Home
        Installation Manual - Solar Hot Water Parts
         Contents
1.       Pat   20 Tube   30 Tube    Roof Attachment Straps   6  EN  a  E  e E                 BottomTrack   1  FrontTrak      Bolts  amp  Nut Lock Assembly       Storage Tank  Inspect the water storage tank to ensure casing is not damaged  Inspect all ports  Inspect the PTR  Valve to ensure that it is not damaged     Note  The tank is supplied with a PTR valve and sensor well which may be stored inside the  thermostat cover and will need to be removed prior to installation of the tank     Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar  Corporation Ltd Page 13 of 37    1 9  Pump  Controller and Air Vent Assembly  The following items are generally packed together in one box     Table 4  Contents of the Solar Control Kit Box    Standard Pump Assembly    Pump Cover  Qty    Hex Bush 3 8   F x 1 2   M  Elbow  15M x 15F  Tee 15F x 15F x 15F    Union Compression 15C X 15M  Elbow Compression 15C X 15F    Qty      Controller unit  with tanks sensor attached    1  Woodscrews o    Wood screws  er    1 10  Evacuated Tubes  Open the boxes containing the Evacuated Tubes        o Check for Damage    o Check Vacuum  Check to make sure the Evacuated Tubes are all intact  and the bottom of  each tube is still silver  Important  If a tube has a white or clear bottom  it is damaged and  should be replaced     Caution  When inspecting the Evacuated Tubes  do not expose them to sunlight for extended  periods of time otherwise the heat pipe will become very hot  This can cause
2.     Hint  To save time you may like to install the collector sensor at this stage  For more information  see Step 5  Solar Pump and Controller  Page 21      Roof Plumbing  amp  Insulation  Once the frame has been mounted and fixed to the roof and the Manifold attached  the collector  system can be connected to the system plumbing     Note  The Evacuated Tubes should be inserted as a final step  after the system has been  commissioned  If you wish to install the Evacuated Tubes ahead of commissioning the system then  you should cover them up     Note  The Manifold will not leak if the Evacuated Tubes are not inserted  No water enters the  Evacuated Tubes  Heat is exchanged from the tubes via a copper heat pipe that conducts the heat  into the manifold     Plumbing Connections    No Brazing Permitted   Do not braze copper pipe directly onto the Manifold ports  Only use the supplied DR brass  compression fittings  or locally available equivalent   which provides a male 1 2    or 3 4    BSP thread   Always use two opposing spanners when tightening the compression fittings  Do not twist the  copper pipe as the header may be damaged     Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 19 of 37    1 5     1 6     Inlet and outlet connection on the collector  There are two 20mm ports on the collector that can be interchanged and used as either inlet or  outlet ports     As a general rule  use the port closest to the storage tank as the outl
3.     Weather Protected Insulation  25  Solar Rated Tempering Valve    Supplied by plumber   26  Copper Pipe DN15   see Note E   27  Tee 15C x 15C x 15C   28  Union Compression 20MI x 15C   29  Copper Pipe run to high temperature rated drainage   30  Union Compression 20MI x 15C   31  Tee 15C x 15C x 15Fl   if required   see Note B   32  Expansion Control Valve 700kPa   if required   see Note B    Notes    A  Non Return Isolating Valve  Duo Valve  can be substituted instead of separate valves   B  Optional Inclusion  Compulsory in some states where hard water is present    C  Pump assembly may vary    D  Air Vent must be vertical    E  A larger diameter pipe may be used  contact Endless Solar for advice    F  Optional item  Not for use with the standard Endless Solar controller  A cap may be  supplied instead     Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 35 of 37    F  Gas Boosted System Schematic    6 7                 r Note F  19    a 20mm hot water outlet  20mm PT amp R  Valve Port  AC 240V Endless  Solar  EN  Tank      Note C    Element    Gas Line    i  1  1     l m T     S          Thermostat   element         14 30  15 E 20mm solar return       _    HOT WATER TO HOUSE    l  E 20mm solar flow       30    20mm cold inlet    COLD WATER SUPPLY 2 23 24 29    Cad  Note A  Notes   A  Non Return Isolating Valve  Duo Valve  can be substituted instead of separate valves   B  Optional Inclusion  Compulsory in some states where 
4.   Installation of the storage tank must comply with the relevant Australian Standards   Tanks may be installed internally or externally     The Endless Solar   stainless steel storage tanks do not require a sacrificial anode  therefore  low  eaves do not present a problem     1 5  Gas Booster Installation    Important  The gas booster is designed for external installation in accordance with Australian    Standards  For full information  see the Gas Booster Installation Guide supplied with the Gas    Booster     Installation location must meet the prescribed requirements in respect to clearances for Gas    systems     1 6  Unpack and inspect    Prior to the installation of the Endless Solar System  all components should be unpacked and    inspected to ensure they are complete and free from damage that may have occurred during transit     Refer to your invoice and Parts List below for a complete list of components     1 7  Damaged Faulty Components    You should notify your supplier of any damaged or faulty components prior to installation     Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 12 of 37    1 8  Parts List  The Endless Solar System is delivered in a number of packages  the contents of these packages are  listed in the following tables and on the supplied invoice  You should notify your supplier of any  missing components prior to installation     Collector Manifold Kit  Table 3  Contents of the Collector Manifold Box  
5.   and or use a closed loop for the solar collector     Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 5 of 37    Water Specifications  To maintain warranty  water flowing through the manifold header must  comply with the water characteristics detailed in the Water Specifications table below     Table 1  Water Specifications     lt  150 mg litre or p p m   lt  10 mg litre or p p m    pH Levels 6 5  8 5    Electrical Conductivity    lt  850 uS cm       Rainwater Tank Supply  Rainwater caught off the roofs of buildings collects carbon dioxide  from the atmosphere  The carbon dioxide dissolves in the water producing a weak acid   carbonic  acid  Although not strongly acidic it can be corrosive  You should ensure that the rainwater quality is  suitable for use with the system     Rainwater supplies must be both strained and filtered before entering the system  as impurities   small particles and debris in rainwater can cause damage to the components in the system  Failure  to do this will void the warranty     Parts Substitution  Parts and components in the system design must not be substituted or omitted  Compliance with  legislation is the responsibility of the installer  Substituting components provided by Endless Solar  will void the warranty and may prevent the customer from applying for STCs  grants and other  financial incentives     Correct valves  fittings  materials  amp  components  It is important to use only the correct va
6.  33 of 37    E  Electric Boosted System Schematic    16    COLD WATER SUPPLY H 21         24       Endless Solar   Installation Manual v5 1          24           20mm hot water outlet  20 20mm PT amp R    Valve Port  26    k    AC 240V       Endless  Solar  Storage  Tank Bm 25       HOT WATER TO HOUSE    Element        Thermostat   element  cover       28           E 20mm solar return       E 20mm solar flow            28    20mm cold inlet    27    Copyright O 2013 Endless Solar  Corporation Ltd Page 34 of 37    List of Components   Electric Boosted System    Endless Solar System Components     Union Compression 15MI x 15C     Circulating Pump   see Note C     Flow Control Valve     Non Return Valve     Isolating Valve     Elbow 15C x 15Fl     Union Compression 20C x 15M     Tee 15Fl x 15Fl x 15Fl     Union Compression 15C x 15M   10  Elbow 15Fl x 15M   11  Air Vent  with Hex Bush 1 2 MI to 3 8 Fl   12  Endless Solar Controller   13  Tank Sensor Cable  3m    14  Collector Sensor Cable  20m    15  Pump Power Cable   16  Evacuated Tube Solar Collector  20 Tube  30 Tube or 40 Tube   17  Endless Solar Storage Tank   18  Lower Tank sensor Well   19  Upper Tank Sensor Well     see note G   20  Pressure  amp  Temperature Relief Valve 3 4  850kPa 992C 46kW  HT575     O CON DM BWHN FE    Supplied by plumber     Also available from Endless Solar  21  Isolating Valve   see Note A   22  Non Return Valve   see Note A   23  Pressure limiting valve 500kPa 15mm   24  Temperature Rated  UV  
7.  Adjustable Aluminium Frame       Front Support Beam  4     ZOmm NUT Bolt  1   50mm Nut amp Bolt  I            Long Rear Support Beam  0     Short Rear Support Beam  D     Foot Beam  B        A Front Support Beam    Long Rear Support Beam    Short Rear Support Beams    Side Support Beam MIN  Upper Rear Leg    Lower Rear Leg  Bottom Support Beam    Additional 20mm Nut and 14 Assembly includes nut  bolt  washer and spring lock  Bolt Assembly washer     MEP  S  Bolt Assembly  manifold box     C  E  F  G  H       Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 30 of 37    Assemble Each Side  e Unfold the side support  E   bottom support  H  and rear legs  F amp G   figure 19    e Slide the bolts on the lower rear leg into the grove on the top rear leg  figure 20    e The length  X  of the top rear leg showing determines the pitch  See figure 21 and table 1    e Leave the second bracket between the side support beam  E  and bottom support beam  H   unconnected until the end of step 3  figure 22      Table 10  Aluminium Frame Angles    25  130   35    aor  45           Figure 19 Figure 20 Figure 21 Figure 22          Connect Foot Beams    e For concrete and most corrugated roofs  slide 2 short bolts onto each of the foot beams  figures  23 and 24     e For tiled roofs and for Colorbond   corrugated roofs where the roof beams will not line up with  the foot beams  see page 4  slide 5 short bolts onto each of the foot beams     e Attach th
8.  Insert the condenser  tip of the heat pipe  all of the way into the manifold         1       Hint  For easier insertion lubricate the top outer glass surface of the Evacuated Tube with a small  amount of water to allow it to slip through the manifold ring seal  Do not allow any water to enter  the Evacuated Tube     4  Using a slight left and right rotation  gently push the Evacuated Tube up into the manifold  The heat  pipe and Evacuated Tube are fully inserted once the black coating of the Evacuated Tube has  disappeared up into the manifold  no clear glass visible      Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 25 of 37       The bottom of the tube should sit correctly in the Locking End Cap     After the insertion of each tube  secure the tube in the Locking End Cap by closing the locking cap    and finger tightening the plastic screw located at the base of the locking cap until the tube is secure     Note  Minimal pressure is required and care should be taken not to over tighten the screw  It only    needs to stop the tubes from moving     Step 8  Post Installation Procedure    Commission Boosters  Check operation of boosters  commission the boosters to  manufacturers    instructions     Final walk around  Check for any leaks or possible problems and gather serial numbers for  any paperwork     Install Pump Box Cover  The pump box cover simply clicks into place on the base covering  the pump and controller  It does not n
9.  Temperature Relief  PTR  valve on the tank is  regularly releasing hot water  it indicates there may be a problem  A few litres a day is normal     Possible Causes  The system may be producing more hot water than is required  This may be  apparent in the summer months  when solar radiation levels are high     Possible Causes  A faulty PTR valve on the tank     Possible Causes  Tank sensor not working or incorrectly installed     Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 28 of 37    B  Roof Attachments    Tiled roof attachment   For tiled roofs the 1m long stainless steel roof attachment straps should first be secured under the  tiles using the supplied 1    roof screws and then to the underside of the frame front tracks using the  M8 20 stainless steel bolts and Nut     Bolt Lock Assemblies  The diagram below shows a roof  attachment strap secured to one of the front tracks     Another strap should also be attached lower down each front track to provide an additional  attachment point  Attachment to the roof should be completed with the 1    stainless steel roofing  screws supplied     Ensure that roof anchoring points are very sturdy  You must refer to local building regulations for  guidance on anchoring that is suited to local conditions  You may use additional roof screws to give a  more secure hold if needed  Once the upper straps are attached and tightened  adjust the bottom  straps to ensure that they too are provi
10.  accidental burns  and or damage to packaging   ensure that you close the boxes fully when done     Note  Endless Solar Evacuated Tubes are supplied pre assembled  There is no need to alter the tube  configuration in any way  Do not remove the heat pipe and other components from the glass tube     Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar  Corporation Ltd Page 14 of 37    Step 2  Ground Plumbing    2 1  Tank      Booster Installation    Cold Water Valve Assembly   The cold water valve assembly must include an isolating valve  a 500kPa pressure limiting valve and  a non return valve  A line strainer and  or an expansion control valve may be required in some  areas  Failure to install a pressure limiting valve will void the Warranty     Figure 3  Cold Water Valve Assembly    To  Tempering  Valve    Expansion Control  Valve  If Required         Non Return  Valve    Non Return Pressure    Isolating Valve Reducing  Valve             Cold Water Supply To Storage Tank    Proper Access  The tanks shall be installed so that each unit is accessible for servicing and  removal  See AS NZS 3500 4    2 2  Tank Connection  Note  This diagram is for explanatory purposes only refer to the Endless Solar pre installation guide  for exact dimensions and port locations     Figure 4  Solar Storage Tank Ports    To Tempering Valve   Booster 4m       Endless  Solar  Storage  Tank    From Evacuated Tubes   gt  W 20mm solar return  To Evacuated Tubes  via Pump  da E 20mm
11.  collector will be greatly reduced     Ensure that there is no shading on the collector for the majority of the day     Controller Error     Table 7  Controller Errors    Problem Possible Cause Solution O   Check Power point   N No Ligh No P re   See rc a Reno mile Check Fuses   circuit breaker  Wire to tank sensor is pon  Repair wire      eee damaged  Sensor OK    light is FLASHING     Tank sensor damaged Replace tank sensor    Wire to roof sensor is ae  Fe ener Repair wire     Sensor OK    light is OFF  5  Roof sensor damaged Replace roof sensor       Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 27 of 37    Pump Not Working    In good sunny weather the circulation pump should activate if the water in the storage tank is cool   This is indicated by the    Pump ON    light on the Controller  The pump may run very quietly  and so  you may need to touch the pump to feel for motor operation  slight vibration      If the    Pump ON    light on the controller is on and the pump is not circulating water   e Check that the pump is plugged in and installed correctly  e Ensure that there is not an air pocket in the solar flow and return lines   e It may be necessary to purge air from the solar flow  amp  return     o After maintenance to the system  o If air has had the opportunity to enter the system    o Ifthe collectors have been allowed to stagnate    Regular Releasing of Hot Water   If during normal daily hot water use  the Pressure
12.  eg  Natural Gas or Liquefied Petroleum Gas      Electric Element with Gas Boosted Systems  If the solar storage tank for a gas boosted system contains an electric element do not connect it to  power     Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 9 of 37    1 1     1 2     1 3     Section 2     Installation Procedure    IMPORTANT NOTE  Do not install the Evacuated Tubes until  the system is ready to be commissioned  Step 7         Step 1  Planning Your Installation    Hazard Analysis  Complete a site specific safe work method statement prior to commencing works     Customer Wishes and Expectations   Speak with the customer about the installation  Ensure that they understand the installation process  and your obligations to meet all of the requirements in this manual  If there are any unexpected  problems or additional costs associated with the installation  inform the customer now     Location of the Collector  Select a roof face with the appropriate direction and pitch that is not affected by shading     Collector Orientation  In Australia  it is desirable that the collector should face due North for optimum performance     Important  The sun will run a different path across the sky depending on the time of year  In winter   the sun will be lower in the sky than it is in summer  Be conscious of possible shading from trees and  buildings at different times of the year     East or West Orientation  If the collector faces Nor
13.  flowing  The use of water  saving tap fittings that have less than a 7 5L min flow rate or that have restrictors in them can  interfere with the operation  To check operation  open the hot tap fully to see ifthe gas booster  comes on     e The gas boosters need a minimum of 150kPa water pressure  15 3m head pressure  in order to  function properly  If the pressure is less than 150kPa then a water pressure pump can be  installed  9 789kPa   1m of head pressure      Regulator   When upgrading from a gas storage tank to a gas solar system using a continuous flow gas booster  check that the gas regulator has been upgraded from 1 375kPa to 2 75kPa otherwise you might  experience low water pressure and or water that does not get heated by the gas booster to the  required temperature     Electronic Temperature Controller   It is not recommended to use electronic temperature controllers with instantaneous gas boosted  solar systems  as their operation is limited due to the stored solar hot water often being hotter than  the temperature selected     Location   The gas booster is designed for external installation in accordance with Australian Standards  The  installation location must meet the prescribed requirements in respect to clearances for the flue  terminal for Gas Boosted systems  Refer to AS5601 or local gas fitting rules for specific locations      Important  Before installing the gas booster  check that the gas booster supplied is suitable for the  type of fuel being used 
14.  limiting the water pressure that  goes into them  Failure to install a pressure limiting valve will void the warranty     The pressure limiting valve should be installed so that it will not interfere with  or unbalance the  proper operation of the solar tempering valve or other mixing valves  or affect the pressure balance  of hot and cold water at the tap  It is good practice to install the pressure limiting valve on the cold  feed to the house to ensure that both the hot and cold supply have equal pressure     Expansion Control Valve  Subject to local authority regulations it is a requirement that an expansion control valve be fitted  between the non return valve and the cold water inlet to the solar storage tank     Note  A separate drain line must be run for the expansion control valve     Copper Olives  Do not use plastic olives  as they will not withstand the heat that the collector produces  Only use  copper olives as they are designed to withstand higher temperatures     Piping  AS 1432 approved copper pipe should be used for the system and be properly insulated using high    quality thermal lagging  Keep pipe runs as short as practical to reduce any possible heat losses     The cold water line to the solar storage tank should be the same size or bigger than the hot water  supply pipe to the house from the solar storage tank     Important  Do not under any circumstances use plastic piping for the solar flow and return lines  or       for PTR valve drains     Insulati
15.  on the controller     Table 5  Checklist for Controller Function    Checklist for Controller Function    Controller OK Light MOE ae Check Power Supply  OFF Check that the Collector Sensor is plugged in   Check the Collector Sensor and Wire for Damage   O    ensors OK Light Figure 13  Air Vent Valve Cap    E Flashing Check the Tank Sensor and Wire for Damage     5  Bleed Solar Flow  amp  Return  Turn the pump on by holding  down the    pump    button on the controller until the pump light        flashes  15 seconds   Remove the Valve Cap on the automatic air  vent and depress the brass plug in the middle until a steady flow  of water is expelled  Replace the valve cap  finger tighten only   and push the pump button one more time to stop the pump     Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 23 of 37    Important  Be extremely careful when releasing water from the  Air Vent  The Air Vent can discharge extremely hot water and  steam     6  Set the Flow Rate    Flow Control Valve  The Flow Control Valve is an in line valve that is mounted immediately after the pump     Setting the flow rate  The flow rate can be set using a screwdriver while the pump is on and  the water flowing  Set the bottom of the white float as the flow rate level in the table below     Important  When installing the flow control valve  ensure that that the screw for adjusting the flow  is accessible and is not obstructed by a wall or another component     
16.  solar flow    From Cold Water Valves   ma e cold inlet       Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 15 of 37    2 3     2 4     Gas connections and gas piping  Gas systems only   The installation requirements of AG 601 apply to all general work  amp  safety requirements  materials  amp   gas piping  installation of gas piping  appliance installation and commissioning     Connect power  electric boosted system   Please refer to    Electric boosted systems    on page 8 for information on suitable electricity  connections     No Building Flow and Return Line  Ring Main   Conventional building flow and return lines cannot be used in conjunction with solar hot water  systems  returning hot water to the solar storage tank will inhibit the operation of the solar    collectors  If a hot water circulator is requested  please contact Endless Solar for information on a  suitable device     Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 16 of 37    Step 3  Roof Installation    Remember  Do not install the Evacuated Tubes until the       system is ready to be commissioned  Step 7      1 1  Mounting  amp  Roof Attachments   e Galvanic reaction between stainless steel and zinc galvanised steel  Zinc or Zn Al  galvanised components should NOT be installed in direct contact with stainless steel  as galvanic  reaction between the two metals can cause premature corrosion of the zinc coating a
17. Copyright O 2013 Endless Solar  Corporation Ltd Page 3 of 37    Section 1     Introduction and Important Information    Introduction   Thank you for choosing an Endless Solar  Evacuated Tube Solar Hot Water System  This document  outlines the principles of installing an Endless Solar   system for residential domestic hot water  applications     Please read this document thoroughly to ensure correct and safe installation of the system  Even  though you may have installed other types of solar hot water systems you should read this manual  thoroughly     Copyright    The information provided in this document is Copyright O Endless Solar  This document or its  content must not be reproduced in any format     No information in this document may be used for commercial or other purposes unless Endless Solar  gives its prior written consent to the intended use     Disclaimer    This document provides an installation overview of the Endless Solar Evacuated Tube Solar Hot  Water System     Endless Solar is not responsible for any loss or damage to any person or property of any type   whether direct or consequential  arising from the installation or operation of the solar hot water  system or any of its components  Endless Solar has made every reasonable attempt to ensure the  accuracy of the information provided  The content in this document is provided for information  purposes only  Certain information in this manual is supplied by third party component  manufacturers  accordingly En
18. Figure 14  Flow Control Valve    Table 6  Flow Rate  per collector     Collector Size Flow Rate  per  collector     20 tube collector    30 tube collector 1 5 L min  40 tube collector       Note  When setting the flow rate  if the pump isn   t  currently  you can temporarily run the pump by pressing  the button on the controller  See Step 5  Solar Pump and  Controller  page 21         Note  If you find that the temperature rise is too high or too low you can increase or  decrease the flow rate with the Flow Control Valve     7  Gas Booster  if applicable   Gas supply and power to the gas booster may be turned on and  the unit checked for leaks  The gas boosted operation of the heater should be checked  refer to the  Gas Booster Installation Manual      Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 24 of 37    Step 7  Insert Tubes  Do not install the heat pipes and Evacuated Tubes until system plumbing is completed and solar  pump and controller are operational     The contact between the heat pipe and the header pipe in the manifold must be tight in order to  ensure good heat transfer  Applying the thermal paste ensures that both the heat pipe and header  port will be in close contact     Figure 15  Applying Thermal Paste                      1  Thermal Paste  Coat the tip of the heat pipe with a thick layer of the supplied thermal paste     2  Pull the copper heat pipe out a short way out of the evacuated tube     E        3 
19. Gas systems ONlY           cccccccnncccnnnnonanocnnnnonanoninnnonaninonnss 16  2 4  Connect power  electric boosted SYSTEM             ceeeccccceessecccceeeesecceeeeeeeeceeseeeeeeeesaeeeeeeetegs 16   Step  ROO Asalto id ee 17  TE MOUNTING SEROOT Attachments  didas 17  1 2 Collector COnStrUCUON tt is 17  3   ROOfPIUMbDIME  amp  MSUIALIOA rr a a A 19  L4   PlUMbINe Connections ici 19  1 5  Inlet and outlet connection on the collector          sssssssssnesssssssseenesssssseerressssssserereessssseerrees 20  Vos   AUtomatc AIF Wet diia 20   step 4 Solar Flowand Return annonce ee ed ia 21    Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 2 of 37    CE  COPPER RI o 21    TD  AO 21  step e Solar Pump and Controller On 21  Tos Aistall te Pump BOX soi a a a 22  ti  Imstalline  Controller Sensorial a A 22  1 2  Pu  umpPoweroutletenaiien ii 23  Mi onina a A onsen csetiacecsans 23  SLED  gt  SV SCI ar UO eaaa N age Sanna tedaweedeecag indus reer ede teoemaeaiernnceeuainees 23  Step  Insert TUDO 25  Step 8 Post Installation Procedure il  26  SECH o   APPENA CE S nea od 27  A  Touple hoole eenia NNN EN 27  Bs   ROOFAttachmMeEnt Sverana aa 29  C  Adjustable Aluminium Frae siii 30  D  Retrofitting to Existing Hot Water SySteMS     cccooocccnconocnnnonaconnnnanonnnonaconnnnnonnnonanonnonanccnnonanonnnnos 33  Es     Eletric BOOStEC System SchemaliC ssr aa id 34  F   Gas DOOSted Sytem Schema ta mance  36    Endless Solar  Installation Manual v5 1 
20. IMPORTANT    Please leave me with the owner        ENDLESS SOLAR       Evacuated Tube Solar Hot Water System    Installation Manual    Version 5 1          ENDLESSSOL IR    Endless Solar Operations Pty  Ltd   ABN 64 128 433 205   Unit 1   340 Chisholm Rd  Auburn NSW 2144    1300 889 585    www endless solar com info endless solar com    Copyright    2013 Endless Solar   Corporation Ltd     Contents    Section 1     Introduction and Important Informati0N          cccooocccnonnccnnnnnncnnnnnncnnnonanonnnnnnonnnonaronnonanonnnnnnoss 4  A A AE 4  Motalan REQUIEM orales 5   Waters as 5  Parts SUBSTITUO ios nidad 6  Correct valves  fittings  materials 8 COMPONENTS       ccccoocccnnonoconnnnnncnnnonanonnonanonnonononnnonaronnonanonnnnnnoss 6    Mbortant  safe V ae iS 6  DOOM aaa 8  PIECE GD OOSTEC  SYSTE Sit dada 8   Section 2 Installation Procedure curtir 10   Step  t Planning Your Instala dias 10    s Haza CANIS ai iii 10  2    Customer Wishes and Expertas 10  LS  Locatonofthe Collector iso tado tada 10  Ae  MOCATION OT otorage Tania Gn a cicle dci obccaiads 12  Las 2GaS BOOSTER Installation iia iaa 12  16     Unpack ana INspeCt cnisa er oia 12  1 7  Daimaced  Faulty COMPONENTS 1 ad 12  Wee  PAS nn nae 13  1 9  Pump  Controller and Air Vent Assembly         occccconccnncnnocnncnnncnnnonaconnnnnnonnnonaconnonaronnonanonnos 14  1 10  EVACUATED  TUD da 14   Step GOMA PIM DIN ari 15  ZE  Tank suBOOSten installato Nat 15  22 Tank CONNECT ia AAA 15  2 3  Gas connections and gas piping  
21. ated towards the bottom of the tank  can be  connected to an Off peak 1 tariff  night rate   or in cases where Off peak 1 tariff is not available  should be connected to continuous electricity with a timer that activates the element after the sun  has gone down     Important  You must not connect the electric element in bottom element tanks to a continuous  electricity supply without a timer as it will prevent the solar working effectively     Mid Element Tanks  Tanks with a mid element  the element is located towards the middle of the tank  can be  connected to either off peak 1  off peak 2 or continuous electricity     Important  Mid element tanks that are connected to an off peak electricity supply will have a  lower capacity to deliver hot water under no solar conditions and may not be suitable  Please  contact your Endless Solar distributor if you are unsure     Important  You should not connect the element to a    manual boosting switch     or any other  device that will override the normal operation of the system     Gas Boosted Systems   Water leaving the solar system and entering the house will be automatically heated  if required  by  an in series instantaneous gas booster  This ensures that in periods of low solar gain that hot water  will always be available     Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 8 of 37    Minimum Flow Rate and Pressure  e The gas booster operates when there is a minimum of 3L of hot water
22. cks using Bottom Track  Attachment Plates  These are designed so that when loose  the Manifold and Bottom Track are able  to slide left and right     This allows the Front Tracks to be adjusted to suit the roofing surface  Once the Front Tracks are  correctly aligned the Nut  amp  Bolt Lock Assemblies should then be tightened using the supplied  socket  locking the Manifold and Bottom Track in place     You may like to only finger tighten the Nut  amp  Bolt Lock Assemblies for the Manifold until after you    Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 18 of 37    have inserted all the Evacuated Tubes  giving you some freedom to maneuver the Manifold in case  the Evacuated Tubes are a tight fit     Secure to roof  Place the Rubber Pads between the stainless steel frame and the roof  Use  silicon to prevent water seeping into the roof  Secure the frame to the roof using large roofing  screws  roof straps or suitable alternative     Figure 9  Rubber Pads    1 3     1 4     A    Positioning the Manifold  Connect the Manifold to the Front Tracks and secure using the  Manifold Attachment Plates     The Manifold and Bottom Track can slide left and right in relation to the Front Tracks  so there is  some flexibility when selecting the location for the Front Tracks  Generally the Front Tracks should  be located such that they lie flat and even on the roof and also line up with the roof frame timbers   or appropriate anchoring point  
23. ding support to the frame  The frame    hangs    off the roof     Figure 16  Tiled Roof Attachment     SCREW ATTACHEMENT   7 tj   0 Y                      WOODEN BATTON         ROOF ATTACHMENT STRAP               RUBBER SUPPORT BLOCK           e  BOLTED TO FRAME  FRONT TRACK    Rubber Pads  The rubber pads that are supplied fit under the frame  by using a dab of silicon against  the frame and then sliding the rubber pads under uniformly appropriate areas of the frame  You can  also use a cable tie to secure the rubber pad to the stainless steel mounting frame  This will prevent  any potential knocking of the frame on tiles due to strong winds     Figure 17  Rubber Pad                      Note  The stainless steel straps should be positioned so that they go down the trough of the tiles  If  you find that the rafter does not exactly line up with the trough in the tiles then you can bend the  Stainless steel strap after connecting it to the rafter so that it will be in the correct position     Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 29 of 37    C  Adjustable Aluminium Frame    Table 8  Components required from the Endless Solar Manifold box  Quantity    Basic Me  13mm hand socket wrench    Self Taping screws with 12 Only required for Colorbond   Corrugated roofs   8mm hex washer    Wood Screws   6   Only required for tiles roofs     Roof Straps Only required for tiled roofs and some Colorbond  roofs  see page 4     Figure 18 
24. dless Solar cannot warrant that all the information is accurate  No  claim is made as to the accuracy or authenticity of the content in this document  Endless Solar will  accept no liability to any person for the information or advice  or the use of such information or  advice  which is provided in this document or incorporated into it by reference     OH amp S Disclaimer   Endless Solar is a supplier of components only  Each installation must be covered  by the installer   s insurances  commercial terms and conditions and by the applicable OH amp S  requirements relevant to the type of work being conducted including  but not limited to  plumbing  work  work on roofs and electrical work  Endless Solar do not accept any responsibility for any loss or  damage to any person or property of any type  whether direct or consequential  arising from the  installation  maintenance or operation of the solar hot water system or any of its components     Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 4 of 37    Installation Requirements    Regulations  Installation of Endless Solar Systems must also be in accordance with     National Plumbing Code AS NZS 3500 4   AS NZS 5601 for installation of the gas booster  in accordance with AG 601   Installation Instructions   AS NZS 3000     Wiring rules   Local gas fitting regulations   Local plumbing regulations   All Government regulations   Local Council regulations    O O O O O O O O  Q    Any o
25. e bottom support beams to the foot beams using the outside bolts  figure 24    e Attach the brackets from the side support beams to the bottom support beams  figure 25      Figure 23 Figure 24 Figure 25       Connect Front Support Beams    e Slide 2 short bolts onto each front support beam  A  figure 18    e Connect the front support beams  A  to the side support beams  E  figure 18      Connect Rear Support Beams    e Slide 2 short bolts onto each upper rear leg  F    e Connect the rear support beams  C  amp  D  to the upper rear leg  F  figure  18      Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 31 of 37    Figure 26    Attach the Standard Frame    e Take the standard frame from the manifold box  3 pieces     e Slide 3 long bolts onto front support beam  A     e Connect one standard frame to the centre of the front support  beams  A     e Connect the other two standard frames to each end of the front  support beam  figure 26               Attach the Complete Pitching frame to the Roof  e Please see    Roof Attachments    on page 29 for more information     For Tiled Roofs   e Attach the end of the roof straps to the short bolts on the bottom track  see step 3   Bend  around the foot beam  figure 27     e Slide the roof strap under the tile and attach to the roof beam     For Colorbond   Corrugated roofs  e Check that the foot beams line up with the roof beams   o If they do  using the 8mm self taping screws  drill through 
26. ecessarily need to be secured to the wall however it can  be if there is a reason to be concerned that the pump may be tampered with  e g  installations in  a public place      Site Cleanup    Paperwork   o Complete the Installation Report form  o Complete STCs Assignment Form    o Give this manual to the homeowner  please include the Collector Sensor Emulator  for future testing purposes     Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 26 of 37    Section 3     Appendices    A  Troubleshooting  Any system assessments  adjustments or repairs must be completed by a qualified tradesperson  For  any problems that involve plumbing or electrical connections the services of a qualified professional  must be employed     The following is a general trouble shooting guide  For more information  contact Endless Solar     No Hot Water    If there is no hot water  it will generally be related to the gas or electric boosting system  and not the  solar collector  The solar component of the system pre heats water  with final boosting completed  by the electric element or gas booster system     Check that the boosting system is operational and all components and valves are configured  correctly     Reduced Solar Contribution    Solar contribution to your heating is directly related to the amount of solar radiation and the volume  of hot water used  During winter  and periods of rainy  overcast weather the amount of energy  produced by the solar
27. ected or be  wrapped in metallic foil to protect against degradation from UV rays     Note  Insulation should have a high R value  It is suggested that an R value of 1 is used     Note  External and internal piping that is subject to low temperatures should have an appropriate  insulation fitted  AS NZS 3500 4 details the requirements for Australia     Step 5  Solar Pump and Controller  The Endless Solar pump and controller are supplied together with a plastic pump box     Figure 11  Endless Solar Pump and Controller    Non Return Valve    ae    i   Lompression    Flow Control Valve    Fitting    SOCKET  gt         Union            Pump Pump Test    Button        gt  Lontrotler      _   Tank Sensor    Compression      Lable    FITTING    Power Cable  as    Collector Sensor Lable    Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 21 of 37    1 3     1 1     Install the Pump Box  Secure the backing plate of the pump box to the solar tank or a wall close to the tank     Make sure that the pump and controller are installed in a location that is easily accessible and  ensure the solar flow pipe can be connected to the pump     Note  Leave the pump cover off for now as you will need access to the pump and controller again  before completing the installation     Important   f you are not using the pump box  e g  you are installing the pump internally  make sure  the pump is installed so that the impeller is in the vertical plane  Do no
28. et port     Hint  You may wish to install the collector sensor now  if so please refer to section 1 1 Installing  Controller Sensors on page 22 for information     Important  The collector sensor must be installed on the outlet side of the manifold     Automatic Air Vent  The Automatic Air Vent will prevent any air from staying in the system in the event of stagnation     Important    e The Air Vent must be attached to the manifold port on the port used as the outlet  solar  return line     e The Air Vent needs to be mounted vertically to the horizontal to allow it to operate correctly    e The Air Vent must be installed at the highest point in the collector array    e You will notice a Valve Cap on top of the air vent  This needs to be finger tightened only     Figure 10  Air Vent Assembly  D mE    E  E    Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 20 of 37    Step 4 Solar Flow and Return  Run flow and return lines to and from the collector  Keep pipe runs as short as possible to reduce  any possible heat losses     1 1  Copper Pipe  Use DN15        AS 1432 approved copper pipe for the solar flow and return pipe     1 2  Insulation  AS NZS 3500 4 details the requirements for insulation in specific areas  It is important to ensure that  insulation is tight against the manifold casing to minimise possible heat loss from the inlet and outlet  connectors  Insulation foam that is exposed to direct sunlight should either be UV prot
29. hard water is present   C  Pump assembly may vary   D  Air Vent to be vertical   F  Optional item  Not for use with the standard Endless Solar controller  A cap may be supplied  instead   G  Solar Transfer Valve is not required for Bosch boosters supplied by Endless Solar  it may be  required for other boosters   H  Do not connect the element on gas boosted systems     Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 36 of 37    List of Components   Gas Boosted System    Endless Solar System Components    A E A S    NNRRBRBBPB PE Pbpbp  RKO0O0o0 YU UNnNnNr O    Union Compression 15MI x 15C  Circulating Pump   see Note C  Flow Control Valve   Non Return Valve   Isolating Valve   Elbow 15C x 15FI   Union Compression 20C x 15M  Tee 15Fl x 15Fl x 15FI   Union Compression 15C x 15M      Elbow 15Fl x 15M     Air Vent  with Hex Bush 1 2 MI to 3 8 Fl      Endless Solar Controller     Tank Sensor Cable  3m      Collector Sensor Cable  20m      Pump Power Cable     Evacuated Tube Solar Collector  20 Tube  30 Tube or 40 Tube     Endless Solar Storage Tank     Lower Tank Sensor Well     Upper Tank Sensor Well     see note G     Pressure  amp  Temperature Relief Valve 3 4  850kPa 992C 46kW    Gas Booster    Supplied by plumber     Also available from Endless Solar    22   23   24   25   26   27     Isolating Valve   see Note A   Non Return Valve   see Note A   Pressure limiting valve 500kPa 15mm   Temperature Rated  UV  amp  Weather Protected In
30. l v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 22 of 37    Note  When installing the sensor ensure that the sensor well is free from dirt and water  as this may  cause incorrect reading from the sensor                                                        Tank Sensor                         Coat the tank sensor probe with thermal paste  and insert into the lower                                                       tank sensor well  The sensor wire should be fully inserted into the well  and sealed inside with a dab of silicone     Multiple Tank Installations only  Connect the supplied sensor well to the          solar flow pipe after the tank array and before the solar circulating       pump  Coat the sensor probe with thermal paste and fully insert it into A                   the well and seal with a dab of silicone   1 2  Pump Power Outlet    The Pump Power Outlet  The pump operation and power source is through the pump power outlet on the controller     Important Note  The pump power outlet has a maximum rating of 10Amp 240V     Step 6  System Start up  1  Fill Tanks    2  Air purge  For direct mains pressure storage tanks  opening up hot water taps will help to  eliminate air from the storage tanks     3  Plumbing Check  Check that pipes  components  valves and fittings are leak free and operational   eg  PTR valves      4  Check Pump and Controller Operation  Turn the pump and controller on at the power  outlet  To turn on the pump use the pump test button
31. lves and fittings when installing the system  The components  specified are legally required and or are required to meet warranty conditions     Important safety valves    Solar Tempering Valve  A solar rated tempering valve must be installed prior fixtures used for sanitary purposes  e g   showers and washbasins  where risk of scalding can occur     The installer accepts full liability for non compliance     The solar tempering valve controls the temperature of the hot water coming from the storage tank  to a maximum of 50  C thus preventing serious burns in outlets within the house  This valve is  designed to work with the higher temperatures that solar hot water systems can produce  Standard  tempering valves are only rated up to 85  C but the solar tempering valve is rated up to 99  C     Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 6 of 37    Non Return Valve   A non return valve must be installed on the cold water line to the solar storage tank in between the  cold water branch to the solar tempering valve and the storage tank  Please refer to system  schematics for more information     This ensures that hot water cannot flow from the storage tanks back into the cold water line or into  the cold inlet to the solar tempering valve     Pressure Limiting Valve   A pressure limiting valve set at 500kPa must be fitted  A pressure limiting valve can protect the hot  water tank and other components appliances that use water by
32. nd possibly the  steel underneath  Use the rubber frame mounting blocks provided     1 2  Collector Construction    Figure 5  Collector Construction    i Evacuated    Tube    __    Manifold        A A deta         7 Front  racks    a    a       Attachment  Plates    Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 17 of 37    1  Front Tracks  Measure and mark out where the solar collector is to be mounted  Correctly  align frame  Make sure that the Front Tracks are parallel and level  An uneven frame may result  in damage to the system  in particular  the Evacuated Tubes     Note  Ensure the Front Tracks are mounted to secure connection points on the roof     2  Nut  amp  Bolt Lock Assemblies  Please ensure that the Nut  amp  Bolt Lock Assemblies are  pointing upwards   with the bolt upside down  and the nut on top  shown below   The bolt head  is prevented from rotating by use of a nut lock  removing the need to use a second spanner     Figure 6  Nut      Bolt Lock Assembly    ie       3  Bottom Track attachment  When assembling the Standard Frame  first connect the Front  Tracks to the Bottom Track using the Bottom Track Attachment Plates    Figure 7  Bottom Track Attachment Plates         Important  Make sure that the Bottom Track is the right way up  You can check by  looking at the Locking End Caps     Figure 8  Bottom Track and Front Track Connection     lt     Both the Manifold and Bottom Track are secured to the Front Tra
33. on   It is important that high quality UV protected insulation be installed on all pipe work to reduce heat  loss  Please review AS NZS 3500 4 for detail on the type and quality of insulation you should use for  your area  As a general rule  the insulation should have a high R Value and be suitable for the pipe  diameter  Insulation should be UV  high temperature and weather protected     Safe Tray   The National Plumbing Code AS NZS 3500 4 requires safe trays to be installed to all water heaters  where  if there is a leak  property may be damaged  Installation of such trays must comply with the  Code     Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 7 of 37    Important  Ensure that all components including the tank  pump assembly  valves and fittings  cannot cause water damage if there is a leak     PTR Valve  An 850 kPa Pressure and Temperature Relief Valve  992C  46kW  must be installed on the solar  storage tank     Boosting   Each of our solar water heaters has a back up boosting system to ensure that hot water is always  available  We design our system so that the sun is always given precedence over the use of  purchased energy to heat the water     There is a choice of gas  Natural Gas or LPG  or electricity  mid or bottom element  to boost the  water     Electric boosted systems  Electric boosted systems contain an electric element inside the tank     Bottom Element Tanks   Tanks with a bottom element  the element is loc
34. rection for    rds    Evacuated Tubes   you should pitch the collector lower  use a pitch that is 2 3 of the Optimum  Pitch or 20    whichever is greater     Table 2  Collector Pitch    Optimum Pitch   Annual  Performance     Optimum  Winter Angle     Acceptable Range of    L i Lati  ocation atitude Pitch    Adelaide 35    Alice Springs  27      35    Sydney     Note  To comply with AS NZS 3500 4  collectors must be installed within 20   of the latitude        Shading Analysis   e Collectors should be located so that shading does not occur for at least the 3 hours either side of  12 noon local standard time  Partial shading due to small objects such antennas or a small flue is  not of concern     Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 11 of 37    Figure 2  Shading       Location of Collector in Relation to the Tank    Without compromising the efficient operation of the solar collector  it is important to keep the    piping distance between the collector and tank to a minimum  This will aid in reducing heat loss     water flow resistance in the pipe work  as well as keep installation and material costs to a minimum     1 4  Location of Storage Tank    The storage tank should be located as close as possible to the most frequently used hot water  outlets  e g  bathroom or kitchen      The storage tank should also be located as close as possible to the hot water outlet of the  collector manifold to reduce heat loss     Note
35. sulation  Solar Rated Tempering Valve   Solar Transfer Valve   60  C  auto by pass valve      see note G    Supplied by plumber    28   29   30   31   32   33   34   35   36   37   38     Copper Pipe DN15   see Note F   Tee 15C x 15C x 15C   Union Compression 20MI x 15C   Copper Pipe run to temperature rated drainage  Union Compression 20MI x 15C   Tee 15C x 15C x 15Fl   if required   see Note B  Expansion Control Valve 700kPa   if required   see Note B  Union Compression 20Fl x 20C   Ball Valve  water  male  green 20mm  inc  Union  Ball Valve  gas  female  yellow 20mm  inc  Union  Tee 20C x 20C x 20C     see note G    Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd    Page 37 of 37    
36. t mount the pump with the  impeller in the horizontal as this will cause the pump to operate incorrectly  reducing the life of the  pump  Failure to install the pump correctly will void the warranty     Figure 12  Solar Pump Orientation       Important  Once installed and operational  do not turn off the controller at the power point as it  needs to be permanently on to operate the solar pump when required  Turning off the controller  can cause damage to the system     Installing Controller Sensors   There are two sensors included with the Endless Solar Controller unit  They are used to determine  the temperature of the collector and the temperature of the water in the lower part of the storage  tank     Important  Install sensor cables with care  Ensure that they are not cut or damaged  ensure that the  wire does not come into contact with the copper flow and return pipe as it will melt     The tank lead sensor is 2 9m long and is hard wired into the controller  The collector sensor lead is  20m long and comes separately to the controller  it can be plugged straight into the controller  no  wiring necessary      Note  If the sensor leads are too short you can extend the length of the cables using medium duty  fig  8 speaker cable     Collector Sensor  Coat the collector sensor with supplied thermal paste and insert fully into the 10mm copper sensor  well near the collectors hot outlet port  return port   Seal the sensor well with silicon     Endless Solar  Installation Manua
37. th East or North West the performance will  decrease by an insignificant amount  and if angled directly East or West the performance will  decrease by only a small amount     Important  Do not install the collector so that it is facing south  Positioning the collector on a South  facing roof can be achieved using a backward facing frame to correctly pitch the collector in a  Northerly direction     Endless Solar  Installation Manual v5 1 Copyright O 2013 Endless Solar  Corporation Ltd Page 10 of 37    Figure 1  Solar Path by Season            bPLN Summer    NX  Spring Autumn       Winter    Collector Pitch   e Endless Solar Evacuated Tubes perform best when installed at an angle of between 20   and 60    from the horizontal  The optimal pitch is the location   s latitude plus 10    unless the latitude is  less than 10     Where possible  the Endless Solar collectors should be installed at the optimal  pitch     e The following table shows the optimal collector angles for the major cities in Australia  If a roof  has an angle less than 20    it is necessary to use the low pitched roof frame or A frame to ensure  optimal performance     e Note  Angling the collector greater than the optimum pitch will give better performance in  winter whilst decreasing performance in summer  Similarly  a lower pitch will increase the  collector   s summer performance whilst decreasing performance in winter     e Note  If the collector is oriented to face East or West  which is an acceptable di
38. the foot beams into the roof  beams  figure 28    e  f the foot beams do not line up with the roof beams   o Attach the roof straps to the short bolts  figure 29    o Attach the roof straps to the roof using the roof screws provided  figure 29    o Optional  Trim any excess roof strap for a neater installation     For Concrete roofs  e Drill through the foot beams and into the roof   e Attach using dynabolts     Figure 27 Figure 28 Figure 29       Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page 32 of 37    D  Retrofitting to Existing Hot Water Systems    Electric Systems  The 5 way retrofit valve is used to retrofit the solar system onto an existing electric tank  This valve  is not required when retrofitting an existing gas boosted system  The connections are as follows     Figure 30  Retrofitting to existing electric systems    SOLAR RETURN SOLAR FLOW   FROM COLLECTOR   TO COLLECTOR     T PTR ME     VALVE      B Snake HOT WATER  Existing TO HOUSE  PUMP Hot  ASSEMBLY  Water  Tank    Solar  Return           Out to  7 Solar      gt   Y Cold in  eet Po  COLD WATER SUPPLY A  COLD WATER 1  SOLAR CONVERSION VALVE  SUPPLY VALVES 2  UNION  Gas Systems    Gas retrofit systems include a solar storage tank  The hot water outlet of the solar storage tank is  connected to the cold inlet of the existing gas storage or instantaneous gas booster     Endless Solar   Installation Manual v5 1 Copyright    2013 Endless Solar   Corporation Ltd Page
39. ther relevant act or regulation    Qualified installer   Installation must be completed and signed off in writing by a qualified plumbing professional   Electrical work must be completed by a qualified electrician  The installation company is required to  supply warranty for the installation and workmanship     Water Supply    Water Pressure  The system has been designed to connect to mains water supply of at least 400kPa     Low pressure water supplies  such as gravity feed or rainwater tank supplies may not provide  adequate water pressure for the system to operate correctly  It may be necessary to install a  household pressure pump to achieve the correct operating pressure     The water supply pressure must be limited to 500kPa  A pressure limiting valve of 500kPa must be  fitted     Water Quality   e Corrosion from Bore Water and Chlorinated Pools and Spas  Copper is susceptible  to corrosion when high concentrations of chloride are present  therefore  use of this system to  directly heat chlorinated pool or spa water will void the Warranty  Chloride levels present in most  reticulated public potable water supplies are safe for use in the solar collector provided there is no  use of bore waters in the reticulated supply     e Hard Water  in areas with    hard    water   gt 200p p m   lime scale may form inside the collector  header pipe  In such regions  it is advisable to install a water softening device to ensure the long  term efficient operation of the solar collector
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
FCG63E - FCG7E - FCG10E FCP87E - FCP7E - FCP10E FCG87E -  Switch Smartphones - Benutzerhandbuch  Conair RPHS10J User's Manual  FR - EXA France  Zanussi ZYB 460 Oven User Manual  JamVOX Owner's manual  MFG. ID. NUMBER 96118001302    HSMS 100 - kopfstation.de  AKG DVD Player DVD47    Copyright © All rights reserved. 
   Failed to retrieve file