Home

FIRENZE™ BATHTUB & WALL SET

image

Contents

1. floor Inside corners of the alcove should be square refer to Illustration 3 Access panel gy location Mixing valve Spout elbow 32 Drain cutout 8 x 10 Max Centered on drain Illustration 2 Suggested rough plumbing locations 3 Special installations e Above the floor drains Create a platform of 2 x 4 s or taller depending on drain requirements to raise the entire bathtub or shower base area and cover it with sub flooring This platform must be level and square to the wall studs When installing plumbing add platform height to the 0 Each alcove dimensions shown in Illustration 2 2 stud must e Masonry walls s A ain Construct a 2 x 6 stud wall for the plumbing end Apply 2 x 2 furring strips to the masonry q wall in the same locations as the studs in Illustration 1 e Installation over greenboard or firewalls If you are installing wall panels over greenboard and or firewall material and not directly on the studs your dimensions must take into account the thickness of this material and measurements should be taken from the inside of the finished walls Illustration 3 TOOLS amp MATERIALS REQUIRED Installation requires common household tools and If you will be installing a tub door you will also need e Level amp square Tape measure Hammer Pencil Utility knife e Two backer boards See step 1 of Wall Set e 3 4 galvanized roofing nails e 2x4 lumber f
2. s Figure 3 11 Appliquez un cordon de colle vers le bas le long de 5 chaque poteau qui doit entrer en contact avec les panneaux lat raux Etendre aussi un peu de calfeutrage dans le coin des panneaux de c t tel qu illustr a la Figure 4 Posez chaque panneau lat ral en le glissant solidement dans le coin Appuyez fermement sur chaque panneau afin de vous assurer qu il adh re bien a chaque poteau Rep rez un trou de 3 16 au centre de la bride de clouage au dessus du panneau centr sur chaque poteau Percez aussi des trous de 3 16 dans la bride de clouage avant sur chaque panneau lat ral 12 d intervalle centr s sur la membrure fig 4 Clouez les clous de toiture galvanis s de 3 4 a travers chaque trou et dans les poteaux fixant ainsi le panneau mural Poteau Figure 4 Installez un contrevent temporaire pour retenir le centre 6 du panneau arri re fermement sur les poteaux pendant environ 24 heures le temps que la colle adh re fig 5 DERNIERS PREPARATIFS Installez la c ramique Lorsque vous installez la c ramique 7 placez les vis de paroi s che au dessus de la membrure de clouage sup rieure afin d viter de percer des trous de passage Si vous d cidez de visser a travers la membrure de clouage vous DEVEZ percer des trous de p de 3 16 dans la membrure afin d viter de craquer o d endommager la mem
3. t des appareils de plomberie droite ou gauche 14 1 2 h 31 gt Coude de la pomme de douche Coupe de vidange E a Emplacement du Max 8 x 10 d appui nea d acc s A y Centr sur la vidange SU p 81 60 Poteau Robinet m langeur suppl mentaire si Tablier de la extr mit du mur baignoire Coude de la gargouille 32 Coupe de vidange C ramique Max 8 x 10 Centr sur la vidange Illustration 1 Positionnement du poteau et emplacement de la vidange Illustration 2 Emplacement sugg r pour la structure de plomberie P N 27724 Rev C 5 09 9 3 Installations sp ciales e Au dessus des vidanges de plancher Cr ez une plateforme de 2 x 4 ou plus selon les besoins de la vidange afin d lever la zone de la baignoire en entier et couvrez la de sous plancher Cette plateforme doit tre d aplomb et droite sur les poteaux du mur Lorsque vous installez la plomberie ajoutez la hauteur de la plateforme aux dimensions illustr es a la figure 2 e Murs en ma onnerie Construisez un colombage de 2 x 6 pour l extr mit de la plomberie Appliquez des tasseaux de 2 doit tre d aplomb et x 2 au mur en ma onnerie au m me endroit que les poteaux de la figure 1 droit e Installation sur une cloison pare feu ou de c ramique Si vous installez les panneaux muraux sur une cloison coupe feu ou de c ramique et non pas di
4. Figura 4 Martille clavos galvanizados de 3 4 para techo en las vigas de la pared a trav s de cada agujero para fijar los paneles de la pared Figura 4 panel posterior presionado contra las vigas de la pared por unas 24 horas mientras se seca el adhesivo Figura 5 PREPARACI N FINAL Coloque el greenboard Al instalar el greenboard coloque 7 tornillos para paneles de pared por encima del ala de fijaci n para evitar perforar agujeros de paso Si escoge atornillar a trav s del ala de sujeci n deber perforar agujeros de paso de 1 16 en el ala para evitar que se raje da e 6 Coloque un soporte provisorio para sostener el centro del CUIDADO Y MANTENIMIENTO Para la limpieza normal use nicamente detergentes suaves 0 agua enjabonada tibia aplicada con un trapo suave Siempre enjuague las superficies luego de limpiarlas y s quelas con un trapo h medo o gamuza No le podemos recomendar un producto limpiador espec fico ya que var an con el tiempo Sin embargo cualquiera sea su opci n e Siga siempre las instrucciones del fabricante e No use un limpiador que no sirva para pl sticos en este producto Para hacer que este producto le dure al m ximo e Siempre enjuague los limpiadores dentro de los 5 minutos de haberlos colocado e Enjuague los limpiadores incluso cuando sean del tipo col quelos y d jelos GAR
5. adicional por favor visite www mascobath com mande un email a customerservice mascobath com o llame al 1 800 355 2721 Si compr productos en Canad y desea llame a sercicio al cliente llame a Mirolin Industries Corp www mirolin com info mirolin com 1 800 647 6546 Mirolin Industries e 60 Shorncliffe Road e Etobicoke Ontario M8Z 5K1 Importante Estas instrucciones incluyen sugerencias para la construcci n inicial instalaci n de los paneles de pared y la ca er a que creemos que es confiable Las normas de construcci n locales var an en cada lugar y pueden tener precedencia sobre estas sugerencias Si no cree tener la habilidad necesaria para realizar estas tareas deber a usar un instalador profesional o subcontratar las tareas para las que necesite ayuda REQUISITOS PARA UNA INSTALACI N EXITOSA 1 Lea estas instrucciones y verifique que la ba era entre en el lugar deseado y que el desag e est donde haga falta antes de empezar con la instalaci n 2 Las vigas de las paredes deben estar ubicadas como se muestra en la figura 1 y deben estar a escuadra Es importante que las vigas est n ubicadas como se indica para poder fijar el ala de cada lado de los bordes de la ba era Las dem s vigas deber n estar ubicadas de acuerdo con las normas locales de construcci n e La ca er a deber instalarse antes que la ba era y o los paneles de pared La figura 2 muestra la ubicaci n sugerida al instalar c
6. is important that a stud is located as shown for attachment of the vertical flange on each side of the tub apron Other studs should be located according to local building codes e Rough plumbing must be installed before tub and or wall panels Illustration 2 shows suggested location of fixtures if new plumbing is being installed Provide an access panel on the back side of the wall with the plumbing fixtures If plumbing exists check that fixtures will clear tub and panels All plumbing must meet local building codes e The bathtub must be installed on a solid and level sub floor 8 11 32 ii 14 5 8 H 14 5 8 a Plumbing fixture side right or left hand 14 1 2 Drain cutout 8 x 10 Max Centered on drain Y Additional stud if end of wall Illustration 1 Stud placement and drain location P N 27724 Rev C 5 09 that is square with the wall studs The bathtub must sit directly on a level sub floor If necessary level floor with leveling compound e Use the cutout from the bathtub carton to protect the bathtub from damage during installation e The bathtub and wall set should not be installed in areas where the temperature may drop below freezing 32 F or 0 C e Allow bathtub and wall set to reach room temperature for 30 minutes before installing Important The alcove studs must be plumb and square to the
7. las placas Figura 1 Placa de soporte i haciendo que lleguen 1 x 1 1 4 x 59 Pared de la ba era hasta la parte de 69 de largo sobre la pared de la ducha arriba del hueco Figure 1 Coloque los tres paneles de la forma en que ir n en el hueco Las alas de fijaci n horizontales estar n ubicadas en la parte superior de los tres paneles Decida cual de los paneles laterales necesitar cortar para las ca er as Ubique marque y corte cuidadosamente los agujeros usando una sierra para agujeros del tama o adecuado Al terminar de colocarlos Capa de adhesivo marque la parte superior de los paneles en cada una de las vigas de la pared Saque los paneles Coloque una capa de adhesivo en cada viga que entrar encontacto con el panel posterior manteni ndose por debajo de la l nea que acaba de marcar No necesita colocar adhesivo en las vigas de las esquinas Vi Coloque una linea de calafateado a lo largo Calafateado del borde de la ba era L nea marcada Figura 2 P N 27724 Rev C 5 09 Si est instalando uno de nuestros juegos de paredes 4 prosiga con las instrucciones de Instalaci n de Juego de Pared a continuaci n Si est instalando greenboard con alg n otro revestimiento deje una separaci n de 1 8 entre el borde de la ba era y el material de la pared para evitar la posibilidad de que el agua llegue a la
8. panneaux Appliquez un cordon de colle le long de chaque poteau vers le bas qui entrera en contact avec le panneau arri re Assurez vous de demeurer en dessous de la ligne que vous avez trac e Il n est pas fa n cessaire d appliquer la colle sur les poteaux Cordon de calfeutrage Figure 2 P N 27724 Rev C 5 09 les instructions Installation de l ensemble mural ci dessous Si vous installez de la c ramique avec un autre rev tement laissez un jeu de 1 8 entre l appui de la baignoire et le mat riau mural afin d viter que l eau ne p n tre le panneau mural Une fois le mur termin scellez ce jeu a l aide de calfeutrage fig 4 4 Si vous installez un ensemble mural correspondant suivez Poteau C ramique Rev tement mural Cordon de calfeutrage Figure 4 en coin Etendez une couche de calfeutrage le long de l appui de la baignoire fig 2 Replacez le panneau arri re et appuyez fermement sur Palc ve contre les poteaux Rep rez un trou de 3 16 au centre de la bride de clouage 4 au dessus du panneau centr sur chaque poteau fig 3 Clouez les clous de toiture galvanis s de 3 4 a travers ove trou et dans les poteaux fixant ainsi le panneau mural Ouverture gale des deux c t s Ouverture gale des deux c t
9. todos los soportes inferiores y que est nivelada pegamente se seque de lee LG LE ya oe con T To de i H Len de A oe paredes No debe quedar un espacio de mas de 1 8 entre la pestafia Fije la ca er a de desag e y desborde siguiendo las 2 instrucciones del fabricante Si el fabricante del drenaje superior de la ba era y las vigas de la pared no incluy una junta de goma utilice sellador de l tex o acr lico NO use masilla entre el drenaje y la ba era El uso de masilla de plomer a degradar el pl stico con el tiempo y podr a causar da os Menos de 1 8 Figura 1 Figura 2 6 P N 27724 Rev C 5 09 La ba era debe estar apoyada en el hueco aplomada y a escuadra Mientras se para en la ba era fije la pesta a superior con clavos galvanizados para techo en cada viga de pared y en dos lugares de cada lado del borde Marque y perfore agujeros de 3 16 en el centro del ala de sujeci n centrados en cada una de las vigas de la pared Martille los clavos en cada una de las vigas de la pared a trav s de los agujeros para fijar la ba era ba era Figura 3 Si va a instalar una puerta de ba era Flaca de soporte debe instalar una llegando placa de soporte hasta vea el tama o arriba del en la Figura 1 en hueco 1e la parte de atras fijaci n de las paredes de los costados Coloque una capa de adhesivo en el interior de cada pared lateral y fije
10. 2 P N 27724 Rev C 5 09 Apply adhesive to the bottom support where it will touch the If you are installing one of our matching wall sets proceed 3 floor The bathtub should now be set in the alcove plumb 4 with the Wall Set Installation instructions that follow If and square While standing in the bathtub the top flange you are installing greenboard with another covering leave should be secured with galvanized roofing nails at each stud a gap of 1 8 between the tub ledge and the wall material to location and in two places on each side of the apron Locate help reduce the chance of water getting into the wall board and drill 3 16 clearance holes in the center of the nailing When wall is finished seal this gap with caulk Figure 4 flange and centered on each stud Hammer nails through each hole and into the studs securing the bathtub Caution Drill chuck or hammer can damage the tub or base Drill holes from the outside or protect tub Flange Figure 3 Figure 4 WALL SET INSTALLATION If you will be installing 2aeker 1 a bathtub door a E backer board note size top of In Figure 1 must be panel installed on the back of recess both side walls Apply a bead of adhesive in the recess of each side wall and attach board Figure 1 butting board up to the top of the recess Locate and drill a 3 16 hole in the center of the nailing 4 flange at the top of the panel
11. ANT A LIMITADA Refi rase a la etiqueta del producto ubicada en la caja para determinar el per odo de garant a de su producto El fabricante le garantiza al comprador original que este producto no tendr defectos de materiales y de mano de obra sujeto a las limitaciones exclusiones y condiciones a continuaci n desde la fecha original de compra indicada en el recibo El fabricante a su criterio reemplazar o reparar SIN CARGO con excepci n de lo indicado m s abajo durante el t rmino de la garant a cualquier parte que considere defectuosa en material y o mano de obra bajo condiciones normales de instalaci n uso y mantenimiento El comprador original deber notificar al fabricante por escrito acerca de cualquier defecto cubierto por la garant a a la direcci n indicada mas abajo ESTA ES LA UNICA GARANT A EXPRESA DEL FABRICANTE TODO RECLAMO HECHO BAJO ESTA GARANT A DEBE REALIZARSE DURANTE EL PERIODO INDICADO ANTERIORMENTE TODA GARANT A IMPL CITA DE CALIDAD O IDONEIDAD PARA UN PROPOSITO EN PARTICULAR SE LIMITA A LA DURACI N DE ESTA GARANT A LOS CARGOS DE MANO DE OBRA Y O DANOS INCURRIDOS DURANTE LA INSTALACI N REPARACI N O REEMPLAZO AS COMO LOS DANOS FORTUITOS E IMPREVISTOS RELACIONADOS CON DICHAS ACTIVIDADES ESTAN EXCLUIDOS Y NO SER N CUBIERTOS POR EL FABRICANTE Algunos estados no permiten limitaciones con respecto a cuanto dura una garant a impl cita o la exclusi n 0 limitaci n de da os imprevi
12. ID BY THE MANUFACTURER Some states do not allow limitations on how long an implied warranty lasts or the exclusion or limitation of incidental or consequential damages so the above limitations or exclusions may not apply to you This warranty gives you specific legal rights and you may also have other rights which vary from state to state This warranty is void for any damage to this product due to misuse abuse neglect accident improper installation modification unauthorized repair or any use violative of instructions furnished by us After greenboard is installed 8 apply finished caulk bead to all edges and joints Figure 6 Follow caulk manufacturers recommended cure time 9 Make connections to supply and drain lines 1 N A Figure 5 2009 Masco Bath Printed in USA Impreso en los EE UU Imprim aux E U 4 Figure 6 Masco Bath www mascobath com P N 27724 Rev C 5 09 MANUAL DE INSTALACION JUEGO DE BANERA Y PAREDES FIRENZE N de Modelo Cliente Anote su n mero de modelo Lo puede encontrar en la etiqueta ubicada en el panel frontal de la caja Es muy importante anotar su n mero de modelo Necesitar esta informaci n cuando nos llame S tiene alguna pregunta referente a la instalaci n de esta unidad no se dirija a la tienda donde la haya comprado Por ayuda
13. INSTALLATION MANUAL FIRENZE BATHTUB amp WALL SET Model No Customer Please record your model number The model number is found on the label located on the front panel of the box It is very important to record your model number This information is necessary when contacting us If you have any questions on the installation of this unit please do not return to the store where you purchased it For additional help please visit www mascobath com email customerservice mascobath com or call 1 800 355 2721 If you have purchased products from Canada and wish to contact customer service please contact Mirolin Industries Corp www mirolin com info mirolin com 1 800 647 6546 Mirolin Industries e 60 Shorncliffe Road e Etobicoke Ontario M8Z 5K1 Important These instructions include suggestions for rough construction drywall installation and plumbing installation that we believe to be reliable Local building codes vary by location and could supersede those suggestions If you are not confident in your ability to perform these tasks you should use a professional installer or contract out those tasks you need help with REQUIREMENTS FOR A SUCCESSFUL INSTALLATION 1 Read these instructions and confirm that bathtub will fit in the intended alcove and that the drain end is located where required before beginning installation 2 The alcove wall studs should be located as shown in Illustration 1 and be plumb It
14. a er a nueva Proporcione un panel de acceso en la parte de atr s de la pared con las ca er as Si la ca er a ya existe verifique que deje suficiente lugar para la ba era y las paredes Todas las ca er as deben cumplir con las normas locales de construcci n He e 15 3 8 f 14 5 8 fi 14 5 8 fl 15 3 8 ee 7 T Lado de la ca er a a la derecha o izquierda 14 1 2 po LA Corte para el desague M x 8 x 10 Centrado en el desag e sv 60 Viga adicional al final de la pared Borde de la ba era Greenboard Figura 1 Reemplazo de vigas y ubicaci n del desag e P N 27724 Rev C 5 09 e La ba era debe instalarse sobre un piso s lido y nivelado que est a escuadra con las vigas de las paredes Los soportes de la ba era que est n incorporados a la base de la misma deben apoyar directamente sobre el piso nivelado e Use el modelo de la caja de la ba era para evitar que se da e durante la instalaci n e No debe instalar la ba era y paredes en lugares donde la temperatura pueda llegar a menos de 32 F 0 C e Permita que la ba era y paredes adquieran la temperatura ambiente durante 30 minutos antes de instalarlas Importante Las vigas del hueco deben estar a escuadra con el pue a esquinas interiores del hueco deben estar a escuadra ver igura 3 se muestra la instalaci n a la derecha Codo de la ducha Placa de Ub
15. alfeutrage de finition sur tous les rebords et tous les joints fig 6 Suivez les recommandations du fabricant du calfeutrage pour le temps de 8 Une fois la c ramique install e repos Branchez les conduites d eau et g de vidange N Figure 5 Figure 6 Masco Bath 2009 Masco Bath Printed in USA Impreso en los EE UU Imprim aux U 12 www mascobath com P N 27724 Rev C 5 09
16. and centered on each stud Figure 3 Hammer 3 4 galvanized roofing nails through each hole and into the studs securing the wall panel Backer board 1 x 1 1 4 x 59 Tub Wall 69 long on Shower Wall Figure 1 Even gap on both sides Position the three panels as they will go into the alcove 2 Figure 3 Horizontal nailing flanges will be located at the top of all three panels Decide which side panel will need cutouts for plumbing fixtures Carefully locate mark and cut holes using the proper size hole saw When satisfied with fit Adhesive bead 3 mark the top of the panels Pencil line on each stud Remove the panels Apply a bead of adhesive down each stud that will come in contact with the back panel being sure to stay below the line you marked You do not need to apply adhesive to the corner studs Lay a bead of caulk along tub ledge Figure 2 Reposition back panel and press firmly in alcove against studs A Caulk bead Even gap on both sides Figure 2 Figure 3 P N 27724 Rev C 5 09 3 Apply a bead of adhesive down each stud that will come in contact with the side panels Also lay a caulk bead in the corner of side panels as shown in Figure 4 Install each side panel by sliding panel firmly into corner Press each pan
17. brure ENTRETIEN ET NETTOYAGE Pour un nettoyage r gulier n employez qu un d tergent doux ou de l eau ti de savonneuse appliqu es l aide d un linge doux Rincez toujours les surfaces apr s le nettoyage et essuyez en tamponnant l aide d un linge humide ou d un chamois Etant donn que les produits de nettoyage changent avec le temps nous ne pouvons recommander un nettoyant sp cifique pour ce produit Cependant peu importe le produit de votre choix e V rifiez toujours les instructions du fabricant e WEMPLOYEZ PAS un nettoyant dont l tiquette indique qu il ne convient pas au plastique Afin d augmenter la dur e de vie utile de ce produit e Rincez toujours les nettoyants 5 minutes apr s leur application e Rincez les nettoyants m me s ils indiquent vaporisez et partez GARANTIE LIMIT E Veuillez vous reporter l tiquette du produit sur l emballage pour la dur e de la garantie limit e de votre produit Le fabricant garantit le premier acheteur de ce produit contre tout d faut mat riel ou de main d uvre partir de la date d achat indiqu e sur le coupon de caisse de l acheteur Cette garantie est assujettie aux limites exclusions et conditions suivantes Pendant la p riode de garantie le fabricant sa discr tion remplacera ou r parera SANS FRAIS sauf dans les cas mentionn s ci dessous toute pi ce consid r e par lui d fectueuse au n
18. el firmly to ensure proper adhesion to studs Locate and drill a 3 16 hole in the center of the nailing flange at the top of the panel and centered on each stud Also drill 3 16 holes in the front nailing flange on each side panel at approx 12 intervals centered on the flange Figure 4 Hammer 3 4 galvanized roofing nails through each hole and into the studs securing the wall panel E SA A LL L fl Pl o E fl 2 7 Figure 4 Install a temporary brace to hold the center of the back 6 panel tight to the studs for approximately 24 hours while adhesive sets Figure 5 FINAL PREPARATION Install greenboard When installing greenboard position 7 drywall screws above the top nailing flange to avoid having to drill clearance holes If you choose to screw through the nailing flange you MUST drill 3 16 clearance holes in the flange to avoid cracking damaging the flange CARE AND CLEANING For regular cleaning use only mild detergents or warm soapy water applied with a soft cloth Always rinse surfaces after cleaning and dry by blotting with a damp cloth or chamois Because cleaning products often change over time we cannot recommend a specific cleaner to use on this product However whichever you choose e Always check the manufacturer s instructions e DO NOT use a cleaner on this product if the label indicates it sh
19. i re le tablier Rep rez des trous de passage de 3 16 au centre de la bride clouer au centre de chaque poteau Clouez les clous travers chaque trou et dans les murs fixant ainsi la baignoire Attention Un mandrin de per age ou un marteau peut endommager la baignoire Percer des trous partir de l ext rieur ou prot ger la baignoire Bride de la baignoire Figure 3 INSTALLATION DE L ENSEMBLE MURAL Si vous souhaitez Planche installer une porte d appui de baignoire une appuy e planche d appui audessus voyez la taille 4 la 4 2 UE figure 1 doit tre Membrures install e l arri re panneau de cloutage de chaque mur lat ral Appliquez un cordon de colle dans la fraisure de chaque mur lat ral et attachez le panneau Planche d appu fig 1 en guidant 1 po x 1 1 4 po x 59 po 2 54 cm x 3 17 le panneau sur le cm x 149 86 cm Mur de la baignoire dessus de la fraisure 69 po 175 26 cm de long pour le mur de douche Figure 1 Placez les trois panneaux l endroit qu ils occuperont dans l alc ve Les brides de clouage horizontales sont au haut des trois panneaux D cidez du panneau lat ral couper pour les appareils de plomberie Rep rez marquez et percez des trous pr cautionneusement l aide de la scie cylindrique appropri e Lorsque vous tes Cordon de colle satisfait du raccord Ligne de crayon marquez le dessus des panneaux sur chaque poteau Retirez les
20. icaci n soporte del panel de 81 acceso V lvula mezcladora Codo de la canilla 32 Corte para el desag e M x 8 x 10 Centrado en el desag e Figura 2 Ubicaci n sugerida del desag e 3 Instalaciones especiales e Acerca del desag e del piso Haga una plataforma de 2 x 4 o m s alta dependiendo de los requisitos del desag e para elevar toda el rea de la ba era y cubrirla con el sub piso Esta plataforma debe estar nivelada y a escuadra con las vigas de las paredes Al instalar ca er as eleve la plataforma hasta las dimensiones indicadas en la figura 2 e Paredes de mamposter a debe estar Construya una pared de vigas de 2 x 6 para el extremo con las ca er as Coloque tiras de lt aplomada y recubrimiento en las paredes de mamposter a en los mismos lugares que las vigas de la figura 1 3 cer e Instalaci n sobre paredes resistentes a la humedad greenboard o contra incendios 7 Si est instalando paneles de pared sobre paredes resistentes a la humedad greenboard o contra incendios sus mediciones deben tener en cuenta el espesor de este material y deber hacerlas desde el interior de las paredes terminadas Cada una de las vigas del hueco Figura 3 HERRAMIENTAS Y MATERIALES NECESARIOS La instalaci n requiere herramientas hogare as comunes y horas para que se seque el calafateado y el pegamento antes de e Nivel y escuadra Cinta m trica Marti
21. iveau mat riel ou de main d uvre suite une installation un emploi et un entretien normaux Le premier acheteur doit informer le fabricant par crit de toute d fectuosit couverte par la garantie l adresse ci dessous CETTE GARANTIE EST LA SEULE GARANTIE EXPRESSE OFFERTE PAR LE FABRICANT TOUTE R CLAMATION EN VERTU DE CETTE GARANTIE DOIT TRE EFFECTU E PENDANT LA P RIODE INDIQU E CI HAUT TOUTE GARANTIE IMPLICITE DE QUALIT MARCHANDE OU DE CONVENANCE POUR UN USAGE PARTICULIER SE LIMITE LA DUR E DE LA PRESENTE GARANTIE LES FRAIS DE MAIN D UVRE ENGAG ES POUR L INSTALLATION LA R PARATION OU LE REMPLACEMENT AINSI QUE LES DOMMAGES INDIRECTS SONT EXCLUS DE CETTE GARANTIE ET NE SERONT PAS REMBOURSES PAR LE FABRICANT Certains tats provinces ou territoires ne permettent pas de restreindre la dur e d une garantie expresse d exclure ou de limiter les dommages accessoires ou indirects de sorte que les limitations ou les exclusions d crites pr c demment peuvent ne pas s appliquer votre cas La pr sente garantie vous accorde des droits juridiques pr cis et vous pouvez galement exercer d autres droits qui varient d un tat d une province ou d un territoire un autre Le m susage labus la n gligence les accidents une mauvaise installation des modifications une r paration non autoris e ou tout emploi contraire aux instructions du fabricant annuleront la garantie appliquez un cordon de c
22. llo L piz Cuchilla usarla e Clavos galvanizados para techo de 3 4 L gt e Maderas de 2x4 para vigas adicionales si es necesario Si instalar una puerta tambi n necesitar e e Relleno paneles de sub suelo o compuesto para nivelar para e Dos placas de soporte Ver paso 1 de la instalaci n del juego asegurar que el piso est nivelado y a escuadra con las paredes de paredes e Materiales y acoples necesarios para las ca er as de agua y desag e Nota importante Esta ba era es m s profunda que una ba era com n y necesitar un conjunto de desag e y desborde para ba eras de 16 1 2 de profundidad El armado del juego de paredes tambi n requiere e Taladro broca de 1 16 5mm e Sierra para agujeros del tama o necesario para las ca er as e Pistola para calafatear e Para bordes de ba eras duchas AS amp B use sellador 100 de silicona 2 tubos e Para bordes de ba eras duchas AS amp B use un adhesivo para construcci n que sea apto para pl sticos 2 tubos Siga las instrucciones del fabricante pero espere por lo menos 24 INSTALACI N DE LA BA ERA N SSSR Til Coloque el soporte del frente en la parte inferor de la ba era Coloque la ba era en el hueco Figura 2 Verifique que la ba era 1 Figura 1 F jelo en su lugar con cinta adhesiva hasta que el est apoyada sobre
23. neau avant Ontario M8Z 5K1 de l appareil Il est tr s important de noter votre num ro de mod le l ee Cette information sera n cessaire lorsque vous nous contacterez Important Ces instructions incluent des suggestions que nous Si vous avez des questions sur l installation de cet appareil ne croyons fiables pour l installation sur une construction sans le retournez pas chez le d taillant o vous l avez achet Pour rev tement paroi s che et sur la plomberie Les codes du obtenir de l aide suppl mentaire visitez le site www mascobath b timent varient d un endroit l autre et ont pr s ance sur ces com faites parvenir un courriel customerservice mascobath suggestions Si vous croyez ne pouvoir ex cuter ces t ches com ou composez le 1 800 355 2721 Si vous avez achet recourez aux services d un installateur professionnel pour des produits au Canada et que vous souhaitez contacter un e l installation en tout ou en partie CONDITIONS POUR UNE INSTALLATION R USSIE 1 Lisez ces instructions et assurez vous que la baignoire convient l alc ve e La baignoire doit tre install sur un sous plancher solide et de niveau choisie et que l extr mit de la vidange se situe au bon endroit avant de qui correspond aux poteaux muraux La baignoire doit tre pos commencer l installation directement sur un sous plancher de niveau Si n cessaire niveler le 2 Les poteaux du mur de l alc ve doivent
24. noire vous aurez besoin de e Deux planches d appui voir l tape 1 de l installation de l ensemble mural INSTALLATION DE LA BAIGNOIRE Attacher le support de tablier au bas de la baignoire Figure 1 1 Fixer en place jusqu a ce que l adh sif s che Attachez la vidange et le d versoir la baignoire selon les 2 instructions du fabricant Si aucun joint d tanch it n a t fourni par le fabricant du drain utilisez un produit de calfeutrage n utilisez PAS du mastic de plombier pour cr er le joint tanche entre le drain et la baignoire L utilisation de mastic de plombier peut d grader le plastique apr s Figure 1 10 un certain temps ce qui peut causer des dommages Placez la baignoire dans l alc ve Figure 2 V rifiez que la baignoire repose sur tous ses supports inf rieurs et qu elle est au niveau vertical et horizontal et droite sur les poteaux du mur Le jeu entre la bride panal de la baignoire et les poteaux du mur ne doit pas exc der Figure 2 P N 27724 Rev C 5 09 1 Appliquer un adh sif sur le support du bas l endroit qui touchera le plancher La baignoire devrait maintenant reposer droit dans l alc ve de plomberie En vous tenant debout dans le bain fixez la bride sup rieure l aide des clous toiture galvanis s vis vis de chaque poteau et deux endroits derr
25. or additional wall studs if required e Necessary water and drain line materials and fittings Important note this tub is deeper than a conventional tub and will require a drain and overflow assembly that will fit a 16 1 2 deep tub Assembly of the wall set also requires e Drill 3 16 5mm drill bit e Hole saw sized to accommodate plumbing fixtures Caulk gun e For AS amp B Tub Surrounds use 100 silicone caulk 2 tubes e For AS amp B Tub Surrounds use a construction adhesive that is safe for use on plastic 2 tubes Follow manufacturers instructions but allow at least 24 hours for caulk and adhesive to set before using BATH INSTALLATION Attach apron support to bottom of tub Figure 1 Tape itin Check that bathtub is sitting on all bottom support and that it is 1 place until adhesive dries level horizontally and vertically and square to the wall studs There should be no more than 1 8 gap between the top bathtub flange and the wall studs Attach drain and overflow to tub following manufacturer s 2 instructions lf a rubber gasket has not been supplied by the drain manufacturer use caulk NOT plumbers putty to seal between the drain and the bathtub The use of plumbers putty will degrade plastic over time and could cause damage Position bathtub in alcove Figure 2 Figure 1 Figure 2
26. ould not be used on plastics To make this product last its longest e Always rinse off cleaners within 5 minutes of application e Rinse off cleaners even if they say they are spray on amp walk away LIMITED WARRANTY Please refer to the product label located on the carton to outline your model s limited warranty period The manufacturer warrants to the original consumer purchaser that its products will be free of defects in materials and workmanship subject to the limitations exclusions and conditions that follow from date of original purchase as shown on purchaser s receipt The manufacturer will at its discretion replace or repair FREE OF CHARGE except as noted below during the warranty period any part that the manufacturer determines to be defective in material and or workmanship under normal installation use and service The original consumer purchaser must notify the manufacturer in writing of any defect covered by the warranty at the address listed below THIS WARRANTY IS THE ONLY EXPRESS WARRANTY MADE BY THE MANUFACTURER ANY CLAIMS MADE UNDER THIS WARRANTY MUST BE MADE DURING THE PERIOD REFERRED TO ABOVE ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE IS LIMITED IN DURATION TO THE DURATION OF THIS WARRANTY LABOR CHARGES AND OR DAMAGE INCURRED IN INSTALLATION REPAIR OR REPLACEMENT AS WELL AS INCIDENTAL AND CONSEQUENTIAL DAMAGES CONNECTED THEREWITH ARE EXCLUDED AND WILL NOT BE PA
27. pared Cuando termine con la pared selle este espacio con calafateado Figura 4 Viga Green board Revestimiento de pared Calafateado Ba era _ Separacion de 1 8 Figura 4 INSTALACION DE JUEGO DE PARED Figura 2 Vuelva a colocar el panel posterior y presi nelo firmemente contra las vigas de la pared Marque y perfore un agujero de 3 16 en el centro del ala de 4 fijaci n en la parte superior del panel en el centro de cada viga Figura 3 Martille clavos galvanizados de 3 4 para techo en las vigas de la pared a trav s de cada agujero para fijar los paneles de la pared La misma separaci n en ambos lados La misma separaci n en ambos lados Figura 3 Coloque una capa de adhesivo en cada viga de la pared 5 que entrar en contacto con los paneles laterales Tambi n coloque una capa de adhesivo en el borde de los paneles laterales como se muestra en la Figura 4 Instale cada panel lateral desliz ndolo firmemente contra cada esquina Presione firmemente cada panel para asegurar que se adhiera correctamente a las vigas de la pared Marque y perfore un agujero de 3 16 en el centro del ala de fijaci n en la parte superior del panel en el centro de cada viga Perfore tambi n agujeros de 3 16 en el ala de sujeci n frontal de cada panel lateral a intervalos de aproximadamente 12 centrados en el ala
28. rectement sur les poteaux vous devez tenir compte de l paisseur de ces mat riaux dans vos mesures qui doivent tre prises de l int rieur des murs de finition Illustration 3 OUTILS ET MAT RIAUX REQUIS L installation exige des outils domestiques communs et e Niveau et querre Ruban mesurer Marteau Crayon Couteau tout usage e Clous toiture galvanis s de 3 4 Sciages de 2 x 4 pour les colombages au besoin e Flipots panneaux de sous plancher ou composite de nivelage afin de s assurer que le plancher est au niveau et droit sur les murs e Mat riaux et raccords d eau et de ligne de vidange au besoin Avis important Cette baignoire est plus profonde qu une baignoire conventionnelle Elle n cessite un assemblage de vidange et de d versement qui convient une baignoire de 16 1 2 Lassemblage de l ensemble mural n cessite aussi e Perceuse M che de perceuse de 3 16 e Scie cylindrique r gl e pour les appareils de plomberie Fusil calfeutrer e Utilisez un produit de calfeutrage fait de silicone 100 pour les contours de baignoire AS amp B 2 tubes e Utilisez un adh sif de construction qui est sans danger pour le plastique pour les contours de baignoire AS amp B 2 tubes Suivez les instructions du fabricant mais laissez prendre le calfeutrage et la colle pendant au moins 24 heures avant d employer votre baignoire Si vous installez aussi une porte de baig
29. stos o consiguientes por lo tanto las exclusiones o limitaciones anteriores pueden no aplicarse en su caso Esta garant a le otorga derechos legales espec ficos y usted puede tambi n tener otros derechos los que var an de estado a estado Esta garant a quedar anulada en caso de da os al producto causados por uso inadecuado abuso negligencia instalaci n inadecuada modificaciones reparaciones no autorizadas o cualquier uso contrario a las instrucciones proporcionadas por nosotros Luego de instalar el 8 greenboard coloque calafateado de terminaci n en todos los bordes y juntas Figura 6 Siga los tiempos de secado recomendados por el fabricante del calafateado Haga las conexiones del agua y g del desag e Figura 5 2009 Masco Bath Printed in USA Impreso en los EE UU Imprim aux E U 8 A Figura 6 Masco Bath www mascobath com P N 27724 Rev C 5 09 GUIDE D INSTALLATION ENSEMBLE MURAL DE SALLE DE BAIN FIRENZE N de mod le repr sentant e de Service a la client le veuillez contacter Mirolin i Industries Corp www mirolin com info mirolin com 1 800 Avis au client Veuillez noter votre num ro de mod le Le num ro 647 6546 Mirolin Industries 60 Shorncliffe Road Etobicoke du mod le se trouve sur une tiquette situ e sur le pan
30. tre situ s tel qu illustr la plancher avec un m lange de nivelage figure 1 Ils doivent tre d aplomb Si les poteaux ne sont pas d aplomb e Prot gez la baignoire des dommages pendant l installation l aide de la vous devrez peut tre les niveler Il est important qu un poteau se trouve d coupe de la bo te de la baignoire tel qu illustr pour la fixation des brides verticales lat rales du tablier e La baignoire et l ensemble mural ne doivent pas tre install s dans un de la baignoire Les autres pivots doivent tre positionn s selon votre endroit o la temp rature peut tre inf rieure au point de cong lation code du b timent r gional 322 F ou 02 e La structure de plomberie doit tre install e avant la baignoire ou les e Laissez la baignoire et l ensemble mural atteindre la temp rature de la panneaux muraux La figure 2 illustre l emplacement sugg r des pi ce pendant 30 minutes avant de l installer poteaux si une nouvelle plomberie est install e Installez un panneau d acc s l arri re du mur l aide des appareils de plomberie Si les appareils sont pr sents v rifiez qu ils laissent assez d espace pour la baignoire et les panneaux La plomberie doit respecter le code du b timent local Important Les poteaux de l alc ve doivent tre d aplomb et droits sur le plancher Les coins internes de l alc ve doivent tre carr s fig 3 installation de droite illustr e C

Download Pdf Manuals

image

Related Search

Related Contents

HP ProBook 4740s  1100i/2200i - Протэкт-Д  Institutional Rocket Stove (IRS) Assembly Guide  in lighting control of your fingers  テルフュージョン輸液ポンプTE-261添付文書  警告 注意  User Manual PZ178E - Physik Instrumente  Consultez le magazine complet en PDF  N0.127  Redes_manual_tecnicoproductores (parte 1)  

Copyright © All rights reserved.
DMCA: DMCA_mwitty#outlook.com.