Home

INSTALLATION MANUAL - McKinnon Heating & Cooling

image

Contents

1. Using cornice centre line as starting point measure 133mm to installers right 46mm away from wall and mark location on ceiling for flue hole Cut 85mm hole in ceiling using previously marked location as hole centre Mount Brackets CONSOLE FLUE INSTALLTION DETAILS 6 Slide aluminium tube with spacer into DWV pipe and joiner repeat process for as many lengths that are required to extend through previously cut hole in ceiling 7 Install the bottom flue assembly the bottom flue assembly is a piece of aluminium tube fixed within a section of DWV shown in illustration below 8 Slide previously assembled DWV pipe and aluminium tube assembly up through hole in ceiling 9 Run a bead of Silicone around the bottom of the aluminium tube already located through hole in ceiling Then connect the inner and finally the outer IMPORTANT ALL JOINS MUST BE SEALED WITH A BEAD OF SILICONE Bottom flue assembly 6 REPLACEMENT WF INBUILT FLUE INSTALLTION DETAILS 6 Remove existing Wall Furnace flue and flue support bracket Fold out top and bottom mounting bracket tabs 4 tabs total to suit spacing between wall studs Attach the top mounting bracket inside cut out at required height for installation type fixing to the wall studs with the supplied fasteners Attach the bottom mounting bracket with the supplied fasteners as shown The dimension given is from the top edge o
2. BRACKET MUST BE ATTACHED TO AT LEAST ONE WALL STUD 1 Remove existing Wall Furnace flue and flue support bracket IMPORTANT WHEN ATTACHING TOP AND BOTTOM MOUNT BRACKETS LOCATE CENTRE LINE OF EXISTING CORNICE CUT OUT AND OFF SET CENTRE OF MOUNT BRACKETS BY 8mm TO INSTALLERS LEFT IN RELATIONSHIP TO CORNICE CENTRE LINE 2 Attach top mounting bracket to wall at required height for installation type fixing to the wall stud on at least on side or centre with the supplied fasteners 3 Attach the bottom mounting bracket with the supplied fasteners as shown The dimension given is from the top edge of the flange on the side of the top mounting bracket to the bottom edge of the flange on the side of the bottom mounting bracket 4 Using cornice centre line as starting point measure 133mm to installers right 46mm away from wall and mark location on ceiling for flue hole 5 Cut 85mm hole in ceiling using previously marked location as hole centre 85mm hole Cornice Cutout I l lt 8mm off set Mount Brackets N 6 Slide aluminium tube with spacer into DWV pipe and joiner repeat process for as many lengths that are required to extend through previously cut hole in ceiling 7 Install the bottom flue assembly the bottom flue assembly is a piece of aluminium tube fixed within a section of DWV shown in illustration below 8 Slide previously assembled DWV pipe and aluminium tube assembly up through h
3. Codes of Practice and Australian Standards which offer practical guidance on these health and safety issues Compliance with these regulations will require appropriate work practices equipment training and qualification of workers Seeley International provides the following information as a guide to contractors and employees to assist in minimising risk Risk Assessment A risk assessment of all hazardous tasks is required under legislation A risk assessment is an essential element that should be conducted before the commencement of work to identify and eliminate the risk of falls and other risks or to minimise these risks by implementing control measures This does not need to be a complicated process it is a matter of assessing the job to be done and considering what actions are necessary so the person doing the job does not injure themselves This should be considered in terms of What are the chances of an incident occurring What could the possible consequences be e What can be done to reduce or better still eliminate the risk Some points to consider when working on or in a roof What is the best and safest access to the roof and working areas What condition is the roof in Should the roof structure and surface be checked Does the worker have appropriate footwear Are all power cables extension leads safe and appropriately rated Are all ladders tools and equipment suitable and in good condition Where ladders are
4. can lead to poor distribution of heated air and short cycling of the heater Avoid placing the heater so that it faces across a room along the room is better Maintain clearances from the sides of the heater as shown above Maintain a clearance of 100 200mm from the floor 2 INBUILT FLUE INSTALLTION DETAILS 2 1 2 Cut opening for heater through plaster wall between wall studs Cut opening for flue in top plate Cut opening for flue in nogging or remove nogging entirely Fold out top and bottom mounting bracket tabs 4 tabs total to suit spacing between wall stud Mount the top mounting bracket against the top of the cut out fixing to the wall studs with the supplied fasteners Mount the bottom mounting bracket with the supplied fasteners as shown The dimension given is from the top edge of the flange on the side of the top mounting bracket to the bottom edge of the flange on the side of the bottom mounting bracket Top mounting bracket 1020 for SH25 Models 870 for SH18 Models INBUILT FLUE INSTALLTION DETAILS 7 Slide aluminium tube with spacer into DWV pipe and joiner repeat process for as many lengths that are required to extend through top plate into roof cavity 8 Slide previously assembled DWV pipe and aluminium tube assembly sections up into wall cavity Joining aluminium tube together w
5. to be used is there a firm stable base for them to stand on Can they be tied or secured in some way at the top Is there a roof anchor to attach a harness and lanyard to If so instruction should be issued for the use of an approved harness or only suitably trained people used Are all tools and materials being used prevented from slipping and falling onto a person at ground level Is the area below the work area suitably protected to prevent people entering this area Does the work schedule take into account weather conditions allowing for work to be suspended in high winds thunder storms lightning or other types of weather giving wet slippery surfaces Is there an on going safety check system of harnesses ropes ladders and access lifting equipment and where they exist on roofs anchor points before the commencement of work Is there a system which prevents employees from working on or in roofs if they are unwell or under the influence of drugs or alcohol Are there any special conditions to consider i e excessive roof pitch limited ground area fragile roof electrical power lines INSTALLATION KITS amp HEATER LOCATION Co Axial Vertical Flue Kit Supplied with 3 6 metres of flue Co Axial Flue Co Axial Long Flue Co Axial Short Flue Extension Kit Offset Kit BE Offset Kit additional length 750mm Kit P N 093079 This Kit P N 093055 The maxium allowed vertical flue length is 6 metres made up o
6. LACEMENT WF INBUILT INSTALLATION Short offset flue kit P No 089997 Short offset flue kit P No 089997 One side of support plate Either side support plate attached to top plate of flue attached to top plate 11 EXTEND FLUE INTO ROOF SPACE amp INSTALL FLUE TERMINAL 11 3 Cut the inner flue to suit the installation and to conform with all necessary regulations making sure there is at least 500mm between the edge of the flue cowl and the roof Cut the outer flue so the inner aluminium flue protrudes 70mm to 80mm past the outer 4 Seal the hole in the roof with appropriate flashing 5 Run a bead of sealant around the top of the inner flue so the inner will seal on the seat within the flue terminal 6 Secure the flue terminal to the flue with the tek screws supplied ensuring the inner flue seals cleanly on the seat within the terminal DWV outer MUST be cut to ensure Aluminium inner flue must sit inside aluminium inner sits cleanly on this seat this spigot in the centre plate 4 O Ld Un Assembled O Assembled DWV Outer Aluminium Inner DWV Outer Aluminium Inner Seeley International Pty Ltd has a policy of continuous improvement and may therefore make changes to these specifications without notice Whilst every care has been taken to assure the accuracy of the data in this manual Seeley International does not assume any liability for
7. SEELEY INTERNATIONAL INSTALLATION MANUAL CO AXIAL VERTICAL FLUE KIT FOR SEELEY INTERNATIONAL BRAEMAR ECO SUPERSTAR SH18 SH25 amp WF25 HEATERS Braemar HEATING COOLING INTRODUCTION This manual covers the following items with respect to installing a co axial vertical flue kit for a Braemar Ecostar SH amp WF25 Heater Selecting a location for the heater Cutting the wall opening Installing the upper and lower heater mounting brackets Installing the flue system and flue terminal Installation of the heater and the connection of the flue system to the heater is covered in the installation manual supplied with each heater SAFETY This Braemar Ecostar Heater Flue Kit must be installed in accordance with these instructions local gas fitting regulations municipal building codes electrical wiring regulations Australian Standard AS NZS 5601 Gas Installations and any other relevant statutory requirements Ensure that the heater is located to maintain the minimum clearances from the flue terminal as specified in AS NZS 5601 Measurement is taken from the edge of the flue terminal Employers and Employees Responsibility The installation and maintenance of gas space heating systems particularly at height has the potential to create Occupational Health and Safety issues for those involved Installers are advised to ensure they are familiar with relevant State and Federal legislation such as Acts Regulations approved
8. errors and or omissions Braemar is a registered trademark of Braemar Industries Pty Ltd Seeley International Pty Ltd ACN 23 054 687 035 www seeley com au SH25 amp WF25 New Console Installation Replacement WF Console Installation Q lt m 12 2 D e e N 2 D lt COMPLETED INSTALLATION roe pm N S s O re uw D m o x S lt B 2 T e N O 3 5 O o x 2 e D 1 9 2 2 re amp c 2 amp T s 12 o E New Inbuilt Installation Replacement WF Inbuilt Installation 636696b Warranty Service Australia 1 300 650 644 seeleyinternational com It is the policy of Seeley International to introduce continual product improvement Accordingly specifications are subject to change without notice Please consult with your dealer to confirm the specifications of the model selected Braemar HEATING COOLING
9. f One Co Axial Wall Cavity Flue Kit and three Co Axial Flue Extension Kits or One co axial Wall Cavity Flue Kit one Co Axial Flue Extension Kit and one Co Axial Flue Offset Kit This kit suits the following installation types CEILING WF25 WF25 SH18 or SH25 CONSOLE INBUILT INBUILT ONLY 1050mm SH25 900mm SH18 INTERNAL OR EXTERNAL WALL INTERNAL OR EXTERNAL WALL INTERNAL OR EXTERNAL WALL FLOOR 100 l Minimum side clearances i 300 mm gt 300 mm minimum minimum 2000 mm minimum When selecting a location for the space heater the following points must be considered to ensure optimum heater performance Avoid corners as this can lead to poor distribution of heated air Locate wall studs for an inbuilt installation the stud spacing measured from inside to inside must be between 405 and 430mm a false stud must be fitted if the spacing is greater than 430mm an alternative location must be selected if the spacing is less than 405mm Ensure that roof timbers will not obstruct the flue Ensure that concealed piping or wiring within the wall cavity will not obstruct the installation If a rear register is to be fitted select a location to ensure that wall studs do not obstruct the rear register Do not obstruct the air outlet or the rear register with furniture as this
10. f the flange on the side of the top mounting bracket to the bottom edge of the flange on the side of the bottom mounting bracket Top mounting bracket Fold out tabs _ Bottom mounting bracket 7 REPLACEMENT WF INBUILT FLUE INSTALLTION DETAILS 7 5 Slide aluminium tube with spacer into DWV pipe and joiner repeat process for as many lengths that are required to extend through top plate into roof cavity 6 Slide previously assembled DWV pipe and aluminium tube assembly sections up into wall cavity Joining aluminium tube together with a bead of Silicone as you go 7 Join aluminium tube assembly sections in wall cavity already to bottom flue assembly with a bead of Silicone the bottom flue assembly is a piece of aluminium tube fixed within a section of DWV shown in illustration below 8 Slide bottom flue assembly and attached tube assembly sections up into wall cavity using tab to lock bottom flue assembly to top mount bracket IMPORTANT EXPANDED END OF ALUMINIUM TUBE MUST FACE UPWARDS amp ALL JOINS MUST BE SEALED WITH A BEAD OF SILICONE Bottom flue assembly REPLACEMENT WF CONSOLE FLUE INSTALLTION DETAILS 8 IMPORTANT FOR TIMBER STUD WALLS THE TOP MOUNTING BRACKET MUST BE ATTACHED TO WALL STUD ON AT LEAST ONE SIDE OR IN THE CENTRE AND BOTTOM MOUNTING
11. ith a bead of Silicone as you go 9 Join aluminium tube assembly sections in wall cavity already to bottom flue assembly with a bead of Silicone the bottom flue assembly is a piece of aluminium tube fixed within a section of DWV shown in illustration below 10 Slide bottom flue assembly and attached tube assembly sections up into wall cavity using tab to lock bottom flue assembly to top mount bracket IMPORTANT EXPANDED END OF ALUMINIUM TUBE MUST FACE UPWARDS amp ALL JOINS MUST BE SEALED WITH A BEAD OF SILICONE Bottom flue assembly 4 CONSOLE FLUE INSTALLTION DETAILS 4 IMPORTANT FOR TIMBER STUD WALLS THE TOP MOUNTING BRACKET MUST BE ATTACHED TO WALL STUD ON AT LEAST ONE SIDE OR IN THE CENTRE AND BOTTOM MOUNTING BRACKET MUST BE ATTACHED TO AT LEAST ONE WALL STUD Attach top mounting bracket to wall fixing to the wall stud on at least one side or centre with the supplied fasteners Attach the bottom mounting bracket with the supplied fasteners as shown The dimension given is from the top edge of the flange on the side of the top mounting bracket to the bottom edge of the flange on the side of the bottom mounting bracket IMPORTANT CENTRE LINE FOR CORNICE CUT OUT IS OFF SET BY 8mm TO INSTALLERS RIGHT FROM CENTRE OF TOP BRACKET WHEN STANDING IN FRONT OF BRACKET Mark centre for cornice cut out and cut away cornice
12. ole in ceiling 9 Run a bead of Silicone around the bottom of the aluminium tube already located through hole in ceiling Then connect the inner and finally the outer IMPORTANT ALL JOINS MUST BE SEALED WITH A BEAD OF SILICONE Bottom flue assembly IN EXTEND FLUE INTO ROOF SPACE amp INSTALL FLUE TERMINAL 10 1 From within the roof space install the top plate based on installation type Inbuilt Locate top plate support over flue attaching top plate to either side of flue Console Locate top plate support over flue attaching one side of support to top plate Replacement WF Inbuilt Locate top plate support over flue attaching top plate to either side of flue Install short flue offset Kit part number 089997 using Silicone on the aluminium inner flue as previously to align flue with existing flue hole in roof Replacement WF Console Locate top plate support over flue attaching one side of support to top plate Install short flue offset Kit part number 089997 using Silicone on the aluminium inner flue as previously to align flue with existing flue hole in roof 2 Install additional DWV and aluminium flue sections using Silicone on the aluminium inner flue as previously to extend the flue through the roof INBUILT INSTALLATION CONSOLE INSTALLATION Either side support plate One side of support plate of flue attached to top plate A attached to top plate REP

Download Pdf Manuals

image

Related Search

Related Contents

Mode d'emploi  Daqstation DX2000T Operation Guide  Philips 5.1 Home theater HTS3538  Samsung M7500 User Manual  Bedienungsanleitung  DELL PowerEdge R720  Ficha de Datos de Seguridad  CONTRATO Nº 00001 CONTRATO DE LOCAÇÃO  Barclay Products TKCTR60-CP1 Installation Guide  RAPID S PARK 230V  

Copyright © All rights reserved.
Failed to retrieve file