Home
User Manual - Ampcontrol
Contents
1. 10 5 1 Description of Operation 10 5 2 Methods of Earth Leakage 10 2 Testing 11 11 5 5 OPINION E 11 6 E 11 7 Maintenance amp Disposal 13 7 1 Equipment Maintenance 13 7 2 Disposal of System Parts ucccccccnscossscssecanscnacesticcaenaeesnncnsasceiesaendenenaisecaasaesinasasessauecaensucensdeedensaenenceaieesbeatessess 13 8 13 Appendix A Drawings 14 Appendix Approvals 22 Error Bookmark not defined ELDBOO6R8 docx Page 3 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 1 Receiving and Storage 1 1 Receiving All possible precautions are taken to protect the equipment against damage or losses during shipment however before accepting delivery c
2. Caution DO NOT 7 Mounting Clips ABN 35 000 770 141 Ph 02 4803 4800 Fax 02 4903 4888 www ampcontroigroup com Designed amp Manufactured in Australia AMPCONTROL CSM Pty Ltd 7 Billbrooke Close Cameron Park NSW 2285 Australia 02 0000000 NOILdO 2 LILAS UMAT AMA FON AOO TONTON 2 S bee 7 eaf fojajn pazo 8079079 ee ww waa 02 79 9 25 HDIH ACIM WWES SNOISNSWIC 110100 7 x SNOISNAWIG 7132389 6601704 LYYd ISV NIC 1 2 ZA LOLSLL 9 LA 2950008 Lud AVISY 073 L NOILdO TANVd Bupunoy LON LOLSLL E 4 L mate 90 LATER ESI EF ey Q OSOTIK TISSA ISEI IESIT DKR NG Page 15 ELDB006R8 docx A ci AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 Remate Monitoring Output gn 1 20 con 4 amp 20 7 7
3. ELD iz Non Fail Safe Link PWR iy q Link 3 3 5 3 Link 2 Yee p 0 R 7 cT can fe Tea ih Link 1 T2 2 TEST RELAY oidal Current Transfarmer ane ea ee ea ne eae d THE CONTACT NEEDS TO BE ADEQUATELY RATED R TEST CURRENT TRIP CURRENT 2096 KV amp 3 3kV SYSTE MS TEST RELAY MUST BE RATED FOR SYSTEM VOLTAGE ELDBO06R8 docx TESTS THE MAIN NER SUITABLE FOR COAL MINES LOOP RESISTANCE lt tohm Page 17 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 CAUTION The ELD relay includes a circuit for continually testing the toroid connection The resistance of the wiring between the relay and toroid must be kept below 1 If this is not done then a CT fault will be detected and the relay will trip ELDBO06R8 docx Page 18
4. 55 5 3 Overview of Earthing 2 6 3 1 Protection Sy SUG 6 4 Need for Earth Leakage 22 7 4 1 Overview of Protection 8 7 4 2 TEI Leakage Systems AEE 7 4 3 Methodsof Earth Leakage 8 4 3 1 Core Balance scapecnschenicssursorirasssssscinadsovonsunassnssnibndsocsnlatadtetnaseatcbesetsnatindcesepstiednatasustanassasacioed 8 4 3 2 Series Neutral Protection c cccsssssscscssssssesesscsssscsssesncsssceussessssssessessesncseeeeesansnsaceeeesecsssacaceeeesacsnees 8 4 4 Earth Leakage gC 6 9 nena Pree ort 9 4 4 1 Selection iain adm 9 442 Installation 2 9 5 ELD Earth Leakage Breaker Operation amp 22 4
5. ELD V2 EARTH LEAKAGE PROTECTION RELAY USER MANUAL Issue R8 Aug 2011 CRN 8530 Ampcontrol User Manual Part No 121581 Designed and Manufactured in Australia by Ampcontrol CSM Pty Limited AMPCONTROL AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 IMPORTANT This manual refers to the ELD V2 Relay A V2 symbol on the fascia of the relay indicates that the ELD relay is version 2 and that this manual is relevant For other models of the ELD Relay refer to the appropriate ELD Manual contact Ampcontrol for further details Safety and other Warnings WARNING This safety alert symbol identifies important safety messages in this manual and indicates a potential risk of injury or even death to the personnel When you see this symbol be alert your safety is involved carefully read the message that follows and inform other operators CAUTION This safety alert symbol identifies important information to be read in order to ensure the correct sequence of work and to avoid damage or even destruction of the equipment and reduce any potential risk of injury or death to the personnel Supplementary information not directly affecting safety or damage to equipment Carefully read the message that follows and inform other relevant personnel Information conc
6. Earth fault protection has been applied with considerable success in limiting faults and providing quick disconnection of electrical apparatus from the supply in the event of earth fault situations A definite time operating characteristic is provided with adjustable trip sensitivity and time delay Time delay between protective units is introduced to allow the unit close to the fault to isolate the faulty circuit without causing the healthy part of the system to be de energised 4 2 Earth Leakage Systems Desirable though it may be it is impractical to provide automatic protection against electrocution as a result of direct contact with a live conductor particularly where the electrical reticulation is exposed to a humid or damp atmosphere Table 4 2 taken from IEC Standards indicates the current values affecting human beings Current mA Symptom 1 or less Causes no sensation not felt 1108 Sensation of shock not painful individual can let go at will as muscular control is not lost 8 to 15 Painful shock individual can let go at will as muscular control is not lost 15 to 20 Painful shock muscular control of adjacent muscles lost cannot let go 20 to 50 Painful severe muscular contractions breathing difficult 50 to 100 Possible 100 to 200 Certain Ventricular fibrillation a heart condition that may result in death Severe burns severe muscular contractions so severe that chest muscles clamp the
7. heart and stop it for the duration of the shock This prevents ventricular fibrillation ELDBO06R8 docx Page 7 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 It can be seen from the previous table Table 4 2 that the passage of a current of as low as 15mA through the human body can cause loss of muscular control to the extent of preventing the recipient from disengaging from the live conductor Whereas a current in excess of 50mA is sufficient to produce a critical heart condition from which there is little or no chance of recovery It follows that as an effective safeguard against electrocution resulting from direct contact with a live conductor it would be necessary to introduce earth leakage protection designed to operate with a fault current below 15mA which in the majority of cases would be impractical The automatic protection of circuits is not intended to take the place of sound installation practice and the regular maintenance and testing of electrical apparatus Care must be taken in the selection and installation of all electrical equipment with due regard to its required duty and the conditions under which it may be called upon to operate Where automatic earth leakage protection has been installed it is essential that its operation be tested often and to facilitate this a means for testing is incorporated in all approved earth leakage relays 43 Methods
8. and symmetry decreases Nuisance tripping tends to occur when the total current rises such as when a large motor is started The following guidelines would help to avoid such problems 4 41 Toroid Selection i Select the smallest internal diameter toroid which will allow the cables to fit through Avoid very large toroids 200mm or toroids with square apertures ii Only use approved toroids specified by Ampcontrol as these have been designed to minimise the problem 4 4 2 Installation Guidelines i Keep cables as close to the centre of the toroid as possible Do not tie them to one side of the toroid Remember to aim at symmetry ii Do not bring the cables back past the toroid within one diameter of the toroid Trying to cram cables into a small space reduces symmetry and may lead to problems which are difficult to solve iii Avoid placing the toroid near any device which produces magnetic fields This includes bus bars transformers or other cables Try to maintain several toroid diameters clearance iv Many small cables tend to be worse than say three large ones Try to position the toroid in the circuit with this in mind Toroids used for core balance earth leakage protection cannot have bus bars passed through the toroid vi To prevent possible nuisance tripping it is suggested that the conductor screen of the earth leakage toroid should be earthed one end only the relay end If both ends are earthed
9. of Earth Leakage Protection Earth Leakage Protection Relays for use in mining applications have to be designed and tested to AS NZS 2081 3 2002 for use on fault limited systems There are two methods of protection used They are the Core Balance and the Series Neutral earth leakage protection systems The Core Balance relay performs the primary protection in an installation protecting the outlet supplying power to a machine In this application the time delay is set at instantaneous The neutral earth leakage relay is the backup relay of the installation and can have a time delay up to a maximum of 500mS 4 3 1 Balance Protection With this method the three phases are passed symmetrically through the toroid If there is no earth fault present the vector sum of the currents in a three phase supply is zero If current from any phase flows to earth the toroid flux becomes unbalanced The toroid produces an output which trips the relay A test current is injected through the window of the toroid to test the operation of the relay See typical circuit Page 16 Drawings 4 3 2 Series Neutral Protection With this method the neutral is passed through the toroid An earth fault on any of the phase conductors causes an earth current which returns through the toroid to the star point of the transformer A test circuit can connect a test resistor between a phase and earth or inject a current through the toroid as previously described The t
10. 2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 Table of Contents Safety and other 6 drare 1 Copyright 2 2 DVIS CLAN IGE 2 Before gt 2 Ampcontrol Electronics Contact details 2 1 4 7 rare 4 1 2 Storage after Delivery 4 1 3 Unpacking 4 2 5 2 1 Personnel Safety 06 2 2 2002202 5 2 1 1 Relevant 22 5 21 2 Safety COMMUNICATION 5 2 2 Use E 5 2 2 1 5 2 2 2 Equipment
11. 3kV SYSTEMS WILL ONLY COMPLY WITH AS4871 IF NER MONITOR FITTED AS IT DOES NOT TEST MAIN NER SUITABLE FOR COAL MINES Laad ELDBO06R8 docx Page 16 AMPCONTROL A Hi ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 NER 4 Remote Monitorin 1 supply ternative 7 2 Output 1 4 20 85 208 Relay Contacts NO 8 or Remote Indication Meter Shown the i De energised State 7 onh 2 2 Ext Reset MOVAC CONTROL TX ij 3 PWR ELD Non Foil Safe Link Pui ie 3 ae Eart Link 2 Yee T 8 m Link 1 27 1 1 CT sig ee Toraidal Current Transformer LOOP RESISTANCE lt tohm ceca Rtest TEST E TEST CURRENT E L TRIP CURRENT 20 leg 180chm 70W NOVAC 545mA e NER Remote Monitarin Incomin lternoti id Supply 5 1 4 20mA 10 30 9 4 kan a a S PLC Analog Input Relay Contacts NO 8 TD or Remote Indication Meter Shown in the De energised State Let j 2 2 Ext Reset 0007 NO 119 CONTROL TX j
12. 7 1 Analog Input Relay Contacts NO Remote Indication Meter Shown in the i De energised State Lt aM aa PR Ext Reset 7777 10 CONTROL TX 4 Ag S Non Fail Safe Link 3 fie l J Link 3 Earth Link 2 y CT com fiz Link 1 72 2 i 4 CT sig 2 lt N Taraidal Current TSOEN LOOP RESISTANCE lt tohm Rtest TEST a TEST CURRENT TRIP CURRENT 20 180chm 70W 10 545mA MOV SYSTEMS SINGLE PHASE NER MONITOR A NER Remate Monitarin Incoming Alternative Toraid Output 3 Supply Positian g 1 4 20 ae 8 20 7 Analog Input a Relay Contacts 402 18 Remote Indication Meter Shown in the a i De energised State a ee Ext Reset 7 NO a 110 CONTROL TX 4 ii ey Pa ig Non Fail Safe Link i PwR I 4 Link 3 T 8 Earthy p Link 2 7 CT col fiz T2 TEST i H 99 CT sig V2 E ET ee 4 Toroidal Current Rtest Transformer LOOP RESISTANCE lt tohm TEST CURRENT EZL TRIP CURRENT 20 180 70W NOVAC 545mA 1 amp 3
13. BO06R8 docx Page 6 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 4 The Need for Earth Leakage Protection 4 1 Overview of Protection Problems Unless properly controlled the occurrence of an earth fault can be hazardous because it may cause to earth voltages dangerous to personnel Electric arcing which may initiate an explosion or fire when arcing occurs in an underground mining operation The main purpose of earth fault protection is to safeguard personnel and electrical apparatus However it is found that relays designed to operate on fault limited systems are not suitable for direct personal protection i e users of portable drills grinders etc which require trip levels of 20 30mA with instantaneous operation Refer AS NZS 3190 The most common apparatus faults in mining applications are cable faults Cables are most susceptible to damage and are the major source of dangerous electrical incidents This applies particularly to the flexible trailing cables supplying power to mobile mining machines Cable construction is such as to provide every phase conductor with an individual conductor screen so that crushing would cause a low single phase to earth fault current The protective device such as an Ampcontrol ELD earth leakage relay would then isolate the cable and contain the sparking within the cable before a heavy short circuit current due to a phase to phase fault occurs
14. at this product is disposed of correctly you will be helping to prevent potentially negative consequences for the environment and human health which could otherwise be caused by incorrect waste handling of this product ENVIRONMENTAL ALERT 8 Equipment List 115161 ELD V2 Earth Leakage Relay 101399 ELD DIN Rail Mounting Kit 120255 ELD ELC F Adaptor Kit 115437 25 mm ID 115637 60 mm ID 101656 112mm ID 144756 300mm ID 121581 ELD V2 User Manual ELDBOO6R8 docx Page 13 i MPCONTROL Appendix Drawings ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 Drawing Number Description ELDA001 General Arrangement with Cut out Details ELDE002 Typical Connection Diagram The drawings appear in the following pages in the same order in which they are listed in the table above ELDBO06R8 docx Page 14 9 sll a Bets Zod 1 1 82 39 AINNOW ANY 13 35 2 OLTALd WS TOULNOIdWY 52 0812313 TOULNOIdHY ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 ao A AMPCONTROL D pabjnaip JD JO 430d uj aayy 94 pafqns s 4 1 30 ALAIdO d JHL 5 38 SIHL
15. cables supply mobile electrical equipment The protection systems are designed to provide touch and step potentials of 50 Volts or less when all the systems are used collectively It should be clearly understood that unless all four types of protection is incorporated any design then personal protection touch and step potentials of 50V or less will need to be assessed by a competent person or authority The protection systems that cover coal shale mines and metalliferous mining are detailed in AS NZS 2081 Section 1 2 and 3 General requirements for electrical protection devices for use in coal and shale mines Section 5 Earth Continuity monitoring devices Section 6 Earth Leakage protection devices Section 7 Lockout Earth fault devices test before energization Section 4 Earth Fault Limitation impedance earthing Section 9 Frozen Contact Protection Devices The above standards are not a stand alone group and have been developed in co ordination with other standards being 51740 Underground mining substations AS1802 AS1300 Reticulation trailing and reeling cables AS1299 AS1300 Plugs adaptors couplers and receptacles AS NZS 4871 Electrical Equipment For Mines And Quarries Internationally accepted voltage time effects on the human body based on IEC479 Instructions for installation in accordance with accepted State and Federal Regulations Equipment maintained in accordance with industry standards ELD
16. erning possible impact on the environment and actions required for prevention and proper response ENVIRONMENTAL ALERT ELDBO06R8 docx Page 1 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 Copyright Notice No part of this publication may be reproduced transmitted or transcribed into any language by any means without the express written permission of Ampcontrol CSM Pty Ltd 7 Billbrooke Close Cameron Park NSW 2285 Australia Disclaimer Ampcontrol CSM Pty Ltd will make no warranties as to the contents of this documentation and specifically disclaims any implied warranties or fitness for any particular purpose Ampcontrol further reserves the right to alter the specification of the system and or manual without obligation to notify any person or organisation of these changes Before You Begin We would like to take a moment to thank you for purchasing the ELD V2 Earth Leakage Relay WARNING To ensure the correct and safe operation of this equipment the user is to become completely familiar with the safety requirements and correct operating procedures detailed in this user manual Ampcontrol Electronics Contact details Ampcontrol CSM Pty Ltd 7 Billbrooke Close Cameron Park NSW 2285 P 61 2 4903 4800 F 61 2 4903 4888 EMAIL electronicsorders ampcontrolgroup com WEB www ampcontrolgroup com ELDBO06R8 docx Page 2 AMPCONTROL ELD V
17. est resistor to earth method is recommended with this type of protection as this test also proves the neutral to earth connection See typical circuit Page 16 Drawings ELDBO06R8 docx Page 8 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 44 Earth Leakage Toroids Toroids current transformers are not ideal devices and if correct procedures are not followed during installation nuisance tripping can result If for example we consider a single phase earth leakage system where active and neutral pass through a toroid then at all times currents in the two wires are equal and opposite so that the net current through the toroid is zero An ideal current transformer would have all of the flux from each wire contained in the core and so would accurately add the opposing fluxes to get a net result of zero A real current transformer has leakage fluxes That is a very small proportion of the total flux from each cable is not contained in the core but in the space outside it and as a result it may link some turns but not others depending on the positioning of the cables The effect of this is that a small output may be obtained from the toroid where none would arise if the device were ideal The size of the error may vary from toroids of the same type because of slight differences in the core and the symmetry of the winding Problems caused in this way increase as the toroid size increases as currents increase
18. evel while the reset button is held closed and will continue to flash for 1 second after the reset button is released 5 4 Toroids The ELD V2 Relay is designed for use with EL500S series Toroids They are available with window sizes 25 60 amp 112mm These allow trip settings from 100mA to 2500mA 5 5 Mode of Operation To comply with AS NZS 2081 3 2002 the relay can only be operated in the fail safe mode This is the default mode where the relay drops out on fault or loss of power Power to the relay is from the line side of the isolating device or from an independent supply 6 Specifications Relay Supply Volts 25 6 132VAC 20 185VDC Power Consumption Approx 4VA 4 20mA Output The Loop Powered current output represents the leakage current as a percentage of the trip level 4mA gt 0 leakage 20mA gt 120 leakage 100 17 33mA Maximum Loop Resistance Vs 10 x 50 where Vs must be greater than 10VDC and less than 30VDC 4 20mA accuracy 2 of full scale Relay Contacts 1 N O 1 Rated at 5 250 Relay to Toroid Loop resistance lt 1 ohm Dimensions Overall 77 W x47 Hx 116 D mm Cut out 69 W x 39 H mm ELDB006R8 docx Page 11 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 Trip and Time Delay Settings Two separate rotary 16 position switches set the trip and time delay parameters of the relay S
19. h indicates the of leakage level being detected This reading can be remotely monitored displayed using the 4 20mA Output of the Relay When the relay measures currents with frequencies much greater than 50Hz the bar graph LED fast flashes 5Hz instead of being steady Should the high frequency current persist until the time delay is exceeded the relay will trip and the Har Trip LED Harmonic Trip will be illuminated The ELD V2 Earth Leakage Relay is housed in a stainless steel case and can be either DIN Rail mounted or Panel Mounted through 69 x 39mm cut out When panel mounted the front of the ELD Relay is designed to provide 56 ingress protection There is provision to prevent unauthorised adjustment of the trip settings by sealing the post in front of the knurled nut with a lead seal thus inhibiting the unauthorized removal of the front fascia cover An internal switch mode power supply allows the ELD to operate from 25 6VAC to 132VAC or 20VDC to 185VDC The ELD V2 Relay has been designed and tested for use on fault limited systems To ensure maximum protection the earth leakage system should be used in conjunction with the other protection systems covered by AS NZS 2081 The collective systems are designed to limit touch and step potentials The relay is also suitable for industry where equipment or system earth leakage protection is required The relay is not suitable for personal protection which requires trip
20. heck all items against the packing list or Bill of Landing If there are shortages or evidence of physical damage notify Ampcontrol immediately Notify Ampcontrol within 7 days maximum in case of shortages or discrepancies according to the packing list This action will help ensure a speedy resolution to any perceived problems Keep a record of all claims and correspondence Photographs are recommended Where practicable do not remove protective covers prior to installation unless there are indications of damage Boxes opened for inspection and inventory should be carefully repacked to ensure protection of the contents or else the parts should be packaged and stored in a safe place Examine all packing boxes wrappings and covers for items attached to them especially if the wrappings are to be discarded 1 2 Storage after Delivery Where equipment is not to be installed immediately proper storage is important to ensure protection of equipment and validity of warranty All equipment should be stored indoors protected from the elements in a cool dry area If storing on the ground ensure that the storage area is not an area where water will collect 1 3 Unpacking of Equipment The method of packing used will depend on the size and quantity of the equipment The following cautions should be interpreted as appropriate CAUTION Take care when unpacking crates as the contents may have shifted during transport Make sure that cable dr
21. levels of 20 30mA with instantaneous operation Refer AS NZS 3190 The ELD Relay continually monitors the toroid and if the connection is lost the relay will trip and flash the CT Fault LED See following Caution CAUTION The ELD relay includes a circuit for continually testing the toroid connection The resistance of the wiring between the relay and toroid must be kept below 1ohm If this is not done then a CT fault will be detected and the relay will trip 5 2 Methods of Earth Leakage Protection The ELD V2 Relay is suitable for the two methods of protection used They are the Core Balance and Series Neutral earth leakage protection systems See Section 4 3 Methods of Earth Leakage Protection for details ELDBO06R8 docx Page 10 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 5 3 Testing Procedure A test current is injected through the window of the toroid to test the operation of the relay See typical connection diagram on page 16Appendix A Drawings To reset the relay press the button located on the facia of the relay or provide an external normally open contact It is recommended that a twisted pair be used between the N O contact and the reset input The reset button is also used to access the memory of the processor to view the maximum level of leakage since the previous trip A section of the bar graph will slow flash 2 2 indicating the peak l
22. pplied has been manufactured within the guide lines of the relevant Australian Standards and state legislative requirements Equipment identified within this manual has been designed for a specific intended purpose therefore any modification or damage must be reported to the manufacturer for repair The instructions within this manual must be observed as an aid towards achieving maximum safety during operation 2 21 Changes to Equipment Changes in the design and modifications to the equipment are not permitted 2 2 2 Equipment Knowledge Experience with or understanding of this equipment is essential for the safe installation and removal of the equipment If in doubt contact Ampcontrol immediately Mechanical and or Electrical installation and maintenance of plant and equipment must only be carried out by appropriately trained qualified and competent personnel ELDBO06R8 docx Page 5 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 3 Overview of Earthing Protection 3 1 Protection Systems Earthing of electrical equipment associated machinery and structures is a seemingly simple practice and is covered adequately by the various applicable sections of Australian Standards AS3000 or AS3007 However in the mining industry earthing is somewhat more complex than normal domestic or commercial applications and requires other factors to be taken into consideration particularly where trailing and or reeling
23. the possibility exists for the shield to become an earth loop having finite resistance and injecting noise into the toroid leads CAUTION ELD relay includes a circuit for continually testing the toroid connection The resistance of the wiring between the relay and toroid must be kept below 1 If this is not done then a CT fault will be detected and the relay will trip ELDBO06R8 docx Page 9 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 5 ELD Earth Leakage Breaker Operation amp Testing 5 1 Description of Operation The Ampcontrol ELD V2 Earth Leakage Relay is electronic in design and is based on microprocessor technology The Healthy LED flashes to indicate correct operation of the microprocessor The Relay uses a toroid to measure earth fault current A definite time operating characteristic is provided with adjustable trip sensitivity and time delay When a fault occurs and the trip level and time delay is exceeded the relay s trip function is activated which operates the trip contacts connected in the system control circuit The trip LED is On when a trip occurs The trip condition is latched in non volatile memory and requires operation of the reset input to clear the trip condition An internal reset is also provided on the facia of the relay The relay LED is On to indicate the relay is energised A ten segment LED bar grap
24. ums are securely attached to their shipping pallets before attempting to move them if applicable The disposal of packaging materials replaced parts or components must comply with environmental restrictions without polluting the soil air or water a Ensure that any timber and cardboard used as packaging is disposed of in a safe and environmentally responsible manner enumonwenta Where possible dispose of all waste products i e oils metals plastic and rubber products ALERT by using an approved recycling service centre ELDBO06R8 docx Page 4 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 2 General Safety D 2 1 Personnel Safety Warnings 2 1 1 Relevant Personnel Ensure all personnel directly responsible or involved with the installation operation and maintenance of the equipment reference this manual in conjunction with any relevant risk assessments to identify all foreseeable hazards 2 1 2 Safety Communication All safety instructions and design requirements within this manual must be communicated to all users These requirements are necessary to identify and control any foreseeable risk associated with this piece of equipment In the event of any damage or malfunction that results in the potential to harm the health or safety of any person the owner operator should notify the manufacturer immediately 2 2 Safe Use of Equipment Equipment su
25. witch Position TripLevelmA Time Delay mS 0 100 50 1 150 100 2 200 150 3 250 200 4 300 250 5 350 300 F 2500 500 Read the following warning WARNING The above table refers to Version 2 of the ELD Relay designed and tested to AS NZS 2081 3 2002 Switch positions 9 to F have been modified from the Version 1 relay to comply with the 2002 version of the standard Verify you have the correct version of the relay by checking that V2 is printed on the fascia as shown in the image on the front cover of this document before selecting positions 9 to F of this table ELDBO06R8 docx Page 12 AMPCONTROL ELD V2 EARTH LEAKAGE RELAY Issue R8 Date 10 08 2011 CRN 8530 7 Maintenance amp Disposal 7 1 Equipment Maintenance WARNING The ELD has no user serviceable parts All repairs must be carried out by Ampcontrol personnel only If a fault develops return the ELD to Ampcontrol for repair It is essential that no attempt be made to repair the ELD as any attempt to STOP dismantle or repair the ELD can seriously compromise the safety of the unit and the consequence can be fatal The ELD V2 Earth Leakage Protection Relay does not have any customer serviceable parts and is not provided with any user adjustments 7 2 Disposal of System Parts 4 The electronic equipment discussed this manual must not be treated as general waste By ensuring th