1. a Figure 18 1 Remove the head jamb parting stop with use of a pry bar See figure 18a 2 Use a flat headed tool with a 90 degree elbow to re move the lower fillers from the jamb hardware assem bly This is best done by placing the tool into the space opened by the removed checkrail pad Loosen both corners of the jamb fillers from the notches before try ing to remove them to reduce the possibility of damage to the fillers See figure 18b Be sure to take care when doing so as there is a possibility of the fillers breaking 19970019 2013 03 01 14 From the exterior pry out the jamb hardware assem bly using a pry bar by placing it into the bottom filler channel hooking it into the notches on the side and levering it out See figure 18c When installation of the unit is complete seat the jamb assembly facing towards the exterior first and ease the remainder of the assembly into the jamb pocket See figures 18d and 18e Use of a rubber mallet may be required If so take the mallet and starting at one end work your way up the filler until fully seated Use of a cloth to protect the wood and keep it clear from direct impact while hammering is suggested 5 Reinstall the checkrail pads and head jamb part stop Window Installation StormPlus and Structural Installations Removing Sash rie Seek Assistance Some sash on large windows are very heavy Av
2. Be aware that the use of rigid sill pans and other barriers will decrease the rough opening height clearance Adjust opening dimensions accordingly WARNING Drilling sawing sanding or machining wood products generates wood dust a substance known to the State of California to cause cancer Avoid inhaling wood dust or use a dust mask or other safeguards for personal protection California Health and Safety Code Section 25249 6 19970019 2013 03 01 Properly flash and or seal all windows at the exterior perimeter Sealants used for installation must be Grade NS Class 25 per ASTM C920 and compatible with the building exterior window exterior surface and flashing water management materials Flashing materials must comply with ASTM E2112 01 section 5 13 and be compatible with all materials used in installation including panning systems air barriers and building papers sheathing and the window unit Flashing material must not contain asphalt and must be compatible with flexible PVC vinyl when used in conjunction with nailing fin Optional foams used for installation must be low expansion only Foam and foam application must comply with ASTM E2112 01 SEC 5 9 2 Shims are required between the window frame and framing members at all locking points and at every point of attachment excluding nailing fin and brick mould casing as well as at all points detailed within these instructions For u
3. Window Installation StormPlus and Structural Installations These instructions are applicable for the following Structural installations Clad Ultimate Double Hung Magnum Wood Ultimate Double Hung Magnum These instructions are applicable for the following StormPlus products Clad Ultimate Casement Wood Ultimate Casememt Clad Ultimate Double Hung CUDH Wood Ultimate Double Hung WUDH 2 Clad Direct Glaze Polygon Round Top Wood Direct Glaze Polygon Round Top Clad Ultimate Double Hung Magnum Wood Ultimate Double Hung Magnum sa NOTE Certified IZ2 and IZ3 Ultimate Casement Ultimate Double Hung and Direct Glaze Polygon a Round Top units must be installed using jamb screws or structural brackets Certified 1Z3 Ultimate Double Hung Magnum units must be installed using the jamb screw method only ABSTRACT These instructions advise the window installer carpenter contractor on the recommended way to install Marvin windows where structural installation is necessary including those rated for use in Impact Zones 2 and 3 Exact installation methods for Impact Zone 4 windows are NOT included Instead refer to the Notice of Acceptance see details inside In addition to steps for installing your window included within are Rough opening RO preparation for recessed masonry applications RO prep and sealing details for standard wood frame construction detailed fastening methods and more The procedures with
4. 4 Fasten and shim the jambs at the bottom with the appropriate fastener follow instructions in the Fastening Methods section See figure 6a NOTE Some units such as the Ultimate Double Hung Magnum and IZ3 Ultimate Double Hung feature unique fastening systems For these windows refer to the Spe cial Fastening Systems section for details 19970019 2013 03 01 5 Fasten and shim at the top corners to square the unit in the opening Take diagonal measurements of the window When equal the window is square in the opening Adjust the shims and fasteners until the unit is square in the opening See figure 6b CAUTION Proper shimming is extremely important Under shimming or over shimming will result in bowed jambs and or head jamb Both conditions can contribute to improper window operation and performance Installation Tip On operating units one method to ensure that the unit is installed square is to check the reveal gap between the operating sash and the frame An even reveal around the entire sash generally indicates a correctly installed unit and will ensure smooth operation 6 Complete shimming and fastening at locations and spacing specified in the Jamb Sill Screw Chart See figure 6c 7 Recheck the diagonals one more time to make sure the unit is square in the opening Adjust fasteners as necessary to bring to square 8 Once the unit is installed square and plumb
5. If used on clad units position the factory applied nailing fin drip cap in the upright position See figure 4 On wood units with brick mould casing apply sealant at the casing to frame joint along the jambs and head jamb at the sill horn to casing joint and at the miter corners of the casing See figure 5 Tool the bead to ensure proper adhe sion to both surfaces If you are installing a window with structural brackets fasten to the window now Follow the fastener spacing in the Jamb Sill Screw Chart Follow the instructions provided with the brackets for details on how to fasten to unit Ultimate Double Hung Magnum units are sent with supplemental instructions which detail how to remove the sash and jamb fillers If you will be fastening with screws through the jambs head jambs and sill remove your sash and covers or liners at this time Refer to the section Removing Interior Stops Liners and Fillers and Removing Sash for details Install jamb extension before installing the win dow in the rough or masonry opening Follow in structions provided with the jamb extension 19970019 2013 03 01 Customer service number Figure 3 Figure 4 Extend nailing fin Figure 5 Apply back caulking to BMC 6 Window Installation StormPlus and Structural Installatio
6. 4 Slide the bottom jamb filler back up until it touches the jamb weatherstrip Replace the check rail dust block and the bottom sash stay See figures 10e and 1 Of 19970019 Window Installation 2013 03 01 10 StormPlus and Structural Installations Step 4 Final Installation Procedures This section does not include details on sealing installations that incorporate a continuous air barrier system such as house wrap or building paper in standard wood frame construction For flashing details in this application refer to the section Continuous Air Barrier Systems Flashing the Installation b Figure 12 Sealing recessed masonry openings 1 Place a bead of sealant at the wood buck to masonry 3 In some situations such as recessed masonry joint See figure 12a Openings you can use frame expander or other clad accessories to finish the exterior If this is the case apply a bead of sealant between the acces sory and the masonry at the head jamb and jamb sections Leave the sill portion unsealed to allow water to escape See figure 12c 2 For recessed masonry applications Marvin recom mends sealing at the buck to frame joint with ap propriate width backer rod and sealant around the en tire perimeter Finish as applicable local code dic tates See figure 12b Low expansion foam Fiberglass insulation Figure 13 Insula
7. operate the sash on operable units to make sure it is operat ing properly If not you may have to make some addi tional adjustments to the shims and fasteners 9 If removed replace your stops covers and liners Window Installation StormPlus and Structural Installations Fastening Methods and Jamb Sill Screw Chart Although structural installations may involve fastening with wood brick mould casing or nailing fin there are two ways to fasten your jambs to the opening for structural purposes 1 8 Wood screws or 3 16 concrete anchors 6 152 from all corners and 15 881 on center around the perimeter or 2 Structural brackets 6 152 from all corners and 15 381 on center around the perimeter Refer to the Jamb Sill Screw Chart for proper fastening requirements for your particular product Illustrations show a concrete block opening but apply to typical wood frame construction as well NOTE All mulled units require fastening with two screws or brackets on each side of the mull joint no more than 6 152 from mull joint NOTE Single UDH products do not require fastening at the sill Multiple wide UDH assemblies require anchoring at the sill mullion UDHM IZ3 units must be installed with jamb screws fastening at the sill is not required Structural Brackets 1 Wrap brackets around the framing buck opening fasten with two 8 x 1 5 8 screws Angle the screws approximately 15 degrees awa
8. the sill for structural purposes place a bead of sealant Attach the lumber to the masonry opening with where the screws will penetrate the rigid sill panning construction adhesive and masonry anchors which should penetrate the masonry opening by at least 4 The window frame must not come in contact with 1 1 1 2 25 38 See figureta and 1b treated lumber If you will not be using rigid panning or shimming at the sill apply a barrier such as a self 2 For standard wood frame construction prepare the sealing adhesive flashing to the rough opening sill opening following local codes ASTM E2112 1 or fol See figure 1 c low the steps in the Continuous Air Barrier Systems section 3 If rigid panning is used place a bead of silicone or construction adhesive over any fasteners used to hold the panning to the sill 19970019 Window Installation 2013 03 01 4 StormPlus and Structural Installations Step 1 Rough Opening and Framing Requirements cont Rough Opening Figure 2 Preparing openings for concrete block openings 5 Rough openings RO should be 1 25 wider than the outside measurement of the frame and 1 2 13 higher Masonry openings MO should be 1 2 13 wider than the outside measurement of the frame or casing and 1 4 6 higher than the outside measure ment of the frame or casing When framing rough Opening care should be taken to ensure the sill pl
9. 002 cece cece eee eee ee eens 8 Wood Screws Concrete Anchors and Structural Brackets Special Fastening Systems osi c teiaa tek ei cee oe oo evs 10 StormPlus Ultimate Double Hung IZ3 Storm Brackets Step Four Final Installation Procedures 00 cece eee eee eee eee eee eee ees 11 Standard Frame Construction and Recessed Masonry Applications Continuous Air Barrier Systems 00 ccc eee eee eee eee 12 Installation Integration and window installation tips for house wrap Removing Interior Stops Liners and Fillers 0 00 ccc eee eee eee ees 14 Removing Casement interior stops Removing Ultimate Double Hung jamb carriers REMOVING Sash we sevcs teen eeordeseneseoe eee a aaa alee beer enw nde ednees 15 Ultimate Double Hung and Ultimate Casement Operators StormPlus IZ4 Notice of Acceptance Information 00c cece eee eee eee 16 Warranty Painting and Staining Information 19970019 Window Installation 2013 03 01 1 StormPlus and Structural Installations Technical Installation Specifications The following details are specified for proper installation and for the unit to meet the advertised design pressure DP rating e Rough Opening Width 1 4 1 6 25 wider than window door frame outside measurement e Rough Opening Height 1 4 1 2 6 13 higher than window door frame outside measurement e Masonry Opening Width 1 4 1 2 6 13 wider than window door frame outside measurem
10. Structural Installations Fastening Methods cont On Ultimate Casement units position the screw so that it misses any operating hardware if applicable With typical installations you should be able to locate the screw in the center groove in the frame and just to the exterior of the kerf that holds the head jamb stop See figure 8 Fastener Fastener On Ultimate Double Hung units locate the screw in the jamb carrier kerf jambs and in the kerf used to hold the parting stop head jamb Make sure to countersink the screw so that it doesn t interfere with installation of the jamb liner and or parting stop See figure 9 Figure 9 Exterior View fastening through UDH frames 5 On 123 Ultimate Double Hung units fasten through the Storm Brackets on the jambs with two 8 x 2 1 2 64 wood screws through the top bracket and one screw through the bottom bracket See the Special Fastening Systems section for more de Figure 8 Exterior view fastening through Ultimate Casement tails frames 19970019 Window Installation 9 StormPlus and Structural Installations 2013 03 01 Special Fastening Systems StormPlus Ultimate Double Hung IZ3 Storm Brackets e b E a o Figure 10 Fastening UDH Storm Brackets 1 Ultimate Dou
11. amp EES refer to www marvin com Roprep for instructions titled Window Rough d Opening Prep and Flashing Method K A1 Membrane Drainage System i d Ta j d S i 4 J i z F S s e l S 3 p ell Figure 15 Sealing the installation in air barrier applications Window Flashing Detail non recessed masonry K a oe toon K Sealant Seam seal tape Jamb flashing ee gS Window casing cladding Figure 16 Flashing windows with casing in typical wood frame construction non recessed masonry NOTE Figure 16 shows a window with casing but the flashing detail also applies to any clad window product For installation in typical wood frame construction or brick veneer non recessed masonry openings figure 16 shows the proper flashing detail in shingle style fashion Once the exterior finish such as siding or brick veneer is installed a bead of sealant should be applied between the finish and the window window casing along the sides and approximately 1 2 25 51 in from the ends at the head jamb see insert Use a backer rod when necessary Window Installation StormPlus and Structural Installations 19970019 13 2013 03 01 Removing Interior Stops Liners and Fillers Some structural installations that use the jamb pinning method require the removal of interior stops before installing the window This section details th
12. ate is level and the opening is square straight and plumb See figure 2 ATTENTION Be aware that use of rigid sill pans and other barriers will decrease the rough opening height clearance Adjust opening dimensions accordingly not met the installer must take corrective actions to alter the opening s before proceeding It is also essential that the sheathing behind the wall be a solid surface to ensure that the unit can be secured firmly to the wall T CAUTION If the previous conditions are NOTE On standard wood frame construction with brick veneer make sure there is at least 1 2 13 between bottom of window sill or eventual placement of the window and the top row of brick to avoid brick bind 1Rough opening gap must be no more than 1 4 for products certified for use in IZ4 regions 19970019 2013 03 01 5 Window Installation StormPlus and Structural Installations Step 2 Unit Preparation 1 Remove the protective packaging from the unit and dispose recycle properly Inspect unit for any hidden damage and report immediately to your Marvin representative Provide the cus tomer service number etched on one of the top corners of the glass See figure 3 Remove any shipping clips unless noted other wise NOTE Do not remove the vinyl shipping blocks or shipping tube assembly on Ultimate Double Hungs until installation is complete unless installing with jamb screws 3
13. ble Hung 123 units have two storm 5 Extend storm brack brackets attached to each jamb If you are using ets during inclement the jamb screw method for installation you will no weather by inserting tice these when you remove the clad and wood fill a stick pin nail or ers If you are using the masonry bracket method pen through the hole you must first remove the check rail dust block and in the bracket Then pull out the bottom part of the top jamb weather slide the bracket strip as well as remove the bottom sash stay See away from the win figures 10a and 10b dow frame as shown 2 Push the clad jamb filler up as far as it will go to re in figure 11 veal the predrilled hole in the jamb carrier Fasten the jambs through the storm bracket by driving one of the 8 x 2 1 2 screws through the pre drilled Fi i Usmastormi bracket hole in the jamb See figure 10c ne o reece 3 Press the top jamb weatherstrip back into place Slide the bottom jamb filler down as far as it will go WARNING 1IZ3 storm protection for Fasten the jamb through the storm bracket by driv CUDH operators requires that storm ing two of the 8 x 2 1 2 screws through the pre brackets be put in the extended position drilled holes in the jamb See figure 10d If the homeowner will be away from home for any period of time in which strong winds are pos sible it is recommended that the storm brackets be pulled out to the extended storm ready posi tion before leaving home
14. e removal of Ultimate Double Hung UDH jamb liners and Ultimate Casement operator and stationary stops Details for UDHM windows can be found in the supplemental instruction sent with the unit Removing Ultimate Casement Stops and Covers i x i f j a Figure 17 Removing Ultimate Casement stops and covers 1 Sill and head jamb covers and stops are held in place with a vinyl barb and can be easily removed by simply and carefully prying up on the stop with a sharp putty knife Be careful not to damage the stop or frame Oc casionally the barb will stay in the frame when you re move the stop Remove the barb with a pair of pliers and reinsert into the kerf on the stop cover See fig ure 17a NOTE Stationary jamb stops are removed in the same fashion You will need to remove the head jamb and sill covers first Removing UDH Jamb Liners Operator jamb covers are held in place by two barbs one on the interior side and one on the exterior side shared by the frame weather strip With the sash opened or removed first pull the frame weather strip out of the kerf and set aside for reuse later Remove the sill and head jamb stops With a sharp putty knife carefully pry on the interior side between the stop and the frame Start at one end and work your way down until stop loosens See fig ure 17b Head jamb parting stop
15. elated to could cause damage could result in individual is necessary alternative Impact rated to the window or personal injury and or to perform this task procedures products only result in faulty severe damage to safely and correctly definitions helpful installation and unit unit equipment hints performance and or structure You Will Need to Supply Safety glasses Hearing protection Level Square Hammer Wood shims Insulation Tape measure Perimeter sealant Sill pan flashing Backing material foam backing rod Low expansion foam insulation Appropriate fastener see Jamb Sill Screw Chart Construction adhesive NOTE Numbers listed in parentheses are metric equivalents in millimeters rounded to the nearest whole number Standard Parts Shipped Units are sent with hardware clad units are sent with four 4 nailing fin corner gaskets Follow installation instructions included with part if applicable UDHM units are sent with a fastening package and supple mental installation instructions NOTE Depending on the installation method other material may be needed to properly prepare and seal the installation such as self sealing adhesive mem brane building paper and seam Seal tape etc WARNING Always practice safety Wear the appropriate eye ear and hand protection especially when working with power tools 1Sealant must be Grade NS Class 25 per ASTM C920 and com
16. ent e Masonry Opening Height 1 8 1 4 8 6 higher than window door frame outside measurement Architectural Detail Manual Specifications e Rough Opening Width 1 25 Height 1 2 13 e Masonry Opening Width 1 2 13 Height 1 4 6 e If using less than a nominal 2 x buck in masonry Openings the rough opening must be no more than 1 2 13 wider and 1 4 6 taller than the outside measurement of the frame Installation methods are limited to Jamb Screw method using 3 16 concrete screws e Marvin recommends the use of sloped sills on all concrete openings either pre cast or poured e Regarding recessed masonry openings the window frame must not come in direct contact with masonry concrete concrete block Construct framing from treated lumber or plywood and fasten to the masonry opening jambs header and sill This framing must be designed and anchored to the opening properly to withstand certified and advertised DP ratings for your particular unit e For installations in typical wood frame construction with sheathing and building paper or air barrier material where a continuous air barrier system is used refer to ASTM E2112 01 or reference the Continuous Air Barrier Systems section for details on preparing the rough opening and sealing the installation e For installations in concrete block or masonry construction etc follow local codes for sealing and water management details
17. esentative NOA DESCRIPTION URL 07 0524 08 sa Ultimate Casement Polygon RT http www miamidade gov buildingcode library productcontrol noa 07052408 pdf icture 07 0524 06 cat Ultimate Casement Operating RT http www miamidade gov buildingcode library productcontrol noa 07052406 pdf olygon 08 0310 11 Clad Awning http www miamidade gov buildingcode library productcontrol noa 08031011 pdf 08 0213 08 Clad Ultimate Casement Picture http www miamidade gov buildingcode library productcontrol noa 08021 308 pdf 08 1014 06 Clad Ultimate Casement Operator http www miamidade gov buildingcode library productcontrol noa 08101406 pdf 08 0310 12 Wood Awning http www miamidade gov buildingcode library productcontrol noa 0803101 2 pdf 08 0213 09 Wood Ultimate Casement Picture http www miamidade gov buildingcode library productcontrol noa 08021 309 pdf 08 1014 07 Wood Ultimate Casement Operator http www miamidade gov buildingcode library productcontrol noa 08101407 pdf 07 0924 01 Clad Direct Glaze Polygon Round Top http www miamidade gov buildingcode library productcontrol noa 07092401 pdf 19970019 Window Installation 2013 03 01 16 StormPlus and Structural Installations
18. in these instructions are consistent with those used in testing to achieve the advertised DP rating Contact your local Marvin dealer if your construction scenario differs from those detailed within Regional standard practices environmental conditions and codes may vary and supersede the procedures contained within The responsibility for compliance is yours the installer inspector and owner s See the Technical Installation Specifications inside for more details Includes Awning Operator Picture 1 Stationary 3 4 Round Top Operator and Round Top Stationary z 2Includes Picture Transom Round Tops and Polygon MARVIN Cn E Windows and Doors 19970019 2013 03 01 Built around you Table of Contents Page Technical Installation Specifications 0 ccc ee eee eee 2 Before YOU BEGIN lt xdace touts ree oaths tees Scie eee betas Stree a E a E E EET 3 Installer and Builder Information Homeowner Information and Aftermarket Products Step One Rough Opening and Framing Requirements 00 00s eee cece eee ees 4 Concrete Block with Plywood Buck Concrete Block with 2 Buck or Standard Wood Framing Step Two Unit Preparation ic awa de euler tea ee ea Ae a A 6 Packaging Shipping Blocks Jamb Extension Nailing Fin and Wood Brick Mould Casing Step Three Installing the Window 0 cece eee eee eens 7 Shimming Plumbing and Squaring Fastening Methods and Jamb Sill Screw Chart
19. nits with flat casing install with installation brackets structural masonry brackets or jamb screws Do not use chemically treated products for shim material Fasteners penetrating chemically treated lumber must be a minimum of 0 90 oz ft zinc hot dipped galvanized or stainless steel type 304 or 316 Clad window frames must not come into direct contact with chemically treated wood products Window Installation StormPlus and Structural Installations Before You Begin Installer and Builder Information e Read these instructions thoroughly BEFORE beginning to install your Marvin window product e Always provide a copy of these instructions for the current or future building owner e Plan sizing of rough opening and clearance from exterior finishing systems to allow for normal materials shrinkage or shifting e g wood structure with brick veneer allow adequate clearance at sill Failure to do so can void the Marvin warranty coverage e Refer to the Technical Installation Specifications section for technical specifications regarding the installation of this product These installation requirements as well as the details in this section must be followed to achieve the advertised design pressure DP rating of this product Aftermarket Products e It is the responsibility of the builder installer and subcontractors to protect the interior and exterior of windows or doors from excessive contact with harsh chemical washes constr
20. ns Step 3 Installing the Window The following steps provide details for structural fastening of the window to the opening When installing windows with nailing fin or wood brick mould casing it may be desirable to first attach the window using these fastening methods in conjunction with steps 1 5 Then complete the installation by fastening with structural brackets or screws Always follow fastener spacing outlined in the Jamb Sill Screw Chart section On applicable construction using a continuous air barrier system prepare the opening before installing the window Refer to the Continuous Air Barrier Systems section for details Measure diagonally Figure 6 Plumb and square unit Illustration shows both structural bracket and jamb screw installation Seek Assistance Some large windows and or assemblies are very heavy Avoid injury by getting help to lift and position the window into the rough opening ome Ww 1 If rigid sill pan is not used pan sill with alternate meth ods or shim under window sill to ensure it does not come in direct contact with treated lumber 2 On some larger units such as the Ultimate Double Hung Magnum it may be necessary to remove the sash prior to installation See the sash removal sec tion for details 3 Center the window in the opening Level at the sill and plumb the frame interior exterior to desired depth
21. oid injury by getting help to lift and gt L position the window into the rough opening For other products not shown here refer to the Marvin Service Manual or contact your Marvin representative Ultimate Double Hung Operator Sash iL so b Figure 19 Tilting and removing Ultimate Double Hung Sash 1 2 Raise the bottom sash approximately 4 102 See figure 19a Pull the tilt lever nested in the sash lock base until it clicks Hold the lever until latches clear the unit frame when tilting Ease top edge of bottom sash out toward you to a horizontal position See figure 19b 3 4 Lift both sides of the sash upward 2 3 51 76 rais ing the pivot pins out of each clutch See figure 20c Rotate the sash until the pivot pins clear the jambs and remove the bottom sash from the frame See fig ure 19d Tilt and remove the top sash using the same tech nique used on the bottom sash The top sash uses tilt latches located on both sides of the top rail Ultimate Casement Operator Sash Operator track Hinge track Pivot shoe b extension a Butterfly Hinge c d arm clip arm Figure 20 Removing Ultimate Casement Operator Sash NOTE Sash with daylight openings of less than 14 1 2 2 Disconnect the butterfly clip on the sho
22. patible with building exterior and window surface 2Optional use low expansion foam insulation only Foam and foam application must comply with ASTM E2112 section 5 9 2 SAPA rated AFG 01 spec 19970019 2013 03 01 3 Window Installation StormPlus and Structural Installations Step 1 Rough Opening and Framing Requirements This section gives requirements for framing and rough opening clearances Masonry or concrete openings must be lined with a treated wood product wood buck You must fasten the buck to the masonry opening in a fashion that will withstand conditions which would be encountered under the certified and advertised DP ratings for this window The structural integrity of this installation is only as good as the bond between the wood buck and the masonry opening For more details contact your Marvin representative NOTE Wood buck material thickness may vary Illustrations show a 1 2 plywood and 2 x 4 buck Installations using material less than 2 nominal material must use the jamb screw method of attachment and use 3 16 concrete anchors Construction adhesive Adhesive flashing Masonry anchor 1 2 treated plywood b Figure 1 Preparing openings for concrete block openings 1 On concrete block masonry or similar situations line NOTE If your installation requires screwing through the sides head jamb and sill with treated lumber
23. rt extension 368 will use hinged single arm operator gear Skip to arm from the stud on the sash bracket See figure 20b step 2 for these units 3 Push the sash open to 90 degrees With a screwdriver imilar tool pry the bottom hinge off from the stud 1 Crank open sash until the nylon roller on the long ex ties tension arm lines up with the arrow on the operator heehee track Repeat this on the top hinge See track Disconnect the extension arm from the opera g l tor track by pushing the roller down through the open 4 Remove the sash by sliding the entire sash on its ing in line with the arrow See figure 20a 19970019 2013 03 01 hinge pivot shoes toward the hinge track studs The shoes will disengage from the track when they hit the stud Carefully remove the sash and set aside See figure 20d Window Installation StormPlus and Structural Installations StormPlus IZ4 Notice of Acceptance Exact instructions for installing windows certified for use in Impact Zone 4 are not included in this publication The installer contractor MUST install the window s according to detailed drawings found in the Notice of Acceptance NOA to the Product Control Division of the Miami Dade County Building Code Compliance Office BCCO You will be able to find the NOA drawings for each certified product on the Miami Dade County website exact URLs listed below at www marvin com or you may obtain a hard copy by contacting your Marvin repr
24. ting the rough opening 4 Apply a 1 2 25 51 thick bead of low expansion 5 Interior and mullion trim Install mullion trim after foam insulation on the back side of the nailing fin interior trim or casing is applied On Ultimate brick mould casing or other trim Do not apply too Double Hung units be sure to use nails and sta much as it is possible to bow the jambs Now insulate ples that are no longer than 3 4 19 Place fasten loosely around the window with fiberglass insula ers at least 1 25 from the edge of interior jamb tion See figure 13 liner 19970019 Window Installation 2013 03 01 11 StormPlus and Structural Installations Continuous Air Barrier Systems Preparing the Opening The method shown below is Method A1 using a TYPE III flash pan For step by step instructions on how to prepare an opening using this method refer to www marvin com ROprep for instructions Window Rough Opening Prep and Flashing Method A1 Membrane Drainage System Refer to ASTM E2112 07 for other rough opening preparations that are more appropriate for your situation Figure 14 Preparing the opening 19970019 Window Installation 2013 03 01 12 StormPlus and Structural Installations Continuous Air Barrier Systems Flashing the Installation EES 1 Flash the installation in a weather board fashion For step by step instructions ai 1 J i amp amp E
25. uction material contamination and moisture Damage to glazing hardware weatherstrip and cladding wood can occur Protect with painters tape and or protective sheathing as required Follow all guidelines regarding material use preparation personal safety and disposal e Refer to the enclosed painting and staining instructions on the last page for exterior and interior finish instructions e Contact your Marvin supplier if you have any questions regarding product and materials used in manufacturing or questions on replacement parts Alterations to Marvin products including window films insulating or reflective interior window treatments or additional glazings can cause excessive heat buildup and or condensation They may lead to premature failures not covered under warranty by Marvin Windows and Doors Before purchasing or applying any product that may affect the installation or performance of Marvin windows contact the manufacturer of aftermarket product glazings that are not supplied by Marvin and request written product use associated warranties and damage coverage Provide this information and warranties to the end user and or building owner for future reference Hazard Notations Please familiarize yourself with the following hazard notations used throughout this instruction Caution Warning Seek Assistance Tips Hints Impact Product ome Mistakes or misuse Mistakes or misuse Help from another Information on Steps r
26. y from the window Always shim above or behind installation brackets Shim i l 5 32 holes i g re Screws Figure 7 Jamb Sill Screw Chart Jamb Screw Sill Screw Product Length Length Clad Ultimate 3 76 2 1 2 64 Casement Family and Direct Glaze Wood Ultimate Casement Family and Direct Glaze 3 76 3 1 2 89 Ultimate Double Ultimate Double Hung Magnum Family Supplied with unit Use predrilled holes in frame members Jamb Sill Screws 1 Space fasteners along jambs and head jambs no more than 6 152 from each corner and 15 381 on center Follow same spacing for sills when appli cable NOTE Structural brackets are allowable replacements for screws if fastening at the sill is necessary 2 After removing covers or liners fasten units to the framing with 8 wood screws or 3 16 concrete an chors Adjust length of fastener so that it penetrates no less than 1 1 4 32 into framing opening When fastening through the sill always pre drill and fill hole with sealant before driving the screw Always place a shim behind or above the screw location on jambs and head jambs NOTE When using masonry anchors be sure to follow manufacturer s guidelines for proper installation Some types require pre drilling 1Use concrete anchors when wood buck material is less than 2 nominal thickness 19970019 2013 03 01 Window Installation StormPlus and