling of granular material  sand  shall be performed in acc
31. ng the reliability test period   but the Contractor will be allowed to make any minor adjustment which may be  necessary  provided that such adjustments do not in any way interfere with  or prevent  commercial use by the Employer     Flight Checks     1      2     Retest    Actual location of APAPI units and setting angle shall be decided after detail survey  of site and determination of operational requirement of setting angle in consultation  with pilots  The commissioning of APAPI system will be done only after checking  the system by the regular flights in Lukla Airport     The Contractor may use for this at the Site the measuring equipment supplied by him  under the Contract with permission of the Engineer  provided that such equipment be  restored to its original condition at the time of commissioning tests        Page   12    Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       10 10    11 0    11 2    11 3    Should the systems or any portion thereof fail under test to give the performance required   then any further test s  which may be considered necessary by the Engineer shall be carried  out in a similar manner  but the whole cost of the repeated test s  shall be borne by the  Contractor     Rejection    If any item fails to comply with the requirements specified in the Specification in any respect  whatsoever at any stage of manufacture  test
32. nstallation of CNS ATM Equipments at TIA and Lukla Airport       13 0    13 1    13 2     c  Operating Instructions     as applicable to the equipment  operating  instructions shall include but not be limited to   preliminary adjustment and  control settings  starting and stopping the equipment  operation  etc     d  Cleaning and lubricating     e  Trouble shooting     1  Preventive maintenance     g  Test equipment      h  Parts list   including component and parts layout      1  Maintenance record log forms and check lists for daily  weekly  monthly   semi annually and annually     0  Service life  year or hours  of equipment and main parts and devices     CABLE WORKS    General     1      2      3      4      5      6     Airfield lighting power and control cables shall be installed in ducts  conduits  and  pits and on cable racks  Counterpoise wire and underground cable marker sheet shall  be installed in the trench of cable ducts     The cable conductor size in the Specification and on the Drawings are given in mm or  mm     Cable length per cable drum shall be less than 1000 meter  and total weight of cable  and drum shall be less than 5 tons  for easy transportation  The Contractor shall  submit AFL power cable length list to the Engineer for approval before  manufacturing     Where cable end projects from a drum they shall be adequately protected to prevent  damage during handling and transportation  and a thick PVC wrapper  cap  shall be  placed over the cable to pre
33. olled and regulated by microprocessors using thyristors with response time less  than 0 5sec  It shall have USB connector in the front panel for parameter setting and diagnosis   It shall support the multiwire interface as well as latest serial communication network     Standards    ICAO Aerodrome Design Manual  Part 5  Electrical Systems  paragraph 3 2 1 4 to  3 2 1 6   FAA  AC150 5345 10G   IEC  61822   Electrical features    Rated output  2 5 kVA   Output current  From 2 8 to 6 6 A RMS   Supply voltage  230 V  410    1 Phase   Frequency  50Hz   2     Power factor   gt 0 9 with optimum load    Efficiency   gt 90  at rated parameters     Output Current Regulation  within  1  under either IEC or FAA standard       Page   31    Air Transport Capacity Enhancement Project Division 123 000 Remote Control and Monitoring System  ICB 02  Supply and Installation of CNS ATM Equipments       6 0    6 1    6 2    6 3    condition  Mode of operation  local and remote   Remote control  24V DC and serial communication network   Brilliancy  three step  Back indication  static dry contacts   Programmability  programmable accordance with security or password     Mechanical features   Use at normal temperature range   20  C to 45  C  Natural air cooling  Protection Level  IP 21  Protections  Over current protection  programmable   Open circuit protection   Under over voltage protection  programmable    Lightening arrestor on input and output   Input circuit breaker     Other requirements    Ho
34. ompletely waterproof  shall withstand continuous    use under the designated ambient temperatures and shall be suitable for burying in the  ground or setting in transformer boxes  as required  Each transformer shall be  completely sealed      4  Two primary lead cables and one secondary lead cable shall be attached to the  isolating transformer      5  Isolating transformers shall show rating information  The Contractor shall examine  necessary length of the secondary lead cable in consideration of the overall height of  light     Power and Control Cables     1  All power cables of parallel circuit  as well as all control cables to be used in the  Works shall be manufactured and tested in accordance with the following Standards     IEC   International Electrotechnical Commission  ICEA   Insulated Cable Engineers Association  U S A      2  All power cables  except where otherwise specified  shall be cross linked polyethylene  insulated and polyvinyl chloride sheathed cables  CV cable       3  All control cables  except where otherwise specified  shall be polyvinyl chloride insulated   polyvinyl chloride sheathed control cables     Bare Copper Wire  Counterpoise wire      1  Bare copper wires for counterpoise installations shall be stranded or PVC insulated wire  with a minimum size of 14 mm       2  The grounding wires to be used in this work shall be manufactured and tested in  accordance with the appropriate Standards authorized in the country of manufacture  or  equivalent 
35. or inspection or test  the Contractor shall give notice to the  Engineer together with the data of tests done by himself      3  The results of factory tests shall be recorded for submission to the Engineer  copy  furnished to the Employer  prior to the shipment of the equipment item      4  The test report shall contain the information specified below    a  Indicate the performance of each equipment under the test and whether it  meets the system limits    b  A record of any engineering changes necessary to correct design deficiencies    5  The suitability of diagnostics and technical manuals provided by the Contractor and  their capability of off line failure isolation and its repair shall be proved by the    Contractor      6  The Contractor shall include all the costs required for such factory test mentioned  below      a  Number of person to be dispatched from the Employer  One  1  persons   maximum       b  Round trip air ticket between Kathmandu and manufactures supplier   s       Page   11    Air Transport Capacity Enhancement Project    Division 120 010 Particular Requirements Lukla    ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       10 5    10 6    10 7    10 8    10 9    country    c  Accommodation    d  Local transportation and daily subsistence allowance sufficient to cover daily    basic requirements       e  Time period  Total 7 days including travel     Tests at Site during Construction    During the course of installation  
36. ordance with the  design  The backfilling shall be compacted to not less than 90  of the maximum dry  density     Backfilling with excavated soil  After the backfilling of granular material  sand  is finished  the backfilling with the    excavated soil shall be performed to the elevations shown on the Drawings  The  backfilling shall be compacted to not less than 90  of the maximum dry density     Clearing and Restoration of Site       Page   27    Air Transport Capacity Enhancement Project Division 122 000 Cable Ducts  amp  Manholes  ICB 02  Supply and Installation of CNS ATM Equipments       After the backfilling is completed  the Contractor shall dispose of all surplus materials  dirt  and rubbish from the site  The Contractor shall remove all tools and equipment from the site  and restore all disturbed areas to their original conditions     3 6 Quality Standards  The quality shall satisfy the standard values set for this type of work   3 7 Tolerance Standards    The tolerance of the work shall be controlled in the manner shown on Table 1     4 0 CONSTRUCTION METHODS OF HANDHOLE    4 1 Excavation     1  The excavation for structures or for the foundation of structures shall be performed in  conformity to the requirements of location  grade and elevation designated on the  Drawings  The Engineer shall authorize change to the construction methods in the  foundations including the elevation in consideration of the stability or the ground      2  The Contractor shall provide a
37. r     The inscription of all nameplates  labels shall be in English and identification marks  shall be in English and clearly designate the service or rating of the particular  equipment  Such nameplates or labels shall be of non hydroscopic material with  engraved lettering or a contrasting colour or  alternatively  in the case of indoor  switchgear  etc   of transparent plastic material with suitably coloured lettering  engraved on the back     All labels shall be attached to equipment by means of adhesive material or of machine  screws and nuts  machine screws in drilled and tapped holes  Wherever practicable   identifying signs shall be provided by means of engraving or printing directly on the  body of equipment     3 kVA Generator Set     1     The generator shall be air cooled engine and Petrol  Start  Kerosene Run Type with     Output Voltage  230 V  50 Hz  Rated power  3KVA    3 kVA Voltage Stabilizer     1  The Voltage Stabilizer shall have the following features   Output Voltage  230 V  1 phase  Input Voltage Range  160 250 V  Power Rating  3 kVA  Regulation   1   LV Switch Board Panel   1  The LV Switch Board Panel shall be constructed with 1 5 mm thick sheet metal and it    shall be fitted and wired with the following     Incoming     1 x 30 A SPN MCB  Outgoing  3x 10 A SPN MCB  Earth Link   Neutral Link   Indicator Lamp for Incoming Supply    Changeover Switch     1  The Changeover Switch shall have the following features     Current Rating  30 A  Voltage Rating
38. r of the equipment        Page   8    Air Transport Capacity Enhancement Project    Division 120 010 Particular Requirements Lukla    ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       10 0    10 1    10 2     Q  Material  Only approved materials  conforming to the requirements of these specification shall  be used in the work     3  Forms and Finishing  Form shall be made of wood or steel  Obtain Engineer   s approval of form before  placing concrete  The surface of the top of concrete blocks and cover of chambers shall  be made smooth   All holes left by insertion of PVC pipes or earthing wire in the Concrete Chamber for  Isolating Transformer Concrete Chamber for Lightning Arrester shall be filled with  cement mortar     4  Dimensions  Dimensions of Concrete Chamber for Isolating Transformer may change subject to  prevailing site conditions     5  Sample  A Sample Concrete Block for Light fittings  Concrete Chamber for Isolating  Transformer including covers  handholes shall be made and approval shall be obtained  from the Engineer before proceeding with further construction    TESTS AND INSPECTION   General    1  The following provisions are to be referred to in connection with this Specification    Scope of Testing    1  The Contractor shall perform all the test activities specified in this Sub Section     2  The Contractor shall prepare and submit  at least twenty eight  28  days  prior to any  test carried out by the Contractor  two se
39. ractor      2  Maximum number of trainees to attend the course for theoretical and practical  training shall be four  4  persons       3  The duration of the course both for theoretical and practical shall be at least the  duration mentioned below            Course Course Duration  Lighting  amp  Cables  2 days  CCR  Control and  Monitoring   4  The Contractor shall include the cost of instruction for the above mentioned courses    and training manuals and material to be used in the courses  in his unit rates or lump  sum prices  unless identified separately in the Bills of Quantities      5  Travel cost and daily allowance for trainee will be borne by CAAN     OPERATION AND MAINTENANCE MANUALS    General    1  The following provisions are to be referred to in connection with this Specification   Draft Manuals   The draft manuals to be submitted shall include  as a minimum  the following      a  Introductory material stating the model or type designation  the equipment  purpose  and any appropriate general descriptive information      b  Preparation for use     any special unpacking and assembling requirements  shall be explained  Essential installation instructions  such as foundation  requirements  plumbing or electrical connections  power requirements and  initial lubrication  servicing and inspection instructions shall also be  explained        Page   14    Air Transport Capacity Enhancement Project    Division 120 010 Particular Requirements Lukla    ICB 02  Supply and I
40. rol Panel at the VFR Tower Console and from the Local Control and Monitor Panel at the  monitor room in the Maintenance Room for APAPI     The control functions shall include ON OFF switching  intensity control and monitoring      In order to receive and the control and monitoring signal between Tower consoles and  facilities  Relay Panel  Interface equipment  shall be installed in the Maintenance Room     Control and Monitoring System of VAGS and A PAPI shall comply with the following      a  ICAO Aerodrome Design Manual Part 4     Visual Aids  Fourth Edition  Chapter 5   Light Intensity Settings      b  ICAO Aerodrome Design Manual Part 5     Electrical Systems  First Edition   Chapter  3  3 4 Control of aerodrome lighting systems and 3 7 Monitoring of aerodrome  lighting circuits     c  ICAO Airport Services Manual Part 9   Airport Maintenance Practices    The Contractor shall submit to the Engineer for approval Equipment Layout plan and cable pit    layout after review of the dimension size  weight and necessary cabling plan including  control communication cabling plan together with heat generation data of equipment     DESIGN REQUIREMENTS    System Function   1  For light operation system the following functions shall be provided      a  Switching On Off of VAGS with  three  3 step Brilliancy control by means of  Push Button type switching at the existing Tower console      b  Switching On Off of A PAPI with  three  3 step Brilliancy control by means  of Push Button typ
41. st at the Site during construction   4 Commissioning test     Sample size for test shall be decided with agreement between the Engineer and the  Contractor before factory test     Documents for Tests and Inspection     1  Before execution of test and inspection  the Contractor shall prepare and submit the  following documents to the Engineer for his approval      a  Complete description in writing about procedure of tests at the factory     b  Complete description in writing about procedure of tests at the Site     c  Complete description in writing about procedure of commissioning tests at  the Site      2  Certified readings and data of all tests to be carried out by the Contractor shall be  submitted to the Engineer from time upon completion of each test and the Contractor  shall prepare additional four  4  copies of complete set of these test data bound in  book form for submission at the time of the commissioning test     Factory Tests     1  Factory tests shall be made by the Contractor on specific items of equipment to  demonstrate that the equipment complies with applicable specifications and   additionally  any test called for by the Engineer to ensure that the equipment to be  supplied meets the requirements of the Specification  The methods of testing of  equipment not covered by any specification or applicable Standards shall be agreed  with the Engineer      2  The Engineer Employer shall be given the option of witnessing all tests  When the  equipment is ready f
42. terproof Test       Relevant Standard  Insulation Resistance Test          Relevant Specification  Dielectric Test         Ditto    Alignment Test    Document for Test and  Inspection  Operation Test e   Ditto            Test Item 1 Test at factory by the Contractor himself   2 Witness test at factory   3 Test at the Site during construction     4 Commissioning test     Sample size for test shall be decided with agreement between the Employer and the  Contractor before factory test     Table 2 Test Item for Constant Current Regulator                                                                ees 1 2 3 Standard  Composition Test  Quality        Approved Shop Drawings  Appearance  amp  Structure Test o    e   Ditto    Dimensional Test         Ditto    Photometric Test         Ditto    1  Transitional A 3 _ Ditto    Response Test  2  Soft starting p _ Ditto    Test  Operation 3  Brilliancy Tap l  Test Changing over e         Ditto    Test  4  Protective      Device Test 5 5 5 SOS   5  Overall f  Operational Test a a a UR  Insulation Resistance Test e       Relevant Specification  Dielectric Test       Relevant Specification  Temperature Test       Relevant Specification       Test Item    1 Test at factory by the Contractor himself        Page   10       Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       10 3    10 4    2 Witness test at factory   3 Te
43. the Engineer shall have full right for making tests and  inspection for the work  as he may deem necessary always with the participation of the  Employer   s personnel in all tests at Site if so requested by the CAAN for the purpose of on   the job training  In this case  the Contractor may have part of the tests conducted by such  personnel but shall assume final responsibilities for test results     Commissioning Tests     1      2     Commissioning tests of the system shall be carried out after it has been installed and  tested  No commissioning test shall be commenced without prior approval of the  Engineer to the schedule and procedure which are to be followed  At least ten  10   working days    notice of the Contractor   s readiness to start each site test shall be given  to the Engineer     The Contractor shall conduct the commissioning tests which  however  shall be  carried out under the direction of the Engineer     Reliability Tests     1      2     When the Contractor considers that the installations are ready for commercial service   the Engineer shall be notified accordingly after the commissioning tests  When the  Engineer agrees that the Works are ready for commercial service  each system will be  required to operate under the working conditions  either continuously or  intermittently as may be convenient  without failure or interruption of any kind for a  period of not less than fifteen  15  days     The system shall be operated by the Employer   s staff duri
44. to meet the    recommendations for maintenance as set out in ICAO Airport Services Manual Part 9      Airport Maintenance Practices  Preventive Maintenance of Illuminated Visual Aids     EQUIPMENT REQUIREMENTS    Screw Thread    All bolts  nuts and screws shall conform to the metric thread of ISO  International  Organization for Standardization     Cleaning and Painting   1  All bright metal parts shall be covered before shipment with an approved protective  compound and protected adequately during shipment to the Site  After erection these    parts shall be cleaned with a correct solvent and polished bright where required      2  All metalwork which is normally painted after manufacture  except where finish       Page   4    Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport        3      4      5     painted  galvanized or polished in the factory  shall be well brushed down and given  one coat of red lead paint before shipment     All parts which will ultimately be buried in concrete shall be cleaned and protected  before leaving the factory by approved method  Before being built in they shall be  thoroughly descaled and cleaned of all rust and adherent matter by the used of strong  wire brush     Exterior surface of metal enclosed switchgear and control gear  metal enclosed type   cubicle type   cabinets  switch box  transformer box  etc  shall be given on
45. tor intends to start the programme      5  The Employer shall nominate candidates for the trainees whose qualification shall be  subject to examination by the Contractor  The Contractor shall reserve the right to  reject any or all the candidates deemed disqualified and to request the Employer to    nominate other candidates      6  The Employer shall have the trainees qualified by the Contractor be ready and  available for the training in accordance with the said programme     Factory Training     1  Factory training of the Employer   s trainees shall be conducted in the manufacturer   s       Page   13    Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       country before shipment      2  The Contractor shall include all the costs required for such training mentioned below    a  Maximum number or persons to be dispatched from the Employer one  1   persons in the field of Airfield Lighting    b  Round trip air ticket between Kathmandu and manufacturer   s country    c  Accommodation   d  Local transportation and daily subsistence allowance sufficient to cover daily    basic requirements    e  Time Period  Total 14 days including travel    f  Training subjects shall include the following   VAGS  APAPI  CCR  Remote control and Monitoring System     11 4 Local Training at Site     12 0    12 1    12 2     1  Training facilities shall be provided by the Cont
46. ts of detailed test procedures and schedules  to the Engineer for consideration and approval  Test procedures shall be  comprehensive and shall demonstrate equipment hardware compliance with all the  requirements of this Specification     3  The entire work to be executed by the Contractor is subject to inspection and test by  the Engineer during manufacturing  installation and on completion at the Site  but the  approval of the Engineer or the passing of any such inspection or test shall not   however  prejudice the right to reject the items of equipment if they do not comply  with the Specification when installed     4  Test items are shown as follows      a  Tests at factory by the Contractor himself   b  Witness test at factory    c  Tests at the Site during construction    d  Commissioning tests    e  Flight tests       Page   9    Air Transport Capacity Enhancement Project  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport    Division 120 010 Particular Requirements Lukla        5  The Contractor should carry out the tests according to the following Tables 1 to 2    Table 1 Test Item for Airfield Light Fittings                                                        peat Eee 1 2 3 Standard  Composition Test  Quality        Approved Shop Drawings  Appearance  amp  Structure Test e      Ditto    Dimensional Test         Ditto    Photometric Test         Ditto    Continuous Operation Test e    Relevant Specification   Temperature Rise Test    Wa
47. ts of the same type or  substitutes of equal or better quality for at least ten  10  years after the issue  of the Defects Liability Certificate      c  The spare parts shall be supplied before the issuance of Operational  Acceptance Certificate        Page   2    Air Transport Capacity Enhancement Project    Division 120 010 Particular Requirements Lukla    ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       5 2    6 0    6 1     d      f      g     Thus  during the one  1  year period after the Defects Liability Period   should any defect occurs which would require replacement of parts other than  the spare parts recommended by the manufacturer  the Contractor shall  supply as soon as possible the needed spare parts at his own expense     The quantity of spare parts shall be recommended by the manufacturer for the  period as stated in para 5 2 below  The recommended quantity shall be  approved by the Engineer who shall have the right to reject the quantity  offered     All spares supplied shall be treated and packed for long storage under the  climatic conditions prevailing at the Site  Each spare shall be clearly marked  or labelled on the outside of its packing with its description and purpose and   when more than one spare is packed in a single case or other container  a  general description of the contents shall be shown on the outside of such case  or containers and detailed list enclosed  Also  containers and other packages  shall be s
48. uitably marked and numbered for purposes of identification     All such cases  containers  cable drums or other packages are liable to be  opened for such examination as the Engineer may reasonably require  and all  such opening and subsequent repacking shall be at the expense of the  Contractor     Minimum Requirements    The Contractor shall supply as a minimum requirement  the spare parts listed below      a  VGAS System    Printed circuit boards 1 no    b  APAPI System    Lamps 12 nos     filters 1 no    d  CCR     Printed circuit boards 1 no   TOOLS AND APPLIANCES  General   1  The following provisions are to be referred to in connection with this Specification      a      b     Tools and appliances necessary for normal maintenance shall be supplied by  the Contractor     Each tool or appliance shall be clearly marked with its size and or purpose  where necessary     The tools and appliances with appropriate boxes shall be handed over to the  Engineer prior to the issuance of the Operational Acceptance Certificate        Page   3    Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       7 0    7 1    7 2    7 3    7 4    7 5    7 6    17    8 0    8 1    8 2     d  The tools and appliances supplied for maintenance shall not be used for  erection purposes      e  The Contractor shall supply effective and efficient tools and appliances to  meet the recom
49. using on rollers    Local remote on  off operation    Tapping on output transformer for load adaptation   Safety device on CCR for maintenance Personnel    Interface    Local Monitoring   It shall have digital display of supply voltage  load  output current  operating mode   brightness state  warnings and fault of any type on the front panel    Remote monitoring   There shall be remote monitoring of CCR parameters  warnings and fault     INSTALLATION    Cabling   The cable connecting between the Remote Control Panel in the VFR room and the local  control and monitor panel in the Maintenance Room at Ground Floor of Control Tower  Building shall be laid through the vertical cable rack or other appropriate means in the Control  Tower    Consoles and Relay Panel     1  The remote control panel shall be installed in the VFR room of the Control Tower      2  Relay panel  interface equipment  shall be installed in the Control Tower Building  Maintenance Room     Constant Current Regulator  CCR     Constant current regulator shall be installed in the Control Tower Building Maintenance  Room        Page   32    
50. vant N S     Concrete  etc     1  The concrete  mortar and reinforcement to be used shall meet the requirements as  specified      2  The Contractor shall  before the work on cable ducts and handholes is started  secure  the Engineer   s approval on the materials to be used and on the method of the work  execution    Crushed Stone or Rubble    The size of the crushed stone or rubble shall not be less than 100mm but no more than  200mm  and the quality of the crushed stone shall be approved by the Engineer     Granular Material for Backfill  Sand     The granular material  sand  shall be free from any foreign substances and shall be approved  by the Engineer      CONSTRUCTION METHODS OF CABLE DUCT    General       Page   26    Air Transport Capacity Enhancement Project    Division 122 000 Cable Ducts  amp  Manholes    ICB 02  Supply and Installation of CNS ATM Equipments       3 2    3 3    3 4    3 5     1      2      3      4      5     The Contractor shall place the electrical cable ducts at the locations approved by the  Engineer     The Contractor shall provide each duct with a core wire     All ducts installed shall be provided with draw wires of galvanized iron or steel of not  less than 1 6 mm diameter for the drawing of the permanent cabling wiring  A part of  the draw wire shall be left in the manhole or handhole in the length enough to be bent  so that the wire will not slide back in the duct     When a spare duct is provided as designated on the Drawings  the termi
51. vent the ingress of dirt  dust and grit  etc     Each drum shall bear a distinguishing number which is branded with hot iron or  neatly chiselled on the outside of one flange  A painted marking shall not be accepted     Particulars of the cable  i e  type of cable  rated voltage  length  conductor size   number of cores  gross and net weights  as well as position of cable end   manufacturer   s name and year and month of manufacture shall be clearly shown on  the drum  The direction of rolling shall be indicated by an arrow     Underground Series Circuit Cable  Primary Cable      1    2     Airfield lighting primary cable shall be manufactured as per this specification     High voltage series circuit cables  primary cable  to be used in the Works shall  comply with ICAO Aerodrome Design Manual  Part 5 and the specification of       Page   15    Air Transport Capacity Enhancement Project Division 120 010 Particular Requirements Lukla  ICB 02  Supply and Installation of CNS ATM Equipments at TIA and Lukla Airport       primary cable shall be as follows     Type of Cable  Cable with screen   Type of Screen  Copper Tape   Type of Outer Sheath    XLPE Cross linked polyethylene   Conductor  Stranded copper   Inner Core Cross section  6 mm    Rated voltage  SKV   Semi Conductor  Extruded   Insulation Resistance  as per ICEA standards    13 3 Extension Cables  Secondary Cables      1      2     The cable for airfield lighting secondary circuit shall comply with ICAO  Aerodrome Design
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
RT-CS 190/1  Zarafa Ryhmätyökalu  Defiant DL82 Installation Guide  XNet Monitor 01.01 User`s Manual  取扱説明書 - SoftBank SELECTION  Underwater Photography    Manual - TECO-Westinghouse Motors (Canada) Inc.  E.Z.N.A.®Cycle Pure Kit - Omega Bio-Tek      Copyright © All rights reserved. 
   Failed to retrieve file