1. 7 7 Return of Equipment Off Hire Clients should ensure that on removal the equipment is returned in sections as supplied 7 8 Stacking and Transportation in Dismantled Form In dismantled form panels should be stacked as shown with suitable timber dunnage Max 4 panels per stack Ensure panels are stacked directly above one another and all panels in a stack are in the same orientation DO NOT stagger or offset the panels within a stack Long struts should be stored on suitable timber dunnage Small components should be stored in skips bins During transportation stacks should be securely chained to the lorry Min 3 straps per stack is recommended Max Width 3 22m Base Panels Extension Panels End View Max 4 No End View Max 4 No per stack with timber packs per stack with timber packs Page 5 of 8 Side View on Loaded Lorry product user guide THe 5 4m Long by 3 2m High Clearance Dragbox Ha Aug 2013 8 Site Assembly of Base or Extension Boxes Dismantling is reverse procedure 8 1 Lie first panel flat on level ground with the strut connector points upwards Max Weight 1800 kg Lift each of the four struts in turn with adjustable struts set at their minimum length position using the D shackles supplied and pin into the panel using 40mm diameter connector pins DBX CPIN HC plus R clips NOTE When using adjustable struts sling the struts with the strut outer to
2. in the notification The police may vary the journey date time or route They also have the power to stop the vehicle in the interests of road safety or to avoid undue traffic congestion Page 1 of 8 product user guide 5 4m Long by 3 2m High Clearance Dragbox pag Aug 2013 4 Identification of Components Extension Panel Code Left Hand DBX TPNL5 1LH HC Code Right Hand DBX TPNL5 1RH HC Weight 1100 kg 200x200 a Fixed Length Strul t Code Length L mm Weight kg DBX S800 HC 800 55 5 DBX S950 HC 950 63 0 i ie Telescopic Strut Inner Code Length mm Weight kg DBX AINNER HC_ 920 67 5 DBX BINNER HC 1220 88 0 DBX CINNER HC 1822 130 5 DBX DINNER HC 2720 194 5 o 200x200 o Telescopic Strut Outer Base Panel Code Length L mm No of Adjusting Holes Code Left Hand DBX PNL5 1LH HC IDBX AOUTER HC _ 950 2 Code Right Hand DBX PNL5 1RH HC DBX BOUTER HC 1255 IDBX COUTER HC 1832 Weight 1800 kg IDBX DOUTER HC _ 2730 3 E 8 Extension to Base Connector Long D Piling Shackle SWL 3 tonnes Code DBX SHACKLE HC Weight 2 29 kg Code DBX CON HC Weight 12 kg T Strut to Panel Connector Pin t Strut Inner to Outer Connec
3. note that some settlement of the reinstated ground and ground adjacent to the Dragbox is likely to occur after backfilling Maintenance Ensure all pins complete with R clips are always fitted Damaged struts must not be used We regret we are not able to provide staff to assemble or change boxes from one size to another on site If in doubt consult Mabey Hire Limited 10 Summary Do s and Don ts 10 1 Do Always consult a qualified person if there is any doubt about ground pressures Ensure a safe system of work is in place Ensure all operatives are familiar with the safety and operating instructions e g Toolbox Talk Take care not to overstress the boxes watch for bowing of the panels Drag the box forward by hooking the excavator bucket around BOTH front struts of the box or using a suitable chain connected to BOTH pulling points Check all pins and R clips are fitted Follow the basic maintenance instructions Use a ladder to enter the box Wear a safety helmet Use suitable 4 leg slings and lifting equipment Provide a landing below the top of the box This will prevent debris rolling down onto personnel inside the box Always maintain a safe batter of the unsupported parts of the trench in front of and behind the Dragbox Store boxes on their side away from the trench v v v v v KANN 858 lt Do Not Move the Dragbox with personnel inside Drag the box using the front struts if there is any
4. side loading on the panels Hammer the box with the bucket Use handling points for other than loading unloading or assembly purposes Use damaged struts Lift a base and Extension box together Use unsafe lifting equipment Enter unsupported parts of the excavation Sit astride the box struts 11 References CIRIA Report 97 Trenching Practice CPA STIG Safety in Shoring manual KKK KKK KK KD lt 12 General Since our policy is one of continual improvement components may vary in detail from the desciptions given in this publication Page 8 of 8
5. be difficult if side loading exists due to friction on the panels Any side loading must be removed before attempting to drag the box either by the front struts or the dragging points Users should ensure that the length and selected width of the box is suf ficient for the work to be carried out Dragboxes are not normally suitable for use in urban conditions soils with a high water table or in trenches crossed by frequent services The Dragbox is not intended for other purposes Design In the event of trench wall instability the Dragbox is designed to carry a uniform lateral earth pres Ground Level sure of 25kN m Users are advised to check that their excavation arrangements will not impose greater working pressures than this Lateral Conditions which will increase the likelinood of trench wall instability and lateral earth pressures Earth are Pressure jeoee at Close proximity of structures gt eee Excavated or construction materials 25 kNime T adjacent to the trench Excavation Level Close proximity of site public roads Close proximity of railways Transportation Notice to Police Important As the load exceeds 3 0m in width two days clear notice must be given to the police in every district through which the vehicle is to pass If the actual carrier is different to the company organising the load movement and completing the paperwork the carri ers details must be included
6. ench Exit from the working space Important Drag the box forward by hooking the excavator bucket around BOTH front struts of the box The pulling force from the excavator bucket must be equally shared between the two front struts otherwise damage may occur Use the hydraulics of the excavator for this rather than moving the machine on its wheels tracks If the excavated trench walls have partially slumped against the panels ensure that a suitable chain connected to BOTH pulling points is used to drag the box along the trench DO NOT attempt to drag the box using the front struts if there is any side loading on the panels Backfill the trench behind the dragbox Page 7 of 8 product user guide THe 5 4m Long by 3 2m High Clearance Dragbox Pek Aug 2013 1 9 5 Extraction Lift from trench with excavator or suitable craneage using 4 leg chain sling DBX SLING HC connected to the handling points If an extension box is fitted to the base drag the assembly far enough out of the trench so that the four number connectors and pins can be removed Lift the extension off the base and then lift the base from the trench Do not lift a base and extension box together Site Storage Stability Considerations Dragboxes should be stored laid flat on their sides when not in use Uneven or sloping ground and or wind loading can result in inadequate stability if left standing upright Trench Reinstatement Users should
7. idth of the box when selecting the size required 6 2 All telescopic struts are adjustable in 150mm increments Internal Width mm External Width mm Base Box Extension Strut Type Min Max Min Max Kit Code _ Wt kg _Kit Code Wt kg Fixed DBXHC 5 1X1 DBXHCT 5 1X1 Fixed DBXHC 5 1X2 DBXHCT 5 1X2 Telescopic DBXHC 5 1X3 IDBXHCT 5 1X3 Telescopic DBXHC 5 1X4 IDBXHCT 5 1X4 Telescopic DBXHC 5 1X5 IDBXHCT 5 1X5 Telescopic DBXHC 5 1X6 DBXHCT 5 1X6 7 General Guidance Notes Off Loading and Site Handling 7 1 Manpower The MHSW Regulations require that personnel deployed are suitably trained and experienced and supervised by a competant person All lifting operations are to be controlled by an appointed person in accordance with BS 7121 and LOLER regulations Plant for Lifting A suitable appliance is required for off loading and assembly The machine lifting capacity and clearance under the lifting point should be checked against the size and weights of the dragbox to be lifted and assembled Tools and Lifting Chains available from Mabey Hire Ltd Lifting chains are required of suitable length and capacity complete with current certification Typically a set of 4 leg 16mm chains with 5 0m leg length complete with shortening clutches and safety hooks Code DBX SLING HC Weight 147kg Refer to Lifting Chain User Information for more details Edge Protection Access and Hard Stand
8. ing Areas These include Suitable area to off load the lorry and assemble the dragbox Suitable hard standing for the machine to operate from to lift the dragbox into the trench Suitable access equipment ladder or staging for attaching lifting chains and connecting top extension to base Edge protection ladders and possibly other provisions to provide safe access into and out of the trench Edge protection and ladder access platform can be supplied by Mabey Hire Services Ltd Supply of Equipment to Site Mabey Hire will normally supply the drag boxes in flat pack form Clients will need to allow for site assembly Page 4 of 8 product user guide Te 5 4m Long by 3 2m High Clearance Dragbox is Aug 2013 7 6 Slinging of the Dragbox see pages 2 and 4 for weights 7 6 1 Lifting Assembled Boxes When on Their Side Use 4 leg chain sling 4 connected to 3 handling points as VN 7 6 2 Standing Assembled Boxes Upright Q Use 2 No handling points Lift by upper panel only N Lifting Assembled Boxes 7 6 4 Connection of Top Extension Q When in Upright Position Use handling points provided Ne Use the 4 No Stand base box upright vi handling points in partly dug trench Cos as provided AUN Lower assembled top oe extension onto base box and fit 4 No connectors DBX CON HC each complete with 2 No pins DBX CONPIN HC and R clips
9. product user guide 5 1m Long by 3 2m High Clearance Dragbox Rag Aug 2013 Contents Page 1 1 Introduction 2 Design 3 Transportation Page 2 4 Component Identification Page 3 5 Dimensions and Connection Details Page 4 6 Dimensions and Weights 7 General Guidance Notes Off Loading and Site Handling Page 6 8 Site Assembly Page 7 9 Dragbox Use Page 8 10 Summary Do s and Don ts 11 References 12 General Introduction This booklet is intended to provide basic information for users of the Mabey Hire Limited 5 1m long x 3 2m High Clearance Dragbox system and to draw the clients attention to the practical aspects of handling assembly installation and use which need to be considered in compiling a safe system of work In particular the clients attention is drawn to the size and weights of the Dragbox components and the need for planning the lifting operations involved All major components of the Dragbox System have handling points for safe slinging It is assumed that clients are familiar with general safe practices applicable to the use of Drag boxes The Dragbox is intended to act as a shield to provide a safe working area for operatives working in a trench and is designed to be placed into a fully excavated section of the trench It is not intended to provide significant support to the trench sides and is therefore intended for use only in dry stable ground which stands to the excavated depth NOTE Dragging of the box may
10. tor Pin Code DBX SPIN HC Weight 4 5kg Weight 3kg Page 2 of 8 Code DBX CPIN HC 16mm Chain Sling Code DBX SLING HC Weight 147 kg Refer to lifting chain user information for further details Extension to Base Connector Pin Code DBX CONPI IN HC Weight 1 1kg THe 5 1m Long by 3 2m High Clearance Dragbox 5 Dimensions and Connection Details 5100mm f Handling Points 875mm Clear 1800mm 430 mm Clear My A Panel Connector Pins Handling and Connection Polnis Strut to Panel Connector Pins Zz Boao Boao 3220mm See Table on Page 4 1225mm Clear 2280mm Clear Front End Handling Points Rear End Elevation Elevation Elevation Pulling points located 4500mm Clear at front of each panel Between Struts ihe 2 Extension L R clips S to Base Connector acd Pins 1 No DBX SPIN HC DBX CONPINHC y onnector Pin R Clip B le re Extension Strut Outer Extensi n to 7 StrUt Inner Base Connector DBX CON HC i Adjustment in 150mm increments Extension to pase Telescopic Strut Connection Detail Connection Detail Page 3 of 8 product user guide Q EREMLE 6 Dimensions and Weights 6 1 Always allow sufficient clearance for the excavator bucket to work comfortably within the internal w
11. use 9 2 Installation Excavate initial section of trench Lift dragbox into trench using excavator or crane The dragbox must NOT be pushed down into the trench 9 2 1 Always maintain a safe batter of the 9 2 2 When the unsupported parts of the trench in required trench front of and behind width and the box excavation level are reached and the box sunk to the required depth ensure the box is vertical Small gap between panel and excavated face 9 2 3 Ensure that j 9 2 4 DO NOT leave the there are no base of the box large voids flying above the between the excavation level box panel and the trench sides as this may cause the box to move Correct Incorrect Incorrect sideways 9 3 Entering the Supported Excavation Use a ladder to enter the working space between the struts of the Dragbox Do not climb up or down the struts Do not use any unsupported part of the trench for access Do not move the box when personnel are inside Wear a safety helmet to minimise the risk of head injury Ensure that the excavator operator is aware of your intentions 9 4 Operation Before entering the working space within the Dragbox Prepare the pipe bedding material Lift a section of pipe into the trench Enter the working space and complete installation of the pipe section by joining onto previously laid sections Restrain the pipe section to prevent displacement whilst dragging the Dragbox along the tr
12. wards the bottom so that the strut inner outer connector pins are easily accessible Lift the second panel with the strut connector points downwards Use all four legs of the lifting chain sling Complete assembly of the box on its side by pinning the struts to the upper panel using 40mm diameter connector pins DBX CPIN HC and R clips Do not release the weight of the the panel until all of the pins and R clips are in place Adjustable struts should be adjusted to the required width if necessary Take the weight of the upper panel use all four legs of the lifting chain and remove the 50mm diameter strut connector pin DBX SPIN HC from each strut Lift the upper panel to the required width and replace all four pins and R clips Do not release the weight of the panel until all of the pins and R clips are in place NOTE Suitable access equipment ladder or staging will be required for assembly of boxes and connection and removal of lifting chains Refer to section 7 6 for information on safe slinging of the assembled dragbox Page 6 of 8 product user guide ae 5 1m Long by 3 2m High Clearance Dragbox nae Aug 2013 9 Dragbox Use 9 1 Preliminaries Check all pins complete with R clips are fitted before lifting box into trench A suitable excavator is required as a guide the manufacturers quoted digging force should be at least five times the weight of the dragbox equipment in
Download Pdf Manuals
Related Search
Related Contents
BENDIX PNU-187 User's Manual SISTEMAS DE RETENCIÓN INFANTIL 2009-II ESTUDIO ADAC-RACC FS982X IDE LASERJET ENTERPRISE 600 M603 SERIES Manual de instrucciones Balanza analítica 取扱説明書 - M Vitachrom Manual de instrucciones de servicio/montaje Samsung SGH-C120 Manual de utilizare INSTRUCTION MANUAL GY-HD110 GY-HD111 Copyright © All rights reserved.