Home

SKM-4 Operating Instructions SB 090 TAP!

image

Contents

1. SKM 4 Operating Instructions SB 090 Q TO DEPLOY TO DEPLOY 1 Firmly tap pedal with toe which releases catch and deploys step Step will lock out in de ployed position TO STOW 2 Support yourself by holding a nearby han dle or rail 3 Place ball of foot on pedal with part of foot on yellow strip Press pedal down TO STOW ease step in whilst releasing pressure on ball of foot as step stows Step may stop a few inches from stow if not done correctly Repeat if this happens

Download Pdf Manuals

image

Related Search

Related Contents

User's Guide  PASCO Specialty & Mfg. 012-09886A User's Manual  Capa (obrigatrio) - Universidade de Brasília  Manual de Instruções  Automatic Modeling and Validation of Pipeline Specifications driven  NGS Slim Pro  FSM-200  WMT700  

Copyright © All rights reserved.
Failed to retrieve file