Home
        Sauna Installation Manual
         Contents
1.  therapy is approx  115 130F  The 135F 150F settings on the  control panel are for users who prefer higher temperatures     2  How often should I turn on the Air lonizer    The Air lonizer should only be used at the end of your session for approx   5min  It will act to purify the air for your next sauna session  To power on ionizer   press the outside light button  To operate press on off button on ionizer     3  Can I use my West Coast Sauna outdoors     In order to achieve optimal results  West Coast Saunas recommends that you  install your sauna indoors  However  we do offer canvas covers for your sauna if  your space is limited to outdoors only  Please note that if sauna is placed  outdoors  heating the sauna may take longer     4  How do   clean my West Coast Sauna     You may wipe down heaters that have accumulated sweat and the wood inside  using a damp cotton cloth  The exterior may be treated with a wood polish     5  Does West Coast Saunas have any other recommendations     We strongly recommend that you gradually introduce your body to infrared  sauna therapy  You should drink sufficient amount of fluids prior to  during  and  after your sauna session in order to assist with the Detox process and to prevent  dehydration  Although most clients will sweat during their first few sessions   others require more time and therapy  Infrared therapy is like any other therapy   it will take time for your body to adjust and to produce the desired results        WEST COAST SAU
2. FOR THE UNITED  STATES AND CANADA   Electrical Testing Laboratories  ETL  was founded in 1896 by  Thomas Edison  and is one of the oldest product safety testing    laboratories in the world  Certification by ETL and ETL C  assures you that all Signature models have been tested to  meet both US and Canadian safety and performance  standards     CE CERTIFIED EUROPEAN SAFETY STANDARDS   The CE Mark is a requirement for products sold to the  European Market  The CE Mark identifies a product as  complying with the health and safety requirements spelled out  in European legislation and is mandatory for equipment  operating in the European Union  EU      ROHS DIRECTIVE   The RoHS Directive stands for  the restriction of the use of  certain hazardous substances in electrical and electronic  equipment   This Directive bans the placing on the EU market  of new electrical and electronic equipment containing more  than agreed levels of lead  cadmium  mercury  hexavalent  chromium  polybrominated biphenyl  PBB  and polybrominated  diphenyl ether  PBDE  flame retardants           WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    21    
3. Malibu Del Mar       WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    8    www MontrealSauna ca       Step 1  Open Box C  Floor panel Roof panel Bench panel Accessories box   Lay  the floor panel at your desired location  The floor heater is towards the front of  the sauna        Step 2  Open Box A  Front panel Right Front Left Front   Install the Front panel  first by sliding the panel onto the metal brackets on the floor panel  Next install  the Left Front panel by raising it above Front panel and guiding it down into the  metal brackets  Next install Right Front panel by same method as Left Front  panel  Please remove plastic wrap from Front panel but be careful so that the  glass door does not swing open  At this point  one person should secure both the  panels by holding them           WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    9    www MontrealSauna ca    Step 3  Open Box B  Right Back panel Left back Panel   Install Right back Panel by  sliding panel onto metal brackets on Floor panel  Semi tighten Right Back panel  to Right Front panel using Installation bolts  accessories box   Install Left back  panel to Right back panel and Left Front panel  note there are no metal brackets  on this side of the floor panel  Semi tighten using installation 
4. Montreal Saunas    West Coast Saunas    id Vi  s  z   AI af       WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    www MontrealSauna ca    TABLE OF CONTENTS   INSTALLATION   ELECTRICAL REOUIREMENTS 3  UNPACKING YOUR SAUNA 4  MALIBU AND DEL MAR INSTALLATION INSTRUCTIONS 5 8  NEWPORT INSTALLATION INSTRUCTIONS 9 12  HOLLYWOOD INSTRUCTIONS 13 16  HOW TO USE   CONTROL PANEL INSTRUCTIONS 17  FREQUENTLY ASKED QUESTIONS 18  DISCLAIMER 19    WARRANTY AND RETURN POLICY INFORMATION 20    WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    2    www MontrealSauna ca    Note   The electric cord extends out from the top roof  The cord is approximately 9ft long  It is recommended  that the location of the outlet you are installing be above 75     which is the height of the sauna   Dedicated requires that no other appliance should share outlet circuit with sauna  Failure to comply  with this requirement may cause electrical interruption and diminished sauna performance  It is  recommended that a qualified electrician install your dedicated electrical wiring for proper sauna  function and to avoid any potential electrical hazards     ELECTRICAL REQUIREMENTS  Malibu   110 120volts 15amp dedicated circuit outlet    NEMA 5 15R required  NEMA 5 15P included        S Heaters 1600 w
5. NAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    18    www MontrealSauna ca    Disclaimer    West Coast Saunas and its associates do not provide medical guidance  Consult  a doctor for medical advice  All of the information contained in this catalogue is  for information purposes only  We reserve the right to change  without notice   anything contained within the catalogue  West Coast Saunas shall not be held  responsible for printing variations  Color variations may occur  Some models are  shown with optional features     Please consult your physician if you are taking medications  Please do not use sauna if under the influence of alcohol or drugs  Do not use sauna if you are pregnant   Do not allow animals inside sauna room   Minor children should be supervised in order to prevent injury  Do not use sauna for drying clothes  bathing suits etc     Do not expose heaters to moisture    o  p ee R K     Do not use sauna for any other purpose than originally designed and    intended    West Coast Saunas and any of its subsidiaries and or associates shall not be  held responsible for any misuse of the sauna by the customer  West Coast  Saunas shall not be held liable for any damage and or injury caused by  customer misuse of product        WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHT
6. R VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    13    www MontrealSauna ca    Step 4  Install Bench Support panels  located in Box C   This step should be  completed prior to installation of Right Panel  Make all electrical connections and  install Bench panels  except for the Right Bench Panel   You will need to  complete step 5 first then make the Right side electrical connections        Step 5  Install Right panel to Front and Back panels using Installation Bolts  Semi   tighten bolts  Once all panels are fully secure tighten all bolts  Next  enter sauna  and make final electrical connections to the Right panel you just installed  Finally   Install the Right Bench           WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    14    www MontrealSauna ca    Step 6  Install Roof panel  Guide the roof panel over the sauna and secure into  position  Please feed all the electrical connections that are on the  Front Back Right Left panels thru the holes in the roof panel        Step 7  Once Roof Panel is securely in place  proceed up top to make all electrical  connections  Please note that there are 3 white ribbon connections  2pin temp  sensor 8pin power 9pin chromo   Match the male female black electrical cord  heater connections        Step 8  Install Top Cover  Feed the main power cord thru the hol
7. S RESERVED    19    www MontrealSauna ca       Warranty    We are so confident about our product  we offer a Lifetime Warranty on  cabinetry  electrical  and heating panels  Just call or email a Customer Service  Representative for any replacement parts  The CD and or DVD player carries a  separate warranty  usually 6 months from date of purchase  from the original  manufacturer  West Coast Saunas will perform all labor at our factory free of  charge during the warranty period  Customer is responsible for shipping  warranted parts to West Coast Saunas at their expense  Customer may elect to  have replacement parts shipped to them when applicable in lieu of labor at the  factory  The warranty is deemed void if the sauna has been misused  altered or  left exposed to the elements of weather     Cancellation Return    Buyer may cancel and return the goods to Seller  subject to the terms and conditions of this  policy  Buyer shall assume all risk of loss associated with the return as well as shipping   handling  restocking and other fees  costs and expenses as described in this policy  Seller  reserves the right to refuse to refund any deposit or payment  or cancel any payment due   and any owing until such time as Seller a  is in receipt of the goods b  has inspected the goods  and c  in the Seller s discretion  has found the goods to be free of damage  All returned goods  must be in their original packaging  Seller may refuse to refund all or any portion of any  payment  or canc
8. T 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    11    www MontrealSauna ca    Step 9  Install Door Handle  If you have purchased the LCD Upgrade then you may  connect it to the 12volt Cig adapter located on the ceiling  if not then cover the  adapter with the wood knob provided in your packaging        Step 10  Once Installation is complete plug in sauna  Please make sure to read the     How to Use Instructions    at the end of this booklet        Newport       WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    12    www MontrealSauna ca       Step 1  Open Box C  Floor panel Roof panel Bench panel Accessories box   Lay  the floor panel at your desired location  The floor heater is towards the front of  the sauna        Step 2  Open Box A  Front panel Back panel   Install the Back panel first by sliding  the panel onto the metal brackets on the floor panel  Next install the Front panel  by the same method used for the Back panel  Please remove plastic wrap from  Front panel but be careful so that the glass door does not swing open  At this  point  one person should secure both Front and Back panels by holding them        Step 3  Open Box B  Right Panel Left Panel   Install Left Panels by lining up the  panels to the Front and Back  Semi tighten Left panel to Front and Back using  Installation bolts  accessories box         WEST COAST SAUNAS INC    2371 LA MIRADA D
9. atts  Del Mar Newport 2  110 120volts 20amp dedicated circuit outlet    NEMA 5 20R required  NEMA 5 20P included        9 Heaters 2150 watts  Hollywood  220 240volts 20amp dedicated circuit outlet    NEMA 6 20R required  NEMA 6 20P included        15 Heaters 2850 watts    WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    3    www MontrealSauna ca       Part A  Installation  Unpacking your Sauna    Please identify the 3 boxes A B C  that arrived in your shipment  Place boxes in an open area  All  3 boxes are labeled with the contents inside  It is recommended that a minimum of 2 people be    present for unpacking and assembly  Lay boxes flat on the ground with lettering facing up  Please  make sure the area is clear of debris       _    e             aay  k t  p     ee Nee tht       WEST COAST SAUNAS INC   2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180    www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    4    www MontrealSauna ca       Step 1  Open Box C  Floor panel Roof panel Bench panel Accessories box   Lay  the floor panel at your desired location  The floor heater is towards the front of  the sauna        Step 2  Open Box A  Front panel Back panel   Install the Back panel first by sliding  the panel onto the metal brackets on the floor panel  Next install the Front panel  by the same method used for the Back panel  Please re
10. bolts  Once all  panels are securely in place fully tighten all bolts        Step 4  Install Bench Support panels  located in Box C   Please make all electrical  connections to the Back panel  Install Bench panels  located in Box C         Step 5  Install Roof panel located in Box C   Guide the roof panel over the sauna  and secure into position  Please feed all the electrical connections that are on the  Front Back Right Left panels thru the holes in the roof panel        WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    10    www MontrealSauna ca    Step 6  Once Roof Panel is securely in place  proceed up top to make all electrical  connections  Please note that there are 3 white ribbon connections  2pin temp  sensor 8pin power 9pin chromo   Match the male female black electrical cord  heater connections        Step 7  Install Top Cover  Feed the main power cord thru the hole and secure  cover to roof panel  Please secure cover with screws provided  Failure to properly  secure cover may result in heat loss and diminished sauna performance        Step 8  Install Cup Holder s   Magazine Rack  Towel Holder  These items may be  installed in any location that you desire  Mount Air Purifier to Back panel by using  a wood screw  just like hanging a picture         WEST COAST SAUNAS INC   2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180    www westcoastsaunas com  COPYRIGH
11. e and secure  cover to roof panel  Please secure cover with screws provided  Failure to properly  secure cover may result in heat loss and diminished sauna performance        WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    15    www MontrealSauna ca    Step 9  Install Cup Holder s   Magazine Rack  Towel Holder  These items may be  installed in any location that you desire  Mount Air Purifier to Back panel by using  a wood screw  just like hanging a picture         Step 10  Install Door Handle  If you have purchased the LCD Upgrade then you  may connect it to the 12volt Cig adapter located on the ceiling  if not then cover  the adapter with the wood knob provided in your packaging        Step 11  Once Installation is complete plug in sauna  Please make sure to read the     How to Use Instructions    at the end of this booklet        Hollywood Sauna       WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    16    www MontrealSauna ca    Part B  How to Use          2  Time Display  3  Time Control    1  On Off  AA Temp Display    5  Temp Control    7  Reading Light      o x  6  Chromo Lights I S    8  Outside Lights  Oxygen lonizer    On Off Press Button to turn sauna on off  Power must be on for CD player to operate  Time Display Displays time for your sauna se
12. el payment due and owing if the Buyer fails to fully comply with or violates  the terms and conditions of this policy  All cancelled or returned goods shall be subject to a   storage fees and costs associated with routing the goods b  handling and restocking fee in the  amount of  495 00 USD for each sauna c  all shipping costs to and from the Seller and d   Seller providing a return merchandise authorization  RMA  number  Buyer s failure to obtain  the RMA number shall result in Seller not accepting any returned shipment and Buyer paying  all costs and fees  All such costs and fees as determined by Seller shall be paid by Buyer to  Seller upon demand by Seller        WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC ALL RIGHTS RESERVED    20    SAFETY CERTIFICATIONS    We at West Coast Saunas are committed to making safety our  1 Priority  Certifications  assure you that our infrared saunas have met a certain level of quality construction  as  well as safety and performance standards     Below is a list of our current certifications by companies authorized to approve the  sauna safety standards in North America  Canada and the European Union     INTERNATIONAL ORGANIZATION FOR  STANDARDIZATION   Our manufacturing facility has implemented a quality  management system in order to maintain the highest standards  in product development and quality assurance    INTERTEK    S ETL SEMKO STANDARDS 
13. move plastic wrap from  Front panel but be careful so that the glass door does not swing open  At this  point  one person should secure both Front and Back panels by holding them           WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    5    www MontrealSauna ca    Step 3  Open Box B  Right Panel Left Panel   Install Right and Left Panels by lining  up the panels to the Front and Back  Right Panel means Right facing the sauna  Please semi tighten installation bolts  located in accessories box   When all 4  panels are securely in place  please tighten all installation bolts        Step 4  Install Bench Support panel  located in Box C   Please make all 4 electrical  connections to the Back panel          w kdl AEA l  T SRI AA 1S  f aa    Step 5  Install Bench by guiding it between the Right and Left panels  There are 2  small pieces of wood that may be used to prevent the back of the bench from  sliding upward when user sits on front of bench  They can be screwed to back  wall  The pieces of wood are included in the accessories box     Wa         A Z      Wa oi      _     s       T 7              N h  NAN  __    ye WAA   kam    WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    6       www MontrealSauna ca    Step 6  Install Roof panel  Guide the roof panel o
14. ssion    Time Control Adjust time up down  Flashing numbers indicate desired time while steady  numbers indicate time remaining  Once time reaches 0 the heaters will shut off  You  must reset time to extend sauna session    Temp Display Displays Temperature for your sauna session    Temp Control Adjust temperature up down  Flashing numbers indicate desired  temperature while steady numbers indicate current temperature  Celsius to Fahrenheit  change  hold both up down arrows simultaneously    Chromo Lights Turn on off chromotherapy lights  If you press this button once it will  cycle thru all 7 lights  If pressed more than once  it will stay on the desired color   Reading Light Turn on off inside reading light    Outside Lights Turn onloff outside lights and oxygen ionizer  This button must be    pressed on for the oxygen ionizer to have power  lonizer has its own on off button        WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    17    www MontrealSauna ca       1  What is the optimal time temp for a typical sauna session     West Coast Saunas recommends that you start out at approx  110 120F for your  first few sessions in order for your body to adjust to infrared therapy  After your  initial sessions  you may start to increase your temp into the higher ranges  A  typical infrared sauna session is approx  30 45min  Please note that the optimal  range for infrared
15. ver the sauna and secure into  position  Please feed all the electrical connections that are on the  Front Back Right Left panels thru the holes in the roof panel        Step 7  Once Roof Panel is securely in place  proceed up top to make all electrical  connections  Please note that there are 3 white ribbon connections  2pin temp  sensor 8pin power 9pin chromo   Match the male female black electrical cord  heater connections  There are 2 in the front and 2 in the back       Step 8  Install Top Cover  Feed the main power cord thru the hole and secure  cover to roof panel  Please secure cover with screws provided  Failure to properly  secure cover may result in heat loss and diminished sauna performance        WEST COAST SAUNAS INC    2371 LA MIRADA DR VISTA CA 92081  1 800 975 6180  www westcoastsaunas com  COPYRIGHT 2010 WEST COAST SAUNAS INC  ALL RIGHTS RESERVED    7    www MontrealSauna ca    Step 9  Install Cup Holder s   Magazine Rack  Towel Holder  These items may be  installed in any location that you desire  Mount Air Purifier to Back panel by using  a wood screw  just like hanging a picture         Step 10  Install Door Handle  If you have purchased the LCD Upgrade then you  may connect it to the 12volt Cig adapter located on the ceiling  if not then cover  the adapter with the wood knob provided in your packaging        Step 11  Once Installation is complete plug in sauna  Please make sure to read the     How to Use Instructions    at the end of this booklet        
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  Copyright© 2000,2001 All Right Reserved. Manual Edition 1.2  78-520-511 Waxjet Pro.book  Gainward 426018336-2401 NVIDIA GeForce GTX 460 1GB graphics card  SUPRA FIT  User Guide  National Instruments NI 6115/6120 User's Manual      Copyright © All rights reserved. 
   Failed to retrieve file