Home
        GSE INTEGRATION INSTALLATION MANUAL Photovoltaic
         Contents
1.         100mm to    20mm  mini   mum covering    wi    waterproofing  strip       LATHING FOR PORTRAIT INSTALLATION     INSTALLATION ON PAN STEEL  cf  tables on P 9   EXAMPLE BELOW  SPACING BETWEEN BATTENS 60cm     LATHING 27x100mm     MODULE 1675mm in Length    Existing batten   opacing of 120 to 150 cm  added intermediate   wooden batten    If spacing is  gt  150 cm                                  LATHING PREPARATION ACCORDING TO THE MOUNTING PLATE    LATHING FOR PORTRAIT INSTALLATION     TRADITIONAL ROOF STRUCTURE  cf  Tables on P9   EXAMPLE BELOW  SPACING BETWEEN BATTENS 60cm     LATHING 27x100mm     MODULE 1001mm in Length    ORG 012259 o tis       A  100mm to   ci     c 120mm   B les 5 minimum  covering   N a with the    waterproo    fing strip                      LATHING FOR LANDSCAPE INSTALLATION     INSTALLATION ON PAN STEEL  cf  tables on P 9   EXAMPLE BELOW  SPACING BETWEEN BATTENS 60cm     LATHING 27x100mm     MODULE 1675mm in Length    Existing batten   opacing of 120 to 150 cm        P9   added intermediate       wooden batten    i spacng iso  150 cm          GSE    Int  gration       nstalation Steps 3 0    E INSTALLING THE WATERPROOFING STRIP    1 1  In the case of a shallow slope or thick roofing elements  e g  Curved tiles  or very  shaped roofing elements  in order to avoid standing water  install two 2 wood planks    dimensioned according to following table  on the entire field width and of sufficient  thickness to allow water to be evacuated correctly  
2.        1 2   Unroll the waterproofing strip  self adhesive preferably  on the prepared  lathing  making sure that it exceeds the PV field by 20cm on each side     1 8  Fold back the upper edge of the waterproofing strip around 2cm  1 4  Fold back the right and left ends in the same way     1 5  Firmly press the waterproofing strip onto the first row of tiles  pressing it down  smoothly and carefully  ensure that you don   t create any water trap zones     The strip should cover the pan as follows      12 cm for tiles that are very curved  curve of over 3cm     10cm for flat tiles or slightly curved  curve of less than Sem     Installation on curved tiles requires a waterproofing strip 45 to 96 cm wide        B IMPLEMENTATION DRAWING         GSE Plates  PV Module    W AKAFLEX             N E 7   p Battens width  y      Batten implementation  mm     The section of the batten can  PANG a A  LE An necis          INSTALLING THE FIRST ROW OF MOUNTING PLATES    1 1  Using the chalk liner  mark a line on the waterproofing  strip  parallel to the battens and 15 cm to 20 cm below the  top edge of the waterproofing strip    The plate will cover 12 cm     1 2  Position the first mounting plate in the bottom right   hand corner of the uncovered area  aligned with the chalk  liner mark  Install the mounting plate    Screw the mounting plate using the 2 central fixing points that  do not need pre arilling  see mounting recommendations  on pages 6  7  18 and 14                  1 3  Place yo
3.      Field width  Field Height       60mm   intermodule of 3Omm Intermodule of 5mm   module height x number of modules    module width x number of modules    2 x 150 mm    150 mm  for waterproofing strip on tile      320 or 200 mm    Intermodule  of 5mm advised    Calculate the PV Field Size    Field Height    Field Height    Landscape installation    e Make sure to uncover 200mm on each side for the lateral flashings        e  n case of Top flashings use  make sure to uncover at least 320mm above the top module   Portrait Installation i       1  Remove the cover elements on the above calculated width        2  lake out an extra row of tiles on the left and on the right  2 rows for slate  or flat tiles   3  Also remove the cover elements on the calculated height above         4  Take out one row of tile on the top par  2 rows for slate or flat tiles   SEM ER Na FORES EG A A FRS AE  A pa O O E PS YANA PT  DEN PEE EET   EET GER ET NE  gt     Photovoltaic field   Photovoltai   field  calculated above   calculated above    e  L                        d 7    oe fee doen lens eer deme Level mente    Slate roof    2 extra rows taken out     Tile roof    1 extra row taken out           350 om          LATHING PREPARATION ACCORDING THE THE MOUNTING PLATE      athing for Portrait Installation     Traditional Roof Structure  cf  Tables on P 9   EXAMPLE BELOW  SPACING BETWEEN BATTENS 60cm   LATHING 27x100mm     MODULE 1675mm in Length                                                      
4.     CentroSolar  Poly Mono Vision  lopende    e Fire Test   L     BROOF T1     Approved  Belgian  Deutsch  and German markets    BROOF T3   Approved  French market    BROOF T4   Approved  British market     e Mechanical resistance  UV  humidity  weather tests available at www gseintegration com L    e New certification CERTISOLIS Sunpower   BenQ SunForte   GSE Int  gration in process    e MCS012   Approved Y       Completed Installations examples          SE  Int  gration       Completed Instalations Examples    7 ye   ER r1 7 TL LL  AT TITI   7 7 4 Fu      SEE gga SERA BA  LLL Ppp  z fs EEE EL  d  m f E ER a d    d    kan M  un EI      i  AM CE ui  E   T    See Se   foe  XR  A        PIA Fa       i 1 mi    T  ue E EET  E                   GROUPE  SOLUTION  ENERGIE       GSE INTEGRATION is a GROUPE SOLUTION ENERGIE  patented development program  Www Segroup fr    OE  Int  gration    Your distributor         GROUPE SOLUTION ENERGIE  155 159 rue du Docteur Bauer  93400 SAINT OUEN   T  l     33 0 1 70 32 08 00   Fax   33 0 1 70 32 08 01  email  contact segroup fr    
5.    r j P i A 1          GE    nt  gratior    GSE INTEGRATION  INSTALLATION MANUAL    Photovoltaic mounting system  for partial or complete roof covering                 PASS INNOVAT ION VERT    CSTB 2019 2219 mn    Y       N  BT130003 tans 2017       WWW GSEINTEGRATION COM       nt  graton       Contents       STEP BY STEP    Presentation Of SYSTEM nn p 4  Contents Of KE s BES  GSE Integration mounting plates      0 6  7  OMR C 0 8  Implementation prescription ic p 9  11  GSE  Mesa FISSO SO NO T TT                                      p 12   32  O use NOR eee 5 33          resentation of system    5 GSE INTEGRATION IN ROOF SYSTEM    The GSE Integration system is used to install modules on all types of roofing   curved tiles  mechanical  flat   slates   on new buildings or buildings being renovated     The system may be installed in portrait format or in landscape format  with a specific mounting plate for  each format  on both small installations  less than 3 kWp  and large roofs  several hundred KW      The GSE Integration system may be installed on wood or metal structures and mounted on battens or  lathing  It can also be mounted directly on common rafters and can be installed on slopes between 15   and 50        he GSE Integration system is guaranteed for 10 years  provided the installation recommendations given  below are respected  The system does not require much maintenance  except for regular cleaning of the  solar panels        WWw gseint  gration corr    GSE    nt 
6.   Main wall    Side Edge    Main wall                      EN ce Standard clamps 2014  resistance 1860 Pa   security coef  1 5     i    ME   R i Ter     5 re A LS               m              2 ox     ee i    r   00  ERG 151 1HE  a   H EI  d      1  j BES    423  z DES    F    Angles y   Rcs Fac IEEE im PLPL TEX T  ui  g   E   uz RTE ABE 5 oe J or      4     5 Ed   d Vi  1 tn ota da        su Y   m mm cum cam   1  SET   pm          3 2 um a ux zi LEE I Di BT Un  a        a    id     F n mE N      XM Em n     EAL Pia L ans r   P xd p FA  ES   z        XG Reinforced clamps 2014  resistance 3460 Pa   security coef  1 5    Cf table p  9 10          nstalation Steps 11 0    5 INSTALLING THE TOP FLASHINGS    1  The tile or zinc covering the top flashings should be at least of 15 cm  In case of a shallow slope or a tile  of high curve  the covering should be more     2  On slate  a 10cm covering is enough     Last tile d         Piece  Use the pop rivets  8  supplied with the kit and mount the comer bead on the central edge joiner  Each hole corresponds to a panel    thickness  The first hole is used when installing the central edge joiner with panels 50 mm thick  the second hole for 45 mm panels   the third hole for 40 mm panels and the last hole for 35 and 31mm panels     Top Corner piece facial view             GSE  nstalation steps 11 1 nt  gratior    5 MINIMUM ROOF SLOPE FOR FLASHINGS INSTALLATION  ACCORDING TO THE THICKNESS OF THE PV PANELS     Top Flashing    MINIMUM TOP FLAS
7.  900 meters     12   to 50   normal site  categorie llla  2 roof slopes    Zone 2        Note Size in mm    Battens spacing  lt  600  spacing trusses or rafters    pa  OjJOJO O    N  N  y    600  lt Battens spacing    eje  OI      900 spacing trusses or  rafters    Ela  O Ww  OJO    Battens spacing  lt  1500    OJO    metal trusses    pa    Battens spacing  lt  1500  1   Battened frame    Main roof wall 10M height    Ela  O N uU  OJOJOO    O    OJO    Battens spacing  lt  600  spacing trusses or rafters    ejeje  BEE  OJO    600  lt Battens spacing   lt  900 spacing trusses or    pa  UJ  b  N     pa     O  N     H  00  TT  x    rafters    Battens spacing  lt  1500  metal trusses    Battens spacing  lt  1500  1   Battened frame    Bead   lt     gt    O     lt       c     a  oD      OS   a   a       C      Battens spacing  lt  1500  1   Metal or wood frame    N  E  O    pa    Battens spacing  lt  600  spacing trusses or rafters    y  OQ 5 O0  Oj OJ O    N     O    600  lt Battens spacing    N  OJO  OJO     lt  900 spacing trusses or  rafters    pa    pa  ul  E    Battens spacing  lt  1500  metal trusses    pa    Angle 10M height  O    eje  U OIOISIDIO  O 1010    OJO    Battens spacing  lt  1500  1   Battened frame    pa     1   Layout of the woods in the direction of the slope       molementation prescnotion 2 0       GSE INTEGRATION MECHANICAL RESISTANCE wassinnovarion w2012 221      TESTED WIND ZONES    fone  fone 3 Zone 4 lone 5  Normal Exposed   Normal Exposed   Normal Expo
8.  ADJUSTMENT EXAMPLES  1650 MM MODULES IN PORTRAIT     8 GSE PORTRAIT MOUNTING PLATE  H1640 80mm X W992mm     For a H1650 mm panel  position the plate at 10mm back  For a H1660 panel   20 mm back          Graduated  overlapping zone    8 GSE LANDSCAPE MOUNTING PLATE  W1640mm X H992 1032mm      For a panel H1002  position the plate at 10mm back  For a panel H1012   20mm back           Graduated  overlapping zone           GSE    Installation Steps 8 0 nt  gratior    5 WEDGES POSITIONNING    The 2014 Version of the GSE Intgration System requires  positioning wedges on the lateral parts of the field     These wedges are to be placed under the plate wave at the  edge  right under where the clamps will be fixed     e Please note that there is a left and a right wedge    e  he wedge will be drilled with the plate and lateral flashing   before fixing the single clamp              nstalation Steps 9 0       INSTALLATION OF THE LATERAL FLASHINGS    1 1  Position the lateral flashings overlapping the waves on the right  and left edges of the integration system     1 2  Use a screw 4 8x25mm at the junction of 2 lateral flashings to  fix them together     1 3  Then  position the single clamp where you marked the mounting  plates  Mark the pre drilling point on the lateral flashing     1 4  Pre adril a 10mm hole  making sure you go through the lateral  flashing  the plate and the wedge        Overlapping of 15 cm    The flashings interlock each other  with the top part over the bottom part
9.  also to respect the PV module manufacturers  recommendations    The majority of PV modules have a resistance to wind depression of 2400Pa     The reinforced clamps being valid all the way to 3400Pa  it is important to  have the manufacturers authorization to go over 2400 Fa  cf Table p  10           nstalation Steps 6 1    5 NOTE    Make sure you interlock the mounting plates correctly in order to ensure proper waterproofing of the  System        View of 4 interlocked mounting plates    Double clamps  attachment       Left PV module    4 Clamps attachment  points on the PV panel  after screwing           GSE  Installation steps 7 0 nt  gratior       GSE PLATES ADJUSTMENT    The GSE Integration Plates are adjustable according to your panel size   In order to adjust the GSE plates  use the graduations on the plate  The graduation vary from O to 40 mm        After having screwed all the mounting plates at the 2 center points  you can start preparing your y 10  mm drill bit  And pre drill all the other holes on the plate  that means 4 pre drills on top of the 2 fixing points  already made        5 GSE PORTRAIT MOUNTING PLATE       Ex   the H1640 80mm x W992mm can fit a panel  1640 to 1680 mm high  and 992mm wide    Graduated  overlapping zone       8 GSE LANDSCAPE MOUNTING PLATES       Ex  the 1640mm Wide x 992 1032 mm long plate can fit a panel  1640 mm high and 992 to 1082mm wide        Graduated  overlapping Zone          Cf  Tables on p 6            nstalation Steps 7 1    B
10.  connection and disconnect it from the string    4  lake out the panel that needs to be changed and replace it with the new one   5  Connect the new panel to the earth and reconnect it to the string    6  put back the clamps     The equipotential connection must be maintained           Assistance 4 contact       TRAINING    Trainings can be organized with your  distributor   Please contact your distributor for further  information           TECHNICAL ASSISTANCE    TECHNICAL ASSISTANCE IS AVAILABLE WITH YOUR DISTRIBUTOR  OR FROM MONDAY TO FRIDAY AT THE CONTACT INFORMATION BELOW     int  gration  16 QUAI GUSTAVE FLAUBERT 76380 CANTELEU    T  l  0232 10 77 60  Mail   technique gseintegration com       Int  gration       Our Gertifications    o    PASS INNOVATION VERT    Nr  2013 221   Module ZN Shine   from oct  2013 to oct  2015  N d    THE FRENCH ETN CERTIFICATION AUTHORIZES THE INSTALLATION OF GSE INTEGRATION IN  PORTRAIT AND LANSCAPE PROVIDED THAT THE MODULE MANUFACTURER ACCEPTS THE  MODULE FIXATION ON THE SMALL SIDE     o ETN INDICE O   BT130003 d o ETN INDEX 1   Validated by Alpes contr  les      Solarworld Sunmodule Poly en SunProtect    Solarworld Sunmodule    Mono    portrait  Sunpower 3XX  Mono      Soluxtec Powerslate  Mono    portrait landscape  BenQ SunForte  Mono    Sillia GOP  Poly      portrait    Soluxtec Das module  Poly Mono    BenQ PM245  Poly    portrait  Al  o S19 HE  Mono      QCells G3 pro  Poly    portrait landscape  1400 Pa   Csun 60P   60M  Poly Mono  
11.  gratior    Contents of kit    5 ASSEMBLY ACCESSORIES        5 WATERPROOFING          ASSEMBLY ACCESSORIES    1  Stainless Steel Screw 6 5 x 60mm   EPDM  Washer   2  Cellular EPDM Joint 21x25mm or 23x45mm  3  2014 Single and double clamps    4  2014 Single and double renforceer clamps    Or   cf  Table p9 1     B FLASHINGS    5  Flashing Hooks   6  Left and Right Top Flashings   Screw 4 8x25mm  T  Top Center Flashing   8  Aluminum Pop Rivet   9  Top Corner Piece  For top Center Flashing    10  Lateral Flashing   Screw 4 8x25mm   11  Top Flashing Junction    E MOUNTING  PLATES   12  Screw 6 5x60mm     EPDM Washer   13  GSE Portrait Plate   14  GSE Landscape Plate   15  Lef tand Right Wedge    Int  gration    S WATERPROOFING    16  Waterproofing Strip  17  Precompressed Seal Rool 20x40mm    18  Roof Underlay Screen    Mounting pate 1 0       PHOTOVOLTAIC PANELS   LANDSCAPE FORMAT    Upper mounting plate PV Upper mounting plate PV  Panel Support Panel Support  Photovoltaic panel mounting Water Drainage  plate and guide Guide    Clamp  Fixation   i ae    Zone    Fixation  zone    Cable outlet Photovoltaic panel mounting Water Drainage Photovoltaic panel support    plate and guide Zone    O Fixation Point needing pre drilling x Reference Fixation Point   DO NOT PRE DRILL          LANDSCAPE PLATE REFERENCE   MODULE SIZES      MODULES TOLERANCE      Height  mm  Width  mm     ais   venerem         1670   990 1001    atr  wwe  room   wt             680   990 100    Graduated  overlapp
12.  recommended size  W 20 mm   H 40 mm     1  Unrol the precompressed seal on the    lateral flashings all the way to the bottom of the    waterproofing strip      he junction between 2 joints needs to be tight        ILE uL  EE Ge S uh  Wo  gt  uM uM c M uh 3L E M JE ee       Precompressed seal       2  Unroll the precompressed seal on the entire length  of the top flashing     3  The precompressed seal needs to be put at 2cm from the edge of the  lateral flashings  You also need a minimum of Scm from the edge of the    mounting plate in order to have proper water drainage     nstalation steps 13 0       PV FIELD INSTALLATION FINAL STEPS    Put back the rows of tiles or slate on top of the lateral flashings and on top of the top flashings  covering    enough of the flashings              Int  gration       Maintenance    B INSPECTION    photovoltaic system  Such elements can be blown out using a compressed air blower  Do not use solvent to    1 It is important to check once per year whether any leaves or other elements have penetrated under the  clean the mounting plates  which are in polypropylene     It is recommended that you offer your customers a maintenance contract  which would include an annual  inspection of   generation  electrical system  panels  panel mounting plates  mountings  precompressed  seals  waterproofing strip        5 REPLACING A MODULE    1  Power off the PV INSTALLATION    2  Remove the clamps from the panel to be replaced    3  Disconnect the earthing
13.  to allow proper water drainage    1  Open the lateral clip over 10 to 15 cm  lower lateral flashing    2  Interlock the upper lateral flashing on the lower one  then re close the clip  3  Fix the lateral flashing to the roof structure using the flashing hooks  5     Upper lateral flashing to be interlocked  on the lower one     Open the lateral clio over 10 to 15 cm   Position and install the upper skirt and clio   and close the clip     Fix the lateral flashing on the battens using the flashing hooks  5       The overlap of one lateral flashing on top of the other needs to be 15 cm       Int  gration       nstallation oteos 10 0       INSTALLING THE PHOTOVOLTAIC PANELS    Place the first row of panels on the mounting plates    he panel is installed on the 2 upper supports on the plate        5 PASSING THE CABLES  1     Note   Cables must transit from one panel to the next through the dedicated cable outlets    olot through the central protection pad     1  amp  2     Passing     the cables    If you are using optimizers or micro inverters  you can  fix them in the center hole of the mounting plate  on the  visible wood battens without risking the module to press  on your equipment        1          R  MIGRO   INVERTER      aM A      manes      ik  ejenphase solarmRE   esee    S Compatibility approved for         nstallaton steps 10 1    5 PASSING THE CABLES    Panels should be connected horizontally when installed in portrait format   The panel can be installed upright or i
14. HING PITCH  5         N Sensor Height    A  IN    Flat Section                      5   margin is of course taken into account   This information is only a guide     Care should be taken to ensure that all roofing regulatory requirements are met        nstalation Steps 11 2  S INSTALLATION OF TOP FLASHINGS    1  Place the top center flashing  having made sure first that  the top corner piece is fixed to the top center flashing  see  p 28   To do so  clip the module in the space created by the  top corner piece  and then fix the top center flashing piece to  the roof structure using the flashing hooks     O E   Add 2 lines of PU adhesive between the  EN junction and the top center flashing           2  Ensure that 2 top flashing pieces are connected together  with the    Top Flashing Junction  piece     Apply two vertical beads of PU adhesive to ensure  waterproofing        3  Place the Top left and top right flashing pieces on top of the  top center flashings and the lateral flashings        Once the top corner flashings are positioned  use the  4 8x25mm screws supplied        4 8x25mm  Apply two vertical beads of PU adhesive to ensure Screw  waterproofing     4  The top comer flashing can be adjusted to the panel  thickness by cutting        5  In a portrait installation the top comer piece  for top flashings   needs to be cut at the edge of the mounting plate  Top comer piece cut Pd       E  nt  gration       nstallation Steps 12 0    B INSTALLING THE PRECOMPRESSED SEAL    
15. ign phases              nstalation Steps 5 1    B REMINDER          During the preparation of the roof structure  it is necessary to install a roof underlay screen  up to the gutter        DIRECTION OF THE APPLICATION          Ihe mounting plates are preferably  installed from right to left but can also be  installed left to right  make sure the plates  are properly interlocked        Please remember to overlap the mounting  plates  12cm to 16 cm  depending on  your module size     You can adjust this overlap with the  graduation on the mounting plate      cf      GSE Intgration Plates   adjustment   Section                        GSE       nstalation Steps 6 0 nt  gratior       CLAMPS FIXATION      Uw       The clamps are to be fixed only on the mounting plate edge  draw 2    Attach the clamps  3 of 4  using the screws to this effect  1  making sure to stick the PEDM Joint  2  between the clamp  and the mounting plate to ensure waterproofness     For single clamps fixation  make sure to position the left and right wedges  15  correctly inside the edge of  the mounting plates     Make sure the wedges are positioned before the lateral flashings        Make sure to fix the clamps on the wood battens  It is imperative to stick the EPDM Joint  2  under the clamp  between  the mounting plate and the clamp            FIXING THE CLAMPS ON THE MOUNTING PLATES    3 clamps per wave    3 clamps  per wave       The use of the various clamps vanes according to the wind  A zones  but needs
16. ing zone         Height Tolerance  lt q   Width Tolerence       nt  gration       WMounting plate 1 1    5 PHOTOVOLTAIC PANELS   PORTRAIT FORMAT    Upper mounting plate PV    Photovoltaic panel mounting  plate and guide   mi Panel Support  Cable outlet d     lt       Clamp  Fixation  Zone      Mounting point on  structure  min  6x          Clamp  Fixation      Zone    f Photovoltaic panel  J support    O Fixation Point needing pre arilling    Water Drainage  Guide    Water Drainage  Zone D        rs   Photovoltaic panel mounting     E X Reference Fixation Point   plate and guide DO NOT PRE DRILL       5 PORTRAIT PLATE REFERENCE   MODULE SIZES      MODULES TOLERANCE  Height  mm  Width  mm   1640   992 1600 1680 991 980  1640   1001 1600 1680 1002 989  1569   1046 1535 1615 1047 1037  1575   1069 1535 1615 1070 1058    1575   1082 1535 1615 1083 1071          Graduated    overlapping zone 1580   808 1540 1608 809 797         Height Tolerance  lt q   Width Tolerence       1ools required tor installation    5 CHALK LINER 5 HAMMER                   E SCREWDRIVER    Adjustable torque necessary    B PLATE SHEAR          DRILL BITS 5 POP RIVET PLIER    e WOOD AND METAL DRILL BIT y 10 mm  e 6 PAN BIT 2 8 mm          MEASURING TAPE   WHITE MARKER OR PENCIL         A       GSE    Int  gration       molementation orescriotion 1 0    5 ROOF FRAME   WIND ZONE CORRELATION         The indicated values in the tables below apply only for wind  zones 1 through 4  and for an altitude inferior to
17. nverted     INSTALLATION FOR       INSTALLATION  PANELS OF MINIMUM     FOR PANELS  40MM THICKNESS OF THICKNESS  between 31mm  and 50mm          ELECTRICALLY EARTHING THE PANELS    The photovoltaic panel should be earthed through the dedicated hole in alloy frame  of the photo voltaic panel                         GSE    Int  gration       nstalation Steps 102       MOUNTING THE PHOTOVOLTAIC PANELS    1  For fixation of the PV Panel to the plate you will have to use one of the two possible clamps  cf  p 14 or below   2  use the pre drilled holes  1 4 p 24  in the lateral flashings and the wedges to position your 3 clamps per panel side       3  Before fixing the clamps  stick the EPDM Joint under the clamps to ensure waterproofing  Use the 6 5x60mm screw supplied     4  The double clamps fix the panels 2 by 2 and align to the single clamps     5  The single clamps are fixed at the edge of the PV Field  align to the double clamps and are position over the wedges that are    under the plate wave   x Y X       A BE CAREFUL TO SCREW THE ELEMENTS TT T  qe  WITH THE RIGHT FORCE      O Ki  Too weak correct Too strong    Diagram of clamps positioning       For landscape fixation  please refer to the  PV panel manufacturers notice        WIN Double Clamps       MEME Single Clamps    Height Position Team 1 iene  le  a 1 Jets 4 Tami 5   m  En   Normal Exposed   Normal Exposed Normal Exposed   Normal Exposed   Normal Exposed    M  i   Side Edge  i Angles  Main wall    Side Edge    Angles 
18. sed   Normal Exposed   Normal Exposed    Main wall  Side Edge  Angles     Main wall  Side Edge  Angles     Main wall  Side Edge  Angles               Main wal  Side Edge  Angles          Main wall      Side Edge i  Angles 2    Bh 4 TED       Ec Standard clamps 2014   resistance 1860 Pa   security coef  1 5   EET Reinforced clamps 2014  resistance 3460 Pa   security coef  1 5        On a building 15m high  the entire roof surface  can be used        Int  gration       molementation orescriotion 9 0    E DILATATION  example  GSE Landscape Plate R  f  1660 992     PE     Reference  gt   Points          Dilatation of the Clamp  fixation points    E   a     s   Mek TH        1 TE ij gran   8mmon 4 points   2mm point  Dilatation of the mounting   a    im   ns   im   um  6mmon8points   2mm point    we      4mm on 3 points   1 33mm point    plate fixation points     J a p Amm on 4 points   1mm point    Fixed    Reference   q The dilatation between  Points    UN  A A the mounting plate and    the wood batten requires a pre ariling  of the plate with a    10 mm dhll bit at  tne points where you wil be fixing your    I mE   clamps as wel as the points where  EE Dilatation of the Clamp fixation points    you wil be fixing the mounting plate on     lt t Dilatation of the mounting plate fixation points ers          nstalation Steps 1 0    5 COVER PREPARATION    Info   Please remember to download our layout calculator at  www gseintegration com  to help you determine the exact  field quotes
19. ur second mounting plate next to the first one  making sure that they interlock  Same for the mounting plates on the    second row and the rows above  etc     Mounting plate wave       INSTALLATION THE FOLLOWING ROWS OF MOUNTING PLATES                      The mounting plates above need to overlap the  mounting plates below all the way until in contact  with the dedicated stops    The overlap hence wil be of 12 to 16cm  depending on your module height   p  6 7     nstalation Steps 5 0    Int  gration          PREDRILLING OF THE MOUNTING PLATES WITH A DRILL BIT OF a 10 mm       Clamp Fixation on high  point of the mounting plate   Stainless Steel Screw 6 5x60mm    EPDM Joint  12     Fixation of the mounting  plate on the roof structure  Stainless Steel Screw 6 5x60mm     EPDM Joint  12        Fixation and preparation of the mounting plates    EPDM Washer    16mm    Pre arilling  a 10mm    Stainless Steel  Screw 2 6 5mm    Mounting plate to roof structure fixation drawing   only 4 of the 6 fixation points     Stainless Steel Screw 6 5x60mm   EPDM Joint  12     Gellular EPDM joint  21x25mm  or 23x45mm  2     EPDM Washer  eo 16mm    Pre arilling  a 10mm    Stainless Steel  SCrew  e 6 5mm    Clamp fixation drawing on the mounting plate  Stainless Steel Screw 6 5x60mm   EPDM Joint  12        Make sure to correctly position the screw at the center of the pre ariled hole in order to ensure  waterorooting longevity  A tolerance has been calculated to this effect during the product des
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
User Manual - File Management  1 - Fujifilm  Installationsanleitung  Manual del usuario  レーザー墨出機 SK205PH カタログ  X-12s Users Manual    Comment ça marche - Centre de langue française      Copyright © All rights reserved. 
   Failed to retrieve file