1. SKYROOM INSTALLATION MANUAL yas VISIT WWW ATLASROOFSOLUTIONS CO UK RINGBEAM amp BOX GUTTER ASSEMBLY Check that frames are square by measuring equal distances from corner to corner Remove the ringbeam flaps from the ringbeam Lift the rear box gutter including the ringbeam and place it on top of the side window frames Centre the gutter on the frames Fix the ringbeam screws into Slide the ringbeam bracket into the predrilled holes from above channel on the adjoining rear ringbeam Lift the final front ringbeam into position and slide the ringbeam bracket into the channel on the adjoining ringbeams and push together Lift the side gutters into place by hooking them onto the hanger plate fixed to the ringbeam Fix the box gutter securely to the rear wall see Figure 1 Fix the ringbeam to the window frames around the perimeter of the Skyroom roof Position the ringbeam flaps into place Flap engages at approximately 90 SKYROOM REAR BOX GUTTER SECTION Rear Guttering LE Opaque Film on glass AS N 4 x Upper Ringbeam i Internal Pelmet FIGURE 1 A FRAME PREPARATION amp ASSEMBLY On a hidden tie bar push the steel bracket into the routed side of the central rafters Layout the routed ridge central rafters and tie bars on the ground Slide the side gutters over the angle corner brackets F
2. bracket to mark the 70mm hole Drill through the small pilot hole Slide the finishing corner cornice angle over the but only mark the aluminium cornice mushroom screws by sliding them up from below Mark out the cornice 70mm and 210mm from the bottom Screw the bottom mushroom screw through the semi drilled holes in the cornice On the top hole line through the smaller hole on the bracket Drill a circular hole in the aluminium internally with the drill hole on the cornice gutter to create the downpipe outlet Screw the outlet connector provided into the hole and tighten Use the cornice bracket again to drill the top 210mm hole right through the cornice INTERNAL PELMET ia SAN 1E e i E Ta 2 Lie T Centralise the vertical ladder frame onto the horizontal bottom frame and fix together with the screws provided Lift the longer ladder frame into position between the ringbeams Fix the hinge attached to the ladder frame onto the inside of the upper ringbeams Make sure ladder frames are level before securing When frames are level fix the ladder frame to the back of the ringbeam see Figure 5 Fix the remainder of the ladder frame making sure the internal corners are securely fitted Screw plasterboard into the steel ladder grids FIGURE 4 SKYROOM CORNICE INSTALLATION Glazed Roof Lantern Guttering Opaque Film on glass Upper gt
3. Ringbeam h ts jl p K N Click Cornice in at bottom Internal Pelmet and rotate FIGURE 5 SKYROOM RINGBEAM SECTION Glazed Roof Lantern Guttering External Cornice Opaque Film on glass Upper 5 Ringbeam 300 Internal Pelmet
4. efore fixing down the rafters temporarily fit foam boards against flap to correctly space Fix each side of the hip glazing rafter positions seat into the ringbeam flaps Once rafters are fixed remove the foam boards and locate the glazing shelf Glue packers into place at bottom glass end closers FIGURE 2 SCREW POSITION Screw fixing to ringbeam Ny Y NN Q Su D T Lift glass into place behind the rafter end stops and press down glazing Make sure the protective yellow tape is removed Once the rafters are in position pull the ringbeam flap up tight to the rafter and fix centrally with a screw see Figure 2 Slide glazing end closer over the bottom of the glazing It is vital when box gutters are required that adequate support is considered in the way of brick piers or gallow brackets Always fix the gallow brackets and packer before the roof is glazed Position the plastic central pressure plate over rear rafters and fix with screws Fit all the rear units of glass keeping the glazing end closer between the rafters INTERNAL RINGBEAM Fix angle cleat to the side of the upper ringbeam Screw through the angle brackets into the side of the rafters Screw fix the upper ringbeams through the pilot holes provided into the side of the hip rafter Slide the upper ringbeams
5. into position between the rafters FIGURE 3 CLEAT POSITION Opaque Film on glass Upper Ringbeam Angled Cleat PRESSURE PLATE amp COVER CAP Glaze the remainder of the roof once all the upper ringbeams are fitted Fit remaining pressure plates into position Guttering Py D Internal Pelmet 5 Fit the remainder of the upper ringbeams into position 4 Fix the ridge pressure plate centrally to the main ridge body with screws Centralise the ridge pressure plate between the rafter pressure plates Position the ridge cover cap over the ridge pressure plate and clip down securely Clip on the external cover caps Fit the gusset cover over the hidden tie bar Secure with screws CORNICE INSTALLATION Mushroom screws are tightened to hold corner square Stick on the arrow shaped flat trim to the underside of the gutter to conceal the joint Lift the external cornice into position by positioning them at the bottom edge of the aluminium gutter and let them drop into place see Figure 4 Fit remainder of cornices Drill the top mushroom screw through the cornice into the bracket held at the back of the cornice Fix the aluminium cornice support straps with screws from the top of the aluminium rafter cover cap to the back of the external cornice at each rafter Firstly use the cornice
6. it the front gutter by hooking it fixed to the rear box gutter and fix with screws onto the pre fixed hanger plate Slide the rafter over the bracket making sure it locates in the central bracket channel Tighten the joints by screwing an angled corner Screw the aluminium gutters and the Engage the rafter bracket into bracket into the adjoining aluminium gutters ringbeams together at approx 400mm centres the slot provided on the ridge Push the plastic moulded corners inside the corners of the aluminium box gutters Cover the inside of the aluminium box gutters at the corners with sealant Screw into position by fixing the top screw Slide the adjacent rafter over the steel angled bracket RAFTER ASSEMBLY Tighten the pre fixed screw Slide the ridge end rafter to secure the ridge end rafter over the pre fixed ridge bracket Place the rafter into the slot on the ridge and slide the rafter up Screw into position by fixing the top screw Slide the hip rafter over the bracket and push it tight against the ridge Lift the main A frame into position Fix the opposite ridge end rafter Fix remaining rafters on the main A frame Rafter Bracket Main Rafter Rotate the ringbeam flaps keeping them tight against the hip rafter cut before fixing Hip Rafter Secure the hip rafter by fixing the top screw Ridge Rafter RIDGE ASSEMBLY GLAZING B

Download Pdf Manuals

image

Related Search

Related Contents

BEA - Stufe Cola  milling-grinding-drilling and slotting attachment  Samsung CE2933N User Manual  Green Laser Sight with Barrel Mount Kit USER MANUAL  CY-1181  Netgear GS116E User's Manual  TCB-DP22CE2 - Homocrisis by Toshiba Calefacción & Aire  Télécharger  Sea Hunt Owners Manual 2012.pub  Manual de Instrucciones  

Copyright © All rights reserved.
Failed to retrieve file