1. BK Ph2 L5 5 13 In pantry remedy restricted flow to cold boiling tap Sharkey Ph2 L5 Hold open doors ease half door sticking on brushes PFP Ph2 L5 m At 5 06 fill and paint score LHS of screen Rainbow Ph2 L5 Corridor 5 01 South Elevation bund 2nd from left not working Fix or to 5 09 replace Corridor 5 01 CSL Ph2 L5 to 5 09 Paint stain on widow ingo BK Ph2 L5 5 206 Fix bracket to pipework note on male WC signs to be swapped BK Ph2 L5 5 207 Fix bracket to pipework note on female WC signs to be swapped WSI Ph2 L5 ge Swap round door number signs PFP Ph2 L5 uc ud Paint stain on ceiling fill and paint hairline cracks BK Ph2 L5 5 208 End cap required to panic alarm bar at door hinge Sharkey Ph2 L5 5 209 Internal face of door requires grill Sharkey Ph2 L5 5 209 Door not double locking BBCL Ph2 L5 WC corridor Investigate yellow stain to concrete both sides of 5 203 doorway Rainbow Ph2 L4 4 01 North elevation RH blind jamming PFP Ph2 L4 4 01 Tidy up ceiling finish at column head on west elevation Mag Hanson Ph2 L4 4 01 Repaint damage to north elevation screen LH side PFP Ph2 L4 4 01 Paint pelmet ends both sides of Internal glazed screen Mag Hanson Ph2 L4 4 01 Seal cill to frame north elevation excessive gap BBCL Ph2 L4 4 01 North elevation LHS of window trim metal corner tape at shadow gap PFP Ph2 L4 4 01 Clean paint from i
2. G R Ross Ph2 L2 2 10 On ext elevation cut back water damage on ceiling and PFP beam reinstate fire proofing to beam patch and paint PFP Ph2 L2 2 10 Touch up at pelmet Sharkey Ph2 L2 2 10 Complete skirting RHS of window and paint JCC PFP Ph2 L2 2 10 Ext elevation cut down and paint CSL Ph2 L2 2 10 Seal round shadow gap generally BK Ph2 L2 2 10 Tape down susp wires generally Ph2 L2 2 10 Bubbled manifestation replace BK Ph2 L2 2 11 Loose end caps to N light JCC Ross PF Ext elevation remove temp bulkhead Fix pelmet skim Ph2 L2 2 11 P CLS paint seal CSL Ph2 L2 2 11 SW column seal shadow gap to S wall BK Ph2 L2 2 11 Check central light does not stay on CSL Ph2 L2 2 41 Seal cracked shadow gap all walls PFP Ph2 L2 2 11 Complete paint above overhead door panel Sharkey Ph2 L2 2 41 Door stop requires fixings PFP Ph2 L2 2 11 Complete paint above door and screen CSL Ph2 L2 2 12 Seal pelmet to ingos PFP Ph2 L2 2 12 Ext elevation high level LHS reskim and paint PFP Ph2 L2 2 12 Clean paint off NW column PFP Ph2 L2 2 12 Tidy ceiling finish at NW column CSL Ph2 L2 2 12 Reseal shadow gap Ph2 L2 2 12 Replace manifestation coming off BBCL Ph2 L2 2 12 Clean top of door overhead panel BK Ph2 L2 2 12 Tighten susp wires to lights CSL Ph2 L2 2 13 Seal cracks to shadow gap all round incl hole at NW column BK Ph2 L2 2 13 Fix pipe cover to radiator PFP Ph2 L2 2 13 Comp
3. 74 Sharkey Ph 2 West Tidy loose membrane above timber Elevation soffit BBCL Ph2 West Remove taps off timber behind RH Elevation column BBCL Ph2 West Clean bottom edge of screen at Ph 2 Elevation jentrance 01 07 2009 75 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED PFP 2 General Seal all concrete columns and walls to rooms 02 06 2009 2 Restriction resistance to windows required to stay open UotE 2 General 6no doors eg 7 07 glazing panel added by UofE currently not complying with fire regulations Sharkey 2 General Check all fire doors are self closing Sharkey Ph 2 L 7 7 02 Chip to int face of glazed screen repair BK 2271 7 7 02 Tape down susp wires Mag Hanson Ph 2 L 7 7 02 Replace gasket both windows Mag Hanson Ph 2 L 7 7 02 windows have no resistance to stay open investigate Mag Hanson Ph 2 L 7 7 03 Replace gasket both windows BBCL Ph 2 17 7 03 Clean floor box frame PFP Ph 2 L 7 7 04 RH light fill hol
4. E ee Move or remove very visible labels above both sets of Mova wall 1 anels D Repaint door and facings to G 04 patchy appearance o ee Lm Seal crack between column and MDF return LHS of G 04 p Floor boxes replace rubber seals Issue with centre section dropping through all floor E Atrium to be checked BBCL Atrium Floor boxes all s s rings to be checked as some are loose historicall General Item Clean surplus paint from sliding door panel facings E UTE acc General item Clean surplus paint from ledges of atrium Pf South wall paint plaster u s edge at 1st floor level screen ngo glazing Po Po RHS of lift 4 touch up paint on column at junction to glazing i RHS of door towards Lift 3 corridor touch up paint in rium shadow gap and around socket Le Lo cabinet Lo Repaint facings to displa cabinet South wall fill fixings and paint both door facings PFP 1 Atrium South wall east door RHS at skirting fill plaster and paint Sockets West wall south corner clean paint from wood paneling in corner and plaster from soffit E Broken light switch 29 052009 BBCL B 02 Check water proofing to ceiling crack is sound free standing column to North wall 01 07 2009 60 ITEM TRADE Phase Location Defect Items From Joint Walkrounds Level Phase 1 BBCL B 02 Check and repair where wall s are cracked the wat
5. 0 T y meme ea _ PC y Ph 1 L3 Repaint RHS window Pht L3 Gap to soffit access hole above light refixed Po osi Po irs R Ph 1 L3 3 32 Patch and repaint at west light conduit Po BBCL PFP Ph 1 13 3 33 NW corner ceiling rust from beam Scrape back recoat GR Ross and plaster and paint Po Phi L3 3 33 Crackin ceiling shadow gap both walls Ph 1 13 East light fitting check lamps O Replace lamp 1 13 3 33 LHS window not locking properly Hanson Mag m Ph 1 13 Seal crack in shadow gap on window elevation Ph 1 L3 Blind missing on LHS window check ee y PFP CSL Pht L3 LHS window sill fill fixings repaint and seal Ph 1 L3 LHS window hole in plaster LHS low level fill and paint o Po Po CSL Ph 1 13 3 34 Seal steel column and skirting PFP Ph 1 L3 3 34 Paint shadow gap east wall at glazed screen Po e Po ers Po Sharkey Ph1 L3 3 34 double locking not working with key Ph 1 13 pin R Ph 1 L3 Make good water damage to ceiling SE corner Pf ee ee Veitchi Phi 13 335 Relay carpet tiles SEcorner_ Phi L3 335 Fixsuspension wire to RHS ligt Phils ____ MEMECMEMMEEENM Ross PSI side Doo o qp CSL Ph 1 L3 3 36 Seal holes at shadow gap SE corner Ph 1 L3 3 37 Check dim west light fitting at south end Y Res
6. ITEM TRADE Ph i Level Locati Defect Items From Joint Walk ACCESS SUBS BBCL UoE COMMENTS ITEM ase Leve ocation pounds Phase 2 DATE CHECK CHECK CHECK CLOSED Briggs Ph 2 L3 Sia Replace cracked slab on west verge Briggs Ph2 L3 ES Roof Replace cracked slab 7m south of Ph 2 doors Terrace BBCL Ph2 L3 L3 Roof General litter pick to slab area verges slab joints Terrace remove mastic Stains M amp S Ph2 L2 2 01 Balcony Clean staining to balustrade 08 06 2009 BBCL Ph2 L2 2 01 Balcony Clean label adhesive from glazing mid level LHs to door BBCL Ph2 L2 2 01 Balcony Clean white r cast from glazing Mag Hanson Ph2 L2 2 01 Balcony me LHS flashing fixings to coloured type noted as M amp S Ph2 L2 2 01 Balcony Tighten wires and fix loose wire Creagh Ph2 L2 2 01 Balcony FFill high level to column UofE Ph2 L2 2 01 Balcony Full length lock barrel required JCC Ph2 L2 2 01 Balcony Door stop required 2 12 2 01 Touch up marks and missed paint on ceiling PFP Ph2 L2 2 01 RH ingo opening window skim and repaint CSL Ph2 L2 2 01 Opening window tidy sealant both sides BBCL Ph2 L2 2 01 Check lack of pelmets to internal screen blinds Mag Hanson Ph2 L2 2 01 Refinish screen cills finish CSL Ph2 L2 2 02 Seal LHS of opening window PFP Ph2 L2 2 02 Paint required at smoke detector CSL Ph2 L2 2 03 Seal LHS of opening window CSL Ph 2 2 2 03 Seal hole at skirting LH door facing PFP Ph2 L2 2 03 tidy ceiling finish at RH column PFP
7. Phi L3 3 19 ToghupceligNWcome E d C sc miu i8 pense 1 Sharkey 1 13 3 2 Adjustkeeper latch not catching and stifftolock FJ BBCL Phi t3 321 Clean out perforated panels holes penis 3 22 Sharkey Pht L3 323 Adjustkeeperdoornotcatching J o o y f hes 3 24 NoComments _ O L Sharkey Pht L3 3 25 Adjust stops to door to eradicate creak _ Refit loose lighting end cap SW corner ___ y J Phris 3 NoCommens o e 32 3 26 No Gomments LL Hanson BBCL Ph 1 13 329 Check shadow gap west wall Sharkey Ph 1 13 330 Door stopper required Ph 1 L3 Paint skirting end LHS of door LH window fill and paint gap to pelmet LHS Sharke Ph 1 L3 3 31 Gap to stops extra fixings with filler PFP m G eius Ph 1 nus NW corner ceiling rust fom beam Scrape back and coat and plaster and paint 20 05 2009 PFP Ph 1 13 3 32 Repaint soffit to windows PFP GR ili i Ross Ph 1 L3 3 32 East wall ceiling cracked replaster and paint 01 07 2009 36 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM MEMI TRADE Phase 1 DATE CHECK CHECK CHECK COMMENTS CLOSED Opening window restrictor damaged check
8. o Pht L2 232 Clean paint from head of concrete column at atium J Ph 1 12 2 33 Fill corner crack and paint SW and SE Rainbow Ph 1 L2 2 33 Stops required to blinds PFP CSL Ph 1 12 2 33 At diagonal brace low level touch up edge and seal joint with MDF Ph 1 L2 Seal shadow gap under window cills Ph 1 12 Stops required to blinds PFP CSL Ph 1 L2 Repaint ingos to windows and seal heads and pelmets el Pe Doo LS PFPTCSL Phil 235 Windows paint at heads seal at heals and sils po MR pes es Do Do siz Phi L2 235 stop RHS window Ph 1 12 Refix MDF plate to brace touch up paint and seal Ph 1 12 2 35 Ceiling at steel column scrape fill and repaint snots G R Ross Ceiling scrape back water damage and reskim and paint Ph 1 12 2 36 PFP Including stains to beams Ph 1 12 Paint water stain SE corner Eoo 1 12 Fill joint in ceiling beam and plaster Ph 1 12 Tidy joint at handle side of window overlay with mastic PFP CSL Ph 1 12 238 Damage to window ingo on handle side fill and paint Reseal same junction PFP Ph 1 L2 Seal concrete column O Ph 1 12 Ph 1 L2 controls faulty o es j Ph 1 L2 lResealwindowcils 1 Lo y sd p p PFP Ph 1 12 2 39 Remove paint from cap
9. BK PhtGrL rmlgntwres3no oo 0 0 Phi Grdt S Wal step shadow gap half way flush off J J o o Phi Grdt 5 1 1 0 o 3 1 0 oo owe rooe TT reception Pnt GraL Sealwindowcills CC CSL Phi GrdL 9 03 Seal windows at handles to ingo key from reception ss To CCS Remove protection from push bar to emergency door O O OE JCC Ph rd L G 03 Emergency door frame cracked needs replaced PEP Ph 1 Grd L G 03 Fire exit sign above emergency door clean paint off condui box Ph 1 GrdL Loose floorboxes O PFP Grd L G 03 Wall fill paint crack LHS of timber paneling Ph 1 Grd L G 03 S wall ingo RHS of timber paneling rub down MDF edge and repaint 01 07 2009 63 pen i CS 21 p fe Timber install damage ay CS ise Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM Bo DATE CHECK CHECK CHECK COMMENTS CLOSED NN above door p 1 Grd L SW corner loose flooring requires packers to walls Veitchi Ph 1 Grd L G 03 SW corner 2 panels short of wall replace ensure packed to wall Screws missing to door hinges Phi GrdaL G06 Sealcolumn
10. Ph 2 L 1 1 01 No access CSL Ph2 L 1 1 03 Seal holes in shadow gap w elevation PFP Ph2 L 1 1 03 Paint to mark above central light Sharkey Ph2 L 1 1 08 Refinish at lock PFP CLS Ph2 L 1 1 04 RH window repaint sill and seal round PFP Ph2 L 1 1 04 W Elevation at S column head skim wall and paint PFP Ph 2 L 1 1 06 Fill and paint ceiling damage on ceiling generally all over PFP Ph2 L1 1 06 2nd from north window fill and paint damage to both ingos PFP Ph 2 L 1 1 06 4th from north window fill and paint damage to both ingos BBCL Ph 2 L 1 1 06 Clean paint from concrete columns PFP Ph 2 L 1 1 06 Redundant light switch behind door build out and paint PFP Ph2 L 1 1 06 Repair tape behind door and paint Veitchi Ph 2 L 1 1 07 Badly creaking floor at door BB PFP Ph2 L 1 1 07 Beam column junction fill hole and paint PFP Ph2 L 1 1 07 Repaint beam in ceiling PFP Ph2 L 1 1 08 Improve finish along ceiling at north wall fill gap Ph2 L1 1 08 Ceiling generally rub down and repaint to improve standard CSL Ph2 L 1 1 08 Seal shadow gap crack above door overhead panel BK Ph2 L 1 1 09 Light switch operation sticky BB PFP Ph2 L 1 1 09 Refinish in shadow gap at beam PFP Ph2 L 1 1 09 Clean paint from over panel PFP Ph2 L 1 1 09 Touch up at SE ferrule BBCL Ph2 L1 140 ve different pelmet detail from other rooms if left BBCL Ph2 L 1 1 10 Clean plaster from LH window PFP Ph2 L 1 1 10 Touch up paint at ferrule BBCL Ph2 L 1 1 10 Clean screen edging on RHS Shar
11. a Ph 1 13 oes paint off RHS window south elevation 1 ACCESS SUBS BBCL ITEM DATE CHECK CHECK check COMMENTS BK Ph 1 L3 3 50 Refix end cap to light fitting Veitchi Ph 1 13 3 50 Displaced floor 2m from door against concrete wall check supports PFP GR Ph1 3 Ross 35 50 350 West wali repair tape in SW corner and touch up paint wall West wall repair tape in SW comer and touch up paint tape in SW corner and touch up paint Ph 1 13 Stops required to blinds Ph 1 13 Seal concrete column at door GR Ross Corri dor 3 50 Ph 1 L3 to 3 45 Fix corner tape LHS door 3 49 and paint Mus 50 Glean paint from screen from 3 46 high level at RH end m pee EST EHE d Cee ore 9 59 BBCL Ph 1 13 a 2 Clean bead north wall LHS corner at concrete wall BBCL Ph 1 L3 s Remove masking tape on N wall Ph 1 L3 E re 9 Seal round vent grill o north wall PFP GR Corridor 3 31 Repair damaged corner above 3 44 door at shadow gap Ph 1 L3 Ross to 3 02 and at external corner Corri Ph 1 L3 to 3 02 dor 3 31 Seal soffit at 3 44 on south and east walls idor Seal open skirting mitre RHS of door 3 44 Corri E to 3 02 Sharkey E 3 2 25 corridor door not closing fully igor 3 31 3 2 20 clean paint from door Corri to 3 02 Corri to 3 02 01 07 2009 dor 3 31 3 5 59 Missing diffuser 39 Level oe ane Sh
12. d coffee point EC FD101 Touch up damaged paintwork above door lintol OOo Ys 5 39 Joint to vision panel LHS door Smooth sharp edges of chip in edge of glass Sharkey poo p Gap below door under stair infill with oak Make good loose and rocking slabs BK Garden bevels Remove masking tape and marks from oak soffit Garden Level 4 Roof Area below key pad behind access L4 door Fix oak JCC 1 Garden cover plate JCC Level 4 Moof Keeper required for drop bolt at access door L4 Garden BH Levels BH to comment on detail of wire to balustrade Garden Ph 1 L4 Paint bottom concrete column LHS OOo ee O OE 18 05 200 Phi L4 401 Mastic to RHs foot of corridor facing po a Ph 1 L4 Paint wall RHS under worktop po ae GRR Ph 1 14 Fill and paint crack junction of bulkhead and soffit EE 402 Stop required to bund on opening window 4 C 01 07 2009 29 iid mo 1 n ee pam i id ii me Ll 55 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM pane can DATE CHECK CHECK CHECK COMMENTS CLOSED Deme m mme T MEM E EETIN N ia RR RN ll Ph 1 14 4 02 door hinge ingo fill and paint screw hole Sharkey Pht L4 uper RR LR CR RR Ph 1 14 EE light ferrule fill and paint Pero RR RE RR is i Ph 1 L4 4 403 Fill and paint paint above i
13. _ y G06 Fill and paint around Dbl socket o CT y y or replace door supports PFP Ph G 04 ips required to perimeter ceiling tiles o o o y Sharkey Phi GrdL GO04 Door stops required to all 5no doors o o Too BBCL Ph1 GrdL SE corner work top adjust uneven feet pS I j Phi GrdL GO04 Complete pipe insulation up to flexi pipe on both sinks G piu Ph 1 Grd L timber double doors RHS repair tape and paint Phi GrdL G 04 timber double doors tidy finish round blank plate o Of pipework Ph 1 Grd L o oe in ceiling west end Ph1 GrdL GO05 Adjust emergency light fitting PrP Ph 1 Grd L Seal and paint cracking at movawall recess West side a Po PhftGrL 905 SW corner crack to corner fill and pait fJ e Et i ee ae og i bet Ses AAA BBCL Ph 1 Grd L 67 29 Remove signs and fill holes both showers replace with correct sign oa Sharkey Phi GrdL GZ29 3 door stops required all doors o y BK Phi GrdL GZ29 JRightshower cablebelowalarmresetexpsed o 1 CT Tier Pht GrdL GZ29 PondigtoflorinletshowerinLHshower J 31 o 3A BK Pht GrdL GZ29 Missing parts to both vertical shower head rais _BeCL_ Phi Grd _Gz 29 fSmelnotedinRshower Td Ce e BK Grd L GZ
14. Ph 1 12 Tidy and rub down light switch PCP tL Mag Ph 1 12 2 31 Fix gasket to opening windows E Hanson Ph 1 L2 fill and paint crack above overhead panel Ph 1 12 Extra fixings at cracked joints on north wall fill and paint TTE 232 Forum 5881 joint on walkway soffit between shadow gap and Lo p metal plate Ph 1 12 2 32 Forum W way soffit square up socket G R Ross Ph 1 12 2 32 Forum SW corner fill and repaint beam MDF end Cap and tidy PFP up paint runs below Veitch pens 1 L2 2 E Forum aoe up carpet tiles along south wall run 2 cut tiles 22 05 2009 Ph 1 12 2 32 2 92 Forum SW corner SW comer tidy above siting above skirting CSL Ph 1 12 2 32 Forum South wall fill skirting joint 1 12 2 32 Forum_ Repaint round switches north and south walls Ph1 L2 2 32 Forum Replace brokenwallsensorcover 01 07 2009 45 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM we ina DATE CHECK CHECK CHECK COMMENTS CLOSED E ne _ 7 7 IN NE CNN UNE NN Ph 1 L2 2 32 Forum Replace broken glazing panel Mag Ph 1 12 2 32 Forum Clean glue from trench heating G R Ross Ph 1 12 2 32 Forum North wall external corner LHS door tidy jagged edge to PFP plaster and paint ee BK 232 Trimsuspensionwirestolights BK 232 AdjustNElightasnotplumb
15. half landing to general in cored see half landing L1 GF for additions in bare metal 1 Clean shadow gap at soffit above Clean off white paint from grey areas general es seep Missing fixing N rail near half landing e UofE Core D L2 Light tube not working on half landing Replace lamp LJ Pre 1 Core Dit Dark colour drips on balustrade tobe cleaned off ff BK 1 Core DL1_ Lid required for UV box RHS bottom of doortoL lobby Y Door lobby Holes filled at fixings to door stops and sharkey x face of door and make good damage to face of door 01 07 2009 69 se Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM DATE CHECK CHECK CHECK COMMENTS CLOSED NN Core DL1 Fire door sign required for door to L1 corridor Core D GF Remove remains of formwork _ 1 Core D GF Exit door requires joiner attention 1 9 87 Touch up paint at shadow gap NW corner poo o SSWW XXX handrail junction with inner drum rub down Genera 1 SSWW Repaint unfinished corner Genera Genera Genera Genera SSWW L3 Core of SSS A stair tread at landing projects into core 2 could cause to hands Cut back and file up end SSWW San SSA General Clean paint off handrail and stair treads and landings Cea a EM BBCL 1 SSA General Rough finish to outer face of drum discuss option
16. BK 1 to BZ 09 Above BZ 09 replace broken diffuser Corridor B10 m BBCL 1 to BZ 09 Clean plaster from ceiling trim at BZ 09 Corridor B10 1 Refinish concrete shadow gap at foot of west FDs to BZ 09 BK 1 s at Light sensor not working correctly Sharkey 1 BZ08 Misigdorsops T S Sharkey a BZ 08 Missing strike plate was was Atrium Stair Stair Atrium Stair Top landing at Top landing at L5 investigate sag and creak to flooring investigate sag and creak to flooring Top landing at L5 investigate sag and creak to iooring f M amp S Atrium Stair oo excessive gaps to landing flooring general Atrium Stair Clean paint from handrails general item 01 07 2009 58 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM MEM TRADE Phase 1 DATE CHECK CHECK CHECK COMMENTS CLOSED E Meee improved Atrium Stair At L5 paint grey marks out on white stair sides and underneath ee Atrium Stair At L4 lights continually trip off brace removed _ Atrium Stair Fil and paint cracks to MDF bulkhead General item o Of s EE E E I Atrium Stair Redo screw repair at half landing between L3 and L4 1 trium Stair Paint around screw support on stair waste between L4 and half landing below CSL 1 rium Stair Seal MDF at main floor levels to balustrade support steelwork Ls Atrium Stair Fill and pain
17. Ph2 L1 145 Tidy finish along east elevation shadow gap fill corners and paint Veitchi Ph2 L 1 1 15 Sort creaking floor at south door PFP Ph2 L 1 1 16 Fill and paint at blank plate above central light PFP Ph2 L 1 1 16 NE corner fill and paint hole to ceiling Mag Hanson Ph2 L 1 1 16 Fix gaskets both windows Mag Hanson Ph2 L 1 1 16 Loose hinge to south window PFP Ph2 L 1 1 16 Repaint south window LH ingo CSL Ph2 L 1 1 16 Complete seal to south window frame PFP Ph2 L 1 1 16 Repaint east wall SE corner high level Ph2 L1 146 Above west Screen sharpen edge of concrete slab fill and paint BBCL Ph 2 L 1 1 16 Check as no pelmets noted to int screen blinds CSL Ph 2 L 1 1 16 NW corner seal gap in shadow gap 01 07 2009 91 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED PFP Ph2 L 1 1 16 Skirting end north of int screen fill and paint BK Ph2 L 1 1 17 Tape down susp Wires north light PFP Ph2 L 1 1 17 Touch up ceiling damage and bumps all over Mag Hanson Ph 2 L 1 1 17 Replace gasket RH window Mag Hanson Ph 2 11 1 17 Fix gasket LH window PFP Ph2 L 1 1 17 Repaint wall LHS mid window low level psa Ph2 L1 117 Repair tape S wall east end PFP Ph 2
18. clean paint from door facings F05 Clean paint from facing P Sharkey 01 07 2009 Corridor 4 02 4 014 4 07 seal door frame RHS at low level 33 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM DATE CHECK CHECK CHECK COMMENTS CLOSED PFP GR pum dor 4 02 Sharke Ph 1 14 ur 4 02 4 14 Air gap through LHS stop Extra fixings fill y d 4 014 resulting holes Ph 1 L4 he 14 13 Paint missing on bulkhead on shadow gap Pf idor 4 15 _ ae a Fire doors noted minor damage where leafs meet Fire doors clean paint off doors 4 26 E 425 st Fire doors crack at head junction with ceiling EH pecia 7 Refix diffuser between 4 19 pin and fill Sharkey Ph 1 14 PEE Air gap both sides of frame to door 4 19 Sharkey Ph 1 L4 n m gap to glazing high level door 4 19 Sharkey Ph 1 L4 dm Door 4 20 fill gap to glazing high level Ph 1 14 pog 15 Adj 4 22 Refix diffuser Sharkey Ph 1 14 Door 4 22 Fill gap to glazing high level Sharkey Ph 1 14 Gam pu p Door 4 24 Fill gap to glazing high level Ph 1 14 Corridor 4 15 door adjacent 4 24 Blank plate to services cut 4 26 Sharkey Ph 1 14 ye i Fire doors smoke seal at head detached BBCL Ph 1 L4 uy oi Corner of concrete wall adjacent 4 27 fill chips EE Ph 1 L4 Gorri P Heating switch plate missing screw i Fire doors clean paint off facings both
19. All Levels General to all Seal all concrete columns and walls in rooms rooms PEE all Seal top of partion to ceig top of partition to ceilin rooms L5 Seal top of partition to ceing 9 13 05 2009 pem 81 Seal partition to concrete column rooms L5 General to all fm m Gensral t0 all Glass doors to be adjusted rubbing on carpet rooms L5 General to all Hairline cracks showing on ceilings fill rub down amp PFP 1 rooms L5 jrepaint General to all Check behind all radiators and make good the poor finish PFP 1 rooms L5 where required Sharkey All Doors Daylight showing through door stops frames Refixing required amp make good nail holes Corridors 5 02 BBCL Ph 1 15 to 5 15 North Tidy external corners of concrete gaps General to South Corridors 5 02 CSL Ph 1 15 to 5 15 North External corners of skirting fill gaps amp repaint to South Ph 1 15 Clean paint from architrave amp powder coated frames of to South glazed screens Corridors is Veitchi Ph1 L5 to 5 15 h Carpet finish to door frames of corridor fire doors requires better fit to a Corridors 5 02 CSL Ph 1 L5 to 5 15 North Seal junction of corridor fire door frames with wall to South Corridors is PFP Ph 1 15 to 5 15 N n Fam shadow gaps of corridor fire doors full height to to 9 Corridors 5 02 Sharkey 1 15 05 15 North Check smoke seals to fire doors refix or replace as Pf required pm South E Ph
20. BBCL Ph 2 L3 3 01 Clean plaster from trench heating PFP Ph 2 L3 3 02 touch up ceiling at ferrules Sharkey Ph 2 L3 3 02 Replace missing escutcheon Mag Hanson Ph 2 L3 3 02 Fix gasket BBCL Ph 2 L3 3 02 Trim mastic back off window frame at handle untidy finish Mag Hanson Ph 2 L3 3 02 Check window handle mechanism BK Ph2 L3 3 02 Tidy loose wire on S light fitting Veitchi Ph2 L3 3 02 Cut carpet tile at radiator CSL Ph2 L3 3 03 Seal shadow gap crack above windows CSL Ph2 L3 3 03 Tidy shadow gap junction with internal screen 01 07 2009 82 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED Reset north light suspension wires to perpendicular BK Ph2 L3 3 03 touch up BK Ph2 L3 3 03 Tape down suspension wire SW BK Ph2 L3 3 04 Tape down suspension wire SW UofE Ph2 L3 3 04 Check window restricted CSL Ph2 L3 3 04 Seal shadow gap crack above door CSL Ph2 L3 3 05 Seal gap at pelmet to ingo junction PFP Ph2 L3 3 05 tidy finish to corner bead high level SW corner PFP Ph2 L3 3 06 Tidy finish at ferrules CSL Ph2 L3 3 06 Seal gap at pelmet to ingo junction UofE Ph2 L3 3 06 Check window restricted PFP Ph2 L3 3 06 Touch up wall at shadow gap LHs of door CSL Ph2 L3 3 07 Seal gaps at
21. Grd L Corridor South FDs fill holes to sealant south side complete on N B Z14 side BBCL Ph 2 Grd L VR at Noted block wall marked CSL Ph 2 Grd L ales a B Z18 Seal frame to opening both sides move cable CSL Ph 2 Grd L pe B 718 Seal blockwork corners CSL Ph 2 Grd L Adj 218 complete joint at concrete Sharkey Ph 2 Grd L Ee 2 B Z18 Door does not double lock 01 07 2009 98 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED Corridor at FDs MDF plate over rough timber at door head adj B Z16 B Z18 both sides CSL Ph 2 Grd L a FDs seal frame to ingos CSL Ph 2 Grd L Stair E1 L8 Seal top landing vinyl Ace Ph 2 Grd L Stair E1 Lift 1 L7 cover exposed wiring Ace Ph 2 Grd L Stair E1 Lift 1 L7 cover exposed wiring Ph 2 Grd L Stair E1 Lift 7 lobby fill and paint ceiling crack PFP Ph 2 Grd L Stair E1 L7 Lift lobby touch up wall above grill BK Ph 2 Grd L Stair E1 L7 Lift lobby replace screw caps to vent BBCL Ph 2 Grd L Stair 1 vere lobby check original snagging gouge noted on lift BBCL Ph 2 Grd L Stair E1 L7 Lift lobby Repair tape and paint N elevation LHS
22. Sharkey Ph 2 Grd L Stair 1 ers FD to main corridor fill knot hole on hinge side E 1 1 BBCL Ph 2 Grd L Stair 1 L1 lobby remove tape at RHS of main corridor door loor level PFP Ph 2 Grd L Stair E1 General item paint shadow gaps all stair soffits PFP Ph 2 Grd L Stair E1 GL touch up ceiling PFP Ph 2 Grd L Stair E1 GF white wall repair tape corner and touch up generally Sharkey Ph 2 Grd L Stair 1 a to basement stop required as hits sensor on Sharkey Ph 2 Grd L Stair E1 GF FD to lobby finish edge and finish applied JCC Ph 2 Grd L Stair E1 GF ext FD refinish frame fixing holes JCC Ph 2 Grd L Stair E1 GF ext FD replace push bar JCC Ph 2 Grd L Stair E1 GF ext FD Tidy finish general int and ext to frame JCC Ph 2 Grd L Stair E1 GF restriction required to ext FD BBCL Ph 2 Grd L Stair E1 GF clean paint off radiator PFP Ph 2 Grd L Stair E1 GF touch up yellow wall PFP Ph 2 Grd L Stair E1 GF lobby repaint skirting and pipe box Uot E Ph 2 Grd L Stair E1 GF lobby 3 faults noted on fireman telephone above control box Ace Ph 2 Grd L Stair E1 GF lobby Replace missing screws to lift fire control PFP Ph 2 Grd L Stair E1 GF lobby touch up white mall and pipe box BK Ph 2 Grd L Stair E1 GF lobby screw cap missing in vent grill GF lobby replace missing veneer at fire seal hinge side Sharkey Ph 2 Grd L Stair 1 FD to open area Sharkey Ph 2 Grd L Stair 1 EN Repair chipped edge to bottom of FD to open M amp S P
23. access problems Access Example 2 232 where the safety flooring is installed directly above the damper actuators MSCPO4 Water Tank Room Ventilation Basement Control Panel 8 this unit serves two areas Sound Booths Sound Perception Labs via two separate reheat batteries Ventilation Studios controlled by common extract temperature sensors from each area Sound Booths amp Perception Labs Access Problems A ads access to the isolation dampers in these areas is extremely difficult and would request that this is demonstrated to the University Engineers AHU 8 serving Perception Labs and Sound Studios why is this AHU fed with intake air from AHU 3 on Level 3 and extract out directly into the plantroom Design query ACCESS SUBS BBCL UoE ITEM DATE CHECK CHECK CHECK CLOSED Riser safety flooring issues again see 2 232 for E ow typical example 6 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM MAY 2009 OUTSTANDING ITEMS COMMENT CHECK CHECK CHECK COMMENT CLOSED ACTION Level 6 Plantroom Lighting There is still insufficient lighting at both of these panels MSCP1 amp to allow safe working highlighted previously MSCP2 Level 6 Plantroom Dampers Unnecessary dampers in middle of Atrium EE 1 amp 2 Access Access walkway required across AHU 1 extract duct Access walkway required across AHU 1 extract duct required across A
24. also the fault to be picked up by the P Room BMS B Ment Visitor centre over door heaters do not operate MCP11 P Room correctly Basement Heatin Both VT pumps were off under BEMS control TAC Plant Room 9 REPORT FROM SWEDEN AWAITED MCP 11 MCP 11 Phase 2 Phase 2 Basement Basement Phase 1 amp 2 Lighting Faults on Emergency lighting bus cable The stainless steel rods are not tight enough and pull HOO perden out ADDITIONAL WORKS TO BE CARRIED OUT EB MSCP 03 MSCP 03 JAHU return air filter manometer damaged and Level 3 Core Level 3 Core indicating pressure of 400 Pascal s Manometers Y Y C Control C Control generally throughout site still require attention re Panel Panel damage leakage and calibration 01 07 2009 3 COMBINED SNAGGING LIST VERSION 16 15th ITEM TRADE LOCATION CAT MAY 2009 OUTSTANDING ITEMS COMMENT ACTION 01 07 2009 MSCP 03 Level 3 Core AHU 3 static pressure sensor PVC pipe requires to be C Control contained in conduit same problem as level 6 AHU s Panel MSCP 03 Level 3 Core Labels missing general comment Zone heating General C Control valves etc Panel MSCPO4 Water Tank Water Booster Set this still has a temporary isolator Room Controls Copex attached to the Grundfoss panel To be Basement removed Control Panel bd bs Fire Suppression Extract Fan EF11 this has an Water Tank 1 Room EF 11 isolation damper with an end switch but there is no BEMS indication of t
25. 14 JCC PET S Elevation LHS of FDs complete skirting Sharkey s d S Elevation repair damaged frame to FDs LHS low level BB PFP m At 1 14 tidy shadow gap end LHS of door Sharke Corridor 2 01 At 1 13 Punch and fill facing on screen side of door aney to 2 15 frame BK General General comment at open areas light switch should be blanked over not the case on Levels 2 and 2 Check all Sharkey 2 d 1 15 refix stops which are proud not fixed back fill holes Corridor 2 01 FDs adj 1 07 Seal cracks and gaps at head MDF to CSL 2 to 2 16 gap BK 2 Gorndor 2 01 Corridor at lockers Radiator foot plate is loose to 2 16 BB 2 Corridor at lockers Fix back loose lockers use plate Corridor 2 01 Corridor at lockers Noted as L2 flooring not below south to 2 16 lockers Corridor 2 01 Corridor at lockers FD to lift several repairs required to Sharkey 2 to 2 16 door and frame BBCL 2 se WC corridor 1 707 Refix top IPS panel BK 2 WC corridor 1 207 Pipe Bracket required Sharkey 2 uc WC corridor 1 207 No red indicator on lock 01 07 2009 93 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED PFP 2 ed WC corridor 1 207 tou
26. Fan fixed speed again but has Ecosmart AND completely inaccessible Siemens speed controller fitted why AHU 21 Extract Fan has two differential pressure switches piped across it One on the BEMS and the other is wired to the Smoke Extract Fans control panel Fans 14a amp 14b This looks like a wiring mistake D P switch should probably be across smoke ex AHU 21 Extract Fan D P switch pipework spigot Y broken off at duct Replacement spigot required 01 07 2009 10 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION RON OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED AHU 21 Extract Damper shown on drawings BEMS system but it has not been installed If there is no damper required then remove all references wiring panel lamps and software for this unit AHU 20 Floors Isolation Dampers as in Phase 1 the access to some of these units is extremely precarious AHU 20 This will have to be looked at an individual basis and a Health amp Safety assessment made on any remedial action required AHU 20 Level 2 Floor Isolation Extract Damper this Ventilation amp has had to be removed by University engineers as it AHU 20 Heating was reported to be creating a vibration type noise in the afternoons To be investigated and replaced once problem rectified AHU 20 Extract Filters these cannot be removed for AHU 20 Access mai
27. G 02 in shadow gap CSL Ph 2 Grd L 602 Seal head of white panels at lift 2 BBCL Ph 2 Grd L Eod G 02 4 of left fill hole and improve finish to 2 patches Veitchi Ph 2 Grd L zm 6 02 East elevation fill gaps to floor tiles at wall BBCL Ph 2 Grd L TUE G 02 t elevation below high level vent remove marks from Corridor G 02 West elevation check flooring detail at G 01 G 02 G 03 Bennets Ph 2 Grd L to noted carpet stamp on corridor or side exposed when door closed Sharkey Ph 2 Grd L naa 6 02 No push plates on FDs adj G 02 Ph 2 Grd L G 02 Eill and paint crack to wall above G 03 PFP Ph 2 Grd L 02 Crack to bulkhead where corridor opens out fill and paint Ph 2 Grd L Corridor G 02 At high ceiling bulkhead junction remove screw fill and to paint BBCL Ph2 GrdL des 602 Check flooring junction timber stone detail threshold PFP Ph 2 Grd L cornar G 02 Open area several ceiling cracks fill and paint PFP Ph 2 Grd L ae Open area Touch up round ceiling access hatch Veitchi Ph 2 Grd L P 6 02 Open area NE corner fill hole to granite tile Veitchi Ph 2 Grd L ds G02 Open area Improve finish to ceiling behind S corner BBCL Ph 2 Grd L ecd G 02 Open area Ext screen clean paint from frame Mag Hanson Ph 2 Grd L Mr Ge Open area Ext screen repaint damage to frame PEP Ph 2 Grd L Corridor G 02 Open area Behind SW column fill conduit knot hole and to paint Sharkey Ph 2 Grd L G 02 Fill temp padlock ho
28. G 06 2nd window from south fix gasket Mag Hanson Ph 2 Grd L G 06 2nd window from south adjust restrictor BBCL Ph 2 Grd L G 06 Improve finish to concrete wall top right corner and along floor PFP Ph 2 Grd L G 06 Clean paint from N and S columns Ph 2 Grd L G 06 Seal skirting hole RHS of door Ph 2 Grd L G 06 Recess required for slip bolt ensure engages Ph 2 Grd L G 06 NE floor box missing handle Veitchi Ph 2 Grd L G 06 Floor box requires carpet E elevation Sharkey Ph 2 Grd L G 06 Remedy excessive gap below door oak threshold PFP Ph 2 Grd L G 06 Clean paint from door frame ins shadow gap BK Grd L G 11 Broken light switch PFP Grd L G 11 Touch up ceiling along concrete wall and into new corner CSL Ph 2 Grd L G 11 Seal concrete wall to ceiling BB PFP Ph 2 Grd L G11 top LH remove screw repair tape BBCL Ph 2 Grd L G 11 LH window remove paint Mag Hanson Ph 2 Grd L 911 LH window loose top hinge CSL Ph 2 Grd L G 11 Reseal LH window at hinge Rainbow Ph 2 Grd L G 11 Stop required to RH blind BBCL Ph 2 Grd L G 11 Clean plaster off column CSL Ph 2 Grd L G 11 Seal cracks and holes to shadow gap Sharkey Ph 2 Grd L G 11 Doorstop required BBCL Ph 2 Grd L G 11 Fill tie hole bottom RH of concrete wall BBCL
29. L 1 1 17 S Wall popped screw 3 metre from east fill and paint PFP Ph2 L1 147 Int screen LHs ingo tidy appearance and remove mastic seal and repaint Ph2 L1 147 Above west Screen sharpen edge of concrete slab fill and paint Door damage repair hole in frame at access control Sharkey conduit level and split to veneer BBCL Ph 2 L 1 1 17 Check as no pelmet to int screen blinds noted BB PFP Ph 2 L 1 1 18 south ceiling shadow gap clean and paint PFP Ph 2 L 1 1 18 Paint walls behind Radiator and LHS of over panel PFP Ph 2 1 1 18 Clean paint from light PFP Ph2 L 1 1 19 Repaint above lights and fill crack BK Ph2 L 1 1 19 Tape down susp wire NE PFP Ph2 L 1 1 19 Repair tape above 1 19A door BBCL Ph2 L 1 1 19 Clean bulkhead extract Sharkey Ph2 L 1 1 19A Door not locking sort PFP Ph 2 L 1 1 19A Repaint shadow gap above door PFP Ph2 L 1 1 19A Above door fill crack and paint Mag Hanson Ph2 L 1 1 19A Window unrestricted CSL Ph2 L 1 1 19A Tidy mastic at window handle side PFP Ph 2 L 1 1 19A Touch up paint on and around bulkhead Mag Hanson Ph2 L 1 1 20 Replace missing gasket PFP Ph2 L 1 1 20 Fill ceiling hole and touch up ceiling generally BK Ph2 L1 1 20 N light fitting requires leveling CSL Ph2 L1 1 20 Seal pelmets to ingos Sharkey Ph 2 L 1 1 20 Replace missing hinge screws Sharkey Ph 2 11 1 22 Replace missing hinge screws CSL Ph2 L 1 1 22 Seal ceiling to concrete wall CSL Ph2 L 1 1 22 Complete seal around window and soffit i
30. Lower light on BK Roof Lighting pole to level of slabs Briggs Atrium Roof No overflows are installed See 0312 27 124 Grainger Atrium Roof No wire ballgratings at the top of the rainwater outlets See 0312 27 124 Internal Atrium Roofspace Light boxes need to be cleaned And offered for light testing Internal Atrium Roofspace No fire exit signs in Plant Room Level 6 Roof No safety labels on latchways See specification 0312 27 N25 210A Req new tags eq Level 6 Roof No safety labels on eyes for abseilers See roofing specification 0312 27 N25 220A N A N A Req new tags Level 6 Roof Damage to render on goods lift overrun No insulation was visible to the rear of the metal profile cladding The internal corners certainly need Level 7 Plant Roof Well sealing up as concrete can be clearly seen Level 7 Plant Roof Well Louvered door snags on opening Lock not engaging Grainger Level 7 Plant Roof Well RWO grill present BBCL Level 7 Plant Roof Well Roof hatch is clashing with parapet Adjustment of actuator required Briggs Level 7 plant room roof No guard on roof outlet as specified Level 7 plant room roof No overflows fitted to plant room roof Level 6 roof west side Mastic Asphalt below smoke vent fan exposed Levels 2 3 4 and 5 Balconies Bolt for door to be fitted to allow to stay open securely JCC Timber cladding level 4 roof Timber boards and aluminum flashing at base to be completed 4th
31. N Step in timber cladding LHS of FD to Elevation Inspace BBCL Ph 1 Ph 1 N Lighting prot on 2no columns box in evation on east faces BBCL Ph 1 Ph 1 N Check schedule Inspace north fire Elevation door has no handle BBCL Screen threshold to FDs LHS main entrance Seal gap in cladding recess RHS of Hanson main entrance LHS main entrance fill and paint screw JCC Ph 1 Inspace LHS main entrance straighten slats below dry riser box JCC Ph 1 Inspace LHS main entrance high level complete shadow gap seal hole Ph 1 Ph 1 Pend Grout paving east side beneath north BEEN most windows JCC Ph 1 Ph 1 Pend NW corner trim cladding battens to line of cladding bottom East elevation remove tape and Clean paint off SE column ex ace JCC Ph 1 Ph 1 Pend North FD repair damage to cladding metal trim at bottom Ph 1 South FD repair damaged slats p eu Main missing anti skate boards studs 01 07 2009 73 Sharkey Sharkey Main LHS of ramp trim membrane seen Entrance below timber Main LHS of ramp horizontal shadow gap to Entrance slats at low level even up router Main LHS of ramp colour repairs to slats 3m Entrance from west corner Ph 1 Ph 1 h 1 G R Ross BBCL CSL BBCL CSL CLS CLS JCC CLS Mag Hanson CLS Mag Hanson CLS 01 0
32. Ph 2 Grd L G 03 Seal cracks and gaps to shadow gap all round PFP CLS Ph 2 Grd L G 03 Pa and seal skirting shadow gap on W elevation note PFP Ph 2 Grd L G 03 LH window clean paint off handle Mag Hanson Ph 2 Grd L G 03 All window handles hit ingos adjust Mag Hanson Ph 2 Grd L G 03 Centre window fix gasket PFP CLS Ph 2 Grd L G 03 Centre window improve finish on handle side PFP Ph 2 Grd L G 03 N elevation paint out pencil marks and damage at sensor Sharkey Ph 2 Grd L G 03 Missing escutcheon to lock CSL Ph 2 Grd L G 03 Seal above over panel Ph 2 Grd L G 04 Rear of column complete granite flooring Mag Hanson Ph 2 Grd L G 04 Repair finish to ext screen paint all over 01 07 2009 94 Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE COMMENTS ITEM CLOSED Ph 2 Grd L G 04 Seal above over panel Ph 2 Grd L G 05 Blank plate on conduit on N wall Ph 2 Grd L G 05 Clean paint from ext screen frame PFP CLS Ph 2 Grd L G 05 LHS shadow gap to column vertical seal tidy trim at bottom BBCL PFP Ph 2 Grd L G 05 Holes to concrete wall RH bottom fill and paint keem or skirting PFP Ph 2 Grd L G 06 Touch up ceiling ferrule at door fill and paint damage in centre CSL Ph 2 Grd L G 06 Seal bulkhead to wall BBCL Ph 2 Grd L G 06 Fill 2 holes centre of concrete wall Mag Hanson Ph 2 Grd L
33. Ph2 L2 2 04 Skim and paint above skirting LHS of door UofE Ph2 L2 2 04 Paint board fixing holes RHS of door Mag Hanson Ph2 L2 2 05 Replace deformed opening window gasket BK Ph2 L2 2 05 Refix loose end caps to lights PFP Ph 2 12 2 05 Touch up ceiling round services PFP Ph2 L2 2 05 Touch up wall LHs of door BK Ph2 L2 2 06 Tape down suspended wire to light NE PFP Ph2 L2 2 06 Complete paint skirting level LHS of door BBCL Ph2 L2 2 06 Tidy shadow gap mastic smears N and S wall Sharkey Ph2 L2 2 06 Over door panel appears loose fix PFP Ph2 L2 2 06 Tidy shadow gap door junction RHS BK Ph2 L2 2 07 Tape down light susp wires NE BBCL Ph2 L2 2 07 Trim bump to shadow gap between column and RH window Mag Hanson Ph2 L2 2 07 Window mechanism stiff ease PFP Ph2 L2 2 08 touch up ceiling SE ferrule Mag Hanson Ph2 L2 2 08 Fix gasket LH window Mag Hanson Ph2 L2 2 08 Replace gasket RH window PFP Ph2 L2 2 08 Wall both sides of mid window high level skim and paint JCC Ross PF Ph2 L2 2 09 Remove temp bulkhead to ext elevation and fix pelmet P CLS skim paint seal BK Ph2 L2 2 09 Tape light susp wire down SW Ph2 L2 2 09 Redo manifestation to screen bubbled 01 07 2009 85 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED
34. Phila 2 17 Replace dark carpet les I 7 a fe L t Excessive gap under door Veitchi Ph 1 12 2 20 Movement floor tiles at N wall PFP Ph 1 L2 2 21 Patch up at head acoustic panel NW corner G R Ross PFP Ph 1 L2 2 21 Tape S wall E low level refix 2 and repaint Ph 1 12 Shadow gap N wall needs tidying Ph 1 L2 Soffit needs tidying at NW corner 01 07 2009 44 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM TRADE Phase 1 DATE CHECK CHECK CHECK COMMENTS CLOSED NN E ooo 0 CdS Mag Ph 1 12 2 24 Window handle w side broken Hanson Po Ph 1 12 _2 24 Sed soffit junctions of ingos Ph 1 12 Touch up ingo top LHS E window Po Ph 1 12 Improve N wall shadow gap PO PFP Ph 1 12 2 25 Improve W wall shadow gap Ph 1 12 2 25 Improve finish on W wall in NW corner at junction with column eu isis 2 25 Improve finish on N wall at junction with soffit and _ structured glazing Tc up shadow gaps at acoustic panels ux E QA REC II TU C S T frt O O Pnt t2 226 lmpoveWwalshadovgap CT o y em ge M G 1 12 227 Tape refix and repaint LHS of door LL L Ph 1 12 Fill gap in shadow gap LHS of door at bottom PT PT PT PT Hanson G R Ross RHS of vision panel junction between wall and frame to Ph 1 12 2 28 PFP glaze panel fill and repaint PT PT P
35. Tidy RHS Sharkey Ph 2 Grd L Stair E1 Square up stair to lobby L7 doors not meeting BBCL Ph 2 Grd L Stair E1 Lobby Clean fire phone surround all 15 06 2009 BBCL Ph 2 Grd L Stair E1 General comment Greening of concrete investigate PFP Ph 2 Grd L Stair E1 L5 landing LH top touch up wall and at radiator PFP Ph 2 Grd L Stair E1 U s landing above L5 paint shadow gap at wall BK Ph 2 Grd L Stair E1 L5 Lobby Replace fire phone catch PFP Ph 2 Grd L Stair E1 L5 Lobby Improve finish to tape LHS Sharkey Ph 2 Grd L Stair E1 L5 Lobby Chip to bottom of FD to corridor BBCL Ph 2 Grd L Stair 1 L5 Lobby FD to landing remove timber to concrete LHS and patch PEP Ph 2 Grd L Stair 1 Balustrade complete return at landing level slab gloss wrong colour all levels PFP Ph 2 Grd L Stair E1 L5 to L4 Paint shadow gaps Sharkey Ph 2 Grd L Stair E1 L4 top facing to FD replace as damaged PFP Ph 2 Grd L Stair E1 L4 Correct wall colour currently yellow PFP Ph 2 Grd L Stair E1 L4 Lobby Tidy shadow gaps LH and RH BBCL Ph 2 Grd L Stair E1 L4 lobby Clean vent grills tape residue etc Sharkey Ph 2 Grd L Stair E1 L3 FD bottom hinge pin falling out Sharkey Ph 2 Grd L Stair E1 L3 FD main leaf leading edge requires finish coating BBCL Ph 2 Grd L Stair E1 L3 Clean paint off radiator PFP Ph 2 Grd L Stair E1 L3 lobby improve finish at shadow gaps sand and paint PEP Ph 2 Grd L Stair 1 L3 lobby Improve finish at electrical boxes high
36. Ventilation Room UV Filter Unit there is no panel fascia warning lamp for this system just a BEMS software alarm Fascia lamp required as per UofE E Controls Guidelines Version 4 0 Section 3 4 4 Basement Water Tank Room Warning Lamp Pasoment Water Water Meters DISCUSSION REQUIRED BH UoE Water Tank meters Room BH UoE Rain Water Tanks incoming mains water isolating Basement Water valve on the mains water inlet just before the 908 Water Tank meters automatic motorised valve Room Note the smell of sewage from the drain in this room Chiller Plant Room Drainage was disgusting Chiller Fault Code E00 this code is displayed on the Chiller Plant Fault chiller unit whenever it is disabled via the BEMS Room Indicator system 5 v Trace Heating there is currently a fault condition in Heating the Level 4 Tea Prep area of the trace heating Trace Heating Alarms there are three BEMS Trace common alarms for ALL of the trace heating units in Heating the building 01 07 2009 12 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION MAY 2009 OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED ACTION Sump Pump Panel this has a local isolator adjacent Panel to the panel which has the required additional pole for Isolation 24 volt isolation of the BEMS alarm circuit Chiller Valve commands are in BEMS Outstation No 137 but the changeove
37. _ and relay carpet tiles Ph 1 L4 Investigate and remedy visible carpet tile joints all over NNI Ph 1 L4 Carpet tile behind magnetic hold open to be replaced Ph 1 L4 Tidy up around light switch at door from corridor Sharkey vee didi Replace smoke brush and intumescent seals to corridor entrance doors BER RHS of door over panel tidy paint on ceiling and take PFT paint across recesses at column head poo ee y poo o qo Sharkey Ph 1 14 439 dus keeper latch Ph 1 L4 Mag Ph 1 14 Fix gasket to opening windows E n Ph 1 L4 Lift 3 Level 4 Fill and paint damaged plaster corner LHS low level BBCL Ph 1 L4 Lift 3 Level 4 Remove protection to doorway low level both sides Ph 1 L4 Lift3 Level 4 Clean paint from indicator above doorwa mp Li o 1 BBCL Ph 14 4 37 Noted pass door has excess clearance 4223 No access o PFP Ph 1 14 4 36 55 concrete columns Mag Ph 1 14 4 36 Fix gasket to opening windows 01 07 2009 32 Phase ITEM TRADE Location Level Hanson Ph 1 14 Fix creaking floor centre of room BBCL Ph 1 14 Note excess clearance on door Do JCC Ph 1 14 Roof Terrace Veneer failure on face on both doors Level 4 Roof Terrace Laval d Rocking floor at door Ph 1 L4 Roof Terrace Level 4 Defect Items From Joint Walkrounds Phase 1 ACCESS SUBS BBCL UoE ITEM DATE CHECK CHECK CO
38. access 1o this fan due to the fixed ceiling Control panel arrangement Ceiling to be altered to provide full access Control panel switch Also fan D P switch appears to be faulty AHUOS9 Kitchen Supply Fan this has the full complement of Ecosmart integral controls fitted ie heating valve cooling valve speed controls etc Once again these valves are completely inaccessible as they are behind the side skin of the AHU which has M amp E Phase 1 M pipework passing through it During tests we could only achieve a 4 7 C rise across the heating battery so presume the Ecosmart valve must be partially blocking the flow All Ecosmart controls should be removed from this system and heating and cooling rebalanced 01 07 2009 17 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION fay 200o OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED COLOUR WORKS COMPLETE UNIVERSITY ITEM BBCL ACTION BK ACTION ITEMS RAISED BY UoE FOR REVIEW BY DESIGNERS BBCL amp BK ITEMS TO BE MONITORED COMMENTS FROM REVIEW OF ACCESS TO PLANT amp EQUIPMENT KEY 01 07 2009 18 ACCESS 5085 BBCL BA Item ITEM Trade Location BENNETTS SNAGGING LIST DATE CHECK CHECK CHECK Comment Closed Lighting by Core A overrun to not be mounted on a high pole See 0312 27 006
39. and ferrule NW PFP Ph 1 12 2 39 Seal concrete column Mag Ph 1 12 Fix gasket to opening windows Pht L2 240 Sealconoretecolumn 1 e Ph 1 12 241 Paint shadow ger SW corner Lo 1 dq y 01 07 2009 46 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL ITEM bn DATE CHECK CHECK CHECK COMMENTS a Ph 1 L2 241 __ Pountight inoperative check and replace lamp inoperative check and replace lamp _ 1 12 243 Easeblinds 1 L2 Seal window soffits Hanson Ph 1 12 Pht L2 244 Ease blinds B E DX Eno 2 LL E Pht L2 Seal concrete wall Phil JCC PFP Pht1 L2 NW corner refix popped screws fill and paint Hanson PFP CSL Ph 1 L2 Repaint marks on ingos seal at head of window S e EE Eo y Po po Po Phil po 1 12 251 Repaint damage to ingo 9 puc Ph 1 L2 Bossed tape at screen refix and paint Ph 1 L2 Seal concrete wall BK 2 53 Loose light diffuser Mag Ph 1 12 2 54 East elevation 2nd window from right handle mechanism Hanson needs adjustment PAT 254 South corner window fill and paint pelmet and ingo blind installation damaged UofE Ph 1 12 2 South light fitting inoperative M CSL Ph 1 L2 West wall seal crack L d 7 Replace lamp GUEST Ph 1 L2 a6 At 2 50 bossed as screen refill and repaint PFP
40. and trunking pore Touch up wall at trunking all walls U of E B10 Booths generally no comment bar 3 and 6 noted water stain check Sage a a ee 3 Ecc ee ce BK 1 Bf0 Loose cable above west area light fiting fJ Jo o To PeP 1 Bzie Replace damaged les t PFP B 05 Replace badly cut tile and marked tiles IAC B 05 Remove tape and tape residue off sliding panels Investigate setting out and arrangement of sliding panels DB PB 1 B 05 Check position in room Check door position if in centre Y Y panels 01 07 2009 56 28 05 200 Door configeration changed to clients wishes 10 06 09 Note not as per drwg Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM roe on a DATE CHECK CHECK CHECK COMMENTS CLOSED LINDEN EN rog ee cag S L5 L1 18 e eae Foam ingo at hinge side of entrance replace as poorly B09 fitted Replace damaged ceiling tiles and missing trim _ Fit missing ight diffuser loose Eo p a Po EE 39 Top landing remove pump to top tred Po Veichi 1 Core C stair_ Complete nosing to bottom tred top flight PFP 1 Core C stair_ Paint marks on wall corners Po Ss Po Replacelamp PFP Core C stair Timber plate at first landing fill holes and paint Sharke Core C stair Bottom door ease stops to allow door
41. at plaster concrete wall junction BK Ph2 L2 247 sagas lights on fittings 3rd from north and 2nd from BK Ph2 L2 2 17 Loose end caps to lights BK Ph2 L2 2 17 3rd Light from north twisted BK Ph 2 12 2 17 Tape down susp wires generally in room PEP Ph2 L2 247 NW corner remove snot and sand down bump to ceiling and paint PFP Ph2 L2 247 Elevation beam trim back concrete at each end and recoat fire paint CSL Ph2 L2 247 W elevation shadow gap fill holes at column wall junctions BB PFP Ph2 L2 2 17 Repair concrete slab ship above N door and paint PFP CLS Ph2 L2 2 17 Tidy junction walls and SW column repaint and seal Mag Hanson Ph2 L2 2 17 Mid window loose hinge PFP Ph 2 2 2 17 Mid window repaint ingo at hinge after MH repair Rainbow Ph2 L2 2 17 Stop required to bund 3rd from south 01 07 2009 87 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED At mid column cover plate required to PC bracket at BB PFP Ph 2 L2 2 17 re skirting and paint Ph2 L2 247 At mid column head remove screws tidy plaster edge and paint BB PFP Ph2 L2 2 7 Tidy shadow gap line and paint E Elevation PFP CLS Ph2 L2 2 17 Repaint E Elevation skirting and
42. ceiling above S Light 2 15 Loose manifestation replace Sharkey 2 15 Loose stop requires fixings CSL 2 15 Seal crack to shadow gap all round BK 2 15 Light fitting s required to south side PFP 2 02 Touch up ceiling at both column heads Mag Hanson 2 08 Replace broken catch to RH window PFP 2 16 Ceiling at S wall water damage scrape back fill and paint BK 2 16 Tape down susp wires generally throughout the room PFP 2 16 Touch up round south smoke detector PFP 2 16 Ceiling NE corner water damage scrape back fill and paint CSL 2 16 Seal window soffit to ingos generally PFP CLS 2 16 Reseal LH window ingo LHS and touch up ingo paintwork CSL 2 16 Seal hole in shadow gap above LH window PFP 2 16 Touch up LH window soffit Mag Hanson 2 16 Furthest RH window hinge loose not closing properly PFP 2 16 E Elevation skirting shadow gap requires filling and paint BB PFP Ph2 L2 2 16 E Elevation shadow gap straighten line PEP Ph2 L2 216 E Elevation at mid column head skim plaster and paint on RHS PFP Ph2 L2 2 16 South door LHs reskim take and paint CSL Ph2 L2 2 16 S Elevation seal shadow gaps at column heads PFP Ph2 L2 2 16 Repair tape and paint RHS of south column CSL Ph2 L2 2 16 Seal column in skirting shadow gap
43. glazed screen 03 06 2009 Mag Hanson Ph 2 L6 6 01 Redo paint repairs to framing Mag Hanson Ph 2 L6 6 01 Replace gasket to opening window PFP Ph 2 L 6 6 01 Paint pelmet ends at glazed screens both sides UotE Ph2 L6 6 01 Longer cylinder required to lock thumb turn required externally JCC Ph 2 L6 6 01 Door stop required to balcony door Mag Hanson Ph2 L6 6 01 Flashing to balcony Screen LHS exposed rusted fixing replaced with concealed non corroding fixing BB Ph 2 L 6 6 02 Clean debris from light fitting top PFP Ph 2 L 6 6 02 Touch up ceiling at ferrule P pos k Ph 2 L 6 6 03 Repair tape down concrete column junction NW corner B jud f Ph 2 L 6 6 04 Repair tape down concrete column junction SW corner Mag Hanson Ph 2 L6 6 05 Replace cut gasket Mag Hanson Ph 2 L 6 6 06 Replace cut gasket BBCL Ph 2 L 6 6 06 Clean window frame high level LHS Mag Hanson Ph 2 L6 6 07 Replace cut gasket CSL Ph 2 L 6 6 07 Seal pelmet to wall RHS JCC Ph 2 L 6 6 08 Repair or replace bottom shelf veneer edge missing PFP Ph 2 L 6 6 08 Touch up window ingo LHS missed at head HT Mag Hanson Ph 2 L6 6 09 Replace gaskets Veitchi Ph 2 L 6 6 09 Fit carpet to floor box Mag Hanson Ph 2 L 6 6 09 West glazing file damage and paint Mag Hanson Ph 2 L 6 6 09 South glazing repaint cill scratched Veitchi Ph 2 L6 6 09 Recut overlapping carpet in NW corner Veitchi Ph 2 L 6 6 09 Redo carpet at east radiator PFP Ph 2 L 6 6 09 South LHS window paint stain on soffit CSL Ph 2 L 6 6 09 So
44. high level trunking to wall Veitchi Ph rdL 17 Adj G 18 RHS replace badly cut floor tile Ph 1 Grd L G1 fone light not working Replace lamp Ph 1 Grd L Paint exposed plaster at door shadow gap i Ph 1 Grd L Door into atrium door sign missing Ph 1 Grd L Door into atrium door catching loose frame Sharkey Ph1 GrdL Door into atrium replace rough facing atrium side RHS Sharkey Ph 1 Grd L Door into atrium D handle missing Ph 1 Grd L Hanson m used Mag Ph 1 Grd L G 13 Check gaskets to windows Hanson Do Do Do Do Ph 1 Grd L Blind out of runner mid window O OE Do o Ph 1 GrdL G18 blinds fill and paint runner fixings damage sae ara reception Sharkey Ph 1 Missing door stops Ph 1 Grd L Moving floor tile 2m from door Hanson Ph 1 Grd L Repair wall damage to rainbow blinds Ph 1 Grd L Fill fixing holes to door stop RHS Ph rd L RHS of door paint exposed plaster at shadow gap Rainbow Ph rd L G 15 Blinds not perpendicular all Hanson Ph Gr Sharke 01 07 2009 66 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM EM Phat Lace pete DATE CHECK CHECK CHECK COMMENTS CLOSED BK Pht GrdL 9 16 Blankplate missing to light trunking O Z o J y y y Phi GraL 61
45. level bump LHS Sharkey Ph 2 Grd L Stair E1 L3 lobby Fill chip in leading edge to main corridor FD CSL Ph 2 Grd L Stair E1 L3 lobby seal skirting ends to walls Sharkey Ph 2 Grd L Stair E1 L2 FD hinge pin coming out PFP Ph 2 Grd L Stair E1 L2 Complete paint to window soffit PFP Ph 2 Grd L Stair E1 L2 Touch up white coloured holes to wall at radiator BK Ph 2 Grd L Stair E1 L2 Lobby Replace fixings to fire refuge panel PFP Ph 2 Grd L Stair E1 L2 lobby Touch up N wall skirting PFP Ph 2 Grd L Stair E1 L2 lobby sand and paint LH and RH shadow gaps BBCL Ph 2 Grd L Stair E1 L2 lobby clean vent grills BK Ph 2 Grd L Stair E1 L2 lobby replace screw caps to bent grills Sharkey Ph 2 Grd L Stair E1 L2 lobby Repair or replace fire stop on main corridor FD 01 07 2009 99 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED Sharkey Ph 2 Grd L Stair E1 L2 lobby Repair veneer at handles on main corridor FD BK Ph 2 Grd L Stair E1 1 2 landing L3 to L2 Check light fitting PFP Ph 2 Grd L Stair E1 L1 touch up wall especially low level PFP Ph 2 Grd L Stair E1 L1 lobby repaint N wall skirting and on pipe box SE BK Ph 2 Grd L Stair E1 L1 lobby replace screw cap to vent grill
46. light 4no BK Grd L Stair E2 L6 lobby fix loose socket PFP CLS Grd L Stair E2 L6 lobby refinish and seal LH ingo to FD to open area PFP Grd L Stair E2 1 2 landing L6 to L5 Tidy finish to slab ceiling edge at window PFP Grd L Stair E2 1 2 landing L6 to L5 Ceiling fill hairline crack to S side and paint PFP Grd L Stair E2 1 2 landing L6 to L5 repaint west face of pipe box PFP Grd L Stair E2 L5 touch up mark below sign Sharkey Grd L Stair E2 L5 lobby fix loose door stop BK Grd L Stair E2 L5 lobby no power socket check and remedy PFP Grd L Stair E2 1 2 landing L5 to L4 tidy edge to slab ceiling at window PFP CLS Grd L Stair E2 L4 tidy painted wall at ceiling junction PFP Grd L Stair E2 L4 Sand bumps on ceiling and paint Sharkey Grd L Stair E2 L4 lobby fix loose door stop FD to open area Sharkey Grd L Stair E2 L4 lobby FD to landing fix missing screw to push plate PFP Grd L Stair E2 L3 tidy edge at walls LH and RH and repaint PFP Grd L Stair E2 L3 paint out low level mark to wall Sharkey Grd L Stair E2 L3 lobby fix loose stop FD to open area Sharkey Grd L Stair E2 L3 lobby replace missing veneer at fire stops high level hinge side PFP Grd L Stair E2 L2
47. paint from hinges make good finish to frame GR Ross Major refinish of ceiling required due to water ingress 1 15 5 27 damage Strip back existing plaster finish seal concrete and replaster and paint Pre Phils 627 Filand paint wall behind door damagedbyhandle To Sharkey Phiis S27 Seal top of vision panel to wall and door standard M T sk Pris 527 eseweWorwn CY GR Ross Make good Ingo to opening window 2nd from left and Ph 1 15 between column and window ome marks on ceiling make good Ceiling damages due to water ingress Remove Ph 1 15 tr damaged plaster and repaint Soi Ph 1 15 sar keeper Ph 1 15 Fill gap to bottom of vision panel GRR os Ph 1 15 loose RH side vision panel shadow gap G _ 225 1 Ceiling damage due to water ingress Remove Ph 1 15 PFP replace damaged plaster and repaint PFP Ph 1 15 Make good shadow gap to RH partitions Ph 1 L5 Tidy silicone around windows CSL Pht L5 Seal top of concrete wall to ceiling CSL Sharkey Ph 1 15 Scratch to door handle height repair not good enough Sharkey Ph 1 15 LH door standard corridor side floor level Fill corner of Veitchi timber frame and piece in carpet BBCL Ph 1 L5 Check acoustic works 4 Ph 1 15 Patch up and paint I
48. pelmet to ingo junction Mag Hanson Ph 2 L3 3 07 Fix gasket CSL Ph 2 L3 3 07 Seal window cill SW corner PFP Ph 2 L3 3 07 Touch up ingo at window hinges Sharkey Ph 2 L3 3 07 Fix missing door stop CSL Ph 2 L3 3 07 Seal shadow gap above door and window BBCL Ph2 L3 3 08 Clean dust from top of light fittings BBCL Ph2 L3 3 08 Clean out diffuser CSL Ph2 L3 3 08 Seal pelmets to ingos CSL Ph2 L3 3 08 Seal SW column head in shadow gap CSL Ph2 L3 3 08 Seal shadow gap crack above door G R Ross PEP Ph2 L3 3 09 Repair tape south elevation RHS CSL Ph2 L3 3 09 Seal soffit and ingo at window CSL Ph2 L3 3 09 Seal hole at NW column head Rainbow Ph2 L3 3 09 dL with blind and board trim blind bottom edge to PFP Ph2 L3 3 09 Touch up round smoke detector CSL Ph2 L3 3 09 Clean mastic from internal screen CSL Ph2 L3 3 09 Seal right round shadow gap Sharkey Ph2 L3 3 09 Repair high level chip 3 to screen high level PFP Ph2 L3 3 10 2 missing ceiling tiles required replace damaged tiles at projector PFP Ph2 L3 3 10 Tidy finish at service penetrations to ceiling tiles Rainbow Ph2 L3 3 10 Blinds not retracting properly windows 1st and 2nd right Mag Hanson Ph2 L3 3 10 Loose hinges on both windows Rainbow Ph2 L3 3 10 Replace internal screen LH blind and square up bracket Veitchi Ph2 L3 3 10 Refix raised flooring at concrete wall at RH window BK Ph2 L3 3 10 Power supply required to AV console PFP Ph2 L3 3 11 1 missing ceiling tile required PFP Ph2 L3 3 11 Tidy f
49. seal BBCL Ph2 L2 2 17 SE column head remove plaster BBCL Ph2 L2 2 17 Clean door overhead panels PFP Ph2 L2 2 18 E elevation fill cracks horizontal and vertical fill and paint PFP Ph 2 L2 2 19 At light switch fill hole and paint PFP Ph2 L2 2 19 Ceiling fill crack and repaint marked ceiling PFP Ph2 L2 2 19 Repaint bulkhead PFP Ph2 L2 2 19 Move door to 2 20 fill cracks and paint CSL Ph2 L2 2 19 Seal gaps at ceiling overhead panel each side BBCL Ph2 L2 2 19 Clean plaster from doors shadow gaps PFP Ph2 L2 2 19 Clean paint from SE ferrule PFP Ph2 L2 2 20 Ceiling fill crack above light paint marked ceiling Mag Hanson Ph2 L2 2 20 Loose hinges both windows PFP Ph2 L2 2 20 Repaint damage to ingos to window after MH repair CSL Ph2 L2 2 20 Seal hinge sides of both window CSL Ph2 L2 2 20 Cut out mastic to floor units reseal BB UofE Ph2 L2 2 20 Noted no drinking water action by whom BBCL Ph2 L2 2 20 Clean radiator tape plaster etc PFP Ph2 L2 2 20 Clean paint from floor BBCL Ph2 L2 2 21 Clean paint from door PFP Ph2 L2 2 21 Repaint water damage at services on ceiling CSL Ph2 L2 2 21 Seal skirting shadow RHS of door BB CLS Ph2 L2 2 21 Trim E elevation shadow gap and seal corners CSL Ph2 L2 2 21 Reseal N column to N wall Veitchi Ph2 L2 2 21 NE corner susp floor refix Sharkey Ph2 L2 2 22 East door lock CSL Ph2 L2 2 22 Seal gaps at column heads CSL Ph2 L2 2 22 Complete floor sealant on N elevation Mag Hanson Ph2 L2 2 23 Window hinge loose M
50. sets Sharkey Double metal doors to 4 40 touch up chips 4 02 Door 4 24 clean plaint from facings ar uM 4 23 Fill high level wall cracks above door 01 07 2009 34 TRADE From Joint Walkrounds Oen dor 4 40 1 14 402 PFP GR Corridor 4 40 ae Optima Ph 1 14 Corridor 4 40 Scenic lift Repaint door frames touch up paint wrong 4 02 colour PFP GR Corridor 4 40 T Corridor 3 02 3 12 d E Door 3 02 frame plugs to fixings Mag Ph 1 13 Fix gasket opening window Ph 1 13 Paint pelmet at shadow gap next to west column 1l Ph 1 L3 Ease latch T Hanson Ph 1 13 Tape loose suspension wire to light fitting SW Y Phi L3_ 3 03 Re polish door at hinge Phils 304 NoComments CE y Ross b s 2 Ph 1 13 Redo tape to south wall at glazing Pf Phi L3 305 JjSealheadofglazng BK Phi L3 305 Replace floor grill grillnotmissing pT Pht t3 306 NoComments 0 0 0 0 0 0 0 BBCL Pht L3 310 Check shadow gap sealed esp at LHS of door Pht L3 307 __ Reseal LHS concrete column LHS vertically 1 13 307 ___ Reseal RHS concrete columnathead J Sharkey Pht L3 308 Passdoornotworking 1 10 10 Veitchi Pht L3 307 South side o
51. there is a Phase 1 Server room basement MCP 11 Sensor required Fire Alarm Interlock during the demos the fire alarm Phase2 Control panel test took place but the control panels in the basement basement shut down despite the operator switching the plant override test keyswitch on the fire alarm panel Server Room supply and extract damper are shown on the BEMS graphics but don t think these actually exist They may have been removed from the contract earlier If so delete all reference to these on the BEMS software graphics and wiring diagrams Phase2 Control panel Rain water tanks when valve opens too much water basement 11 comes out and the tundish overflows flooding the floor Rain water tanks noticed that Phase 2 valve and Phase2 Control panel level switch is engineered through software basement incorrectly would say but Phase 1 tanks are hard wired 01 07 2009 15 Phase2 Control panel basement MCP 11 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION fay an OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED Rain water tanks the access hatch to Tank no 2 is Phase 2 Control panel f completely inaccessible due to server room AHU basement MCP 11 supply duct crossing directly above it Phase2 Control panel First floor heating zone valve faulty requires basement MCP 11 replacement actuator Rooms 1
52. to close BBCL 1 CoreCstair Cleandoor Cd Sharkey 1 CoreCstair Repair cracked frame on above handle level or replace BBCL 1 Core c stair oe Genere item regarding marks paint on waste BBCL CSL 1 Condor Adj BZ 23 complete pointing and sealant to windpost i Coridor Adj 2 23 Light inoperative check BK 1 Corridor 9 BZ 23 Farthing leaf no keeper for bottom slip bolt m Lo ER Lo Lo NN NA Replace lamp Lo Um o eee Lo emm ETE Lo ERN NEN Corridor B10 BZ 18 Fire batt to be completed on south wall Im Conduit box requires cover LHS of door U of E B 03 Discharge from drip tray need directed to floor check contract Corridor B10 poe ot to B09 ee eee yf 01 07 2009 57 Level Phase 1 DATE CHECK CHECK CHECK CLOSED e o e eeno 0 _ pasmem Le v E ae a ae a TEE enemas _ TEE Rer eeseemen Sharkey Coridor BTO BZ 13 Missing door stop Sharkey gri BZ 13 Missing door stop swa umm eme O Corridor B10 Corridor B10 PS Corridor B10 Corridor B10 Corridor B10
53. 1 L5 Tolet Cubicles Cubicles Taps loose tighten as required Taps loose tighten as required Y Ph1 L5 Toilet Cubicles Some fixings to pipework and wastes below Whb s are missing fix as required Sharkey Ph 1 L5 209 Screws missing from handle L sd l 01 07 2009 20 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM TRADE Fe DATE CHECK CHECK CHECK COMMENT CLOSED Corridors 5 02 TT to South ___ EEE O ae 1 y y Ph1 L5 All Corridors Finish off around fire alarm points Floor tile dropping at base of steel beam make good 5 01 Coffee Chrome strip oak carpet fixings missing General at all Veitchi point coffee points Mag L7 Roof Birdcages to RWP missing FINEM L7 Roof Refix flashing behind roof access EE Hanson 1 L7 Roof Restrict roof access hatch to avoid flashing being damaged Adjust small access louvered door to lower roof to close L7 Roof and lock Grainger L7 Roof Birdcages to RWP missing UofE BBCL BK K BBCL P L6 Roof Lower light above AHUOS5 to just above slabs over tank 16 Roof 17895 to latchway systems are missing Install as UoE action currrent required tags need renewed Make good gap to base of steel columns and investigate L6 Roof water stain on floor M Ea access hatch and check during bad weather E L6 Roof Rem
54. 17 2 01 7 08 7 03 these rooms all show Phase2 Control panel trench heating on the BEMS software and graphics basement but don t think it exists now If not remove all references Extract Fan EF01 has been temporarily reversed to make it a supply fan for the basement plantroom MCP7 areas If this is to be a permanent solution then the M amp E Phase 1 Control panel panel fascia label and BEMS software and graphics will need modified to reflect this change is it wise to do this before the effect of the UPS DX Unit is known MCP7 Extract Fan EF101 now supply fan requires M amp E Phase 1 differential pressure switch complete with BEMS and Control panel panel fascia indication lamp for air flow failure MCP7 Trace Heating panel fascia fault lamp for riser B Phase 1 should actually be engraved risers B and C and Tea Control panel 05 prep area as it serves these areas MCP7 Trace Heating BEMS graphic s with all boxes Control panel individually numbered required and locations required Extension Heating Zone Buttons and valves A few MCP7 problems found with zone valves button operations Control panel and labels to investigate and rectify Inspace fit out area this has a heating zone valve in riser C ground floor but there is no extension button Phase 1 f area Phase 1 VT Circuits Pressure Transmitters there are two static pressure sensors installed one for phase 1 i
55. 2 paint round ferrules and paint marks on ceiling CSL Ph2 L4 4 13 Seal vertical shadow gap to SE column and S wall PFP Ph2 L4 4 13 Improve paint finish at head of SE column BBCL Ph2 L4 4 13 Trim corner tape at shadow gap each side of door CSL Ph2 L4 4 13 Seal crack in shadow gap above door PFP Ph2 L4 4 13 Paint round ferrules Ph2 L4 L4 balcony Render soffit improve junction finish to glazed screw M amp S Ph2 L4 L4 balcony venalia Item Clean rust stains from balustrade L6 as UofE Ph2 L4 L4 balcony Extra long cylinder required to timber door JCC Ph2 L4 L4 balcony Door stop required to timber door PFP Ph2 L4 4 15 Ceiling colour incorrect change yellow to orange Ph2 L4 445 Shadow gap on east elevation complete ceiling colour into screens Veitchi Ph2 L4 415 Timber flooring rebated edge split same as levels above remedy 01 07 2009 81 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED CSL Ph 2 14 ro Above balcony door seal pelmet to ceiling PFP Ph2 L4 ci At balcony door fill wall cracks and paint PFP Ph2 L4 Hold open doors repaint ingos poor finish CSL Ph2 L4 Corridor 4 01 ned open doors renew stained sealant LHS to 4 07 B
56. 29 L shower pipe bracket broken replace x Pat Phi GrdL GZ29 Lshower seal door head Eo BBCL Ph 1 Grd L Shower curtains different types used Replace wrong rail Sharkey Phi GrdL Check main door ironmongery schedule lock fitted and queried if an error fit 2no blank plates over holes 01 07 2009 64 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM Me Lace Pe DATE CHECK CHECK CHECK COMMENTS CLOSED Ph 1 Grd L Repair scores to door and frame p ppp BBCL Ph 1 Grd L Remove rubbish and tool box ____ eee eee eee entrance entrance CSL Ph 1 Grd L LHS G 17 door seal hole in shadow gap PFT entrance Ph 1 Grd L Goods At ceiling camera tidy finish entrance Ph 1 Grd L Goods ift indicator clean entrance Ph 1 Grd L Goods ift indicator fill hole and paint entrance Ph 1 Grd L Goons G Z27 paint exposed plaster edges to shadow gap entrance BK PFP Ph1 GrdL Goods Socket LHS G Z27 to be squared up tidy around entrance P P FP FP UofE Ph 1 Grd L 29000 G 04 Clip down white cable entrance Sharkey Ph 1 G 04 Veneer loose door frame entrance PFP Ph 1 Grd L G 04 paint exposed plaster edges to shadow gap entrance SL P Sharkey Ph1 GrdL Door into atrium door stop required Repair wall behind PFT entrance Sharkey Ph 1 Grd L Door into atrium refix facing fill and paint PFT entrance re
57. 6 RHS ofdoor paintskiring j Pht GrdL Pantatwindowhandes o y Phi GrdL G6 West wall high level data point broken replace ___ Y Ph 1 Grd L Missing cable access point replace po o eee S see WET pessum eae _ FDs door stop missing to farthing leaf adj G 14 General Item White paint on railing all stairs General Item White paint on railing all stairs General Item all landings No door stops Core stair_ L5 Above FD ceiling crack fin and paint J stair_ L5 lobby Fill holes in concrete below lift call button PFP 1 Core Bstair_ L4 Hairline cracks in ceiling at pipe box 1 CoreBstair_ L4 Repaint pipe box and clean off concrete J o BBCL 1 Core Bstair L4 Fillieholeoppositelftdoo __ Po Core B stair L4 Opposite lift doors remove yellow stain on wall kems paint po A 1 1 L3 Complete green paint behind radiator 1 Core stair L3 Remove paint from FD to stair 1 Core B stair L3 Replace missing stair sign i Lo L3 Fire exit sign required to lobby light fitting ir LGB sant gis screw A ir r i 1 1 CoreBstair L3 Check lux level
58. 7 2009 Main Render to beam and patch to soffit Entrance check colours and repain t Main clean west facing screen above ramp Entrance Main i Clean paint from soffit at column heads Entrance Main nun Soffit lights light inoperable check Main Soffit lights light sensors appear Entrance inoperable check lights on constantly h 1 Main At main door ingos recess flexell and Entrance seal SW corner west face of stone West Ph 1 investigate and remove mark to stone Elevation cladding above round column Ph 1 At FD to G 07 stone cladding broken Elevation Ph 1 West At FD to G 07 reseal crack to soffit evation edge West Visitors centre sign clean out slab joint Ph 1 Elevation jand seal round Ph 1 West Stays or stops required at FD behind evation columns West Touch up column paint damage at FD Elevation behind columns West Seal stone cladding to soffit RHS at FE evation behind columns West Paving light RHS of shop entrance evation cover broken replace West Paving light RHS of shop entrance Elevation seal gap to paving slabs West Shop entrance doors not plumb Ph2 evation _ realign gap when closed West Shop entrance doors seal ingos to Ph2 i Elevation paving West Remove black mastic from stone Ph 2 Elevation cladding between windows West LH end of stone cladding at column Ph 2 Elevation seal edge to white wall P P h 1 1 1 1 1 Ph Ph Ph Ph EH
59. BCL Ph2 L4 oS Hold open doors remove plaster from concrete edge Mag Hanson Ph 2 14 pe South elevation all windows fix gaskets PEP Ph2 L4 Corridor 4 01 South elevation Ingo at handle LH window fill junction to 4 07 and paint BK Ph2 L4 4 206 Bracket required to tap pipework BK Ph2 L4 4 207 Bracket required to tap pipework Sharkey Ph2 L4 4 208 Cover missing from 4 209 closer replace Sharkey Ph2 L4 WC Corridor Fill padlock fixing holes low level on riser doors PFP Ph 2 14 WC Corridor Fill and paint ceiling crack Ph 2 14 4 Z09 No access Sharkey Ph2 L4 WC corridor Ease FD to main corridor due to slamming 05 06 2009 PFP CLS Ph2 L4 4 209 Paint above door concrete and redo mastic Sharkey Ph2 L4 4 209 Missing hinge screws BK Ph2 L4 4 208 Fix loose panic reset plate BK Ph2 L4 4 208 Refix loose WC pan PFP Ph2 L4 L4 balcony Fill and paint ceiling cracks BK 2 Check lovre grill sizes at WC corridors L4 to L7 Patch under grill L3 noted with full HT grill North All levels check manifestation missing on some levels Mag Hanson 2 i Elevation North elevation of main corridor BBCL 2 General Check signage no baby change signs on doors bar 3 708 Sharkey Ph2 L3 3 01 Door catching carpet Mag Hanson Ph 2 L3 3 01 Repaint screen cills Mag Hanson Ph2 L3 3 01 Replace incorrectly coloured glazing bead to west screen Dm l Ph2 L3 3 01 NW corner fill and paint plaster at column head BBCL Ph 2 13 3 01 Check no opening windows to room
60. CL Ph 2 Grd L Stair E2 1 2 landing L1 to GF look at detail to exposed concrete slab in window BK Ph 2 Grd L Stair E2 GF Blank plate to conduit required BB PFP Ph 2 Grd L Stair E2 ae of concrete wall fill BB and paint also PFP Ph 2 Grd L Stair E2 GF paint MDF grey to FD facing Sharkey Ph 2 Grd L Stair E2 GF FD to basement adj closer Sharkey Ph 2 Grd L Stair E2 GF FD to basement repair top corner and scores Sharkey Ph 2 Grd L Stair E2 GF FD to basement refinish facings BK Ph 2 Grd L Stair E2 Check light fitting CSL Ph 2 Grd L Stair E2 GF Basement side of FD seal RHS corner PFP Ph 2 Grd L Stair E2 GF clean paint of base FD and facings BB PFP Ph 2 Grd L Stair E2 1 2 landing L1 to GF Exposed slab u s fill and paint BBCL Ph 2 Grd L Stair E2 1 2 landing GF to basement noted no pipe box check requirement PFP Ph 2 Grd L Stair E2 1 2 landing GF to basement tidy up window facing PEP Ph 2 Grd L Stair E2 1 2 landing GF to basement complete paint high level on wall return BBCL Ph 2 Grd L Stair E2 Basement clean wall and door Sharkey Ph 2 Grd L Stair E2 Basement FD stop required BK Ph 2 Grd L Stair E2 Basement Conduit cover plate required PFP Ph 2 Grd L Stair E2 Basement touch up yellow wall Sharkey Ph 2 Grd L Stair E2 Basement repair bottom corner of 1st FD Sharkey Ph 2 Grd L Stair E2 Basement Replace facings to 2nd FD BBCL Ph 2 Grd L Stair E2 Basement Check why 1st FD has 2 vision panel
61. E corner into concrete Ph 1 14 Paint required at opening window ee R Ph 1 L4 Split tape LHS doorway fill and paint Ph1 L4 4 26 West wall repaint bare patches at head Ph 1 14 Central light southend not working Fix Replace lamp CSL Ph 1 L4 4 28 North wall fill crack at shadow gap Mag Ph 1 L4 4 29 Refix gasket RH opening window Hanson 01 07 2009 31 ie Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM reu rane EJ DATE CHECK CHECK CHECK COMMENTS CLOSED EE ft ___ ni t4 Sliding partition not checked Veitchi Ph1 L4 4 31 Disturbed carpet tile cuts Glued down allow Atrium elevation Ph 1 14 Seal concrete wall Sharkey Ph 1 L4 Fill door stop fixing holes Veitchi Ph 1 14 433 Glue down disturbed tile cuts along atrium elevation and LLL generally tidy Ph 1 14 Fill door stop fixing holes PFP Ph 1 L4 4 33 Clean glass fin at high level Veitch Ph 1 L4 4 33 Missing carpet tile cut at radiator fixed Ph 1 L4 Fix gasket RHS opening window Hanson PFP Ph 1 14 4 40 Mini forum make Ju uneven fire coating on ceiling beam sand and paint Ph1 L4 Fill and paint gap on east elevation LHS high level JJ Hanson Ph 1 14 North elevation carpet tile cuts disturbed by furniture o Ph 1 14 440 raised flooring into column on east elevation Veitchi rer 4 40 Rocking raised floor end of channel heading SE corner
62. EFE entice Pub dow and epah window c oe M Hanson Phils 541 NE window bind stops missing rom 2 windows Phils 541 _ Filland repaint al skirings 1 LI 4 Reposition back board for fire extinguishers at door to be JCC PFP edge to edge with shadow gap Fill and paint holes from redundant fixings Sharkey 5 43 Poor finish to veneer replace door Veitchi 5 43 Carpet is lifting just inside door refix Repair and refinish facings stops and frame to RH side Sharkey i SS of door outside face including filling nail holes Ead Ph 1 15 5 43 Door stops protruding due to installation of acoustic seals Adjust to suit Ph1 L5 Lintel stop end is painted black remove paint 5 sinis Ph1 L5 blind made up of 2 pieces materials Why 01 07 2009 26 ITEM TRADE Phase Eeeation Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE COMMENTS ITEM Level Phase 1 DATE CHECK CHECK CHECK CLOSED aee M H ag Ph 1 15 543 Reminder handles to replacement and windows to be Hanson changed Ph 1 15 replace broken light fitting due to replacement window works Ph 1 L5 5 43 Clean paint from ceiling and give a general clean down Top of RH column opposite corner from door rub down PFP CSL Ph 1 15 5 43 and refinish timber ceiling seal between timber and column Veitchi Ph 1 15 5 43 Carpet between floor grille and sou
63. Floor roof terrace Incorrect fixings used for oak on bench Corrosion occurring To be replaced 4th Floor roof terrace Insulation exposed at top of core D stair threshold Gravel covering needed DE502 top of spiral stair SP05 Under landing of SP05 Steel plate missing leaving breather membrane visible Inspace Entrance Last timber cladding board is missing at junction with curtain walling Room 4 33 North Wall Hole at top of glazed screen Also room 4 34 Affects sound insulation Sealant required Special area Corrosion on angles Cleaning required Levels 2 3 4 and 5 Balconies Metal profile not sealed to the inside of concrete pre cast panel Large wooden sliding door Sliding gear to be verified as specification Check and ensure that door is sliding freely Loose wrinkled membrane below handrail needs securing or covering with saran type membrane or Robotics Atrium Briggs Levels 2 3 4 and 5 Balconies safriametal trim BK Meeting room G7 G7a and Trench heater covers sit approximately 10 15mm higher than floor finish around in places forming Conference room G3 atrip hazard To be made flush when trench heaters are replaced 01 07 2009 19 Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM dii ia un DATE CHECK CHECK CHECK COMMENTS osep EN GENERAL NOTE Items shown as General are recurring GENERAL to the majority of areas amp rooms
64. HU 1 extract duct Ventilation Night Purge this is currently configured as Level 6 follows the purge will only take place if the external Plantroom Ventilation amp temperature is between 12 degrees C and 17 degrees MSCP1 amp Heating MSCP2 C and if any of the Zone room temperature sensors rises above 23 degrees C Level 6 AHU 1 and 2 plus 4 Floor Zone Dampers as Plantroom highlighted many times before these dampers are MSCP1 amp virtually inaccessible and therefore the operation of MSCP2 each individual unit could not be witnessed Level 6 Plantroom Trench Trench Heating Thermostats UoE REQUIRE COPY MSCP1 amp Heating OF SPECIFICATION MSCP2 Level 6 AHU 5 Supply Fan Toilets could not access the fan Plantroom chamber and Ecosmart Unit within as the unit is MSCP1 amp mounted in an extremely awkward location with MSCP2 pipework passing across the access door Level 6 Plantroom MSCP1 amp MSCP2 Level 6 Kitchen Extract EFO2 note that Kitchen Supply Plantroom Ventilation system AHU 9 is fed from basement MCP7 panel and MSCP1 amp was not checked at this visit but the interlocking MSCP2 between the two is in question Level 6 Kitchen EF02 Fan Speed This fan has a 5 Amp FLC Plantroom motor running at a constant 50Hz and a simple DOL MSCP1 amp starter would have been sufficient and far more cost MSCP2 effective for the job AHU 6 Supply Fan Toilets Once again we have an Ec
65. MMENTS cy osep Varnish failed to external facings to both doors JC Briggs Ph 1 14 Ph 1 14 Ph 1 14 Ph 1 14 Ph 1 14 Ph 1 L4 PFP BBCL Ph1 L4 Ph1 L4 Ph1 L4 Vei Ph1 L4 Ph 1 L4 PFP GR Ross B Ph 1 L4 B B Ph 1 L4 Roof Terrace Level 4 t door Root Terrace Remove timber Level 4 Terrace East external door needs to be eased Level 4 Root Talrdog 4 bolts noted missing from glass fins Level 4 Corridor 4 02 Above 4 02 door fill and paint holes each side of 4 014 overhead panel Corridor 4 02 4 014 Corridor 4 02 4 014 Corridor 4 02 4 014 Corridor 4 4 014 Corridor 4 02 4 014 Corridor 4 02 4 014 Corridor 4 02 4 014 Corridor 4 02 4 014 Corridor 4 02 4 014 idor 4 02 4 014 02 Fix loose tape at glazed screen low level and paint missing high level Rocking paving slabs check all and reduce slab height at wes Po Po 4 03 door clean paint from facings Corner of concrete wall adjacent 4 03 patch concrete at high level At fire door blank plate to services cut out PF Paint door frame between corridor wall and facings Li WC corridor clean paint from fire escape sign EE Fix rocking floor adj 4 2 12 door 4 2 13 WC fix missing light diffuser 4 2 11 WC Electric flush not working 4 200 WC Leak at WHB Part on order due13 07 09 K FP FP Veitchi K K K FP FP idor 4 02 4 014 Corridor 4 02 4 014 4 04A
66. Ph 1 11 Sand and paint ingos at window handles o LT Ph 1 L1 p eee Rum Sharkey Ph1 L1 Realign door excessive gap at lock side poa Ph 1 L1 o 44 Loose tape at screen repair and paint Loose tape at screen repair and paint at screen repair and paint Hanson Veitchi Ph 1 11 1 45 Recut carpet to NW floor box 01 07 2009 51 Ph 1 11 1 41 Ease stiff LHS window ITEM TRADE PASE Location Level Hanson BBCL PFP Ph1 L1 Remove plate on opening window ingo fill and paint Phi L1 145 Repair hinge side of window ingo Defect Items From Joint Walkrounds Phase 1 ACCESS SUBS BBCL UoE ITEM DATE CHECK CHECK COMMENTS ER Ph 1 11 Paint shadow gap with ceiling colour 1 PFP Ph 1 L1 1 45 m and paint ceiling damage SM hole above north light Ph 1 L1 Paint sm mark high level south wall pius Ph 1 L1 Loose tape repair and paint Mag Hanson Ph 1 L1 Ph 1 L1 Seal columns and wall Window lock needs freeing Ph 1 L1 Ph 1 11 Ph 1 L1 BBCL PFP G R Ross PFP PF G R Ross PFP G R Ross PFP Mag Hanson G R Ross PFP 01 07 2009 Ph 1 L1 Ph 1 L1 Ph 1 L1 Ph 1 L1 Ph 1 L1 Ph 1 L1 Ph 1 L1 Ph 1 L1 Ph 1 L1 Ph 1 L1 Ph 1 L1 1 47 1 48 Corridor 1 48 1 40 Corridor 1 48 1 40 Corridor 1 48 1 40 Corridor 1 48 1 40 Corridor 1 48 1 40 Corridor 1 48 1 40 Corridor 1 39
67. Ph 2 Grd L G 13 Clean plaster off vent and light Ph 2 Grd L G 13 Touch up ceiling CSL Ph2 GrdL 9 13 Seal round ceiling hatch CSL Ph 2 Grd L G 13 Seal gaps at grab rails Ph 2 Grd L G 13 Shower seat tighten and check fixing to RH bracket BBCL Ph 2 Grd L G 13 Complete ingo at door hinge side CSL Ph 2 Grd L G 13 Seal along head of door frame BBCL Ph 2 Grd L G 14 Clean plaster off vent 4 PFP Ph 2 Grd L G 14 Touch up ceiling fill crack CSL Ph 2 Grd L G 14 LH bottom of frame cut back packers and seal BBCL Ph 2 Grd L G 14 Clean paint off door and facing BBCL Ph 2 Grd L G 14 RH coat hook loose CSL Ph 2 Grd L GF reception Concrete wall seal to ceiling 01 07 2009 95 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED Paint line on concrete wall remove plaster or move paint Area BB PFP Ph2 GrdL GF reception line Ph 2 Grd L GF reception ce wall on paint live high level fill hole and BBCL Ph 2 Grd L GF reception Clean paint off light fittings PFP Ph 2 Grd L GF reception Repair tape to partition corner high level north of desk BBCL Ph 2 Grd L GF reception Clean shadow gaps to column 2no PFP CLS Ph 2 Grd L GF reception Touch up head of column and seal round PFP Ph2 GrdL M
68. Ross paint Ph 1 L3 Lu h ust keeper door not always catching 1 Cid sd 1 Lo l prr y y Ph 1 13 Door handles need to be tightened up sd Cid d y 1 Light sensors do not work correctly dims no matter what ii conditions are Are sensors correctly positioned UofE Pht L3 346 Lightinoperative North o p Sesion me 31 3 OBERE ee ae Rainbow Ph1 L3 3 47 xi 3 blinds need adjustment CSL Ph 1 L3 3 47 Seal window soffits p n Ph 1 L3 Tape bossed at screen RHS of door bs Ph 1 13 Repair ceiling damage at ferrule Veitchi Ph 1 L3 3 47 Refit carpet to floor box currently oversized Sharke Ph 1 L3 6 48 Move doorstop clash with shown furniture PPP FGR Ph 1 L3 Retape SE corner at screen Ross Hanson 01 07 2009 38 BK Ph 1 L3 3 46 Replace lamp ITEM TRADE Phase Location Defect Items From Joint Walkrounds Level Phase 1 Se o ER G Phi L3 348 Sealwindowsoffts ooo x cd LT MR 1 en a i Phi t3 348 SealbetweenRHcolumnandwall J o Too Rainbow Phi 13 349 Missing stopstoblinds 0 1 13 349 Sealceiling junction above door J Phi L3 349 Fil andpaint above centraltigt ST o
69. Sharke 1 BZ 09 Missing fifth hinge Replace hinge Do y y y SS ioo CSL 1 5 Z08 Seal concrete corner PC 01 07 2009 61 Codes issued to Estates and may have been changed since Done 16 06 09 Issued 11 05 09 Defect Items From Joint Walkrounds Phase MEN 57 Cabinet tom at 20 C check required on un ff Pp 1 52 Noted damage toroofofcabinet_ o ee a csL 1 52772 SealconcretewalltoplasterLHS J o o S PrP 1 522 Sealconcretewal 0 0 0 csL 1 429 Sealconcretewal 0 0 0 0 0 1 429 PNotddamagedcabnetrot 0 Jo o 0 0 g 4 55 pe ES EU e mss ae eee Sharkey 3 709 Timber panel at lock Side moves at column Dressed er support re ees EE Sharke 3 222 Adjust keeper difficult to open Sharke 27 33 Adjust keeper difficult to open General PFP All IT cupboards seal concrete columns and walls Sharke Adjust door as catching on corridor carpet 2 2 22 BK 1 2zo Conduit box lid required on west wall pus Ph 1 Grd m NRI 1 2 33 No comments 1 7 09 Cut out latch pocket 1 Z 22 Adjust keeper difficult to open No comments C n Ph 1 Grd BK Ph1 GrdL tear ight tings re
70. Touch up wall high level PFP Grd L Stair E2 L2 Fill and paint screw holes RHS low level at door BK Grd L Stair E2 L2 lobby check lux level Sharkey Grd L Stair E2 L2 lobby loose FD stop fix BBCL Grd L Stair E2 L2 lobby clean black mastic from ingo RHS of FD PFP Grd L Stair E2 1 2 landing L2 to L1 high window facing sand MDF edge and paint PFP Grd L Stair E2 1 2 landing L2 to L1 Flight soffit sand N edge and paint JCC PFP Grd L Stair E2 1 2 landing L2 to L1 Low window facing repair or replace and paint PFP Grd L Stair E2 L1 Repair ceiling at light fitting and paint PFP Grd L Stair E2 L1 Repaint wall finish bare Sharkey Grd L Stair E2 L1 Fill hole in FD BK Grd L Stair E2 L1 lobby fix loose socket Sharkey Grd L Stair E2 L1 lobby FD to open area replace fire stop veneer LHS BBCL Ph 2 Grd L Stair E2 L1 lobby FD RH ingo clean mastic off concrete CSL Ph 2 Grd L Stair E2 L1 lobby West wall seal crack to ceiling junction 01 07 2009 101 Defect Items From Joint Walk ACCESS SUBS BBCL UoE ITEM HEM TRADE Phase Location pounds Phase 2 DATE CHECK CHECK cHECK COMMENTS CLOSED BB
71. UNIVERSITY OF EDINBURGH POTTERROW FINAL DEFECTS LIST INDEX COMBINED ARE THE OUTSTANDING ITEMS ABSTRACTED FROM THE ORIGINAL COMBINED SNAGGING LIST BENNETTS IS THE BENNETT ASSOCIATE ITEMS FROM THEIR ORIGINAL SNAGGING LIST THE OTHER SECTIONS ARE FINAL DEFECT ITEMS IDENTIFIED BY THE INSPECTIONS CARRIED OUT WITH UoE CoW AND BBCL USER GUIDE A Traffic light system will be used to track this document Outstanding numbered ITEMS are in RED Items Actions checked by sub contractors will be identified by Y for yes Items Actions checked by BBCL will be identified by Y for yes Items ready for checking by University will be in AMBER If the University accepts the item the AMBER box will be marked with a Y When a box is marked as stage 6 above the ITEM CLOSED box can go to GREEN If at stage 4 above BBCL do not accept the remediation the letter N will be inserted This restarts the process on this item If at stage 5 above the University do not accept the remediation the letter N will be inserted and the box made RED This restarts the process on this item A0 NN 01 07 2009 1 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION MAY 2009 OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED ACTION Detection are
72. a 2 23 Acoustics Sound proofing between rooms 2 23 and 2 25 seems ineffective Can hear each other s conversations BB 42 BC amp E ALL Snags Many steel panels of corridor doors only have 3 or the 4 screws in place The partition wall is the sound studio control room very Sound Moveable difficult to open and drags particularly at one end Studios Wall Additionally the door is positioned in an end section rather than in the middle as specified on the plans gt v Ic o O gt L I U O m gt gt 20 20 I A A Door is too small gap below the door can stick Acoustics fingers through can also hear cleaners talking next door 3 Signage No sign on door AGREED 15th MAY UoE gnage ACTION EU A4 sign on door core C instead of 2 A4 signs without BC amp E 3 218 Signage text on the wall fire door leading to bridge over Mini Y Forum 1 AGREED 15th MAY UoE TO ACTION ___ eee Roof Garden Snags On north side there is tape running up the westernmost stone face Internal Concrete dust continues to build up on all the internal Concrete concrete walls despite number of attempts to seal Surfaces surfaces Awaiting completion and commissioning of the Levels 1 2 3 Intruder Intruder Alarm System on Ground Floor Fire Exit and Alarm Doors Basement Server Room IFMSnterconnecting Basement System doors to Informatics Forum on Levels 1 2 3 and Basement UoE responsibility 2 09 and 2 11 W
73. a N PO ee es eee ee BBCL Ph 1 Grd L Goods At fire point clean plaster off electric boxes entrance Ph 1 Grd L oode At fire point seal crack down sides white or clear entrance PF Ph 1 Grd L Goods At fire point paint MDF edges yellow entrance ROSS Ph 1 Grd L 0008 Behind radiator tape joint skim and paint PFP entrance BK Ph 1 Grd L Goods Clip back white cable above fire point entrance FP Ph1 GrdL Goods riy finish at fuse point above fire point entrance Veitchi Ph 1 Grd L poe Realign moved floor tiles entrance U BK Phi GrdL G 17 Trim light suspension wires 4no UofE Ph 1 Grd L 9 17 LHS high level of entrance door recess back box and fit key switch U of E works Sharkey Ph1 GrdL Door at head spiral stair excessive gap to frame 01 07 2009 65 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL ITEM mal DATE CHECK CHECK CHECK COMMENTS CLOSED BBCL Phi GrdL G 7 jOlanpaitfromtimberspralteds Po BBCL PhtGrdL G18 door clean plaster from shadow gap J 3 3 PhtGrL G7 _ Atlarge sliding door RHS fill and paint fixing holes TT PhtGrL Seacoums Phi GrdL South wall fill and paint crack adj to dust extract y ane paint to opening windows e CSL Ph 1 Grd G 17 Adj G 18 seal end of
74. ag Hanson Ph2 L2 2 23 Window lock stiff PFP CLS Ph2 L2 2 23 Repaint window ingo at hinge and reseal after MH CSL Ph2 L2 2 23 tidy seal at column heads Sharkey Ph 2 2 2 24 Gaps to office door stops generally all PEP Ph2 L2 2 24 touch up ceiling into shadow gap where missed and along concrete wall Rainbow Ph2 L2 2 24 Stop required to blind N Elevation Sharkey Ph2 L2 ea Corridor FDs small leaf sticks PFP Ph2 L2 Adj 2 05 fill hole ceiling and paint Corridor 2 01 a PFP Ph2 L2 to 2 16 2 206 crack to ceiling BK Ph2 L2 xou 2 206 Pipe bracket required 01 07 2009 88 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED BK Ph2 L2 er 2 207 Pipe bracket required CSL Ph2 L2 2 207 Seal ceiling trim mitre SW corner BBCL Ph2 L2 Corridor 2 01 2 208 Clean plaster off mosaics high level at mirror and to 2 16 below baby change BK Ph2 L2 t 2 208 Alarm reset fuse popped reset and check Tiler Ph2 L2 rir un 2 708 Fill hole above alarm reset CSL Ph2 L2 ped 2 208 At door cut out crack and seal BBCL Ph2 L2 ain 2 Z08 Clean plaster off IPS BBCL Ph2 L2 cr 2 208 Tidy mastic cut at IPS corner PFP Ph2 L2 sd 2 208 Paint Concrete above door Sharkey Ph2 L2 2 209 Screw missing to keeper PFP P
75. ain Ta Touch up round NE light and sand fill bump adjacent PFP Ph 2 Grd L Repaint bulkhead to head of screen CSL Ph 2 Grd L Clean paint off screen frame at bulkhead and seal Veitchi Ph 2 Grd L Clean adhesive off threshold Mag Hanson Ph 2 Grd L Main Entrance Touch up screen sills Area BBCL Ph 2 Grd L Clean tape residue of RHS main door frame CSL Ph 2 Grd L Seal SW screen wall junction Main Entrance r U of E CLS Ph 2 Grd L Arca U of E move bust seal hinge ingo full height Veitchi Ph 2 Grd L Wood floor north edge repair broken section Veitchi Ph 2 Grd L Main pee Replace carpet with vinyl at column Main Entrance x r UofE Ph 2 Grd L Area Int glass doors swipe access inoperative Optima Ph 2 Grd L Main Entrance Adjust glass doors Area Sharkey Ph 2 Grd L Main Entrance Eire door leafs adj G 01 do not match flip small leaf 01 07 2009 96 Phass Level Location Defect Items From Joint Walk ACCESS COMMENTS ITEM Rounds Phase 2 DATE CLOSED Main Entrance Sharkey Ph 2 Grd L Area Fire door leafs catch floor box adjust Main Entrance Fire door facings adj G 02 fix correct width to give Sharkey i il Area correct shadow gap BK Ph 2 Grd L Du G 02 Main lighting 1 lamp out check 15 06 2009 CSL Ph 2 Grd L G 02 eal hole above FDs adj
76. all end at 3 19 and make Ross PFP i 3 10 good score and lump at low level LHS of 3 19 and at high level lump near column at Repair gap low level RHS and high level RHS a Ph 1 L3 9 Pd Light switch change to single switch plate SS PFT ic at Tape on LHS low level to be refixed and repainted Fire door between 3 25 Paint to be cleaned off 3 26 side frame N side 3 27 G ue Ph 1 L3 Tape on low level LHS to be refixed and repainted PFT Sharkey Ph 1 13 Coreg Sion on fire door to Core B to be removed and make MEER good door face 01 07 2009 42 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM TRADE Phase 1 DATE CHECK CHECK CHECK COMMENTS CLOSED 1 13 Corridor 3 31 Maglock on small leaf of fire door lifts up floor tile fr Ph1 L3 Corridor 3 31 Fire door at RHS frame clean up paint 1 1 13 Corridor 3 31 Low level socket seal around and clean LHS of 3 31 sd Po Po Ph 1 L3 at Movement in floor tiles in front of door BBCL UoE i Discuss quality of finish on the steel plating to bridge lintol and stairs PFP 1 Corridor at Requiring improved appearance of junction ceiling and bridge lintol shadow gap colours N and S wall bridge lintol 1 Corridor at Fire coating at bracket between column and bridge lintol bridge lintol should be cleaned and sealed Corridor at Shadow gap return to corridor LHS fill gap
77. and decorate PFP 1 i bridge lintol on both sides Corridor at Fire doors on N side move poster frame to S side bridge linto Gorridor at North fire doors Crack at top of fire doors on N side bridge linto PPL ee y G po Ph 1 L2 LHS door tape refix and repaint Pf Lo es y Lo ee y pp uU EE Lo ee y Lo w EEG Ph 1 L2 Door needs to be eased at head Ph 1 L2 Replace dark carpet tiles Ph 1 L2 N side shadow gap to be sealed Ph 1 L2 Fill cracks at soffit of ingo Ph 1 L2 Reset carpet tile SW corner Ph 1 12 ze ea chain for window blind 2nd window Clean up diffuser at entrance Cover to spare perforation at soffit to be made good 2 07 Facing of open area needs to be tidied PFP Pnti2 207 Clean paint off floor box next to desk UofE Phi L2 3 208 JMovedorstop gt P J 4 7 208 EwallSendmakegoodlumps o 3 L Pe f muita Ph 1 12 2 09 Crack SW corner of box out Sharkey Phi L2 209 Excessive clearance ofdoor o o o To o 4 CSL Pnti2 210 JjSealsofitjuncionsofings num m juge eee _ ppp Sharkey Phi L2 210 Trim patch below RHS door frame 01 07 2009 43 ITEM TRADE Phase L cati n Defect Items From Joint Walkr
78. arkey wc Corridor 3 31 Cok to 3 02 Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE COMMENTS ITEM Phase 1 DATE CHECK CHECK CHECK CLOSED 3228 Sealdoortrameneasbonsies J conpanctotwaoronme Corridor 3 31 to 3 02 CSL m 2s Rainbow E PFP ud UofE Br BBCL i PFP ur Veitchi 331 a ene ae Veitchi 3 31 Corridor 3 31 to 3 02 00 W 9 0 E Concrete column adjacent to circular stair Tidy column head detail grey mastic Visible joint in plaster rub down and fill adjacent to WOs 3 44 Reseal skirting at windows and sills to ingos Pf Clean paint from window frames and floor grill Pf Clean out light fittings in 3 41 area check who At metal door clean shadow gap to corner RHS to concrete column adj 3 41 Tidy paint to RHS of metal doors high level adj 3 41 Above hold opening square up and flush off socket Metal doors chipped on leading edge Metal doors replace badly fitted carpet tiles Seal at partition head above metal doors RHS intumescent required Adjust 3 2 23 raised flooring uneven Improve finish around socket at 3 2 23 Fill skirting mitres at lift 3 area Corridor 3 31 to 3 02 PFP GR Corridor 3 31 Ross to 3 02 At 3 2 22 Fill and paint cracks above door At 3 2 22 Repair and paint bossed bottom bead PFP GR Corridor 3 31 Ross to 3 02 01 07 2009 At Lift 4 Seal crack at shad
79. ater BBCL still monitoring water ingress in Rooms 2 09 and Ingress 2 11 B Z16 Ceilings Water damage to Corridor ceiling opposite B Z16 The lighting under the cabinets is not always present Lighting e g L5 or working Please check all G m uw mo d ju A 01 07 2009 2 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION fay an OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED The guys carrying out the Acceptance test procedure Bound today said that as far as they could tell they Studios Testing unable to control the air conditioning ventilation with the bank of switches provided This should probably be investigated further B Z23 MSCP MSCP showing fault light B Z17 No identification on valves L6 Riser Riser General Main supply cable on main rising ladder rack appears to be damaged taped No gas detection has been installed in the gas meter Roof top 1 NO manometers on AHU 20 21 and such BMS not P Room able to pick up the filter dirty condition B Ment See MCP11 UV Filter still not picked up by the BMS system a Throughout the various floors there are condensate Roof top boxes embedded in fire bat that have been unable to P Room be removed to enable the condensate stats to be picked up by the BMS B Ment Ground floor over door heater does not appear to be MCP11 linked to the BMS
80. ce Ph2 L3 MES 3 01 Repaint ceiling 3 01 to 3 04 due to flashing BBCL Ph2 L3 Corridor 3 01 Check distance between fire signs adjacent to 3 05 and to 3 09 PFP Ph2 L3 L3 Corridor South elevation fill and paint wall cracks at terrace door PFP Ph2 L3 L3 Corridor Junction with white green paint in south leg tidied up PFP Ph2 L3 L3 Corridor Repaint mark to pelmet S elevation LH window i adjacent 3 06 note step in concrete wall shutter No PISA be Comet action proposed by BBCL BBCL Ph2 L3 L3 Roof investigate cill detail on north elevation Terrace L3 Roo JCC Ph2 L3 Timber door from Phase 2 ironmongery to be resolved Terrace Sharkey Ph2 L3 L3 Roo Refix loose filler pieces to door cladding groove hinge Terrace side 1 L3 Roo M amp S Ph2 L3 Tighten balustrade cables check right along Terrace L3 Roo i M amp S Ph2 L3 South end of balustrade requires to be plumbed Terrace BBCL Ph2 L3 L3 Roo South elevation clean mastic from cladding below 4th Terrace floor level and check corner not cracked BBCL Ph2 L3 L3 hes Incomplete ironmonger to south elevation door Terrace 4 i L3 Roo Briggs Ph2 L3 Terrace Complete gravel verge on south elevation M amp S Ph2 L3 L3 Roof jhten Hor wires below planter Terrace L3 Roo Land Eng Ph2 L3 Noted soft landscaping needs attendance Terrace 01 07 2009 84
81. ch up ceiling BK 2 WC corridor 1 206 Pipe brackets required BK 2 M I WC corridor 1 206 Tap needs replaced BK 2 t WC corridor 1 706 Trap is slack to WHB PFP 2 uir WC corridor 1 706 Touch up ceiling BK 2 Corridor 2 0 1 WC corridor 1 Z08 Loose seat to 2 16 Sharkey 2 WC corridor 1 209 Missing hinge screw PFP 2 rci WC corridor Cracked ceiling fill and paint Sharkey 2 xd WC corridor Fill padlock fixing holes PFP 2 1 21 Touch up ceiling Mag Hanson 2 1 21 Fix gasket to window Mag Hanson 2 1 21 Repaint SE corner at column CSL Ph 2 Grd L G 01 Seal cracks and holes to shadow gap 11 06 2009 CSL Ph 2 Grd L G 01 Seal top of over panel to wall Sharkey Ph 2 Grd L G 01 Plug fixing hole in frame above keeper Rainbow Ph 2 Grd L G01 Blinds not running true fix RH and mid windows Replace mid PFP Ph 2 Grd L G 01 RH window repaint soffit Mag Hanson Ph 2 Grd L G 01 RH window adjust opening handle hits ingo JCC Ph 2 Grd L G 01 Shelving fix missing screws CSL Ph 2 Grd L G 02 Seal top of over panel to wall Rainbow Ph 2 Grd L G 02 LH window blind not running true fix replace blind Rainbow Ph 2 Grd L G 02 RH window blind not running true fix rollers level CSL Ph 2 Grd L G 02 Mid window tidy seal on hinge side PFP Ph 2 Grd L G 02 Sand and paint wall edge at NW column CSL Ph 2 Grd L G 02 Seal shadow gap at NW column PFP Ph 2 Grd L G 02 touch up ceiling at centre light BBCL Ph 2 Grd L G 03 Clean shadow gap above over panel CSL
82. chippededge o 3 1 Core Asstair_ L2 Above half landing fixinoperativelignt ma NA OT Core A stair L3 u s half landing fill tie hole half covered Pf 1 Core A stair L2 Grey mastic to railing fixing holes Y S L1 Replace screw cap on vent grill Sharkey Replace lamp 01 07 2009 68 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM LL DATE CHECK CHECK CHECK COMMENTS CLOSED BBCL Core A stair lobby FD adj 1 03 clean mastic from shadow gap above handles rs L1 above half landing clean diffusers M amp S Core A stair GF hand rail on bulkhead loose at top of 1st flight up from GF M amp S 1 Core A stair GF Handrail on concrete missing fixing of 1st flight up from GF Sharkey Core A stair GF FD to main stair lower stair missing fire door signs 2no lower stair sign L rea B B Hairline crack to wallhorizontal sid psp e B Handrail missing fixing junction GF 2no vent grils all screws require caps Cord D L4 L Separating wall between lights quality of finish poor anding should be improved suggest cover flashing drippings Core D door to Check sionade L3 from roof gnag p ae a fe Core D door to rom in 5 i s Lo 02 06 2009 L3 corridor ae up paint on rail at half landing on balustrades from
83. corridor 2 54 2 Sharkey Ph 1 L2 FD s at 2 2 38 scratch low level on farthing leaf repair PFT Phi L2 Corridor 2 45 WC corridor check as noted no fire direction sign in fT main or WC corridor BK Pht L2 Corridor 2 45 2 2 29 bracket required to pipework Pnt L2 Corridor 2 45 2 2 27 no comments gt 01 07 2009 47 TRADE en prase 1 From Joint Walkrounds ef PFP 1 12 Corridor 2 45 2 2 29 fill hole and paint in ceiling at light sensor T ee RR 1 12 Corridor 2 45 2 42 Seal window soffits PT Pht L2 Corridor 2 45 2 42 Seal skirting joint eee Veitchi Ph 1 12 Corridor 2 45 2 42 Uneven flooring Note in area where trench heating being extended Lo Phi L2 Corridor 2 45 2 42 Sealpelmetjoints Jo 1 2 42 Kitchen reseal junction to floor lip in vinyl tle 5 Pht L2 Corridor 2 45 2 42 Clean paint off light at spiral stair_ PFP 1 12 Corridor 2 45 At metal doors RHSathighlevelpaintplaster J Jo Pht L2 Corridor 2 45 Above 2 2 23 paint corner at high level _ o o To o BK Phi L2 Corridor 2 45 Square up socketat 2 37 0 Po G R Ross Ph 1 12 Corridor 2 45 At stair opposite 2 34 paint shadow gap right along and PFP fill hope to trim Ph1 L2 Corridor 2 45 d coffee p
84. ds ACCESS SUBS BBCL UoE ITEM Met Lacan Pel DATE CHECK CHECK CHECK COMMENTS CLOSED Phi L4 4 15 Balcony Clean balcony door facing ___ Phi L4 4 15 Balcony Mastic to balcony door facing RHS Lo po N Hanson O Phi l4 416 Repaintceiling above doorwa Lo ee Phi 4214 Nocomments PFP GR 4245 tidy plaster on ceiling especially at smoke alarm and aM Ross paint i d aL 4 2 15 At access panel tidy plaster and paint Ross Mag s Hanson 4 Refix opening window gasket Phi L4 418 Touch up chipped paint to balustrade top Ph 1 L4 4 19 Blinds move stop down 100mm in open position ies Ph 1 14 4 18 Fill and paint tape at LHS of glazed screen Sharkey Ph 1 14 4 18B Adjust door as catching at head PFP GR f a Ph 1 14 4 18B Clean paint off glazing fin Ph 1 14 4 18B Seal west concrete column and wall at top with mastic Ph 1 L4 4 18C Clean and seal east column Ph 1 14 4 18D Clean paint off bottom shelf Ph 1 14 4 18D Adjust keeper latch Ph 1 14 Light rocker switch faulty L Mag Ph 1 L4 Fix opening window gasket Phils Not found Ph1 L4 422 Seal window sills to ingo 17 Ph 1 L4 refix RHS opening window gasket Hanson 1 14 423 concrete wall 9 Ph 1 14 4 23 Acoustic panel in Atrium in NE corner repaint cherry picker required Ph 1 14 Rocking floor tile NE corner Ph 1 14 Peal shadow gap to screen into N
85. e in ceiling at conduit paint UofE Ph 2 L7 7 04 Move door stop due to furniture PFP Ph 2 L7 7 04 Remove paint from screen LHS of door high level Replace gasket to south elevation window and north Mag Hanson Ph 2 17 7 05 elevation RHS BBCL Ph 2 17 7 05 Clean floor grills PEP Ph 2 L7 7 05 Ceiling paint round smoke detector and plate above light adj to door PFP Ph 2 L 7 7 05 Clean paint from south elevation LH window high level BK Ph 2 17 7 06 Faulty light switch CSL Ph 2 L 7 7 06 Seal window soffit to ingos PFP Ph 2 L 7 7 07 Touch up mark on wall due to door closer CSL Ph 2 17 7 07 Reseal floor units to floor CSL Ph 2 L 7 7 07 Seal window soffit to ingos Sharkey Ph 2 L 7 7 07 Move door stop currently XXX hinges BB PFP Ph 2 L 7 7 08 Window cills recess fixings refill and paint CSL Ph 2 L 7 7 08 Seal window soffit to ingos G R Ross Ph 2 L7 7 08 East elevation 2nd window from LH repair plaster high PFP level and paint BK Ph 2 L7 7 08 Level off lights PFP Ph 2 L 7 7 08 SW corner touch up green ceiling damage 2 17 7 08 Fill and paint bulkhead joints at corridor Movawall Ph 2 L 7 7 01 Moving wall small RHS panel not operating on key Mag Hanson Ph 2 17 7 01 Gaskets to be replaced both windows Mag Hanson 2 17 7 01 West elevation RHS end frame redo paint repair BBCL Ph 2 L 7 7 01 Tidy joints to MDF bulkhead on south elevation G pa Ph 2 L7 7 01 Repair plaster crack high level RHS of MDF bulkhead Veitc
86. ean paint from door over panel Jo o 1 3 X PhftGrL GO7 JCleanendfxedsectionofwhiepanelwallpan J J o PhtGrL GO7 __ Seal low level NE corner hole above skirting fJ o To o BK PhtGrL 907 Replace seals and fix loose floor boxes J 1 Ven f Pht GriL G 07__ Grack floor 6m west of entrance door atfloorbox pp Po Po HEN Pe Po Po Po Mova wall rd L G 07A Pass door not opening Mova wall Phi GrdL G 07A Damagedpanel7thfromRH T o y Po Ee etek ERA acre above north Ph Grd L G 07A Seal MDF above North panel wall Ph 1 Grd L G 07A Ceiling 2no corners required to redundant ceiling boxes PFP Pht GraL G 07A Tidy finish around ceiling socket Ph 1 Grd L G 07A Between curtain and light track fill and paint screw holes Co a Sharkey Pht GrdL G 07A__ Swall istfin RHS squareup BBCL Pht GrdL G 07A j Swallcleanventilation panel behindfins Ph 1 Grd L G 07A S wall touch up ventilation black paint BBCL Phft GrdL G 07A___ Swall remove masking tape high level Sharkey Pht GrdL G 07A Door stop required to entrance door BBCL Phf GrdL GO07A JOleanplastefromdoorshadowgap 1 o Phi GrdL GO7A Clean paint from floor at eastwal
87. elmet is poor make good 514 Touch up ingos with white paint Repaint shadow gap to top of concrete column LH side Crack to corner NW partition Ceiling cracks joint to plasterboard Ceiling air vent make good poor YY 13 open area Filling and paintwork EE Sharkey Ph1 L5 LH side of vision screen over panel install facing and decorate Lud Ph 1 15 EUN of walls external wall cracking to PO6 make Ph 1 15 powder essem seals around main screen window and SL Phils 515 Make good threshold ay Sharkey Ph 1 15 515 Adjust Plane stop to allow door to fit properly FP GRR il ou TER i TM ER igi mE NEM 01 07 2009 23 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM wane es Location Pee DATE CHECK cHECK COMMENTS Eu No 0 22g 24 Ph 1 L5 Balcony edge in front of balustrade finish not as detail _ Ph 1 15 Fit drop bolt to hold door GR si LH partition concrete column Ames tape split make Ph 1 15 good and repaint G a E EIN is _ Ph 1 15 Touch up junction of concrete columns ceiling PY GRR h 5 titio 5 o idu e 2 kn G 3 5 h 5 one NNI G 1 15 Ph 1 15 G z Sharkey Ph1 L5 good silicone seal to glass frame directly opposite GRR Ph 1 15 Make good plaster around louver plate Phizts 521 Vision panel Ingo
88. erproof membrane General item e Replace cap above ACU 02 on ceiling BBCL 1 B 02 Check and repair vertical joints at column RHS of door of waterproofing as crushed PS a sg Remove drip tray surplus mm as Bi 4 B 02 AHU 01 needs resetting several times a week oo fk investigate Ampage displays need to be transposed Wrongly B 02 labeled Sharkey 1 B2 jMagiockrelocatetoroomside a os m pte io ee Sharkey 1 BZ14 Magiockrelocatetoroomside e __ Sharkey 1 BZ14 Slip bolt hole to farthing leaf requiresasleeveinfloor BBCL BZ 14 Check and repair waterproofing to column wall junctions BK 1 BZ 14 Fit additional suspension wires to light fittings BK 1 BZ 14 Fit missing cover plate to light fitting General item all rooms concrete columns and walls DEAL required to be sealed BK 1 B0 Checkemergency light provision Z o Y 31 Bo Hreextsgnrequed Or TY Check Earthing contacts to flooring stools o y y BK 1 BZ 4 _ Checkemergency light provision o T BBCL 1 2 14 Fireexitsignrequired Ci SY o y Sharkey BZ 14 Repair to door required fixing holes after temp padlock PFT removed eect Boze214 x ee L3 CTC y y ee EE ee e
89. ers to timber cladding PER nr pee S grating check responsibility BBCL Cycle Rack Clean swarf from base of columns Cycle Rack Touch up paint to bottom of columns landscaping Touch up beams internally oael at ELS EE ERE Clean render from north screen head BBCL Ph 2 pend Remove film from u s of N screen Ph2 2 small damage to soffit el render north side 2m from screen BBCL Ph 2 E Elevation Clean sawdust from insect mesh E ERE elevation door RHS Mag Screen to G 05 Phase 2 seal hole MERE look at boxing in detail Hanson clean seal internally Elevation Mag Ph1N Paint mark on atrium door soffit Ph 1 i Elevation cladding SEN Atrium screen bottom LHS seal hole Hanson Elevation Clean paint from external face of NW G 03 column Ph1N G 03 external FD extend drip flashing JCC Elevation at head 01 07 2009 72 Ph1N G 03 external FD check glazing Ph 1 Elevation screen moves when door shuts Retaining Land Eng Ph 1 Wall Top up soil to where cladding runs out BBCL Ph 1 Retaining Tighten bolts allen to recessed wall Wall lights Repair damage to Inspace FD on slat evation Ph1N JCC Ph 1 Ph 1 N Re laminate door fit out complete to Elevation Inspace JCC Ph 1 Ph 1
90. et now working T y y O PO poo o T y PO PFP GR mois 335 Cut out and make good ceiling along line of beam east BK BBCL CSL Ph1 L3 3 40 Seal 10mm gap at wall unit junction at skirting 01 07 2009 37 fees Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM Pa ent DATE CHECK CHECK CHECK COMMENTS CLOSED Ph 1 L3 EM paint off door facings at high level Kitchens Noted hinges loose and tightened at time of inspection Ph 1 L3 check out General item reoccurs in most kitchens Inter check all PFP CSL Pht1 L3 Paint and seal above RHS cupboard in shadow gap a e p Ph 1 L3 342 Clean paint off screen high level east of door PST meo Sharke Ph 1 L3 3 42 Adjust keeper as door rattles Clean paint of NW column at paint off NW column at Clean paint off NW columnathighlevel ven RET eet es me E O Veitchi Pht L3 342 Fixcarpettile into floor box T Jp y Ph 1 L3 SETS paint missing at screen junction Ph 1 L3 Paint missing at screen head PFP GR p 1 15 damage to ceiling east side Cut out patch and Ross TSW emer Tey end of Sellng Gap BBCL Ph 1 13 SW corner tidy end of ceiling recess at shadow gap Ph 1 L3 Seal door head to ceiling Ph 1 L3 Paint to shadow gap 4 sides clean snots to north side 55 PFP GR p 4 15 Cracked tape to pipebox and RHS of door repair and
91. f middle rocking floor J o Phi L3 308 Fill andpaintcrackin SE corner 1 Veitchi Ph1 L3 3 09 Bumpinraisedflooingatdoonvay Phi t3 309 jPantMDFpanelonppebox 0 1 Rainbow Pht L3 311 Ease blind middle window Rainbow Ph1 L3 3 12 Stoppers required to blinds J Mag 1 13 Rub down and repaint window sills Ph 1 L3 3 13 Crack to tripe fill and paint green walls Optima Ph 1 L3 3 14 Glass door catching on floor hinge plate Ph 1 L3 Crack SE corner fill and paint pop 01 07 2009 35 Door 3 02 to roof terrace Seal door frame to ingos Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM Phase 1 DATE CHECK CHECK CHECK COMMENTS CLOSED ee Se T y y O Ph 1 oar 0 Timber door catching on frame FX Ec ids Ph 1 L3 IN opening window latch side complete plaster and paint No Comments Remove masking tape above door PFP Ph i L3 3 14 Paint copper pipe at ceiling level R Ph 1 L3 Refix tape and paint LHS of door Ph 1 L3 Paint mark on ceiling NE corner Ph 1 L3 3 8 door frame LHS EH Ph 1 L3 Seal wall head SW corner to corridor and glazed screen Optima Ph 1 vus 15 Fix gasket opening window _ RUE Optima eee O
92. h screw missing buttons poo o Ph 1 GrdL GZ09 Seal shadow gap to frame Ph 1 GrdL GZ08 Outside corridor fill and paint crack and hole at light l JJ Ph 1 GrdL GZ 11 Refix door facings and seals replace 1 G Ph 1 Grd L GZ11 Skim and paint wall at door hinge site aM Sharkey Ph 1 Grd L GZ11 FDs to atrium excessive gap to threshold BBCL Ph 1 GrdL 9711 FDS to atrium Remove and replace stop at head with proprietary ironmongery Investigate Sharkey Ph1 GrdL G Wicket gate not running on wheels and keeper required for latch BK Ph 1 Grd L G Area lights have independent switch but dim with stairs 9 9 Ph 1 Grd L 9 Shutters required holes for sup bolts in runner all 9 9 Check schedule for door handles none fitted K BK Ph 1 Grd L G10 Video entry display does not identify which entrance activated 01 07 2009 55 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL ITEM MEM DATE CHECK CHECK CHECK COMMENTS CLOSED Srakey ee sew bing n Sharkey Pht GrdL Fil fixing holes to door frame and door paneling J Ere Git Sharkey Pht GrdL G11 JDoojampsonfram i 0 5 m EMEN B pastane pail and regain ipee apie ff puc Ph 1 Grd L NW corner repair shadow column junction and paint Check missing face plate missing power point Seal around pipes at wall bel
93. h 2 Grd L Stair E1 Handrail GF to base loose fixings replace BBCL Ph 2 Grd L Stair E1 Base West wall remove tie tube and fill and above door BBCL Ph 2 Grd L Stair E1 Base Tidy concrete at FD hinge side low level Sharkey Ph 2 Grd L Stair E1 Base FD replace facings PFP Ph 2 Grd L Stair E2 L7 lobby fill paint hairline crack above FD into stair PFP Ph 2 Grd L Stair E2 L7 lobby touch up ceiling edges as marked PFP Ph 2 Grd L Stair E2 L7 touch up green wall Colt Ph 2 Grd L Stair E2 L7 Roof access button broken PFP Ph 2 Grd L Stair E2 L7 ceiling fill patch in centre and touch up shadow caps BBCL Ph 2 Grd L Stair E2 L7 clean FD facing a LH shadow gap PFP Ph 2 Grd L Stair E2 Generally paint stair soffit shadow gaps BBCL Ph 2 Grd L Stair E2 L7 Remove paint from ladder and tape from ceiling PFP Ph 2 Grd L Stair E2 L7 Ceiling around ladder repair crack and paint staining PFP Ph 2 Grd L Stair E2 L7 Pipe box repair and paint at ceiling level 01 07 2009 100 Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE COMMENTS ITEM CLOSED Grd L Stair E2 L7 Remove and fill fixing below ladder to LHS and on stair waste Grd L Stair E2 L6 Touch up wall at hinge side top and bottom of door opening Grd L Stair E2 L6 replace odd fixings to refuge point Grd L Stair E2 L6 lobby sand pumps on ceiling and paint adj to
94. h2 L2 uiu WC corridor Ceiling crack fill and paint Corridor 2 01 Sharkey Ph2 L2 to 2 16 WC corridor Fill padlock fixing holes to riser doors CSL Ph2 L2 Corridor 2 01 WC Corridor Vent on main corridor side cut back white to 2 16 mastic and replace with grey BBCL Ph2 L2 epe Concrete wall corner adj 2 08 tidy edge BBCL Ph2 L2 Coridor ZO Adj 2 08 West elevation no blind noted check drawing PFP Ph2 L2 Adj 2 08 Paint out pencil marks to ceiling Ph2 L2 eS Adj 2 08 Noted flooring not below south lockers BBCL Ph2 L2 Corridor 2 01 Adj 2 08 Fix back north elevation lockers to wall use to 2 16 batten Ph2 L2 Corridor 2 01 Adj 2 08 check centre ceiling tile in bulkhead packed to 2 16 and short Sharkey Ph2 L2 En Adj 2 09 Improve finish to back of main FD Sharkey Ph2 L2 Corridor 2 01 2 06 and 2 12 frame and door finish to be reapplied at to 2 16 lock areas PFP Ph2 L2 pud Tidy finish to socket adj 2 14 PFP Ph2 L 2 a FD Adj 2 16 fix plate to handle hole PEP Ph2 L2 t FD Adj 2 16 Clean paint off frame at high level PFP Ph2 L2 d FD Adj 2 16 Repair scratch to door LH 01 07 2009 89 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED
95. hi Ph 2 17 7 01 North elevation fit carpet missing at trench heating Sharkey Ph 2 L 7 7 09 No sup bolt floor plate fit CSL Ph 2 L 7 7 1 bulkhead RHS seal end to wall PFP Ph 2 L 7 7 1 Refinish MDF plate to wall end Corridor 7 01 is NEP BK Ph 2 17 to 7 06 FDs hold hope fixings missing Corridor 7 01 BK Ph 2 L 7 to 7 06 Check inop light adj 7 03 Rainbow Ph 2 17 uc South elevation windows uneven open position to blinds 01 07 2009 76 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED CSL Ph 2 L7 eee ag Seal window soffit to ingos Corridor 7 01 Remove paint white high level red at tie and plaster a 7 06 high level to concrete wall adj 7 06 Ph 2 L 7 7 206 No comments BK Ph 2 L 7 7 207 Bracket required to pipes BBCL Ph 2 L 7 7 208 Note clash with door and adj door closer arm Solution BK Ph 2 17 7 Z09 Missing screws to hinges Sharkey Ph 2 L 7 7 Z09 Door vent grill required to inside face BK Ph 2 L 7 7 Z09 Loose tap pipe bracket PFP Ph 2 L 7 7 Z09 Fill screw holes and paint MDF facing to vent on wall BBCL Ph 2 L 7 WC corridor Check signage no fire sign at door to corridor Optima Ph 2 L6 6 01 Polish out scratches on
96. his damper Panel amp software Basement e modifications required Control Panel oo Gas Meter Room Extract Fan EF10 this fan runs Water Tank un 24 7 and has an air flow fail differential pressure Room EF 10 SD END pin Basement switch How critical is this fan i e if it does fail should it shut the gas valve off in the meter room Control Panel Level 6 Plantroom General PVC tubing has just been clipped to the ventilation MSCP1 amp ductwork and is quite unacceptable MSCP2 Level 6 Plantroom General Fire Dampers same as before still require MSCP1 amp identification labels on some units MSCP2 Level 6 Plantroom AHU AHU 4 Supply Duct Fire Damper still broken and MSCP1 amp manually open MSCP2 ACCESS SUBS BBCL UoE ITEM DATE CHECK CHECK CHECK COMMENT CLOSED COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION car fay an OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED Level 6 Plantroom MSCP1 amp MSCP2 Level 6 Plantroom There is no BEMs graphic slide provided for the MSCP1 amp Basement of Phases 1 or 2A Graphics required MSCP2 Level 6 Plantroom All AHU s Manometers as before red dye on AHU casings PVC pipework still to be renewed on some unit Equipment labeling generally speaking there are a lot of ID labels still to be fitted to equipment in the risers General plant rooms It is not really m
97. i Ph 1 L1 Kitchen units reseal to floor Ph 1 L1 Fix gasket LHS opening window Phi L1 102 Sealwindow soffits Ph 1 L1 Fix gasket both windows Phi L1 103 Seal window soffits Ph 1 L1 Fix gasket Ph 1 L1 Seal concrete column Ph 1 L1 Back of LHS acoustic panel remove silver tape Ph 1 L1 Seal concrete column both sides S 1 Phiri 106 Nocommnts Ph 1 L1 Replace missing screws to shelving brackets Ph 1 L1 1 09 Seal pipe box high level to wall Ph 1 L1 Fix loose light diffuser M Hanson Fix gasket opening window Mag 1 11 Fix gasket LHS window Hanson 01 07 2009 49 Phi Li 105 Seal concrete columns Lo Lo Y TRADE ion 061601 m From Joint Walkrounds Ph 1 L1 Em Seal LHS window at handle side G Ph 1 11 uno Ru down and skim and repaint RHS of LH window ingo r ra G Pe Ph 1 L1 Rub down skim and repaint RHS of LH window ingo Pf a ee Phi Nocomments PEP Phili 1 14 ceiling junction above door 1 Shane mu zu Emewebk o 1 3 East wall between XXX Screw and board above sues Ph 1 L1 1 15 rub down and paint Sharkey Ph 1 L1 MCN Flush off door stops and fill fixing holes acoustic seal Pf Sharkey Ph 1 11 Flush off door stops and fill fixing holes acoustic seal Phi L1 146 Central light inoperable Ph 1 11 _1 18_lAdl u
98. in lobby Appears lower o dq J 7j PEE 1 Core B stair_ L3 touch up paint at head of pipe box S Core stair_ Half landing below L4 Fill holes around light fitting Core B stair L2 Fix missing FD sign to both doors p 1 1 1 1 1 1 1 1 1 1 1 L2 Lobby Remove paint from concrete walls and smoke detector cable 1 1 1 1 L2 Lobby Replace seals to FD adj 2 30 Po Core B stair L2 Lobby Replace vent screw caps 4no p c p _ L2 Remove purple paint from radiator qp o y Core B stair L2 Ceiling above paint out black mark 1 Core B stair L1 FD adj 1 26 missing screw to push plate 01 07 2009 67 ITEM TRADE Phase Location Defect Items From Joint Walkrounds Level Phase 1 BBCL L1 Remove setting out marks at and below FFL Lo p BBCL Core B stair GF Shrinkage cracks noted on opposing exposed concrete walls M amp Sor Mag 1 Core B stair GF Remove surplus handrails stored Core B stair Remove paint from wall below bottom flight CoreBstair GF Removeredpaintfromtopstepatfireext Jo o o GF Renew door finish eqq y y GF Repair ceiling above FD ir ir ir poe S GF Fire exit door remove tape residue from push bar Pf GF Fill and paint joints to MDF both sides of exit door EE ir L d ir ir r GF Lobby Clean Perspex door to fireman s phone OOO O GF Lobby Replace 4
99. indow clean frame high level RHS Paint T 7 133 jSedcoums 5 Sharkey Phi L1 1 34 Adjdoorlatchnotengaging o 1 J Po G Ph 1 11 Loose tape screen junction RHS repair and paint Pf Mag Ph 1 11 1 34 Loose RH window Hanson Veitchi Phi tt 137 Replace damaged floor tile at screen LHS ofdoor Po CSL Ph 1 11 1 38 Reseal RH window sill j Ph 1 L1 1 35 Fill gap between fridge and wall Check all other kitchens BBCL 135 Cleancolumn gt p Ph 1 11 Seal ceiling perimeter Ph 1 11 Paint pipe box against concrete column gt ppp Ph 1 L1 Seal round work top ji a Ph 1 L1 Loose tape at door hinge repair and paint po Po E PO y Po Po Po C Phi ti 140 Move Doorstop 0 o0 T Po 26 05 200 po Po P po Po y Po NE Sharkey Pht L 140 Excessivegaptodoor lockside o 3 PFP 1 11 140 Finand paint around ferrule to central ligt 5 BBCL Phi Li_ 140 Remove packer high level LHS dor T T y Mag Hanson PFP Ph 1 L1 1 41 Clean paint from concrete column high level Ph 1 11 Repaint north wall RHS high level Ph 1 11 Loose button in light switch Ph 1 11 Fix gasket both windows Hanson
100. inish at service penetrations to ceiling tiles PFP Ph 2 L3 3 11 Complete paint to wall high level RHS of LH window Mag Hanson Ph2 L3 3 11 Loose top hinge RH window Mag Hanson Ph2 L3 3 11 Fix gasket RH window PFP Ph2 L3 3 11 Rub down and repaint sill RH window BK Ph2 L3 3 11 Flatten plate to top of south light 01 07 2009 83 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED Sharkey Ph2 L3 3 11 Door catching air vent BK Ph 2 L3 3 10 North light fix top plate BK Ph 2 L3 3 10 Straighten suspension wires N Light BK Ph 2 L3 3 706 Tap pipe requires bracket BK Ph 2 L3 3 207 Tap pipe requires bracket Ph2 L3 3 207 SE corner grout tiles high level CSL Ph2 L3 3 207 SE corner seal mitre in shadow gap PFP Ph2 L3 3 207 SE corner of column touch up PFP Ph2 L3 3 208 Fill and paint hairline in ceiling BK Ph2 L3 208 Missing spindle to toilet paper holder Ph2 L3 3 209 No comments Sharkey Ph2 L3 3 208 Colour repair at handle externally Sharkey Ph2 L3 We Repair riser doors at temp padlock location corridor PFP Ph2 L3 i WG Fill and paint ceiling cracks corridor Veitchi Ph2 L3 E 3 01 At 3 11 Missing carpet tile LHS of door Creagh Ph2 L3 red 301 Column adjacent 3 03 crazed stain to S fa
101. ioose pce Fre LH window Ingo make good finis 7 4 prp Phxis S22 Make good finish to ceiling at vision panels PFP CSL Ph 1 15 5 22 Top of door frame paint white the timber filler pieces and finish gray silicone seal Verni PRiLS 822 rocking floor tle LH side of centre concrete coum T T Sharkey Ph 1 15 5 23 Adjust Keeper ee Ph 1 15 5 24 PORETOIS wa plasterboard finish silicone seal 1 PP toe ae fee ws RR RR Ph 1 15 Tidy plasterboard to bottom of RH window LH light fiting ferrule loose _ E PFP Ph 1 L5 Paint Ingo to LH side of opening window Paint Ingo to LH side of opening window to LH side of opening window Veitchi Ph 1 L5 5 25 Make good carpet around floor outlet Ph 1 L5 5 25 LH door make good shadow gap 01 07 2009 24 LH partition Ames tape loose Ingo finish to windows make good Ceiling to LH side of door make good Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM Me Lacan Pel DATE CHECK CHECK CHECK COMMENTS E PFP CSL Top of door standards paint filler piece white and finish silicone seal Sharkey 1 15 526 jSealgapstobotomofvsionpane J LE ELEM a aes 527 aea window ingos o __ op p p e 7 31 Ph 1 15 527 side window opening clean off
102. junction with wall Finish is poor with insulation showing Sealant missing etc Veitchi Ph 1 15 5 02 Carpet tile junction with window cill fit black trim to keep carpet in place PFP Ph1 L5 5 02 Paint to concrete columns and concrete runs to be cleaned off i Seal gap concrete column partition GRR m TUM oss Ph1 L5 5 06 LH North partition Ames tape at low level adrift make PFP good Vision panel seal top corners GRR 1 15 5 08 Ceiling cracks PFP BK Ph 1 15 5 08 Floor box clip missing Sharkey Ph 1 15 5 08 Refinish face of door veneer Ph 1 15 Fill and repaint crack RHS top of 5 15 and RHS 5 14 PEP 5 08 Clean paint splatters from glass vision panels and doors and frames Sharkey 5 09 Adjust lock BK Ph 1 L5 5 09 Light switch sticking Y 01 07 2009 22 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM TRADE Phase 1 DATE CHECK CHECK CHECK COMMENTS CLOSED Sharkey Ph 1 15 Silicone seal to top of glass PY GRR Smmey Phris s10 RH parton behind door paint sk Pis 5 Sharkey Phils 5 11 Vision panel seal top comers GR Ross eee ee RES EET mm ee Ph ists 6 14 off around ight switch 1 GRR 5 Reposition door stop to stop door hitting shelves J Sharkey Ph 1 15 Reposition door stop to stop door hitting shelves 5 5 Window dropped and catching frame Seal of p
103. k of ventilation Temperature Trench heating very poor in Rooms 7 10 G 01 G 02 Heating G 03 G 05 G11 and Reception Area Ground Floor Corridor COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION em OUTSTANDING ITEMS COMMENT Dare cHECK COMMENT cLoSED B6 22 Access to light fitting far wall Lo 2 03 Level Ventilation 1 Extract fan showing fault C Control 2 EF02 seems to have an intermediate issue initially there was a fault shown on the panel but after a bit of tinkering the breaker was tripped and re set the fan oo there after there was no explanation 5 AHU 8 Supply Fan has an Ecosmart unit again but this time it has internal temperature controls too why see attached photos 0004 0006 0007 6 Fire suppression Extract Fan EF11 again this has an Ecosmart controller for no apparent reason Fan is fixed speed M amp E B Z17 Temperature 2 Temperature ofroomexcessive _ BZ2 Access Access to electrical services Tooo Oooo o T e TAC have allowed a shut off damper in EF08 control panel EF14 does not operate as per specification or system description There is no control for this fan as CHP Room MCP07 scheduled and fan will only operate when both motorised dampers are open to both
104. key Ph2 L 1 1 11 Repair damage to door at high level CSL Ph2 L 1 1 11 Seal mid window soffit ingo joints PFP Ph 2 L 1 1 11 Touch up at ferrules PFP Ph2 L 1 1 11 Sand and paint ceiling above internal screen BBCL Ph 2 L 1 1 11 Clean shadow gap LHS door high level Ph 2 L 1 1 12 No access BBCL Ph2 L 1 1 13 Clean mastic etc off screen edging RHS CSL Ph2 L 1 1 14 Introduce soft joint along beam in ceiling CSL Ph 2 L 1 1 14 Column box out to ceiling reseal ditto for vertical joints BB PFP Ph2 L 1 1 14 Tidy south elevation shadow gap trim down or build up CSL Ph2 L 1 1 14 Seal Pelmet PFP Ph2 L 1 1 14 Repair tape at NW column pris Ph2 L1 1 14 Repair tape at screen PFP Ph 2 L 1 1 14 Complete paint behind door PFP Ph2 L 1 1 14 Remove paint from ceiling blankplate 01 07 2009 90 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED PFP Ph2 L 1 1 01 Bulkhead above int screen cracked fill and paint 10 06 2009 Rainbow Ph2 L 1 1 01 Stops missing on internal screen blind south and mid BBCL Ph2 L 1 1 01 Check as no pelmet fitted to int screen blinds PFP Ph2 L 1 1 01 Paint ingo soffit to vent above door Sharkey Ph2 L 1 1 01 Ease door not clo
105. l at corridor door to corridor L3 W toilet corridor Clear away marks patch at head of oak paneling Veitchi E W toilet Small bit of carpet missing on w side corridor G R Ross L3 W toilet corridor Tape bossed at screen RHS of door 01 07 2009 41 TRADE ion 061601 aie From Joint Walkrounds Ph 1 mius LSW toilet Fill hole at base LHS of door to toilet corridor in corridor _ S C S S corridor ENEUGE raS nea oe p S 3 1 3 E EUR BK Phi L3 3212 Refixtheloosevent 0 0 Y Phi L3 3211 jHeadofdoorframetobeseaed o 1 BK PhtL3 3211 Pipebraketsrequredathot codesuply fJ o Phi L3 3211 good mosaics around perforation of pipes 1 o Fx um Corridor Ph1 L3 between 3 05 Concrete column needs seal 3 07 Corridor Ph1 L3 between 3 10 Socket make good around it 3 11 Ph 1 L3 Corridor 3 15 Seal above over panel 3 1 Ph 1 L3 Corridor 3 15 Pigeon holes junction of sealing 2 wall needs to be sealed Corridor at Clean surplus plaster room shadow gap LHS 3 16 and Ph 1 L3 3 16 touch up wall at shadow gap HERES G Ph 1 13 E Make good ext corner of wall LHS of vision panel 3 17 EE NN N wall corridor from corner 3 10 to column to left gt seal CSL GR Corridor 3 17 open junction of plate and w
106. l floor tiles not level Adjust to fit At start of concrete wall loor tles not level Corridor 5 28 Ph 1 L5 to 5 35 south Fire Exit sign missing on light fitting to North Ph 1 15 Room 5 29 Top of door frame tidy junction with ceiling OOo S T OE Corridor 5 28 CSL Ph 1 15 to 5 35 south gaps to ceiling North wall above spur EB to North 9 Sh E arkey Ph 1 15 5 31 Seal bottom of vision panel and glue down small piece of Veitchi carpet tile Corridor 5 41 Sharkey Ph1 L5 5 04 East to 5 41 Make good damage to veneer West 01 07 2009 28 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM wane eet Location Pee DATE CHECK CHECK CHECK COMMENTS CLOSED Corridor 5 41 Optima to 5 04 East to West Corridor 5 41 Veitchi to 5 04 East to 5 40 Uneven tiles to RHS of door West Ph1 L5 Goods Lift B3 Make good seal between panel and wall RHS PY FD Adj Sharkey Ph 1 15 5 36 P4 Doors rubbing on carpet FD Adj Fix white kick plate to cover screw holes at bottom of both BBCL Ph 1 L5 Main lifts Repaint metal frame around doors BBCL ph1 L5 Structured wey timber infill at floor level to 1 unit only Glazing Sharkey FD101 High level glass panel above fire door fixing missing a a ee next to coffee point BBCL aaa FD101 Remove protection from structural glazed screen Lo L1 1 1 2 1 FD101 Make good paint damaged to metal trunking above door
107. les to riser PFP Ph 2 Grd L aos G 02 Touch up marks to ceiling 01 07 2009 97 Level Location Defect Items From Joint Walk ACCESS COMMENTS ITEM Rounds Phase 2 DATE CLOSED Sharkey Grd L G02 G Z06 Indication not looking on lock BK Grd L ub 6 02 G Z06 Bracket required to pipes Grd L Maid Ge G Z06 Clean mosaic east wall high level RHS GrdL Vales G 02 706 At door fill ceiling crack and paint BK Grd L 6 02 G Z07 Bracket required to pipes Sharkey gt Grd L G 02 707 Fill frame holes on LHS BK gt Grd L uiro G 02 708 Alarm reset hanging off wall fix BK Grd L 6 02 G Z08 Grab screws mixed types change to CSL Grd L G 02 G 708 Complete seal to hinge side PFP Grd L 6 02 G Z07 Paint missing at door frame head latch side Basement 3 BBCL Grd L Corridor at li At lift clean snots off lift concrete ingos low level Basement BBCL Grd L Corridor at li At lift call button fill recess edges Basement BBCL Grd L Corridor at li N Elevation fill hole above swipe access BBCL Ph 2 Grd L B Z12 Fill tie holes CSL Ph 2 Grd L B Z12 Replace and reseal duct seal fire rates mastic CSL Ph 2 Grd L cen a Reseal tidy mastic to B Z14 door check if fire rates Sharkey Ph 2 Grd L al Escutcheons missing both sides BK Ph 2 Grd L Men at Remove protection from AHUs CSL Ph 2
108. lete finish to shadow gap below LH window CSL Ph2 L2 2 18 SW column reseal to west wall PFP Ph2 L2 2 13 Clean off paint from ferrules PFP Ph2 L2 2 13 Touch up round south light conduit PFP Ph2 L2 2 13 Clean paint from door facing LHS skirting level CSL Ph2 L2 2 13 Seal hole above skirting SE corner BK Ph2 L2 2 13 Faulty light switch does not switch off Sharkey Ph2 L2 2 14 Fill screw hole to door frame bottom RHS Rainbow Ph2 L2 2 14 LH blind very stiff ease PFP Ph2 L2 2 14 Tidy finish to ext elevation wall head fill and paint G R Ross i Shadow gap bead RHS of LH window cut out renew Ph2 L2 2 14 i PFP and paint not perpendicular PFP Ph2 L2 2 14 Fill hole in skirting and paint mid point ext elevation G 7 f Ph2 L2 2 14 Repair tape at NW column high level and paint CSL Ph2 L2 2 14 Seal shadow gap BK Ph2 L2 2 14 Fix down light top plates Sharkey Ph 2 12 2 14 Remove mark from overhead panel RHS BK Ph2 L2 2 15 Complete cabling or conceal at column box out JCC Ph2 L2 245 SW corner shadow gap pelmet detail tidied plasterboard heightened 01 07 2009 86 Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE COMMENTS ITEM CLOSED PFP CLS 2 15 Ext and south elevation water damage repaired wall and ceiling BK 2 15 Replace distorted north floor box frame PFP 2 15 Repair shadow gap plaster LHS of door PFP 2 15 Paint
109. lign LH pelmet with shadow gap PFP Ph2 L5 5 07 Repaint high level corner at pelmet NW CSL Ph2 L5 5 07 Seal crack to shadow gap above door BK Ph2 L5 5 07 Clean all diffusers CSL Ph2 L5 5 08 Seal window soffit to ingos CSL Ph2 L5 5 08 Seal shadow gap crack all Mag Hanson Ph2 L5 5 08 Fix gasket to west window PFP Ph2 L5 5 09 Opening window handle side fill hole and paint Sharkey Ph2 L5 5 09 Missing screw to door hinge Veitchi Ph2 L5 5 10 Loose carpet to floor box Mag Hanson Ph2 L5 5 10 LH window loose hinge needs tightened CSL Ph2 L5 5 10 RH window seal soffit and sill to ingos CSL Ph2 L5 5 10 Seal hole LHs at head of central column CSL Ph2 L5 5 10 Seal shadow gap crack door elevation BK Ph2 L5 5 11 Replace missing cable access to floor box Mag Hanson Ph2 L5 5 11 window requires restriction CSL Ph2 L5 5 11 Seal window soffit to ingos CSL Ph2 L5 5 11 Seal crack to shadow gap above door PFP Ph2 L5 5 11 Paint round NW corner BK Ph2 L5 5 11 Tape down support to light NW corner PFP Ph2 L5 5 11 Sand and paint spot on ceiling south of NE ferrule CSL Ph2 L5 5 12 Seal crack to shadow gap above door BK Ph2 L5 5 13 Fix loose top cover to light fitting at 5 11 Veitchi Ph2 L5 5 13 Damaged edge to timber floor adj to pantry same as L6 01 07 2009 79 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED
110. n level 4 riser B the other in phase 2 level 6 riser They have no control or monitoring function so what is the purpose of these sensors They do not show any change of value when the VT pumps are on or off probably due to the CHP primary static MCP7 Control panel 01 07 2009 16 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION ear OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED Chilled water Circuit Pressure Transmitter this is Phase 1 installed under the floor in the phase 1 server room Control again what is the purpose of this sensor CHP plant room there are isolating valves on the heating and cooling CHP flow and return pipes 4 in total These valves and actuators have no obvious function as they are not controlled via the flow return MCP7 Phase 1 Control panel Kamstrup meters as would normally be done on University heating cooling stations They also have no end switches to give feedback of their open closed position Htg valves MV1 and MV2 valves MV100 and MV101 CHP plantroom Cooling Isolation Valve MV114 MCP7 located at high level which shuts off the chilled water M amp E Phase 1 to the entire building As this would include all of the Control panel IT hub rooms it can never be shut under any circumstances so what exactly is its function EF14 serving G07 GO7A function rooms there is insufficient
111. nell airflow normal signal direct from an internal airflow basement switch Propose to convert panel lamp to airflow normal and modify panel and software to suit this is the easiest and quickest solution 01 07 2009 14 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION car fay an OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED Main Entrance door curtain This unit has no temperature control over it s heating battery despite there being a control valve and actuator being installed Phase 2 Control panel in the local riser pipeline There is no wiring to this basement actuator and there is no temperature sensor in the entrance hall to control it This will give full flow temperature back to the CHP return pipework under light load conditions Sump Pump Panel as for Phase 1 there is no 24 Phase 2 Control panel volt isolation of the BEMS signal through the mains basement MCP 11 m isolator Auxiliary pole required Phase2 Control panel Server room CCUs number 1 has a faulty LCD basement MCP 11 display Server room CCUs number 2 keeps alarming with Phase 2 Control panel the humidity fault disabling the unit and changing over basement to number 1 Unit 2 requires attention and control alarm strategy to be discussed and modified Server Room there is no BEMS temperature sensor Phase 2 Control panel gt in this room but
112. ng properly Pf or 1 39 1 36 RHS high level at kitchen fill and paint crack a a to a 199 1 36 Loose double socket RHS or 1 39 to Glass balustrade adj lifts trim and seal on void side dT 39 FDs at 1 01 Loose raised flooring do 133 FD adj farthing leaf catching on frame to Er 1 39 Past 1 7 06 loose fire exit sign facing 1 39 to 1 Z 06 seal door head Sharkey to 1 12 idor 1 39 to idor 1 02 FD to phase 2 check ironmongery schedule closers removed no D handles At 1 2 06 paint patch at smoke detector Veitchi Core 01 07 2009 Bor 1 08 Loose flooring opposite 1 02 53 ITEM TRADE Phase Location Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE COMMENTS ITEM Level Phase 1 DATE CHECK CHECK CHECK CLOSED GR Ross Corridor 1 02 p veien 1 11 1 Corridor 1 02 At stair FD replace notched cut carpet round concrete to 1 12 corner G R Ross Corridor 1 02 to 1 12 1 04 Loose tape repair and paint Sharkey y WC corridor repair wall finish 1 2 12 and 1 2 13 BBCL Ph 1 11 Corridor 1 02 WC corridor Clean plaster from plastic cap at screen to 1 12 wall junction 1 11 Corridor 1 02 4 7 14 Fill and paint ceiling joint to 1 12 Ph 1 L1 us i 1 05 Above door fill and paint score Ph 1 L1 D 02 1 05 Above door paint out mark cum SL PF PF PF PF R Ross Corridor 1 02 Adj 1 11 Repair and
113. ngo CSL Ph2 L 1 1 22 Seal shadow gap crack W elevation PFP Ph2 L 1 1 22 Clean paint from concrete wall LHS low level PFP Ph2 L1 1 23 N Elevation clean plaster and paint off concrete wall at high level PFP Ph2 L 1 1 23 Touch up white walls at shadow gap Corridor 2 01 i JCC 2 to 2 15 N elevation refinish MDF edges and paint 2 edges m Corridor 2 01 Adj 2 01 Carpet timber joint to be tidied Transition Veitchi 2 to 2 15 strip If so all levels PFP 2 crc At 1 23 column missing purple paint touch up BK 2 Corridor 2 01 nori ce chipped diffuser adj 2 01 to 2 15 01 07 2009 92 Phase Level Location Defect Items From Joint Walk ACCESS COMMENTS ITEM Rounds Phase 2 DATE CLOSED Corridor 2 01 At FDs complete ingo paint at low level 4 corners adj PFP to 2 15 1 04 PFP pd At 1 04 touch up RHS high level at over panel CSL samoar ear Mastic ceiling RHS of WC corridor Sharkey m At FDs adj 107 LH hold open override button jammed BBCL a oou At 1 07 Remove writing on screen frame RHS high level BB CLS Corridor 2 01 At skirting ends of 1 17 and 1 16 screen tidy detail trim or to 2 15 fill G R Ross Corridor 2 01 PFP to 2 15 At 1 07 1 09 1 10 1 11 1 13 Repair tape at screen BBCL cid Overhead panel refixed above 1 15 U of E BB wr EU Noted access control not working lock or electrics BB CLS m S Elevation beam to ceiling soft joint required see 1
114. ngo to opening window PFP and repaint Make good the finish of the shadow gap Sharkey Ph 1 L5 5 33 Door stop missing 01 07 2009 25 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM DATE CHECK CHECK CHECK COMMENTS oo Sharkey Priis 34 Adjust door stop to properly p E Sharkey Phils 535 Reposition door stop 14 05 2009 Sharkey Ph 1 15 T dropped on hinges Adjust to fit frame EUN Ph 1 L5 LH window junction with cill silicon missing or poor 4 Ph 1 15 5 37 Window behind column finish junction with ingo PFP Ph 1 15 5 37 Vision panel clean off paint Sh i i i arkey Ph 1 15 5 38 Paint on new fore edge Improve fit of door and repolish PFP to suit Ph 1 15 5 38 Vision panel clean off paint from frame Ph 1 15 5 38 Vision panel LH side at top of door Channel is short in length and sealant missing Ph 1 15 Gaps in sealant to concrete column Sharkey Ph1 L5 5 39 Gaps to vision panels at junction with door frame J Sealant required GR Ross Ceiling above large cupboards poor finish Vision panel Ph 1 15 5 39 PFP head channel to same area Clean off paint showing PFP Ph1 L5 541 Timber ceiling clean off paint and wipe clean all areas of general marks BBCL PFP Ph1 L5 SW concrete column requires cleaning of patch at base Shadow gaps to be made better Ph 1 L5 n a in front of 3 seat sofa
115. no screw caps to vent grill po Y com B siar GF Losby RHS Rerwane tttoeatstacovews L5 Lobby Replace screw cap to vent grill Y L5 Lobby FD adj 5 03 fix FD sign poo y i MEN MEN 1 CoreAstair 5 Fire sign required tolightfitting 3nointotal J _1_ CoreAstair General Doorstopsrequired CC 1 OoreAstair L5 Above half landing remove white painton wall 1 Core Astair L5 Abovehalflandingrepairceling2comers o To o J 1 CoreAstair L4 lobby FD adj4 03firedoorsignmissing J 1 OCoreAstair L4lobby replacebrokenscrewcapstoventgrlls Y J T 1 CoreAstair L4lobby Lifttcallbuttonsaretranspoed Core A stair_ L4lobby Callbutton 2missingscrews o o Core stair_ L3 lobby FD adj3 03closerarmcatchingdoor T 1 Core Astair L3 lobby FD adj 3 03 repair damage to frame TC 1 CoreAstair L3lobby missingventgrillscrewcaps o Y J 1 T RR 11 all doors 1 Gore Astair_ L3 Diffuser missing abovehalflandng T O T L2 lobby FD adj 3 03 replace damaged seals ooo o o o 1 Core A stair L2 lobby replace screw cap on vent grill Y 1 Core Astair L3 u smainlandingpaint
116. nt of oom xa Sharkey Phi GrdL G 07 Loose wood slat above light switch RHS PFP Pnt GrdL GoO07 Back of room fill 4no ceiling holes and pait J o Pht GrdL G 07 good round smoke detectorbackofroom 1 BK Pnt GrdL GO7 f Trmsuspensonwires 3noligts O 1 o BK Pht GrdL G7 j2nocoversrequredtoredundantcelingboxes Phi GrdL G07 Seal columns incomplete works To CC y ror o 7 JCC Ph 1 Gra G 07 NW corrigr low level panel mis alig ned Journ ce sain Seat a EM Phi GrdL 9 07 Seal NW column head CE PntGraL GO7 Curtain to fully open _ _ ooo o y y Mova wall G 07 Damage to panels 2nd from LH bottom edge SL 01 07 2009 y y GZ10 i o Lo Lo y O 27 05 200 HEN 62 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL ITEM enim a DATE CHECK CHECK CHECK COMMENTS CLOSED Phi Grdt GO Repaint MDF plate above fingermarks ooo Po PhftGrL 9 07 Cracked tape high level fill and paint eastwall fJ Jo o PhtGrdL G07 East walll final coat to skirtings both o PhtGrL G07 __ Eastwall door switch fill and paint poor finish PhtGrdL Cl
117. ntemal screen above internal screen Veitchi Mag Hanson FEA R EITH 1 L4 4 aosa Cracking to RHS door way to tape and fil and pait to Cracking to RHS door way to tape and fil and paint door way to tape and fill and paint dc R Ph 1 L4 Cracking to RHS door way to tape and fill and paint ee NUN ae omes Phila 497 adjust door n keaper EE Pee it M amp S Pht L4 408 Check fixings to balustrade both ends o 7 i X Phtl4 409 Nocommens P Phi L4 410 Ventpanelexternallyrequirescleaning 0 Bk f 410 Sor fauty ight ting nearest door R Ph 1 L4 Rub down fill and paint pipe box face towards door Phil Phi L4 ee Room number not used Ross Ph 1 L4 Fill hole in shadow gap and paint not acoustic Ross Mag Ph 1 L4 4 14 Fix gasket to opening window 1 14 415 Glass door grinding on floor plate mra E EE Ca 0o EE JCC Ph F L4 4 15 Balcony Fit door restrainer BBCL Pht l4 415 Balcony Clean off soffit of precast behind open door LEE JCC Ph 1 L4 4 15 Balcony Replace damaged slat behind door Ph1 L4 4 15 Balcony Adjust keeper on balcony door 01 07 2009 30 Phase Defect Items From Joint Walkroun
118. ntenance due to restricted opening of the access door Requires attention AHU 20 Plate Heat Recuperator there is some AHU 20 Heat physical damage to the internal fins of the exchanger Exchanger plate It looks like it has broken the seal between the supply and extract airflows AHU s 20 amp 21 Fire Dampers as mentioned before there are nine or eleven damper actuators which are AHU 20 amp 21 Ventilation not in any fire compartment of the building Awaiting decision on the requirement for these units However if they are to remain then once again a He Labels missing throughout E g AHU 21 Extract Fan Extract Fan EF22 Server Room Gas Suppression there is a motorised damper still to be fitted on this Server Room EF 22 unit and some panel modifications to be carried out before this unit will be ready for demonstration 01 07 2009 11 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION MAY 2009 OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED ACTION Pd It was noted during this demo that Extract Fan EFO05 in EF 05 the roof plantroom had tripped again Ecosmart unit Roof Ecosmart jor fan motor requires attention Extract Fan EF08 is a single speed fan with a speed controller installed Vent Axia However the speed controller is not compatible with BEMS 0 10v DC control signal and currently runs at full speed Basement Water Tank
119. nternal screen frame at head BK Ph2 L4 4 01 Replace missing thermostat cover Mag Hanson Ph2 L4 4 02 Fix gasket to RH window CSL Ph2 L4 4 02 Reseal RH window to ingo on handle side Mag Hanson Ph2 L4 4 02 Scratched window polish out CSL Ph2 L4 4 02 Cracked shadow gap SE corner seal PFP Ph2 L4 4 02 Touch up finish at SW column head BB PFP Ph2 L4 4 02 At pelmet RH window plasterboard to be extended to shadow gap and paint PFP Ph2 L4 4 02 Fill hole and paint in wall behind door PFP Ph2 L4 4 02 Mid light complete paint round conduit at ceiling Mag Hanson Ph2 L4 4 03 Fix gasket to window BK Ph2 L4 4 03 Fix loose top plate on north light PFP Ph2 L4 4 03 Sand and paint rough finish behind door at frame PFP Ph2 L4 4 03 Fill and paint ceiling at NW column head CSL Ph2 L4 4 03 Seal cracks to shadow gap above window and door PFP Ph2 L4 4 03 Fill and paint RH ingo to RH window PFP Ph2 L4 4 04 Tough up ceiling at concrete columns BK Ph2 L4 4 04 Tape down exposed wire SE light ferrule 01 07 2009 ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED CSL Ph2 L4 4 04 Seal gap in shadow gap above door CSL Ph2 L4 4 04 Seal gap at skirting screen junction BBCL Ph2 L4 4 05 Trim
120. oint remove fixings RHS door fill and Ph1 L2 Corridor 2 45 253 Screed cut manifestation off joint top up joint with PFT grey mastic CSL Ph 1 12 Corridor 2 45 RHS of white doors seal gap between frame and skirting opposite side seal RHS sd sd sd isd sd sd sd sd Sharky Bieta l Comdora45 Nr eda large leaf 2 areas of damage to corridor side Ph1 L2 Corridor 2 45 At white doors moving floor tiles CT poa Ph 1 L2 Corridor 2 45 Ceiling crack adjust 2 06 fill and paint BBCL Ph 1 12 Corridor 2 45 Replace pelmet of fire exit sign mue owe emi a mw y investigate TTD _ RN me _ ceri eene eamtemamm ff meme _ ceri coor _ nes fd 01 07 2009 48 25 05 2009 ITEM TRADE Phase Location Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE COMMENTS ITEM Level Phase 1 DATE CHECK CHECK CHECK CLOSED Corridor 2 02 _ Corridor 2 14 Sharkey to Adj 2 16 fire doors out of top hinge and repair damage S S Sharkey i B Adj 2 16 refix hold open floor box CSL pa ata Adj 2 16 fire door seal LH ingo crack Sharkey 2 14 Adj 2 27 Replace missing screw to hold open BBCL Ph 1 12 Corr bs Ben Tidy concrete wall external corner Pf Ph 1 12 a 228 Fire door adj 2 31 seal LHS shadow gap to frame PhtLt
121. oint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED Mag Hanson Ph2 L5 5 01 Repaint poor finish on window frame cills all PFP Ph2 L5 5 01 Clean paint from screen frame and glass LHS of door CSL Ph2 L5 5 02 Seal window ingo to soffit CSL Ph2 L5 5 02 Seal crack to shadow gap above door a us 2 15 5 02 Repair tape crack new corner and paint Ph 2 15 5 03 NW corner ceiling tidy finish Mag Hanson Ph2 L5 5 03 Loose hinge to window PFP Ph2 L5 5 03 Touch up window damage to ingo CSL Ph2 L5 5 03 Seal crack to shadow gap above door Sharkey Ph2 L5 5 04 as column trim pelmet to line of shadow gap 04 06 2009 Ph2 L5 5 04 At concrete column tidy paint finish both sides Tidied up at head CSL Ph2 L5 5 04 at concrete column seal at head LHS Mag Hanson Ph2 L5 5 04 Fix gasket to opening window UofE Ph2 L5 5 05 External face of door scored client damage noted Mag Hanson Ph2 L5 5 05 Fix gasket to RHS window Sharkey Ph2 L5 5 05 nag pelmets to LH and mid windows to level of shadow PFP Ph2 L5 5 06 Ceiling fill and paint 2no scratches middle Mag Hanson Ph2 L5 5 06 Fix gasket Sharkey Ph2 L5 5 06 RH pelmet refix PFP Ph2 L5 5 06 Touch up paint at smoke detector Mag Hanson Ph2 L5 5 07 Fix gasket Sharkey Ph2 L5 5 07 A
122. on sal circiut p c S yy y OBB O Rises Allrisers require to be cleared of debris amp cleaned Phase2 Control panel EF101 fan speed controller is burnt out requires basement 11 replacement unit Trace hating found two relays missing from level 1 Phase2 Control panel and 6 connection boxes Also found exposed live basement connection joining bar in junction boxes which is potentially very dangerous Phase2 Control panel AHU22 Further access hatch required outside room basement MCP 11 for duct frost stat Phase2 Control panel AHU22 General access to the whole unit is very poor due to fixed ceiling structure Installation of basement MCP 11 T suspended ceiling to be looked at AHU 22 Ecosmart unit has a heating control valve a cooling control valve with actuator removed and two double reg valves all fitted INSIDE of the AHU Phase2 Control panel chamber with no access to same There appears to basement be no flow to either battery as the TAC control valves make no difference to the supply temperature when modulated Requires all Ecosmart valves and controls to be removed and system recommissioned AHU22 TAC control valve is still embedded in the fire Phase2 Control panel 2 wall Photos supplied over 6 months ago by myself basement MCP 11 and Peter Lehany Main Entrance door curtain TAC have a fault signal on the panel fascia for this unit but it only provides an Phase2 Control pa
123. op BK 01 07 2009 103 Sharkey Sharkey Sharkey Door lock no thumb turn noted Check schedule Seal holes in ceiling to alarm cables Fill and paint cracks and nail hole above door epair damage to door Adjust door hinge adj and hits stop not closing and paint ceiling cracks Seal cracks in shadow gap MDF on ceiling patch ceiling or replace with hatch Reseal concrete walls junction Grey Seal crack above over panel Seal joint concrete to plaster NE corner BBCL o o o T o o o T oL e E p L 31 LL v dg Sharkey G 0 Adjust door not closing properly __ p p d Jd o o o T oL e E o i T XJ T e e f o pO T T ee f 01 07 2009 104
124. osmart unit running continuously at 50 Hz 01 07 2009 9 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM PACTIONE OUTSTANDING ITEMS COMMENT CHECK CHECK CHECK COMMENT CLOSED Level 6 Forum Meeting Rooms isolation dampers these are Plantroom Dampers simple on off shut off dampers so why are the supply MSCP1 amp dampers analogue 0 10volt but the extract dampers MSCP2 are digital on off Level 6 Plantroom EF03 Stores Cleaners cupboard 50Hz Ecosmart Unit MSCP1 amp again why MSCP2 Level 6 Robotics Lab EFO9 interesting to note that this fan is Blanircom a Nu Aire motor but the control has been modified MSCP1 amp Ventilation from speed control to a DOL starter in the control MSCP2 panel so it can be done So why have we got Ecosmart controllers everywhere Solder Extract Fan EF15 Once again we have a Level 6 Siemens Micronet 420 speed inverter AND an Plantroom Ventilation Ecosmart speed controller mounted in the same MSCP1 amp box panel See photo 452 attached Also our MSCP2 University Engineering Guidelines quite clearly states that any invert AHU 21 duct frost thermostat Ampel Ventilation recalibrated switching unit off at 17 C AHU 21 programme interlocked with Phase 1 floor time schedules Reprogramming to Phase 2 Y Y schedules required again out running at mre __ Y Y fitted again but running at fixed speed AHU 21 Extract
125. ounds Level Phase 1 EE M Sharkey Phrte 2m Touch up shadow gap above door panel o Bk Phil2 212 Square up light swith T vy o To Cover top hinge pivot glass door missing EG AM Phil2 244 Clear paint of over panel both sides 6 1 Hanson Mag Ph 1 12 214 Clean off protection and paint from W frame of NENNEN Hanson curtain walling O E i Lo o y Seo Pte Ba Balcony Baloo deci ta HS Bacony doortacing tobe cleaned d e F 1 h Ph i L2 2 14 Balcony SE corner clean rough cast off SS barrier rails No comments y 7 Ls RED ace lama CSL 215 Sealsoffitjunctionofingss CE Dripping shower tap BBCL Phi L2 2214 _ CE To PFP Pnt t2 2214 Cracksonsofftbyshowerwallatsmokedetector o 1 o y 1 12 2215 Cracks on soffit shower wall at smoke detector CT PFP Pnt t2 2215 Paitcopperexensionabovebollfxvaves J Z CE o CS ja sd sd y isd CTC i CT Sharkey Pht L2 216 Excessiveclearanceofdoor Sharkey Phi t2 217 Excessive clearance ofdoor o o f
126. ove debris from roof L6 Roof Tidy membrane sticking through ballast stones L6 Roof Remove wooden steps and clear debris Maintenance area void L6 Roof Atrium Maintenance area void Lobby PR6 BK Make good damaged insulation ductwork Lobby to plant Finish plasterboard at high level room 6 BBCL Plant room 6 Clean face of steel panels Plant room 6 Rubber mat required at MCP 1 and 2 Access doors to roof metal work at low level is rusting 1 Plant room 6 clean off and plug 01 07 2009 21 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM ITEM TRADE ever Location DATE CHECK CHECK CHECK COMMENTS osep Mag Hanson Plant room 6 Membrane to riser daylight showing make good Mag 1 Plant room 6 Door front top of stair to PR6 fix and adjust closer Hanson BBCL 1 Stair to PR6 Heating pipework half landing should they have finished coat of paint BBCL Stairs General Clean off writing and paint from stair stringers and waist 5 01 Coffee Fit overpanel to column LH side of tall unit with shadow Ph 1 15 gap and shelf at low level Mag Ph 1 L5 5 02 Gaskets to opening light window loose again Hanson Veitchi Ph 1 L5 5 02 Loose floor tile PFP Ph 1 L5 5 02 Dust sealer required to concrete wall CSL Ph1 L5 5 02 Door over panel both sides
127. ow Whb rd L G11 Check schedule for Whb no plug fitted BBCL PFP Ph 1 Grd L Gn fixing RHS door countersink fill and paint Sharkey Phi GrdL Gf Replace facing to atium with single pieces J PhftGrL Dit Door atrium side fill and paint fixing holes J Tier Pht GdL GZt4 Fill hole LHS of Alarm bar 1 10 Tier PhftGrL GZ14__ Relay 2 mosaics above RH alarm bar 1 1 Ceiling crack fill and paint qq d y UofE Phft GrL QGZt6 _ Shelf support bracket damaged wallend J o Jo 1 PhtGrdL QGZI7 jLocktotowel handdryerbroen replace J To o Sharkey Pht GrdL GZ17 required paint wall damage PhtGrdL GZt5 score at low level and pait Jo o o PhtGrL Gzt7 Ceador 9 D 2 PJp Phi GrdL Corridor_ AdjGZ14 Fireexitsignfaceplateloose J Sharkey Pht GrdL Corridor AdjGZ14 Replacedoorstop Joo Phi GrdL AdjGZt4 Filandpantcelingcracks To o Sharkey Pht Grit corridor Ad GET FD to offices punch and il _ PERENNE ee PT 1 HEN PT i o Lo PT ee E og 0 PT ee o Clip perimeter tiles both areas 1 Bio rTigytile finish at conduits
128. ow gap and across ceiling NN C 40 ITEM TRADE Phase Location Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE COMMENTS ITEM Level Phase 1 DATE CHECK CHECK CHECK CLOSED Atrium stair 1 13 Plaster ceiling junction with oak soffit requires filling and PFT painting Ph 1 13 o EE strip between carpet and oak floor is flexing and screws worked manifestation Atrium Stair L3 a stair supports and remove surplus paint from 3 01 ie suspension wires of light fitting need to be taped Ph 1 13 o ok above tall cupboard at tea point Ph 1 13 Soffit above tea point cracked by ventilation grill Ph 1 L3 Su next to Vertical crack RHS of fire doors fire door 3 32 next to BK Ph 1 L3 fire break Secure break glass point glass point Sharkey Ph 1 L3 bu Damage on small leaf fire door to be made good Ph 1 13 General Secure all fire door hold open magnets 2 realign and overhaul G pa Ph 1 L3 Sus Cracks in soffit between fire doors 2 3 03 min 4x CSL Ph 1 L3 Coridor 3 in 7 skirting board butt to fill Roof garden JCC Ph 1 13 Roof garden Make good the redundant holes on door face RHS at eye PPLS ext door level CSL Ph 1 L3 Pon garden Clean socket 2 make good around PPLS ext door 9 21 05 2009 Ph 1 L3 Concrete External corner concrete corridor wall to be improved corner Core A L3 W toilet Make good damage at perforations to the cover pane
129. paint wall at shadow gap column Ph 1 L1 A PFP to 1 12 junction tape coming loose G R Ross Ph 1 11 Corridor 1 15 1 13 build up bulk head shadow gap verticals and paint PFP to 1 24 Bad finish both sides Corridor 1 15 A PF Ph 1 11 wc d 1 13 Clean paint from pigeon hole BBCL FD at 1 16 Tidy wall frame junction LHS Corridor 1 15 1 18 RHS of door junction of wall and screen bulkhead to 1 24 fill vertical crack and paint G R Ross Corridor 1 15 1 18 LHS of door on shadow gap loose tape Repair PFP to 1 24 and paint Corridor 1 15 Sharkey to 1 24 PFP FDs at 1 22 adj doors as gap between meeting stiles 01 07 2009 54 ITEM TRADE Phase Location Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE COMMENTS ITEM Level Phase 1 DATE CHECK CHECK CHECK CLOSED to oint PFP to BBCL i Tem Adj 1 28 High porthole remove pen mark G Po e 1 59 1 28 Loose tape repair and paint G R Ross Corridor 1 25 1 29 Loose tape repair and paint Veitchi GZ06 Along whbs cut out and reweld vinyl to skirting GZ06 Cubicle 2nd from RH loose seat Ph 1 Grd L GZ06 Adjust door catching on floor Ys Ph 1 Grd L GZ08 Clean paint from column BK y Sharkey Ph 1 GZ08 Seal fixing holes LHS frame o Ph 1 GrdL GZ08 Bracket required to pipes BK NENNEN SEE EE Sharkey Ph 1 GZ08 Repair finish above handle Ph 1 Grd L Gz08 Spa corridor heating switc
130. r valve commands for the 214 MBE CHP Chiller bypass valves in Outstation 138 DHW circuits not controlling Adjacent to Heating extend button loose Fixtowall LI ID plates to override switches text to one is P black amp the other red Both to be black text West Atrium Plant Space Ductwork insulation damaged Make good Ductwork insulation damaged Make good insulation damaged Make good Phase 1 Roof Phase 1 Roof Labelin Roof access control panel is labeled Smoke Extract Access Hatch 9 Relabel correctly e East Atrium Plant Space Labeling Electrical boxes require labels boxes Electrical boxes require labels labels pulled back left il GZ12 Cablin Unidentified red coloured cable is hanging loose pis e 9 Identify cable and refix Funetlan of poeti not repositioned to allow access for maintenance 4210 5709 require also door stops Make good 01 07 2009 13 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION ear fay an OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED Level 6 Electrical installations to concrete soffit are loose and Cabling etc poorly installed Make good Specification to be stairwell mn 2 checked to establish if allowance made for a ceiling BK As all Level 6 Plant 2 No lights are on continuously should operate via Lighting PIR Make good lobbies
131. s 01 07 2009 102 ITEM TRADE Phase Location Defect Items From Joint Walk Rounds ACCESS SUBS BBCL UoE COMME ITEM Level Phase 2 DATE CHECK CHECK INTS CLOSED Shop Various ceiling cracks fill and paint o C op not lamp issue eese s LL BK f Shop Lights require programming position queried Shop Improve ceiling finish behind north concrete columns Clean plaster and paint from N concrete column Shop and adj screen frame f Shop N East elevation fill ceiling crack at head of east P concrete column Shop Column LHS of east seal head to ceiling Adjust east entrance door sensor ext sensor not Shop 2 quick enough pre Sw eo elevation tape crack above G 10 door fill and pre Sw South elevation ceiling joint above G 10 door fill and paint _ Shop_ Floor clean and reseal a _ Floor grill LHS of west entrance requires to be flush with FFKL p i Shop Clean floor grill floor grout Shop e Floor grill NE corner replace bent section fit support angle G 07 Lock indicator not working G 08 Touch up around switch and spur below on west wall Reseal kitchen units to floor Floor grill n elevation LHS of North column BK straighten slat itchi Sh
132. s 5 02 PFP Ph 1 15 to 5 15 North up paint to skirting edge LH toilet door at column to South Corridors 5 02 Refinish door and stops marked veneer to South Sharkey Ph 1 15 Tolet West Door not closing and rubbing on carpet Door not closing and rubbing on carpet Ph 1 15 bu Light fitting suspension cable visible Tape out of sight o pod GRR Ph 1 L5 bct RH wall Ames tape coming loose refix and repaint wall ES Ph 1 L5 Remove paint from skirting and fill gaps and repaint Remove paint rom skirting and fil gaps and repaint f Sharkey Ph 1 15 Toilet West Wooden panels make good splits in timber fore edges PFT Block cubicle doors BBCL 1 15 Tolet West Olean all marks from panels Block Ph 1 15 bo Seal panel wall junction both ends of corridor Seal pane wall junction both ends of coridor Corridor 5 15 Ph 1 15 to 5 28 West Make good mastic seal gap at floor spring wall 5 15 to East Corridor 5 15 CSL Ph 1 15 to 5 28 West Small corridor to S214 clean paint from light fittings and to East silicone seal shadow gaps to walls and bulkhead Ph 1 L5 Tidy up paint and gaps above lintol to inside 4 Pht L5 Tidy up around coving vents sensors Ph 1 15 5177 outside LHS fill and touch up paint Ph 1 L5 524 524 start of concrete wall floor tles not level Adjust to fit start of concrete wal
133. s L Veitchi 1 SSA General Damage to stair nosing to be made good rounded ee y y Outer drum intersection with ingo panel requires mastic SSA L4 Hen f pointing to seal untidy open junction RHS SSA L4 Gap at soffit of L4 landing and atrium locks untidy suggestions please Touch up unpainted section of drum ingo LHS L3 at junction with oak tread SSA L3 Clean off dark spot on landing and treads going down sees Clean paint off handrail and stair treads and landings General 992 97 Touch up damage on outer face of drum General General _ Rub down and touch up damage at top edge of drum 552 32 General Top landing shrinkage to oak to be resolved Touch up paint at junction handrail bracket and skin at General top landing Inner lobby entrance General clean of ceiling and walls 01 07 2009 70 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM EI Phase 1 DATE CHECK CHECK CHECK COMMENTS CLOSED Innen obby Seal open channel at threshold of the inner doors entrance d Missing fixing at inner doors push plate Q Atrium Floor Inconsistent colours of granite floor entrance ing query entrance 01 07 2009 71 Phase Defect Items From Joint Walk ACCESS BBCL ITEM i B HECK COMMENTS ITEM TRADE Rounds Phase 2 DATE SUES THES CHECK ae CLOSED a main doors Mag Remove spac
134. screen repaint cill appearance unacceptable PFP Ph 2 L 6 6 01 601 LHS of screen touch up bare plaster Sharkey Ph2 L6 6 01 Excessive gal to u s of door Remedy with drop Sharkey Ph2 L6 ar 6 01 MS Excessive gal to u s of door Remedy with drop Veitchi Ph2 L6 Corridor 6 01 Adj to pantry flooring edge split Repair or replace Fill to groove to edge to prevent reoccurrence Sharkey Ph 2 L 6 ds 6 01 eps damage noted repair PFP Ph 2 L 6 d 6 01 6 06 shadow gap LHs paint required PEP Ph2 L6 Corridor 6 01 South elevation paint required to shadow gap west to corner CSL Ph 2 L 6 92 South elevation seal soffit to ingos Sharkey Ph 2 L 6 5901 Missing screw to FD hinge to lift lobby Sharkey Ph 2 L6 Ed 6 01 Repair FD at push plate to lift lobby BK Ph 2 L6 uid 6 01 South part diffuser and sensor displaced PFP Ph 2 L6 LG WG Paint ceiling stain and fill and paint cracks corridor Ph 2 L6 6 206 No comments Sharkey Ph 2 L 6 6 207 Fit escutcheon to handle 2 Ph2 L6 6 208 Laminate missing to IPS end panel at floor damage pre sealant Sharkey Ph 2 L6 6 209 Back of door vent grill required Sharkey Ph 2 L6 we n m Refinish panel between 6 208 and 6 207 PFP Ph 2 L6 we aa Above fire door paint grey timber at vent above Sharkey Ph2 L5 5 01 Ease stops binding on door BBCL Ph2 L5 5 01 Noted no opening window Check design 01 07 2009 78 ITEM TRADE Phase Level Location Defect Items From J
135. shadow gap line on west elevation PFP Ph2 L4 4 05 Paint mark to LH ingo high level 3rd window from right Mag Hanson Ph2 L4 4 05 Fix gasket 1st and 3rd windows from left BBCL Ph2 L4 4 05 re sliding glass screen rattling when FD closes Sharkey Ph2 L4 4 07 Repair smoke seal to door Sharkey Ph2 L4 4 07 Po closer adjusted to prevent slamming when window Mag Hanson Ph2 L4 4 07 Fix gasket PFP Ph2 L4 4 07 Paint round ferrules BK Ph2 L4 4 08 Refix smoke detector to ceiling PFP Ph2 L4 4 08 Fill crack and paint on ceiling PFP Ph2 L4 4 08 Sand round shadow gap and paint Sharkey Ph2 L4 4 08 Replace missing hinge screws CSL Ph2 L4 4 09 Seal kitchen floor units to floor PFP Ph2 L4 4 11 Bulkhead repaint finish poor Recess and fill screw heads Mag Hanson Ph2 L4 4 11 Fix gasket mid and LH windows Mag Hanson Ph2 L4 4 11 Restrict opening to RH and LH windows Rainbow Ph2 L4 4 11 Blind inoperative 2nd from LH uu Ph2 L4 4 14 Repair tape behind door BBCL Ph2 L4 4 11 Trim corner beads at shadow gap RHS of door PFP Ph2 L4 4 11 Repaint shadow gap corner LHS of door CSL Ph2 L4 4 11 Seal crack to shadow gap RHS of door PFP Ph2 L4 4 11 Tidy paint finish round ferrules Sharkey Ph2 L4 4 12 Door requires re edging Failed pinned repair CSL Ph2 L4 4 12 Seal crack to shadow gap above door PFP Ph2 L4 4 12 Improve ceiling finish above internal glazed screen CSL Ph2 L4 4 12 Seal window soffits to ingos Sharkey Ph2 L4 4 12 Fill and polish shake to door frame LHS PFP Ph2 L4 4 1
136. sides of the meeting room Roof top McP1o The BMS has a damper point for EF21 which is not L P Room fitted and requires to be stripped out Fan is not working properly 1 The 1st amp 2nd floor PHD students areas are Phase2 Temperature generally always cold 2 The displacement ventilation floor outlets in all areas appear to be causing discomfort to the users due to the quite noticeable velocity and low temperature Vent currently supplied at 18 C 01 07 2009 7 TRADE LOCATION 01 07 2009 COMBINED SNAGGING LIST VERSION 16 15th MAY 2009 OUTSTANDING ITEMS COMMENT ACTION 4 On some floors we noted radiators on one side of the corridor to have much lower surface temperatures than all of the radiators on the other side 5 In some areas Ken pointed out that the radiators and subsequent room temperatures appeared to get much cooler the further away from the main heating riser 6 Room G 05 has trench heating but it has two thermostats in the room one controlling the heating within the room and the other controlling the trench heating outwith the room 8 Room 1 17 is a very small Seminar Room which has an underfloor cooling unit Room 1 16 is a PC lab with no cooling FCU and it is extremely warm It transpires that the use of the two rooms was swapped over at some stage but the cooling FCU was not MSCP 03 Level 3 Core C Control Panel Riser ventilation shut off dampers
137. sing freely Sharkey Ph2 L1 1 01 Repair damages to door ext at hinge and scratch int at bottom PFP Ph 2 L 1 1 01 Remove small paint mark on door PFP Ph 2 11 1 01 Repaint s wall marked during ceiling repair Mag Hanson Ph2 L 1 1 01 Repaint ext screen cill CSL Ph2 L 1 1 01 At ext screen head tidy joint to bulkhead CSL Ph2 L 1 1 12 Tidy shadow gap cracking CSL Ph2 L 1 1 12 Seal pelmet CSL Ph2 L 1 1 12 Seal top of skirting RHS RH window BK Ph2 L 1 1 12 Replace missing cable access to floor box Ph2 L1 142 Touch up ceiling hand print SW plus lines above lines and at ferrules Ph2 L1 142 Touch up walls high level RHS of door and popped screw SE corner BK Ph 2 L 1 1 15 Fix down susp wire to light 5th fitting from south E end CSL Ph2 L 1 1 15 W elevation seal gaps at column heads Ph2 L1 145 W elevation paint shadow gap south of south door and north of north door CSL Ph2 L1 1 15 Seal shadow gap crack south wall G pur Ph2 L 1 1 15 Repair tape RHS of south door and repair top corner PFP Ph2 L 1 1 15 Remove paint from doors and overhead panel BBCL Ph2 L 1 1 15 Clean light fittings PFP Ph2 L 1 1 15 Ceiling above S Door sand bump and paint G f Ph2 L 1 115 Repair tape RHS of north door PFP Ph 2 11 1 15 Repaint LHS of north door above skirting BK Ph2 L 1 1 15 Replace broken diffuser on north most light PFP Ph2 L 1 1 15 Fill and paint shadow gap at skirting east elevation BBCL Ph2 L 1 1 15 Clean plaster from radiators
138. st LHS blind not running perpendicular sd __ NA X Lo e p T rj tT Sharkey 1 11 137 Adjuststoptodoorandchecklatchengaging Phi tt 117 Sealconcretecolumns Phi tt 148 JSealwndowcil midde 0 o Sharkey 119 MAdustlath Veitchi Phi tt 119 Fixmissingcarpetatatriumscreen Jo o Phi Li 120 Tidy shadow gap to wall at door hinge fill and pait f oes Bh tf Let lo wall RAG x atm ff Seal concrete wall Lo Lo Lo LENS Lo Lo p Hanson Ph 1 L1 Seal al handle side window Ph 1 L1 Hanson tt Rainbow Ph s L1 1 28 Ease stiff blind RH window Phi Li 1 29 window elevation inaccessible EE Sharke Ph 1 L1 1 30 Adj door not closing smoothl 130 Seacoums O 01 07 2009 50 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL ITEM Me Lace Pale DATE CHECK CHECK COMMENTS CLOSED Adj poor not closing smoothly stops _ oome UofE 1 11 1 33 Twolampsoutonlightfiting CE NA NA Replcelamp 133 LHS w
139. t cracks to P GD soffits general item 1l Seal atrium side glass to steelwork floor level rium Stair beams M amp S trium Stair Half landing between L3 and L2 improve finish to middle floor panel First floor beam on atrium side paint over white mark at Atrium Stair east column MEM Atrium Stair First half landing below L1 improve finish ae ente Atrium Stair Middle flight between L1 and GF improve finish Paint out white paint in web of column at first half 2L trium Stair up from GF M amp S trium Stair Balustrade north side below GF level remove step at glass joint Arch BBCL 1 rium Stair Damage to hanging curtain at GF level cover with sign Complete clear seal to lift glass NE corner below GF trium Stair level Atrium Stair Paint shadow gap North side behind half landing glass BK 1 Atrium Stair a emergency light fitting 2no above half Atrium Stair Half landing below GF improve floor finish PFP 1 Atrium Stair Repair hanging curtain support heads general item PFP 1 Atrium Stair Improve finish to soffit of flight GF to half landing below Atrium Stair Seal bulkhead vert joints side below GF level 01 07 2009 59 TRADE Mi oo From Joint Walkrounds te eee i Aun EC sec Am T e a PrP 1 Atum _ Paint plaster in shadow gap below tst floor northside PFP 1 Atrium Clean paintoffgranite slabinlift5 ooo
140. th wall poorly fitted PFT and require replacing Sharkey Ph 1 15 Double door hinges bound and refix frame Ph 1 15 Double door area Fit carpet tile to door check PY Mag Both opening window hinges broken again Make good Ph 1 L5 5 42 Hanson Also make good damage to ingo s and repaint Ph 1 15 RH opening window redo silicone between frame and wall aM Phils 542 Blinds dificult to operate Sharkey Ph 1 15 Fire door fix grub screw at hinges OOo ee OE Remove paint splattering Check why no seal to bottom PES Bee 52 door threshold All external doors Ph 1 15 5 42 Timber ceiling remove paint check finish and clean throughout Ph 1 15 Rub down and repaint plaster to soffit at door o Seal gap at top of door standards and wall ceiling junction Fire exit sign above door is missing on light fitting LH side of fixed window repaint black shadow gap at ceiling Entrance door clean off paint splatters and tidy up PFP shadow gap at lintel BK Under unit lights bezel missing ilicone sealing in general requires to be redone 5 Fill gaps to skirting kick panels Tidy shadow gap lintel inside of door Fi Sharkey Ph 1 15 to 5 15 North Door to toilet refinish LH door frame to South 01 07 2009 27 Phase Defect Items From Joint Walkrounds ACCESS SUBS BBCL UoE ITEM ae Phase 1 DATE CHECK CHECK CHECK COMMENTS CLOSED Corridor
141. to Corridor 1 39 to to to to Corridor 1 39 Corridor 1 39 to Loose tape at screen repair and paint Refix pelmet to corner window and repaint Replace floor vent at door spares with U of E works At 1 42 Repair tape and paint at screen At FD RHS eye level refill fixing and paint At 1 41 Repair tape and paint at screen At 1 40 Repair tape and paint at screen Adj 1 40 adjust window restriction as hitting ingo Adj 1 40 Fill and paint window handle damage At 1 39 RHS of door repaint plaster damage WC corridor refill and paint ceiling joint 1 Z 29 No comments 1 Z 28 No comments 1 Z 27 Replace ceiling hatch 1 Z 26 Repair tape and paint Phase ITEM TRADE Location Level BK Ph 1 11 Defect Items From Joint Walkrounds Phase 1 ACCESS SUBS BBCL UoE ITEM DATE CHECK CHECK CHECK COMMENTS CLOSED Rainbow Inter Inter 1 11 Ph 1 L1 133 Lift 4 seal gap across ceiling 1 11 Cori d 1 39 it 4 LHS high level cut down trim Ph 1 11 1 39 it 4 LHS high level fill gap Sharkey Ph 1 11 Cor BBCL 1 11 Cor Ph 1 11 a ie Lift 4 and 5 touch up frames Ph 1 L1 01 trim lights suspension wires 1 11 Past 1 2 06 fill and paint cracks to ceiling 2 199 1 36 Seal cill ingos 1 36 Stop missing to blind 2nd from left window to idor 1 39 to pide id 1 36 Door below sink not closi
142. uth LHS window seal soffit to ingos Sharkey Ph 2 L 6 6 10 Replace smoke seal to door Sharkey Ph 2 L6 6 10 Adjust door currently not latching or locking Ph 2 L 6 6 10 Extend shadow gap RHS of door PFP Ph 2 L 6 6 10 Paint stain on window south RHS soffit PFP Ph 2 L6 6 10 Clean paint from window frame south RHS high level BBCL Ph 2 L 6 6 11 Look at tidying concrete wall patch BK Ph 2 L 6 6 11 Insert required to ceiling blanking plate 01 07 2009 ri ITEM TRADE Phase Level Location Defect Items From Joint Walk Rounds Phase 2 ACCESS DATE SUBS CHECK BBCL CHECK UoE CHECK COMMENTS ITEM CLOSED Mag Hanson Ph 2 L 6 6 11 Fix gasket to opening window replace PFP Ph 2 L 6 6 12 Touch up around blank plate above light fitting Veitchi Ph 2 L 6 6 12 Refix carpet at NE floor box PFP Ph 2 L6 6 13 Touch up corner of plaster high level LHS of door Mag Hanson Ph 2 L 6 6 13 Fix gasket to window CSL Ph 2 L 6 6 14 NE window seal soffit to ingos BK Ph 2 L 6 6 14 Remove tape from south light fitting BK Ph 2 L6 6 14 Clean diffusers BK Ph 2 L6 6 15 Restricted flow to drinking boiling water tap Rectify BK Ph 2 L6 6 15 Fuse popped out on kitchen light investigate BK Ph 2 L 6 6 15 2no inserts to ceiling blank plates to be replaced Rainbow Ph 2 L 6 6 01 North screen blind adjust stop Mag Hanson Ph 2 L 6 po North
143. y job to check each MSCP1 amp d item and report which is or isn t labeled so would ask MSCP2 the contractors to do a com There are hardly any built in bins in the coffee areas and pantries Even though the spec shows that they should be in all of them Please check Dishwashers in coffee points are not according to EXC spec ie with 2 baskets for glass and mugs and none for plates pe on the outside lower left below the doors m m 1 sm offices 01 07 2009 5 COMBINED SNAGGING LIST VERSION 16 15th ACCESS SUBS BBCL UoE ITEM ITEM TRADE LOCATION fay an OUTSTANDING ITEMS COMMENT DATE CHECK CHECK CHECK COMMENT CLOSED 1 07 1 08 1 10 1 11 1 16 2 08 2 33 2 35 2 40 2 50 2 53 3 05 3 11 3 21 3 25 3 22 3 33 3 35 3 37 3 43 3 46 4 09 4 11 4 15 4 25 4 26 4 29 5 03 5 08 5 09 5 19 5 32 5 34 5 37 5 38 5 43 4 180 43 1 4 33 L5 Also 2 25 3 3 1 34 3 29 6 12 08 Heating Various rooms particularly external corner rooms with trench heating underheated 1 44 1 48 4 15 4 16 L3WW 7 01 G 01 G 02 G 03 G 05 G 11 and Reception Area Ground Floor Corridor Level 1 emperature Level 1 and the three PhD Multi User Rooms 1 15 2 16 amp 2 17 Ventilation Cold draughts from ventilation grilles in floor 01 07 2009 6 Internal spaces overheat in summer conditions general lac

Download Pdf Manuals

image

Related Search

Related Contents

ATALIA  ﺑﻟوﭬﯾـزا - United Pharmaceuticals  Infinity User Manual  L`ETIQUETAGE DES DENRÉES ALIMENTAIRES EN ESPAGNE  Siemens SE26T290EU dishwasher  LET-42636-LS9  Logitech Presenter R400 User's Manual  Samsung 720TD Uživatelská přiručka  T'nB New York  “Faire soi-même”  

Copyright © All rights reserved.
Failed to retrieve file