Home

User Manual Alarm Sheets

image

Contents

1. returns it to FM IB Betrieb AC 2 After the user has filled out the relevant sections of the alarm sheet he she has to return it as soon as possible but no later than one week after reception to FM IB Betrieb Only after having received the correctly filled out alarm sheet FM IB Betrieb will connect the installation in question to the building automation system and the alarm sheet is deposited at ED Now if an alarm occurs the responsible unit takes action as defined on the alarm sheet and if necessary contacts the users concerned From 7 to 17 o clock it is FM IB Betrieb which is alarmed ED has a monitoring role and reacts if an alarm is not reset in due time From 17 to 7 o clock ED forwards an alarm either to the stand by duty service or to the Security Service In case of a gas alarm but not in case of a false alarm ED informs COBRa immediately COBRa in turn takes over first response or supports the users in solving the problem Annually FM IB Betrieb sends out a reminder to the users telling them to check the correctness of their alarm sheets and to notify FM IB Betrieb of possible changes How to proceed if there are changes The users ask the relevant FM IB Betrieb employee building area to send them the original alarm sheet always administered by the relevant building area the users receive a copy respectively make the necessary corrections and return the adapted original to the building area The latter are respo
2. ETH Eidgen ssische Technische Hochschule Z rich Swiss Federal Institute of Technology Zurich Facility Management IB Betrieb User Manual Process Alarm Sheets ETH Zurich General information For installations which are to be connected to the building automation system the users have to fill out so called alarm sheets These contain information on how to proceed in case of an incident if an alarm reaches the Emergency Desk ED According to the Service Level Agreement of the Facility Management Infrastructure Division FM IB Betrieb there are four different alarm categories AC however only for two of them alarm sheets have to be created e AC 1 Personal and animal protection alarms 15 minutes intervention time e AC 2 Technical alarms property protection 15 minutes intervention time For AC 1 and AC 2 intervention time in case of an alarm a defect is essential Out dated contact details lead to delayed intervention which in turn might lead to aggravated consequences For this reason we have compiled information on when to fill out a new alarm sheet what information to fill in and when to update it Alarm sheet filling it out and keeping it up to date e lf a request for a new installation has been submitted to the building and construction unit by a user FM IB Betrieb issues a new alarm sheet as well as a standardised installation code and fills in the top section of the alarm sheet e Thereupon FM IB B
3. etrieb sends the alarm sheet to the user concerned who in turn fills in the relevant information Important in this respect is that o the alarm sheet lists at least three persons who can be contacted by ED in case of an alarm 1 the safety officer of the group in question 2 the lab safety officer of the group in question 3 the employee of the group who uses the installation the most These persons have to know what to do in case of an alarm they have to be trained by the provider of the installation and they have to refresh this knowledge periodically What is equally important is that these persons speak German well enough to be able to correctly inform ED in case of an incident o the alarm sheet contains clear information on the proceeding in case of an incident o The safety officer of the institute concerned should be listed on the alarm sheet as well Thus he she can be contacted if the persons mentioned above are not available 1 3 2014 1 2 ETH Eidgen ssische Technische Hochschule Z rich Swiss Federal Institute of Technology Zurich Facility Management IB Betrieb 1 3 2014 AC 1 After the user has filled out the relevant sections of the alarm sheet he she has to send it as soon as possible but no later than one week after reception to the Safety Security Health and Environment SSHE unit section for Chemical Occupational and Biological Safety and Radiation Protection COBRa COBRa checks the sheet and then
4. nsible for depositing the alarm sheet at ED again 2 2

Download Pdf Manuals

image

Related Search

Related Contents

LAR-15 RifLes And PistoLs oPeRAting & sAfety instRuction MAnuAL  Pleasant Hearth FC-5904 Installation Guide  Conditions générales de vente  

Copyright © All rights reserved.
Failed to retrieve file