Home
Baxi EcoBlue Heat Owner's Manual
Contents
1. EcoBlue Heat 29 Notes 28 EcoBlue Heat 7212291 01 06 14 Notes 7212291 01 06 14 EcoBlue Heat 31 All descriptions and illustrations provided in this leaflet have been carefully prepared but we reserve the right to make changes and improvements in our products which may affect the accuracy of the information contained in this leaflet All goods are sold subject to our standard Conditions of Sale which are available on request BAXI A Trading Division of Baxi Heating UK Ltd 3879156 Brooks House Coventry Road Warwick CV34 4LL After Sales Service 0844 871 1525 Technical Enquiries 0844 871 1555 Website www baxi co uk e amp oe PART OF BDR THERMEA 7212291 7212291 01 06 14
2. 11 1 Energy Saving 11 2 Room Thermostats and Settings 7212291 01 06 14 Environmental 11 Tips on saving energy gt Do not cover radiators Do not hang curtains in front of radiators gt Install reflective panels behind the radiators to prevent heat losses Insulate the pipes in rooms that are not heated cellars and lofts Install loft insulation amp double glazing Use draught excluders where necessary Upgrade any older external controls Turn down room thermostats by 1 C Turn off radiators in rooms not in use Do not run hot or cold water pointlessly Fit a water saving shower head to save up to 40 energy Take showers rather than baths A bath consumes twice as much water and energy Y Y Y Y Y Y Y Y Y Various models of room thermostats are available The thermostat type and setting affect the total energy consumption A few tips gt Fully opening or closing thermostatic radiator valves result in unwanted temperature fluctuations Turn the thermostat knob or valve higher or lower in small steps gt Lower the thermostat to approximately 20 C This reduces heating costs and energy consumption gt When rooms are to be aired lower the thermostat well in advance gt When setting thermostats or programmers take account of days when nobody will be in and of holidays EcoBlue Heat 27 12 Warranty 12 Warranty 12 1 General Baxi would like to thank you for buying one of our app
3. 5 times within one hour sing the reset button Any repeating fault should be full Shutdown High Temperature G 9 7 TSP 19 z NIE 2 j investigated and appropriate remedial actions taken by your Input Protection installer or heateam 3 Flame Ignition Loss Fault If there is a continuous red light contact your installer or heateam g Communi ation Fan and inform them of the fault code displayed Fault Fault 5 Parameter Parameter Fault Fault 6 macro raer The R symbol indicates the flashing Status Light Flashing Flashing X X G Upper Horizontal Line Light ON gt ON LED OFF Lower Horizontal Line Light OFF 1 flash Time 1 flash Time XK R R Mo p l 2 rapid flashes Time 2 rapid flashes Time LED ON LED OFF RRR RRR NI l LED ON N RRR NR RRR LED ON LED OFF 4 rapid flashes Time 4 rapid flashes Time COO R RRR R II 5 rapid flashes Time 5 rapid flashes Time LED ON LED OFF CO RN RR N R LED ON LED OFF OFF 3 rapid flashes Time 3 rapid flashes Time 6 rapid flashes Time 6 rapid flashes Time EcoBlue Heat 7212291 01 06 14 8 2 Fault Finding Problem There is no domestic hot water and or the radiators are cold The boiler is not working The domestic hot water is not hot enough The radiators are not hot enough 7212291 01 06 14 Troublesh
4. Warn any other occupants and vacate the premises Telephone the National Gas Emergency Service on 0800 111 999 al GC Gl es IS The boiler can be isolated at the gas valve under the appliance by turning the tap through 90 1 4 turn For advice please contact your Installer Annual Service Provider or heateam The Service Division of Baxi You can contact heateam on telephone number 0844 871 1525 When contacting heateam it will be useful to have the benchmark checklist at the back of the Installation amp Service Manual to hand as it includes details relevant to the boiler and installation WARNING Do not touch flue chimney pipes Depending on the settings of the appliance the temperature of flue chimney pipes may exceed 60 C Do not touch radiators for long periods Depending on the settings of the appliance the temperature of radiators may reach 85 C Take precautions with domestic hot water Depending on the settings of the appliance domestic hot water temperature may reach 65 C CAUTION Do not neglect to service the appliance Contact a qualified professional or take out a maintenance contract for the annual servicing of the appliance EcoBlue Heat 2 2 2 10 Safety Recommendations EcoBlue Heat AN CAUTION Only qualified professionals are authorised to work on the appliance and the installation L For sealed systems regularly check the water L pressure in the s
5. 12291 01 06 14 Introduction 1 1 4 Abbreviations Glossary DHW Domestic Hot Water CH Central Heating GB Great Britain IE lreland BS British Standard HHIC Heating and Hotwater Industry Council Y Y Y Y V Y 1 5 Extent of Liabilities 1 5 1 Manufacturer s Liability Our products are manufactured in compliance with the requirements of the various european applicable Directives They are therefore delivered with C marking and all relevant documentation In the interest of customers we are continuously endeavouring to make improvements in product quality All the specifications stated in this document are therefore subject to change without notice The manufacturer will not accept any liability for loss damage or injury arising as a result of gt Failure to abide by the instructions on using the appliance gt Failure to regularly maintain the appliance or faulty or inadequate maintenance of the appliance gt Failure to abide by the instructions on installing the appliance This company declares that no substances harmful to health are contained in the appliance or used during appliance manufacture The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in force and only used in a suitably ventilated location In GB the installation must be carried out by a Gas Safe Registered Installer It must be carried out in accordance with the current
6. Blue Heat boiler If the appliance is sold or transferred or if the owner moves leaving the appliance behind you should ensure that the manual is kept with the appliance for consultation by the new owner and their installer The appliance is designed as a boiler for use in residential domestic environments on a governed meter supply only The selection of this boiler is entirely at the owner s risk If the appliance is used for purposes other than or in excess of these specifications the manufacturer will not accept any liability for resulting loss damage or injury The manufacturer will not accept any liability whatsoever for loss damage or injury arising as a result of failure to observe the instructions for use maintenance and installation of the appliance Various timers external controls etc are available as optional extras Full details are contained in the relevant sales literature In these instructions various danger levels are employed to draw the user s attention to particular information In so doing we wish to safeguard the user s safety prevent hazards and guarantee correct operation of the appliance DANGER Risk of a dangerous situation causing serious physical injury WARNING Risk of a dangerous situation causing slight physical injury CAUTION Risk of material damage Signals important information Signals a referral to other instructions or other pages in the instructions 4 gt gt D 72
7. United Kingdom en User Guide Gas Fired Wall Mounted Condensing Boiler EcoBlue Heat 12 15 18 21 24 Please keep these instructions in a safe place If you move house please hand them over to the next occupier Model Range Baxi EcoBlue 12 Heat G C N 41 470 02 Baxi EcoBlue 15 Heat G C N 41 470 03 Baxi EcoBlue 18 Heat G C N 41 470 04 Baxi EcoBlue 21 Heat G C N 41 470 05 Baxi EcoBlue 24 Heat G C N 41 470 06 Dear Customer Thank you for purchasing this appliance Please read this manual carefully before using the product and keep it in a safe place for future reference In order to ensure continued safe and efficient operation we recommend that the product is regularly maintained Our Service and After Sales organization can assist with this We hope you will receive many years of satisfactory service Baxi Heating UK Ltd 2014 All rights reserved No part of this publication may be reproduced or transmitted in any form or by any means or stored in any retrieval system of any nature including in any database in each case whether electronic mechanical recording or 0 08 6 otherwise without the prior written permission of the copyright owner except for permitted fair dealing under Copyrights Designs and Patents Act 1988 Applications for the copyright owner s permission to reproduce or make other use of any part of this publication should be made g
8. abel under the boiler Fig 3 This is for user reference 4 2 1 In Operation 1 Whilst the boiler is in operation cooled flue gases are discharged through the flue gas discharge pipe This may appear as a cloud of steam which is normal 2 Condensed water is discharged from the boiler heat exchanger into a pipe the condensate drain This pipe must never be altered or re routed except by a qualified professional EcoBlue Heat 13 4 Description of the Product 4 3 Control Panel Description f RESET w H N iL J Fig 4 R RESET N 7 1 P Fig 5 Normal Operation The Hg green light remains on for around seven seconds and then extinguishes briefly repeating the sequence whilst the boiler is firing The symbol indicates the Status Light ON X X X LED R ON Light ON approx 7 sec LED p OFF flash OFF D Time 1 flash OFF D Time Fig 6 Upper Horizontal Line Light ON Lower Horizontal Line Light OFF 14 EcoBlue Heat 4 3 1 User Interaction Controller Fig 4 Key to symbols Ti Heating Water Temperature Hg Sweep Key and Status Signals RESET Reset button and On Off Signal 1 The User Interaction Controller has 2 illuminating push buttons which provide information about the operating condition of the boiler 2 The RESET button illuminates green when the boiler receives a demand for CH or DHW 3 The Hg button can flash orange green or red a
9. and relevant requirements of legislation and guidance Where no specific instructions are given reference should be made to the relevant British Standard Code of Practice In IE the installation must be carried out by a competent Person and installed in accordance with the current edition of I S 813 Domestic Gas Installations the current Building Regulations and reference should be made to the current ETCI rules for electrical installation Incorrect installation could invalidate the warranty and may lead to prosecution 7212291 01 06 14 EcoBlue Heat 7 Introduction EcoBlue Heat 1 5 2 Installer s Responsibility The installer is responsible for the installation and initial start up of the appliance The installer must adhere to the following instructions gt Read and follow the instructions given in the manuals provided with the appliance gt Carry out installation in compliance with the prevailing legislation and standards gt Ensure the system is flushed and inhibitor added gt Install the flue chimney system correctly ensuring it is operational and complies with prevailing legislation and standards regardless of location of the boiler s installation gt Only the installer should perform the initial start up and carry out any checks necessary gt Explain the installation to the user gt Complete the Benchmark Commissioning Checklist in the Installation Manual this is a condition of the warran
10. cesesssessesenscseseseesesescssssessesesacseseessesessessesessseseeacaeeeseenenees 20 7 3 Filling the System S 7 4 Venting the System 7 5 Draining the System Sa ices cle eau tse a eda Ved eae ieee a in ata cle ecg cms oar eit 23 7212291 01 06 14 EcoBlue Heat 3 10 11 12 Contents Troubleshooting a Shses Bsa cesdece scestasrs E E 8 1 Fault Warning amp Lock out Codes 8 2 Fault Finding ETT TTT T Decommissioning a Ea r a E a E NE 26 9 1 Decommissioning Procedure soe an eee ee ee ee 26 Disposal T 26 10 1 Disposal Recycling E R T EAA e E HE IRH AE AAE AE aT 26 Environmental eerren a aAA A eli EE 27 11 1 EVEA E 27 11 2 Room Thermostats ANd Settings cserricsssursiisaniei na A 27 WA cT ccc teenieceieteanieescemmn an ensie ner EAEE EREE ESE 12 1 General 12 2 Terms Ob WV EA MIME TT 28 EcoBlue Heat 7212291 01 06 14 This page is intentionally blank 7212291 01 06 14 EcoBlue Heat 1 1 1 1 2 1 3 Introduction Introduction General Additional Documentation Symbols Used EcoBlue Heat WARNING AN Installation repair and maintenance must only be carried out only by a competent person This document is intended for use by competent persons All Gas Safe registered engineers carry an ID card with their licence number and a photograph You can check your engineer is registered by telephoning 0800 408 5500 or online at www gassaferegister co uk This manual is intended for the user of the Baxi Eco
11. es that may occur during operation The boiler has an inbuilt auto air vent to aid the removal of air and is supplied in the open position Proceed as follows 1 Open the valves of all the radiators connected to the system 2 Set the room thermostat to the highest possible temperature and any timers to ON 3 Wait until the radiators are warm 4 Switch off the boiler 5 Vent the radiators Work from the lowest radiator in the property 6 Open the bleed vent with the key keeping a cloth pressed against the vent 7 Wait until water comes out of the bleed vent and then close AN WARNING The CH water in the radiators will still be hot 8 Switch the boiler on 9 After venting if the system is of the sealed pressurised type check that the water pressure is still adequate L For sealed systems if the water pressure is lower than 1 0 7 bar the water must be topped up recommended water pressure between 1 0 and 2 0 bar 10 Reset the room thermostat to the desired temperature 7212291 01 06 14 7 5 Draining the System 7212291 01 06 14 Maintenance 7 It may be necessary to drain the CH system if radiators need to be replaced or removed if there is a major water leak or if there is a risk of freezing Proceed as follows 1 Open the valves of all the radiators connected to the system Switch off or disconnect the boiler s electrical isolation point Wa
12. etent person Use only genuine spare parts 2 The painted panels should be wiped with a damp cloth and then dried completely DO NOT USE ABRASIVE CLEANING AGENTS 7 2 Maintenance Instructions 1 The central heating system should be checked regularly Proceed as follows For Sealed Systems IEY If the water pressure is lower than 0 7 bar the water must be topped up If necessary top up the CH system recommended water pressure between 1 and 2 bar e Check radiators for leaks and especially in damp areas for rust gt Open and close the radiator valves several times a year to ensure they can still be rotated e Only clean the outside of the boiler with a damp cloth Do not use abrasive cleaning agents AN CAUTION Only a qualified installer may clean the inside of the boiler 20 EcoBlue Heat 7212291 01 06 14 7 3 Filling the System 7212291 01 06 14 Maintenance 7 The boiler will be installed on either an open vented or sealed pressurised heating system If you are unsure which type of system you have consult your installer Sealed systems may require periodic re pressurisation If this is required on a regular basis a fault or leak is indicated Seek advice from your installer EcoBlue Heat 21 7 4 Venting the System 22 Maintenance EcoBlue Heat If any air is present in the appliance or system it must be removed in order to prevent nuisance nois
13. event of any warranty work IEY See Section 12 for warranty information 7212291 01 06 14 3 Technical Specifications 3 1 Technical Data NOTE All data in this section are nominal values and subject to normal production tolerances Flow Temperature adjustable 30 C to 80 C 5 C 7212291 01 06 14 Outercase Dimensions Overall Height Inc Flue Elbow 790mm Casing Height 625mm Casing Width 370mm Casing Depth 280mm Clearances Both Sides 5mm Min Above Casing Top Flue 190mm Min Above Casing Rear Flue 35mm Min Below Casing in Cupboard 35mm Min Below Casing 120mm Min Front For Servicing 800mm Min Front In Operation 5mm Min Ventilation of Compartment Where the boiler is installed in a cupboard or compartment no air vents are required for cooling purposes providing that the minimum dimensions above are maintained Technical Specifications Electrical Supply 230V 50Hz Appliance must be connected to an earthed supply Power Consumption 12 model 17W 15 model 20W 18 model 23W 21 model 25W 24 model 33W External Fuse Rating 3A EcoBlue Heat 11 12 Technical Specifications At least ES Fig 1 EcoBlue Heat 3 1 1 Clearances 1 A flat vertical area is required for the installation of the boiler 2 These dimensions include the necessary clearances around the boi
14. ing e g fire cooker If the property has a prepayment meter ensure it has sufficient credit NO If no gas consult your supplier YES Is the Timer ON and YE Is the Room Thermostat if gt calling for heat fitted set high enough No Typical examples of external timer Ensure timer is set for Central Heating ON see any instructions supplied with timer NO Press the Reset Button Reset Button 16 EcoBlue Heat Boiler fails to light YOUR If boiler will not light 15 0 20 WU ox es C Turn Room Thermostat to maximum setting typical example shown 15 ao 20 WL ow Kix CONTACT INSTALLER OR SERVICE ENGINEER 7212291 01 06 14 Operation 5 H naei to s 1 Ignition Spark will commence NO T YES NO Switch on Boiler flame established Both lights are on Check the fused spur to NO the boiler is in the on position YES If the boiler fails to operate Contact your Installer Nt S re Chimney Sweep On neces 7174 Button Light a veal Reset Button Light Boiler operating satisfactorily If you don t know what you need to do to get the boiler to light or need help with the system and controls contact your installer as soon as possible 7212291 01 06 14 EcoBlue Heat 17 5 5 2 5 3 18 Operation Shutdown Frost Protection EcoBlue Heat 1 If it is antici
15. it until all the radiators are cold Connect a drain hose to the lowest draining point Place the end of the hose in a drain or at a place where drained water will not cause any damage Open the CH system drain valve Drain the system AN WARNING 6 The CH water may still be hot When water stops flowing from the draining point close the draining valve mS See Section 7 4 Venting the system If in doubt seek advice from your installer After draining the concentration of system corrosion 1 inhibitor and anti freeze may become excessively diluted seek advice from your installer EcoBlue Heat 23 Troubleshooting Troubleshooting 8 1 Fault Warning amp Lock out Codes 24 1 The colour of the status light Hg on the boiler control panel and the number of times that it flashes indicates whether the boiler is working normally has a problem or requires servicing HE Reser Fault Warning When flashing green Hf light indicates that the IQI boiler has detected a problem and is attempting to resolve it If it 4 does not succeed the boiler will go into lock out mode and Ha will display a red light Green Light Red Light Fault Lock out When flashing red Hg light indicates that the boiler has a fault and has locked out Press the RESET button for a minimum of 5 seconds to try and clear the fault condition Temperature Sensor Protection Error A lock out condition can be re set up to
16. iving details of the proposed use to the following address The Company Secretary Baxi Heating UK Limited J enchmari Brooks House Coventry Road Warwick CV34 4LL COLLECTIVE MARK THE MARK OF QUALITY FOR THE INSTALLATION COMMISSIONING Full acknowledgement of author and source must be given AND SERVICING OF DOMESTIC HEATING AND HOT WATER SYSTEMS WARNING Any person who does any unauthorised act in relation to a ISO 9001 copyright work may be liable to criminal prosecution and civil claims for FM 00866 damages The Benchmark Scheme Baxi Heating UK Ltd is a licensed member of the Benchmark Scheme which aims to improve the standards of installation and commissioning of domestic heating and hot water systems in the UK and to encourage regular servicing to optimise safety efficiency and performance Benchmark is managed and promoted by Heating and Hotwater Industry Council For more information visit www centralheating co uk 2 EcoBlue Heat 7212291 01 06 14 Contents Contents THEO CUCTIONN eres esse tesssessesesstessscsensonsscnsseossvonsnossssssscsssesssssessosssossssecssossssasssosssssessosssesssnessscssssssssossnesssssssnosssosssnosssosssnsesnesssosesnesssossates 6 1 1 General errr 6 1 2 Additional Documentation 6 1 3 Symbols Used e 6 1 4 Abbreviations Glossary 7 1 5 Extent of Liabilitjeg rrer 7 1 5 1 Manufacturer s Liability 1er 7 1 5 2 Installer s Responsibility 8 1 5 3 Users Responsible 8 Safet
17. ler for case removal spanner access and air movement Figs 1 amp 2 Additional clearances may be required for the passage of pipes around local obstructions such as joists running parallel to the front face of the boiler 800mm Min For Servicing Purposes 270mm 5mm Min L gt In Operation 5mm Mi 370mm Min i i A i i 1 1 1 ATEN 1 l VA Y H 190mm 1 i L i 1 a 1 i 94 a ME st o T l 1 i a 1 1 1 4 1 l 1 l 1 l 1 1 1 1 l 1 1 l 1 1 1 1 i 1 625mm i i 1 1 Li 1 1 Li 1 l 1 l 1 1 H aa 1 1 i l 1 1 l 1 1 l 1 1 i e a 1 ja M i Y 35mm Min i i in Cupboard pre mace r eee E r 1 1 l EE 120mm Min Fig 2 7212291 01 06 14 4 Description of the Product 4 1 General Description Information Label gt Slide Forward Fig 3 4 2 Operating Principle 7212291 01 06 14 Description of the Product 4 1 The Baxi EcoBlue Heat is a wall mounted condensing boiler which is room sealed and fan assisted and will serve central heating and stored domestic hot water 2 The boiler will be one of the following outputs 12 kW 15 kW 18 kW 21 kW 24 kW 3 The boiler is factory set for use only on Natural Gas G20 4 The boiler model serial number and Gas Council number are shown on the information l
18. liances and for your trust in our product In order to ensure continued safe and efficient operation we recommend that the product is regularly inspected and maintained Your installer and our service division heateam can assist with this 12 2 Terms of Warranty 12 2 1 Standard Warranty Terms and Conditions Warranty Registration Service amp Repair To activate and maintain your warranty the following conditions must be met e Benchmark Checklist completed by a Gas Safe registered installer e Boiler warranty registered with Baxi within 30 days of installation e Boiler must have an annual service Please be aware that if you do not activate your warranty a basic one year warranty will apply For details of our full Terms and Conditions please see www baxi co uk terms Benchmark Checklist This checklist will be completed by your installer and records whether the boiler has been installed correctly This checklist can be found at the back of the Installation and Service Manual and should be retained over the life of the boiler Ways to Register Your Warranty If your boiler is eligible for a promotional warranty your installer will register the product on your behalf and will provide you with the relevant documentation In such cases there is no further action required on your part For a standard two year warranty please use one of the following methods e Freephone 0800 013 7989 or e Return the enclosed regis
19. nd at different frequencies 4 The User Interaction Controller also has one rotary knob The rotary knob is used to set the maximum flow temperature of the heating water 5 The temperature selected by the rotary knob must be set to a higher temperature than the cylinder thermostat to achieve the required hot water demand 4 3 2 Indicator Lights Fig 5 The colour of the status light Hg on the boiler control panel and the number of times that it flashes indicates whether the boiler is working normally has a problem or requires servicing IS See Section 8 1 for details of the fault conditions Boiler Operating The Hg light will flash orange at EVERY heating demand The number of flashes will correspond with the heat output of the boiler This is normal and does not indicate a fault condition During normal running HB illuminates green and blinks off momentarily every seven seconds approximately to show the boiler is running normally and supplying heat Fig 6 Error When flashing green Hg light indicates that the boiler has detected a problem and is attempting to resolve it If it does not succeed the boiler will go into fault mode and display a red light Defect When flashing red Hg light indicates that the boiler has a fault Press the RESET button for a minimum of 5 seconds to try and clear the fault condition A lock out condition can be re set up to 5 times within one hour using the reset button Any fault that occurs repea
20. ooting 1 If the boiler is not working check section 5 1 Operation Checking Procedure amp Basic Fault Identification or the fault finding table Contact your Installer Possible Causes Check that the boiler is being supplied with power all controls set to ON Check the fuses and the switches If possible check whether the gas cock is properly open If the property has a prepayment meter ensure it has sufficient credit Check if the Fault Lock out is illuminated See Section 8 1 to reset The boiler temperature setting is below the cylinder thermostat setting The radiator valves are not open The temperature set point for the heating is too low check boiler amp room thermostat EcoBlue Heat 25 9 10 Decommissioning Disposal 9 Decommissioning 9 1 Decommissioning Procedure AN CAUTION Only qualified professionals are authorised to work on the appliance and system to decommission 1 If your the boiler needs to be decommissioned either temporarily or permanently the following should be performed e Switch off the boiler e Switch off the boilers electrical connection e Close the boiler gas valve e Drain the CH system Seek the advice of your installer 10 Disposal 10 1 Disposal Recycling AN WARNING Removal and disposal of the boiler must be carried out by a qualified installer in accordance with local and national regulations 26 EcoBlue Heat 7212291 01 06 14 11 Environmental
21. pated that the boiler will not be used for a long period or the property is to be unoccupied it is recommended that the system is drained if the electricity amp gas supplies are to be turned off Your installer will be able to offer advice 1 To prevent radiators and the system from freezing in rooms where there is a risk of frost e g a garage or storage room a frost thermostat can be connected to the system 7212291 01 06 14 6 Settings 6 1 Setting the Boiler Flow Temperature mW RESET Rotary Knob Boiler Temperature Adjustment b lt n 7212291 01 06 14 Fig 7 Settings 6 To increase or decrease the boiler temperature 1 Turn the rotary knob to the right Fig 7 to increase the boiler temperature 2 Turn the rotary knob to the left Fig 7 to decrease the boiler temperature 3 To achieve the required domestic hot water temperature the rotary knob must be set to a higher temperature than that selected on the cylinder thermostat EcoBlue Heat 19 7 Maintenance T7 Maintenance 7 1 General 1 The boiler does not require any special maintenance However the boiler must be serviced annually in accordance with the Installation and Service Manual and the relevant section of the Benchmark Service Record completed in order to maintain the warranty L Taking out a maintenance contract is recommended AN CAUTION Maintenance operations must be performed by a qualified comp
22. tedly should be fully investigated and appropriate remedial actions taken by your installer or heateam If there is a continuous red light contact your installer or heateam The lights will be OFF when there is no demand for heat 7212291 01 06 14 Description of the Product 4 4 4 Standard Delivery 1 The literature pack contains gt Literature pack e Installation amp Servicing Manual including Benchmark e User Guide Instructions e Flue Accessories amp Fitting Guide e Service Contract Leaflet e Registration Card e Envelope e Fernox Leaflet e Wall Template 4 5 Accessories amp Options 4 5 1 Optional Extras 1 Various items are available as optional extras Flue Accessories elbows extensions clamps etc refer to the Flue Accessories amp Fitting Guide supplied in the literature pack Remote relief valve kit 1M Condensate Drain Pipe Trace Heating Element 2M Condensate Drain Pipe Trace Heating Element 3M Condensate Drain Pipe Trace Heating Element 5M Condensate Drain Pipe Trace Heating Element Any of the above MUST be fitted ONLY by a qualified competent person Further details can be found in the relevant sales literature and at www baxi co uk 7212291 01 06 14 EcoBlue Heat 15 5 Operation 5 Operation 5 1 Operation Checking Procedure amp Basic Fault Identification START Make sure the gas supply is turned ON and check if other gas appliances are operat
23. tration card or e Register online at www baxi co uk registration 28 EcoBlue Heat 7212291 01 06 14 Information Label gt Slide Forward 7212291 01 06 14 Warranty 12 Annual Service An annual service must be completed every 12 months from the date of installation This service must be completed by e your Gas Safe registered installer or e heateam the service division of Baxi telephone 0844 871 1525 or gt another GAS SAFE registered engineer If you experience a problem with your boiler Please check that there is a gas electricity and water supply to the boiler Contact your installer because the fault may not be related to the boiler If your installer confirms that the fault is with the boiler simply call heateam on 0844 871 1525 heateam is open Monday to Friday 8am 6pm weekends and Bank Holidays 8 30am 2pm excluding Christmas Day and New Year s Day Before calling heateam please have the following information to hand e Boiler serial number e g BMY073450028CP see opposite for location of serial number gt Your installer s name and address e Proof of purchase if you do not have the boiler serial number To ensure the highest level of customer service heateam will text to you your engineer appointment details if you provide a mobile phone number Following your engineer visit we will ask you to rate your level of satisfaction with our service via text message
24. ty gt Warn the user of the obligation to check the appliance and maintain it in good working order K Give all the instruction manuals to the user 1 5 3 User s Responsibility To guarantee optimum operation of the installation you must observe the following instructions gt Read and observe the instructions given in the manuals supplied with the appliance K Seek the assistance of a qualified installer for the installation and initial commissioning gt Ask the installer to explain the installation K Have the required annual inspection and maintenance carried out by a qualified installer and ensure the Benchmark K Service Record in the Installation Manual is completed this is a condition of the warranty K Keep the manuals in good condition and near to the appliance This appliance must not be used by people with a lack of experience or knowledge unless they are supervised by someone familiar with the appliance or if they have been instructed on how to operate the appliance correctly Do not allow children to operate or play with the appliance 7212291 01 06 14 2 Safety 2 1 General Safety Instructions 7212291 01 06 14 Safety A DANGER If you smell gas Turn off the gas supply at the meter Open windows and doors in the hazardous area Do not operate light switches Do not operate any electrical equipment Do not use a telephone in the hazardous area Extinguish any naked flame and do not smoke
25. y STT 2 1 General Safety Instructions 2 2 RECOMMENCATIONS vrrs s s eseseseeseeeteseecesesesecsesesesscseseseesesesecscsesesesseseseassesesceseseseeasseseuscseseseeseseseceesesesesesenecseseseesesessesseseeeenesenenees 2 2 1 Benchmark Commissioning CReECKIISE 1 ciesese ceitin ee cente cieiecciehaniisieiasieiineied ented 10 Technical Specifications N EEEE A N EE E E E E EE EE 11 3 1 Technical Data eessen a E ES A EA R EE A Ea E E EA Taaa 11 3 1 1 Clearan eS srssrorscnsenasinoni nnn ERE RN R A N EEEE 12 Description of the PrOCUICE essicnsrsrirennenereneerarei Une N R E E RNs 13 4 1 General Description 4 2 Operating Principle 4 2 1 MESo e E 4 3 Control Panel Description veeeeerereresrertrererteresresteresrerrerenrestarenresrarenretarenrertarenretarenrestarenrentarenrarrarenren tt 4 3 1 User Interaction Controller 4 3 2 Indicator Lights PEE E E E E E E S A E a A S 4 4 Standard Delivery E raia AT 4 5 Accessories amp Options PEES EE E E 4 5 1 Optional DA e TET A ET MO ARN IN eeen E E EN 16 5 1 Operation Checking Procedure amp Basic Fault Identification seene 16 5 2 Shutdown 5 3 Frost Protecto eeecsereroniraonein e i i eNA E ila AAR REE N RE RTE EE VEE E 18 Settings r 19 6 1 Setting the Boiler Flow Temperature sccccsessssecsssesccsneesssnecssssecssnsecssnsecssnecssssecssssecssnscsssseessasscssnsesanecssaeccsnecssneesss 19 Maintenance 7 1 General 7 2 Maintenance INStrUCTIONS eseeseesesetsesesesessesesessesesessesesenscsesesesseses
26. ystem recommended pressure is 1 5 bar Your installer will advise on the method of repressurising if required Keep the appliance accessible at all times Do not remove or cover the serial number label affixed to the slide out flap at the boiler lower left It must remain legible throughout the lifetime of the appliance 2 2 1 Benchmark Commissioning Checklist 1 Please ensure that the installer has fully completed the Benchmark Checklist on the inside back pages of the installation instructions supplied with the product and that you have signed it to say that you have received a full and clear explanation of its operation The installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations England and Wales 2 All installations must be notified by the installer to Local Area Building Control either directly or through a Competent Persons Scheme A Building Regulations Compliance Certificate will then be issued to the customer who should on receipt write the Notification Number on the Benchmark Checklist 3 This product should be serviced annually to optimise its safety efficiency and performance The service engineer should complete the relevant section of the Benchmark Service Record in the Installation amp Service manual after each service 4 The completed Benchmark Checklist amp proof of annual servicing where applicable will be required in the
Download Pdf Manuals
Related Search
Related Contents
ALLROUNDER 720 H Version « Packaging » (P) T09 Aglomerante de aridos Drame de Woippy : l`enquête CHSCT qui accuse !!! iSCADA User Manual 医療機器の添付文書の記載要領について User Manual Samsung Soundbar HW-E450 Bruksanvisning Transition from Q4ARCPU to QnPRHCPU Harbor Freight Tools 3/8 in. Heavy Duty Professional Magnesium Variable Speed Reversible Drill Product manual Targus NOTEBOOK DOCKING station with video User's Manual Copyright © All rights reserved.
Failed to retrieve file