Home

Installation and operating instructions

image

Contents

1. A nonflammable granite sandstone concrete bricks ceramic tiles mortars fire stopping B hardly flammable plasters C heavily flammable akumin izumin heraklit lignos basalt plates and felts fibre glass boards C2 moderately beech wood oak wood hobrex plates plywoods werzalit formica sirkolit flammable pine wood larch wood spruce wood chipboard and cork slabs rubber flooring C3 easily flammable materials asphalt pasteboards pressed fibre boards cellulose materials polyurethan styrofoam polyethylene PVC Fuel location It is strictly forbidden to place the fuel behind the boiler or store it next to the boiler within a distance smaller than 800 mm It is strictly forbidden to place the fuel between two boilers in the boiler room The producer recommends to keep the minimum distance of 1000 mm between the boiler and fuel or place the fuel into a room being separated from the room where the boiler has been installed 5 3 Installation into the heating system The protecting equipment against overheating is not necessary in the event of using an open expansion reservoir Any heat source within the open thermal system must be connected to the open expansion reservoir being located in the highest thermal system point The expansion reservoirs must be dimensioned so that they are able to take hold of water volume changes incurred by heating and cooling processes These open expan
2. 4201 Designing of chimneys and smoke stacks c With regards to fire regulations CSN 06 1008 Fire safety of heat installations CSN EN 13 501 1 Fire technical material properties Building material combustibility grades d To the system for TUV heating CSN 06 0320 Heating systems in buildings Hot water preparation Designing and projection CSN 06 0830 Heating systems in buildings Protecting equipment CSN 73 6660 Water distribution pipes 5 2 Location options The UNI boiler must be installed in a separate boiler room specifically modified for heating purposes The boiler room area should be sufficient to enable the boiler installation and maintenance It must be secured a satisfactory fresh air circulation for the combustion process The chimney structure must ensure the appropriate draught with regards to the respective boiler type and must meet the building criteria mentioned further in this manual and binding regulations You can never install the boiler within open spaces or terraces inside premises inhabited by people as kitchens living rooms bathrooms bedrooms or in areas where explosive or flammable materials are stored It is recommended to install the boiler onto a fire proof concrete base The base minimum dimensions are stated within the following table Model UNI UNI UNI UNI UNI UNI 3 4 5 6 7 8 Base height mm 50 Base width mm 600 Base length mm 385 490 5
3. boiler drum and cardboard package containing the boiler shell and insulation are placed side by side on a palette while boiler accessories are inserted inside the boiler drum The boiler must not turn over during the transportation Accessories delivered regularly together with the boiler Draught controller Suspension plate Cleaning brush Scraper Fire hook Thermomanometer mounted on the boiler shell upper cover Obligatory accessories for closed heating systems Two way safety valve DBV 1 02 This equipment may not be used in the case of open heating systems 4 1 Delivery and accessories Standard boiler delivery e Boiler on the palette e Shell in the cardboard package including insulation e Ashtray inside the boiler drum e Cleaning tools cleaning brush scraper fire hook Thermomanometer mounted on the boiler shell upper cover 1 piece e Filling and discharge cock Js 1 2 1 piece mounted on the boiler drum e Draught controller 1 piece Smoke flap control label 1 piece e Shell connection accessories in the shell cardboard package e Heating and return water flange 2 2 pieces mounted on the boiler drum Commercial and technical documentation Essential accessories not included within the delivery e Two way safety valve DBV 1 02 This equipment may not be used in the case of open heating systems e Safety valve 1 piece At customer s request not included within the delivery e
4. impurities formed inside the valve Clean up the filter fitted on the cooling water inlet Heat removal equipment storage reservoirs It is recommended to install a storage reservoir in case the required volume exceeds 300 litres A calculation of the stack exchanger smallest volume Vsp 15Tb x Qn 1 0 3 x QH Qmin Where Vsp storage reservoir volume in litres Qn nominal heat output in kW Tb burning time in hours Qu building thermal load in kW Qmin lowest heat output in kW The storage reservoir dimensions at central heating boilers operated with single specified fuels must be determined according to the output of the largest storage reservoir However this storage reservoir is not necessary if the calculated volume is smaller than 300 I 5 5 Chimney connector The UNI boiler must be connected to an independent chimney ensuring at least the required minimum draught The smoke stack between the boiler and chimney should be insulated with mineral wool The smoke stack leading to the chimney and chimney itself must be made out of steel or equivalent material which may be used at temperatures around 400 All joints of the exhausting system must be sealed to enable a good burning and high efficiency The smoke stack must be attached to the chimney through the shortest way possible and shall comply with dimensions stated within the subsequent scheme Any horizontal connections and equipment increasing the pressure losses a
5. upper cover onto side shell parts insert the fastening pins into prepared feathers 5 Put the rear shell part on and bolt it to the side and upper shell parts with the aid of screws Filling the heating system with water The water hardness must meet requirements of CSN 07 7401 if it be to the contrary treat the water as given in the chapter No 5 1 Heating systems fitted with the open expansion reservoir enable a direct contact of the heating water with atmosphere In the course of heating period the water expanding in the reservoir absorbs oxygen which enhances its corrosive effects and at the same time evaporates significantly For refilling the system only water treated onto values complying with CSN 07 7401 can be used The heating system must be thoroughly rinsed to remove all impurities It is necessary to maintain a stable water volume in the heating system during the course of heating period When adding water into the heating system it is inevitable to look out for preventing any air induction into the system Water from the boiler and heating system must never be drained or taken at disposal except for cases indispensably needed e g in the event of repairs etc A drainage and filling of new water increase the danger of corrosion and scale forming If it is necessary to refill water into the heating system add it only into a chilled boiler in order to avoid disruptions of sectional boiler elements After filling the boiler a
6. 13 TS 79 2 18 J Ashtray door insulation C _ Screw M6x40 19 Primary air choker D__ Nut M6 TS1026 1 20 Primary air choker axis F Washer A8 4 TS79 2 22 _ Feeding door handle G__ Nut M8 TS1026 1 23 _ Door handle fixing screw H Screw M8x15 24 Door handle Screw M8x20 25 Combustion chamber door J Screw M6x30 26 __ Swivel K Screw M10x25 27 Combustion chamber door suspension M___ Washer A10 5 TS 79 2 28 _ Upper door suspension N Retaining stirrup ring 29 Bottom door suspension R Screw M6x12 30 Door closure bushing S Screw M10x40 31 _ Door closure pin T __ Nut M10 TS1026 1 32 Smoke extension OPOP s r o Boiler serial number 2 Ek kK KEK KK KK KK KK KK KK kk Boiler ana PEE ETTET T E E T AE E EET Address street city POSICOQE neaei e aaa E OA AAE EEEE A EA A A A EE O ee AE GEA TAa E EE EARE aA Boiler meets the following requirements CSN EN 5 Boilers for central heating systems Part 5 Central heating solid fuel boiler with manual or automatic fuel supply and maximum nominal output of 300 kW terminology requirements testing and marking Manufacturer provides the following warranty Boiler 24 months since the date of putting the product into operation 30 months at most since the date of dispatching from the manufacturing plant Boiler drum 5 years since the date of dispatching from the manufacturing plant Conditions for the warranty validity Boiler installation and putting int
7. 2 Height H2 mm 1070 Width A mm 520 Length L mm 432 537 642 747 852 957 Fuel type Wooden logs Output kW 13 19 5 24 27 30 5 33 8 Efficiency 62 67 5 Boiler class 1 Maximum loading combustion time h 2 up to 4 Required fuel parameters Maximum water content 20 Recommended cross section 10 cm x 10 cm Average calorific value 14 18 MJ kg Flue gas average temperature C 220 300 Required chimney draught j 0 15 0 15 0 15 0 15 0 15 mpar 0150 igi 0 25 0 26 0 27 0 28 Boiler hydraulic loss at At 20 C mbar 0 13 0 51 1 03 1 81 2 92 4 63 Average CO content at 10 O01 mg m 8 500 10 800 Fuel type Black coal Output kW 16 5 20 28 35 44 53 Efficiency 70 6 76 6 Boiler class 2 Maximum loading combustion time h 4 up to 6 Required fuel parameters Maximum water content 15 Recommended size between 30 up to 60 mm Average calorific value 26 28 MJ kg Flue gas average temperature C 220 320 Required chimney draught 7 0 15 0 15 0 15 0 15 0 15 mbar 0 19 02 0 22 0 25 0 26 0 27 0 28 Boiler hydraulic loss at At 20 C mbar 0 24 0 76 1 46 2 47 3 90 5 84 Average CO content at 10 OU mgm 4900 7400 b a Opening to connect the discharge valve R 1 Figure No 1 Boiler schematic illustration 4 Delivery and accessories The UNI boiler is delivered as follows complete
8. 95 700 805 910 Free space The below indicated minimum free space should be available around the boiler 40 cm 100 cm 60 cm i 40 cm Figure No 2 Free space Safety distance from flammable materials When installing and operating the boiler it is necessary to observe the safety distance of 200 mm from flammable materials with B C and C combustibility grades according to CSN 06 1008 Regarding easily flammable materials with C3 combustibility grade that burn quickly and alone even after the ignition source has been removed e g paper pasteboard cardboard asphalt and tar pasteboards wood and wood fibre boards plastics flooring materials the safety distance must be doubled to 400 mm The safety distance must be also doubled if the building material combustibility grade has not been proven The boiler location with regards to the necessary handling space Basic environment AA5 AB5 according to CSN 33 2000 3 Minimum handling space of 1000 mm should be reserved in front of the boiler Minimum distance between the rear boiler part and wall makes 600 mm Minimum space of 400 mm for accessing the rear boiler part must be reserved from one side at least Combustibility grades of building materials and products Combustibility grades of Building materials and products classified according to their combustibility grade building materials and selection from CSN EN 13 501 1 products
9. Filter 3 4 for a boiler equipped with the two way safety valve DBV 1 02 The boiler equipment ordered as essential accessories and at customer s request is not included within the basic boiler price 5 Location and installation 5 1 Regulations and directions The solid fuel boiler can be installed only by a specialized company validly authorized to execute its installation and maintenance An installation project according to applicable regulations is required Before installing the boiler onto an older heating system the installation company has to rinse out clean up the whole system The heating system must be filled with water corresponding to CSN 07 7401 and especially its hardness cannot exceed the required parameters In case the two way safety device reacts adding the water that does not comply with CSN 077401 it is necessary to treat the water inside the system so that it meets again requirements of this standard a To the heating system CSN 06 0310 Heating systems in buildings Designing and installation CSN 06 0830 Heating systems in buildings Protecting equipment CSN 07 7401 Water and steam for thermal energy devices with operating steam pressure up to 8 Mpa CSN EN 303 5 Boilers for central heating systems Part 5 Central heating solid fuel boiler with manual or automatic fuel supply and maximum nominal output of 300 kW terminology requirements testing and marking b To the chimney CSN 73
10. UNI Cast iron solid fuel boiler Installation and operating instructions Content OT PAG JO t 8 9 10 11 12 Introduction Characteristics of boilers Technical parameters Delivery and accessories Location and installation 5 1 Regulations and directions 5 2 Location options 5 3 Installation into the heating system 5 4 Surplus heat removal equipment 5 5 Chimney connector 5 6 Installation procedure Operating instructions 6 1 Putting into operation instructions for a specialized service organization 6 2 Putting the boiler into operation 6 3 Firing 6 4 Operation 6 5 Fuel Maintenance and cleaning 7 1 Maintenance 7 2 Regular inspections 7 3 Boiler cleaning 7 4 Annual inspection Health and safety information Important warnings Guidelines on the product end of life disposal Warranty and liability for defects Certificate of warranty 1 INTRODUCTION Thank you for buying the boiler UNI Please read carefully this manual before installing and putting the product into operation and keep it during the whole time of its service life Do not touch or intervene in any parts of the product unless it is explicitly allowed The installation maintenance and service of this boiler can be performed only by technicians of a specialized service agency This manual as well as necessary regulations have to be observed when installing the boiler and specifying its correct location at establishing the wat
11. acks of the boiler drum due to high thermal energy e Ifthe draught controller does not work properly change its adjustment step by step as described in the draught controller manual e Ifthe chimney draught is not sufficient or completely missing e g the chimney is blocked uninsulated or built incorrectly etc you can experience combustion difficulties no fire excessive smoking condensation resulting from the cold flue gases In this case it is strictly recommended to inspect the chimney by an expert and repair all possible irregularities Your boiler has been designed on the principle of natural draught therefore the correct chimney installation is so important 10 Guidelines on the product end of life disposal It is recommended to dispose the wrappage as follows Plastic foil cardboard package use the junk services Metal strapping tape use the junk services Wooden base is disposable and cannot be further utilized as a product Its liquidation is subject to the law No 94 2004 Coll and 185 2001 Coll as subsequently amended Because the product is made out of ordinary metal materials it is recommended to dispose single components as follows Exchanger grey cast iron use the junk services Conduits shell use the junk services Other metal parts use the junk services Insulation material ISOVER use a company dealing with waste collection and disposal 11 Warranty and liabilit
12. alve DVB 1 02 ON Bho Se ale ji t O 1 Boiler 2 Two way safety valve DBV 1 02 3 Protection valve 4 Reduction valve 5 Filter 6 Ball cock 7 Pump 8 Surplus heat removal 9 Draining cock Cold water inlet Il Heating water outlet IlI Return water inlet Figure No 5 Recommended scheme of connecting the two way safety valve DBV 1 02 Technical data of the two way safety valve DBV 1 02 manufactured by the company Regulus Opening temperature limit value 100 C 0 5 C Maximum temperature 120 C Maximum pressure on the boiler part 300 kPa Maximum pressure on the water part 600 kPa Nominal flow at delta p 100 kPa 1 9 m h Application The two way safety valve DBV 1 02 is intended to protect the central heating boilers against overheating The draining and filling valve inside the valve body is controlled by a thermostatic element When the limit temperature is reached draining and filling valves are opened simultaneously which means that the cold water flows into the boiler while the hot water is drained off When the temperature drops below the limit value draining and filling valves are closed at the same time ATTENTION This does not supersede the protection valve In case the two way safety device reacts adding the water that does not comply with SN 077401 it is necessary to treat the water inside the system so th
13. at it meets again requirements of this standard Installation The installation can be performed only by a professionally competent person In order to secure a correct function of the thermostatic two way safety valve it is necessary to adhere to specified conditions of its installation and respect the flow direction marking on the valve body The safety valve should be always mounted into the outlet boiler pipeline or directly onto the boiler in its upper part where the heated water leaves the boiler being distributed into the heating system When attaching the valve it is essential to check whether the usage of 3 4 sleeve piece that can be mounted either inside the pipeline or on the boiler ensures a full submersion of the thermostatic valve element following the valve installation After mounting into the sleeve piece the discharge conduit draining the hot water from the boiler shall be connected at the point C figure No 4 The inlet of cold water according to the figure No 5 that ensures the boiler cooling after the valve is put into operation shall be connected at the point A figure No 4 A filter for retaining mechanical impurities must be fitted onto the cooling water inlet At the point B figure No 4 a conduit shall be attached leading into the heating system reverse pipe in the boiler vicinity according to the figure No 5 Regular maintenance Turn the safety valve head once a year to remove pertinent
14. cted about the appliance usage by a person responsible for their safety e Children should be watched in order to ensure that they do not play with the equipment e In case the flammable vapours or gas may be created and released into the boiler room or when performing activities during which a temporary risk of fire or explosion may occur gluing of floor clothes coating with flammable paints the boiler must be put out of operation before commencing such activities e Itis FORBIDDEN to use flammable liquids for firing the boiler e It is FORBIDDEN to overheat the boiler during its operation e No subjects made out of flammable materials may be placed on the boiler or within a distance shorter than the safety distance e When removing ash from the boiler no flammable materials may be placed within the minimum distance of 1500 mm around the boiler e When operating the boiler at temperatures lower than 60 C a moisture condensation on the boiler drum may occur so called low temperature corrosion which shortens the boiler drum service life Therefore it is recommended to operate the boiler at temperatures above 60 C e After the heating season it is necessary to clean up thoroughly the boiler smoke stacks and smoke extension Lubricate the pivots smoke flap mechanism and other movable boiler parts with graphite grease Keep the boiler room clean and dry e Pertinent signs of corrosion on the boiler drum cannot be considered as defects and
15. d or sharp edges Pressure equipment 1 Avoid contacts with pressure parts of the heating system during the boiler operation These dangerous parts are Boiler sectional elements Boiler input and output conduit Safety conduit Pressure protection equipment mounted on the heating system 2 Never attempt to drain water from the heating system while the boiler is operating 3 Never and by any reason feed cold water directly into the boiler while it is operating and hot if you do it the boiler sectional elements may be damaged cracks When using the two way safety valve DBV 1 02 the cooling water is gradually added into return water High temperature surfaces Avoid contacts with high temperature parts and surfaces being dangerous for humans as further indicated Boiler feeding door Ashtray door in the front Water input and output conduit although it is insulated safety conduit Smoke stack Connector between the smoke stack outlet and chimney Circulating pumps expansion reservoirs Boiler room 1 Make sure that the boiler room can be easily left in the case of emergency related to the heating system 2 Do not leave the solid fuels and auxiliary material kindling paper etc for firing the boiler within the distance shorter than 800 mm from the boiler 3 Do not cover openings that supply fresh air into the boiler room because the air supply is very important for good burning Flue gases 1 When the feeding door is ope
16. do not affect the boiler function e The system must be fitted with a protection valve maximum overpressure of 300 kPa dimensioned in accordance with the nominal boiler output If you have any other questions please address the respective specialized installation companies and service organizations e Incase the two way safety device reacts adding the water that does not comply with CSN 077401 it is necessary to treat the water inside the system so that it meets again requirements of this standard e The UNI boiler must be connected to a suitable separate chimney designed in compliance with instructions stated further within this manual and mandatory regulations The chimney must show the draught values required for the given boiler model The boiler may not be operated unless the chimney connector is ready and sufficient burning draught ensured e Always ensure a satisfactory fresh air supply into the boiler room see the instructions for placing and installing the boiler e Do not install the boiler within an area being shared or used by persons or in the place with any direct openings to habitable rooms e Ifthe hydraulic circle is not equipped with the safety heat exchanger system according to instructions provided in this manual the boiler must be installed into the open system e Do not drain any water from the hydraulic circle except for the cases of maintenance or risk of frost The hydraulic system may be refilled with the anti free
17. er connection and structuring the chimney 2 CHARACTERISTICS OF BOILERS The UNI boiler is a cast iron sectional boiler for burning solid fuels with three draught design It is intended for hot water heating of single family houses and other objects The three draught boiler design enables to achieve a high efficiency and low emission values The boiler can be used both in gravity central heating systems and systems with forced circulation The boiler burns wood and black coal fuel specifications are given further in this manual Because the heating powers of single solid fuels differ from each other the boiler output varies between the stated maximum and minimum values Coke can be utilized as an alternative fuel 3 Technical parameters Model UNI 3 UNI 4 UNI 5 UNI 6 UNI 7 UNI 8 Number of sectional boiler elements 3 4 5 6 7 8 Fuels Wooden logs black coal Output range 13 19 5 30 5 33 8 kW 16 5 20 24 28 27 35 44 53 Weight kg 190 235 280 325 370 415 Water volume l 22 28 34 40 46 52 Combustion chamber volume dm3 33 0 51 6 70 3 89 1 107 8 126 5 Maximum height of the loaded fuel mm 280 Heating water service temperature C 60 up to 90 range Minimum return water temperature C 60 recommended Safety system activated at C 95 Maximum service pressure bar 3 Flue gas outlet diameter mm 160 Water inlet outlet connections
18. flue gases into the area of boiler room If a leakage occurs the draught controller must be totally inactivated close the choker completely 5 In the morning recover the boiler operation by unclosing the smoke flap and raking up the fire grate after the ashtray door is opened 6 Ashtray door must be permanently closed during the boiler operation 7 Empty the ashtray according to needs it is necessary to use gloves 8 When using shut off valves it is necessary to install the protection valve between the boiler and shut off valve 9 It is recommended to clean up the filter after the heating test is finished and subsequently before starting the heating period Figure No 8 Auxiliary air choker Suspension plate UNI is a three draught boiler It is equipped with a suspension plate 50 on the boiler front sectional element to avoid leakage of flue gases from the boiler when the upper door is opened The suspension plate also protects the upper door against overheating Figure No 9 Suspension plate You can lift the suspension plate when feeding a new fuel however keep it always in the right position to maintain an efficient combustion 6 5 Fuel The fuel must meet the data presented within the section on technical parameters The manufacturer does not bear any liability for problems caused by using fuels that are not suitable with respect to this boiler 7 MAINTENANCE AND CLEANING A regular maintenance perfor
19. he two way safety valve DBV 1 02 1 Place the boiler drum onto a base wall pad 2 Connect the heating water flange to the heating system 3 Connect the return water bottom flange to the heating system 4 Connect the two way safety valve DBV 1 02 according to the figure No 5 to the return heating water flange cooling water inlet and surplus heat outlet 5 Put the smoke extension on the smoke pipe and insert into the chimney opening 6 Screw the draught controller into the opening in the upper part of the front sectional boiler element The procedure of adjusting the boiler draught controller is presented within the manual enclosed to the respective controller Shell installation 1 Remove shells from the cardboard package 2 Put the left and right shell part on the anchoring screws and fix them to the boiler drum in the front part using screws and nuts right part with the aid of screws 3 pieces left part with the aid of nuts 3 pieces at the same time they serve for attaching the suspensions of feeding and ashtray doors 3 The thermomanometer is already inserted in the upper shell part Insert the temperature gauge into the thermometer well located in the upper part of the front boiler drum sectional element and insert the pressure gauge into the well of outgoing heating water flange The pressure gauge capillary must not touch the boiler drum 4 Install 4 pieces of fastening pins into the upper shell part Put the
20. ler output can be roughly regulated by changing the chimney draught with the aid of smoke flap inside the smoke extension A fine output regulation is achieved by using the auxiliary air choker that adjusts the air supply under the fire grate through the draught controller Set up the draught controller so that the ashtray door choker is almost closed when the required heating water temperature has been reached 2 During the operation the boiler must be refueled depending on the heat requirements and combustion intensity Feed the fuel so that the fuel layer is evenly high along the whole boiler depth The fuel should be added up to the maximum height of 2 cm below the bottom margin of feeding space opening 3 When burning black coal or wood it is necessary to keep slightly open the auxiliary air inlet of the feeding door all the time during which the gases and flames from the freshly fed fuel are evolving If adding any new fuel open slightly the feeding door by about 2 cm and wait for 10 seconds approximately until the flue gases are exhausted into the chimney Afterwards you may open the door completely 4 When changing over to the lowered night service clean up the fire grate let the freshly fed fuel burn up well and then suppress the boiler output by choking the chimney draught with the aid of smoke flap located in the smoke extension and closing the auxiliary air inlet flap in the feeding door It is always necessary to prevent any leakage of
21. med by skilled personnel in compliance with the manufacturer s instructions is necessary for ensuring the effective system operation 7 1 Maintenance Remove ash from the ashtray during the boiler operation several times a day depending on the used fuel because the full ashtray prevents the correct distribution of combustion air under the fuel and causes uneven fire penetration of the fuel laid on the grate Remove all residues from the combustion chamber especially slag before any new firing and in the course of the morning recovery of boiler operation The ash should be gathered into non flammable containers equipped with a cover When working use protective means and pay attention to your personal safety While burning black coal or wood clean up regularly the boiler walls inside the combustion chamber boiler smoke draughts and smoke extension using a brush when the boiler is cooled down and temperature does not exceeds 40 C once a month When using fuels with larger evolution of gas and tar deposits contaminate the walls of combustion area remove them by burning dry and hard wood while putting the boiler onto the maximum service temperature Attend properly the smoke flap swivels and pivots of all doors after the heating season is over 7 2 Regular inspections In the case of open system check the water level inside the expansion reservoir In the case of closed system deaerate the whole heating system and adjust the system water
22. nd heating system it is essential to check the tightness of all joints When using the two way safety valve DBV 1 02 the cooling water is added gradually into return water The termination of installation and heating test execution must be recorded in the Certificate of warranty 6 OPERATING INSTRUCTIONS 6 1 Putting into operation instructions for a specialized service organization The boiler can be put into operation only by specialized installation companies entitled to performing all respective activities Inspection activities before the start u Before putting the boiler into operation it is necessary to check a Filling the heating system with water check of the thermomanometer and system tightness b Connection to the chimney this connection can be done only upon approval of the respective chimney company chimney revision c Functionality of the draught controller and thermostatic valve 6 2 Putting the boiler into operation 1 Fire the boiler 2 Set the boiler to the needed service temperature recommended temperature of the outgoing water is 80T 3 Adjust the draught controller including the chain length in accordance with the enclosed draught controller instructions 4 Check the functionality of safety equipment against overheating two way safety valve DBV 1 02 5 Run the boiler under operating conditions in compliance with respective standards 6 Recheck the boiler tightness 7 Inform the use
23. ndant solid fuels are consumed quickly In such a case it is recommended to reduce the air supply either by the primary air flap or smoke flap e Check the surfaces transferring the heat from cast iron elements The soot formation will vary in dependence on the kind of fuel that you are using and combustion air quantity If you feel that the outgoing water temperature cannot reach the usual value under the same conditions it is recommended to clean up the boiler heating surfaces 7 3 Boiler cleaning Before cleaning the boiler switch off the pump and other electrical appliances in the boiler room Clean up the boiler only when it is cooled When cleaning the boiler remove the suspension plate 50 shown in the figure No 11 When cleaning the boiler Clean up all heating surfaces using the brush supplied together with the boiler Clean up the flue gas routes using the supplied brush Sweep the deposited soot down to the ashtray area Remove the waste Figure No 10 Procedure of removing the suspension plate Annual inspection Before any heating season it is recommended to invite a representative of specialized service organization to inspect the condition of boiler heating system electrical connections and chimney Do not attempt to perform any maintenance work without assistance of qualified persons 8 HEALTH AND SAFETY INFORMATION Sharp edges Give attention when handling iron plate panels having unsecure
24. ned a small amount of gas can be released on the front boiler side Never inhale this gas 2 When feeding solid fuels while the combustion chamber interior is glowing protect your hands and face Use protective gloves Fuel combustion 1 Do not remove the fuel from combustion chamber while still burning 2 Do not attempt to extinguish the burning fuel with water or other liquids 3 Do not leave the feeding door or ashtray door opened while the fire is still present inside the combustion chamber 4 Close the air inlets and chimney outlets when trying to slow down the fire or stop it 5 Your boiler can burn only solid fuels specified within the section Technical parameters Never use any different solid fuel which can be harmful to the structure of boiler sectional elements as well as any liquid or gas fuel o IMPORTANT WARNINGS A Adhere to safety instructions when installing and running the UNI boiler e The boiler can be operated only by adult persons familiar with these operating instructions It is unpermissible to leave children at the boiler beyond control of adults Interventions into the boiler design that could threaten the health of attending personnel or roommates are forbidden e The boiler is not intended for being operated by persons including children whose physical sensual or mental disability or lack of experience and knowledge inhibit them from a safe usage of the appliance unless being supervised or instru
25. o operation must be performed according to Boiler installation and operating instructions by a specialized installation company Removal of defects must be executed by a specialized service organization Completeness of the boiler delivery is guaranteed by the manufacturer This certificate of warranty is not valid if submitted blank User s confirmations The user confirms that the boiler has been adjusted by a specialized installation company and did not show any defect during the heating test The user confirms to have received Boiler installation and operating instructions together with properly executed Certificate of warranty and Certificate of quality The user confirms to have been acquainted with the boiler operation and maintenance Dispatch date Manufacturer s stamp Checked by signature Date of installation and putting Installation company User s signature into operation stamp signature Attachment to the certificate of warranty Records on executed warranty and after warranty repairs Entry Activity performed Specialized Client s date service signature organization signature stamp
26. pressure according to the water column height at maximum temperature of 40 C If the water level or pressure is below the level of water column height after the boiler is filled for the first time it is necessary to supply additional water into the system and deaerate it again The water to be added into the system must be treated in compliance with local regulations see the chapter 5 1 in order to avoid corrosion inside the heating circle and boiler The water refilling into the heating system can be done only if the boiler is cold otherwise the cast iron elements may crack Check the boiler front door whether the seal is functional Replace the door gaskets where appropriate Check the insulation condition inside the front door If it is damaged the front door surface temperature would be higher In this case it is necessary to replace the insulation in order to save energy and prevent further cracking Check whether flue gases leak from the chimney connector and get it repaired if they do e Check the correct function of draught controller in the boiler upper part In case of need you can easily adjust the controller to achieve better burning and output of your boiler If the combustion air amount is not sufficient you may observe an excessive soot deposition on heating surfaces and smoke evolution or smell Set up the flap of primary air so that larger air volume is sucked in for more efficient burning If the combustion air quantity is redu
27. r how to operate the boiler 8 Make entry into the certificate of warranty 6 3 Firing 1 Check the amount of water inside the heating system using the thermomanometer 2 Open the shutting armatures between the boiler and heating system 3 Check whether the chimney draught as regards the connected product is sufficient 4 Clean up the fire grate ashtray smoke stacks and boiler walls 5 Open the ashtray and flue gas chamber doors Lay the kindling and wood onto the cleaned fire grate along the whole boiler depth 6 Put the smoke flap inside the smoke extension to the position open and close the auxiliary air inlet of the feeding door 7 Fire the kindling through the open combustion chamber door and close it subsequently 8 The ashtray door should remain opened until the kindling fires perfectly It is recommended to lay another weaker layer of the basic fuel onto the burning kindling 9 Close the ashtray door after it fires well add further fuel through the feeding door up to its lower edge and align the fuel into an even layer along the whole boiler depth 10 Set the primary air supply using the draught controller after closing the ashtray door recommended temperature adjustment makes at least 70 TC 11 As soon as the fuel merges into deep red glow open slightly the auxiliary air inlet in the feeding door 6 4 Operation 1 After reaching the heating water temperature adjust the supply of combustion air The boi
28. s bends have to be excluded A compact vertical steel pipeline should not be used as the chimney The chimney must consist of one inner and one outer layer The outer layer can be made out of steel or bricks Regarding the inner layer stainless steel parts are preferred because of corrosion The space between the inner and h DRAUGHT LIMITER Sinton a outer layer must be insulated in order to prevent the oe z condensation in flue gases oa i al ewe A cleaning hole made out of steel and sealed against a possible leakage should be prepared at the lowest chimney level The smoke stack length between the boiler and chimney should not exceed 100 cm The chimney diameter must be by 10 larger than the smoke stack diameter on the boiler As regards the chimney total height and minimum inner diameter the following scheme should be taken into account with reference to the boiler output unless stated otherwise within respective binding regulations Figure No 6 Example of the chimney connection The highest outdoor chimney level should be in compliance with dimensions presented on the following sketch in order to minimize any harmful environmental impacts and improve the chimney draught Boiler output kw s ta s 70 Chimney height m Figure No 7 Determination of the chimney diameter 5 6 INSTALLATION PROCEDURE Boiler installation in the closed heating system with t
29. s caused by neglecting the water quality within the heating system see the chapter No 5 1 and 6 2 Defects caused by neglecting the instructions stated in this manual The manufacturer reserves the right to alterations resulting from the product innovations which may not be contained within this manual Se mL mi eo Oma no G aa Figure No 11 Boiler assembly Legend to the figure No 11 Positio Title Positio Title n n 1 Front sectional element 33 Smoke flap controller 2 Central sectional element 34 Smoke flap 2 Central sectional element with recess 35 Flange seal 3 Rear sectional element 36 Flange 4 Nipple 37 _ Draught controller 5 38 Right shell side part including Anchor bolt insulation 6 Boiler drum bottom 39 _ Left shell side part including insulation 7 Reduction 1 1 2 1 2 40 a 41 Upper shell part including insulation 8 Thermometer well R1 2 42 ___ Rear shell part including insulation 9 Plug 11 2 43 Thermomanometer 11 Feeding door cover 44 _ Identification label 12 Feeding door insulation 46 _ Ashtray 13 Special pad under the door insulation 49 Feeding door closure plate 14 __ Gasket diameter 12 mm 50 Suspension plate 15 __ Auxiliary air choker 51 Suspension plate hangers 16 _ Auxiliary air choker screw A___ Nut M12 TS1026 1 17 _ Ashtray door cover B Washer A
30. sion reservoirs have to be equipped with non shuttable aeration and overflow pipelines The overflow pipeline should be designed in order to drain off safely the highest flow quantity entering the system This can be reached through dimensioning the overflow pipeline by one DN higher than the filling pipeline The expansion reservoirs and respective connection pipelines must be designed and positioned so that their freezing is reliably prevented 1 Heat source 2 Expansion reservoir 3 Protecting pipeline 4 Expansion pipeline 5 Overflow pipeline 6 Filling pipeline 7 Water level limiter 8 Return pipeline Figure No 3 Examples of connecting the open expansion reservoirs 5 4 Surplus heat removal equipment The two way safety valve DBV 1 02 serves for removing the surplus heat in case the boiler water temperature exceeds 95 C This two way safety valve is connected to boiler flanges as shown in the figure No 5 If the system is fitted with the two way safety valve DBV 1 02 and the boiler becomes overheated incoming water temperature is higher than 95 C the two way safety valve creates a cold water cycle until the temperature decreases below the limit value At this moment the discharge cooling equipment and inlet of cold water being added into the system are closed simultaneously A cold water inlet B outlet to the boiler C outlet to the drain D inlet from the boiler Figure No 4 Two way safety v
31. y for defects Manufacturer provides the following warranty Boiler 24 months since the date of putting the product into operation 30 months at most since the date of dispatching from the manufacturing plant Boiler drum 5 years since the date of dispatching from the manufacturing plant The user is obliged to entrust a specialized installation company with putting the boiler into operation whereas all defects may be solved and removed only by a professional contractual service organization if this is not respected no warranty on the proper boiler function is applicable After filling in the form Certificate of quality and completeness of the UNI boiler it serves as the Certificate of warranty The user is obliged to perform a regular maintenance on the boiler Any notice of failures must always be made in writing and by phone without any delay after the respective defects have been found If the given instructions are not observed the warranty provided by the manufacturer cannot be recognized The manufacturer reserves the right to alterations resulting from the product innovations which may not be contained within this manual The warranty does not apply to Defects caused by incorrect installation procedures incorrect product operation or incorrect maintenance see the chapter 9 Damage of the product during the transportation or other mechanical damage Defects caused by incorrect storage conditions Defect
32. ze fluid Friterm e Do not feed cold water directly into the boiler overheated for any reason This might lead to cracking of boiler sectional elements When using the two way safety valve DBV 1 02 the cooling water is gradually added into return water e Do not fire the boiler with the front door opened e The heating system should enable the water flow corresponding to the boiler output and temperature difference between the incoming and return water should not exceed 20 TC e Check regularly whether the heating system is filled with water e Boilers should be installed directly onto a flat and smooth floor made out of non flammable materials It is recommended that the height of pedestal is 50 mm at least and its other dimensions are bigger than ground plan dimensions of the boiler This pedestal isolates the boiler from water spilled on the floor e Ifthe boiler is installed into an old heating system the heating system must be rinsed and cleaned from all contaminants before the boiler is connected e Your boiler cannot switch the pump on and off automatically The pump must be switched on if the boiler temperature is higher than temperature of cold water or if the fuel is burnt inside the combustion chamber Never switch the pump off unless the fire is completely quenched e Water in the boiler should never reach high temperatures when the pump is switched off In such a case an immediate supply of cold water into the hot boiler may cause cr

Download Pdf Manuals

image

Related Search

Related Contents

Bosch EXMB.007B mounting kit    EL-ES02FHQ  SHS1206 User`s manual  Bedienungsanleitung  +03_1929•r.1.1cap.5 humiFog F/D  User Manual for KNOT-O-METER - smt  Garantía - Sistemas de Bombeo  

Copyright © All rights reserved.
Failed to retrieve file