Home

OPERATING INSTRUCTIONS ASTRO HOIST Type

image

Contents

1. C A 4 8 To lift the ASTRO operate in the up direction Line up the holes in the stirrup bar with the holes in the stirrup and push home the bolts Issue date 6 Dec 2012 Page 10 of 14 Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations INSTALLATION Cont 19 mm 10 Reeve the safety rope by pushing the bullet end into the entry guide on top of the ASTRO 11 Push the rope through the slack rope safety device compartment A weight of about 8 kg should be hung on the bottom of the safety rope to keep it straight 12 aE X ANY vt CO MIN STRIKER PLATE FOR k TOP LIMIT SWITCH IMPORTANT Power Climber Bolt the ASTRO to the stirrup with the suspension rope departure roller to the outside of the platform Mount the ASTRO hoist with bolts M12 and self locking nuts on stirrup Install the striker plate to activate the top limit switch after testing the platform during the first run up The striker plate should be clamped on the safety wire at a distance of min 200 mm from the Talurit clamp Check the function of the top limit switch each time before using the platform
2. Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations Power Climber TECHNICAL DATA CENTRAL CONTROL BOX MERCURY SWITCH S15 WARNING LIGHT OVERLOAD H1 T EMERGENCY STOP S10 WARNING LIGHT OVERLOAD H2 SELECTOR SWITCH HOIST A Lt LL CONNECTION TO HOIST CONNECTION TO HOIST TOOL OUTLET POWER SUPPLY PLUG Types 95300 Three Phase 3x400V N E 50HZz The central control box can be hooked over the rear guard rail in the middle of the platform The control box is equipped with a Male CEE plug for the power connection and a Female CEE plug to power tools 230V 50HZ single phase 16 amp The connection to the hoists is made by steel Harting plugs Inside the control box is a mercury switch to maintain the horizontal level of the platform Connection plugs to hoists 10 pole Connection plugs to overload limiter 4 pole Self weight of control box 10 kg Issue date 6 Dec 2012 Page 6 of 14 Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the prope
3. e When rigging is complete carry out the routine tests to ensure safe and correct operation e When de reeving the suspension rope push the slack rope lever backwards and manually keep tension in the rope above the hoist to avoid rope jams Issue date 6 Dec 2012 Page 11 of 14 Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations Power Climber DAILY CHECKLIST AND ROUTINE TESTS Check before using the Astro hoist 1 OVERSPEED GOVERNOR Check flywheel rotation through the inspection window by powering the ASTRO up and down about 1 m 2 OVERSPEED SAFETY DEVICE MANUAL TRIP BUTTON Raise the platform about 1 m Power hoist down and press the button Downward travel is electrically cut off Manually release the main brake by pulling the No Power emergency descent lever to ensure that the safety device is activated and preventing further downward movement To reset power hoist up about 10 cm and turn reset knob anti clockwise to reset Normal operation is restored 3 NO POWER EMERGENCY DESCENT Power the ASTRO up about 1 m Disconnect the power supply Operate the No Power emergency descent lever in the direction shown The ASTRO descends at contro
4. 2 Ifthe platform will not operate with the power supply connected change over pair of phases on the incoming supply only Issue date 6 Dec 2012 Page 9 of 14 Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations Power Climber INSTALLATION 1 Install central control box on the rear platform guardrail 2 Connect plug from the central control box to matching plug of the ASTRO hoist 3 Plug in power supply cable to the pigtail on the central control box and secure the retainer to the mid rail of the platform 4 Both hoists have to be connected to the central control box for either hoist to operate Attention Use 30 mA earth leakage relay at power source 5 Check that the overspeed safety device 15 reset by rotating the rest knob anti clockwise all the way 6 Push slack rope lever backwards with one hand and feed the bullet end of the suspension rope into the entry guide and push firmly into the hoist 7 Operate the ASTRO in up direction to self reeve the suspension rope OK
5. IPTION Emergency stop Pushing this button disconnects the power to both hoists Operating buttons Hold to run operation for up down direction of the hoist Warning light Overload This red light indicates the presence of an overload Selector switch Switching to operate left hoist both hoists right hoist SS es Mercury switch Maintains the horizontal level of the platform Cuts the down direction of the lower hoist and the up direction of the upper hoist 7 Top limit switch when the striker plate activates the top limit switch of either hoist the up direction of both hoists is cut Only down is possible 8 Overload switch The up direction of both hoists will be cut when the switch is activated due to overloading of either of the hoists 9 Pigtails for power supply cable 10 Power supply cable with retainer 11 Tool outlet 230V 50HZ single phase 16 amp 12 Overspeed stop The down direction of the hoist will be cut when button is pushed and the safety device will grab on the suspension wire rope This device will also be automatically engaged in case of overspeed of the hoist 13 Handwheel To operate the hoist manualy up to reset the overspeed in case the safety device has tripped and there is a power failure 14 Hoist Connection 10 Pole plug to connect the hoist with the central control box 15 Overload switch connection 4 pole plug to connect the overload switch to the hoist Issue d
6. Power Climber OPERATING INSTRUCTIONS ASTRO HOIST Type E89 CTO 1808 MARCH 1999 MACHINE DIRECTIVE 98 37 All persons operating this equipment must read and completely understand this manual Any operation in violation of these instructions is at the operator s own risk Keep this manual with the hoist at all times Only use spare parts and steel wire rope from POWER CLIMBER Manufacturer POWER CLIMBER BVBA Website www PowerClimber be Satenrozen 7 Tel 32 3 451 05 00 B 2550 Kontich Fax 32 3 451 05 01 BELGIUM e mail Info PowerClimber be Issue date 6 Dec 2012 Page 1 of 14 Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations Power Climber INDEX TAD gt APENE E EE 2 GENERAL INFORMATION s s cssssossesssecsesesesscseserscseserscsesrscseserscsess 3 PRECAUTION LIMITATIONS ccscscccesesscsesessesesessesesesscsessescseserees 4 TECHNICAL DATA HOISTS 89 5 TECHNICAL DATA CENTRAL CONTROL 6 TECHNICAL STEEL WIRE ROPE c cesessscesessesessesesecseees 7 OPERATING INSTRUCTIONS 8 OPERATING INS
7. TRUCTIONS 9 INSTALLATION c cececessecscsscsscessesesessesescsesesrscseserscseserscseseeacsetscecsers 10 INSTALLATION ccccssessccesssscsesesscsesesscseserscseserscseserecsernecsess 11 DAILY CHECKLIST AND ROUTINE 12 MAINTENANCE cccccecescssesscsscceccscsesesscsesrscseserscsesrscseseracserececsess 13 MEIETEnGE Issue date 6 Dec 2012 Page 2 of 14 nn i Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only he user must ensure that the equipment complies with local rules and regulations Power Climber GENERAL INFORMATION The equipment configuration covered in this manual is two Astro type traction hoists controlled by one central control box Astro Types e Astro 89 Three Phase Central control boxes e 95300 Three Phase This equipment is to be used on Temporary Suspended Platforms TSP The hoists and the central control box are to be mounted on a suitable platform and Suspended with steel wire ropes from a suitable suspension system The strength of the platform and suspension system used in combination with the hosts must be in relation to the Working Load Limit WLL of the hoist The suspension system can be Counterweighted roof beam
8. ate 6 Dec 2012 Page 8 of 14 Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations Power Climber OPERATING INSTRUCTIONS Cont B OPERATING INSTRUCTIONS TO START Turn the selector switch 4 in the required position to operate both hoists 2 platform can now be driven up or down using the operating buttons 2 OVERLOAD CONDITION 1 The overload switch 8 opens the up circuit in both hoists The red light 3 indicates an overload on the platform 2 Remove excessive weight to reset the overload device It might be required to remove a bit more weight to allow the springs to reset 3 The platform can now be operated again in up direction OUT OF LEVEL CONDITION When the inclination of the platform is more than 6 the up direction of the upper hoist and the down direction of the lower hoist will be cut until the platform becomes level again Out of level condition PHASE PROTECTION RELAY FOR 3 PHASE HOISTS ONLY 1 The control box of a 3 phase system has a phase protection relay The main contactor can only be switched on if the three phases L1 L2 L3 are connected in the correct sequence The neutral and earth wires have to be correctly connected
9. damage Replace any damaged ropes or supply cable DO NOT USE EQUIPMENT THAT IS NOT OPERATING PROPERLY Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations
10. eventive measures have to be taken to safeguard the people below e g barriers roof protected walkways etc 8 An area must be available to allow access operators to get on and off the platform 9 The operators must stop working with the equipment and notify the supervisor if faults damage to the equipment or other circumstances may jeopardize safety 10 Only steel wire specified by the manufacturer shall be used The steel wire ropes shall be inspected regularly using the guidelines as indicated on the steel wire rope specifications sheet 11 The operator shall check for obstructions along the travel of the platform 12 The equipment may not be used when the wind speed is more than 12 5 m s 45 km h 13 When the work is finished the operator shall bring the equipment in the out of service position switch off and isolate from the main supply 14 The equipment as described in this manual may not be used for operation in silo s shafts and underground access because special precautions may be required for these specific applications 15 Physical environment and operating conditions for electric equipment Temperature range 10 C and 55 C Humidity range Between 30 and 95 Altitude above sea level Up to 1200 m Contaminants Degree of protection IP 54 Issue date 6 Dec 2012 Page 4of 14 Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be T
11. his document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations Climber TECHNICAL DATA HOISTS E89 CTO Working Load Climbing Running Limit Speed currect Electric motor WLL 400V 50Hz 8 000 N 8 5 The ASTRO Hoist is producing 84 DBA in up direction and 80 DBA in down direction DESCRIPTION The ASTRO 15 a self reeving traction hoist which has a single wrap traction sheave and a roller chain traction principle for multiple steel wire rope sizes Power is supplied by an electric motor via the QUADRANT drive In the event of power loss slow and controlled descent can be achieved by manual release of the main brake The overload limiter is adjusted at 125 of the working load limit of the hoist SAFETY ROPE SUSPENSION ROPE SLACK ROPE LEVER SLACK ROPE SAFETY DEVICE INSPECTION SHIELD NO POWER EMERGENCY DESCENT LEVER HOUR METER ELECTRICAL BOX MAIN BRAKE NAME PLATE ASTRO SERIAL NO SUSPENSION ROPE DEPARTURE ROLLER STRIKER PLATE OVERSPEED SAFETY 2 0 DEVICE TOP LIMIT SWITCH MANUAL TRIP BUTTON 4 OVERSPEED SAFETY DEV RESET KNOB a OVERSPEED SAFETY DEV POWER LIGHT INSPECTION WINDOW OVERSPEED GOVERNOR MAIN HOUSING WITH QUADRANT DRIVE AND TRACTION MECHANISM ELECTRIC MOTOR SUPPLY CABLE OVERLOAD DEVICE
12. lled speed 4 SLACK ROPE SAFETY DEVICE Lower platform to the ground Slacken the suspension rope Pull up on the safety rope to make sure the safety device is gripping the rope 5 TOP LIMIT SWITCH Run the ASTRO in up direction and manually press down the top limit switch The ASTRO stops and can only be powered downwards while the limit switch knob is depressed 6 EMERGENCY STOP Move the platform about 1 m While moving press the emergency stop The platform will stop immediately and cannot be driven up or down To reset twist the knob in the direction of the arrow on the top of the knob Note Resetting Overspeed when no power is available It is neccesary to take the load off the overspeed safety device in order to reset 1 Locate the insertion point of the handwheel on the opposite side of the hoist to that of the electric motor Remove cap on and fit in the handwheel 2 Grip the handwheel firmly Rotate the handwheel clock wise whilst at the same time pulling on the emergency descent lever 3 Release emergency descent lever BEFORE releasing your grip on the handwheel 4 Repeat as required until it is possible to reset the overspeed safety device Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rule
13. rty of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations Power Climber TECHNICAL DATA STEEL WIRE ROPE The recommended steel wire rope to be used with the Astro hoist is the Power Climber Greenflex Specifications 5 x 26 WSR Warrington Seale Compacted construction HDDP High Density Polypropylene core Right hand regular lay Preformed Galvanized Weight 0 340 kg m load ac Calculated 80 0 KN Hoist type Recommended steel wire DIA 9 5 0 0 3mm E89 CTO Greenflex Dia 9 5mm Steel wires must be replaced in any of the following conditions More than 10 broken wires over a length of 30xd Kinking crushing or any other distortion of the steel wire rope structure Excessive corrosion Damage due to heat Reduction of the nominal diameter by more than 10 Issue date 6 Dec 2012 Page 7 of 14 Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations Power Climber OPERATING INSTRUCTIONS a 12 gt FUNCTION amp DESCR
14. s Parapet clamps Davits Fixed suspension points Other The suspension system must be calculated for a load of WLL x 3 WLL Working Load Limit of the hoist The maximum allowed stress with this load must be below Yield Issue date 6 Dec 2012 Page of 14 Tel 32 3 451 05 00 E mail Info PowerClimber be Fax 32 3 451 05 01 Website www PowerClimber be This document and all copies are the property of Power Climber BVBA All dimensions and data are indicative only The user must ensure that the equipment complies with local rules and regulations Power Climber PRECAUTION LIMITATIONS 1 Only authorized trained and physically fit persons shall operate the suspended access equipment 2 Before using the equipment the operator should read and understand fully the contents of this manual Serious injuries to personnel may result if the instructions are not followed At the connection to the power source a main switch must be available 4 An earth leakage circuit breaker ELCB of 30 mA and an automatic fuse of 20 A Type C must be used at the power source 5 Before using the equipment operators must carry out the daily checks and make sure that the equipment is in perfect working condition 6 Before using the equipment the suspension system must be checked to ensure the stability of the SAE Suspended Access Equipment at all times 7 In case the area below the SAE is open to the public pr
15. s and regulations Power Climber MAINTENANCE MAINTENANCE MAY ONLY BE EXECUTED BY PERSONS AUTHORISED BY THE MANUFACTURER A ROUTINE MAINTENANCE The Suspended Access Equipment should be inspected by a qualified person on a regular basis which for normal platform use should be every three months Carry out the daily checklist procedure as detailed in the manual Make any adjustments and rectify any problems as necessary Open the central control panel and disconnect all plugs and sockets to check for any signs of water penetration B ANNUAL MAINTENANCE Annual maintenance should preferable be done preferably in a workshop equipped with a test rig Remove the hoist and control box from the platform completely strip the hoist inspect all parts and replace worn parts if necessary Clean lubricate and reassemble Test the hoist on a test rig Carry out the daily check list Test the overload limiter at 125 of WLL Check the central control box and all plugs and socket connections for any signs of water penetration Record the hour meter reading which is located in the electrobox on the motor Fill in the maintenance sheet of each hoist indicating repairs done or parts replaced Mount the hoist and the control box back on the platform Run the platform over the full height of the building and carefully inspect the steel wire ropes for kinks broken wires or other damage Also inspect the trailing supply cable for

Download Pdf Manuals

image

Related Search

Related Contents

WS-100/WS-200S  Configuration Manager 5.0  2008-09 RevLim for Windows - School Services of California  PRA 22 - Hilti    Betriebsanleitung KKV  MADSAX0030E0 (man. DSA standard quick start gamma ING rev 0.0)    GUÍA DEL USUARIO  

Copyright © All rights reserved.
Failed to retrieve file