        EuroMix Dry Mortar User Guide
         Contents
1.    July 2009          At CPI  we have always placed a  considerable emphasis on customer  care  It is our aim to make things as  easy as possible for our customers  by offering innovative products and  technology backed up by a superior  level of service     The objective of this user guide is to  help you get the most from the EuroMix  Dry Mortar System  It is intended   to guide you on all aspects of the  system from initial site preparation  requirements to actually operating the  Silo on a daily basis  As such it should  be studied carefully to make sure you  get the most from EuroMix     This EuroMix user guide covers the following  areas in detail    1  Pre site   ordering  delivery  re ordering and training     2  Site set up   how to correctly place the silo on site plus  power and water requirements     3  Daily use   silo start up and shut down procedures  the  control panel and proper care of equipment     This user guide also acts as a reference point for any  queries which you may have on the EuroMix system  If you  have any difficulties with the system then your first port of  call should be this user guide     If having checked this user guide  you are still experiencing  problems then of course CPI will be happy to help you   Just call your supplying depot number        Pre Site    Ordering    All orders should be placed directly with the CPI sales  office  Please allow a minimum of 72 hours notice when  placing your order for a CPI Euromix System     At this 
2. TTR  Pores    LLL  OOO  gg  H    AOOO  OOTO    SENENEEEN   Www te    Health  amp  Safety    Best Practice Awards  Li       FM 60139    Southampton  Marchwood Industrial Park  Marchwood  Southampton  Hants SO40 4PB   Tel   44  0 2380 662 000  Fax   44  0  2380 662 009    Bristol   Unit 8    Severnside Industrial Park   Central Avenue    Bristol BS10 7SD   Tel   44 0 1179 160 300  Fax   44  0  1179 160 333         MORTAR  INDUSTRY    ASSOCIATION       
3. Uncouple the water supply pipe    3  Uncouple the pipe off the mixing tube   4  Open the water drain taps    5  Flick switch to brush position     6  Let the water drain off completely     Care of Equipment    Any damage to instrumentation or switches on the   mixer or control panel could interfere with the normal  operation of the system  Therefore it is important that  the silo mixing station is treated with care at all times    and particularly when site vehicles are used to load and  transport the mortar     Please note the following    e Any damage or alterations made to the silo or  associated equipment must be reported  to CPI immediately       The person who orders the silo will be held liable for  all damage which results from the improper use of  the silo       CPI will provide training sessions for customers and  staff using EuroMix silos  Customers are responsible  for ensuring that only trained operators use CPI  EuroMix silos and that the correct procedures covered  in the training sessions are followed by operators     e Damage to CPI silos or associated equipment will  be charged for     Also available from CPI    In addition to the EuroMix user guide  the following  literature on the EuroMix system is also readily available  from CPI     e Material safety datasheets    e Equipment  amp  service solutions brochure   e Model NBS specification clauses    e CPD seminars     Please call CPI to obtain documents or download at  www euromix com    Beaconsfield   Spri
4. all users have been trained     Start Up Procedure    On delivery  and every morning  the following start up  procedure should be followed     1  Place mortar tub under discharge chute     NO      Hook on control panel and connect power leads     CO      Connect water pipes     D      Run mixer momentarily and always check motor  direction     5  Run mixer  NB  Always run mixer before opening  butterfly valve     6  Open butterfly valve on the silo     7  Adjust water as necessary using the water flow  control valve     Timed Run    To run using the timer  set the desired running time and  press the green button on the panel  The mixer will stop  automatically when the set time has elapsed     Daily Cleaning    At the end of each day and before an empty silo is  collected  the following shut down and cleaning procedure  must be followed     1  Close butterfly valve on the silo   2  Run out all the remaining material in the mixer     3  After approximately 5 minutes  clean water should be  running out of the mixer  This means that the mixer  is clean     4  Disconnect water pipes and remove the control panel  for storage in a warm  dry  secure location  In cold  conditions see Winter Weather instructions opposite for  drain down procedure to avoid frost damage     Weekly Cleaning  1  Carry out the daily cleaning procedure     2  Isolate   Power source must be disconnected before  next step     3  Remove the mixing chamber and screw   4  Clean completely     5  Reassemble     T
5. allations must be installed to current IEE  Regulation Requirements for Electrical Installations    BS 7671 2001  with attention being paid to the special  location section relating to construction sites   section 604     Placing the EuroMix Silo on Site    Where possible  space should  be left for a second silo   to facilitate a changeover     2 5 Metres                     7 2 Metres       3 Metres      Allow vehicle access for silo placer  and refill tanker      Keep silos away from public roads   footpaths and rights of way    SS y e Approx 33 tonnes when full      mm     ZI   Approx 15 tonnes when delivered      Silo requires working area of 3m x 3m       s                  gt    Refill level      Water  amp  Power  Maximum 5 metres from silo    Water Requirements  UK    In the UK a standard 3 4  tap located within 5 metres of  the silo is required     Where a water storage tank is required  this should be  mounted not less than 2 metres above ground level within  5 metres of the silo  Each mixer must be piped directly  from the tank  using an outlet not less than 3 4  internal  bore fitted with a gate valve  Contact your local sales team  for further advice     Ireland    In Ireland a water tank with a minimum capacity of 500  litres is required  this should be mounted not less than 2  metres above ground level and within 5 metres of the silo   A standard 3 4  tap should also be located within 5 metres  of the silo  Each mixer must be piped directly from the tank   usin
6. ead  cables or other headroom impediments  Where  restrictions cannot be avoided  a standard silo requires  a minimum of 7 2m clearance between the top of the  foundation and the obstruction     m Where possible  space should be left beside the silo for  a second silo  to facilitate a changeover      m The customer is responsible for the safe access for  delivery collection of the silo  refilling  and taking note  of all safety signage on silos     Electrical Requirements  3 Phase Mains    For 3 phase mains supply  400 415V neutral and earth    the total maximum load is 5kW  A 16A 5 pin industrial  socket must be provided  from a 16A 3 phase motor rated  M C B  type C or D   The electrical supply to the silo must  be backed up by a 30mA RCD which is exclusively for   silo use  The socket must be located within 5 metres of  the silo     Single Phase Mains    The connection from the mains requires a 32A single  phase 3 pin industrial socket which must be provided  from a 32A motor rated M C B  type C or D  The electrical  supply to the silo must be backed up by a 30mA RCD  which is exclusively for silo use  Please contact your CPI  representative to confirm single phase availability     No Power    In the event of no power being available on site  a 3 phase  generator with a minimum capacity of 12kVA  fitted with   a 16A 5 pin industrial socket from a 16A 3 phase motor  rated M C B  type C or D  is also sufficient to run the silo  mixing station     Please note    All silo inst
7. elivery of the silo there will be   approximately 40 tubs of size 0 25m    50 when refilled      Certain silos contain level indicators  Where fitted  these  Show the re order level     NB  Silos can be refilled only when they are below the  bottom red line     Training    CPI personnel will provide relevant training on how to use  the EuroMix system  This should ensure that you get the  best from EuroMix     A Certificate of Training will be issued to all people who  have been fully trained in the operation of the system  Only  such people should operate the silo  It is the customer   s  responsibility to notify CPI of any additional training  requirements  due to people moving on or off sites    Refresher training is available free of charge        Site Set Up    Placing the silo on site    When placing the CPI EuroMix silo on site  the following  must be taken into consideration     B Silo will only be placed on sites with suitable foundations  and at locations that meet the working space criteria   Design and construction of any foundations is the  responsibility of the customer     B A flat and level top surface of any foundation must be  provided to ensure even bearing of silo feet     E No blocking or raising of the silo must be carried out  unless agreed in writing with CPI     B Silos must not be placed in areas accessible to the  general public and delivery can only be made to areas  controlled by the customer     E Select a silo placement area that is free of overh
8. g an outlet not less than 3 4  internal bore fitted with a  gate valve  Contact your local sales team for further advice     Site Survey    All sites should be subject to a survey by CPI personnel  prior to silo delivery  CPI regrets that silos cannot be  provided to the customers unable to comply with the site  requirements stipulated     Working Space Requirements    3 Metres          e 3 0 metres x 3 0 metres  minimum for single silo  installations    A A A     6 0 metres x 3 0 metres  single silo installations  or for silo swap outs    3 Metres         9 0 metres x 3 0 metres  v minimum for triple silo     lt   gt   O netallaiians   gt  Lorry   lt  Access  wv    Foundation Design Data    6 Metres          9 Metres                3 Metres             A    2 5 Metres   A e Silo Diameter   2 5m  e Maximum Silo Height   7 2m   9 2   zj g e Silo Barrel Height   4 3m     E   mM oe  N e Maximum Weight Filled   40 0 Tonnes  Y e Weight of Empty Silo   2 2 Tonnes  0 3 Metres                      Daily Use   Summary    Full operating instructions will be issued on induction     When the EuroMix silo is correctly set up on site  CPI will  test it to make sure that it is operating correctly  No attempt  whatsoever should be made to use the EuroMix silo until it  has been fully commissioned by CPI     Furthermore  new users should not use the system until  they have been fully trained in the correct operating  procedures by CPI  It is the responsibility of the customer  to ensure that 
9. he Control Panel    SPLIT PANEL    FAULT LIGHT  ELECTRICAL PANEL    A MAIN ISOLATOR    STOP START  E POWER OUT TO MIXER MOTOR    E MAINS POWER IN    WATER PANEL    WATER HOSE OUT TO  MIXING CHAMBER    ELECTRICAL CONNECTION  FROM PANEL ABOVE    gt     WATER FLOW ADJUSTMENT  VALVE INSIDE    WATER FEED IN WATER DRAIN TAPS    STANDARD COMBINED PANEL    LEANING T  LE SWITCH  STOP START s AEST Iny    MAINS ISOLATOR      i    WATER HOSE OUTTO          9    MIXING CHAMBER    FAULT LIGHT    INVERTOR SWITCH   SINGLE PHASE ONLY     d POWER OUT TO  MIXER MOTOR    A    y 4        POWER OUT TO VIBRATOR    ll            MAINS POWER IN    WATER FLOW INTO    MIX ADJUSTMENT E WATER FEED IN    WATER PRESSURE GAUGE    WATER DRAIN TAPS       For single phase use   blue sockets  amp  blue plugs  for three phase use   red sockets  amp  red plugs     Hot Weather    In hot weather  if the mixer is left unused for more than  about 30 minutes  the mix in the wet compartment will  tend to set  This will overload the mixer motor the next  time it is run  To avoid this  close the butterfly valve on the  silo and run all the material out of the mixer each time it is  run     Winter Weather    In cold weather the freezing water may seriously damage  the control panel and the water fittings  In cases of long  interruptions and after cleaning of the mixer  ensure the  water fittings are always completely drained and control  panel is stored indoors overnight     Procedure   1  Turn off the water supply    2  
10. ngfield Farm Quarry   Broad Lane  Beaconsfield   Buckinghamshire HP9 1XD  Tel   44  0  1494 680 814  Fax   44  0  1494 730 816    Bilston  Wolverhampton  Springvale Industrial Park   Springvale Avenue Bilston   Wolverhampton   West Midlands WV14 OQL  Tel   44  0  1902 357 500  Fax   44  0  1902 357 506       IalD    Bord Agr  ment na h  ireann  Irish Agr  ment Board    CERTIFICATE NO  06 0257  EuroMix One Coat and    General Purpose Renders    La             BBA tix   CERTIFICATE NO  03 3997  EUROMIX ONE COAT RENDER    Coatbridge   Gartsherrie Industrial  Estate  Hornock Rd   Coatbridge ML5 2DX   Tel   44  0  1236 700 500  Fax   44  0  1236 700 520    Dublin   Laraghcon    Lucan    Co  Dublin   Tel   353  1  630 2700  Fax   353  1  628 0331    Coatbridge    Southampton       Harlow   29 Mead Industrial Park  Riverway  Harlow   Essex CM20 2SE   Tel   44 0  1279 634 680  Fax   44  0  1279 634 681    Irlam  Manchester  Northbank Industrial Estate  Martens Road  Irlam  Manchester M44 5AX   Tel   44 0  161 777 7500    Fax   44  0  161 777 7501       A Grafton Group Company    Manchester    Bilston   Wolverhampton        Beaconsfield E  LI    Bristol    Harlow    Northfleet d    e  v    Leeds   Stadium Park  Altofts Lane   Whitwood   Castleford  WF10 5PZ   Tel   44  0 1977 523 300  Fax   44  0 1977 523 333    Northfleet   Robins Wharf    Grove Road  Northfleet   Kent DA11 9AX   Tel   44  0  1474 333 372  Fax   44  0  1474 325 080    eee NH   TOO  Ty J yyy   227 4    ara    Ss  SST 
11. stage our sales team will advise you how many  Silos you will need on your site  based on your estimate  of the daily usage rate of mortar  You will then be able to  make the necessary site preparations  See Site Setup    When delivered  each silo will contain approximately 16  tonnes of dry material and refills will be made by road  tanker as necessary     Delivery    When preparing for delivery  make sure that there is  unobstructed access to the site at all times  Clear access  must be provided on hard road or other surfaces which  are capable of carrying a gross weight of up to 40 tonnes   Delivery vehicles are rigid or articulated trucks and require  a minimum headroom of 4 2 metres and a minimum width  of 3 metres     The site itself should also be prepared for the arrival of  the silo  See site set up      Re ordering    A minimum of 72 hours is required when you need to  re order mortar  Silos can only be refilled by a specialist  EuroMix tanker     As your contract progresses  you will gain more experience  in judging the level of mortar in the silo and the daily usage   One simple way to check the amount of mortar left in the  silo is to tap the silo with the palm of your hand  You will  hear a distinctive hollow sound or a dull thud  depending on  the level     Another way of knowing when to re order is to count down   the number of tubs used  As the system lends itself to one  person operation  this operative could easily keep a check  on the daily tubs used  On d
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Q06CCPU-V-H01 - User`s Manual (Hardware) IB(NA  Les orphelins de la parole    Preso suspeito de furtos de veículos  SP80 User Guide, rev A  Samsung ATIV NP915S3G    Sony MEX-1GP Installation/Connections Manual  Jacuzzi LUXURA F947 User's Manual  programme_saison_13_14    Copyright © All rights reserved. 