Home
HWR Platinum Installation Manual - Heat
Contents
1. AtoP Default E 8 8 8 CYCLE TIME BASED ON 30 60 90 MINUTE CYCLES SELECT Settings System Settings Day Heat Adjust E E 88 The duration of the Cycle On and Cycle Off varies EISE Outdoor Cutoff less Outdoor temperature allele based on Outdoor temperature and Cutoff Temperature s 8 8 0 5 10 15 20 25 30 50 p io P m 30 as H and Heat Adjust settings Mi d sss e The graph shows the Heat Adjust curves for a 60 balls 7 8 15113 minutes heat cycle If Day Heat Adjust setting was E 75 50 25 Pi L 151 0 5 and Day Cutoff setting was 60 F and when Outdoor ca es EA M temperature is at 20 F the Cycle On time will be 20 y minutes for a 60 minute Cycle Time The remaining 40 M NN s i o minutes of the cycle will be the Cycle Off time e 55 s ME 3 e To find out Cycle On time for a different cycle time C 45 0 15 cl divide your current heat cycle time by the standard 9 a las 60 minute cycle That will be the ratio you should use with this graph If we used the previous example but with a 30 minute Cycle Time that will give us 10 23 15 68 45 minutes for the Cycle On time and 20 minutes for the aslltoll s 75 50 25 Cycle Off time A 90 minutes Cycle time will give sls la NR a 30 minutes Cycle On and 60 minutes Cycle Off if o olo so leo sn using the same criteria 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 Du
2. amp 8 BR amp farm up Prior to Morning Boost 0 to 180 Minutes Duration of Morning Boost in Minutes Night Time The maximum amount of Early Shutdown ESD is 90 minutes S So 45 40 35 20 28 20 15 10 S D 57 10 167 2028 The Early Shutdown follows Vari Boost curve number Outdoor Temperaturen EARLY SHUT DOWN 90 75 Duration of Early Shutdown in Minutes 0 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 25 Outdoor Temperature in F SRC Platinum 21 Valve Settings SELECT Settings System Settings More Settings Valve Settings The SRC Platinum is designed to control the building heat through the operation of a motorized valve This menu provides the means for setting the valve opening at different heating stages In addition it provides the means to change valve response time Freezing Valve Opening at 32 F 50 to 100 Default 80 SELECT Settings System Settings More Settings Valve Settings Freezing e This setting tells the SRC Platinum the percent the valve opening should be at when Outdoor temperature is 32 F e This value is used in conjunction with the Cutoff to set the valve opening percent curve e The limits for the Freezing and the Cutoff change dynamically In other words The Freezing 96
3. SIGNAL Valve Outputs are active when SRC changes heat amount A1 A2 A3 A4 SIGISIGIGISIGISISIGISTISIS SIS SYSTEM TEMP SHUTDOWN lo VPVALVE POSITION NETWORK SYSTEM lo PROVE OUT lo TEMP T AUX TEMPO T AUX j TEMP 1 LO SHIELD ROUTE SENSOR AND AUXILIARY WIRES THROUGH THIS KNOCKOUT ONLY From heating system sensor When closed Burner is turne off and Valve close relay will energize Valve positioning feed Back From Heat Timer network sensors Checks status of system components From outdoor sensor mounte in the shade Remote Communication Option Remote Communication Option Red lights indicate when the associated relay is activated 4 Heat Timer Corp Understanding Operation Concept The SRC Platinum controls a steam heating system to provide a building with comfortable and even heat levels The control operates a steam boiler a valve and a vacuum pump automatically providing the desired heat pattern for a building The SRC Platinum manages the heat in the building using two ways First it varies the percent of a motorized valve opening in response to changes in the outdoor temperature Second it changes the On and Off part of a preset cycle length The building temperature is controlled through the use of a motorized valve through direct burner operation and vacuum pump control CYCLE PRINCIPLE The control operates on the C
4. 28 Heat Timer Corp Troubleshooting When there is a problem with heat in a building the first place people look is at the heating control And the heating control may be the problem but so may be other system components or perhaps the heating control is not adjusted properly To help determine and correct the problem simply follow the troubleshooting guide that best describes your heating situation Temperature Sensor Chart TEMPERATURE Value No Heat Low Heat in Degrees F in Ohms e Too Much Heat The troubleshoot diagrams in the following pages represent these issues 117720 Valve Troubleshoot 82823 In addition to these basic problems you may have intermittent problems If you 39076 Sometimes have No Heat too Little Heat or too Much Heat 42683 The SRC Platinum may not be programmed correctly Check through all the settings of the clock 31215 to make sure the Day and Night Setback modes are when you want them to be Go through all 23089 four settings for each day of the week making sure any unused settings display Pay special 19939 attention to the AM and PM since if these are incorrect the program will be 12 hours off Refer to DE Schedules Day and Night Schedule menu selection pem Have too Little Heat or too Much Heat Only at the 1d Time adjust your Vari Boost The Vari 13040 Boost changes with Outdoor temperature OD and is therefore r
5. The System Setpoint is available when the SRC Platinum is in the Boiler or Valve operation mode It allows the SRC Platinum to start the heating cycle when Heating System Sensor temperature reaches this setting This informs the SRC Platinum that heat has been established to all parts of the building e The SRC Platinum monitors this setting before starting any heating cycle If the System temperature SYS is below this setting the valve will open till heat is established If the System temperature SYS is above this setting the following heating cycle will start immediately District Steam Delay Available for District Steam Operation Mode 0 to 30 minutes Default 15 minute SELECT Settings System Settings More Settings Dist Stm Dly e The District Steam Delay is available when the SRC Platinum is in the District Steam operation mode It uses this period prior to starting any heating cycle to establish heat to all parts of the building Boost and Early Shutdown ESD Disable Manual Vari and VaritESD Default Vari SELECT Settings System Settings More Settings Boost Mode The morning Boost is designed to return the building to comfortable ambient temperatures after the cooler Night Time period The SRC Platinum will accomplish this by opening the valve 10 more than the Day Time setting If you do not want a Boost on a day of the week simply program the 1 Day Time schedule to and use the 2 Day Time program for any Normal Day
6. Adjusting the Day and Night Heat Adjustments and Valve Trim or Calibration Identifying the Type of Heating System The SRC Platinum can control the heating system through these different methods Operation Mode either Direct Boiler control or District Steam Direct Boiler control with or without a 2 Way Motorized Valve and Vacuum Pump This involve wiring the SRC Platinum Burner output to the burner The SRC Platinum can control an On Off burner Furthermore relays must be installed on the Burner Output socket as well as the Motorized Valve and Vacuum Pump relays on the SRC Platinum On Startup Settings Boiler or Valve option must be selected from the Operation Mode menu Additionally a System Setpoint menu option will be available on the System Settings 2 menu The SRC Platinum can control either a Time Based or a Positioning Sensor feed back Motorized Valve This must be selected during Startup or from the Valve Positioning menu District Steam control with a 2 Way Motorized Valve and Vacuum Pump The SRC Platinum can control heat to a building connected to District Steam or when there is a constant header pressure Relays must be installed on the Motorized Valve and Vacuum Pump socketss on the SRC Platinum On Startup Settings District Steam option must be selected from the Operation Mode menu A District Steam Delay menu option will be available on the System Settings 2 menu The SRC Platinum can control either a Time Based or a Positioning Sens
7. or RIM Modem a Gateway option will be present on the Remote Interface menu list The Gateway is to configure the connection to the SRC Platinum using a direct cable connection RS232 or RS485 Cables or a modem connection by dialing into the SRC Platinum RIM through a modem When connecting multiple SRC Platinums to a Heat Timer TGC Gateway the numbers 1 through 21 will be used to identify each SRC Platinum Space Lock On or Off Default Off SELECT Settings System Settings More Settings Remote Interface Space Lockout The Space Lockout is required to be set to On to be able to use Space sensors for Day Target and Night Target This option can be set when the SRC Platinum has any of the communication packages Day Target 55 F to 85 F Default 75 F SELECT Settings System Settings More Settings Remote Interface Day Target The Day Target is the space temperature the SRC Platinum will try to reach during the Boost period when coming out of the Night Time setting Night Target 50 F to 80 F Default 65 F SELECT Settings System Settings More Settings Remote Interface Night Target The Night Target is the space temperature the SRC Platinum will try to reach during the Early Shutdown ESD period when switching from the Day setting SRC Platinum 2d Schedules Enter menu by pressing SELECT Settings Schedules The SRC Platinum has two levels of heat The Day level is used when a building is occupied and people are active The Nig
8. 17 18 Heat Timer Corp System Settings Enter menu by pressing SELECT Settings System Settings The System Settings and System Settings 2 menus allow for adjusting and fine tuning the system for enhanced comfort and more fuel savings e Season Winter or Summer Day Heat Adjust e Night Heat Adjust Day Cutoff e Night Cutoff e System Setpoint District Steam Delay Boost and Early Shutdown ESD Valve Settings Remote Interface Can be utilized with Remote Communication Only Season Winter or Summer Default Winter SELECT Settings Season when in Winter setting SELECT Settings System Settings Season when in Summer setting CAUTION DO NOT turn power off to the SRC Platinum when heating season is over If you do so the battery will run down and will have to be replaced Instead switch to Summer The SRC Platinum will turn off the Vacuum Pump relay when it is in Summer setting In addition the burner will be off and the motorized valve will be fully closed When in Winter setting the SRC Platinum will activate the Vacuum Pump relay whenever the Outdoor temperature OD falls below the cutoff setting Day Night Therefore during the heating season this setting must be set to Winter When the heating season is over it is a good practice to switch the SRC Platinum to Summer setting Day Heat Adjust
9. The Aux will act as separate time clock which can turn on and off lights fans dampers or other equipment Refer to Schedules Aux Schedule menu selection Aux Output Relay e The Aux relay on the SRC Platinum can be configured to either follow the Aux Schedule or the Vacuum Pump operation This gives the option to activate or deactivate additional equipment based on the SRC Platinum operation or separate schedule Refer to System Startup Aux Relay Mode menu selection Making Sure You Have the Right Control If you need the SRC Platinum to do additional tasks that either 1s not listed or do not know how to configure them contact Heat Timer Corp Sales Department either by Phone 973 575 4004 Fax 973 575 4052 or by E mail support heat timer com 8 Heat Timer Corp Installation Before beginning the installation carefully evaluate your heating system The SRC Platinum can control the heating system through these different methods Direct Boiler Control with a Vacuum Pump and a 2 Way Motorized Valve District Steam Control with a Vacuum Pump and a 2 Way Motorized Valve Mounting the Control Box Locate an appropriate site Near the equipment to be controlled Away from excessively high or low temperatures Ateye level or where the displays are easily visible The surface must be strong enough to hold the weight of the control and the metal enclosure Leave 12 of clearance under the enclosure to allow access to gutter
10. amount of additional time the SRC Platinum will energize the Motorized Valve Close relay to guarantee a full closure Pause Length 0 to 60 seconds Default 10 seconds SELECT Settings System Settings More Settings Valve Settings Pause Length e It determines the amount of time the SRC Platinum will pause in between valve opening and closing during the heating cycle Pulse Close E No Yes Default Yes SELECT Settings System Settings More Settings Valve Settings Pause Length e tallows the SRC Platinum to pulse the Close relay at the Pause length intervals instead of driving the valve close continuously 22 Heat Timer Corp Remote Interface SELECT Settings System Settings More Settings Remote Interface The SRC Platinum can be controlled remotely This allows the SRC Platinum to monitor additional sensors that can be used for monitoring and turning alarms On or Off The SRC Platinum using a communication package RI RIM RI Net and a computer with Visual Gold software or internet access for RI Net only can configure a large number of sensors that can be used either in calculating the heat required or for monitoring several building and equipment functions Using this feature allows setting alarms warnings and analysis Gateway Serial 485 None 1 through 21 Default None SELECT Settings System Settings More Settings Remote Interface Gateway Address When connecting to the SRC Platinum using an RI Remote Interface
11. are usable heat energy Second condensate occupies approximately 1500 times its volume as vapor When the vapor condenses it forms a natural vacuum in the system which 10 helps move condensate and pulls steam through for the next heat cycle y Pra L Curve Pd Open 25 at thd Day dd T Open 40 at Freezing PERCENT VALVE OPEN 09 55 F 45 F 35 F 30 F 25 F 20F 15 F 10 F 5F OF Day Cutof OUTDOOR TEMPERATURE Freezing CYCLE Length Based on Outdoor Temperature By monitoring the outside temperature the SRC Platinum is able to anticipate the heating needs of the building Each fixed time Cycle period SEI usually 60 minutes long but adjustable depending on the building response STA 52 Minutes is divided into a Cycle ON segment and a Cycle OFF segment The length Gyde Length 60 minutes of the ON segment will vary with the outside temperature The colder itis Estabish casi outside the longer the ON part of the cycle will be Sample Cold Weather Cycle The SRC Platinum constantly checks the Outdoor temperature OD by means of a solid state sensor located on the exterior of the building At the same time it monitors the System temperature SYS of the building by means of a Heating System Sensor HSS This Heating System Sensor is located where it will show that heat has reached to the furthest lo
12. cycle Thirty minutes after satisfying 5 set points when switched to Manual Shift Enter menu by pressing SELECT Settings Shifi The Shift selection allows you to manually shift from any setting into Night Day Extended Day Schedule or programmed Schedules This can be used to temporarily override the programmed schedule A typical example where the shift would be used is in a school where an event has gone into overtime Instead of reprogramming the control to keep it from going into the Setback mode simply select the Shift followed by the Shift option The amount of time the SRC will hold the shift is e Shifting from Day to Night The control will stay in the Night mode until either the control is shifted again or until the next programmed Day mode time The Display will show Night Shift to indicate this status e Shifting from Night to Day The control will stay in the Day mode until either the control is shifted again or until the next programmed Night mode time The Display will show Day Shift to indicate this status e Shifting to Extended Day The control will stay in the Day mode for an adjustable amount of time adjustable between 60 to 240 minutes and then revert automatically back to the scheduled program This prevents a user without a programming password from putting the SRC Platinum in Day mode for an extended period of time when it is programmed for Night When the control is manually shifted to Day The Displa
13. settings To set up the morning Boost you must set the type of Boost and the amount of Boost There are three types of Boost Manual Vari and Vari with ESD 20 Heat Timer Corp Boost Manual 0 to 120 minutes Default 10 minutes SELECT Settings System Settings More Settings Boost Mode Manual e The Manual Boost begins earlier than the 1 Day Time schedule In this case the Boost Adjustment is the number of minutes before the Day Time setting the Boost will start Boost Vari 0 1 to 6 4 Default 3 0 SELECT Settings System Settings More Settings Boost Mode Vari e The Vari Boost begins earlier than the 1 Day Time schedule In this case the Boost Adjustment is the curve number that reflects the number of minutes before the Day Time setting the Boost will start based on a specific Outdoor OD VARI BOOST temperature 1 7 Ifthe temperature at the Day Time 1 is cold then increase the Boost Adjustment by 1 0 and wait for several days before adjusting the Boost again Boost Vari with Early Shutdown 0 1 to 6 4 Default 3 0 SELECT Settings System Settings More Settings Boost Mode Vari ESD e This should be used in commercial buildings where the building will be unoccupied in the Night Time setting A Vari Boost as described above is run In addition the SRC Platinum will switch into the Night Time mode earlier than the latest n setting for that day The warmer it is outside the earlier the SRC Platinum will shift into
14. upper limit will not change below the Cutoff Cutoff Valve Opening at Cutoff Temperature 0 to 100 Default 50 SELECT Settings System Settings More Settings Valve Settings Cutoff 100 Curve 2 This setting tells the SRC Platinum the percent the valve opening should be at sal l odio 4 when Outdoor temperature is the Cutoff setting for that time i e This value is used in conjunction with the Freezing to set the valve opening idi percent curve ii 70 Fil 24 e The limits for the Freezing the Cutoff change dynamically In other i 7 words The Cutoff upper limit will not change above the Freezing x f Paid z Pai P 20 Shea 25 ah Day Diet Off Cycle Valve Opening During Cycle Off 40 Let 0 to 100 Default 80 Be 27 SELECT Settings System Settings More Settings Valve Settings Off Cycle is This setting tells the SRC Platinum the percent the valve closing should be in the 7 Off Cycle as a percent of the opening when in the On Cycle i If during the On Cycle the valve was at 50 and the Off Cycle was set to 80 that will close the valve to 10 Close 80 of the 50 The valve will close tutor 40 OUTDOOR TEMPERATURE x 32 F Freezing Close Overdrive 0 to 90 seconds Default 30 seconds SELECT Settings System Settings More Settings Valve Settings Close Overdrive e tis the
15. 4 PM Night temperature level is maintained from 4 PM to 6 PM Day temperature level is maintained from 6 PM to 10 PM Night temperature level is maintained from 10 PM until 8 am Saturday morning Saturday No Vari Boost due to the 1 is not programmed Day temperature level is maintained from 8 am to 4 PM Night temperature level is maintained from 4 PM into Sunday Sunday Night temperature level is maintained all day Sunday ending at the Vari Boost Monday morning Copy Schedule SELECT Settings Schedules Copy Schedule To reduce the need for setting each week day time schedule this feature has been made to allow the copying of the MON Day Time and Night Time schedule settings to all of the reset of the days Set Date and Time SELECT Settings Schedules Set date amp Time In the startup process of the SRC Platinum the Date and Time will need to be set If the Date or Time needs to be adjusted this area of the menu allows that Selecting Date will allows you to set the year followed by the month then finally the days Adjust the time by selecting Time from the menu and then scrolling through the hours followed by the minutes Remember that the battery is the only backup for the Date and Time If no power is supplied to the SRC Platinum and there was no battery or battery had no power date and time values will be lost and will need to be readjusted Aux Schedule SELECT Settings Schedules Aux Schedule Use the Aux Schedule sett
16. HEAT TIMER INSTALLATION AND OPERATION INSTRUCTIONS SRC Platinum STEAM HEATING CONTROL RESET CONTROL FOR STEAM HEATING WITH MOTORIZED VALVE AND VACUUM PUMP Table of Contents HEAT TIMER U eM coRPORATION Panel Layout 3 SRC Understanding Operation Concept 4 Bb MOH 12 26 04 18 430m n Q s Cycle Or 518m e Sl 6 VAL 4 er E DD SicF SYS Lido n e P o NETWORK Installation aue x ee oe rS 8 C sa D vro An lei E Setting the Control 13 DARE M ae ks ce nsl OTT ax Display and Change Settings 13 Ems System Startup Settings 13 System 5 18 Valve 5 lt 21 Remote 22 pee pv 0 0 0 0 7 f 4 E Schedules nadi ana a A 23 Maintenance 25 Shift eie Baia uod hada oy EAE s 27 Auto Manual Open Bypass 27 This Preliminary manual attempted to be complete and accurate Troubleshoot 2 28 at the time of publication Additional upgrades and new features may chan
17. Trim When the SRC Platinum is controlling a Motorized Valve with a Time based Motor this menu option will allow for fine tuning of the valve opening to match the actual valve Before adjusting the Valve Trim make sure to synchronize the valve by switching to Summer In addition check if Valve Motor Time setting matchesactual valve setting After synchronizing recheck valve opening If incorrect adjust Valve Trim in small A CAUTION increments After adjusting the Valve Trim make sure to synchronize the valve again When in Time Based Valve Positioning mode and valve opeing does not match actual valve 96 synchronize the valve before adjusting Valve Trim SRC Platinum 27 Valve Synchronization for Valves with Time Based Motors When the SRC Platinum is controlling a Time Based motorized valve the Startup menu Valve Positioning must be set to Time Based A Valve Trim menu option will show on the Maintenance menu allowing for fine tuning of the valve operation In addition the SRC Platinum will synchronize the valve fully closed by energizing the Motorized Valve Close relay for the complete Valve Mo tor Time in addition to the Close Overdrive time The synchronization will take effect in the following situations e When the SRC Platinum starts up e When switching SRC Platinum from Winter to Summer e When the SRC Platinum is in Winter and the Outdoor temperature increases above the Cutoff Before the end of the 5th heating
18. a specific schedule setting HELP when clicked on a specific menu item will provide help instructions When powering up the SRC Platinum for the first time it will take you through an 80 second count down followed by the System Startup Settings then another 10 second boot setup and finally end with the system screen Once the control is mounted and wired set up an initial pilot program e Set and adjust System Startup Settings e Set and adjust System Settings e Set and adjust Maintenance e Set and adjust Schedules System Startup Settings Enter menu by pressing SELECT Settings System Startup If entering this menu option after the control has been set several warnings will display with an option of pressing the Select button to continue After the warnings the following options will be displayed in this order e Sensor Type F for Fahrenheit or C for Celsius Operation Mode Boiler or Valve or District Steam Cycle Length Setting a range between 10 to 240 minutes e Valve Positioning Positioning Sensor or Time Based e Valve Motor Time a range between 120 to 600 seconds Sensor Fault setting Output On or Output Off e Day Light Saving Enable or Disable e Aux Relay Mode Aux Schedule Same as Pump or Inverse of Pump Sensor Type F Fahrenheit or C for Celsius SELECT Settings System Startup Sensor Type This option allows you to set the display mode of the sensors and all temperature settin
19. able or Disable Default Enable SELECT Settings System Startup Day Light Saving Enable this feature in areas where Day Light Saving is observed to account for the time changes without having to manually change the time twice a year Aux Relay Mode Aux Schedule Same as Pump Inverse Pump Default Aux Schedule SELECT Settings System Startup Aux Relay Mode e Adjusting this feature to Aux Schedule allows the SRC Platinum to control the Aux relay output based on the Aux Schedule The relay will energize at Close Time and deenergize at Open Time e When Same as Pump option is selected the Aux output relay will behave the same as the Vacuum Pump relay e Inverse Pump option is selected the Aux output relay will behave the opposite of the Vacuum Pump relay e Remember that the Vacuum Pump relay energizes for 10 minutes Prevacuum prior to valve opening As well it energizes for a full cycle time after Burner relay deenergize Date and Time Setting Year Month Day Time SELECT Settings System Startup Set Year Entering the correct date and time assures that the SRC Platinum will make its changes correctly e Use the Select and Adjust button to change date and time values 16 Heat Timer Corp SYSTEM SETTINGS SYSTEM STARTUP SYSTEM SETTINGS 2 District Stea Time Base Continue to Month Day Hours and Minutes MAINTENANCE Positioning Sensor SHIFT SCHEDULES SRC Platinum
20. ack into the enclosure SRC Platinum 9 Install the Sensors i Gold Series Outdoor Sensor Installation e Only use the Heat Timer Gold Series sensor included with the unit 904025 If you are replacing an earlier model Heat Timer it is necessary to upgrade the sensor Locate the sensor in the shade on the north side of the building The sensor should never be in direct sunlight e Be sure the location is away from doors windows exhaust fans vents or other possible heat sources e sensor should be mounted at least 4 inches away from the building wall and approximately 10 feet above ground level Pipe Clamp Pi e The sensor wires be extended up to 500 using shielded 2 conductor cable Do not CSR ground the shield at the sensor 10 Minimum Do not run sensor wires in conduit with line voltage wiring 7 8 Dia Hole Pipe Clamp WARNING The SRC Platinum is an operating control only The boiler must have all safety and limit controls required by code It is the responsibility of the installer to verify that all the safety and limits are working properly before the SRC Platinum is installed Low Voltage CAUTION pos Determining the proper location for the Outdoor Sensor is very important The SRC Platinum will base the heat on the outdoor temperature information it receives from this location If the sensor is in the sun or covered with ice its reading will be different from the actu
21. al Outdoor temperature OD Heating System Sensor HSS Installation Heating System Sensor Installation Locating HSS The ideal location for the HSS is on the last radiator in the system to get warm This radiator is usually the one with the furthest piping distance from the boiler e With a one or two pipe system the sensor may be located high up on the furthest supply riser With a two pipe system the sensor may be located on the furthest return riser However the sensor must be above the water line of the boiler on a dry return e Never install the sensor between a condensate receiver and the boiler Immersion Well Common Supply Pipe 3 8 ID 1 2 NPT a di X Sensor Probe OO Heating System A CAUTION If the HSS can not sense the system is full of steam the SRC Platinum will not provide comfortable heat levels Be sure the HSS is located on a properly vented pipe which can not easily be isolated from the system A CAUTION Since Heating System Sensor HSS affects the operation of the SRC Platinum when Boiler or Valve Operating Mode is selected from the Startup menu HSS fault affects the control operation in Boiler or Valve Operating Mode only Heating System Sensor HSS Installation e Only use a Gold Series sensor If you are replacing an earlier model Heat Timer it is necessary to upgrade the sensor Installa 3 8 ID 1 2 NPT immersion well HT 904011 or equivalent
22. art of the Heating Cycle and pulse the Motorized Valve relays to reach an optimum opening percent based on the Outdoor temperature OD the System temperature SYS Cutoff Percent and Freezing Percent When the calculated time for the Heating Cycle On period elapses the Off period starts The Motorized Valve relays will pulse accordingly based on the Off Cycle Percent as part of the On Cycle percentage After the SRC Platinum terminates the Heating Cycle Off period it will check the status of the System temperature SYS If it is above the System Setpoint it will start a new Heating Cycle otherwise it will go through the Establish Heat procedure before starting a new cycle This will continue till the Outdoor temperature is 2 F above the Day Cutoff In District Steam mode and after terminating the Off Cycle time the SRC Platinum will engage the District Steam Time Delay before stating a new heating cycle 6 Heat Timer Corp Initial Pilot Program Setting an Initial Pilot Program will ease the configuration of the SRC Platinum and will give the opportunity to utilize the features that are to save on energy and give more comfortable heat when needed The program should consist of the following Identifying the type of heating system Selecting the features that your system can utilize Making sure you have the right control and accessories Installation Setting the System Startup Setting the System Settings Setting the Schedules
23. cation in the building or the hardest to heat area On the basis of this combined data the SRC Platinum sends instructions to the heating plant to control the heat level in the building In addition to adjusting the length of the ON part of a cycle the Outdoor temperature OD acts as a system cutoff When the Outdoor temperature rises 2 F above an adjustable cutoff temperature the SRC Platinum will not call for any heat When the Outdoor temperature drops below the cutoff the SRC Platinum will automatically begin controlling the heating cycles Once the heating system has been activated the heating system sensor will register when heat has reached throughout the building The combined effect of these two sensors is to provide an even comfortable level of heat throughout the building The SRC Platinum is able to maintain two different heat levels The Day heat level is the higher level of heat that provides comfortable temperatures when the building is occupied or tenants are active The Night heat level is lower and can be used to conserve energy when the building is empty or when tenants are asleep Both heat levels rely on the identical cycle concept but the lower Night settings provide less heat given the same Outdoor temperature SRC Platinum 5 Boost Vari Boost and Early Shutdown VARI BOOST co The boost 1s designed to return the building to its Normal Day heat level after Night heat level It does it by increasing the motori
24. changed without entering the Password Once the Password is entered you can make multiple changes The Password will expire 15 minutes after the last change has been made Using the Default Password e The SRC Platinum has a built in default Password SRCX Enabling the default Password will prevent most unauthorized users from adjusting the settings but will not prevent Heat Timer service personnel or anyone else with access to this manual from adjusting the panel Toenable the default Password enter the Maintenance menu select Password and follow the prompts to enable the Password e At the Login screen you will have to enter the Password Turn the Adjust knob until the desired letter is shown Then press the Select to move on to the next letter e Enter SRCX into the Login screen e When completed select No to the prompt Change Password 26 Heat Timer Corp Valve Calibration for Valves with Positioning Sensors SELECT Settings Maintenance Valve Calibration When the SRC Platinum is controlling a Motorized Valve with Positioning Sensor feed back and when Positioning Sensor option is selected from the Valve Positioning Startup menu this menu option will allow for calibration of the valve operation Auto Calibration SELECT Settings Maintenance Valve Calibration Auto Calibration This selection automatically sets the valve open and close perimeters Thus eliminating the need for manual calibration using two individ
25. cover screws Remove the SRC Platinum from the metal enclosure Take offthe gutter cover by loosening the screws at its bottom Remove the top center screw holding the panel to the enclosure Loosen the two screws at the bottom of the enclosure Make sure to unscrew any encloser cables Primarily used to connect to computers and remote systems Liftthe panel from the enclosure Screw the enclosure to the mounting surface through the holes provided Rear of Panel BACK OF PLATINUM PANEL Connect Activate the Battery Io Turn the SRC Platinum panel over to reveal the piggyback circuit Modem board CPU board S Software C tt thernet Chip A CAUTION Bi oid Do not install the battery unless you plan to power the control RJ45 Cat 5 cable gece at once If the control is not powered the battery will lose its TM Baie charge in 100 days insane Motherboard Fuse Connecting Modem RS232 RS485 Ethernet or Internet Cables e All panels will include Motherboards and CPU boards e Some panels might include an addition board When connecting a RS232 or RS485 cables a RI board must exist for this connection to operate e Modem Ethernet or internet connection must have the proper boards A modem requires RIM board e Remember that there is no upgrade to Internet panel A purchase of a complete SRC Platinum with RI Net panel is a must Screw the SRC Platinum b
26. e nsert the sensor probe of the supplied immersion sensor HT 904024 into the well and screw the handy box into the threaded top of the well e The sensor wires can be extended up to 500 using shielded 2 conductor cable Do not ground the shield at the sensor Do not run sensor wires in conduit with line voltage wiring 10 Heat Timer Corp Wiring Power Input Wiring Bring the power wires through the bottom left hand knock out of the enclosure Do not bring wires through sides or the top as this will interfere with servicing the control Attach 120V 60 Hz to terminals Line and Neutral Ground terminal must be connected to Ground green screw DO NOT use the neutral line as earth ground Class 1 copper wire is required by UL Class 1 voltages must enter the enclosure through a different opening from any Class 2 voltage wiring vacuum Pump Output Wiring The Vacuum Pump Terminals are dry contacts only They do not source any power Wire the Normally Open N O Pump dry contact terminals to the Vacuum System The N O contacts DO NOT source any power Make sure Vacuum Pump relay is installed Vacuum Pump relay energizes 10 minutes before starting to Give heat Pre Vacuum Vacuum Pump relay de energizes one cycle time after the system shuts down Bumer Output Wiring With direct burner operation burner relay must be used The N O contacts do not source any power Burner relay energizes whenever the Outdoor temperature
27. e Outdoor Temperature OD The Night Time settings allows the SRC Platinum to follow the Night Heat Adjustment and Night Cutoff settings Moreover if the Early Shutdown feature is being set it uses the Night Time setting on the 1st setting of that week day as an Early Shutdown calculation starting point In this case the actual Early Shutdown start time will vary depending on the Outdoor temperature OD In this area of the menu 3 buttons will take effect The NEXT button will allow the scroll between the 4 different settings of a specific week day The DAY button will allow the scroll between all week days The PREV DEL button will erase the Day Time and Night Time settings for a specific day schedule i e 1st Day Time and Night Time schedule on Tuesday Schedule Example Day of Week MON TUE WED THU FRI Day 6 00AM 6 00AM 6 00AM 6 00AM 7 00AM Night 10 00PM 10 00PM 10 00PM 10 00PM 11 00AM Day 1 00PM Schedule 1 2 3 Monday through Thursday Vari Boost begins before 6 am and ends at 6 am Day temperature level is maintained from 6 am to 10 PM Night temperature level is maintained from 10 PM until the Vari Boost the following morning 24 Heat Timer Corp Friday Vari Boost begins before 7 am and ends at 7 am Day temperature level is maintained from 7 am to 11 am Night temperature level is maintained from 11 am to 1 PM Day temperature level is maintained from 1 PM to
28. ecommended if there is too little 11374 heat increase the Boost Adjustment it there is too much heat reduce the Boost Adjustment Refer 9944 to System Settings System Settings 2 Boost Mode Vari menu selection 8714 7653 Have too Little Heat Before the Last Setback Program you may not wish to use the Early Shutdown feature Simply select the Vari Boost instead of Vari Boost ESD Refer to System Settings System Settings 2 Boost Mode Vari menu selection 222 3667 Have too Little Heat too Little Heat Only in Parts of the Building then check the heating 2914 system components Check that there is no air trapped in the system and that the vacuum pump is 2332 working properly 1879 1524 Testing the Sensors 1243 1021 The SRC Platinum sensors record the temperature where they are located Before assuming a 842 sensor is not working it is important to get an accurate reading at the sensor location If the 699 outdoor sensor is affected by sun exhaust fans open doors or windows the reading may vary significantly from the actual outdoor temperature Similarly if the heating system sensor HSS does not appear to be reading correctly check if it is located correctly 583 489 412 To perform the test you will need a digital multi meter capable of reading resistances The Heating System Sensor and Outdoor Sensor temperatures are constantly displayed on the SRC Platinum Remove the outdoor sensor wires from the Out Temp te
29. emperature read by the Heating S stem Sensor HSS The bottom left 15 3 will show the temperature read by the Outdoor Sensor Ifthe display reads or an incorrect temperature follow the troubleshoot procedures at the end of this manual Wireless and MIG sensors readings can only be viewed on Visual Gold or the Internet Setting the Control SRC Platinum Digital display shows the date heating status Valve opening percent outdoor and system temperatures To view and adjust settings press the Adjust Select button 13 Depress the knob to move forward through the menus and to accept changes To change a setting s value rotate the knob ADJUST Display and Changing Settings The SRC Platinum comes with a 80 character 20 character per raw x MOM 4 raws digital display In addition to the right of the display a turn ADJUST and push PRESS TO SELECT knob is used to scroll through settings when turned When PRESS TO SELECT is pushed the menu selection or value is selected A push BACK button is used to go to the previous step on the menus or to display Aux sensor values 5 PRESS TO SELECT w 2 o e e e e Under the display four additional push buttons exist to assist in other menu jn pay 7 functions Depress the button to go back NEXT goes to next schedule time on schedules M e RUNS DAY switches between different week days when in schedules PREV DEL clears
30. es can be extended up to 500 by splicing with 18 gauge shielded sensor wire Do not run sensor wire in conduit with line voltage Wiring Network Sensors Wireless and MIG Remember that network sensors can only be configured remotely through Visual Gold or the Internet The SRC Platinum Network terminals can connect to up to 64 sensors When connecting to multiple sensors a MIG control can be used handle up to 28 sensors each Multiple MIG s can be used to connect to one SRC Platinum Wireless sensors can be used with a Receiver and an Antenna to reduce building sensor wiring The Receiver then can be wired directly to the Network SRC Platinum 11 AUXILIARY WIRING AUX Indicator Light gt Relay AUX Device controlled using Aux Schedule A CAUTION When connecting SRC to the Internet Aux output relay acts a Modem power switch Thus Aux output relay can not be used for anything else OUTDOOR SENSOR WIRING HEATING SYSTEM SENSOR WIRING Wireless Antena Network Sensors Wireless Receiver Platinum Space Sensor Count Sensor Switch Sensor T2 Heat Timer Corp Wiring Valve Positioning Positioning Sensor Mode Valve Position Input Valve Positioning input can be used when a motorized valve with Positioning SHUTDOWN Sensor feed back is used 4 Seo 26 T
31. factory 32 Heat Timer Corp Specifications Voltage Input 120 VAC 60 Hz Power Consumption 30 VA Max Heating Modes Boiler or Motorized Valve District Steam Heating Cycle Length 10 to 240 Minutes Vacuum Pump Output 1 S PS T N O Burner Output 1 S PS T N O Motorized Valve Output 2 S P S T N O Motorized Valve Positioning Modes Positioning Sensor Time Based Motorized Valve Motor Time 120 to 600 Seconds Motorized Valve Positioning Calibration Manual Auto Motorized Valve Syncronization When switched from Winter to Summer and during startup Every 5 cycles when switched from Winter to Summer and during startup Auxiliary Output 1 S PS T N O Output Relay Ratings 1 Amp inductive 6Amp resistive at 120 VAC 60 Hz 15A total for all circuits Temperature Display Fahrenheit or Celsius Display 80 character Alphanumeric 4 raws with 20 characters each Sensor Ranges Outdoor temperature sensor minus 35 F to 250 F Heating system sensor minus 35 F to 250 F Network Sensor Input Up to 64 Sensors Use only Nueron Sensors MIG Wireless Receivers Day and Night Outdoor Cutoff Ranges 20 F to 100 F Day Heat Adjustment Curves AtoP Night Heat Adjustment Curves A to P Vacuum Pump Pre Vacuum 10 minutes Vacuum Pump Post Vacuum 1 complete cycle time Schedules 4 DAY and 4 NIGHT settings per day Aux Clock Schedule 4 OPEN and 4 CLOSE settings per day Morning Boost and Early Shutdown Manual Boos
32. ge SRC Platinum functions Upgrades to this manual may Specifications vx can dead oe m e 32 occur at any time Contact the factory for further details 2 Heat Timer Corp Contents Panel Layout 3 Understanding Operation Concept 4 Cycle Principle 2 ee eee eee mm m 4 Cycle Length Based on Outdoor Temperature 4 Boost Vari Boost and Early Shutdown 5 Sequence of Operation 5 Initial Pilot Program 6 Identifying the Type of Heating System 6 Selecting the Features of the System 6 Making Sure You Have the Right Control 7 Installation ses 2t 8 Mounting the ControlBox 8 Rear of Panel iii 8 Install the Sensors sce ssor e Ee a 9 WINN 2mm e xs 10 Power Input Wiring 10 Vacuum Pump Output Wiring 10 Burner Output Wiring 10 Motorized Valve Output Wiring 10 Aux Output Wiring and Multi Mod Wiring optional 11 Wiring the Outdoor Sensor 11 Wiring the Heating System Sensor HSS 11 Wiring Network Sensors Wireless and MIG 11 Wiring Valve Positioning Positioning Sensor mode 12 Wiring Shutdown Terminals optional 12 Wiring Prove Terminals 12 Wiring Aux input Terminals Optional 12 Testing Sensors liess 12 Setting the Control 13 Display and Changing Sett
33. gs displayed by the SRC Platinum Default F Fahrenheit Operation Mode Boiler or Valve or District Steam Default Boiler or Valve SELECT Settings System Startup Operation Mode e The SRC Platinum can control the heating of a building by either directly controlling the burner and outputting a valve signal to a motorized valve With this setting a SYS Setpoint setting will be available on the System Settings 2 menu When the return temperature reaches the SYS Setpoint the SRC Platinum acknowledges that heat has been established and starts the steam cycle 14 Cycle Length Setting 10 to 240 minutes Default 60 minutes SELECT Settings System Startup Cycle Length Valve Positioning Positioning Sensor or Time Based Default Positioning Sensor SELECT Settings System Startup Valve Positioning Valve Motor Time Available with Time Based Valves 120 to 600 seconds Default 120 seconds SELECT Settings System Startup Valve Motor Time Sensor Fault Output On or Output Off Default Output On SELECT Settings System Startup Sensor Fault Heat Timer Corp If the SRC Platinum was set to District Steam it will start the heating cycle after an adjustable time delay Dist Stm Dly that can be set from the System Settings CAUTION 2 menu When the SRC Platinum is in the Dist Stm Dly the Display will show If the Output Mode is set incorrectly Steam Time as the remaining of the Dist Stm Dly the SRC Platinum will not c
34. he Valve Positioning feed back should have 3 wires Connect the yellow wire to n VP E E input terminal VP A5 on the SRC Platinum The other 2 to A4 and A6 38 8 e Set Valve Positioning Startup Menu to Positioning Sensor AG Black Close cow F wining Shutdown Terminals Optional This feature can be used whenever it is desirable to turn off the SRC Platinum from a remote location or another controller e Atypical use for this feature would be to disable all heat when an Energy Management System EMS indicates a building is overheated e When the Shutdown feature is enabled by closing a dry contact the Burner relay will deenergize The Motorized Valve Close OUTPUT relay will energize while the Motorized Valve Open relay will deenergize The Vacuum Pump relay will continue to be energized for an additional complete Cycle Time Dry Contact e Shutdown signal must be dry contact only No voltage can be placed across A WARNING the SHUTDOWN terminals Never apply external voltage to the Bring the wires from the dry contact to the Shutdown terminals marked A3 A4 input terminals Permanent damage e Shutdown will affect the SRC Platinum only when in Auto mode will occur voiding the warranty Wiring Prove Terminals Prove Signal The Prove feature checks system components are operational before activating the boiler or opening the motorized valve e Ifthe PROVE input terminals are open the SRC Platinum will enable o
35. ht level is used when a building is not occupied or when people are sleeping The SRC Platinum can have up to four Normal and four Night Setback periods for each individual day of the week The SRC Platinum will show which period is it in on the 3rd line of the display Every time the SRC Platinum updates the clock time it checks A CAUTION the Day Night program If there is a matching Day Night time programmed it sets the heat level accordingly otherwise the heat level is not changed This means you do not have to program every day of the week If an office building is unoccupied all weekend simply set the last programmed 4 setting 8 00 PM on Friday Then set all the Saturday and Sunday programs to using the DEL button The control will stay in Night Setback until it reaches a Day setting 6 00AM on Monday The SRC Platinum will ignore any Time setting that reads The 1 setting for any Day Time is used by the Boost The last n setting is used by the Early Shutdown ESD feature Day Night Schedule SELECT Settings Schedules Day Night Schedule Use this setting to set up to 4 Day Time and 4 Night Time settings per each day of the week The Day Time settings allows the SRC Platinum to follow the Day Heat Adjustment and the Day Cutoff settings If the Boost feature is being used it uses the Day Time on the Ist setting of that day as a Boost calculation starting point The actual Vari Boost start time varies depending on th
36. ing to set up to 4 Close Time and 4 Open Time settings per each day of the week to control the status of the Aux Clock Relay The Aux schedule works independently from the Day and Night Schedule The Close Time setting closes the Aux Clock relay allowing activation or deactivation of an external device or control The Open Time opens the Aux Clock relay allowing activation or deactivation of an external device or control In this area of the menu 3 buttons will take effect The NEXT button will allow the scroll between the 4 different settings of a specific week day The DAY button will allow the scroll between all week days The PREV DEL button will erase the Close Time and Open Time settings for a specific day schedule i e 1st Close Time and Open Time schedule on Tuesday Copy Aux Schedule SELECT Settings Schedules Copy Aux Schedule To reduce the need for setting each week Aux Time schedule this feature has been made to allow the copying of the MON Close Time and Open Time schedule settings to all of the reset of the days SRC Platinum 25 Maintenance Enter menu by pressing SELECT Settings Maintenance The Maintenance menu gives access to sensor trimming and Password protection Fast Cycling Valve Trim and Valve Calibration are used by maintenance individuals to adjust and fine tune the operation of the SRC Platinum System and Outdoor Sensor Trim SELECT Settings Maintenance System Trim SELECT Settings Maintenance Outd
37. ings 13 System Startup 13 Sensor suu mex Rm ex ps 13 Operation 13 Cycle Length Setting 14 Valve Positioning 14 Valve Motor Time Available with Time Based Valves Dd don RR 4e 4 wR AR ded ok RU 14 Sensor Fault 2 sers rert addas RES 14 Day Light Saving 15 Aux 15 Date and Time Setting 15 Menu Layout 2 2 2 lll ees 16 System Setting 18 S6 SsOl 64 1 dee gx Re X bee As 18 Day HeatAdjustment 18 Night Heat Adjustment 19 Day Cutoff LL 19 Night Cutoff 19 System Setpoint Available for Boiler or Valve Operation 19 District Steam Delay Available for District Steam Operation 19 Boost and Early Shutdown ESD 19 Boost Manual 20 Boost Vari 2 20 Boost Vari with Early Shutdown 20 Valve SettingS 6 pe 4G ox EORR mg 21 Freezing Valve Opening at 32 F 21 Cutoff Valve Opening at Cutoff Temperature 21 Off Cycle Valve Opening During Cycle Off 21 Close Overdrive 21 Pause length 21 Pulse 21 Remote Interface 22 22 Space Loc
38. is below the Outdoor Cutoff for that time in the schedule Motorized Valve Output Wiring MOTORIZED VALVE With a motorized valve the motor must be of the floating type If WIRING MOTORIZED using a pneumatic valve use the Electro Pneumatic Transducer HT VALVE 926018 00 Wire Terminal 15 to the Common Red of the motor Wire Terminal 14 to the Close White and Terminal 16 to the Open Lights O Black of the motor 2 Relays are required to control a motorized valve Both output relays are N O contacts that do not source any power Relays E Close Common Open FLOATING MOTORIZED VALVE Earth Ground Power Switch Surge Suppressor 120 VAC 60 Hz VACUUM PUMP WIRING VACUUM PUMP Indicator BURNER WIRING BURNER Indicator Light BURNER AUX Output Wiring and Multi Mod Wiring Optional The Aux outputs are an extra set of contacts which switch based either on a separate schedule or Vacuum Pump operation These contacts can be used in place of an external time clock To switch units on or off use the N O dry contacts terminals to open a damper activate a motor or connect to a Heat Timer Multi Mod control in which can modulate up to 20 modulating burners If there is a need to control additional equipment or building functions on a separate schedule wire to the Aux terminals and set the Aux Relay Mode in Startup menu to Aux Sched
39. k 22 Day 22 Night Target uu a Boe we we eR xU 22 Schedules 20 020005 23 Day Night Schedule 23 Copy Schedule 24 Set Date and Time 24 Aux Schedule lll sn 24 Copy Aux Schedule 24 Maintenance 25 System and Outdoor Sensor Trim 25 Fast Cycle Test 25 PasswOEd cx EROR aea 25 Auto Calibration 26 OpenandCloseTrim 26 Manual CAL Open 26 Manual CAL Close 26 Valve Trim for Valves with Time Based Motors 26 Valve Synchronization for Valves with Time Based MOTORS sii Romo ox mo vo X KS Roe 3 8 27 Shift coss eh eae Se Soupe dtu itp 27 Auto Manual Open Bypass 27 Troubleshoot sn 28 Testing the 28 NO Heat Low 29 Too Much Heat i 30 Valve Troubleshoot 31 Specifications 32 Panel Layout Digital display shows the date heating status and Valve open percent outdoor and system temperatures To view and adjust settings press the Adjust Select button CORPORATION HEAT TIMER Depress the knob to move forward through the menus and to accept changes To change a se
40. ning of the valve No synchronization will occur if Positioning Sensor option was selected This selection is only available when Positioning Sensor is selected from the Valve Positioning menu It allows for the adjustment of the SRC Platinum to match the valve motor time In addition this time will be used in the valve synchronization The Heating System Sensor fault affects the SRC Platinum in Boiler or Valve Operating Mode only This selection determines the status ofthe Boiler and Motorized Valve Outputs when A CAUTION either the Outdoor Sensor or System Sensor is at fault sensor reading will blink with Since Heating System Sensor HSS either OPEN or SHORT Also the Display second line will show SENSOR FAULT affects the operation of the SRC This message will not show if System Sensor fails while in District Steam mode Platinum when Boiler or Valve is When Output On is selected and a sensor is at fault the Vacuum Pump and Burner selected as an Operating Mode from relays will energize In addition the Motorized Valve will open to 100 the Startup menu HSS fault affects When Output Off is selected and a sensor is at fault the Burner relay will deenergize the control operation in Boiler or Valve while the Vacuum Pump relay will deenergize after a full cycle time elapses The Operating Mode only Motorized Valve Close relay will energize till valve 1s fully closed then deenergize SRC Platinum 15 Day Light Saving En
41. nly the Vacuum Pump relay The Burner and Motorized valve OUTPUT relays will be deenergized when the PROVE input is open f NO external conditions must be met before the OUTPUT relays are energized DO NOT remove the factory installed jumper across the PROVE terminals SYSTEM PROVE Dry Contact The Prove signal must be a dry contact only No voltage can be placed across the PROVE terminals Bring the two wires from the dry contact to the terminals marked A9 and A10 e Prove will affect the SRC Platinum whether in Manual and Auto CAUTION The PROVE input terminals must be shorted for SRC Platinum to provide heat DO NOT remove the factory installed PROVE jumper unless replacing it with a Prove signal WARNING The PROVE input CAN NOT be used as a safety limit All equipment must have its own certified limit and safety controls as required by local codes Any safety interlock MUST be wired back to the boilers or other equipment as required by code Wiring Aux Input Terminals Optional e Remember that Aux sensors can only be configured remotely through Visual Gold or the Internet e Each Aux terminal can connect to only one temperature sensor e Youcan view Aux sensor values by pressing the Back button on RI RIM and RINet SRC Platinum panels Testing the Sensors e Power up the SRC Platinum e The control will go through a countdown and then the bottom right of the display marked SS will show the t
42. ol will energize the Motorized Valve Close relay for a period determined by the Valve Motor time to synchronize the control and valve When the control first senses a need for heat the Vacuum Pump Burner and Motorized Valve relays will all energize to initialize the system correctly The Vacuum Pump relay will energize for a Pre vacuum period of 10 minutes followed by normal operation o A a w a o a ES w N Once the SRC Platinum has initialized the system and the Outdoor temperature OD falls below the Day Cutoff the control will energize the Burner and the Vacuum Pump for a Pre Vacuum period if in Time Mode will Synchronize the 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 25 motorized valve by energizing the Close Relay for the total Valve Motor Time Following these steps the SRC Platinum will pulse the Motorized Valve Open and Close relays to establish heat and monitor the System temperature SY S till heat is established Establishing heat is terminated when the System temperature SYS reaches the System Setpoint setting This is done to insure that heat has reached all portions of the building During Establishing Heat period the Valve can open to a full 100 Even if Cutoff setting had a smaller value Duration of Early Shutdown in Minutes o Outdoor Temperature in F The SRC Platinum will start the On Cycle p
43. ontrol the After the cycle elapses a new District Steam Delay period Steam Time will start building temperature properly and terminate before a new cycle initiates This selection allows you to adjust the Cycle length of the control This setting in conjunction with the Heat Adjustment SYS Setpoint and Outdoor temperature allows the SRC Platinum to calculate the Cycle On and Cycle Off times During the cycle time the SRC Platinum will display cycle status whether On or Off In addition it will display the number of minutes elapsed within the cycle time followed by the total cycle time A good starting point for Cycle Length is 60 minutes for large buildings The smaller the building the shorter the Cycle Length should be If the SRC Platinum is controlling a motorized valve with a specific motor time Time Based should be selected A Valve Motor Time will follow this option in the Startup menu allowing the selection of motor time A Valve Trim menu option will be available in the Maintenance menu when this option is selected When Time Based is selected the SRC Platinum will synchronize the motor occasionally for accuracy When controlling a motorized valve with a sensor positioning feed back Positioning Sensor must be selected The valve feed back must be wired to A4 A5 and A6 input terminals for the control to operate properly A Valve Calibration menu as an option of the Maintenance menu will allow the adjustment and fine tu
44. oor Trim The Heat Timer thermistor type sensors are very accurate and normally require no calibration Sometimes it may be desirable to make small adjustments to the displayed value for either the Outdoor temperature OD or the System temperature SYS The Trim setting can adjust the displayed value by 5 Do not use the Trim setting to make the Outdoor temperature sensor match that reported on the radio or TV Outdoor temperature can vary widely over a broadcast range Only trim the outdoor sensor based on an accurate thermometer reading taken where the sensor is located Fast Cycle Test OFF ON Default OFF SELECT Settings Maintenance Fast Cycle When in Off SELECT Settings Cancel Fast Cycle When in On The Fast Cycle test allows for the troubleshoot ofthe SRC Platinum This affects all time based functions except for the motorized valve time Password SELECT Settings Maintenance Password The Password is provided to prevent unauthorized users from making changes to SRC Platinum settings Setting up the Password feature is not recommended as it slows down access makes servicing more difficult and can disable the system 1f management or ownership should change The Password feature is not active unless a user enables it If you choose to enable the Password DO NOT forget the Password Write it down and store it in a safe location known to at least one other authorized user When the Password is enabled none of the settings can be
45. or feed back Motorized Valve This must be selected during Startup or from Startup menu Motorized Valve with a Time Based Motor or Positioning Sensor Feed Back Time Based Motorized Valve This allows the SRC Platinum to control a 2 Way Motorized Valve If valve is Time Based meaning the motor has a specific measurable time to open or close Select Time Based from the Valve Postioning menu at Startup or in Starup menu With that the valve motor will be forced to shut close occasionally to synchronize its timing In addition a Valve Trim option will be available in the Maintenance menu to assist in fine tuning the valve position Motorized Valve with Positioning Sensor If the Motorized Valve has Posioning Sensor Feed back the wires can be connected to the A4 A5 and A6 terminals as described later The Positioning Sensor option must be selected from the Valve Positioning menu at Startup or in Starup menu A Valve Calibration menu will be available as an option in the Maintenance menu Selecting the Features of the System The SRC Platinum has been designed with steam heating with vacuum pump as the primary purpose With this in mind many of the SRC Platinum features can be utilized to ease enhance and improve your system performance Some of theses features are listed in this section Schedules By setting an operating Schedule Night Cutoff and Night Heat Adjustment you can save energy while providing comfortable heat to the building The se
46. ring the Day Time schedule the SRC Platinum will Outdoor Cutoff less Outdoor temperature follow the Day Heat Adjust curve SRC Platinum 19 Night Heat Adjust AtoP Default B SELECT Settings System Settings Night Heat Adjust e The Night Heat Adjust allows the SRC Platinum to follow that curve during the Night Time schedule Day Cutoff 20 F to 100 F Default 55 F SELECT Settings System Settings Day Cutoff When the Outdoor temperature falls below this setting during Day Time schedule the SRC Platinum will give heat by energizing the Burner and Vacuum Pump relays followed by the Motorized Valve Open relay after the valve synchronization and Prevacuum periods The valve open curve is the line between this setting at the Cutoff and the Freezing at 32 F during the Day Time schedule Night Cutoff 20 F to 100 F Default 45 F SELECT Settings System Settings Day Cutoff e When the Outdoor temperature falls below this setting during Night Time schedule the SRC Platinum will give heat by energizing the Burner and Vacuum Pump relays followed by the Motorized Valve Open relay after the valve synchronization and Prevacuum periods The valve open curve is the line between this setting at the Cutoff and the Freezing at 32 F during the Night Time schedule System Setpoint Available for Boiler or Valve Operation Mode 70 F to 250 F Default 150 F SELECT Settings System Settings More Settings Sys Setpoint
47. rminals A11 and A12 or the heating system sensor wires from System Temp terminals A1 and A2 Use the multi meter to take a resistance reading across the detached wires going to the sensor If the reading shows e OPEN or resistance is higher than the values on the adjacent chart Check the wires going to the sensor They may have been broken or become disconnected If the wires are fine check the resistance at the sensor itself If the resistance is still open the sensor has been damaged and needs to be replaced e SHORT or resistance is lower than the values on the adjacent chart Check the wires going to the sensor They may have become shorted together in the run of the wire If not check the resistance at the sensor itself If there still is no resistance the sensor has been damaged and needs to be replaced Resistances from 187 ohms to 117720 ohms Find the temperature that corresponds to the resistance value on the chart If the sensor appears to be outputting correctly check that the wires were properly connected to the SRC Platinum inputs If the sensor is not outputting correctly take another reading at the sensor itself If this is correct the problem is in the wiring between the sensor and the SRC Platinum Otherwise the sensor has been damaged and should be replaced No Heat Low Heat SRC is Working fine Wait till Outdoor temperature drop or change Cutoff setting Choose the next letter in the Heat Adj
48. s E change to D Wait 24 hours before making any additional changes Reduce Cutoff Valve Opening by 5 Wait 24 Mild hours before making any additional changes Reduce Freezing Valve Opening by 5 Wait 24 Does Over Heat occur in Cold or Mild Weather hours before Cold making any additional changes Choose the Previous Day and Night Heat Adjustments i e If setting was E change to D Yes Synchronize the valve by switching Auto Calibrate the Valve Motorized Valve have Positioning Yes to summer then back to winter SRC Platinum 31 Valve Troubleshoot Does the Control Find power source Have Power and switch ON Is System Set to Summer or Set Control to Winter Winter Winter SRC is Working fine Wait till Outdoor temperature drop or change Cutoff setting Is Outdoor Temperature Lower than Cutoff The SRC Platinum is working fine Check No Heat Low Heat Auto Calibrate the Does the Valve Move Manual Valve have Auto Bypass Knob to Positioning Manual And Move Sensor the valve using the Adjust Knob SRC Platinum and Motorized valve Resynchronize the Valve by switching Does the Valve from Winter to open or close Summer Yes are fine Check other system components Replace relays If after replacing valve does not move SRC Install Relays Platinum is damaged Contact
49. t Time adjusting from 0 to 90 minutes Valve opens an additional 10 Vari Boost Self adjusting from 0 to 180 minutes Valve opens an additional 1096 Early Shutdown Self adjusting from 0 to 90 minutes Power Backup Lithium coin battery 100 days minimum 5 year replacement Remote Communications 1 RS232 and 1 RS485 RI controls using Visual Gold Software or an EMS system using XML Modem RIM Controls using Visual Gold or Ethernet RI Net only using a web Browser External Inputs 1 Network Input 2 Aux Inputs Positioning Sensor Input Shutdown Input and Prove Input Fast Cycle Capable Allows minutes to turn to seconds during troubleshoots Password Capable Season Winter and Summer Enclosure NEMA 1 Dimensions 5 4 x 13 x 13 Weight 14 pounds um Fairfi 7004 7 75 4004 7 75 4 20 New Dutch Lane Fairfield NJ 07004 973 575 4004 Fax 973 575 4052 http www heat timer com aa CORPORA ION 059110 00 Rev A
50. tting allows the SRC Platinum to reduce the heat based on Night Cutoff setting and a lower operating curve during the night or when building 1s unoccupied i e office buildings and schools During the day Day Time settings will change building temperature to depend on Outdoor temperature OD Day Heat Adjustment Each week day can have up to 4 Day Time and 4 Night Time settings Refer to Schedules menu selection and System Settings Day Heat Adjust menu selection SRC Platinum 7 During the Night Night Time settings will change building temperature to depend on Outdoor temperature OD Night Heat Adjustment Refer to Schedules menu selection and System Settings Night Heat Adjust menu selection Boost e This feature allows the SRC Platinum to bring the building up to temperature quickly after a night setting It does it using the Outdoor temperature as a guide Refer to System Settings System Settings 2 Boost Mode menu selection Early Shutdown ESD e This feature allows the SRC Platinum to shift to Night Time setting before the last n setting for that day The Early Shutdown varies based on Outdoor temperature OD The warmer the Outdoor temperature the earlier the SRC Platinum will shift to Night Setback Refer to System Settings System Settings 2 Boost Mode menu selection Auxiliary Schedule e The Aux output relay in conjunction with the Aux Schedule provides output switching based solely on the time setting of the Aux Schedule
51. tting s value rotate the knob SRC Platinum 3 Depress the button to go back through the menus MENU FUNCTIONS SELECT enters menus or accepts changes ADJUST selects menu items or changes settings BACK returns to previous menu DAY selects next day PREV NEXT steps through output status M MANUAL US AUTO ENCLOSED NCLOSE BYPASS MANAGEMENT EQUIPMENT LISTED 99RA OUTPUT RATINGS 120VAC 6A RESISTIVE 1A PILOT DUTY 15A TOTAL FORALL CIRCUITS INPUT RATINGS 115VAC 60Hz 30VA MAX USE COPPER WIRE CLASS 1 WIRE ONLY HELP DEL VACUUM PUMP BURNER PREV AUX CLOCK DAY MOTORIZED VALVE CLOSE OPEN e NEXT DO NOT APPLY ANY VOLTAGE TO SENSOR TERMINAL INPUTS ADJUST PRESS TO SELECT w 2 o A aog TT 2 3 a OS 3 SAFETY GROUND MUST BE CONNECTED MADE IN U S A Green Ground screw must be 120VAC connected to Power Earth Ground BYPASS position mechanically overrides outputs so the valve and burner are always active DRY CONTACT ONLY p VACUUM BURNER PUMPA Vacuum Pump Output is active heat and has optional Run On CLOSE OPEN MOTORIZED VALVE Aux Clock status is programmable based on Aux time schedule when SRC requires Only available with the Remote Communications package
52. uals at the control and at the valve locations Upon selecting this option the Motorized Valve Open relay will pulse until the Positioning Sensor feed back stabilizes Then the Motorized Valve Close relay will do the same This will allow the SRC Platinum to register the upper and lower readings from the valve Potentiometer Open and Close Trim 0 to 5 Default 1 2 SELECT Settings Maintenance Valve Calibration Open Trim SELECT Settings Maintenance Valve Calibration Close Trim This option allows for linkage and operation variation when the valve is being fully opened or fully closed by the SRC Platinum The Close Trim value is important to set if the Close Overdrive has been set to 0 seconds Manual CAL Open No Yes Default No SELECT Settings Maintenance Valve Calibration Manual CAL Open This option allows for the registering of the valve open position in the SRC Platinum memory This will be the position that the display will show as 100 valve open In addition this value combined with the close position value will determine the rest of the valve opening percentages Manual CAL Close No Yes Default No SELECT Settings Maintenance Valve Calibration Manual CAL Close This option allows for the registering of the valve close position in the SRC Platinum memory This will be the position that the display will show as 096 valve close Valve Trim for Valves with Time Based Motors SELECT Settings Maintenance Valve
53. ule option Install a relay on the Aux Clock output Wire the terminals marked Aux Clock to the equipment These terminals do not source power They act as a dry contact only If connecting to a Multi Mod wire these terminals to Multi Mod A3 and A4 Shutdown terminals Furthermore you must set the Aux Relay Mode in Startup menu to Inverse of Pump option When using SRC Platinum with RINet the Aux Output relay acts a Modem power switch In this case Aux Output relay can not be used for anything else A CAUTION Each relay is rated at 1 amp inductive 6 amps resistive at 120V The total output of all relays must not exceed 15A Wiring the Outdoor Sensor The SRC Platinum is designed to be connected to a HT 904025 00 Outdoor sensor Attach the sensor wires to the Out Temp terminals A11 and A12 Temperature sensors have no polarity Connect the shield to the right hand O terminal with a circle next to it Outdoor sensor wires can be extended up to 500 by splicing with 18 gauge shielded sensor wire Do not run sensor wire in conduit with line voltage Wining the Heating System Sensor HSS The SRC Platinum is designed to be connected to a HT 904024 00 temperature sensor for immersion in 3 8 ID well HT 904011 00 or equivalent Attach the sensor wires to the SYSTEM TEMP terminals A1 and A2 Temperature sensors have no polarity Connect the shield to the right hand O terminal with a circle next to it Temperature sensor wir
54. ustments Do not Cold make any more Outdoor changes within 24 hours Does the Control NO Have Power Yes Is System Set to Summer or Winter Summer Winter Temperature Lower than Cutoff Yes Is Vacuum Pump Running NO Yes Is Burner ON NO When does under heat occur Outdoor All Weather If under heat occurs after Night Time Increase morning boost If it happens all the time increase Valve opening percents at both Freezing and Cutoff or choose the next letter in Heat Adjustment Replace relay IK Yes Mild Increase the Outdoor Cutoffs Or increase Valve Cutoff 96 SRC Platinum Find power source and switch ON Set Control to Winter Is there a relay Vacuum Pump socket NO Install a Relay Yes Knob to Bypass Is Vacuum Pump components Is there a relay on Burner socket NO Install a Relay Yes Switch Knob to Bypass Is Burner Running Check wiring and components Yes Replace relay Check wiring and 29 30 Heat Timer Corp Too Much Heat Choose the Decrease Boost Previous Night Adjustment Heat Adjust E t Night Day eat occurs after After Night i th SALARIUSIMENE Schedule Schedule ight Schedule or Schedule MUEINEROn Manual or Vari Boost i e If setting was B change to A Choose the Previous Day Heat Adjustment i e If setting was Alway
55. y will alternate between the Day Ext and the Extended Time balance remaining in minutes indicating the Extended Day mode Auto Manual Open Bypass MANUAL The switch must be in the AUTO position for the SRC Platinum to control the Vacuum Pump Burner and the Motorized Valve In the Open Bypass position the Vacuum AUTO Pump Burner and Motorized Valve Open relays will run constantly That will leave the burner to run on its limits and the motorized valve will be fully open In the OPEN Manual position the Vacuum Pump and Burner will run constantly The Adjust dial BYPASS knob will control the valve opening percentage When the SRC Platinum is in the Open Bypass position no normal functions will be executed The display will change to read the total amount of time the control has been in Bypass Open The display will show the number of days hours and minutes the SRC Platinum has been in Open Bypass The Bypass Open switch directly connects the Normally Open contacts 4 to 5 contacts 9 to 10 and contacts 15 to 16 Therefore if there is no heat test the Vacuum Pump and Boiler or Motorized Valve by putting the control in Open If the units do not run the problem is not with the SRC Platinum panel The Manual position activates the Vacuum Pump and Burner relays But allows the adjustment of the Valve opening manually using the Adjust turn knob Remember that the Pulse Close Pause Length will still take effects in this mode
56. ycle principle which was created specifically for steam heating systems The Cycle concept was developed by Heat Timer to overcome the inabilities of standard thermostatic controls to cope with the unique challenges of steam heating The temperature of steam can not be regulated as with hydronic systems In addition steam heat can not be switched on and off instantaneously as with hot air systems Instead it takes time to build up a head of steam Once the system starts heating up it has momentum which can not be quickly stopped 100 Open 10 at the Day Cutoff Opel 50 Freezing ur Heat Timer s theory of steam reset heating is as follows Pulse the valve open to a limited valve position very slowly filling the system with 80 steam and starting a timed heating period The valve position will be determined by two adjustable points The first point is the percent the valve should be open when the control starts giving heat 1 e at the Day Outdoor Set Point typically 55 F The second point will be the percent the valve should be open at freezing i e at 32 F The time of the heating period will vary according to the Outdoor temperature OD and the Heat Adjustment settings When this timed heating period is over the valve will close either partly or fully as adjusted by the operator This will cause two things to happen First as steam turns back into 30 water all the energy it carries is released in the form of BTUs which
57. zed valve opening by 1096 above the Day calculated percentage There are two types of boosts in the SRC Platinum The manual boost which allows the change of the amount of time required to start the Boost before the Day schedule The Vari Boost increases the motorized valve opening as the manual boost The difference is the initial start time The Vari Boost depends primarily on the Outdoor temperature and the Boost Adjustment boost curve selection See Boost and Early Shutdown a A a o Early Shutdown is a feature that allows a commercial building that is not occupied during Night heat level to be shutdown earlier The SRC Platinum calculates the time period from the last Schedule setting for that day based on Outdoor temperature OD and the Boost Adjustment boost curve selection 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 25 The warmer it is outside the earlier the SRC Platinum will shift to Night At 55 F Outdoor Temperature in F Outdoor Temperature OD the Early Shutdown is the longest of 90 minutes At 25 F Outdoor Temperature OD there is no Early Shutdown or Early Shutdown is 0 minutes See Boost and Early Shutdown arm up Prior to Morning Boost 0 to 180 Minutes Duration of Morning Boost in Minutes EARLY SHUT DOWN Sequence of Operation E a When the SRC is powered up the contr
Download Pdf Manuals
Related Search
Related Contents
RWT310/320 SERIES TRANSDUCER USER MANUAL User Guide - It works! Text MFS4, MFS5, MFS6 Version B.fm Logiciel interne (firmware) du DiMAGE X1 Ver.1.10 DECAP + GEL EXPRESS TEFAL FZ300010 Instruction Manual y descarga el manual de usuario - Inter-M CLUB3D DVI to VGA video converter/adapter Copyright © All rights reserved.
Failed to retrieve file